27
H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM WITH THE OB SYSTEM ANTARES COLLABORATION MEETING ANTARES COLLABORATION MEETING 08-12 FEBRUARY 2010, CERN 08-12 FEBRUARY 2010, CERN (SWITZERLAND) (SWITZERLAND)

H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

  • View
    218

  • Download
    3

Embed Size (px)

Citation preview

Page 1: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia)H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia)

NEWS ON ABSORPTION LENGTH MEASUREMENT WITH NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEMTHE OB SYSTEM

ANTARES COLLABORATION MEETING ANTARES COLLABORATION MEETING

08-12 FEBRUARY 2010, CERN (SWITZERLAND)08-12 FEBRUARY 2010, CERN (SWITZERLAND)

Page 2: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

OUTLINE

A REMINDER OF THE EXPERIMENTAL PROCEDURE

STATUS OF OPTICAL PROPERTY RUNS ACQUISITION

ANALYSIS BASED ON GOLDEN RUNS: NEW MEASUREMENTS

PERFORMED WITH UV LEDS

CONCLUSIONS AND OUTLOOK

Page 3: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

F2

EXPONENTIAL FIT

L

Rpe

pe eQRQ

02L

Rhitssignal

hits eNRN

02

1. THE EXPERIMENTAL SETUP:

One single top LED of the lowest optical beacon in the line flashes to the upper storeys and the collected charge (Q) can be plotted and fitted through an exponential function for hits or charge, once quality cuts are applied.

The collected charge is a convolution of:

Physics:

• Absorption length (Labs)

• Scattering (Lsca and = ())

Detector:

• OB – OM relative orientation

• OM efficiency

• ARS token ring dead time

• Charge resolution

To minimize the effects of the detector:

• Consider only OMs in the same line of the OB

• Consider only the region (Rmin, Rmax) where signal < spe but well above background

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

A REMINDER OF THE EXPERIMENTAL PROCEDURE

3

Page 4: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

Qnoise

Tmax

Tmin

Qsignal

2. TIME DISTRIBUTION:

• Determine the peak Gaussian fit

• Choose a fixed time window [Tmin, Tmax] and select the hits:

Tmin = Tpeak – 3Tmax = Tpeak + 1000 ns

• Calculate their overall charge Qtot and the signal hits.

3. NOISE CONTRIBUTION:

• Fit a constant in the [-1000, -50] ns range (B level) and substract the noise contribution (Qnoise):

Qsignal = Qtot – Qnoise = Qtot – Blevel (Tmin - Tmax)

NOISE LEVEL

Time distribution

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

A REMINDER OF THE EXPERIMENTAL PROCEDURE

4

Page 5: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

4. CHARGE LOSSES:

• Some hits are lost due to the electronic dead time from the readout of the ARSs.

• Consider only the region where the probability to get more than one photoelectron is negligible (i.e. < 1 %).

• Electronics dead time effects related to Rmin.

5. PMT EFFICIENCY CORRECTION BY NOISE:

• Assume that the Qnoise ~ PMT

• Normalize PMTs signal charge to their own noise charge:

noise

signalsignal Q

QQ

Time distribution Efficiency correction by noise

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

A REMINDER OF THE EXPERIMENTAL PROCEDURE

5

Page 6: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

6. NOISE FLUCTUATIONS:• To avoid noise fluctuations at large distances, signal greater than the noise is required Maximum distance to fit Rmax. 7. MEASUREMENT OF ERRORS:• Statistical and dispersion errors are considered for the data.8. LOW EFFICIENCY OMs CLEANING:• Low efficiency OMs are removed. Checked from noise plots Compute hits projections, fit a Gaussian and consider only OMs between (+3, -3).9. THE BACKGROUND “FLATNESS”:• Efficiency correction by noise is affected by noise fluctuations along the line A “flat” level noise along the line is required.

GOLDEN RUN

TOTAL RUNs 126

GOLDEN 53

The experience from the analysis has let the optimization ofdata taking:

• Golden runs taken by request, once conditions are met.

