H84_BPP_EN_DE

Embed Size (px)

Citation preview

SAP ECC 6.00 August 2006 English

H84: Make-to-Stock (MTS) Production with Batch Management, Warehouse Management (WM) and Handling Unit Management (HUM)Scenario Business Process Procedures

SAP AG Dietmar-Hopp-Allee 16 69190 Walldorf Germany

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Copyright Copyright 2006 SAP AG. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice. Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors. Microsoft, Windows, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation. IBM, DB2, DB2 Universal Database, OS/2, Parallel Sysplex, MVS/ESA, AIX, S/390, AS/400, OS/390, OS/400, iSeries, pSeries, xSeries, zSeries, z/OS, AFP, Intelligent Miner, WebSphere, Netfinity, Tivoli, Informix, i5/OS, POWER, POWER5, OpenPower and PowerPC are trademarks or registered trademarks of IBM Corporation. Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries. Oracle is a registered trademark of Oracle Corporation. UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group. Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc. HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C, World Wide Web Consortium, Massachusetts Institute of Technology. Java is a registered trademark of Sun Microsystems, Inc. JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape. MaxDB is a trademark of MySQL AB, Sweden. SAP, R/3, mySAP, mySAP.com, xApps, xApp, SAP NetWeaver, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary. These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.

SAP AG

Page 2 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

IconsIcon Meaning Caution Example Note Recommendation Syntax

Typographic ConventionsType Style Example text Description Words or characters that appear on the screen. These include field names, screen titles, pushbuttons, as well as menu names, paths and options. Cross-references to other documentation. Emphasized words or phrases in body text, titles of graphics and tables. Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE. Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools. Keys on the keyboard, for example, function keys (such as F2) or the ENTER key. Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation. Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.

Example text EXAMPLE TEXT

Example text

EXAMPLE TEXT

Example text

SAP AG

Page 3 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

ContentsH84: Make-to-Stock (MTS) Production with Batch Management, WM & HUM................................6 Purpose......................................................................................................................................6 Process Flow..............................................................................................................................6 Organizational and Master Data ...............................................................................................10 Preliminary Steps......................................................................................................................12 Uploading the Evaluation Role..............................................................................................12 Business Process Procedure........................................................................................................13 Controlling................................................................................................................................13 Costing Run .........................................................................................................................13 Sales Order Processing ...........................................................................................................16 Creating Customer Order......................................................................................................16 Materials Requirement Planning .............................................................................................17 Checking Complete Planning for the Ordered Material..........................................................17 Material Requirements Planning at Plant Level......................................................................18 Purchasing................................................................................................................................19 Preparatory Steps.................................................................................................................19 Creating Purchase Orders from the Stock/Requirement List..................................................20 Manufacturing Parts Number Processing...............................................................................23 Maintaining Delivery Schedule for Scheduling Agreement.....................................................24 Posting the Goods Receipt ...................................................................................................24 Posting Goods Receipt to WM...............................................................................................26 Posting Goods Receipt and Following Lean WM ..................................................................29 Posting Goods Receipt for Material with Manufacturer Part Number .....................................30 Production Order Processing....................................................................................................31 Creating Production Orders...................................................................................................31 Scrap Treatment and Analysis...............................................................................................32 Releasing Production Orders for Semi-finished Products.......................................................33 Picking Components with WM/PP interface and FIFO Strategy at Semi-Finished Goods Order Level ....................................................................................................................................35 Option 1: WM/PP Material Staging for Pick List Parts (Staging Indicator 1)............................35 Option 2: WM/PP Material Staging for Crate Parts (Staging Indicator 2)................................37 Option 3: WM/PP Material Staging for Release Order Parts (Staging Indicator 3)..................40 Confirming Production Orders with Bar Code Scanner (Optional) for Semifinished Goods.....42 Rework Order Process..........................................................................................................44 Analysis and Treatment of Bulk Materials..............................................................................45 Missing Part Management (Optional: with Workflow Integration)............................................48 Releasing Production Orders for Finished Products...............................................................50 Picking Components for Finished Products (IM FIFO Strategy)..........................................51 Confirming Production Orders with Barcode Scanner (Optional) for Finished Products..........52 Handling Unit Management for Finished Products ....................................................................53 Initial Goods Receipt for Packaging Material.........................................................................53 Option 1: Creating Handling Units at the End of Production...................................................54 Option 2: Creating Handling Units Before Outbound Delivery................................................55 Creating Outbound Delivery .................................................................................................57 Picking Outbound Delivery (Assigning HU and Batch) ..........................................................58 Posting Goods Issue.............................................................................................................59

SAP AG

Page 4 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Checking Status of Outbound Delivery and History Check of HU...........................................60 Billing Processing......................................................................................................................60 Creating Billing Document.....................................................................................................60 Displaying Customer Line Items ...........................................................................................61 Cost Object Controlling in Discrete Manufacturing Preliminary Costing..................................62 Cost Object Controlling in Discrete Manufacturing Simultaneous Costing...............................65 Cost Object Controlling in Discrete Manufacturing Period End Closing...................................66

SAP AG

Page 5 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

H84: Make-to-Stock (MTS) Production with Batch Management, WM & HUMPurposeThis scenario focuses on sales-order-independent production by MTS (make-to-stock) combined with a variety of logistic functions: Bulk material Scrap processing Missing parts management with workflow integration Warehouse Management / Lean WM (with FIFO material consumption and manufacturer part number processing

Process Flow Costing Run You can use the costing run to process mass data. The purpose is to compute prices for the selected materials that are then updated in the material master records as the standard price. The standard price is used to valuate goods movements within the company. The price update consists of two steps, marking the computed price and then releasing it. Marking the price means setting it as the future price for the material; releasing it means making it the current standard price. Before you can carry out marking, you have to allow marking for the company code involved. Sales order processing with availability check The system checks the incoming sales orders to determine whether the components are available. When doing so, both the available warehouse stock and the receipts from forecast planning are taken into account. Therefore, the system calculates the confirmed delivery date from the receipt date of the next (still unplanned) planned or production order. If a suitable receipt element is found, the sales order receives a confirmation date, and the order confirmation can be printed out. At the same time, the system compares the forecast details with the specific customer requirements. First of all, the system checks 40 days in the past, and then 20 days in the future to determine whether a planned independent requirement has not been allocated yet. Material Requirements Planning (MRP) The daily MRP run generates replenishment elements at each low-level code. The system automatically generates purchase requisitions for purchased parts within the 3-month opening period for the planned order. The system uses planned orders to implement receipt elements, which are also required. In general, the system also creates planned orders for parts that will be produced internally. When the planned opening date has been reached, these planned orders are converted to production orders by the production planner. As a result, the system reserves all of the required components. In the material master for all of the interface cards in this series, the planned opening date is set to 5 days. Some raw materials (panel = H84-1045, resistor = H84-1060, bulk material Glue / oil = H84-1070, and packing material H84-1080) are planned on a consumption basis. Since these parts are required for a variety of other boards and cards, large quantities of these materials are to be stored in the warehouse. Replenishment orders are triggered as soon as a specified reorder point is reached. The stock issues are backflushed when the activity is confirmed. The service stock material (Hexagon Head Screw = H84-1010) is also planned on a consumption basis. Manufacturer Part Number Processing The process integrates manufacturer part number processing. The purchase order for one material (H84-1030) contains the valid manufacturer part numbers according the approved manufacturer

