Upload
others
View
13
Download
0
Embed Size (px)
Citation preview
Hamelin Pool Stromatolites Conservation and Management
Adapting to ecosystem change in the Shark Bay World Heritage Site – June 6, 2018
Erica P. Suosaari
Conserving our heritage by learning, protecting and inspiring
Long-termmonitoring
Long-termmonitoring• Discrete measurements
• pH • Alkalinity • TDS • Trace elements • Stable Isotopes • Saturation state modeling • Rare Earth elements • 87Sr / 86Sr
Long-termmonitoring• Microbial Mat monitoring
• High-resolution drone imagery transects
• Microscopy • Molecular • Geochemistry
Reid et al. 2017
Long-termmonitoring
GapsinKnowledge• What are the short and long-term patterns of temperature, salinity and
water level in Hamelin Pool? • Can the ground water source be determined? • What additional information is needed to understand the hydrology of the
area? • Does water chemistry influence carbonate precipitation leading to
syndepositional lithification in Hamelin Pool microbial mats? • What is the totality of the microbes, genomes and environmental
interactions of the stromatolite ecosystem in Hamelin Pool? • Can we delineate gene activities within these communities and link them
to mineral products and stromatolite formation?
GapsinKnowledge• Is carbonate precipitation in microbial mats seasonal/episodic, and can it
be linked to observed environmental parameters or microbial activity? • Which microbial communities are responsible for making unique and
distinctive cements? • Are there changes in the benthic cover of habitat forming organisms
such as macroalgae and seagrass? • If there are temporal changes, what is the rate of change and what are
the drivers? • What environmental parameters are changing within Hamelin Pool and
at what rate? • How are/will changing parameters affect the stromatolites, seagrasses
and faunal assemblage in Hamelin Pool?
GapsinKnowledge&Threats
GapsinKnowledge&Threats
Climate Change Related Threats - Ocean Acidification
Pmel.noaa.gov
SCALE @ A3
PROJECT NO.
REVISION
DATE
DRAWING NO.
DRAWING
DRAWN
1. THIS DRAWING IS COPYRIGHT PROTECTED AND REMAINS THE PROPERTY OF OPENHOUSE DESIGN (ABN 74 148 215 070) ANDSHALL NOT BE USED FOR ANY OTHER PURPOSE THAN ORIGINALLY INTENDED.
2. READ FIGURED DIMENSIONS IN PREFERENCE TO SCALE ALL DIMENSIONS IN mm U.O.N.3. BUILDER TO CHECK AND CONFIRM ALL MEASUREMENTS, LEVELS & DETAILS PRIOR TO THE COMMENCEMENT OF ANY WORK
OR FINANCIAL COMMITMENT. BUILDER TO CHECK AND CONFIRM MEASUREMENTS OF EXISTING BUILDING.4. THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL BUILDING DESIGN DRAWINGS, ARCHITECTURAL NATSPEC
SPECIFICATION, ALL CONSULTANTS DRAWINGS AND SPECIFICATIONS & MANUFACTURERS SPECIFICATION. 5. ALL WORKMANSHIP AND MATERIALS TO BE IN ACCORDANCE WITH THE MOST CURRENT BUILDING REGULATIONS, S.A.A.
CODES AND AUSTRALIA STANDARDS.6. CONCEPTS SHOWN ARE SUBJECT TO RELEVANT AUTHORITY APPROVALS.7. FURNITURE, FIXTURE & LANDSCAPING FOR ILLUSTRATIVE PURPOSES ONLY.8. 3D IMAGES FOR ILLUSTRATIVE PURPOSES ONLY.
DRAWN FOR:
CLIENT:
PROJECT:
ADDRESS:
A
23‐Oct‐17 4:54:20 PM
8‐0029
SK313D VIEW
SKETCH DESIGN
WH
ECO STRUCTURES AUSTRALIA
BUSH HERITAGE AUSTRALIA
HAMELIN SCIENCE ENGAGEMENT CENTRE
HAMELIN STATION SHARK BAY ROAD HAMELINPOOL WA 6532
REVISION SCHEDULEREV. DATE DESCRIPTIONA 23.10.17 LAYOUT REVISED
LAKE LOOKING TO ALFRESCO
OUTDOOR INTERACTIVE SPACE
SCALE @ A3
PROJECT NO.
REVISION
DATE
DRAWING NO.
DRAWING
DRAWN
1. THIS DRAWING IS COPYRIGHT PROTECTED AND REMAINS THE PROPERTY OF OPENHOUSE DESIGN (ABN 74 148 215 070) ANDSHALL NOT BE USED FOR ANY OTHER PURPOSE THAN ORIGINALLY INTENDED.
