oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX401-751-8613 A Subsidiary of GZA GeoEnvironmental Technologies, Inc GZA GeoEnvironmental, Inc. May 10, 1995 File No. 31030.00 Engineers and Scientists Mr. Dennis aRusso, Environmental Manager R.I. Solid Waste Management Corporation Central Landfill 65 Shun Pike Johnston, Rhode Island 02919 Re: Central Landfill Operable Unit 2 RI/FS Progress Report No. 4 Work Period: April 10 to May 9, 1995 Dear Dennis: This letter with attachments serves as the fourth progress report prepared by GZA Geoenvironmental, Inc (GZA) associated with activities completed to date on the Central Landfill Operable Unit 2 Remedial Investigation/Feasibility Study (RI/FS). This progress report has been prepared in accordance with the requirements of Section 37 of the Administrative Order by Consent, U.S. EPA Docket No. 1-87-1016. We prepared this letter on behalf of the RISWMC in accordance with the terms and conditions of our July 9, 1992 Environmental Engineering Consulting Services Contract. Please do not hesitate to call me at ext. 320 with any questions or comments regarding this information. Very truly yours, GZA GEOENVIRONMENTAL, INC. Edward A. Su Project Maj EAS:pab Attachments: Progress Report No. 4 MW95-ML9 Draft Boring Log Summary Table Cluster Well Schematic Borehole Geophysical Logging Report Mr. James Brown/USEPA (3 copies) Ms. Becky Cleaver/HNUS (1 copy) Mr. Warren Angel/RTOEM (2 copies) An Equal Opportunuv hmplo\er M 1 \ H F:\IOBS\3L030.EAS\PR4.LET Or

GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

oz 140 Broadway

Providence

Rhode Island 02903 401-421 4140

FAX 401-751-8613

A Subsidiary of GZA

GeoEnvironmental

Technologies Inc

GZA GeoEnvironmental Inc

May 10 1995 File No 3103000

Engineers and

Scientists

Mr Dennis aRusso Environmental Manager RI Solid Waste Management Corporation Central Landfill 65 Shun Pike Johnston Rhode Island 02919

Re Central Landfill Operable Unit 2 RIFS Progress Report No 4 Work Period April 10 to May 9 1995

Dear Dennis

This letter with attachments serves as the fourth progress report prepared by GZA Geoenvironmental Inc (GZA) associated with activities completed to date on the Central Landfill Operable Unit 2 Remedial InvestigationFeasibility Study (RIFS) This progress report has been prepared in accordance with the requirements of Section 37 of the Administrative Order by Consent US EPA Docket No 1-87-1016 We prepared this letter on behalf of the RISWMC in accordance with the terms and conditions of our July 9 1992 Environmental Engineering Consulting Services Contract

Please do not hesitate to call me at ext 320 with any questions or comments regarding this information

Very truly yours

GZA GEOENVIRONMENTAL INC

Edward A Su Project Maj

EASpab

Attachments Progress Report No 4 MW95-ML9 Draft Boring Log Summary Table Cluster Well Schematic Borehole Geophysical Logging Report

Mr James BrownUSEPA (3 copies) Ms Becky CleaverHNUS (1 copy) Mr Warren AngelRTOEM (2 copies)

An Equal Opportunuv hmploer M 1 H

FIOBS3L030EASPR4LET

Or

oz

PROGRESS MADE THIS REPORTING PERIOD

DeliverablesCorrespondenceMeetings

The following deliverables were submitted to EPA and RIDEM by GZA on RISWMCs behalf

bull Borehole Geophysical Logging Central Landfill Johnston Rhode Island dated April 1995 - Prepared by Hager GeoScience Inc (attached)

RISWMC has received the following EPA review comments

bull April 11 1995 Upper Simmons Reservoir Phase II Report Review Comments received April 14 1995

bull April 14 1995 Ecological Characterization OU2Task 2 Review Comments received April 17 1995

bull April 14 1995 Operable Unit 2 Remedial Investigation Draft Work Plan Response Summary Review Comments received April 25 1995

bull April 17 1995 Draft Feasibility Study Work Plan - Operable Unit 2 Review Comments received April 18 1995

A proposed schedule for RISWMCs response (ie response summary document revision or work implementation) to these comments is provided below Please note that as of the date of this progress report RISWMC had not received written comments on any of the above deliverables from the RIDEM The schedule as presented assumes that RIDEM will not make changes if they chose to do so this schedule may require revision

RISWMC is currently awaiting review commentsapproval to implement the March 29 1995 Work Plan for Stream Flow Measurements - OU2 Task 3 This document was submitted to the agency on March 29 1995

A meeting was held on April 251995 at EPAs offices in Boston Massachusetts between RISWMCGZA and EPAHNUS The purpose of the meeting was to discuss EPAs April 14 1995 OU2RI Response Summary Review Comments and the scope of the OU2 Risk Assessment General agreement was reached on the numbers and types of samples to be collected as part of the OU2RI RISWMC will be providing EPA and RIDEM with a list of area sites potentially contributing to contamination within the OU2 study area to initiate an agency file RISWMC will perform a screening level risk assessment of the Upper Simmons Reservoir sediments to determine if additional sampling and analytical data is

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 1 of 5

oz

necessary to complete the OU2 study General agreement was also reached on most aspects of the OU2Risk Assessment scope One major point still to be determined is the future use of groundwater on properties RISWMC does not currently own It was decided that RISWMC would move forward with preparation of the OU2RA Draft Work Plan which would include a proposed groundwater use scenario for EPA to evaluate Agreements reached at the meeting as to the form of deliverables are reflected in the schedule presented below

Operable Unit 2Task 4 Well Installations

GZA has evaluated the VOC screening geophysical analysis and hydraulic conductivity testing of the 310 foot deep bedrock well (MW95-ML9) at the Central Landfill Superfund site Based on these data we recommend installation of two 2-inch ID PVC wells screened from 133 to 143 feet and 275 to 295 feet below ground surface and one 1-inch ID PVC well screened from 85 to 95 feet The recommendation for the placement of a 1-inch ID well is based on our discussions with EPA hydrologist Mr Al Klinger who suggested that an installation of this type carefully sampled with a peristaltic pump would be acceptable for organic and inorganic analysis Well screens are to be installed as described in the OU2Task 4 field sampling plan which includes a sand filter packs extending 2 feet above and below the screens For your use in reviewing these recommendations we have attached 1) draft log of the boring 2) a table summarizing field screening results laboratory screening and hydraulic conductivity testing results 3) the borehole geophysical report completed in April 1995 by Hager GeoScience Inc and 4) a sketch of the proposed well cluster sampling zones

In order to make well placement recommendations GZA evaluated each borehole testing zone based on a three-components which were numerically rated for each zone (ie 10 foot long packer testing and groundwater sampling zone) Where necessary raw scores were adjusted to compensate for any lack of chemical testing data We weighted the estimated hydraulic conductivities more heavily than the other factors (50 Hydraulic Conductivity data 25 Chemical data and 25 Geophysical data) In estimating hydraulic conductivities we adjusted flow data to compensate for observed vertical leakage around the packers

The table below represents results of our comparison detailing the top ten zones in rank order The complete comparative rankings are provided on Table 1 attached

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 2 of 5

GZ

CorojwativeiUak

Raw Soom

Zooe TMsampb

l 19 25 825 shy 91 2 20 19 134 - 144 3 20 21 1145-1245 4 20 24 85-95 5 28 7 2424 - 2524 6 35 6 249-259 7 37 8 2335 - 2435 8 39 22 1036- 1136 9 40 20 124 - 134 10 41 18 145 - 155

Having used this comparison to narrow the scope these ten test zones were then grouped by depth and more thoroughly reviewed It is clear that the highest ranking zones are concentrated at the top of the uncased portion of the borehole This provides further evidence that groundwater contaminant transport at the site occurs at relatively shallow depths However the intent of this deep borehole is to monitor deeper fractures for possible landfill-derived contamination because MW95-ML9 is part of a well cluster which already contains screens in the shallower fractured bedrock Therefore GZA recommended well placements which span the deeper hydraulically active testing zones

In selecting the deepest screened zone (designated MW95-ML9C) we reviewed the available data and concluded that Zone 2 had chemical geophysical and hydraulic properties which fulfill the selection criteria The geophysical data shows both a caliper enlargement and a temperature differential anomaly at 290 feet below ground surface which roughly corresponds with a horizontal fracture with a 05 inch aperture identified by the Acoustic Televiewer (ATV) Given roughly equivalent hydraulic conductivities and higher chemical screening results than neighboring zones GZA feels it would be imprudent to not sample the ground waters from this depth In order to compensate for the low absolute hydraulic conductivities observed at this depth we recommend installing a 20-foot screened interval which spans two zones of fracturing observed on the ATV logs

The two upper wells (designated MW95-ML9A and -ML9B) were selected based on our ranking criteria which inclusive of filter sand packs placed them at 1 and 2 respectively The upper most zone would have spanned the bedrocksteel casing interface (as described on the attached boring log) for this reason the well was shifted down to a point below the 6-inch casing

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 3 of 5

GZV

UPCOMING EVENTSACTIVITIES

Field Activities

OU2Task 4 - Well Installations Field activities for this task will continue into the next reporting period and will likely include the following

bull Deep Borehole Well Installation shy anticipated start date is May 22 and completion date is May 25 1995

bull As-built survey of exploration locationsof May 29 1995

shy anticipated completion the week

Please note that field activities are highly dependant on the weather and the availability of subcontractors and equipment and are thus subject to change We will notify EPA and RIDEM as such changes become evident

Schedule of Deliverables

1) Operable Unit 2 RI Work Plan - Plan will be revised and reissued in final draft form as requested by EPA during April 25 1995 RIRA meeting Anticipated delivery date June 16 to EPA

2) Response Summary for Ecological Characterization Report - Response summary will address EPA comments received April 17 1995 to our report Anticipated delivery date June 16 to EPA

3) Response Summary and Screening Level Risk Assessment for Upper Simmons Reservoir Sediment Study - Response summary will address EPA comments received on April 14 1995 to our Phase n Report and include a screening level risk evaluation Anticipated delivery date June 20 to EPA

4) Multi-media Sampling and Analysis Plan for OU2RI - Document to include SAP and QAPP for Phase I OU2RI environmental sampling and analysis as agreed upon at the April 25 1995 RIRA meeting Anticipated delivery date June 20 to EPA

5) OU2 Draft Operable Unit 2 Risk Assessment Work Plan - Draft Work Plan for completion of the off-site baseline human health and ecological risk assessments Anticipated delivery date June 23 to EPA

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 4 of 5

6) Operable Unit 2 FS Work Plan - Plan will be revised and reissued in final draft form as requested by EPA during April 25 1995 RIRA meeting Anticipated delivery date June 23 to EPA

KEY PERSONAL CHANGES

No substitutions have been made to the GZA project team The team remains for the ozv OU2 RIFS Michael Powers is the Principal in Charge and technical reviewer for the RI Edward Summerly is the Project Manager for the RIFSRA projects and technical lead on the RI project Douglas Larson is the technical lead on the FS project Albert Ricciardelli is the technical reviewer for the FS Gregg McBride is technical reviewer for the RA Lisa Camp is the Human Health risk assessment specialist Timothy Briggs is the wetlands and ecological risk assessment specialist Stephen Kline and Matthew Bellisle are the project engineers and Mark Dalpe is the project field geologist

F1OBSVM030EASPR4RPT

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 5 of 5

GZA GEOENVIROI (MENTAL INC PROJECT REPORT OF BOR1NC i NOMW95-ML9 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No ~TI4797~ GEOTECHNICAL GEOHYDROLOGICAL CONSULTANTS JUHN3IUN KMlAJt ISLAND CHKD BY tAS

BORING Co DL MAKER DRILLING COMPANY BORING LOCATION SEE EXPLORATION LOCATION PLAN FOREMAN JOHN tuwtN GROUND SUKr-ACk tLkVAIlUN JAIUf) NuVp GZA ENGINEER PAKK JALPt DATE START 21095 UAIt tNU CICMY3

GROUNDWATER READINGS SAMPLER UNLESS OTHERWISE NOTED SAMPLER CONSISTS OF A 2 SPLIT

SPOON DRIVEN USING A US Ib HAMMER FALLING 30 In DATE TIME WATER CASING STABILIZATION TIME

CASING UNLESS OTHERWISE NOTED CASING DRIVEN USING A 301 3 Ib 31495 1310 106 825 1 MONTH HAMMER FALLING 24 In

CASING SIZE 10 ID OTHER 9 78 AIR HAMME R AND 6 ID 6 AIR HAMMER

E SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD EX f SCREENING M

N W PEN DEPTH DESCRIPTION INSTALLED HNU K H G S NO REC (Ft) BLOWS6 Bur-mister CLASSIFICATION (117) S

(Strati graph lie descriptions are 1 based on thlaquo i examination of FILL drilling cut tmgs and air hammer response)

S-1 GRAB 3-5 BrownBlack coarse to fine SAND J

44 little Wool 1 little-Debris trace Silt J

5

S-2 GRAB 9 coarse to fine SAND 34 10

2

15

TILL

S-3 GRAB 19-20 sarse t9 fine SAND AND 04 20 tie- Silt

25

S-4 GRAB 29-31 TanGray c oarse tdeg fine SAND AND ND 30 tie- Silt

MINFT

2 31+ BEDROCK

2 15 GRANITE

15 35

12 23 Fracture Zone 37 to 38 Brown 37

10 FRACTURE ZONE

10 38 HARDER ROCK GRANITE

S-5 GRAB 39 12 Tan (iron-stained) GRANITE Cuttings NO

REMARKS 1 Soil headspace TVOC screen ng was conducted employing a HNU Systems Model PI-101 Photoionization Detector equipped with an 17 Lamp

