15
Page 1 HALFWAY HOUSE, RAME 29/01/20 REVE MANDATORY

HALFWAY HOUSE, RAME 29/01/20 REVE Page 1 · 2020-02-03 · HALFWAY HOUSE, RAME 29/01/20 REVE Page 3 KEY INFORMATION AND SITE PLAN PROJECT CORE VALUES Located in the village of Rame

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HALFWAY HOUSE, RAME 29/01/20 REVE Page 1 · 2020-02-03 · HALFWAY HOUSE, RAME 29/01/20 REVE Page 3 KEY INFORMATION AND SITE PLAN PROJECT CORE VALUES Located in the village of Rame

Page 1HALFWAY HOUSE, RAME 29/01/20 REVE MANDATORY

Page 2: HALFWAY HOUSE, RAME 29/01/20 REVE Page 1 · 2020-02-03 · HALFWAY HOUSE, RAME 29/01/20 REVE Page 3 KEY INFORMATION AND SITE PLAN PROJECT CORE VALUES Located in the village of Rame

Page 2HALFWAY HOUSE, RAME 29/01/20 REVE

OUTLET NAME: Halfway House

AREA: 177

OUTLET NUMBER: 202829

CURRENT SEGMENT: Destination food.

PROPOSED SEGMENT: Our local with carvery.

OUTLET ADDRESS: The Halfway house A394

Rame Cross, Penryn

TR10 9ED

EXISTING EXTERNALS TO PUB PROPOSED EXTERNALS TO PUB

MANDATORY

Page 3: HALFWAY HOUSE, RAME 29/01/20 REVE Page 1 · 2020-02-03 · HALFWAY HOUSE, RAME 29/01/20 REVE Page 3 KEY INFORMATION AND SITE PLAN PROJECT CORE VALUES Located in the village of Rame

Page 3HALFWAY HOUSE, RAME 29/01/20 REVE

KEY INFORMATION AND SITE PLAN

PROJECT CORE VALUES

Located in the village of Rame Cross on the A394 road. It is the only pub left in the village. The site has been run mainly as a pub and restaurant but does have a small caravan and motorhome park to the rear complete with electric hook up.The pub has recently been closed and is in need an overhaul to get it fit for purpose and also a pub that the village will support and use alongside the seasonal customers. The building is tired and the presentation from the outside is poor which is a let down when there is a huge amount of passing trade to be drawn in. It has been noted that previously there were a number of elderly clients and there is a need for an accessible toilet going forward. Also there is a requirement to improve and utilize the gardens to the rear, forming a welcoming family friendly space that suits both drinkers and diners alike

ORDINANCE SURVEY LOCATION PLAN

MANDATORY

Page 4: HALFWAY HOUSE, RAME 29/01/20 REVE Page 1 · 2020-02-03 · HALFWAY HOUSE, RAME 29/01/20 REVE Page 3 KEY INFORMATION AND SITE PLAN PROJECT CORE VALUES Located in the village of Rame

Page 4HALFWAY HOUSE, RAME 29/01/20 REVE

EXISTING EXTERNAL PHOTOS AND PLAN

EXISTING EXTERNAL PLAN EXISTING EXTERNAL PHOTOS

MANDATORY

Page 5: HALFWAY HOUSE, RAME 29/01/20 REVE Page 1 · 2020-02-03 · HALFWAY HOUSE, RAME 29/01/20 REVE Page 3 KEY INFORMATION AND SITE PLAN PROJECT CORE VALUES Located in the village of Rame

Page 5HALFWAY HOUSE, RAME 29/01/20 REVE

EXISTING INTERNAL PHOTOS AND PLAN

EXISTING INTERNAL GF PLAN EXISTING INTERNAL GF PHOTOS

MANDATORY

Page 6: HALFWAY HOUSE, RAME 29/01/20 REVE Page 1 · 2020-02-03 · HALFWAY HOUSE, RAME 29/01/20 REVE Page 3 KEY INFORMATION AND SITE PLAN PROJECT CORE VALUES Located in the village of Rame

Page 6HALFWAY HOUSE, RAME 29/01/20 REVE

EXISTING GROUND FLOOR PLAN

Gross Customer Area 163m sq

Drinking Area (incl serveries and trade corridors)

43m sq

Dining Area (incl serveries and trade corridors)