SAP AG

Page 6 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

parts list (AMPL) in message format for the communication with vendors (such as, for transmission as hardcopies or via EDI). This data is only displayed in the document. Procurement Different types of procurement are shown: Procurement of stock material using purchase orders (PO); procurement with scheduling agreements is also integrated. Specific overdelivery and underdelivery tolerances are defined for the ordered goods. Full WM / Lean WM integration is also shown. During the goods receipt for some materials, a batch number (for example, H84-1020, H84-1030, H84-1045, or H84-1050) is automatically assigned. Batch classification can be used to enter the MPN information in the batch. Make-to-Stock Production / Production Order Processing The production planner releases the production orders created on the release date and simultaneously prints the shop floor papers with a bar code. Production orders with missing parts are not usually released by the production planner. However, in exceptional cases, the production planner can also send orders with missing parts to the production and the planner receives information as soon as the missing material comes in. This means that on goods receipt a workflow is triggered and the material is not posted to the warehouse but directly sent to the production line. The warehouse worker picks the production order in the parts warehouse based on the first in first out (FIFO) strategy. The WM/PP material staging interface is activated, allowing an adequate replenishment strategy for each component from the warehouse to the production supply areas (pick list component, crate part, or release order part). The principle behind WM/PP staging is that a WM transfer order is created and executed from any WM storage type to storage type 100 (production supply area). The goods issue is posted at a later stage (on confirmation of the production order) and is not part of the WM/PP interface. The staging method is defined in a control cycle for each material in a production supply area (staging indicator). The WMPP material staging can be customized with transfer requirements or WMPP deliveries. Both ways are possible for the different staging indicators. The following example uses the WMPP delivery for the staging indicator pick list component; for crate parts and release order parts transfer requirements are used. Both document types are a reference to create a WM transfer order. A WM/P delivery can be used if, for example, the in-house logistic requires a delivery note for material movements (warehouse is not near by the production site). The warehouse worker uses the pick list to pick the components managed in the temporary warehouse (storage locations without WM relevance) for each order. The consumable material (hexagon head screw) is managed in the service stock at the work center. o WM/PP material staging for pick list components Components of high value or very large components can be supplied to the production area with the staging indicator pick list component (1). The replenishment quantity is defined by the quantity of the production order (quantity of reservation). The release of a production order creates an in-house delivery with the delivery type WMPP. The WMPP delivery is transformed to a WM transfer order to execute the material provision for the production order.

SAP AG

Page 7 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

o

WM/PP material staging for crate parts Components of low value or of small size (consumables) can be supplied to the production area with the staging indicator Crate parts (2). This type of replenishment is a classical KANBAN processing. The replenishment quantity is defined in a control cycle for this type of material. The control cycle determines the number of KANBAN containers circulating between the warehouse and the production supply areas. The release of a production has no impact of the replenishment point or quantity. After receiving an empty KANBAN container, the warehouse worker executes the transaction LP11 for the corresponding material. According to the definition in the control cycle, the system creates a transfer requirement (TR) and a transfer order (TO). The creation of the WM documents is possible in one step with transaction LP11 (TR and TO) but also in two steps with transaction LP11 (to create the TR) then transaction LT04 (to create the TO).

o

WM/PP material staging for release order parts Components of medium value or of medium size can be supplied to the production area with the staging indicator release order part (3). This type of replenishment is a mix between classical KANBAN processing and material staging with a pick list for a production order. The replenishment is triggered by executing transaction LP12. The transaction can be started for one material or for all release order parts in this production supply area. The system cumulates for each material the open quantities of production order reservations. On the other side the system checks the stock level of the storage bin in the production supply area (the storage bin in the production supply area is defined in the control cycle such as, PSARELORD in storage type 100). If the stock level of the WM bin in the production supply area is lower than the required quantities of the reservations for the production orders, the system suggests the creation of a transfer requirement (TR). The warehouse worker can increase this quantity in order to remove a whole pallet from stock. If there are no open production order reservations for this type of staging material, the system does not suggest replenishment. On the other hand, the release of production orders has an impact of the replenishment point or quantity. Therefore the transaction LP12 should be executed regularly after releasing production orders to check the replenishment quantities. The creation of the WM documents is possible in one step with transaction LP11 (TR and TO) but also in two steps with transaction LP11 (to create the TR) then transaction LT04 (to create the TO).

Scrap Processing At the beginning of production planning, the planned scrap quantity (component scrap, assembly scrap, and operation scrap) is considered. Rework for Subassembly Subassembly (H84-1040 Circuit Board PCB 2L 8B 7.6): If not found to be OK in the quality check (the last operation of the standard routing), the operation routing set is triggered, and the process is executed to finish the rework process. Order Confirmations A move ticket (German Laufkarte) for the production order is printed with a confirmation number (bar code) at the same time as the shop floor papers. Processing is carried out in accordance with this information. Once the production process has been completed, the user confirms the activity. The material used is backflushed when the operation is confirmed.

SAP AG

Page 8 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Handling Unit Management for Finished Product Handling units for a finished product can be used in two ways: If you want to pack the finished goods with a constant quantity and a constant packing material just after the production order process, you should use transaction COWBPACK (Pack for work order). In this step, you can create a handling unit by using a packaging instruction (which contains the packaging material), and at the same time you can post the goods receipt of the production order in the handling unit storage location YD05. If you do not pack the finished product directly after production because the quantities to be packed or to be delivered might vary, you can execute the packing process after you create the outbound delivery. In this case the dispatch worker can create handling units with the transaction HUPAST (free packing) according to the quantities of the delivery notes or to other customer specific criteria (e.g. packaging material). Cost Object Controlling Cost Object Controlling is an area in cost accounting that assigns the costs incurred in the execution of company activities (such as internally manufactured materials) to those activities. Product cost by order enables you to analyze costs at the level of manufacturing orders, production orders, and process orders. In product cost by order, the manufacturing orders themselves are the cost objects. Costs charged to manufacturing orders are usually analyzed and settled by lot. This means that variances can only be analyzed after the entire planned production quantity has been put into the inventory.

SAP AG

Page 9 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Organizational and Master DataThe following organizational and master data is required in the scenario: Field Name Controlling area Company Code Plant Sales organization Distribution channel Division Purchase organization Storage location Value BP01 BP01 BP01 BP01 01 01 BP01 0010 0003 0004 0002 0005 0006 YD05 F01 L01 H84-1000 H84-1040 H84-1080 H8410 H8420 H8430 H8450 H8460 H8445 H8440 H8490 Description Best Practices Company Code BP01 Production Plant (Produktionswerk) BP01 Sales Org. BP01 Direct Sales Product Division 01 Purchase Org. BP01 Standard stock finished product (unpacked) raw material ( without WM ) production Lean WM Component FullWM Handing unit with Warehouse F01 Warehouse L01 (Lean WM) Interface Card Circuit Board Packing material for H84 Vendor MTS 01 Vendor MTS 02 Vendor MTS 03 Vendor MTS 04 Vendor MTS 05 Vendor MTS 06 Ship-to-party Supply Area PROD_MTS Customer MTS

Warehouses Material (finished good) Material (semifinished goods) Material (packaging material) Vendor

Customer

SAP AG

Page 10 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

The diagram below outlines the material BOM structure in this scenario:

MTS-Production w. Batch Management, WM and HUM Product StructureH84-1080Packaging Material for H84-1000 VERP VBSC

H84-1000

HU

Interface Card V24/2 HC 150 E HALB B PD

Assembly scrap in Material Master

0002 - ProductionSC SC

H84 -1010Hexagon Head Screw ROH VB Operation scrap in BOM item with net indicator

H84 -1020IC LogicMAX884IM

M

BH

H84 -1030Transformer ROH B PD Component scrap in Material Master

H84 -1040Circuit Board PCB 2L 8B 7.6 HALB B RW PD

H84 -1050Connector SUB-D2 ROH PD

H84 -1060Resistor RES0805MS392 ROH VB Procurement with Scheduling Agreement

H84 -1070Glue ROH VB

ROH VB

B

MP

B

BH

WM Warehouse Management: FIFO LM Lean Warehouse Management IM Inventory Management: FIFO WM B Batch Management HU Handling Unit Management

SC Scrap Processing

H84 -1045Panel ROH PD

H84 -1047Plastic Film ROH PD LM WM

H84 -1048Supplies ROH PD WM

H84 -1046Flex Connection ROH PD LM

RW Rework BH Bulk Material Handling M Manufacturer Part Number MP Missing Parts Processing

B

0006

0006

0006

0005

SAP AG 2002, Title of Presentation, Speaker Name 9

SAP AG

Page 11 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Preliminary StepsUploading the Evaluation Role UseBefore you can begin performing the steps described in the Business Process Procedure, you need to upload the evaluation role for this scenario and assign it to your user. An evaluation role enables you to comfortably access all transactions required for the business application testing. You have to install an evaluation role for each scenario. The following role is available: Technical name Description File name for upload /SMB50/H84_05U H84: MTS Production with Batch Management, WM and HUM _SMB50_H84_05U.SAP

ProcedureFor more information about uploading the evaluation role to the system and working with roles, see to the Essential Information building block.