• No silver and copper runs taken anymore.

• Updated golden runs table until 01/02/2010:

22dispstatT

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

A REMINDER OF THE EXPERIMENTAL PROCEDURE

6

Page 7: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

DATA ACQUISITION STATUS:

Optical property runs are taken on request when background rates are low:

USER Line 1-12 LED Beacon - Optical properties HI - V3.1 (L2F2)

• High intensity runs at 470 nm Stability in time of results is confirmed

USER Line 1-12 LED Beacon - Optical properties MI - V3.1 (L2F2)

• Medium intensity runs for testing

USER Line 1-12 LED Beacon - L12 F2 KM3NeT LEDs - V3.1 (L12F2, UV!)

• First UV runs obtained (11 UV runs at present)

USER Line 1-12 LED Beacon - only test (L4F2, L8F2, L2F9)

• Different lines/OBs/LEDs (L4F2, L8F2) to study systematic effects and influence of depth on absorption length (L2F9).

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

STATUS OF OPTICAL PROPERTIES RUNS ACQUISITION

7

Page 8: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

1. THE STABILITY FOR THE OPTICAL PARAMETER L:

Last Collaboration Meeting (Gandia):

• Values for L obtained from different runs are stable provided that 1) a correction by efficiency is made (based on background rate), 2) high intensity runs are used and 3) phe level is required.

High intensity runs Rmin(H) = 135 m Rmax(H) = 275 m

• Value for L computed from the number of hits if the reference fit (0F, 0F) is moved:

If Rmin decreases We go out from the photoelectron region L increases.

If Rmin increases Scattering effects are most remarkable L decreases.

Reference fit

Rmax Rmin -2F (F10) -1F (F11) 0F (F12) +1F (F13) +2F (F14)

-1F (F20) 57.15 55.8 56.13 55 53.77

0F (F21) 56.86 55.24 55.2 54.18 53.77

+1F (F22) 56.99 55.24 55.14 54.18 53.59

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

ANALYSIS BASED ON GOLDEN RUNS

8

Page 9: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

2. THE REFERENCE FIT FOR UV RUNS:

Take distances where the probability to get more than one phe is negligible:

x = number of signal reaching the OM

= number of signal hits / number of flashes

High intensity runs (470 nm) Rmin(H) = 135 m Rmax(H) = 275 mHigh intensity runs (400 nm) Rmin(H) = 135 m Rmax(H) = 275 m

LED intensity Rmin (m) P(phe > 1)

H (blue) 135 0.2%

H (UV) 135 0.5%

ex

xPx

!),(

High intensity at 470 nm (blue) High intensity at 400 nm (UV)

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

ANALYSIS BASED ON GOLDEN RUNS

9

Page 10: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

3. RESULTS BY LED WAVELENGTH:

L(470 nm)

L8, L2, L4, L1

L(400 nm)

L12

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

ANALYSIS BASED ON GOLDEN RUNS

10

Page 11: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

ANALYSIS BASED ON GOLDEN RUNS

11

Page 12: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

4. RESULTS BY LINES:

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

ANALYSIS BASED ON GOLDEN RUNS

12No hint of a dependence of L on line or OB

Page 13: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

5. RELATIONSHIP BETWEEN L AND THE ABSORPTION LENGTH (abs):

MC PRODUCTIONWater model: Particabs = 60 m fixed = 0.17, 0.05scat = 30, 40, 50, 60, 70 m

L1000 IS A LOWER LIMIT FOR THE abs

abs MC input

L obtained from Data

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

ANALYSIS BASED ON GOLDEN RUNS

13

L obtained from MC

The difference abs - L depends on scat and ↔ ()

Page 14: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

6. THE R TECHNIQUE:

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

ANALYSIS BASED ON GOLDEN RUNS

14

• The effect of scattering is to increase the photon path length in ΔR on average.• Perform the exponential fit using (mean photon path), R + ΔR instead of R.