120m sq

Drinking Covers UNKNOWN

Dining Covers UNKNOWN

MANDATORY

Page 7: HALFWAY HOUSE, RAME 29/01/20 REVE Page 1 · 2020-02-03 · HALFWAY HOUSE, RAME 29/01/20 REVE Page 3 KEY INFORMATION AND SITE PLAN PROJECT CORE VALUES Located in the village of Rame

Page 8HALFWAY HOUSE, RAME 29/01/20 REVE

EXISTING AND PROPOSED GROUND FLOOR PLAN

EXISTING GROUND FLOOR PLANPROPOSED GROUND FLOOR PLAN

OPTIONAL

Externalstoragearea

new vinyl safetyfloor

new vinyl safetyfloor

new timberpergola w/

polycarbonateroof - walkway

new timber gateto external store

new lightwell

New screen

Retain existing paving - somenew slabs as required and re

bed loose exist ing pavingslabs

Drinking area32 covers

External Dining

new timber floor

new timber floor

new timber floor

existing carpet to be cut back

new

entrancematting

existing tiles exist ing tiles

existing tiles

existing tiles

EX

IST

ING

FIX

ED

SE

AT

ING

03

new roof

light

Seating Area28 covers

Dining Area32 covers

Se

rvery

/ca

rve

ry are

a StaffEntrance foyer

Cellar

Heating

Kitchen Kitchen

Bar

MaleFemale

Entrance Lobby

new fence tohouse externalstore

new shelving / screen

extend section off ixed seating

NEW 2 SEATER BOOTH

Accessible& Baby

Existing Garage

new shelving / screen

new screen

H HNEW HIGH FIXED

SEATING 07

H

meet

/greetstation

new vinyl safety

floor

new vinyl safetyf loor

extendfixedseating

firep

lace

existing

waiterstation

removal store

VE

RTIC

AL B

ABY

CH

AN

GE U

NIT

retaining postsand roof and

newentrancematting

NEW FIXED SEATING 01

NEW LOW FIXED SEATING 02

EX

IST

ING

FIX

ED

SE

AT

ING

04

NE

W L

OW

FIX

ED

SE

AT

ING

05

NE

W H

IGH

FIX

ED

SE

AT

ING

06

H

new safety floor

relocate carveryservery to new

location

new gardengates toenclose area

allow for fulldecsthroughout

allow for full

decsthroughout

Page 8: HALFWAY HOUSE, RAME 29/01/20 REVE Page 1 · 2020-02-03 · HALFWAY HOUSE, RAME 29/01/20 REVE Page 3 KEY INFORMATION AND SITE PLAN PROJECT CORE VALUES Located in the village of Rame

Page 9HALFWAY HOUSE, RAME 29/01/20 REVE

PROPOSED INTERNAL RENDERED GROUND FLOOR PLAN

INDICATING CHANGES

MANDATORY

Gross Customer Area 181m sq

Drinking Area (incl serveries and trade corridors)

52m sq

Dining Area (incl serveries and trade corridors)

123m sq

Drinking Covers 32

Dining Covers 60

Existing feature brick wall

Fireplaces

Wallpaper

Page 9: HALFWAY HOUSE, RAME 29/01/20 REVE Page 1 · 2020-02-03 · HALFWAY HOUSE, RAME 29/01/20 REVE Page 3 KEY INFORMATION AND SITE PLAN PROJECT CORE VALUES Located in the village of Rame