SAP AG

Page 12 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Business Process ProcedureControllingCosting Run UseThe costing run allows you to cost multiple materials at the same time. It is used to cost materials based on planning data. You can use the costing run to process mass data. The purpose is to calculate prices for the selected materials. The price update, also in the costing run, consists of two steps, marking the price computed and then releasing it. The prices for the material are then updated in the material master records as the standard price, which is used to valuate goods movements within the company.

PrerequisitesMaterials, BOM, routing, work centers, costing variant have been created.

Procedure1. Access the activity using one of the following navigation options: SAP role menu Transaction code Edit Costing Run CK40N

2. On the Edit Costing Run screen, make the following entries. Field name Costing run Costing run date Description Key, which identifies the costing run Current date User action and values Enter the costing run key (for example, 01_2005) Comment

3. Choose Create Costing run (F5). 4. On the Create Costing Run screen, make the following entries: Field name Costing run text Description Text, which identifies the costing run User action and values Enter text describing costing run key. (For example, costing run Jan. 2005, legal valuation) YPC1 01 BP01 BP01 Adopted automatically from costing variant Comment

Costing variant Costing version Controlling Area Company Code Transfer Control

Server Group 5. Choose Enter. 6. On the Dates tab page, enter todays date in the Costing Date from field. The fields Costing date to, Qty Structure date and Valuation Date should be taken as proposed.

SAP AG

Page 13 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

7. Save your entries. 8. In the Create Cost Estimate section, choose Change Parameter in the Parameter column of the Selection row. 9. Make the following entries: Field name Material Description Selection of single materials or an interval of materials User action and values H84-1000 Comment If you have already created and released a cost estimate for one of these materials in the current period, for example, while running another scenario, exclude the material here to prevent error messages in the course of processing the costing run.

Low-level code Material type Plant Select configured materials only Always recost material Background processing Print log BP01 Do not set indicator

Do not set indicator Do not set indicator Do not set indicator

10. Save your entries and choose Back. 11. Choose Execute in the row of Selection. 12. In the Create Cost Estimate section, choose Change Parameter, which is located in the Parameter column of the Struct. Explosion row. 13. Make the following entries: Field name Background processing Print log Description User action and values Do not set indicator Do not set indicator Comment

14. Save your entries and choose Back. 15. Choose Execute in the row of Struct. Explosion. 16. In the Create Cost Estimate section, choose Change Parameter, which is located in the Parameter column of the Costing row.

SAP AG

Page 14 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

17. Make the following entries: Field name Cost ests with errors only Description Set the indicator if you have already executed the costing run once and now want to rerun only those cost estimates with errors Set the indicator to generate a separate log for each costing level. User action and values Do not set indicator Comment

Log per costing level

Do not set indicator

Parallel processing Background processing Print log

Do not set indicator Do not set indicator Do not set indicator

18. Save your entries and choose Back. 19. Choose Execute in the Costing row. 20. In the Create Cost Estimate section, choose Change Parameter in the Parameter column of the Analysis row. 21. Make the following entries: Field name Variant catalog for program RKKBKAL2 Costing run Costing date Description The program provides different list variants for the analysis User action and values Select SAP&11 and choose Enter. Comment

Select your costing run Select your costing date

22. Save your entries and choose Back. 23. Choose Execute in the Analysis row and then choose Back. 24. Confirm the Leave list dialog box. 25. Check the lock on the Edit Costing Run screen in the row Marking. If the lock is closed follow the next steps as described. 26. If the lock is open you can go on with step 33. 27. On the Edit Costing Run screen, choose the icon in the column Authorization, line Marking. 28. On the Price Update: Organizational Measures screen, make the following entries: Field name Posting Period Fiscal Year 29. 30. 31. 32. 33. Description User action and values (current period) (current year) Comment

Choose Enter. Double click the company code BP01, and select the costing variant YPC1. Save your entries. Choose Enter and then choose Back. In the Create Cost Estimate section, choose Change Parameter, which is located in the Parameter column of the Marking row. 34. Make the following entries:

SAP AG

Page 15 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Field name Test run

Description Set this flag if you first want to have a test of the marking without change any thing in the material master

User action and values Do not set indicator

Comment

With list output Parallel processing Background processing

Set indicator Do not set indicator Do not set indicator

35. Save your entries and choose Back. 36. Choose Execute in the row of Marking. On the screen Price update: mark standard price you get a list of your materials that are now marked for the price update. 37. Choose Back 38. In the Create Cost Estimate section, choose Change Parameter, which is located in the Parameter column of the Release row. 39. Make the following entries: Field name Test Run Description Set this flag if you first want to have a test of the marking without change any thing in the material master User action and values Do not set indicator Comment

With list output Parallel processing Background processing

Set indicator Do not set indicator Do not set indicator

40. Save your entries and choose Back. 41. Choose Execute in the row of Release. On the screen Price update: release standard price you get a list of you materials that are now released. 42. Choose Exit to return to the SAP Easy Access screen.

ResultThe calculated standard price is used to valuate goods movements within the valuation area. The marking of the calculated price changes the field Planned price in the future on the material master view Costing 2. The releasing of the calculated price changes the field Current planned price on the material master view Costing 2 and the valuation of the material master. If a released material cost estimate exists for the material master in the current period, it is not possible to release a new cost estimate for the current period.

Sales Order ProcessingCreating Customer Order UseThe sales organization receives a customer order by telephone, fax or another medium. You have to enter the customer order in the SAP system.

Procedure1. Access the activity using one of the following navigation options:

SAP AG

Page 16 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

SAP role menu Transaction code Field name Order Type Sales Organization Distribution Channel Division

Create Sales Order VA01 Description User Action and Values OR BP01 01 01 Comment

2. On the Create Sales Order: Initial Screen, make the following entries:

3. Confirm your entries with Enter. 4. On the Create Standard Order: Overview screen, make the following entries: Field name Sold-to party Purch. order no. Material Order quantity Description User Action and Values H8490 MTS enhancement H84-1000 50 Customer order number In the Items table In the Items table Comment

5. Confirm your entries with Enter. 6. In the availability check, you can only confirm a subset of the requested quantity with the requested delivery date, the remaining quantity is shared according to the ATP quantities. 7. In the Dely Proposal area, confirm the delay with the green checkmark. 8. Save your entries. 9. Make a note of the order number ____________________ 10. Choose Back to return to the SAP Easy Access screen.

ResultYou have created a sales order.

Materials Requirement PlanningChecking Complete Planning for the Ordered Material UseThis step informs you about the MRP and how the customer order requirements are allocated.

Procedure1. Access the activity using one of the following navigation options: SAP role menu Transaction code 2. Enter the following data: Field name Description User Action and Values Comment Display Stock/Requirements Situation MD04

SAP AG

Page 17 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Material Plant

H84-1000 BP01 Confirm entry with ENTER

ResultYou can see how the customer order requirements are allocated as well as the planning within the adjusted horizons.

Material Requirements Planning at Plant Level UseThe aim of material requirements planning is to tailor available capacities and receipts on time to suit requirements quantities. You can use MRP or consumption-based planning for this purpose.

PrerequisitesThe finished product H84-1000 (Interface Card) is planned at plant level. There is now a requirement for the material H84-1000 in plant BP01. Single-item, multi-level requirement planning is carried out for plant BP01.