2 Mild leachage odor noted fr 3 10 (D steel casing spun to yengt Attenp to advance open borehole - borehole collapses on 21695

continued to advance 10 ca sing to a total depth of 57 below ground surface

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRgt INSITI ONS KAY BE GR ADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED 1LUCTU AT IONS OF GRQ UNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENfs WERE HAD | BORING NOMW95-ML9

N ES2 REPORT OF BORIN G NOMW95-ML9 aENCE-RHCOE ISLAND ^zsect maK

bull CENTRAL LANDFILL - OU2 - TASK 4 FILE No 3amp79Ugt2-amp~ GEOTECHNICAL GEOHYDROLOGICAL CONSULTANTS 3DHUSTDN RHUJb ISLAND CHKD BY LAS D

f H

C B

BO N U G S No

PEC

SAMPLE DEPTH (Ft) M INFT

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

STRATUM DESCRIPTION

EQUIPMENT INSTALLED

FIELD SCREENING

I |

i NR

NR

NR

NR

1 yen

NR 45

20

20 47 20

20

WEATHERED ZONE at 47 to 48 Brown Silts

WEATHERED ZONE

48

13

20 50

S-6 GRAB 49 20

10

TanGray GRANITE cuttings very highly WEATHERED AND FRACTURED ZONE at 50 to 55

50 05 4

15 FRACTURE ZONE

15 54

55 15 10 TanGray GRANITE Cuttings 55 5

10 J10 casing to 57 57

10

15 IshyNshy

60 S-7 GRAB 59

20

10 TanGray GRANITE Cuttings -

0-N I-

10

15

15

65 15 10 66

03 Silts and rock fragments FRACTURE ZONE

70

S-8 GRAB 67 5

5

0

Highly weathered gray GRANITE rock fragments

67

GRAY GRANITE

03

6 0 0

Fracture Zone at 70 to 73 Red Brown SILTS

70 FRACTURE ZONE

10

75

10

15 BrownGrayTan GRANITE (smaller pieces)

73

15 15

15

15

80 S-9 GRAB 80

20

20

20

Harder rock (small pieces) still a lot of weathering evident _J6 casing to 825

81

825

NO 7 8

10 mdash 10

10 REMARKS 4 Drill water effluent fs si ghtly FOAMY (making approx 30 gpm and borehole collapses at the Fracture Zone

5 Began open-hole drilling w th 978 straight haomer Advanced to 81 6 Large fracture between 70 and 73 making less water laquolaquo bdquo _ _ - _7 6 ID steel casing spon into rock to a depth of 825 on 22095 began drilling open borehole with

6 straight hammer 8 On 22195 the decision was made to leave the 10 casing in the steel ground In prder to protect nearby

borings MW95-47 and MW94-47S the 6 casing was sealed with a layer of fentomte chip from 825 to 54 above which the annular space between the 10 and 6 casings were filled with High Early grout to ground surface

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS KAY BE GR ADUAL 2 WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIONS OF GRO UNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE | BORING NOMW95-ML9

i

GZA GEOENVIRONNENTAL INC PROJECT REPORT OF BORING NOMW95-ML9 140 BROADWAY PROVIDENCE RHODE ISLAND r_laquojpoundv_ CENTRAL LANDFILL - OU2 - TASK 4 FILE No 314792

GtOlbCHNlCALGEOHYDROLOUICAL LONSULIANIS JOHNSTON RHDUb ISLANU CHKD BY fcAS D C B

SAMPLE SAMPLE DESCRIPTION H

50 N W G S No

PENREC

DEPTH (Ft) MINFT Bunmiter CLASSIFICATION

10

10

10

10

90 S-10 GRAB 90 10

07 Gray GRANITE Bedrock (High Quartz)

08

05

05

95 05

05 05

05

05

100 05 10

S-11 GRAB 102 10 Gray GRANITE

10

10

105 10

10

10

05

10

110 S-12 GRAB 110 20 Gray GRANITE

10

10

10 08

115 08

08 05

05

05

120 S-13 GRAB 120 05 Weathered GRANITE (TanBroun

05

04

04

04

125 S-14 GRAB 126

04 04 GrayCream GRANITE

05

08

08

08 OliveTan GRANITE (possible fracture at 129)

REMARKS 9 Large weathered seam from 118 to 129 (borehole remains open)

STRATUM DESCRIPTION

GRAY GRANITE

96

100

GRAY

108

GRAY 111

GRAY

118

LIGHT BROUN ROCK SOFTER ROCK

CHANGES FROM LIGHT BROWN TO CREAM AT 126

FRACTURE 129

EQUIPMENT INSTALLED

(FIELD

jSCREENING HNU 117 gt

NO

NO

NO

ND

ND

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIC NS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

9

GZA GEOENVIRON CENTAL INC140 BROADWAY PROVIDENCE RHODE ISLAND

mdashGEOTECHNICALGI EOHYDROLOGICAL CONSUL ANTS

SAMPLE P

H W

G S No PENREC

DEPTH (Ft) MINFT

10

10 10

10

S-15 GRAB 135 05

05 05

05

05

140 05

05

05

05

05

145 S-15 GRAB 145 05

05

05 05

05

150 05

05

05

08

10

155 S-16 GRAB 155 10

10

10 05

05

160 05

03 S-17 GRAB 162 03

05

03

165 03

03

08

10

10

170 10

10

10

10

10 S-18 GRAB 175 10

PROJECT L^^mdash CENTRAL LANDFILL shy OU2 shy TASK 4

~ TOKNSTON RHDTJb ISLAND

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

REPi

STRATUM

DESCRIPTION

FILE NoCHW) BY

EQUIPMENT INSTALLED

314 2 EAS

FIELD SCREENING HNU 11

R

GRAY

BrownOrange SILTS FRACTURE 135

WEATHERED ZONE

01

ORANGE SOFT LARGE CHUCKS OF ROCK

10

BrownOrange Silts 146

LIGHT BROWN

NO

Dark gray with black and red rock chips GRANITE (BrownGray Silts)

152 CREAMGRAY

HARDER NO

BrownRed SILTS

Brighter red

Gray SILTS

BrownHeavier SILT content

162 BROWN

16|OFT ROCK

REDBROWN 166

GRAY ROCK

169

BROWNRED

01 11

brown Silts ND

REMARKS 10 Large highly weathered seaa at 135 to 146 larger chunks of rock in cuttings (borehole remained

11 Large] highly weathered seam at 162 to 166 very bright red silts suspect PID reading - probably

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATE MS OF GROUNDWATER

KAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE 1 BORING NOMW95-ML9

aENCEHOOE ISLANDra muGEOTECHNICALGEOHYDROLOGICAL CONSULTANTS

D B SAMPLE

H w

G S No PENREC

DEPTH (Ft) M INFT

10 10 10 10 10

bull on

10 10 08 08 08

185 08

S-19 GRAB 187 08 05 05 05

190 05 05 05 03 03

195 S-20 GRAB 196 03

03 03 05

200 05 48

08 10 10

205 05 05 0

S-21 GRAB 208 0 0 0

210 0

S-22 GRAB 212 05 05

05 08

215 08 08 08 08

220 08

EE2JIpoundI ^^CENTRAL LANDFILL - OU2 - TASK 4

JOHNS UK RHODt ISLANU

SAMPLE DESCRIPTION STRATUM DESCRIPTION

Burmister CLASSIFICATION 176

PINKCREAMSILT

183

LIGHT BROWN SILT

Dark Gray with Red amp Black Chips (Brown Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt)

BlyeCreawBlackRed Rock Chips (with brownorange Si If some white flecks and Red Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt some white flecks and Red Silts)

WhiteRedDark Gray Chips (Bright Red Silts)

194

BROWNORANGE

199

LIGHT BROWN

205

BROWNREDSILTS

209

GRAYCREAM

BRIGHT RED

MORE LIGHT GRAY

OHW95-HL9sW mdashjL- r B_

FILE Mo CHKD BY fc AS Tr

I EQUIPMENT FIELD

IINSTALLED SCREENING HNU 117 raquo

NO

NO

NO

ND

REMARKS 12 Borehole remains open despite very weathered soft rock with high silt content

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS HAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

12

ISLANDW KBRflr WfoJgmmdash

GEOTECHNICALG EOHYDROLOGICAL CONSULTANTS

I C B A L SAMPLE

I N W G S No

PENREC

DEPTH (Ft) MINFT

10 S-23 GRAB 222 10

10 10

225 05 05 05 05 08

230 08 08 08 0

5

235 S-24 GRAB 235 5

5

5

5

5

240 0 0 0 5 5

245 S-25 grab 245 5

5

5

5

5

250 5 5 5 5 5

255 5 5

S-26 GRAB 258 0 0 0

260 0 0

0

0

0

0

EE REPORT OF BORING NOMW95-ML9 ^ SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No TreTp-2shy JUHNSIUN HHUUh ISLAND CHKD BY -HAS

)

SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD |DESCRIPTION INSTALLED SCREENING

Bunnister CLASSIFICATION HNU 117 t

221 NO

WhiteLight Gray (whitecream WHITE Silts) LIGHT GRAY

226 (Fractured Zone at 226 to 228 13 Bright Red Silts) BRIGHT RED

228SILTS

Soft Zone 229 to 234 Green rock TANGRAY chips (Tan Silts)

234 OLIVETAN NO

HARDER ROCK 8lfcfttsfl5$Dark Gray bull GRADING TO LIGHT GRAY

GrayWhite with Black Flecks (Gray Silts) LIGHT GRAY NO

GRAY SILT GRAYWHITEBLACK ROCK

GreenGrayB^ack Rock Fragments 257 NO (TanOlive Silts) - Possible Fractured Zone TANOLIVE

SILTS

260 BLUEGRAY

REMARKS 13 Deepest observed fracture zone 226 to 228 more bright red Silts

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO NS OF GROUNDWATER

bdquobdquobull NAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE GZA | BORING NOMW95-ML9

REPORT OF BORING NOMU95-M19 gtROVIDENCE RHODE ISLAND

CENTRAL LANDFILL - OU2 - TASK 4 IVflV fe GEOTECHNICALGI iOHYDROLOGICAL CONSULTANTS V JUHNS 1 UN HHOUb 1 bLAHD CHKD BY TAr-

H

270

275

280

285

290

295

300

305

310

SAMPLE DESCRIPTION

Bui-mister CLASSIFICATION

Dark GrayWhiteLight Gray GRANITE (Light Silts)

Dark GrayUhiteLighl Gray GRANITE (Light Slits) did not grab sample

Dark GrayUhiteUght Gray GRANITE (Light Slits) slightly sillier

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

End of Exploration at +310

REMARKS 4 Borehole still making water rock much harder gt 2 gpm rate 5 Drilled to depth of 310 below ground surface a 1414 hrs on 22095 6 After developing the well for 15 ninutes with air well making +5 gpm (measured with calibrated

bucket) bull 17 Hager GeoScience Inc working with Colog Inc performed bqreholenepphysical logging 3-arm

borehole ca(iperanltf fluid temperature testing was performed on 33957 Acoustic Borehole teleshy18 A minimal amount of water was lost to the borehole during drilling On 31095 prior to packer

B SAMPLE

1 PEN DEPTH G S No REC (Ft)

S-27 GRAB 270

S-28 GRAB 288

S-29 GRAB 300

MINFT 10

10

15

15

15

20 20

20

20

20

20

20

20

20

20

20

20

20

20

20 20

20

20

20

20 25

25

25

25

25

25 25

25

25

25

20 20

20

15

15

15

15

15

15 15

STRATUM DESCRIPTION

HARDER ROCK

GRAY GRANITE BEDROCK

303

SLIGHTLY SOFTER

DRILLING

EQUIPMENT INSTALLED

I FIELD

ISCREENING HNU 117 i

ND

14

ND

ND

18

19

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETUEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMU95-ML9

GZA GEOENVIRONMENTAL INC PROJECT REPORT OF BORING NoHWS 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET o ut

CENTRAL LANDFILL -OU2 - TASK FILE No rftTV GEOTECHNICALGEOHYDROLOGICAL CONSULTANTS JuHNVilUN KHWb iSLANU CHKD BY bAS f

SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD S 0 N U PEN DEPTH DESCRIPTION INSTALLED G S No IREC (Ft) HINFT Burmister CLASSIFICATION STOP

REMARKS 18 contd 870

19

ing testing

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATEWATERR AEyELREADINGS_HAVE_BEELEVEL READINGS HAVE BEENN MADMADEE AT TIMES AND UNDER CONDITIONS STATED FLUAT_I1MES_AND_UNDER CONDIIIWISSIATip^FLUCTUATigNS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WEIRE MADEGZA |BORING NOMW95-ML9

