Upload
others
View
5
Download
0
Embed Size (px)
Citation preview
Hammersmith Bridge: proposed temporary walking and cycling bridge We’d like your views on plans for a temporary walking and cycling bridge over the river.
Background
The existing Grade II* Listed Hammersmith Bridge requires extensive repairs to protect it for the future.
The bridge is currently closed to all motorised vehicles but remains open for people to continue to walk and cycle across.
To do the repairs to the bridge quickly and safely it may need to be fully closed.
Therefore to maintain this link across the river during the repairs Hammersmith & Fulham Council have asked us to consider installing a temporary walking and cycling bridge.
The proposal The installation of a temporary prefabricated, steel walking and cycling bridge alongside, and at a similar height to, the existing bridge.
The proposed bridge would be:
• Step-free with a 5.5 metre space for pedestrians and cycles.
• Accessed by shallow ramps from Queen Caroline Street from the north and from close to the junction of Castelnau and Riverview Gardens from the south.
• Supported by two piers, each comprising four piles, located in the river.
ChancellorsWharf
Queen’sWharf
R I VE R
TH
AM
ES
Frank Banfield Park
FurnivalGardens
PLAYFAI R
S TREET
ST. EDM
UN
DS
SQU
ARE
DI S T I L L E R Y L A N ECHA N C E LLOR S
S T R E E T
HA
MM
ERSMI T
H
BR IDG
E RO
AD
THE SQ
UA
RETH
E SQU
ARE
S U S S E X P L A C E
AN
GE
LW
ALK
D O W N P L A C E
CA
MB
RID
GE
GR
OV
E
UP P E R M A L L
MA
CB
ET
HS
TR
EE
T
TE
ER
TS
EB
MO
CLO
H
CR
OM
WE
LLA
VE
NU
E
DOW N P L A C E
DIM
ES
PL
AC
E
EC
ALP
ELY
GR
A
A L B I ON P L A C E
A L B I ON M E W S
CA
MB
RID
GE
GR
OV
E
K E B L E P L A C E
F I E L D I N GM E W SN
OW
EL
LR
OA
D
NO
WE
LL
RO
AD
GL
EN
TH
AM
GA
RD
EN
S
L I L L I A N R O A D
R A V E N S C O U R TP L A C E
W I N S L OWR OA D
L O C H A L I N E S T R E E T
PA R F R E Y S T R E E T
C O LW I T H R O A D
R O S E D E W R O A D
B E R Y L R O A D
B I S C AY R O A D
YE LDHA MR OA D
KCI
WR
ET
TU
B
H A M M E R S M I T HB R O A D W AY
SN
ED
RA
G E
TU
B
S K E LW I T H R O A D
C O LW I T H R O A D
RA
NN
OC
HR
OA
D
R I V ERV I EW G
ARDEN
S
MA
NB
RER
OA
D
W I N S LOWR OA
D
THA
MES
PATH
DI S T I LLE R
YRO
AD
S T. JA M E S S T R E E T
CR I S P ROAD
C H A N C E L L O R ’ S R O A DQUE E N
C A R OL I N E S T R E E T
R U T L A N D GR OV E
W OR L I DG E S T R E E T
QU
EENC
AR
OL I
NE
STR
EET
WEI
VE
GDI
RB
BR
IDG
E A
VEN
UE
EU
NE
VA
EG
DIR
B TE
ER
TS
ENI
LO
RA
C N
EE
UQ
B L A C K ’ S R O A DB L A C K ’ S
R OA D
LE
AM
OR
E S
TR
EE
T
TE
ER
TS
ER
OM
AEL
CA
MB
RID
GE
GR
OV
E
MA
L L R
OA
D
R I V E R S I D E G A R D E N SNIG
EL
PLA
YFA
I RA
VE
NU
ES
TU
DL
AN
D S
TR
EE
T
SW
EM
ET
AGL
EF
DA
OR
AN
ELA