R

ΔR

R+ΔR

w direct wR c t t c t

• ΔR should be proportional to the scattering.• Exponential fit with R + ΔR will be more insensitive to scattering since the greater the scattering the greater the delay and viceversa, making the L parameter closer to the real absorption length.

ΔR can be extracted from time distributions !!!

t

L

RR

eIIR)(

02

Page 15: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

ANALYSIS BASED ON GOLDEN RUNS

15

7. PARAMETERIZATION OF R FOR DATA AND MC SIMULATIONS:

Correlation between R+R for data (golden runs) Correlation between R+R for MC

The values of the above slopes are then related to the Rayleigh scattering ().

MC simulations can give an idea about the scattering contribution, from the relationship between R + R and R.

R + R = R ( depends on scattering)

R [m]

R +R [m]

PRELIMINARY

R [m]

R +R [m]

PRELIMINARY

Page 16: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

ANALYSIS BASED ON GOLDEN RUNS

16

scat, eff

PRELIMINARY

cos1scateff

scat

Relationship scat, eff and (differents ) MC

8. DEPENDENCE OF ON THE EFFECTIVE SCATTERING LENGTH (scat, eff)

Page 17: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

ANALYSIS BASED ON GOLDEN RUNS

16

L parameter using R parameterization MCL parameter using R parameterization DATA

• Fit of L to <R+R> seems to “recover” abs

• VERY PRELIMINARY Needs cross-checks !!!

9. RESULTS OF THE R TECHNIQUE ON MC AND DATA:

PRELIMINARY PRELIMINARY

Page 18: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

CONCLUSIONS AND OUTLOOK

• The new runs confirm the stability of L for high intensity runs in the blue (470 nm).

• New UV (470 nm) runs have been taken. L (≈38 m) is also stable (good agreement with the old run of the previous L12F2 OB collaboration meeting Marseille).

• L does not seem to depend on OB, LED or line. Depth dependence being currently studied. Systematic errors have to be revisited.

• Monte Carlo simulations indicate that L is a lower limit of abs . However, = abs ­­L depends on scat and on the angular distribution () and these are poorly known (to say the least). An educated guess indicates ≈ 5-10 m for 470 nm.

• A first attempt has been made to extract information for scat and () from the time distribution at different distances. Assuming that scattering changes absorption length only through the increase of the effective travelled distance, the fit is made to R + ΔR (instead of R) where ΔR is extracted from data. Preliminary Monte Carlo results are encouraging (L is much closer to abs), but still a lot of work to be done to check the range of applicability of the procedure.

• Take new low intensity runs → distance OB-OM shorter → effect of scat smaller→ L should approach abs . This is indeed roughly seen, but the few low intensity runs that we have are poorly understood, the exponential seems to change slope (an indication?).

• Integration of new multi-wavelength OB in line 6 has taken place. Hopefully new data at different wavelengths soon.

Page 19: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

BACKUP SLIDES

Page 20: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

BACKUP SLIDES

THE BACKGROUND FLATNESS AS A QUALITY FACTOR

Noise efficiency correction is affected by noise fluctuations along the line A “flat” level noise along the line is required.

The background level flat shape along the line is correlated with low rates Special runs request at low mean background rates: E-LOG entry: 4126

USER Line 1-12 LED Beacon - Optical properties MI - V3.1 USER Line 1-12 LED Beacon - Optical properties HI - V3.1

Page 21: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

BACKUP SLIDES

DEPENDENCE OF P1 (a) ON SEVERAL WATER PARAMETERS

Page 22: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

BACKUP SLIDES

Page 23: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

BACKUP SLIDES

Page 24: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

BACKUP SLIDES

Page 25: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

BACKUP SLIDES

Page 26: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

BACKUP SLIDES

Page 27: H Yepes, C Bigongiari, J Zuñiga, JdD Zornoza IFIC (CSIC - Universidad de Valencia) NEWS ON ABSORPTION LENGTH MEASUREMENT WITH THE OB SYSTEM ANTARES COLLABORATION

|| Harold Yepes || ANTARES Collaboration Meeting, 08-12 February 2010, CERN ||

BACKUP SLIDES