Procedure1. Access the activity using one of the following navigation options:SAP role menu Transaction code MRP Single-item, Multi-level MD02

SAP AG

Page 18 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

2. On the Single-Item,Multi-Level screen, enter the following data.Field name Material Plant Scope of planning Product group MRP control parameters Processing key Create purchase req. Delivery schedules Create MRP list Planning mode Scheduling Process control parameters Also plan unchanged components Display results before they are saved Display material list Simulation mode (remove indicator) NETCH 1 (Purchase requisitions) 3 (Schedule lines) 1 (MRP list) 3 (Delete and recreate planning data) 2 (Lead time scheduling and capacity planning) Description User Action and Values H84-1000 BP01 Comment

(remove indicator)

(remove indicator) (remove indicator)

3. Confirm your entries with Enter. 4. Confirm the information message Please check input parameters. 5. Go back to the SAP Easy Access screen.

ResultRequirements planning has been carried out.

PurchasingPreparatory Steps Use

SAP AG

Page 19 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

In this activity, you run the MRP for the materials H84-1010 and H84-1020 wit the MRP type VB at their own level. This manual step is performed at this point to enable the whole scenario running. In a real life business process, the MRP run for all VB materials should be defined to run periodically in the background.

Procedure1. Access the activity using one of the following navigation options: SAP role menu Transaction code Field name Material Plant Scope of planning Product group MRP control parameters Processing key Create purchase req. Delivery schedules Create MRP list Planning mode Scheduling Process control parameters Also plan unchanged components Display results before they are saved Display material list Simulation mode (remove indicator) NETCH 1 (Purchase requisitions) 3 (Schedule lines) 1 (MRP list) 3 (Delete and recreate planning data) 2 (Lead time scheduling and capacity planning) MRP Single-item, Multi-level MD02 Description User Action and Values H84-1010 and H84-1020 separately BP01 Comments

2. On the Single-Item, Multi-Level screen, enter the following data.

(remove indicator)

(remove indicator) (remove indicator)

3. Confirm your entries with Enter. 4. Confirm the information message Please check input parameters. 5. Go back to the SAP Easy Access screen.

Creating Purchase Orders from the Stock/Requirement List UseYou want to display the stock/requirements for the material H84-1010 in the stock/requirements list.

SAP AG

Page 20 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

PrerequisitesRequirement planning has been completed.

Procedure1. Access the activity using one of the following navigation options: SAP role menu Transaction code Field name Material Plant Description Display Stock/Requirements Situation MD04 User Action and Values H84-1010 BP01 Comment

2. On the Stock/Requirements List: Initial Screen, make the following entries:

3. Confirm your entries with Enter. The BOM explosion during the MRP run has generated purchase requisitions for H84-1010. 4. Note the number of the MRP element PurRqs ________________. 5. Double-click the MRP element PurRqs. 6. On the Additional Data for MRP Element screen choose Purchase order (Convert purchase requisition to purchase order). 7. On the Create Purchase Order screen, select the purchase requisition in the Document overview section and choose Adopt. 8. Confirm the information message Can delivery date be met? (Realistic delivery date: XX.XX.XXXX) with Enter. 9. On the Delivery/Invoice tab page, enter the payment terms 0001. 10. Save your entries. 11. On the Stock/requirement List as of XX:XX Hrs choose Refresh. The above noted MRPElement PurRqs is now called POitem. Note the number of the MRP-Element POitem ___________________________

SAP AG

Page 21 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Repeat the steps 1 to 10 for the materials H84-1020, H84-1030, H84-1045, H84-1046, H841047, H84-1048 and H84-1050. H84-1020 Note the number of the purchase order for material H84-1020:____________________________ H84-1030 Note the number of the purchase order for material H84-1030: ____________________________ H84-1045 Note the number of the purchase order for material H84-1045: ____________________________ Choose Enter to confirm the warning message Order quantity violates rounding rules (See long text) Check if there are any rounding violations and change the order quantity manually. This results from the different units of measurement in the material master. The material is procured and handled in pieces but calculated in CM2 (sq cm). H84-1046 Note the number of the purchase order for material H84-1046: ____________________________ H84-1047 Note the number of the purchase order for material H84-1047: ____________________________ Change the order quantity to reach the minimum order quantity notified by the system message. H84-1048 Note the number of the purchase order for material H84-1048: ____________________________ H84-1050 Note the number of the purchase order for material H84-1050: ____________________________

ResultThe purchase requisitions have been converted to purchase orders.

SAP AG

Page 22 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Manufacturing Parts Number Processing UseYou want to display the manufacturing parts numbers for the material H84-1030, which can be delivered by the distributor H8430. According to the Approved Manufacturing Part List (transaction: MP01), the electronic component H84-1030 can be procured from two different manufacturers. Both manufacturing parts correspond to the valid specification for the material H84-1030. The manufacturing parts number information can only be shown in the print preview of the purchase order and can be transferred to the distributor via print output, email, fax, or EDI.

PrerequisitesThe purchase order has been created.

Procedure1. Access the activity using one of the following navigation options: SAP role menu Transaction code Field name Material Plant Purchasing Organization Scope of List Purchase Orders by Material ME2M Description User Action and Values H84-1030 BP01 BP01 BEST Comment

2. On the Purchasing Documents for Material Screen, enter the following data:

3. Select the purchase order created before and choose Print Preview. 4. On the Print Preview you can see that for the transformer H84-1030 two manufacturing part numbers are valid. Ignore the missing tax information on this standard print layout. 5. Go back to the user menu.

SAP AG

Page 23 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Maintaining Delivery Schedule for Scheduling Agreement UseYou want to display the schedule lines which are created during the MRP run for the material H84-1060.

Procedure1. Access the activity using one of the following navigation options: SAP role menu Transaction code Field name Material Plant 3. 4. 5. 6. Description Display Stock/Requirements Situation MD04 User Action and Values H84-1060 BP01 Comment

2. On the Stock/Requirements List: Initial Screen, enter the following data:

Confirm your entries with Enter. Note the number of the MRP element SchLne ________________. Double-click the MRP element SchLne with the number noted above. In the Additional Data for MRP Element window choose Display Element. The scheduling agreement schedule is displayed.

ResultYou have checked the schedule lines for the material H84-1060 which the BOM explosion has generated during the MRP run.

Posting the Goods Receipt UseIn this activity, you post the incoming goods for the materials H84-1010, H84-1020 and H84-1060. Materials H84-1020 is handled in batches. During the goods receipt a batch number is assigned.

The batches for the materials H84-1020 and H84-1030 use batch classification Therefore it is necessary to use the older transaction MB01 for goods receipt processing instead of the transaction MIGO. Posting the goods receipt with the transaction MIGO skips the characteristic assignment screen of the batch classification. It is then not possible to find the material batch later in the process.

SAP AG

Page 24 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Procedure1. Access the activity using one of the following navigation options: SAP role menu Transaction code Field name Movement Type Purchase Order Plant Description Post Goods Receipt for PO MB01 User Action and Values 101 xxxxxxxxxx BP01 Comment Goods receipt Number of the purchase order for the material H84-1040 as noted above

2. On the Goods Receipt for Purchase Order: Initial Screen, make the following entries:

3. Confirm your entries with Enter. In the Item Overview of the main window, choose the item you want to post and make the following entries: Field name OK Stor.Loc. 4. 5. 6. 7. 8. Description Indicates that you want to post the goods movement for this item Storage location User Action and Values Set indicator 0004 Comment

Confirm your entries with Enter. Save your entries and confirm any warning messages with Enter. Repeat steps 1 5 for material H84-1020, and execute the following procedure in addition: Confirm the pop-up window with Automatic batch number allocation information with Enter. On the Goods Receipt for Purchase Order: Classification screen, make the following entry: Field name Posting date Description GR posting date User Action and Values Enter goods arrival date Comment

9. Save your entries. 10. Repeat steps 1 5 again for material H84-1060, execute the following procedure in additional. Set the suggest ZeroLines indicator since the GR quantity for the scheduling agreement is normally done partially. With material H84-1060, use the noted document number of the schedule agreement instead of a purchase order number.

SAP AG

Page 25 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Posting Goods Receipt to WM UseIn this activity, you post the incoming goods for materials H84-1045, H84-1047, and H84-1048. The material H84-1045 is handled in batches, during the goods receipt a batch number is assigned. You want to compare the stock situation for material in IM and WM. You also post the goods receipt to WM.