G
T R I N I T Y C H U R C H R OA D
JEN
NER P
LAC
E
MERTH
YR T ERRACE
N OW E LL R OA D
BO
ILEA
U R
OA
D
ARUN
DEL T E RRACE
CLAVER I NG
AVENU
E
DA
OR
S’A
DLIH .T
S
G L E N T HA M R OA D
G L E N T H A M R O A D
RIV
ER
CO
UR
T R
OA
D
WE
LTJ E
RO
AD
RIV
ER
CO
UR
T R
OA
D
DA
OR
EJ
TLE
W
RA
VE
NS
CO
UR
T R
OA
D
DA
OR
GNILL
AD
FU
LH
AM
PA
LA
CE
RO
AD
H A M M E R S M I T H F L Y O V E R
SH
EP
HE
RD
’SB
US
HR
OA
D
HA
MM
ER
SM
IT
HB
RI
DG
ER
OA
D
B
RI D
GE
RO A D
HA
MM
ER
SM
I T H
K I N G S T R E E T
BE
A D O NR O A D
G L E N T H O R N E R O A D
K I N G S T R E E T
L O N S D A L E R O A D CA
ST
EL
NA
U
K I N G S T R E E T
H A M M E R S M I T H R D
G R E A T W E S T R O A D
Hammersmith Pier
RavenscourtPark
RavenscourtPark
Hammersmith(Circle and Hammersmith & City)
Hammersmith(Circle and Hammersmith & City)
Hammersmith(District and Piccadilly)Hammersmith(District and Piccadilly)
HammersmithHammersmithHammersmithHammersmithHammersmithHammersmithHammersmithHammersmithHammersmithHammersmithHammersmithHammersmithHammersmithBroadwayBroadwayBroadwayBroadwayBroadwayBroadwayBroadwayBroadwayBroadwayBroadwayBroadwayBroadwayBroadwayBroadwayBroadwayBroadwayBroadway
Fulham ReachFulham ReachFulham ReachFulham ReachFulham ReachFulham ReachFulham ReachFulham ReachFulham Reach
King Henry’sReach
Kings MallShopping Centre
HammersmithBridge
© Crown copyright and database rights 2020 Ordnance Survey 100035971© Copyright Transport for London 2020
QUEEN CAROLINE STREET
RIVERVIEW GARDENSCASTELNAU
Proposed temporary bridge location
The proposal
Elevation(Scale 1 : 300)
Plan(Scale 1 : 300)
Drawing No:
Rev.
Title:
Revision Details Drawn By Auth ByChecked By Date
23677-23544-P-102B
Mabey BridgeUnit 9 Lydney Harbour Estate, Harbour Road
Lydney, Gloucestershire, GL15 4EJ : +44 (0)1291 623801
www.mabeybridge.com
© Copyright
This drawing must not be reproduced, copied or disposedof directly or indirectly or used for any purpose other thanthat of which it is specifically provided.
The apparatus as shown in this drawing is of a proprietarynature and is covered by patents.
Scale: As shownDo not scale from this drawingOriginal sheet size = A1 (841x594mm)
Mabey Delta Bridging
United Kingdom
U K A SMANAGEMENT
SYSTEMS
021
SCCS
General Arrangement for a Multi Span (19/SJ/19/SJ/10 Bay) 218.390m Bridge5.25m Roadwidth - Steel Deck Units with Anti-Skid
SS%6130238+/SS%6130238+/SS6130238 ConstructionComplete with SmartEdge Panels
B
A Original
Overall & Clearance Dimensions Revised
PW
PW
ILL
ILL
- 10/12/2019
16/12/2019
North EndBase End of Bridge
(Fixed Bearings)
South EndApex End of Bridge(Sliding Bearings)
Pier 2Pier 1
Preliminary
This drawing is indicative only.All details may be subject to change at final design stage.