--

1

s 1 ltbull

-

OV

ER

ALL

Of to t 5 - bulln t- s 8 s 0

- 9 ~ laquobull bull bull laquo shy

- 1 Ei

i 0

AU

IUW

HO

O

i 1 i i

M IO laquo tobull - 8 - 5 8 n in bull - S shy

I bull bull shy

CO

ND

UC

TIV

ITY

Mgt M o f~ s 8 t 5 s t 8 - 8 ttbull n bull0 raquogbull bullI

() rV

LU DC

a z 1 1 fr t I 1 m I

1 O n LU 1 r I 1 i-~_5 i S i oS sect 1 s sect pound s sect sect

ltraquo g

S s s S

V Vdeg o 2 o 1 ^

111

ID bull- - bull- bull- bull- bull- - - bullshyn mdash mdash

C

HU

OR

O

NIN

OH

E9U

L i 0 o o O o z z Z Z

o laquo t C c Q O Oo O z Z Z Z Z Zz (Dz

2 I 5i i D)D a

- S ui laquo s- pound7 1 8 pound

uT tu Q t bullJ S 1

TR

AC

E(

O Q e e ou o S o o sU o 2 u C1 s A a2 a e z zB D

2

O

cc

V)

f 5gt W cc

o IU

i d

i s 40

O Z

g

8 0

g

i

8 0

deg

I

i

sect

i

I

i

8

Q Z

g

O Z

s

O z

c

O Z

bull Q Z

N

o z

8

i

8

i

g

i

sect

0

1

i

1

i

2

o z

pound

0shyat

-

p

in c

0 O2

fl8

V

i i s s iU

i o n 0 o

En K

O 2

07 V

t- S S c I

b b

O 01

34

0

io

r

O

1 v 0 K b b b - c 1 c ia I S i i s i i sc

111 III UJ bull 13 as 1 s a I | S a z i

Ill

C 0 lt t lt ( C O O (0

-

I CO UJ CC a z

UJ UJ ^

gw -5

-I y 1

CN

o z ^ ltD ii eg

8 o_ UJ bullsect H J bdquo

-8 S 1 -8

u o en

(0

9 S

s I

r K shyozv JOB

GZA GEOENVIRONMENTAL INC SHEET NO OF EngnMrs and ScwnMts

14O BROADWAY PROVIDENCE RHODE BLAND O2903 (4O1J421-414O

CALCULATED BY_

CHECKED BY

DATE

DATE

SCALE L Blocks IO

I

MtU

Co

  1. barcode 3228
  2. barcodetext SEMS Doc ID 3228
Page 2: GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

oz

PROGRESS MADE THIS REPORTING PERIOD

DeliverablesCorrespondenceMeetings

The following deliverables were submitted to EPA and RIDEM by GZA on RISWMCs behalf

bull Borehole Geophysical Logging Central Landfill Johnston Rhode Island dated April 1995 - Prepared by Hager GeoScience Inc (attached)

RISWMC has received the following EPA review comments

bull April 11 1995 Upper Simmons Reservoir Phase II Report Review Comments received April 14 1995

bull April 14 1995 Ecological Characterization OU2Task 2 Review Comments received April 17 1995

bull April 14 1995 Operable Unit 2 Remedial Investigation Draft Work Plan Response Summary Review Comments received April 25 1995

bull April 17 1995 Draft Feasibility Study Work Plan - Operable Unit 2 Review Comments received April 18 1995

A proposed schedule for RISWMCs response (ie response summary document revision or work implementation) to these comments is provided below Please note that as of the date of this progress report RISWMC had not received written comments on any of the above deliverables from the RIDEM The schedule as presented assumes that RIDEM will not make changes if they chose to do so this schedule may require revision

RISWMC is currently awaiting review commentsapproval to implement the March 29 1995 Work Plan for Stream Flow Measurements - OU2 Task 3 This document was submitted to the agency on March 29 1995

A meeting was held on April 251995 at EPAs offices in Boston Massachusetts between RISWMCGZA and EPAHNUS The purpose of the meeting was to discuss EPAs April 14 1995 OU2RI Response Summary Review Comments and the scope of the OU2 Risk Assessment General agreement was reached on the numbers and types of samples to be collected as part of the OU2RI RISWMC will be providing EPA and RIDEM with a list of area sites potentially contributing to contamination within the OU2 study area to initiate an agency file RISWMC will perform a screening level risk assessment of the Upper Simmons Reservoir sediments to determine if additional sampling and analytical data is

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 1 of 5

oz

necessary to complete the OU2 study General agreement was also reached on most aspects of the OU2Risk Assessment scope One major point still to be determined is the future use of groundwater on properties RISWMC does not currently own It was decided that RISWMC would move forward with preparation of the OU2RA Draft Work Plan which would include a proposed groundwater use scenario for EPA to evaluate Agreements reached at the meeting as to the form of deliverables are reflected in the schedule presented below

Operable Unit 2Task 4 Well Installations

GZA has evaluated the VOC screening geophysical analysis and hydraulic conductivity testing of the 310 foot deep bedrock well (MW95-ML9) at the Central Landfill Superfund site Based on these data we recommend installation of two 2-inch ID PVC wells screened from 133 to 143 feet and 275 to 295 feet below ground surface and one 1-inch ID PVC well screened from 85 to 95 feet The recommendation for the placement of a 1-inch ID well is based on our discussions with EPA hydrologist Mr Al Klinger who suggested that an installation of this type carefully sampled with a peristaltic pump would be acceptable for organic and inorganic analysis Well screens are to be installed as described in the OU2Task 4 field sampling plan which includes a sand filter packs extending 2 feet above and below the screens For your use in reviewing these recommendations we have attached 1) draft log of the boring 2) a table summarizing field screening results laboratory screening and hydraulic conductivity testing results 3) the borehole geophysical report completed in April 1995 by Hager GeoScience Inc and 4) a sketch of the proposed well cluster sampling zones

In order to make well placement recommendations GZA evaluated each borehole testing zone based on a three-components which were numerically rated for each zone (ie 10 foot long packer testing and groundwater sampling zone) Where necessary raw scores were adjusted to compensate for any lack of chemical testing data We weighted the estimated hydraulic conductivities more heavily than the other factors (50 Hydraulic Conductivity data 25 Chemical data and 25 Geophysical data) In estimating hydraulic conductivities we adjusted flow data to compensate for observed vertical leakage around the packers

The table below represents results of our comparison detailing the top ten zones in rank order The complete comparative rankings are provided on Table 1 attached

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 2 of 5

GZ

CorojwativeiUak

Raw Soom

Zooe TMsampb

l 19 25 825 shy 91 2 20 19 134 - 144 3 20 21 1145-1245 4 20 24 85-95 5 28 7 2424 - 2524 6 35 6 249-259 7 37 8 2335 - 2435 8 39 22 1036- 1136 9 40 20 124 - 134 10 41 18 145 - 155

Having used this comparison to narrow the scope these ten test zones were then grouped by depth and more thoroughly reviewed It is clear that the highest ranking zones are concentrated at the top of the uncased portion of the borehole This provides further evidence that groundwater contaminant transport at the site occurs at relatively shallow depths However the intent of this deep borehole is to monitor deeper fractures for possible landfill-derived contamination because MW95-ML9 is part of a well cluster which already contains screens in the shallower fractured bedrock Therefore GZA recommended well placements which span the deeper hydraulically active testing zones

In selecting the deepest screened zone (designated MW95-ML9C) we reviewed the available data and concluded that Zone 2 had chemical geophysical and hydraulic properties which fulfill the selection criteria The geophysical data shows both a caliper enlargement and a temperature differential anomaly at 290 feet below ground surface which roughly corresponds with a horizontal fracture with a 05 inch aperture identified by the Acoustic Televiewer (ATV) Given roughly equivalent hydraulic conductivities and higher chemical screening results than neighboring zones GZA feels it would be imprudent to not sample the ground waters from this depth In order to compensate for the low absolute hydraulic conductivities observed at this depth we recommend installing a 20-foot screened interval which spans two zones of fracturing observed on the ATV logs

The two upper wells (designated MW95-ML9A and -ML9B) were selected based on our ranking criteria which inclusive of filter sand packs placed them at 1 and 2 respectively The upper most zone would have spanned the bedrocksteel casing interface (as described on the attached boring log) for this reason the well was shifted down to a point below the 6-inch casing

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 3 of 5

GZV

UPCOMING EVENTSACTIVITIES

Field Activities

OU2Task 4 - Well Installations Field activities for this task will continue into the next reporting period and will likely include the following

bull Deep Borehole Well Installation shy anticipated start date is May 22 and completion date is May 25 1995

bull As-built survey of exploration locationsof May 29 1995

shy anticipated completion the week

Please note that field activities are highly dependant on the weather and the availability of subcontractors and equipment and are thus subject to change We will notify EPA and RIDEM as such changes become evident

Schedule of Deliverables

1) Operable Unit 2 RI Work Plan - Plan will be revised and reissued in final draft form as requested by EPA during April 25 1995 RIRA meeting Anticipated delivery date June 16 to EPA

2) Response Summary for Ecological Characterization Report - Response summary will address EPA comments received April 17 1995 to our report Anticipated delivery date June 16 to EPA

3) Response Summary and Screening Level Risk Assessment for Upper Simmons Reservoir Sediment Study - Response summary will address EPA comments received on April 14 1995 to our Phase n Report and include a screening level risk evaluation Anticipated delivery date June 20 to EPA

4) Multi-media Sampling and Analysis Plan for OU2RI - Document to include SAP and QAPP for Phase I OU2RI environmental sampling and analysis as agreed upon at the April 25 1995 RIRA meeting Anticipated delivery date June 20 to EPA

5) OU2 Draft Operable Unit 2 Risk Assessment Work Plan - Draft Work Plan for completion of the off-site baseline human health and ecological risk assessments Anticipated delivery date June 23 to EPA

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 4 of 5

6) Operable Unit 2 FS Work Plan - Plan will be revised and reissued in final draft form as requested by EPA during April 25 1995 RIRA meeting Anticipated delivery date June 23 to EPA

KEY PERSONAL CHANGES

No substitutions have been made to the GZA project team The team remains for the ozv OU2 RIFS Michael Powers is the Principal in Charge and technical reviewer for the RI Edward Summerly is the Project Manager for the RIFSRA projects and technical lead on the RI project Douglas Larson is the technical lead on the FS project Albert Ricciardelli is the technical reviewer for the FS Gregg McBride is technical reviewer for the RA Lisa Camp is the Human Health risk assessment specialist Timothy Briggs is the wetlands and ecological risk assessment specialist Stephen Kline and Matthew Bellisle are the project engineers and Mark Dalpe is the project field geologist

F1OBSVM030EASPR4RPT

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 5 of 5

GZA GEOENVIROI (MENTAL INC PROJECT REPORT OF BOR1NC i NOMW95-ML9 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No ~TI4797~ GEOTECHNICAL GEOHYDROLOGICAL CONSULTANTS JUHN3IUN KMlAJt ISLAND CHKD BY tAS

BORING Co DL MAKER DRILLING COMPANY BORING LOCATION SEE EXPLORATION LOCATION PLAN FOREMAN JOHN tuwtN GROUND SUKr-ACk tLkVAIlUN JAIUf) NuVp GZA ENGINEER PAKK JALPt DATE START 21095 UAIt tNU CICMY3

GROUNDWATER READINGS SAMPLER UNLESS OTHERWISE NOTED SAMPLER CONSISTS OF A 2 SPLIT

SPOON DRIVEN USING A US Ib HAMMER FALLING 30 In DATE TIME WATER CASING STABILIZATION TIME

CASING UNLESS OTHERWISE NOTED CASING DRIVEN USING A 301 3 Ib 31495 1310 106 825 1 MONTH HAMMER FALLING 24 In

CASING SIZE 10 ID OTHER 9 78 AIR HAMME R AND 6 ID 6 AIR HAMMER

E SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD EX f SCREENING M

N W PEN DEPTH DESCRIPTION INSTALLED HNU K H G S NO REC (Ft) BLOWS6 Bur-mister CLASSIFICATION (117) S

(Strati graph lie descriptions are 1 based on thlaquo i examination of FILL drilling cut tmgs and air hammer response)

S-1 GRAB 3-5 BrownBlack coarse to fine SAND J

44 little Wool 1 little-Debris trace Silt J

5

S-2 GRAB 9 coarse to fine SAND 34 10

2

15

TILL

S-3 GRAB 19-20 sarse t9 fine SAND AND 04 20 tie- Silt

25

S-4 GRAB 29-31 TanGray c oarse tdeg fine SAND AND ND 30 tie- Silt

MINFT

2 31+ BEDROCK

2 15 GRANITE

15 35

12 23 Fracture Zone 37 to 38 Brown 37

10 FRACTURE ZONE

10 38 HARDER ROCK GRANITE

S-5 GRAB 39 12 Tan (iron-stained) GRANITE Cuttings NO

REMARKS 1 Soil headspace TVOC screen ng was conducted employing a HNU Systems Model PI-101 Photoionization Detector equipped with an 17 Lamp

2 Mild leachage odor noted fr 3 10 (D steel casing spun to yengt Attenp to advance open borehole - borehole collapses on 21695

continued to advance 10 ca sing to a total depth of 57 below ground surface

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRgt INSITI ONS KAY BE GR ADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED 1LUCTU AT IONS OF GRQ UNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENfs WERE HAD | BORING NOMW95-ML9

N ES2 REPORT OF BORIN G NOMW95-ML9 aENCE-RHCOE ISLAND ^zsect maK

bull CENTRAL LANDFILL - OU2 - TASK 4 FILE No 3amp79Ugt2-amp~ GEOTECHNICAL GEOHYDROLOGICAL CONSULTANTS 3DHUSTDN RHUJb ISLAND CHKD BY LAS D

f H

C B

BO N U G S No

PEC

SAMPLE DEPTH (Ft) M INFT

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

STRATUM DESCRIPTION

EQUIPMENT INSTALLED

FIELD SCREENING

I |

i NR

NR

NR

NR

1 yen

NR 45

20

20 47 20

20

WEATHERED ZONE at 47 to 48 Brown Silts

WEATHERED ZONE

48

13

20 50

S-6 GRAB 49 20

10

TanGray GRANITE cuttings very highly WEATHERED AND FRACTURED ZONE at 50 to 55

50 05 4

15 FRACTURE ZONE

15 54

55 15 10 TanGray GRANITE Cuttings 55 5

10 J10 casing to 57 57

10

15 IshyNshy

60 S-7 GRAB 59

20

10 TanGray GRANITE Cuttings -

0-N I-

10

15

15

65 15 10 66

03 Silts and rock fragments FRACTURE ZONE

70

S-8 GRAB 67 5

5

0

Highly weathered gray GRANITE rock fragments

67

GRAY GRANITE

03

6 0 0

Fracture Zone at 70 to 73 Red Brown SILTS

70 FRACTURE ZONE

10

75

10

15 BrownGrayTan GRANITE (smaller pieces)

73

15 15

15

15

80 S-9 GRAB 80

20

20

20

Harder rock (small pieces) still a lot of weathering evident _J6 casing to 825

81

825

NO 7 8

10 mdash 10

10 REMARKS 4 Drill water effluent fs si ghtly FOAMY (making approx 30 gpm and borehole collapses at the Fracture Zone

5 Began open-hole drilling w th 978 straight haomer Advanced to 81 6 Large fracture between 70 and 73 making less water laquolaquo bdquo _ _ - _7 6 ID steel casing spon into rock to a depth of 825 on 22095 began drilling open borehole with