The batch for the material H84-1045 uses batch classification dependent on the posting date. Therefore it is necessary to use the older transaction MB01 for goods receipt processing instead of the transaction MIGO. Posting the goods receipt with the transaction MIGO skips the characteristic assignment screen of the batch classification. It is then not possible to find the material batch later in the process using the posting date as search characteristic.

Procedure1. Access the activity using one of the following navigation options: SAP role menu Transaction code Field name Description Purchasing Document Number Movement Type Plant Post Goods Receipt for PO MB01 User Action and Values xxxxxxxxxx 101 BP01 Comment Number of the purchase order for material H841045 as noted above Goods receipt

2. On the Goods Receipt for Purchase Order: Initial Screen, make the following entries:

3. Confirm your entries with Enter. On the Item Overview of the main window, choose the item you want to post and make the following entries: Field name OK Stor.Loc. Description Indicates that you want to post the goods movement for this item Storage location User Action and Values Set indicator 0006 Comment

GR for H84-1045 is posted by default to storage location 0006, which is subject to full WM. Execute the following WM process: 4. Save your entries and confirm any warning message with Enter. 5. Confirm the pop-up window with Automatic batch number allocation information with Enter. 6. On the Goods Receipt for Purchase Order: Classification screen, make the following entry: Field name Posting date Description GR posting date User Action and Values Enter goods arrival date, for example the current date Comment

SAP AG

Page 26 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

7. Choose Back. Confirm the system information Enter delivery note for evaluated receipt settlement and post the goods receipt with Save. The system brings to the Create Transfer Order for Material Document: Initial screen. 8. If you want to create transfer order directly, skip the following steps and go to step 21. 9. Before follow-up WM activities, firstly you access the IM stock overview. Access the activity using one of the following navigation options: SAP role menu Transaction code Stock Overview MMBE

10. On the Stock overview: company code/plant/storage location/batch, make the following entries: Field name Material Description User Action and Values H84-1045 Comment

11. Choose Execute (F8). All inventory stock is displayed. 12. You then check the WM stock overview. Access the activity using one of the following navigation options: SAP role menu Transaction code Field name Warehouse No. Material Plant Description Display Quants for Material LS24 User Action and Values F01 H84-1045 BP01 Comment

13. On Stock per material screen, make the following entries:

Choose Enter. All warehouse bin stock is displayed. 14. You then post the TR. Access the activity using one of the following navigation options: SAP role menu Transaction code Field name Warehouse Number Material Plant TRs for Material LB11 Description Warehouse Number material User Action and Values F01 H84-1045 BP01 Comment

15. On the display transfer requirement : list for materials screen make the following entries:

16. Confirm your entries with Enter. 17. On the Transfer requirements for material screen, select the purchase order (displayed in Tracking No.) for which you just post the goods receipt before. Choose TO in Foregr.

SAP AG

Page 27 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

18. On the Create TO for TR xxxxxxxxx :prepare for putaway screen, make the following entries: Field name Storage Unit Type Description User Action and Values E1 Comment In the area Palletization at the bottom row

19. Choose ENTER. Choose putaway foreground (F5). Confirm the information message on the next screen. Choose Save. 20. On the Create Transfer Order for Material Document: Initial screen, confirm all default values with ENTER. 21. On the Create TO from TR: Overview of Transfer Requirement screen, choose button Create SU (single), make the following entries: Field name Storage Unit Type Description User Action and Values E1 Comment

22. Choose Create then save your entries. 23. Now you may check the stock situation once more in IM to see the effects of the posting. Access the activity using one of the following navigation options: SAP role menu Transaction code Stock Overview MMBE

24. On the Stock overview : company code/plant/storage location/batch screen, make the following entries: Field name Material Description User Action and Values H84-1045 Comment

Choose Execute (F8). All inventory stock is displayed. 25. Finally you check the stock overview once more in WM. Access the activity using one of the following navigation options: SAP role menu Transaction code Field name Warehouse No. Material Plant Description Display Quants for Material LS24 User Action and Values F01 H84-1045 BP01 Comment

26. On the Stock per material screen, make the following entries:

27. Choose Enter. All warehouse bin stock is displayed. 28. Repeat steps 1 28 for the materials H84-1047 and H84-1048 which are managed with full warehouse management function. (steps 5 7 can be skipped for H84-1047 and H84-1048 materials are not subject to batch management)

ResultThe ordered quantities are posted to the stock (both IM and WM)

SAP AG

Page 28 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Posting Goods Receipt and Following Lean WM UseYou want to post the incoming goods and perform subsequent lean WM activities for the material H84-1046. A transport order (TO) is required for incoming goods receipt posting for H84-1046, but the TO is not required for picking.

PrerequisitesThe purchase order has been created.

Procedure1. First you create the inbound delivery for the purchase order. Access the activity using one of the following navigation options: SAP role menu Transaction code Field name Vendor Purchase Order Description Create Inbound Delivery (Lean WM) VL31N User Action and Values H8445 xxxxxxxxxx Number of the purchase order for material H84-1046 as noted above Comment

2. On the Create inbound delivery screen, make the following entries:

3. Confirm your entries with Enter. 4. On the Create Inbound Delivery: Overview screen, choose Save and note the Inbound delivery No___________________.___________________. 5. In the next steps you create a transfer order for the inbound delivery. Access the activity using one of the following navigation options: SAP role menu Transaction code Field name Warehouse No. Inbound delivery Description Create TO for Inbound Delivery LT0F User Action and Values L01 The no. you noted before Comment

6. On the Create inbound delivery screen, make the following entries:

7. Confirm by choosing Enter. 8. On the Create Transfer Order for Inb. Delivery: Overview Deliveries screen, choose Generate TO item, and save your entries. One transfer order is triggered. 9. To post the goods receipt for the transfer order, access the activity using one of the following navigation options: SAP role menu Transaction code Change Inbound Delivery VL32N

10. Enter the inbound delivery number you noted before and choose Post Goods Receipt. The delivery is changed and saved. 11. Choose Document flow to analyze the whole procedure.

SAP AG

Page 29 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Posting Goods Receipt for Material with Manufacturer Part Number UseYou want to post the incoming goods for material H84-1030. In the purchase order you informed your vendor about the approved manufacturer part numbers.

The batch for the material H84-1030 uses batch classification. Therefore it is necessary to use the older transaction MB01 for goods receipt processing instead of the transaction MIGO. Posting the goods receipt with the transaction MIGO skips the characteristic assignment screen of the batch classification. It is then not possible to find the material batch later in the process.

PrerequisitesThe purchase order of material H84-1030 with MPN has been created.

Procedure1. Access the activity using one of the following navigation options:SAP role menu Transaction code Post Goods Receipt for PO MB01

2. On the Goods Receipt for Purchase Order: Initial Screen, make the following entries:Field name Movement Type Purchase Order Plant Storage Location Description User Action and Values 101 BP01 0004 Comment

3. Confirm your entries with Enter. 4. On the Goods Receipt for PO: Selection Screen, verify the item and quantity and choose theitem that you want to post. Select Adopt+Details.

SAP AG

Page 30 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

5. On the Goods Receipt for Purchase Order: New Item 0001, make the following entries:Field name MPN material Description Identifies the manufacturer part User Action and Values H84-1031 or H84-1032 Comment

6. 7. 8. 9.

Confirm your entries with Enter. On the Confirm receipt of certificate dialog screen, choose Yes. On the Automatic Batch number Allocation screen, choose Yes. On the Goods Receipt for Purchase Order: Classification screen, make the following entries: Field name Manufacturer Part Number Data Code Manufacturer Batch Description User Action and Values The same as step 5 Comment

10. Choose Back and confirm the warning message with Enter, then confirm your entries withSave. Note the number of the goods receipt: _____________________________

11. Choose Back to return to the SAP Easy Access screen.

ResultGoods receipt for H84-1030 has been posted.

Production Order ProcessingCreating Production Orders UseThe purpose of this activity is to create production orders for the H84-1000, H84-1040 in-house production parts.

PrerequisitesRequirement planning has been carried out.