85.5m Bearing Centres
1.195m Span Junction
85.5m Bearing Centres
1.195m Span Junction
45.0m Bearing Centres
218.390m Bearing Centres Overall
5.474m
4.5
m
Steel Deck Units with Anti-Skid
XHSXHS XHS XHS
S
W
E
N
6.746m
1 to 20
1 to 16
1 to 6
1 to 16
Riverside
Shingle
5.7m
Mean H
igh Water
Flood Gates
11 to 20
1 to 4 Adela House
5.7m
2
Charlotte HouseAlexandra House
Queen's Wharf
Caroline H
ouse
5
1 to 6
1 to 141
1 to 20
LB
1 to 20
Henrietta House
6.5m
Mean H
igh Water
House
MP
Phillippa
PH
Hammersmith Bridge
El Sub Sta
Studios
1
1 to 40
Shingle
7 to 12
1 to 10
MP
107
Isabella House
El Sub Sta
Sophia Ho
MP
4.2m
220
9.2m
Eleanor House
222
Castelnau Mansions
Posts
Hammersmith Bridge
Castelnau
QUEEN CAROLINE STREET
45000 85500 85500
SOUTH ABUTMENT NORTH ABUTMENT
PLAN
NORTH PIERSOUTH PIER
X = 522957.6441
Y = 178024.0930
65432 7 8 9 10 11 12 13 14 15 161
65432 7 8 9 10 11 12 13 14 15 161
I
J
H
G
L
K
D
C
E
F
A
B
I
J
H
G
L
K
D
C
E
F
A
B
Document Number
Scale
Title
Project Title
Document Number Revision
This drawing and the informationcontained herein is the property of
COSTAIN OIL, GAS & PROCESS LTD.and is provided on condition that it will notbe reproduced, copied, lent or disclosed,
directly or indirectly, nor used forany other purpose than that for which it is
specifically furnished.
COSTAIN - NATURAL RESOURCES DIVISIONCostain House1500 Aviator Way, Manchester Business ParkManchester M22 5TG
A1-A, 07-2-14 (A1 841mm x 594mm)
Web: www.costain.com
Hammersmith Temporary Bridge
Temporary BridgePreliminary General Arrangment
NTS 0013-01-001-SK001 P02
0013-01-001-SK001 P02
Reviewed ByApproved ByChecked ByDrawn By
Rev
Status Dat
e*
*
*
****
****
Reviewed ByApproved ByChecked ByDrawn By
Rev
Status Dat
e*
*
*
****
****
Reviewed ByApproved ByChecked ByDrawn By
Rev
Status Dat
e*
*
*
****
****
Reviewed ByApproved ByChecked ByDrawn By
Rev
Status Dat
eP01
PRELIMINARY 04.0
3.20 JB
---
FOR DISCUSSION ONLY
NOTES1. Do not scale this drawing. All details are indicative
only prior outline design.2. Details may be subject to change based on additional
survey information and design development.3. Locations of piers and abutments are subject to
approval from relevant authorities and stakeholdersin consultation with relevant geotechnical,navigational and UXO reports and risk assessments..
4. Final bridge design and layout to be confirmed bytemporary bridge designer.
5. Confirmation of piling in river subject to designdevelopment by piling contractor.
6. Confirmation of abutment construction and abutmentpiles subject to design development.
7. Ramp construction to be proprietary lightweightmodular steelwork. Details subject to conclusion ofstats / services information.
8. Drawing issued as preliminary for discussion purposesonly and details may be subject to change.
N
ELEVATION
Soffit = 5.93mAODSoffit = 8.13mAOD
Soffit = 5.93mAOD
Fall 1:39Fall 1:20SOUTH ABUTMENT
SOUTH PIER NORTH PIERNORTH ABUTMENT
LOCATION
PLAN - TEMPORARY BRIDGE
SOUTH RAMP
NORTH RAMPSOUTH ABUTMENT SOUTH PIER NORTH PIER NORTH ABUTMENT
South abutment
Queen Caroline Street
Crisp
Road
Riverside Studios
Existing footpath / towpath
INDICATIVE SECTION
PRELIMINARYFOR DISCUSSION
Reviewed ByApproved ByChecked ByDrawn By
Rev
Status Dat
eP02
PRELIMINARY 06.0
3.20 JB
---
FOR DISCUSSION ONLYSOUTH SITE AMENDED
1 to 20
1 to 16
1 to 6
1 to 16
Riverside
Shingle
5.7m
Mean H
igh Water
Flood Gates
11 to 20
1 to 4 Adela House
5.7m
2
Charlotte HouseAlexandra House
Queen's Wharf
Caroline H
ouse
5
1 to 6
1 to 141
1 to 20
LB
1 to 20
Henrietta House
6.5m
Mean H
igh Water
House
MP
Phillippa
PH
Hammersmith Bridge
El Sub Sta
Studios
1
1 to 40
Shingle
7 to 12
1 to 10
MP
107
Isabella House
El Sub Sta
Sophia Ho
MP
4.2m
220
9.2m
Eleanor House
222
Castelnau Mansions
Posts
Hammersmith Bridge
Castelnau
QUEEN CAROLINE STREET
45000 85500 85500
SOUTH ABUTMENT NORTH ABUTMENT
PLAN
NORTH PIERSOUTH PIER
X = 522957.6441
Y = 178024.0930
65432 7 8 9 10 11 12 13 14 15 161
65432 7 8 9 10 11 12 13 14 15 161
I
J
H
G
L
K
D
C
E
F
A
B
I
J
H
G
L
K
D
C
E
F
A
B
Document Number
Scale
Title
Project Title
Document Number Revision
This drawing and the informationcontained herein is the property of
COSTAIN OIL, GAS & PROCESS LTD.and is provided on condition that it will notbe reproduced, copied, lent or disclosed,
directly or indirectly, nor used forany other purpose than that for which it is
specifically furnished.