6 straight hammer 8 On 22195 the decision was made to leave the 10 casing in the steel ground In prder to protect nearby

borings MW95-47 and MW94-47S the 6 casing was sealed with a layer of fentomte chip from 825 to 54 above which the annular space between the 10 and 6 casings were filled with High Early grout to ground surface

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS KAY BE GR ADUAL 2 WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIONS OF GRO UNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE | BORING NOMW95-ML9

i

GZA GEOENVIRONNENTAL INC PROJECT REPORT OF BORING NOMW95-ML9 140 BROADWAY PROVIDENCE RHODE ISLAND r_laquojpoundv_ CENTRAL LANDFILL - OU2 - TASK 4 FILE No 314792

GtOlbCHNlCALGEOHYDROLOUICAL LONSULIANIS JOHNSTON RHDUb ISLANU CHKD BY fcAS D C B

SAMPLE SAMPLE DESCRIPTION H

50 N W G S No

PENREC

DEPTH (Ft) MINFT Bunmiter CLASSIFICATION

10

10

10

10

90 S-10 GRAB 90 10

07 Gray GRANITE Bedrock (High Quartz)

08

05

05

95 05

05 05

05

05

100 05 10

S-11 GRAB 102 10 Gray GRANITE

10

10

105 10

10

10

05

10

110 S-12 GRAB 110 20 Gray GRANITE

10

10

10 08

115 08

08 05

05

05

120 S-13 GRAB 120 05 Weathered GRANITE (TanBroun

05

04

04

04

125 S-14 GRAB 126

04 04 GrayCream GRANITE

05

08

08

08 OliveTan GRANITE (possible fracture at 129)

REMARKS 9 Large weathered seam from 118 to 129 (borehole remains open)

STRATUM DESCRIPTION

GRAY GRANITE

96

100

GRAY

108

GRAY 111

GRAY

118

LIGHT BROUN ROCK SOFTER ROCK

CHANGES FROM LIGHT BROWN TO CREAM AT 126

FRACTURE 129

EQUIPMENT INSTALLED

(FIELD

jSCREENING HNU 117 gt

NO

NO

NO

ND

ND

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIC NS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

9

GZA GEOENVIRON CENTAL INC140 BROADWAY PROVIDENCE RHODE ISLAND

mdashGEOTECHNICALGI EOHYDROLOGICAL CONSUL ANTS

SAMPLE P

H W

G S No PENREC

DEPTH (Ft) MINFT

10

10 10

10

S-15 GRAB 135 05

05 05

05

05

140 05

05

05

05

05

145 S-15 GRAB 145 05

05

05 05

05

150 05

05

05

08

10

155 S-16 GRAB 155 10

10

10 05

05

160 05

03 S-17 GRAB 162 03

05

03

165 03

03

08

10

10

170 10

10

10

10

10 S-18 GRAB 175 10

PROJECT L^^mdash CENTRAL LANDFILL shy OU2 shy TASK 4

~ TOKNSTON RHDTJb ISLAND

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

REPi

STRATUM

DESCRIPTION

FILE NoCHW) BY

EQUIPMENT INSTALLED

314 2 EAS

FIELD SCREENING HNU 11

R

GRAY

BrownOrange SILTS FRACTURE 135

WEATHERED ZONE

01

ORANGE SOFT LARGE CHUCKS OF ROCK

10

BrownOrange Silts 146

LIGHT BROWN

NO

Dark gray with black and red rock chips GRANITE (BrownGray Silts)

152 CREAMGRAY

HARDER NO

BrownRed SILTS

Brighter red

Gray SILTS

BrownHeavier SILT content

162 BROWN

16|OFT ROCK

REDBROWN 166

GRAY ROCK

169

BROWNRED

01 11

brown Silts ND

REMARKS 10 Large highly weathered seaa at 135 to 146 larger chunks of rock in cuttings (borehole remained

11 Large] highly weathered seam at 162 to 166 very bright red silts suspect PID reading - probably

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATE MS OF GROUNDWATER

KAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE 1 BORING NOMW95-ML9

aENCEHOOE ISLANDra muGEOTECHNICALGEOHYDROLOGICAL CONSULTANTS

D B SAMPLE

H w

G S No PENREC

DEPTH (Ft) M INFT

10 10 10 10 10

bull on

10 10 08 08 08

185 08

S-19 GRAB 187 08 05 05 05

190 05 05 05 03 03

195 S-20 GRAB 196 03

03 03 05

200 05 48

08 10 10

205 05 05 0

S-21 GRAB 208 0 0 0

210 0

S-22 GRAB 212 05 05

05 08

215 08 08 08 08

220 08

EE2JIpoundI ^^CENTRAL LANDFILL - OU2 - TASK 4

JOHNS UK RHODt ISLANU

SAMPLE DESCRIPTION STRATUM DESCRIPTION

Burmister CLASSIFICATION 176

PINKCREAMSILT

183

LIGHT BROWN SILT

Dark Gray with Red amp Black Chips (Brown Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt)

BlyeCreawBlackRed Rock Chips (with brownorange Si If some white flecks and Red Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt some white flecks and Red Silts)

WhiteRedDark Gray Chips (Bright Red Silts)

194

BROWNORANGE

199

LIGHT BROWN

205

BROWNREDSILTS

209

GRAYCREAM

BRIGHT RED

MORE LIGHT GRAY

OHW95-HL9sW mdashjL- r B_

FILE Mo CHKD BY fc AS Tr

I EQUIPMENT FIELD

IINSTALLED SCREENING HNU 117 raquo

NO

NO

NO

ND

REMARKS 12 Borehole remains open despite very weathered soft rock with high silt content

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS HAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

12

ISLANDW KBRflr WfoJgmmdash

GEOTECHNICALG EOHYDROLOGICAL CONSULTANTS

I C B A L SAMPLE

I N W G S No

PENREC

DEPTH (Ft) MINFT

10 S-23 GRAB 222 10

10 10

225 05 05 05 05 08

230 08 08 08 0

5

235 S-24 GRAB 235 5

5

5

5

5

240 0 0 0 5 5

245 S-25 grab 245 5

5

5

5

5

250 5 5 5 5 5

255 5 5

S-26 GRAB 258 0 0 0

260 0 0

0

0

0

0

EE REPORT OF BORING NOMW95-ML9 ^ SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No TreTp-2shy JUHNSIUN HHUUh ISLAND CHKD BY -HAS

)

SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD |DESCRIPTION INSTALLED SCREENING

Bunnister CLASSIFICATION HNU 117 t

221 NO

WhiteLight Gray (whitecream WHITE Silts) LIGHT GRAY

226 (Fractured Zone at 226 to 228 13 Bright Red Silts) BRIGHT RED

228SILTS

Soft Zone 229 to 234 Green rock TANGRAY chips (Tan Silts)

234 OLIVETAN NO

HARDER ROCK 8lfcfttsfl5$Dark Gray bull GRADING TO LIGHT GRAY

GrayWhite with Black Flecks (Gray Silts) LIGHT GRAY NO

GRAY SILT GRAYWHITEBLACK ROCK

GreenGrayB^ack Rock Fragments 257 NO (TanOlive Silts) - Possible Fractured Zone TANOLIVE

SILTS

260 BLUEGRAY

REMARKS 13 Deepest observed fracture zone 226 to 228 more bright red Silts

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO NS OF GROUNDWATER

bdquobdquobull NAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE GZA | BORING NOMW95-ML9

REPORT OF BORING NOMU95-M19 gtROVIDENCE RHODE ISLAND

CENTRAL LANDFILL - OU2 - TASK 4 IVflV fe GEOTECHNICALGI iOHYDROLOGICAL CONSULTANTS V JUHNS 1 UN HHOUb 1 bLAHD CHKD BY TAr-

H

270

275

280

285

290

295

300

305

310

SAMPLE DESCRIPTION

Bui-mister CLASSIFICATION

Dark GrayWhiteLight Gray GRANITE (Light Silts)

Dark GrayUhiteLighl Gray GRANITE (Light Slits) did not grab sample

Dark GrayUhiteUght Gray GRANITE (Light Slits) slightly sillier

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

End of Exploration at +310

REMARKS 4 Borehole still making water rock much harder gt 2 gpm rate 5 Drilled to depth of 310 below ground surface a 1414 hrs on 22095 6 After developing the well for 15 ninutes with air well making +5 gpm (measured with calibrated

bucket) bull 17 Hager GeoScience Inc working with Colog Inc performed bqreholenepphysical logging 3-arm

borehole ca(iperanltf fluid temperature testing was performed on 33957 Acoustic Borehole teleshy18 A minimal amount of water was lost to the borehole during drilling On 31095 prior to packer

B SAMPLE

1 PEN DEPTH G S No REC (Ft)

S-27 GRAB 270

S-28 GRAB 288

S-29 GRAB 300

MINFT 10

10

15

15

15

20 20

20

20

20

20

20

20

20

20

20

20

20

20

20 20

20

20

20

20 25

25

25

25

25

25 25

25

25

25

20 20

20

15

15

15

15

15

15 15

STRATUM DESCRIPTION

HARDER ROCK

GRAY GRANITE BEDROCK

303

SLIGHTLY SOFTER

DRILLING

EQUIPMENT INSTALLED

I FIELD

ISCREENING HNU 117 i

ND

14

ND

ND

18

19

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETUEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMU95-ML9

GZA GEOENVIRONMENTAL INC PROJECT REPORT OF BORING NoHWS 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET o ut

CENTRAL LANDFILL -OU2 - TASK FILE No rftTV GEOTECHNICALGEOHYDROLOGICAL CONSULTANTS JuHNVilUN KHWb iSLANU CHKD BY bAS f

SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD S 0 N U PEN DEPTH DESCRIPTION INSTALLED G S No IREC (Ft) HINFT Burmister CLASSIFICATION STOP

REMARKS 18 contd 870

19

ing testing

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATEWATERR AEyELREADINGS_HAVE_BEELEVEL READINGS HAVE BEENN MADMADEE AT TIMES AND UNDER CONDITIONS STATED FLUAT_I1MES_AND_UNDER CONDIIIWISSIATip^FLUCTUATigNS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WEIRE MADEGZA |BORING NOMW95-ML9

--

1

s 1 ltbull

-

OV

ER

ALL

Of to t 5 - bulln t- s 8 s 0

- 9 ~ laquobull bull bull laquo shy

- 1 Ei

i 0

AU

IUW

HO

O

i 1 i i

M IO laquo tobull - 8 - 5 8 n in bull - S shy

I bull bull shy

CO

ND

UC

TIV

ITY

Mgt M o f~ s 8 t 5 s t 8 - 8 ttbull n bull0 raquogbull bullI

() rV

LU DC

a z 1 1 fr t I 1 m I

1 O n LU 1 r I 1 i-~_5 i S i oS sect 1 s sect pound s sect sect

ltraquo g

S s s S

V Vdeg o 2 o 1 ^

111

ID bull- - bull- bull- bull- bull- - - bullshyn mdash mdash

C

HU

OR

O

NIN

OH

E9U

L i 0 o o O o z z Z Z

o laquo t C c Q O Oo O z Z Z Z Z Zz (Dz

2 I 5i i D)D a

- S ui laquo s- pound7 1 8 pound

uT tu Q t bullJ S 1

TR

AC

E(

O Q e e ou o S o o sU o 2 u C1 s A a2 a e z zB D

2

O

cc

V)

f 5gt W cc

o IU

i d

i s 40

O Z

g

8 0

g

i

8 0

deg

I

i

sect

i

I

i

8

Q Z

g

O Z

s

O z

c

O Z

bull Q Z

N

o z

8

i

8

i

g

i

sect

0

1

i

1

i

2

o z

pound

0shyat

-

p

in c

0 O2

fl8

V

i i s s iU

i o n 0 o

En K

O 2

07 V

t- S S c I

b b

O 01

34

0

io

r

O

1 v 0 K b b b - c 1 c ia I S i i s i i sc

111 III UJ bull 13 as 1 s a I | S a z i

Ill

C 0 lt t lt ( C O O (0

-

I CO UJ CC a z

UJ UJ ^

gw -5

-I y 1

CN

o z ^ ltD ii eg

8 o_ UJ bullsect H J bdquo

-8 S 1 -8

u o en

(0

9 S

s I

r K shyozv JOB

GZA GEOENVIRONMENTAL INC SHEET NO OF EngnMrs and ScwnMts

14O BROADWAY PROVIDENCE RHODE BLAND O2903 (4O1J421-414O

CALCULATED BY_

CHECKED BY

DATE

DATE

SCALE L Blocks IO

I

MtU

Co

  1. barcode 3228
  2. barcodetext SEMS Doc ID 3228
Page 3: GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

oz

necessary to complete the OU2 study General agreement was also reached on most aspects of the OU2Risk Assessment scope One major point still to be determined is the future use of groundwater on properties RISWMC does not currently own It was decided that RISWMC would move forward with preparation of the OU2RA Draft Work Plan which would include a proposed groundwater use scenario for EPA to evaluate Agreements reached at the meeting as to the form of deliverables are reflected in the schedule presented below

