Upload
malcolm-joseph
View
220
Download
3
Embed Size (px)
Citation preview
h
B O S C H A N D S I E M E N S H O M E A P P L I A N C E S G R O U P
OOO BSH Bytowije Pribory
Round-Table for Suppliers
St. Petersburg
19 May 2011
Round-Table for Suppliers I STP I 19 May 2011 I Slide: 2
h
B O S C H A N D S I E M E N S H O M E A P P L I A N C E S G R O U P
BSH-Group: Shareholders
BSH Bosch und Siemens Hausgeräte GmbH
50 % 50 %
1967
2010
Siemens AGRobert Bosch GmbH
Round-Table for Suppliers I STP I 19 May 2011 I Slide: 3
h
B O S C H A N D S I E M E N S H O M E A P P L I A N C E S G R O U P
BSH-Group: Business at a Glance
As of Dec. 31, 2009
Number of brands: 13
Number of employees: ca. 43,000 worldwide
Corporate sales in 2010: 9.1 billion EUR
Number of companies: ca. 70 in 46 countries
Number of factories: 41 in 13 countries in Europe,
Americas and Asia. ~ 40 Millions of home appliances produced p.a.
Multiple awards for products and factories
Round-Table for Suppliers I STP I 19 May 2011 I Slide: 4
h
B O S C H A N D S I E M E N S H O M E A P P L I A N C E S G R O U P
BSH location in Strelna -today-
Foundation of BSH Bytowije Pribory 21 March 2005
Start of production Cooling 1st Step Sept. 2007– Production surface 21,000 sq.m– Capacity 250,000
units p.a.
Extension production Cooling Step 2– Extended surface 7,000 sq.m– Total surface production 28,000 sq.m– Capacity total 500,000 units p.a.
Logistics Warehouse– Total surface 20,000 sq.m
Assembly of Washing machines– Start of production July 2010– Capacity 100,000
units p.a.
Employees* 700 total
520 in production Building new factory Washing machines
– Capacity 350,000 units p.a.
– Start of production June 2012
Total investment till end of 2011 € 100 M* As of 03/2011
Round-Table for Suppliers I STP I 19 May 2011 I Slide: 5
h
B O S C H A N D S I E M E N S H O M E A P P L I A N C E S G R O U P
February 2011
Round-Table for Suppliers I STP I 19 May 2011 I Slide: 6
h
B O S C H A N D S I E M E N S H O M E A P P L I A N C E S G R O U P
Extension of BSHP-RUS
Status 2007
Status 2010
Extension options
WashingStep 2
The capacity increase for the cooling appliance factory up to 500,000 units per year finished 1 July 2010
The logistic extension finished 1 July 2010.
First step of washing machine production with a capacity of 100,000 units per year started 1 July 2010.
Second step of washing machine production with a capacity of 350,000 units per year will start
1 of June 2012
There are further possibilities for expansion on the site
CoolingStep 1
LogisticsStep 1
LogisticsStep 2
CoolingStep 2
WashingStep 1
Round-Table for Suppliers I STP I 19 May 2011 I Slide: 7
h
B O S C H A N D S I E M E N S H O M E A P P L I A N C E S G R O U P
We produce Bottom-Freezer refrigerators in St. Petersburg...
Round-Table for Suppliers I STP I 19 May 2011 I Slide: 8
h
B O S C H A N D S I E M E N S H O M E A P P L I A N C E S G R O U P
SKD Slimline actual 3 VIB’s
5,0 kg Load capacity 1000 rpm o. 1200 rpm 45cm depth
3 Option buttons LED Symboldisplay Superfast programme 30 minutes Mixed load programme 30cm door
Actual 3 VIB‘s 3 additional from April 2011
Round-Table for Suppliers I STP I 19 May 2011 I Slide: 9
h
B O S C H A N D S I E M E N S H O M E A P P L I A N C E S G R O U P
SEP
Potential Analysis (PA)
Supplier EnabelingPre SelectionSupplierDevelopment
SupplierMarketing
Released Suppliers
in progress
Activities stopped Finished
Q11 N.N. B33 N.N. B33 N.N. R2x N.N. H33 N.N.
B33 N.N.
R2x N.N.
H33 N.N. C12B R2x N.N. B12A R2x N.N. C12B R2x N.N. B12A T03 N.N. B18A N02 N.N. B09A N02 N.N. B09A
H33 N.N. C12C
B33 N.N. C12C
N02 N.N. C12C
B33 N.N. (on hold) B06A B33 N.N. B09A R52 N.N. C18B
H33 N.N. 12/08
R2x N.N. 12/08
R52 N.N. 12/08
R2x N.N. 02/09
Procedure of Supplier Enabling Program
Round-Table for Suppliers I STP I 19 May 2011 I Slide: 10
h
B O S C H A N D S I E M E N S H O M E A P P L I A N C E S G R O U P
Need for localization: Refrigerators
Microsoft Excel Worksheet
Round-Table for Suppliers I STP I 19 May 2011 I Slide: 11
h
B O S C H A N D S I E M E N S H O M E A P P L I A N C E S G R O U P
Need for localization: Washing machine assembly SKD
Microsoft Excel Worksheet
Round-Table for Suppliers I STP I 19 May 2011 I Slide: 12
h
B O S C H A N D S I E M E N S H O M E A P P L I A N C E S G R O U P
Thank you!
ООО «БСХ Бытовые Приборы»
ул. Карла Сименса, 1, лит. А,
Петергоф, 198515, Санкт-Петербург
тел. (812) 605-5555
факс (812) 605-5550
www.bsh-group.ru
Rassadin, Anton (STP/PR) [email protected]
Solovykh, Konstantin (STP/FP) [email protected]
Sharoshkin, Sergey (STP/PU) [email protected]