COSTAIN - NATURAL RESOURCES DIVISIONCostain House1500 Aviator Way, Manchester Business ParkManchester M22 5TG
A1-A, 07-2-14 (A1 841mm x 594mm)
Web: www.costain.com
Hammersmith Temporary Bridge
Temporary BridgePreliminary General Arrangment
NTS 0013-01-001-SK001 P02
0013-01-001-SK001 P02
Reviewed ByApproved ByChecked ByDrawn By
Rev
Status Dat
e*
*
*
****
****
Reviewed ByApproved ByChecked ByDrawn By
Rev
Status Dat
e*
*
*
****
****
Reviewed ByApproved ByChecked ByDrawn By
Rev
Status Dat
e*
*
*
****
****
Reviewed ByApproved ByChecked ByDrawn By
Rev
Status Dat
eP01
PRELIMINARY 04.0
3.20 JB
---
FOR DISCUSSION ONLY
NOTES1. Do not scale this drawing. All details are indicative
only prior outline design.2. Details may be subject to change based on additional
survey information and design development.3. Locations of piers and abutments are subject to
approval from relevant authorities and stakeholdersin consultation with relevant geotechnical,navigational and UXO reports and risk assessments..
4. Final bridge design and layout to be confirmed bytemporary bridge designer.
5. Confirmation of piling in river subject to designdevelopment by piling contractor.
6. Confirmation of abutment construction and abutmentpiles subject to design development.
7. Ramp construction to be proprietary lightweightmodular steelwork. Details subject to conclusion ofstats / services information.
8. Drawing issued as preliminary for discussion purposesonly and details may be subject to change.
N
ELEVATION
Soffit = 5.93mAODSoffit = 8.13mAOD
Soffit = 5.93mAOD
Fall 1:39Fall 1:20SOUTH ABUTMENT
SOUTH PIER NORTH PIERNORTH ABUTMENT
LOCATION
PLAN - TEMPORARY BRIDGE
SOUTH RAMP
NORTH RAMPSOUTH ABUTMENT SOUTH PIER NORTH PIER NORTH ABUTMENT
South abutment
Queen Caroline Street
Crisp
Road
Riverside Studios
Existing footpath / towpath
INDICATIVE SECTION
PRELIMINARYFOR DISCUSSION
Reviewed ByApproved ByChecked ByDrawn By
Rev
Status Dat
eP02
PRELIMINARY 06.0
3.20 JB
---
FOR DISCUSSION ONLYSOUTH SITE AMENDED
Section drawings of proposed bridge
Location of proposed temporary bridge
Proposed south worksite boundary
Proposed north worksite boundary
1 to 20
1 to 6
LBMoP
Riverside
Shingle
TCB
Sports Court
5.7m
Mean H
igh Water
D Fn
1 to 4 Adela House
2
Charlotte HouseAlexandra House
Queen's Wharf
5
107a
1 to 141
1 to 20
HAMMERSMITH BRIDGE ROAD
Shelter
Shingle
Caroline H
ouse
HAMMERSMITH BRIDGE ROAD
1 to 12
Rowing Club
Henrietta House
Mean H
igh Water
House
to
84
Phillippa
20 to 29
El Sub Sta
Digby Mansions
Studios
1
1 to 40
Shingle
7 to 12
MP
107
12a
Edith House
Isabella House
El Sub Sta
Sophia Ho
6.2m
30
Eleanor House
38
6
94
Castelnau Mansions
14 to 19
Posts
Castelnau
QUEEN CAROLINE STREET
65432 7 8 9 10 11 12 13 14 15 161
65432 7 8 9 10 11 12 13 14 15 161
I
J
H
G
L
K
D
C
E
F
A
B
I
J
H
G
L
K
D
C
E
F
A
B
Document Number
Scale
Title
Project Title
Document Number Revision
This drawing and the informationcontained herein is the property of
COSTAIN OIL, GAS & PROCESS LTD.and is provided on condition that it will notbe reproduced, copied, lent or disclosed,
directly or indirectly, nor used forany other purpose than that for which it is
specifically furnished.