Operable Unit 2Task 4 Well Installations

GZA has evaluated the VOC screening geophysical analysis and hydraulic conductivity testing of the 310 foot deep bedrock well (MW95-ML9) at the Central Landfill Superfund site Based on these data we recommend installation of two 2-inch ID PVC wells screened from 133 to 143 feet and 275 to 295 feet below ground surface and one 1-inch ID PVC well screened from 85 to 95 feet The recommendation for the placement of a 1-inch ID well is based on our discussions with EPA hydrologist Mr Al Klinger who suggested that an installation of this type carefully sampled with a peristaltic pump would be acceptable for organic and inorganic analysis Well screens are to be installed as described in the OU2Task 4 field sampling plan which includes a sand filter packs extending 2 feet above and below the screens For your use in reviewing these recommendations we have attached 1) draft log of the boring 2) a table summarizing field screening results laboratory screening and hydraulic conductivity testing results 3) the borehole geophysical report completed in April 1995 by Hager GeoScience Inc and 4) a sketch of the proposed well cluster sampling zones

In order to make well placement recommendations GZA evaluated each borehole testing zone based on a three-components which were numerically rated for each zone (ie 10 foot long packer testing and groundwater sampling zone) Where necessary raw scores were adjusted to compensate for any lack of chemical testing data We weighted the estimated hydraulic conductivities more heavily than the other factors (50 Hydraulic Conductivity data 25 Chemical data and 25 Geophysical data) In estimating hydraulic conductivities we adjusted flow data to compensate for observed vertical leakage around the packers

The table below represents results of our comparison detailing the top ten zones in rank order The complete comparative rankings are provided on Table 1 attached

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 2 of 5

GZ

CorojwativeiUak

Raw Soom

Zooe TMsampb

l 19 25 825 shy 91 2 20 19 134 - 144 3 20 21 1145-1245 4 20 24 85-95 5 28 7 2424 - 2524 6 35 6 249-259 7 37 8 2335 - 2435 8 39 22 1036- 1136 9 40 20 124 - 134 10 41 18 145 - 155

Having used this comparison to narrow the scope these ten test zones were then grouped by depth and more thoroughly reviewed It is clear that the highest ranking zones are concentrated at the top of the uncased portion of the borehole This provides further evidence that groundwater contaminant transport at the site occurs at relatively shallow depths However the intent of this deep borehole is to monitor deeper fractures for possible landfill-derived contamination because MW95-ML9 is part of a well cluster which already contains screens in the shallower fractured bedrock Therefore GZA recommended well placements which span the deeper hydraulically active testing zones

In selecting the deepest screened zone (designated MW95-ML9C) we reviewed the available data and concluded that Zone 2 had chemical geophysical and hydraulic properties which fulfill the selection criteria The geophysical data shows both a caliper enlargement and a temperature differential anomaly at 290 feet below ground surface which roughly corresponds with a horizontal fracture with a 05 inch aperture identified by the Acoustic Televiewer (ATV) Given roughly equivalent hydraulic conductivities and higher chemical screening results than neighboring zones GZA feels it would be imprudent to not sample the ground waters from this depth In order to compensate for the low absolute hydraulic conductivities observed at this depth we recommend installing a 20-foot screened interval which spans two zones of fracturing observed on the ATV logs

The two upper wells (designated MW95-ML9A and -ML9B) were selected based on our ranking criteria which inclusive of filter sand packs placed them at 1 and 2 respectively The upper most zone would have spanned the bedrocksteel casing interface (as described on the attached boring log) for this reason the well was shifted down to a point below the 6-inch casing

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 3 of 5

GZV

UPCOMING EVENTSACTIVITIES

Field Activities

OU2Task 4 - Well Installations Field activities for this task will continue into the next reporting period and will likely include the following

bull Deep Borehole Well Installation shy anticipated start date is May 22 and completion date is May 25 1995

bull As-built survey of exploration locationsof May 29 1995

shy anticipated completion the week

Please note that field activities are highly dependant on the weather and the availability of subcontractors and equipment and are thus subject to change We will notify EPA and RIDEM as such changes become evident

Schedule of Deliverables

1) Operable Unit 2 RI Work Plan - Plan will be revised and reissued in final draft form as requested by EPA during April 25 1995 RIRA meeting Anticipated delivery date June 16 to EPA

2) Response Summary for Ecological Characterization Report - Response summary will address EPA comments received April 17 1995 to our report Anticipated delivery date June 16 to EPA

3) Response Summary and Screening Level Risk Assessment for Upper Simmons Reservoir Sediment Study - Response summary will address EPA comments received on April 14 1995 to our Phase n Report and include a screening level risk evaluation Anticipated delivery date June 20 to EPA

4) Multi-media Sampling and Analysis Plan for OU2RI - Document to include SAP and QAPP for Phase I OU2RI environmental sampling and analysis as agreed upon at the April 25 1995 RIRA meeting Anticipated delivery date June 20 to EPA

5) OU2 Draft Operable Unit 2 Risk Assessment Work Plan - Draft Work Plan for completion of the off-site baseline human health and ecological risk assessments Anticipated delivery date June 23 to EPA

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 4 of 5

6) Operable Unit 2 FS Work Plan - Plan will be revised and reissued in final draft form as requested by EPA during April 25 1995 RIRA meeting Anticipated delivery date June 23 to EPA

KEY PERSONAL CHANGES

No substitutions have been made to the GZA project team The team remains for the ozv OU2 RIFS Michael Powers is the Principal in Charge and technical reviewer for the RI Edward Summerly is the Project Manager for the RIFSRA projects and technical lead on the RI project Douglas Larson is the technical lead on the FS project Albert Ricciardelli is the technical reviewer for the FS Gregg McBride is technical reviewer for the RA Lisa Camp is the Human Health risk assessment specialist Timothy Briggs is the wetlands and ecological risk assessment specialist Stephen Kline and Matthew Bellisle are the project engineers and Mark Dalpe is the project field geologist

F1OBSVM030EASPR4RPT

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 5 of 5

GZA GEOENVIROI (MENTAL INC PROJECT REPORT OF BOR1NC i NOMW95-ML9 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No ~TI4797~ GEOTECHNICAL GEOHYDROLOGICAL CONSULTANTS JUHN3IUN KMlAJt ISLAND CHKD BY tAS

BORING Co DL MAKER DRILLING COMPANY BORING LOCATION SEE EXPLORATION LOCATION PLAN FOREMAN JOHN tuwtN GROUND SUKr-ACk tLkVAIlUN JAIUf) NuVp GZA ENGINEER PAKK JALPt DATE START 21095 UAIt tNU CICMY3

GROUNDWATER READINGS SAMPLER UNLESS OTHERWISE NOTED SAMPLER CONSISTS OF A 2 SPLIT

SPOON DRIVEN USING A US Ib HAMMER FALLING 30 In DATE TIME WATER CASING STABILIZATION TIME

CASING UNLESS OTHERWISE NOTED CASING DRIVEN USING A 301 3 Ib 31495 1310 106 825 1 MONTH HAMMER FALLING 24 In

CASING SIZE 10 ID OTHER 9 78 AIR HAMME R AND 6 ID 6 AIR HAMMER

E SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD EX f SCREENING M

N W PEN DEPTH DESCRIPTION INSTALLED HNU K H G S NO REC (Ft) BLOWS6 Bur-mister CLASSIFICATION (117) S

(Strati graph lie descriptions are 1 based on thlaquo i examination of FILL drilling cut tmgs and air hammer response)

S-1 GRAB 3-5 BrownBlack coarse to fine SAND J

44 little Wool 1 little-Debris trace Silt J

5

S-2 GRAB 9 coarse to fine SAND 34 10

2

15

TILL

S-3 GRAB 19-20 sarse t9 fine SAND AND 04 20 tie- Silt

25

S-4 GRAB 29-31 TanGray c oarse tdeg fine SAND AND ND 30 tie- Silt

MINFT

2 31+ BEDROCK

2 15 GRANITE

15 35

12 23 Fracture Zone 37 to 38 Brown 37

10 FRACTURE ZONE

10 38 HARDER ROCK GRANITE

S-5 GRAB 39 12 Tan (iron-stained) GRANITE Cuttings NO

REMARKS 1 Soil headspace TVOC screen ng was conducted employing a HNU Systems Model PI-101 Photoionization Detector equipped with an 17 Lamp

2 Mild leachage odor noted fr 3 10 (D steel casing spun to yengt Attenp to advance open borehole - borehole collapses on 21695

continued to advance 10 ca sing to a total depth of 57 below ground surface

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRgt INSITI ONS KAY BE GR ADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED 1LUCTU AT IONS OF GRQ UNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENfs WERE HAD | BORING NOMW95-ML9

N ES2 REPORT OF BORIN G NOMW95-ML9 aENCE-RHCOE ISLAND ^zsect maK

bull CENTRAL LANDFILL - OU2 - TASK 4 FILE No 3amp79Ugt2-amp~ GEOTECHNICAL GEOHYDROLOGICAL CONSULTANTS 3DHUSTDN RHUJb ISLAND CHKD BY LAS D

f H

C B

BO N U G S No

PEC

SAMPLE DEPTH (Ft) M INFT

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

STRATUM DESCRIPTION

EQUIPMENT INSTALLED

FIELD SCREENING

I |

i NR

NR

NR

NR

1 yen

NR 45

20

20 47 20

20

WEATHERED ZONE at 47 to 48 Brown Silts

WEATHERED ZONE

48

13

20 50

S-6 GRAB 49 20

10

TanGray GRANITE cuttings very highly WEATHERED AND FRACTURED ZONE at 50 to 55

50 05 4

15 FRACTURE ZONE

15 54

55 15 10 TanGray GRANITE Cuttings 55 5

10 J10 casing to 57 57

10

15 IshyNshy

60 S-7 GRAB 59

20

10 TanGray GRANITE Cuttings -

0-N I-

10

15

15

65 15 10 66

03 Silts and rock fragments FRACTURE ZONE

70

S-8 GRAB 67 5

5

0

Highly weathered gray GRANITE rock fragments

67

GRAY GRANITE

03

6 0 0

Fracture Zone at 70 to 73 Red Brown SILTS

70 FRACTURE ZONE

10

75

10

15 BrownGrayTan GRANITE (smaller pieces)

73

15 15

15

15

80 S-9 GRAB 80

20

20

20

Harder rock (small pieces) still a lot of weathering evident _J6 casing to 825

81

825

NO 7 8

10 mdash 10

10 REMARKS 4 Drill water effluent fs si ghtly FOAMY (making approx 30 gpm and borehole collapses at the Fracture Zone

5 Began open-hole drilling w th 978 straight haomer Advanced to 81 6 Large fracture between 70 and 73 making less water laquolaquo bdquo _ _ - _7 6 ID steel casing spon into rock to a depth of 825 on 22095 began drilling open borehole with

6 straight hammer 8 On 22195 the decision was made to leave the 10 casing in the steel ground In prder to protect nearby

borings MW95-47 and MW94-47S the 6 casing was sealed with a layer of fentomte chip from 825 to 54 above which the annular space between the 10 and 6 casings were filled with High Early grout to ground surface

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS KAY BE GR ADUAL 2 WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIONS OF GRO UNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE | BORING NOMW95-ML9

i

GZA GEOENVIRONNENTAL INC PROJECT REPORT OF BORING NOMW95-ML9 140 BROADWAY PROVIDENCE RHODE ISLAND r_laquojpoundv_ CENTRAL LANDFILL - OU2 - TASK 4 FILE No 314792

GtOlbCHNlCALGEOHYDROLOUICAL LONSULIANIS JOHNSTON RHDUb ISLANU CHKD BY fcAS D C B

SAMPLE SAMPLE DESCRIPTION H

50 N W G S No

PENREC

DEPTH (Ft) MINFT Bunmiter CLASSIFICATION

10

10

10

10

90 S-10 GRAB 90 10

07 Gray GRANITE Bedrock (High Quartz)

08

05

05

95 05

05 05

05

05

100 05 10

S-11 GRAB 102 10 Gray GRANITE

10

10

105 10

10

10

05

10

110 S-12 GRAB 110 20 Gray GRANITE

10

10

10 08

115 08

08 05

05

05

120 S-13 GRAB 120 05 Weathered GRANITE (TanBroun

05

04

04

04

125 S-14 GRAB 126

04 04 GrayCream GRANITE

05

08

08

08 OliveTan GRANITE (possible fracture at 129)

REMARKS 9 Large weathered seam from 118 to 129 (borehole remains open)

STRATUM DESCRIPTION

GRAY GRANITE

96

100

GRAY

108

GRAY 111

GRAY

118

LIGHT BROUN ROCK SOFTER ROCK

CHANGES FROM LIGHT BROWN TO CREAM AT 126

FRACTURE 129

EQUIPMENT INSTALLED

(FIELD

jSCREENING HNU 117 gt

NO

NO

NO

ND

ND

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIC NS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

9

GZA GEOENVIRON CENTAL INC140 BROADWAY PROVIDENCE RHODE ISLAND

mdashGEOTECHNICALGI EOHYDROLOGICAL CONSUL ANTS

SAMPLE P

H W

G S No PENREC

DEPTH (Ft) MINFT

10

10 10

10

S-15 GRAB 135 05

05 05

05

05

140 05

05

05

05

05

145 S-15 GRAB 145 05

05

05 05

05

150 05

05

05

08

10

155 S-16 GRAB 155 10

10

10 05

05

160 05

03 S-17 GRAB 162 03

05

03

165 03

03

08

10

10

170 10

10

10

10

10 S-18 GRAB 175 10

PROJECT L^^mdash CENTRAL LANDFILL shy OU2 shy TASK 4

~ TOKNSTON RHDTJb ISLAND

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

REPi

STRATUM

DESCRIPTION

FILE NoCHW) BY

EQUIPMENT INSTALLED

314 2 EAS

FIELD SCREENING HNU 11

R

GRAY

BrownOrange SILTS FRACTURE 135

WEATHERED ZONE

01

ORANGE SOFT LARGE CHUCKS OF ROCK

10

BrownOrange Silts 146

LIGHT BROWN

NO

Dark gray with black and red rock chips GRANITE (BrownGray Silts)