Page 10HALFWAY HOUSE, RAME 29/01/20 REVE

Externalstorage

area

Grass

Grass

Grass

Grass

new vinyl safetyfloor

new vinyl safety

floor

new timber

pergola w/polycarbonateroof - walkway

extg shed

new timber gateto external store

new lightwell

New screen

Retain existing paving - somenew slabs as required and re

bed loose existing pavingslabs

Drinking area32 covers

External Dining

External Dining &Family Area - grassed

New Childrens

Play Equipment- by specialists

new timber floor

new timber floor

new timber floor

existing carpet to be cut back

new

entrancematting

existing tiles existing tiles

existing tiles

existing tiles

ExistingCalour gas Tank

EX

IST

ING

FIX

ED

SE

AT

ING

03

new rooflight

Seating Area28 covers

Dining Area32 covers

Serve

ry/carve

ry a

rea Staff Entrance foyer

Cellar

Heating

Kitchen Kitchen

Bar

MaleFemale

Entrance Lobby

new fence tohouse external

store

new shelving / screen

extend section of

fixed seating

NEW 2 SEATER BOOTH

Accessible

& Baby

Existing Garage

new shelving / screen

new screen

H HNEW HIGH FIXED

SEATING 07

H

meet/greetstation

new vinyl safetyfloor

new vinyl safetyfloor

extend

fixedseating

firep

lace

existingwaiterstation

allow forremoval store

risers

VE

RT

ICA

L BA

BY

CH

AN

GE

UN

IT

allow forretaining postsand roof and

decorate

newentrancematting

Retain existing paving

NEW FIXED SEATING 01

NEW LOW FIXED SEATING 02

EX

IST

ING

FIX

ED

SE

AT

ING

04

NE

W L

OW

FIX

ED

SE

AT

ING

05

NE

W H

IGH

FIX

ED

SE

AT

ING

06

H

new safety floor

relocate carveryservery to new

location

new gardengates toenclose area

allow for fulldecs

throughout

allow for fulldecsthroughout

PROPOSED INTERNAL COVERS - 87PROPOSED EXTERNAL COVERS - 112

SITE PLAN

Car Park

Patio garden area

Family garden area/ play area

Main Entrance

Garden Entrance

Existing Garage

MANDATORY

1

2

2

3

3

4

5

6

6

5

4

1

Page 10: HALFWAY HOUSE, RAME 29/01/20 REVE Page 1 · 2020-02-03 · HALFWAY HOUSE, RAME 29/01/20 REVE Page 3 KEY INFORMATION AND SITE PLAN PROJECT CORE VALUES Located in the village of Rame

Page 11HALFWAY HOUSE, RAME 29/01/20 REVE

TRADING AREA MOODBOARD

MANDATORY

Page 11: HALFWAY HOUSE, RAME 29/01/20 REVE Page 1 · 2020-02-03 · HALFWAY HOUSE, RAME 29/01/20 REVE Page 3 KEY INFORMATION AND SITE PLAN PROJECT CORE VALUES Located in the village of Rame

Page 12HALFWAY HOUSE, RAME 29/01/20 REVE

TOILET MOODBOARD

MANDATORY

Page 12: HALFWAY HOUSE, RAME 29/01/20 REVE Page 1 · 2020-02-03 · HALFWAY HOUSE, RAME 29/01/20 REVE Page 3 KEY INFORMATION AND SITE PLAN PROJECT CORE VALUES Located in the village of Rame

Page 13HALFWAY HOUSE, RAME 29/01/20 REVE

GARDEN MOODBOARD

Page 13: HALFWAY HOUSE, RAME 29/01/20 REVE Page 1 · 2020-02-03 · HALFWAY HOUSE, RAME 29/01/20 REVE Page 3 KEY INFORMATION AND SITE PLAN PROJECT CORE VALUES Located in the village of Rame

Page 15HALFWAY HOUSE, RAME 29/01/20 REVE

BACK BAR DETAILS

Be

er

Bee

r

Bee

r

Bee

r

Bee

r

Bee

r

Bee

r

Be

er

Be

er

Be

er

BACK BAR UNDERCOUNTER TO REMAIN AS EXISTING

Be

er

Be

er

win

e

win

e

win

e

win

e

win

e

win

e

win

e

win

e

win

e

win

e

win

e

win

e

win

e

win

e

win

e

win

e

win

e

win

e

win

e

win

eBe

er

Be

er

Be

er

Bee

r

Bee

r

Bee

r

Bee

r

Bee

r

Bee

r

Be

er

Be

er

Be

er

xo

xo

xo

new LED lit double bottle step

new metro tiles

new tilest&g t&g

new tiles

coffee machine

Page 14: HALFWAY HOUSE, RAME 29/01/20 REVE Page 1 · 2020-02-03 · HALFWAY HOUSE, RAME 29/01/20 REVE Page 3 KEY INFORMATION AND SITE PLAN PROJECT CORE VALUES Located in the village of Rame

Page 16HALFWAY HOUSE, RAME 29/01/20 REVE

EXTERNAL SIGNAGE SCHEME – PROPOSED DAY SHOTS

PROPOSED SIGNAGE SCHEME - DAY SHOT

MANDATORY

Page 15: HALFWAY HOUSE, RAME 29/01/20 REVE Page 1 · 2020-02-03 · HALFWAY HOUSE, RAME 29/01/20 REVE Page 3 KEY INFORMATION AND SITE PLAN PROJECT CORE VALUES Located in the village of Rame

Page 18HALFWAY HOUSE, RAME 29/01/20 REVE

EXTERNAL SIGNAGE SCHEME – LOCATION PLAN AND SIGNAGE DETAILS

MANDATORY