Procedure1. Access the activity using one of the following navigation options:SAP role menu Transaction code Display Stock/Requirements Situation MD04

2. On the Stock/Requirements List: Initial Screen, enter the following data:Field name Material Plant Description User Action and Values H84-1000 BP01 Comment

3. 4. 5. 6.

Confirm your entries with Enter. Double-click the first planned order; choose Convert planned order to production order. Choose Save. The converted order number is displayed at the bottom of the screen. Return to the stock/requirements list and choose Refresh. The planned order is replaced by a new production order.

SAP AG

Page 31 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

To analyze the requirement, double click the production order, choose Pegged Requirements, and the sales order number you noted before is displayed.

7. Repeat steps 1-6 for material H84-1040. 8. Choose Back to return to the SAP Easy Access screen.

ResultThe production orders are created for the parts produced in-house.

Scrap Treatment and Analysis UseWhen you create a production order, the system calculates the scrap based on different scrap types. In this activity, you go through the results of the assembly scrap, operation scrap and component scrap. Assembly scrap: A percentage of the quantity of an assembly that does not meet the required production quality In material requirements planning (MRP), this percentage scrap is considered for all components contained in the assembly. The only components excluded from this calculation are those for which the net operation scrap indicator is set. Operation scrap: The percentage of the material processed in an operation that does not meet quality requirements. Component scrap: The scrap that is expected to occur when a material is used in production, if the material is a component. Component scrap is used in material requirements planning to determine the input quantities of a component. Net indicator: This indicator determines whether scrap for the component is calculated on the basis of the net required quantity (the required quantity without assembly scrap from the material master record).

Procedure1. Access the activity using one of the following navigation options: SAP role menu Transaction code Display Production Order CO03

2. On the Production Order Display: Initial Screen, make the following entries: Field name Order Description User Action and Values Your Production Order Number for material H84-1000 Comment

Confirm your entries with Enter. 3. On the General tab page, check the total quantities and scrap portion.

SAP AG

Page 32 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

4. Choose Component Overview (F6), and check the Reqmts qty for each item. In this scenario, with a production order for 50 pieces H84-1000, the results are as follows: Component H84-1000 (5% assembly scrap) H84-1010 (2% operation scrap with net ID) H84-1020 H84-1030 (10% component scrap) H84-1040 H84-1050 H84-1060 H84-1070 Original Quantities 50 200 50 50 50 50 750 5L Reqmts. Quantities 53 204 53 59 53 53 795 5,3 L

In the stock/requirements list you do not find any requirements for bulk material H841070 since the dependent requirements of bulk materials are not relevant to material requirements planning. Dependent requirements are only created in the planned order for information purposes and they can be displayed there. Dependent requirements for bulk material are not shown in the MRP list or the stock/requirements list. 5. Choose Back to return to the SAP Easy Access screen.

Releasing Production Orders for Semi-finished Products UseRelease at order header level releases the order and all its operations. The order and the operations receive the status REL (released). You can release a production order in create and change mode.

PrerequisitesThe production order created by the MRP controller has been assigned a release date in accordance with the scheduling margin key. The production scheduler selects all the created production orders with a release date and releases all relevant production orders by means of mass processing.

Procedure1. Access the activity using one of the following navigation options: SAP role menu Transaction code Release Production Orders CO05N

SAP AG

Page 33 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

2. On the Release Production Orders screen, enter the following data: Field name List Selection Material Order type Select. at operation level Plant Sys. Status 3. 4. 5. 6. BP01 CRTD H84-1040 YHM2 In this step the production order for component H84-1040 is selected and released. Description User Action and Values Order Headers Comment

On the Mass processing -Release tab in the Function parameter area, select Order release. Confirm your entries with ENTER and choose Execute (F8) to execute the report. Make a note of the total order quantity: ________________________. Select the production orders and choose Mass Processing (Ctrl + F8) Execute (F8) to execute Mass processing.

Shop floor papers are printed automatically when the production orders are released. In the production order display screen, choose Order Settings List control to get an overview about the lists to be printed and the spool settings. Alternatively you can check the papers created by the production order through transaction SP01. 7. The system status has changed from CRTD (created) to REL (released). 8. Select your production order and choose Change Object. 9. Choose Operation Overview (F5).

10. Choose Select All, followed by Op. details. 11. Make a note of the confirmation numbers (Confirmation) for each operation. You can scroll through the operations using the navigation buttons. Confirmation numbers: ________________. 12. Choose Back to return to the Production Order Change: Operation Overview screen. 13. A material availability check can be carried out manually by choosing: check material availability. If there are no missing components the status will change to MACM: Material Committed. The availability check in Shop Floor Control checks whether the components required for a production order are available. The checking control can be automatically performed during order creation or during order release. 14. Save the production order and return to the Order Information System: Detail List of Order Headers screen. 15. Go Back to return to the SAP Easy Access screen.

ResultThe production order for the component H84-1040 has been released.

SAP AG

Page 34 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Picking Components with WM/PP interface and FIFO Strategy at Semi-Finished Goods Order Level UseThe released production order is now ready for picking. The components H84-1045, H84-1047, and H84-1048 have to be picked from the WM storage location 0006. The WM/PP interface for this storage location is activated. The component H84-1046 has to be picked from the IM storage location 0005. The procedure for picking from an IM storage location is described in the section Picking components for Finished Goods (IM FIFO strategy) below. The following section focuses on the different types of WM/PP material staging (pick list component, crate part and release order part).

Option 1: WM/PP Material Staging for Pick List Parts (Staging Indicator 1) PrerequisitesThe putaway stategy of the WM storage types is defined with F (FIFO). The use of WM/PP deliveries instead of WM transfer requirements for pick list parts (staging indicator 1) is set in the Customizing of the WM/PP interface for the warehouse. The master data maintenance for the WM/PP material staging of pick list part H84-1045 is complete: Backflush indicator 1 or 2 in Material Master H84-1045 is maintained Storage bin PSA_PICKLI in storage type 100 is maintained Control cycle for material master H84-1045 in production supply area PROD_MTS is maintained with staging indicator 1 and storage type 100/storage bin PSA_PICKLI

Production supply area PROD_MTS is assigned to work center E1013 for activity 10 (assembly) The release of the production order for material H84-1040 has created a WM/PP delivery.

Procedure1. Access the WM/PP delivery using one of the following navigation options: SAP role menu Transaction code Field name Production order 3. 4. 5. 6. Description Order number of the production order to be picked Display Production Order CO03 User Action and Values Enter your order number for material H84-1040 Comment

2. On the Production Order: Initial screen, enter the following data:

Choose Header. On the Production Order Header screen, choose from the menu Goto WM picklist. Choose Display in the WM mat. provision dialog windows. On the Display WM Material Staging for Production Order screen, select the tab page Only PickParts. Component H84-1045 is displayed in the first line. 7. Choose Documents for Order to switch to the Days Workload for Picking screen. The overview shows the WM/PP delivery created on release of the production order. Select the item and choose TO (Transfer order) in foreground. 8. On the Create Transfer Order for Delivery Note screen, the number of the WM/PP delivery is set as the default value. Choose Enter.