152 CREAMGRAY

HARDER NO

BrownRed SILTS

Brighter red

Gray SILTS

BrownHeavier SILT content

162 BROWN

16|OFT ROCK

REDBROWN 166

GRAY ROCK

169

BROWNRED

01 11

brown Silts ND

REMARKS 10 Large highly weathered seaa at 135 to 146 larger chunks of rock in cuttings (borehole remained

11 Large] highly weathered seam at 162 to 166 very bright red silts suspect PID reading - probably

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATE MS OF GROUNDWATER

KAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE 1 BORING NOMW95-ML9

aENCEHOOE ISLANDra muGEOTECHNICALGEOHYDROLOGICAL CONSULTANTS

D B SAMPLE

H w

G S No PENREC

DEPTH (Ft) M INFT

10 10 10 10 10

bull on

10 10 08 08 08

185 08

S-19 GRAB 187 08 05 05 05

190 05 05 05 03 03

195 S-20 GRAB 196 03

03 03 05

200 05 48

08 10 10

205 05 05 0

S-21 GRAB 208 0 0 0

210 0

S-22 GRAB 212 05 05

05 08

215 08 08 08 08

220 08

EE2JIpoundI ^^CENTRAL LANDFILL - OU2 - TASK 4

JOHNS UK RHODt ISLANU

SAMPLE DESCRIPTION STRATUM DESCRIPTION

Burmister CLASSIFICATION 176

PINKCREAMSILT

183

LIGHT BROWN SILT

Dark Gray with Red amp Black Chips (Brown Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt)

BlyeCreawBlackRed Rock Chips (with brownorange Si If some white flecks and Red Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt some white flecks and Red Silts)

WhiteRedDark Gray Chips (Bright Red Silts)

194

BROWNORANGE

199

LIGHT BROWN

205

BROWNREDSILTS

209

GRAYCREAM

BRIGHT RED

MORE LIGHT GRAY

OHW95-HL9sW mdashjL- r B_

FILE Mo CHKD BY fc AS Tr

I EQUIPMENT FIELD

IINSTALLED SCREENING HNU 117 raquo

NO

NO

NO

ND

REMARKS 12 Borehole remains open despite very weathered soft rock with high silt content

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS HAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

12

ISLANDW KBRflr WfoJgmmdash

GEOTECHNICALG EOHYDROLOGICAL CONSULTANTS

I C B A L SAMPLE

I N W G S No

PENREC

DEPTH (Ft) MINFT

10 S-23 GRAB 222 10

10 10

225 05 05 05 05 08

230 08 08 08 0

5

235 S-24 GRAB 235 5

5

5

5

5

240 0 0 0 5 5

245 S-25 grab 245 5

5

5

5

5

250 5 5 5 5 5

255 5 5

S-26 GRAB 258 0 0 0

260 0 0

0

0

0

0

EE REPORT OF BORING NOMW95-ML9 ^ SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No TreTp-2shy JUHNSIUN HHUUh ISLAND CHKD BY -HAS

)

SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD |DESCRIPTION INSTALLED SCREENING

Bunnister CLASSIFICATION HNU 117 t

221 NO

WhiteLight Gray (whitecream WHITE Silts) LIGHT GRAY

226 (Fractured Zone at 226 to 228 13 Bright Red Silts) BRIGHT RED

228SILTS

Soft Zone 229 to 234 Green rock TANGRAY chips (Tan Silts)

234 OLIVETAN NO

HARDER ROCK 8lfcfttsfl5$Dark Gray bull GRADING TO LIGHT GRAY

GrayWhite with Black Flecks (Gray Silts) LIGHT GRAY NO

GRAY SILT GRAYWHITEBLACK ROCK

GreenGrayB^ack Rock Fragments 257 NO (TanOlive Silts) - Possible Fractured Zone TANOLIVE

SILTS

260 BLUEGRAY

REMARKS 13 Deepest observed fracture zone 226 to 228 more bright red Silts

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO NS OF GROUNDWATER

bdquobdquobull NAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE GZA | BORING NOMW95-ML9

REPORT OF BORING NOMU95-M19 gtROVIDENCE RHODE ISLAND

CENTRAL LANDFILL - OU2 - TASK 4 IVflV fe GEOTECHNICALGI iOHYDROLOGICAL CONSULTANTS V JUHNS 1 UN HHOUb 1 bLAHD CHKD BY TAr-

H

270

275

280

285

290

295

300

305

310

SAMPLE DESCRIPTION

Bui-mister CLASSIFICATION

Dark GrayWhiteLight Gray GRANITE (Light Silts)

Dark GrayUhiteLighl Gray GRANITE (Light Slits) did not grab sample

Dark GrayUhiteUght Gray GRANITE (Light Slits) slightly sillier

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

End of Exploration at +310

REMARKS 4 Borehole still making water rock much harder gt 2 gpm rate 5 Drilled to depth of 310 below ground surface a 1414 hrs on 22095 6 After developing the well for 15 ninutes with air well making +5 gpm (measured with calibrated

bucket) bull 17 Hager GeoScience Inc working with Colog Inc performed bqreholenepphysical logging 3-arm

borehole ca(iperanltf fluid temperature testing was performed on 33957 Acoustic Borehole teleshy18 A minimal amount of water was lost to the borehole during drilling On 31095 prior to packer

B SAMPLE

1 PEN DEPTH G S No REC (Ft)

S-27 GRAB 270

S-28 GRAB 288

S-29 GRAB 300

MINFT 10

10

15

15

15

20 20

20

20

20

20

20

20

20

20

20

20

20

20

20 20

20

20

20

20 25

25

25

25

25

25 25

25

25

25

20 20

20

15

15

15

15

15

15 15

STRATUM DESCRIPTION

HARDER ROCK

GRAY GRANITE BEDROCK

303

SLIGHTLY SOFTER

DRILLING

EQUIPMENT INSTALLED

I FIELD

ISCREENING HNU 117 i

ND

14

ND

ND

18

19

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETUEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMU95-ML9

GZA GEOENVIRONMENTAL INC PROJECT REPORT OF BORING NoHWS 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET o ut

CENTRAL LANDFILL -OU2 - TASK FILE No rftTV GEOTECHNICALGEOHYDROLOGICAL CONSULTANTS JuHNVilUN KHWb iSLANU CHKD BY bAS f

SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD S 0 N U PEN DEPTH DESCRIPTION INSTALLED G S No IREC (Ft) HINFT Burmister CLASSIFICATION STOP

REMARKS 18 contd 870

19

ing testing

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATEWATERR AEyELREADINGS_HAVE_BEELEVEL READINGS HAVE BEENN MADMADEE AT TIMES AND UNDER CONDITIONS STATED FLUAT_I1MES_AND_UNDER CONDIIIWISSIATip^FLUCTUATigNS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WEIRE MADEGZA |BORING NOMW95-ML9

--

1

s 1 ltbull

-

OV

ER

ALL

Of to t 5 - bulln t- s 8 s 0

- 9 ~ laquobull bull bull laquo shy

- 1 Ei

i 0

AU

IUW

HO

O

i 1 i i

M IO laquo tobull - 8 - 5 8 n in bull - S shy

I bull bull shy

CO

ND

UC

TIV

ITY

Mgt M o f~ s 8 t 5 s t 8 - 8 ttbull n bull0 raquogbull bullI

() rV

LU DC

a z 1 1 fr t I 1 m I

1 O n LU 1 r I 1 i-~_5 i S i oS sect 1 s sect pound s sect sect

ltraquo g

S s s S

V Vdeg o 2 o 1 ^

111

ID bull- - bull- bull- bull- bull- - - bullshyn mdash mdash

C

HU

OR

O

NIN

OH

E9U

L i 0 o o O o z z Z Z

o laquo t C c Q O Oo O z Z Z Z Z Zz (Dz

2 I 5i i D)D a

- S ui laquo s- pound7 1 8 pound

uT tu Q t bullJ S 1

TR

AC

E(

O Q e e ou o S o o sU o 2 u C1 s A a2 a e z zB D

2

O

cc

V)

f 5gt W cc

o IU

i d

i s 40

O Z

g

8 0

g

i

8 0

deg

I

i

sect

i

I

i

8

Q Z

g

O Z

s

O z

c

O Z

bull Q Z

N

o z

8

i

8

i

g

i

sect

0

1

i

1

i

2

o z

pound

0shyat

-

p

in c

0 O2

fl8

V

i i s s iU

i o n 0 o

En K

O 2

07 V

t- S S c I

b b

O 01

34

0

io

r

O

1 v 0 K b b b - c 1 c ia I S i i s i i sc

111 III UJ bull 13 as 1 s a I | S a z i

Ill

C 0 lt t lt ( C O O (0

-

I CO UJ CC a z

UJ UJ ^

gw -5

-I y 1

CN

o z ^ ltD ii eg

8 o_ UJ bullsect H J bdquo

-8 S 1 -8

u o en

(0

9 S

s I

r K shyozv JOB

GZA GEOENVIRONMENTAL INC SHEET NO OF EngnMrs and ScwnMts

14O BROADWAY PROVIDENCE RHODE BLAND O2903 (4O1J421-414O

CALCULATED BY_

CHECKED BY

DATE

DATE

SCALE L Blocks IO

I

MtU

Co

  1. barcode 3228
  2. barcodetext SEMS Doc ID 3228
Page 4: GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

GZ

CorojwativeiUak

Raw Soom

Zooe TMsampb

l 19 25 825 shy 91 2 20 19 134 - 144 3 20 21 1145-1245 4 20 24 85-95 5 28 7 2424 - 2524 6 35 6 249-259 7 37 8 2335 - 2435 8 39 22 1036- 1136 9 40 20 124 - 134 10 41 18 145 - 155

Having used this comparison to narrow the scope these ten test zones were then grouped by depth and more thoroughly reviewed It is clear that the highest ranking zones are concentrated at the top of the uncased portion of the borehole This provides further evidence that groundwater contaminant transport at the site occurs at relatively shallow depths However the intent of this deep borehole is to monitor deeper fractures for possible landfill-derived contamination because MW95-ML9 is part of a well cluster which already contains screens in the shallower fractured bedrock Therefore GZA recommended well placements which span the deeper hydraulically active testing zones

In selecting the deepest screened zone (designated MW95-ML9C) we reviewed the available data and concluded that Zone 2 had chemical geophysical and hydraulic properties which fulfill the selection criteria The geophysical data shows both a caliper enlargement and a temperature differential anomaly at 290 feet below ground surface which roughly corresponds with a horizontal fracture with a 05 inch aperture identified by the Acoustic Televiewer (ATV) Given roughly equivalent hydraulic conductivities and higher chemical screening results than neighboring zones GZA feels it would be imprudent to not sample the ground waters from this depth In order to compensate for the low absolute hydraulic conductivities observed at this depth we recommend installing a 20-foot screened interval which spans two zones of fracturing observed on the ATV logs

The two upper wells (designated MW95-ML9A and -ML9B) were selected based on our ranking criteria which inclusive of filter sand packs placed them at 1 and 2 respectively The upper most zone would have spanned the bedrocksteel casing interface (as described on the attached boring log) for this reason the well was shifted down to a point below the 6-inch casing

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 3 of 5

GZV

UPCOMING EVENTSACTIVITIES

Field Activities

OU2Task 4 - Well Installations Field activities for this task will continue into the next reporting period and will likely include the following

bull Deep Borehole Well Installation shy anticipated start date is May 22 and completion date is May 25 1995

bull As-built survey of exploration locationsof May 29 1995

shy anticipated completion the week

Please note that field activities are highly dependant on the weather and the availability of subcontractors and equipment and are thus subject to change We will notify EPA and RIDEM as such changes become evident

Schedule of Deliverables

1) Operable Unit 2 RI Work Plan - Plan will be revised and reissued in final draft form as requested by EPA during April 25 1995 RIRA meeting Anticipated delivery date June 16 to EPA

2) Response Summary for Ecological Characterization Report - Response summary will address EPA comments received April 17 1995 to our report Anticipated delivery date June 16 to EPA

3) Response Summary and Screening Level Risk Assessment for Upper Simmons Reservoir Sediment Study - Response summary will address EPA comments received on April 14 1995 to our Phase n Report and include a screening level risk evaluation Anticipated delivery date June 20 to EPA

4) Multi-media Sampling and Analysis Plan for OU2RI - Document to include SAP and QAPP for Phase I OU2RI environmental sampling and analysis as agreed upon at the April 25 1995 RIRA meeting Anticipated delivery date June 20 to EPA

5) OU2 Draft Operable Unit 2 Risk Assessment Work Plan - Draft Work Plan for completion of the off-site baseline human health and ecological risk assessments Anticipated delivery date June 23 to EPA

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 4 of 5

6) Operable Unit 2 FS Work Plan - Plan will be revised and reissued in final draft form as requested by EPA during April 25 1995 RIRA meeting Anticipated delivery date June 23 to EPA

KEY PERSONAL CHANGES

No substitutions have been made to the GZA project team The team remains for the ozv OU2 RIFS Michael Powers is the Principal in Charge and technical reviewer for the RI Edward Summerly is the Project Manager for the RIFSRA projects and technical lead on the RI project Douglas Larson is the technical lead on the FS project Albert Ricciardelli is the technical reviewer for the FS Gregg McBride is technical reviewer for the RA Lisa Camp is the Human Health risk assessment specialist Timothy Briggs is the wetlands and ecological risk assessment specialist Stephen Kline and Matthew Bellisle are the project engineers and Mark Dalpe is the project field geologist