COSTAIN - NATURAL RESOURCES DIVISIONCostain House1500 Aviator Way, Manchester Business ParkManchester M22 5TG
A1-A, 07-2-14 (A1 841mm x 594mm)
Web: www.costain.com
Hammersmith Temporary Bridge
Temporary BridgeProposed Location Plan
NTS 0013-01-001-SK002 P02
0013-01-001-SK001 P02
Reviewed ByApproved ByChecked ByDrawn By
Rev
Status Dat
e*
*
*
****
****
Reviewed ByApproved ByChecked ByDrawn By
Rev
Status Dat
e*
*
*
****
****
Reviewed ByApproved ByChecked ByDrawn By
Rev
Status Dat
e*
*
*
****
****
Reviewed ByApproved ByChecked ByDrawn By
Rev
Status Dat
eP02
PRELIMINARY 06.0
3.20 JB
---
FOR DISCUSSION ONLYSOUTH SITE AMENDED
Reviewed ByApproved ByChecked ByDrawn By
Rev
Status Dat
eP01
PRELIMINARY 05.0
3.20 JB
---
FOR DISCUSSION ONLY
NOTES1. Do not scale this drawing. All details are indicative
only prior outline design.2. Details may be subject to change based on additional
survey information and design development.3. Locations of piers and abutments are subject to
approval from relevant authorities and stakeholdersin consultation with relevant geotechnical,navigational and UXO reports and risk assessments..
4. Final bridge design and layout to be confirmed bytemporary bridge designer.
5. Confirmation of piling in river subject to designdevelopment by piling contractor.
6. Confirmation of abutment construction and abutmentpiles subject to design development.
7. Ramp construction to be proprietary lightweightmodular steelwork. Details subject to conclusion ofstats / services information.
8. Drawing issued as preliminary for discussion purposesonly and details may be subject to change.
N
SOUTH RAMP
NORTH RAMP
PRELIMINARYFOR DISCUSSION
Proposed worksite boundary
Proposed worksite boundary (at bridge deck level)
The benefits The temporary bridge would:
• Maintain safe access for people walking and cycling across the river during the repairs.
• Be installed and removed quickly, keeping local construction impacts to a minimum.
• Provide step-free access via ramps at a safe gradient and allow boats the same headroom as the existing bridge.
• Enable the repair works to the existing bridge to be completed as early as possible.
Computer generated image of the proposed temporary bridge
Artist’s impression of the proposed temporary bridge
The environment The proposed bridge has been designed with the aim of minimising environmental impacts and the proposed planning application will provide more information about how we will seek to mitigate any concerns.
We would like to hear your views on how the landing points should be restored when the temporary bridge is removed and, in particular, how the area at the end of Queen Caroline Street should be restored for the benefit of the local community.
Your views are important to us Please let us have your views, by speaking to a TfL representative here today, filling in our feedback form, emailing us at [email protected], or writing to us at: Freepost, TfL Feedback
Next steps
Review of feedback ongoing local engagement
Submission of planning applications to Hammersmith & Fulham and Richmond Councils
Planning application decision
Start of proposed temporary bridge works
Start of next phase of repair works to existing bridge*
Temporary bridge opens
spring 2020
summer 2020
summer2020
winter/spring 2020/21
winter 2020/21
* Subject to Hammersmithand Fulham Council