2. READ FIGURED DIMENSIONS IN PREFERENCE TO SCALE ALL DIMENSIONS IN mm U.O.N.3. BUILDER TO CHECK AND CONFIRM ALL MEASUREMENTS, LEVELS & DETAILS PRIOR TO THE COMMENCEMENT OF ANY WORK
OR FINANCIAL COMMITMENT. BUILDER TO CHECK AND CONFIRM MEASUREMENTS OF EXISTING BUILDING.4. THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL BUILDING DESIGN DRAWINGS, ARCHITECTURAL NATSPEC
SPECIFICATION, ALL CONSULTANTS DRAWINGS AND SPECIFICATIONS & MANUFACTURERS SPECIFICATION. 5. ALL WORKMANSHIP AND MATERIALS TO BE IN ACCORDANCE WITH THE MOST CURRENT BUILDING REGULATIONS, S.A.A.
CODES AND AUSTRALIA STANDARDS.6. CONCEPTS SHOWN ARE SUBJECT TO RELEVANT AUTHORITY APPROVALS.7. FURNITURE, FIXTURE & LANDSCAPING FOR ILLUSTRATIVE PURPOSES ONLY.8. 3D IMAGES FOR ILLUSTRATIVE PURPOSES ONLY.
DRAWN FOR:
CLIENT:
PROJECT:
ADDRESS:
DESIGN APPROVALWE AUTHORISE OPENHOUSE TO PROGRESS WITH WORKING DRAWINGS.
OWNER.............................................
SIGNATURE.......................................
DATE.................................................
B
23‐Oct‐17 4:54:57 PM
8‐0029
SK20ELEVATIONS
SKETCH DESIGN
WH
ECO STRUCTURES AUSTRLIA
BUSH HERITAGE AUSTRALIA
HAMELIN SCIENCE ENGAGEMENT CENTRE
HAMELIN STATION SHARK BAY ROAD HAMELINPOOL WA 6532
0
SCALE 1: AT ORIGINAL SIZE
2500 5000 7500 mm
250
SK10 1 : 2502 ELEVATION 2
SK10 1 : 2501 ELEVATION 1
SK10 1 : 2504 ELEVATION 4
SK10 1 : 2503 ELEVATION 3
REVISION SCHEDULEREV. DATE DESCRIPTIONA 22.05.17 FOR REVIEWB 23.10.17 LAYOUT REVISED
SCALE @ A3
PROJECT NO.
REVISION
DATE
DRAWING NO.
DRAWING
DRAWN
1. THIS DRAWING IS COPYRIGHT PROTECTED AND REMAINS THE PROPERTY OF OPENHOUSE DESIGN (ABN 74 148 215 070) ANDSHALL NOT BE USED FOR ANY OTHER PURPOSE THAN ORIGINALLY INTENDED.
2. READ FIGURED DIMENSIONS IN PREFERENCE TO SCALE ALL DIMENSIONS IN mm U.O.N.3. BUILDER TO CHECK AND CONFIRM ALL MEASUREMENTS, LEVELS & DETAILS PRIOR TO THE COMMENCEMENT OF ANY WORK
OR FINANCIAL COMMITMENT. BUILDER TO CHECK AND CONFIRM MEASUREMENTS OF EXISTING BUILDING.4. THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL BUILDING DESIGN DRAWINGS, ARCHITECTURAL NATSPEC
SPECIFICATION, ALL CONSULTANTS DRAWINGS AND SPECIFICATIONS & MANUFACTURERS SPECIFICATION. 5. ALL WORKMANSHIP AND MATERIALS TO BE IN ACCORDANCE WITH THE MOST CURRENT BUILDING REGULATIONS, S.A.A.
CODES AND AUSTRALIA STANDARDS.6. CONCEPTS SHOWN ARE SUBJECT TO RELEVANT AUTHORITY APPROVALS.7. FURNITURE, FIXTURE & LANDSCAPING FOR ILLUSTRATIVE PURPOSES ONLY.8. 3D IMAGES FOR ILLUSTRATIVE PURPOSES ONLY.
DRAWN FOR:
CLIENT:
PROJECT:
ADDRESS:
DESIGN APPROVALWE AUTHORISE OPENHOUSE TO PROGRESS WITH WORKING DRAWINGS.
OWNER.............................................
SIGNATURE.......................................
DATE.................................................
B
23‐Oct‐17 4:54:57 PM
8‐0029
SK20ELEVATIONS
SKETCH DESIGN
WH
ECO STRUCTURES AUSTRLIA
BUSH HERITAGE AUSTRALIA
HAMELIN SCIENCE ENGAGEMENT CENTRE
HAMELIN STATION SHARK BAY ROAD HAMELINPOOL WA 6532
0
SCALE 1: AT ORIGINAL SIZE
2500 5000 7500 mm
250
SK10 1 : 2502 ELEVATION 2
SK10 1 : 2501 ELEVATION 1
SK10 1 : 2504 ELEVATION 4
SK10 1 : 2503 ELEVATION 3
REVISION SCHEDULEREV. DATE DESCRIPTIONA 22.05.17 FOR REVIEWB 23.10.17 LAYOUT REVISED
World class research into our natural & cultural
heritage
Objec;ves• Tryingtofillgapsinknowledgethroughresearchandmonitoring
• Establishinglong-termmonitoring– allowsdetec:onofissuesandchanges– comparisonstootherareas
• Collectedinforma:oncanfeedintofutureplanning
“Thewholeisgreaterthanthesumofitsparts.”
-Aristotle