F1OBSVM030EASPR4RPT

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 5 of 5

GZA GEOENVIROI (MENTAL INC PROJECT REPORT OF BOR1NC i NOMW95-ML9 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No ~TI4797~ GEOTECHNICAL GEOHYDROLOGICAL CONSULTANTS JUHN3IUN KMlAJt ISLAND CHKD BY tAS

BORING Co DL MAKER DRILLING COMPANY BORING LOCATION SEE EXPLORATION LOCATION PLAN FOREMAN JOHN tuwtN GROUND SUKr-ACk tLkVAIlUN JAIUf) NuVp GZA ENGINEER PAKK JALPt DATE START 21095 UAIt tNU CICMY3

GROUNDWATER READINGS SAMPLER UNLESS OTHERWISE NOTED SAMPLER CONSISTS OF A 2 SPLIT

SPOON DRIVEN USING A US Ib HAMMER FALLING 30 In DATE TIME WATER CASING STABILIZATION TIME

CASING UNLESS OTHERWISE NOTED CASING DRIVEN USING A 301 3 Ib 31495 1310 106 825 1 MONTH HAMMER FALLING 24 In

CASING SIZE 10 ID OTHER 9 78 AIR HAMME R AND 6 ID 6 AIR HAMMER

E SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD EX f SCREENING M

N W PEN DEPTH DESCRIPTION INSTALLED HNU K H G S NO REC (Ft) BLOWS6 Bur-mister CLASSIFICATION (117) S

(Strati graph lie descriptions are 1 based on thlaquo i examination of FILL drilling cut tmgs and air hammer response)

S-1 GRAB 3-5 BrownBlack coarse to fine SAND J

44 little Wool 1 little-Debris trace Silt J

5

S-2 GRAB 9 coarse to fine SAND 34 10

2

15

TILL

S-3 GRAB 19-20 sarse t9 fine SAND AND 04 20 tie- Silt

25

S-4 GRAB 29-31 TanGray c oarse tdeg fine SAND AND ND 30 tie- Silt

MINFT

2 31+ BEDROCK

2 15 GRANITE

15 35

12 23 Fracture Zone 37 to 38 Brown 37

10 FRACTURE ZONE

10 38 HARDER ROCK GRANITE

S-5 GRAB 39 12 Tan (iron-stained) GRANITE Cuttings NO

REMARKS 1 Soil headspace TVOC screen ng was conducted employing a HNU Systems Model PI-101 Photoionization Detector equipped with an 17 Lamp

2 Mild leachage odor noted fr 3 10 (D steel casing spun to yengt Attenp to advance open borehole - borehole collapses on 21695

continued to advance 10 ca sing to a total depth of 57 below ground surface

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRgt INSITI ONS KAY BE GR ADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED 1LUCTU AT IONS OF GRQ UNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENfs WERE HAD | BORING NOMW95-ML9

N ES2 REPORT OF BORIN G NOMW95-ML9 aENCE-RHCOE ISLAND ^zsect maK

bull CENTRAL LANDFILL - OU2 - TASK 4 FILE No 3amp79Ugt2-amp~ GEOTECHNICAL GEOHYDROLOGICAL CONSULTANTS 3DHUSTDN RHUJb ISLAND CHKD BY LAS D

f H

C B

BO N U G S No

PEC

SAMPLE DEPTH (Ft) M INFT

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

STRATUM DESCRIPTION

EQUIPMENT INSTALLED

FIELD SCREENING

I |

i NR

NR

NR

NR

1 yen

NR 45

20

20 47 20

20

WEATHERED ZONE at 47 to 48 Brown Silts

WEATHERED ZONE

48

13

20 50

S-6 GRAB 49 20

10

TanGray GRANITE cuttings very highly WEATHERED AND FRACTURED ZONE at 50 to 55

50 05 4

15 FRACTURE ZONE

15 54

55 15 10 TanGray GRANITE Cuttings 55 5

10 J10 casing to 57 57

10

15 IshyNshy

60 S-7 GRAB 59

20

10 TanGray GRANITE Cuttings -

0-N I-

10

15

15

65 15 10 66

03 Silts and rock fragments FRACTURE ZONE

70

S-8 GRAB 67 5

5

0

Highly weathered gray GRANITE rock fragments

67

GRAY GRANITE

03

6 0 0

Fracture Zone at 70 to 73 Red Brown SILTS

70 FRACTURE ZONE

10

75

10

15 BrownGrayTan GRANITE (smaller pieces)

73

15 15

15

15

80 S-9 GRAB 80

20

20

20

Harder rock (small pieces) still a lot of weathering evident _J6 casing to 825

81

825

NO 7 8

10 mdash 10

10 REMARKS 4 Drill water effluent fs si ghtly FOAMY (making approx 30 gpm and borehole collapses at the Fracture Zone

5 Began open-hole drilling w th 978 straight haomer Advanced to 81 6 Large fracture between 70 and 73 making less water laquolaquo bdquo _ _ - _7 6 ID steel casing spon into rock to a depth of 825 on 22095 began drilling open borehole with

6 straight hammer 8 On 22195 the decision was made to leave the 10 casing in the steel ground In prder to protect nearby

borings MW95-47 and MW94-47S the 6 casing was sealed with a layer of fentomte chip from 825 to 54 above which the annular space between the 10 and 6 casings were filled with High Early grout to ground surface

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS KAY BE GR ADUAL 2 WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIONS OF GRO UNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE | BORING NOMW95-ML9

i

GZA GEOENVIRONNENTAL INC PROJECT REPORT OF BORING NOMW95-ML9 140 BROADWAY PROVIDENCE RHODE ISLAND r_laquojpoundv_ CENTRAL LANDFILL - OU2 - TASK 4 FILE No 314792

GtOlbCHNlCALGEOHYDROLOUICAL LONSULIANIS JOHNSTON RHDUb ISLANU CHKD BY fcAS D C B

SAMPLE SAMPLE DESCRIPTION H

50 N W G S No

PENREC

DEPTH (Ft) MINFT Bunmiter CLASSIFICATION

10

10

10

10

90 S-10 GRAB 90 10

07 Gray GRANITE Bedrock (High Quartz)

08

05

05

95 05

05 05

05

05

100 05 10

S-11 GRAB 102 10 Gray GRANITE

10

10

105 10

10

10

05

10

110 S-12 GRAB 110 20 Gray GRANITE

10

10

10 08

115 08

08 05

05

05

120 S-13 GRAB 120 05 Weathered GRANITE (TanBroun

05

04

04

04

125 S-14 GRAB 126

04 04 GrayCream GRANITE

05

08

08

08 OliveTan GRANITE (possible fracture at 129)

REMARKS 9 Large weathered seam from 118 to 129 (borehole remains open)

STRATUM DESCRIPTION

GRAY GRANITE

96

100

GRAY

108

GRAY 111

GRAY

118

LIGHT BROUN ROCK SOFTER ROCK

CHANGES FROM LIGHT BROWN TO CREAM AT 126

FRACTURE 129

EQUIPMENT INSTALLED

(FIELD

jSCREENING HNU 117 gt

NO

NO

NO

ND

ND

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIC NS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

9

GZA GEOENVIRON CENTAL INC140 BROADWAY PROVIDENCE RHODE ISLAND

mdashGEOTECHNICALGI EOHYDROLOGICAL CONSUL ANTS

SAMPLE P

H W

G S No PENREC

DEPTH (Ft) MINFT

10

10 10

10

S-15 GRAB 135 05

05 05

05

05

140 05

05

05

05

05

145 S-15 GRAB 145 05

05

05 05

05

150 05

05

05

08

10

155 S-16 GRAB 155 10

10

10 05

05

160 05

03 S-17 GRAB 162 03

05

03

165 03

03

08

10

10

170 10

10

10

10

10 S-18 GRAB 175 10

PROJECT L^^mdash CENTRAL LANDFILL shy OU2 shy TASK 4

~ TOKNSTON RHDTJb ISLAND

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

REPi

STRATUM

DESCRIPTION

FILE NoCHW) BY

EQUIPMENT INSTALLED

314 2 EAS

FIELD SCREENING HNU 11

R

GRAY

BrownOrange SILTS FRACTURE 135

WEATHERED ZONE

01

ORANGE SOFT LARGE CHUCKS OF ROCK

10

BrownOrange Silts 146

LIGHT BROWN

NO

Dark gray with black and red rock chips GRANITE (BrownGray Silts)

152 CREAMGRAY

HARDER NO

BrownRed SILTS

Brighter red

Gray SILTS

BrownHeavier SILT content

162 BROWN

16|OFT ROCK

REDBROWN 166

GRAY ROCK

169

BROWNRED

01 11

brown Silts ND

REMARKS 10 Large highly weathered seaa at 135 to 146 larger chunks of rock in cuttings (borehole remained

11 Large] highly weathered seam at 162 to 166 very bright red silts suspect PID reading - probably

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATE MS OF GROUNDWATER

KAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE 1 BORING NOMW95-ML9

aENCEHOOE ISLANDra muGEOTECHNICALGEOHYDROLOGICAL CONSULTANTS

D B SAMPLE

H w

G S No PENREC

DEPTH (Ft) M INFT

10 10 10 10 10

bull on

10 10 08 08 08

185 08

S-19 GRAB 187 08 05 05 05

190 05 05 05 03 03

195 S-20 GRAB 196 03

03 03 05

200 05 48

08 10 10

205 05 05 0

S-21 GRAB 208 0 0 0

210 0

S-22 GRAB 212 05 05

05 08

215 08 08 08 08

220 08

EE2JIpoundI ^^CENTRAL LANDFILL - OU2 - TASK 4

JOHNS UK RHODt ISLANU

SAMPLE DESCRIPTION STRATUM DESCRIPTION

Burmister CLASSIFICATION 176

PINKCREAMSILT

183

LIGHT BROWN SILT

Dark Gray with Red amp Black Chips (Brown Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt)

BlyeCreawBlackRed Rock Chips (with brownorange Si If some white flecks and Red Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt some white flecks and Red Silts)

WhiteRedDark Gray Chips (Bright Red Silts)

194

BROWNORANGE

199

LIGHT BROWN

205

BROWNREDSILTS

209

GRAYCREAM

BRIGHT RED

MORE LIGHT GRAY

OHW95-HL9sW mdashjL- r B_

FILE Mo CHKD BY fc AS Tr

I EQUIPMENT FIELD

IINSTALLED SCREENING HNU 117 raquo

NO

NO

NO

ND

REMARKS 12 Borehole remains open despite very weathered soft rock with high silt content

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS HAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

12

ISLANDW KBRflr WfoJgmmdash

GEOTECHNICALG EOHYDROLOGICAL CONSULTANTS

I C B A L SAMPLE

I N W G S No

PENREC

DEPTH (Ft) MINFT

10 S-23 GRAB 222 10

10 10

225 05 05 05 05 08

230 08 08 08 0

5

235 S-24 GRAB 235 5

5

5

5

5

240 0 0 0 5 5

245 S-25 grab 245 5

5

5

5

5

250 5 5 5 5 5

255 5 5

S-26 GRAB 258 0 0 0

260 0 0

0

0

0

0

EE REPORT OF BORING NOMW95-ML9 ^ SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No TreTp-2shy JUHNSIUN HHUUh ISLAND CHKD BY -HAS

)

SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD |DESCRIPTION INSTALLED SCREENING

Bunnister CLASSIFICATION HNU 117 t

221 NO

WhiteLight Gray (whitecream WHITE Silts) LIGHT GRAY

226 (Fractured Zone at 226 to 228 13 Bright Red Silts) BRIGHT RED

228SILTS

Soft Zone 229 to 234 Green rock TANGRAY chips (Tan Silts)

234 OLIVETAN NO

HARDER ROCK 8lfcfttsfl5$Dark Gray bull GRADING TO LIGHT GRAY

GrayWhite with Black Flecks (Gray Silts) LIGHT GRAY NO

GRAY SILT GRAYWHITEBLACK ROCK

GreenGrayB^ack Rock Fragments 257 NO (TanOlive Silts) - Possible Fractured Zone TANOLIVE

SILTS

260 BLUEGRAY

REMARKS 13 Deepest observed fracture zone 226 to 228 more bright red Silts

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO NS OF GROUNDWATER

bdquobdquobull NAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE GZA | BORING NOMW95-ML9

REPORT OF BORING NOMU95-M19 gtROVIDENCE RHODE ISLAND

CENTRAL LANDFILL - OU2 - TASK 4 IVflV fe GEOTECHNICALGI iOHYDROLOGICAL CONSULTANTS V JUHNS 1 UN HHOUb 1 bLAHD CHKD BY TAr-

H

270

275

280

285

290

295

300

305

310

SAMPLE DESCRIPTION

Bui-mister CLASSIFICATION

Dark GrayWhiteLight Gray GRANITE (Light Silts)

Dark GrayUhiteLighl Gray GRANITE (Light Slits) did not grab sample

Dark GrayUhiteUght Gray GRANITE (Light Slits) slightly sillier

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

End of Exploration at +310

REMARKS 4 Borehole still making water rock much harder gt 2 gpm rate 5 Drilled to depth of 310 below ground surface a 1414 hrs on 22095 6 After developing the well for 15 ninutes with air well making +5 gpm (measured with calibrated

bucket) bull 17 Hager GeoScience Inc working with Colog Inc performed bqreholenepphysical logging 3-arm

borehole ca(iperanltf fluid temperature testing was performed on 33957 Acoustic Borehole teleshy18 A minimal amount of water was lost to the borehole during drilling On 31095 prior to packer

B SAMPLE

1 PEN DEPTH G S No REC (Ft)

S-27 GRAB 270

S-28 GRAB 288

S-29 GRAB 300

MINFT 10

10

15

15

15

20 20

20

20

20

20

20

20

20

20

20

20

20

20

20 20

20

20

20

20 25

25

25

25

25

25 25

25

25

25

20 20

20

15

15

15

15

15

15 15

STRATUM DESCRIPTION

HARDER ROCK

GRAY GRANITE BEDROCK

303

SLIGHTLY SOFTER

DRILLING

EQUIPMENT INSTALLED

I FIELD

ISCREENING HNU 117 i

ND

14

ND

ND

18

19

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETUEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMU95-ML9