SAP AG

Page 35 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

9. On the Create Transfer Order for Delivery Note: Overview screen select the item and choose Stock figures (between the two pushbuttons). On the Stock that can be removed from storage screen, you can see an overview of the stock figures. The stocks are sorted in ascending order by GR date. If you do not select a storage bin and batch, the system applies the FIFO strategy. You can check this by choosing Stock removal foreground. The oldest quant should have been selected (depending of the open quantity of the transfer order, several TO items might be created). 10. On the Create Transfer Order for Delivery: Generate TO Item screen, choose Enter and on the following Create TO for Delivery : Prepare for Stock Removal screen, save the data to post the transfer order for the WM/PP delivery. 11. Note the number of the transfer order: _________________ ____ 12. After the physical movement of the component H84-1045 to the production supply area (destination: storage type 100 / storage bin PSA_PICKLI) the transfer order has to be confirmed. Access the activity using one of the following navigation options: SAP role menu Transaction code Confirm Transfer Order Item LT11

13. On the Confirm Item: Confirm Single Item screen, enter the TO number and the item. Select Background in the Control subscreen and confirm with Enter. The TO is confirmed in background. If the planned TO quantity is not equal to the moved quantity, you can enter and correct the quantity by choosing Foreground on the control screen. 14. Access the activity using one of the following navigation options to check the document flow and the status of the WM/PP delivery: SAP role menu Transaction code Field name OutboundDelivery Display Outbound Delivery VL03N

15. On the Display Out bound Delivery screen, make the following entries: Description User Action and Values Number of WM/PP delivery Comment

Choose Enter to access the overview screen. 16. To check the status of the delivery, choose Document flow: The status of the WM/PP delivery and the WM transfer order should be Completed. In the item details you can also check the status. 17. Access the activity using one of the following navigation options: SAP role menu Transaction code Stock Overview MMBE

18. On the Stock Overview: Company Code/Plant/Storage Location/Batch screen, make the following entries: Field name Material Description User Action and Values H84-1045 Comment

19. Choose Execute (F8). All inventory stock is displayed. 20. Access the activity using one of the following navigation options: SAP role menu Transaction code Field name Warehouse Description Display Quants for Material LS24 User Action and Values F01 Comment

21. On the Stock per material screen, make the following entries:

SAP AG

Page 36 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

No. Material Plant H84-1045 BP01

22. Choose Enter. All warehouse bin stock is displayed.

Picking for WM/PP deliveries can also be executed using transaction VL06P. In this case you can select several WM/PP deliveries (for example, for the production supply area)

ResultThe WM staging movements with strategy FIFO has been carried out. The WM/PP delivery is completed. No inventory posting has been executed

Option 2: WM/PP Material Staging for Crate Parts (Staging Indicator 2) PrerequisitesThe putaway stategy of the WM storage types is defined with F (FIFO). The use of WM transfer requirements for crate parts (staging indicator 2) is set in the Customizing of the WM/PP interface for the warehouse. The master data maintenance for the WM/PP material staging of crate part H84-1047 is complete: Backflush indicator 1 or 2 in Material Master H84-1047 is maintained Storage bin PSA_CRATE in storage type 100 is maintained The control cycle for material master H84-1047 in production supply area PROD_MTS is maintained with staging indicator 2 and storage type 100 / storage bin PSA_CRATE Production supply area PROD_MTS is assigned to work center E1013 for activity 10 (Assembly)

The available stock quantity of H84-1047 shall be no less than 100 PCs, otherwise post goods receipt to WM for H84-1047. The release of the production order for material H84-1040 does not create a WM/PP delivery, and there is no transfer requirement and no transfer order for material H84-1047 due to crate part processing.

SAP AG

Page 37 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Procedure1. Display the WM/PP staging situation of the production order for H84-1040 SAP role menu Transaction code Field name Production order Description Order number of the production order to be picked Display Production Order CO03 User Action and Values Enter your order number for material H84-1040 Comment

2. On the Production Order Display: Initial screen, enter the following data:

3. Choose Header. 4. On the Production Order Display: Header screen, choose from the menu Goto WM picklist. On the Display WM Material Staging for Production Order screen, select the tab page All Parts. Material H84-1047 is listed. On the bottom of the screen scroll to the right to get all the WM/PP staging information (staging indicator, storage bin, requirement quantity, ) It is only possible to realize material staging if the required quantity of material H841047 is in stock. You can check the stock situation in transaction MMBE. There must be a stock of at least 100 PC. 5. Access the activity WM staging of crate parts using one of the following navigation options: SAP role menu Transaction code Field name Material Plant Supply area TO creation Description H84-1047 BP01 PROD_MTS Set the indicator for automatic TO creation immediately after TR creation WM staging of crate parts LP11 User Action and Values Comment

6. Enter the following data on the WM Staging of Crate Parts screen:

7. Choose Enter. The system message You are requesting immediate TO creation is an information message only and can be ignored. 8. On the next screen, the system displays the replenishment information, for example the bin information and the destination. Choose WM material staging. 9. Confirm the system message Requirement will cause an overdelivery Submit requirement anyway with Yes. Staging is executed and the system issues the information message WM staging of materials executed without error. 10. Choose Save. As a result, a transfer order is created. Note the number of the transfer order: _________________ ____ 11. Use the following activity to display and check the transfer order created. SAP role menu Transaction code Display Transfer Order / Material LT24

12. On the Transfer Orders for Material screen, make the following entries: Field name Description User Action and Values Comment

SAP AG

Page 38 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Warehouse Material Confirm status

F01 H84-1047 Only open TO items

13. Choose Execute (F8). The unconfirmed transfer order is displayed. 14. Following the physical movement of the component H84-1047 to the production supply area (destination: storage type 100 / storage bin PSA_CRATE) the transfer order has to be confirmed. Access the activity using one of the following navigation options: SAP role menu Transaction code Confirm Transfer Order Item LT11

15. On the Confirm Item: Confirm Single Item screen, enter the TO number and the item. Select Background in the Control subscreen and confirm with Enter. The TO is confirmed in background. If the planned TO quantity is not equal to the moved quantity, you can enter and correct the quantity by choosing Foreground on the control screen. 16. Access the activity using one of the following navigation options: SAP role menu Transaction code Stock Overview MMBE

17. On the Stock overview: company code/plant/storage location/batch screen, make the following entries: Field name Material Description User Action and Values H84-1047 Comment

18. Choose Execute (F8). All inventory stock is displayed. 19. Access the activity using one of the following navigation options: SAP role menu Transaction code Field name Warehouse No. Material Plant Description Display Quants for Material LS24

20. On the Stock per material screen, make the following entries: User Action and Values F01 H84-1047 BP01 Comment

21. Choose Enter. All warehouse bin stock is displayed.

ResultThe WM staging movements with strategy FIFO has been carried out. No inventory posting has been executed.

SAP AG

Page 39 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Option 3: WM/PP Material Staging for Release Order Parts (Staging Indicator 3) PrerequisitesThe putaway stategy of the WM storage types is defined with F (FIFO). The use of WM transfer requirements for release order parts (staging indicator 3) is set in the Customizing of the WM/PP interface for the warehouse. The master data maintenance for the WM/PP material staging of release order part H84-1048 is complete: Backflush indicator 1 or 2 in Material Master H84-1048 is maintained Storage bin PSA_RELORD in storage type 100 is maintained Control cycle for Material Master H84-1048 in Production supply area PROD_MTS is maintained with staging indicator 3 and storage type 100 / storage bin PSA_RELORD

Production Supply Area PROD_MTS is assigned to work center E1013 for activity 10 (Assembly) The release of the production order for material H84-1040 has created no WM/PP delivery, no transfer requirement, and no transfer order for material H84-1048 because of the release order part processing.

ProcedureDisplay the WM/PP staging situation of production order H84-1040 SAP role menu Transaction code Field name Production order Description Order number of the production order to be picked Display Production Order CO03

On the Production Order: Initial screen, enter the following data: User Action and Values Enter your order number for material H84-1040 Comment

Choose Header. 4. On the Production Order Header screen, select Goto WM picklist from the menu. 5. On the Display WM Material Staging for Production Order screen, select All Parts. You can see the release order for the part H84-1048. On the bottom of the screen scroll to the right to get all the WM/PP staging information (staging indicator, work center, requirement quantity, ) 6. Access the activity WM Material Staging of Release Order Parts using one of the following navigation options: SAP role menu Transaction code Staging release order parts (WM-PP) LP12

SAP AG

Page 40 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

7. On the WM Material Staging of Release Order Parts screen, make the following entries: Field name Plant Supply area Material TO creation Description User Action and Values BP01 PROD_MTS H84-1048 Flag for Automatic TO creation immediately after TR creation Comment

8. Choose Enter. The system message You are requesting immediate TO creation is an information message only and can be confirmed with Enter. The replenishment information, bin information and destination are displayed. The system suggests the requested quantity (requirement quantity minus storage bin quantity), but the warehouse worker can modify this quantity (higher or lower) to avoid needless WM movements. 9. Select the item and choose Orders at the bottom of the screen. All production orders including the release order part H84-1048 are displayed. Once an activity is confirmed, (backflushed), the production order (reservation) disappears from this list. Posting the goods issue during confirmation also reduces the stock of storage type 100 / storage bin PSA_RELORD. 10. Go back and choose WM material staging. 11. Choose Save to complete the staging of the release order part H84-1048. A transfer order has been created. Note the number of the transfer order: _________________ ____ 12. Display and check the transfer order created using the transaction LT24. 13. Use the following activity to display and check the transfer order created. SAP role menu Transaction code 14. entries: Field name Warehouse Material Confirm status Display Transfer Order / Material LT24 On the Transfer Orders for Material screen, make the following Description User Action and Values F01 H84-1048 Only open TO items Comment

15. Choose Execute (F8). The unconfirmed transfer order is displayed. 16. After the physical movement of component H84-1048 to the production supply area (destination: storage type 100/storage bin PSA_RELORD) the transfer order has to be confirmed. Access the activity using one of the following navigation options: SAP role menu Transaction code Confirm Transfer Order Item LT11

17. On the Confirm Item: Confirm Single Item screen, enter the TO number and the item. Select Background in the Control subscreen and confirm with Enter. The TO is confirmed in background. If the planned TO quantity is not equal to the moved quantity, you can enter and correct the quantity by choosing Foreground on the control screen.

SAP AG

Page 41 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

18. SAP role menu Transaction code

Access the activity using one of the following navigation options: Stock Overview MMBE

19. On the Stock overview: company code/plant/storage location/batch screen, make the following entries: Field name Material 20. 21. SAP role menu Transaction code 22. Field name Warehouse No. Material Plant 23. Description Description User Action and Values H84-1048 Choose Execute (F8). All inventory stock is displayed. Access the activity using one of the following navigation options: Display Quants for Material LS24 On the Stock per material screen, make the following entries: User Action and Values F01 H84-1048 BP01 Choose Enter. All warehouse bin stock is displayed. Comment Comment

ResultThe WM staging has been completed using the FIFO strategy. No inventory posting has been executed.

Confirming Production Orders with Bar Code Scanner (Optional) for Semifinished Goods UseA confirmation documents the processing status of orders, operations, sub-operations and individual capacities. It is identified by a confirmation number that is printed as a barcode.

PrerequisitesA production order is printed with a confirmation number barcode at the same time as the shop floor papers. The process is carried out in accordance with this information. Once the production process has been completed, the user confirms the activity. The material used is backflushed when the operation is confirmed. Ensure that sufficient material is in stock. You can check this using transaction MMBE. If there is not enough material in stock, you can post a goods receipt using the transaction MB1C with the movement type 561.

SAP AG

Page 42 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Procedure1. Access the activity using one of the following navigation options: SAP role menu Transaction code Single Screen Entry of Confirmations CO11N

2. On the Enter time ticket for production order screen, make the following entries: Field name Description User Action and Values Comment This is printed on the shop floor papers in the standard process. It is possible to enter the confirmation number manually if the barcode scanner fails. (Here, the process is run using manual input of the order number and operation number.)

Confirmation

Bar code reader scan

Order Oper./activity Confirm. type

The order number you noted for H84-1040 0010 Final confirmation

3. Confirm your entries with Enter. 4. Confirm the subsequent information messages with Enter. Accept the default values displayed. 5. In the Yield field, confirm is the total order quantity entered as default. 6. Save your entries. 7. Choose Back to return to the SAP Easy Access screen.

ResultAfter saving the confirmation data, the stock postings are executed for withdrawing raw material and goods receipt for the semi-finished product. If the posting cannot be performed, the user is asked to make the necessary corrections. If the user does not make any corrections, the stock posting is sent to a pool so that the incorrect goods movements can be processed (transaction code COGI). At the same time, the receipt of the completed assembly is posted to the amount of the confirmed yield. From an organizational point of view, it is important to ensure that incorrect goods movements are post-processed when backflush and automatic stock postings are used (transaction code COGI).

SAP AG

Page 43 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

Rework Order Process UseSome operations produce more scrap due to operational or component defects. To simulate the process, some predefined operations are triggered automatically at end of the planned required operation. These are also released automatically and are followed by production execution as normal production parts. In the following scenario, scrap is detected during a QM activity. A rework process is triggered immediately, the rework activity is confirmed, and the additional material consumption is posted. To simulate the process, we assume that some scrap was found by inspection in the last order (the production order for H84-1040 which you just completed in the last step).

PrerequisitesThe reference operation set for H84-1040 has been defined.

Procedure1. Access the activity using one of the following navigation options: SAP role menu Transaction code Field name Order Oper./activity Confirm. type 3. 4. 5. 6. 7. 8. 9. 10. Description Single Screen Entry of Confirmations CO11N User Action and Values The order no. you noted for the material H84-1040 0020 Partial confirmation Important Comment

2. On the Enter time ticket for production order screen, make the following entries:

Confirm your entries with Enter. In the Scrap field, enter the scrap quantity 5, and choose Enter. Choose Save. Confirm the dialog box Trigger point function with Enter. Choose Copy (F7) on the Assign Operation/Sub operation Numbers screen. Confirm the dialog box Trigger point function with Enter. Go back to your user menu. Display the production order. To do so, access the activity using one of the following navigation options: SAP role menu Transaction code Display Production Order CO03

11. Enter the order number for the material H84-1040. 12. On the Production order Display: Header screen, choose Operation overview (F5). 13. Note that the rework operation 0022 was added and released.

SAP AG

Page 44 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

14. After the scrap is repaired (rework finished), repeat steps 1-3 for the operation 0022. 15. Enter the yield quantity 5 and the labor time 1 H (assumed the rework time). Choose Enter. 16. Choose Goods movement and perform an additional goods issue posting here (assume additional material needs for rework). 17. On the Enter production order confirmation: goods movements screen make the following entries: Field name Material Quantity Plant Stor. Loc. storage location Description User Action and Values H84-1020 5 PC BP01 0004 Comment

18. Confirm your entries with Enter. 19. Confirm the message Enter the Batch with Enter. 20. Select the material and choose Batch determination (contrl+F4). The batch was determined using the FIFO strategy. 21. Choose Save.

ResultThe rework process is complete.

The rework process shown here is a real business case. The scrap is completely repaired with some additional material consumption and activities in an automatically triggered rework process. For a more complex business case with more complex rework activities, you can define the operations in a reference operation set. Another possibility is to cancel the confirmation of operation 0010, confirm it again with the actual quantity and activity again. This can be applied if the scrap is not completely repaired.

Analysis and Treatment of Bulk Materials PrerequisitesMaterial H84-1070 Glue / oil is defined as bulk material.

Procedure1. Access the activity using one of the following navigation options: SAP role menu Transaction code Display Stock/Requirement Situation MD04

2. On the Stock/Requirements List: Initial Screen, make the following entries: Field name Material Plant 3. Confirm your entries with Enter. Description User Action and Values H84-1070 BP01 Comment

SAP AG

Page 45 of 71

SAP Best Practices

H84: MTS Production with Batch Management, WM and HUM

4. Note that no dependent requirement is triggered and no reservation, planned order or production order is included in the bulk material. To analyze this, enter the following data on the Stock/Requirements List: Initial Screen: Field name Material Plant Description User Action and Values H84-1000 BP01 Comment

5. Select a production order number and choose Display. Choose Component overview (F6). Material H84-1070 is displayed. Do the same for a planned order. 6. Note that in the Production Order Display: Component Overview screen, the component H841070 (Glue/oil) is not flagged as a backflushed material and there is no default issue storage location although both are maintained in material master. This means that the bulk material will not be backflushed or issued to a single production order; instead it is issued to the cost center with the movement type 201. To do this, you have to execute the procurement first. 7. Access the activity using one of the following navigation options: SAP role menu Transaction code Field name Material Plant Scope of planning Product group MRP control parameters Processing key Create purchase req. Delivery schedules Create MRP list Planning mode Scheduling Process control parameters Also plan unchanged components Display results before they are saved Display material list Simulation mode (remove indicator) (remove indicator) (r