GZA GEOENVIRONMENTAL INC PROJECT REPORT OF BORING NoHWS 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET o ut

CENTRAL LANDFILL -OU2 - TASK FILE No rftTV GEOTECHNICALGEOHYDROLOGICAL CONSULTANTS JuHNVilUN KHWb iSLANU CHKD BY bAS f

SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD S 0 N U PEN DEPTH DESCRIPTION INSTALLED G S No IREC (Ft) HINFT Burmister CLASSIFICATION STOP

REMARKS 18 contd 870

19

ing testing

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATEWATERR AEyELREADINGS_HAVE_BEELEVEL READINGS HAVE BEENN MADMADEE AT TIMES AND UNDER CONDITIONS STATED FLUAT_I1MES_AND_UNDER CONDIIIWISSIATip^FLUCTUATigNS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WEIRE MADEGZA |BORING NOMW95-ML9

--

1

s 1 ltbull

-

OV

ER

ALL

Of to t 5 - bulln t- s 8 s 0

- 9 ~ laquobull bull bull laquo shy

- 1 Ei

i 0

AU

IUW

HO

O

i 1 i i

M IO laquo tobull - 8 - 5 8 n in bull - S shy

I bull bull shy

CO

ND

UC

TIV

ITY

Mgt M o f~ s 8 t 5 s t 8 - 8 ttbull n bull0 raquogbull bullI

() rV

LU DC

a z 1 1 fr t I 1 m I

1 O n LU 1 r I 1 i-~_5 i S i oS sect 1 s sect pound s sect sect

ltraquo g

S s s S

V Vdeg o 2 o 1 ^

111

ID bull- - bull- bull- bull- bull- - - bullshyn mdash mdash

C

HU

OR

O

NIN

OH

E9U

L i 0 o o O o z z Z Z

o laquo t C c Q O Oo O z Z Z Z Z Zz (Dz

2 I 5i i D)D a

- S ui laquo s- pound7 1 8 pound

uT tu Q t bullJ S 1

TR

AC

E(

O Q e e ou o S o o sU o 2 u C1 s A a2 a e z zB D

2

O

cc

V)

f 5gt W cc

o IU

i d

i s 40

O Z

g

8 0

g

i

8 0

deg

I

i

sect

i

I

i

8

Q Z

g

O Z

s

O z

c

O Z

bull Q Z

N

o z

8

i

8

i

g

i

sect

0

1

i

1

i

2

o z

pound

0shyat

-

p

in c

0 O2

fl8

V

i i s s iU

i o n 0 o

En K

O 2

07 V

t- S S c I

b b

O 01

34

0

io

r

O

1 v 0 K b b b - c 1 c ia I S i i s i i sc

111 III UJ bull 13 as 1 s a I | S a z i

Ill

C 0 lt t lt ( C O O (0

-

I CO UJ CC a z

UJ UJ ^

gw -5

-I y 1

CN

o z ^ ltD ii eg

8 o_ UJ bullsect H J bdquo

-8 S 1 -8

u o en

(0

9 S

s I

r K shyozv JOB

GZA GEOENVIRONMENTAL INC SHEET NO OF EngnMrs and ScwnMts

14O BROADWAY PROVIDENCE RHODE BLAND O2903 (4O1J421-414O

CALCULATED BY_

CHECKED BY

DATE

DATE

SCALE L Blocks IO

I

MtU

Co

  1. barcode 3228
  2. barcodetext SEMS Doc ID 3228
Page 5: GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

GZV

UPCOMING EVENTSACTIVITIES

Field Activities

OU2Task 4 - Well Installations Field activities for this task will continue into the next reporting period and will likely include the following

bull Deep Borehole Well Installation shy anticipated start date is May 22 and completion date is May 25 1995

bull As-built survey of exploration locationsof May 29 1995

shy anticipated completion the week

Please note that field activities are highly dependant on the weather and the availability of subcontractors and equipment and are thus subject to change We will notify EPA and RIDEM as such changes become evident

Schedule of Deliverables

1) Operable Unit 2 RI Work Plan - Plan will be revised and reissued in final draft form as requested by EPA during April 25 1995 RIRA meeting Anticipated delivery date June 16 to EPA

2) Response Summary for Ecological Characterization Report - Response summary will address EPA comments received April 17 1995 to our report Anticipated delivery date June 16 to EPA

3) Response Summary and Screening Level Risk Assessment for Upper Simmons Reservoir Sediment Study - Response summary will address EPA comments received on April 14 1995 to our Phase n Report and include a screening level risk evaluation Anticipated delivery date June 20 to EPA

4) Multi-media Sampling and Analysis Plan for OU2RI - Document to include SAP and QAPP for Phase I OU2RI environmental sampling and analysis as agreed upon at the April 25 1995 RIRA meeting Anticipated delivery date June 20 to EPA

5) OU2 Draft Operable Unit 2 Risk Assessment Work Plan - Draft Work Plan for completion of the off-site baseline human health and ecological risk assessments Anticipated delivery date June 23 to EPA

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 4 of 5

6) Operable Unit 2 FS Work Plan - Plan will be revised and reissued in final draft form as requested by EPA during April 25 1995 RIRA meeting Anticipated delivery date June 23 to EPA

KEY PERSONAL CHANGES

No substitutions have been made to the GZA project team The team remains for the ozv OU2 RIFS Michael Powers is the Principal in Charge and technical reviewer for the RI Edward Summerly is the Project Manager for the RIFSRA projects and technical lead on the RI project Douglas Larson is the technical lead on the FS project Albert Ricciardelli is the technical reviewer for the FS Gregg McBride is technical reviewer for the RA Lisa Camp is the Human Health risk assessment specialist Timothy Briggs is the wetlands and ecological risk assessment specialist Stephen Kline and Matthew Bellisle are the project engineers and Mark Dalpe is the project field geologist

F1OBSVM030EASPR4RPT

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 5 of 5

GZA GEOENVIROI (MENTAL INC PROJECT REPORT OF BOR1NC i NOMW95-ML9 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No ~TI4797~ GEOTECHNICAL GEOHYDROLOGICAL CONSULTANTS JUHN3IUN KMlAJt ISLAND CHKD BY tAS

BORING Co DL MAKER DRILLING COMPANY BORING LOCATION SEE EXPLORATION LOCATION PLAN FOREMAN JOHN tuwtN GROUND SUKr-ACk tLkVAIlUN JAIUf) NuVp GZA ENGINEER PAKK JALPt DATE START 21095 UAIt tNU CICMY3

GROUNDWATER READINGS SAMPLER UNLESS OTHERWISE NOTED SAMPLER CONSISTS OF A 2 SPLIT

SPOON DRIVEN USING A US Ib HAMMER FALLING 30 In DATE TIME WATER CASING STABILIZATION TIME

CASING UNLESS OTHERWISE NOTED CASING DRIVEN USING A 301 3 Ib 31495 1310 106 825 1 MONTH HAMMER FALLING 24 In

CASING SIZE 10 ID OTHER 9 78 AIR HAMME R AND 6 ID 6 AIR HAMMER

E SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD EX f SCREENING M

N W PEN DEPTH DESCRIPTION INSTALLED HNU K H G S NO REC (Ft) BLOWS6 Bur-mister CLASSIFICATION (117) S

(Strati graph lie descriptions are 1 based on thlaquo i examination of FILL drilling cut tmgs and air hammer response)

S-1 GRAB 3-5 BrownBlack coarse to fine SAND J

44 little Wool 1 little-Debris trace Silt J

5

S-2 GRAB 9 coarse to fine SAND 34 10

2

15

TILL

S-3 GRAB 19-20 sarse t9 fine SAND AND 04 20 tie- Silt

25

S-4 GRAB 29-31 TanGray c oarse tdeg fine SAND AND ND 30 tie- Silt

MINFT

2 31+ BEDROCK

2 15 GRANITE

15 35

12 23 Fracture Zone 37 to 38 Brown 37

10 FRACTURE ZONE

10 38 HARDER ROCK GRANITE

S-5 GRAB 39 12 Tan (iron-stained) GRANITE Cuttings NO

REMARKS 1 Soil headspace TVOC screen ng was conducted employing a HNU Systems Model PI-101 Photoionization Detector equipped with an 17 Lamp

2 Mild leachage odor noted fr 3 10 (D steel casing spun to yengt Attenp to advance open borehole - borehole collapses on 21695

continued to advance 10 ca sing to a total depth of 57 below ground surface

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRgt INSITI ONS KAY BE GR ADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED 1LUCTU AT IONS OF GRQ UNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENfs WERE HAD | BORING NOMW95-ML9

N ES2 REPORT OF BORIN G NOMW95-ML9 aENCE-RHCOE ISLAND ^zsect maK

bull CENTRAL LANDFILL - OU2 - TASK 4 FILE No 3amp79Ugt2-amp~ GEOTECHNICAL GEOHYDROLOGICAL CONSULTANTS 3DHUSTDN RHUJb ISLAND CHKD BY LAS D

f H

C B

BO N U G S No

PEC

SAMPLE DEPTH (Ft) M INFT

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

STRATUM DESCRIPTION

EQUIPMENT INSTALLED

FIELD SCREENING

I |

i NR

NR

NR

NR

1 yen

NR 45

20

20 47 20

20

WEATHERED ZONE at 47 to 48 Brown Silts

WEATHERED ZONE

48

13

20 50

S-6 GRAB 49 20

10

TanGray GRANITE cuttings very highly WEATHERED AND FRACTURED ZONE at 50 to 55

50 05 4

15 FRACTURE ZONE

15 54

55 15 10 TanGray GRANITE Cuttings 55 5

10 J10 casing to 57 57

10

15 IshyNshy

60 S-7 GRAB 59

20

10 TanGray GRANITE Cuttings -

0-N I-

10

15

15

65 15 10 66

03 Silts and rock fragments FRACTURE ZONE

70

S-8 GRAB 67 5

5

0

Highly weathered gray GRANITE rock fragments

67

GRAY GRANITE

03

6 0 0

Fracture Zone at 70 to 73 Red Brown SILTS

70 FRACTURE ZONE

10

75

10

15 BrownGrayTan GRANITE (smaller pieces)

73

15 15

15

15

80 S-9 GRAB 80

20

20

20

Harder rock (small pieces) still a lot of weathering evident _J6 casing to 825

81

825

NO 7 8

10 mdash 10

10 REMARKS 4 Drill water effluent fs si ghtly FOAMY (making approx 30 gpm and borehole collapses at the Fracture Zone

5 Began open-hole drilling w th 978 straight haomer Advanced to 81 6 Large fracture between 70 and 73 making less water laquolaquo bdquo _ _ - _7 6 ID steel casing spon into rock to a depth of 825 on 22095 began drilling open borehole with

6 straight hammer 8 On 22195 the decision was made to leave the 10 casing in the steel ground In prder to protect nearby

borings MW95-47 and MW94-47S the 6 casing was sealed with a layer of fentomte chip from 825 to 54 above which the annular space between the 10 and 6 casings were filled with High Early grout to ground surface

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS KAY BE GR ADUAL 2 WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIONS OF GRO UNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE | BORING NOMW95-ML9

i

GZA GEOENVIRONNENTAL INC PROJECT REPORT OF BORING NOMW95-ML9 140 BROADWAY PROVIDENCE RHODE ISLAND r_laquojpoundv_ CENTRAL LANDFILL - OU2 - TASK 4 FILE No 314792

GtOlbCHNlCALGEOHYDROLOUICAL LONSULIANIS JOHNSTON RHDUb ISLANU CHKD BY fcAS D C B

SAMPLE SAMPLE DESCRIPTION H

50 N W G S No

PENREC

DEPTH (Ft) MINFT Bunmiter CLASSIFICATION

10

10

10

10

90 S-10 GRAB 90 10

07 Gray GRANITE Bedrock (High Quartz)

08

05

05

95 05

05 05

05

05

100 05 10

S-11 GRAB 102 10 Gray GRANITE

10

10

105 10

10

10

05

10

110 S-12 GRAB 110 20 Gray GRANITE

10

10

10 08

115 08

08 05

05

05

120 S-13 GRAB 120 05 Weathered GRANITE (TanBroun

05

04

04

04

125 S-14 GRAB 126

04 04 GrayCream GRANITE

05

08

08

08 OliveTan GRANITE (possible fracture at 129)

REMARKS 9 Large weathered seam from 118 to 129 (borehole remains open)

STRATUM DESCRIPTION

GRAY GRANITE

96

100

GRAY

108

GRAY 111

GRAY

118

LIGHT BROUN ROCK SOFTER ROCK

CHANGES FROM LIGHT BROWN TO CREAM AT 126

FRACTURE 129

EQUIPMENT INSTALLED

(FIELD

jSCREENING HNU 117 gt

NO

NO

NO

ND

ND

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIC NS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

9

GZA GEOENVIRON CENTAL INC140 BROADWAY PROVIDENCE RHODE ISLAND

mdashGEOTECHNICALGI EOHYDROLOGICAL CONSUL ANTS

SAMPLE P

H W

G S No PENREC

DEPTH (Ft) MINFT

10

10 10

10

S-15 GRAB 135 05

05 05

05

05

140 05

05

05

05

05

145 S-15 GRAB 145 05

05

05 05

05

150 05

05

05

08

10

155 S-16 GRAB 155 10

10

10 05

05

160 05

03 S-17 GRAB 162 03

05

03

165 03

03

08

10

10

170 10

10

10

10

10 S-18 GRAB 175 10

PROJECT L^^mdash CENTRAL LANDFILL shy OU2 shy TASK 4

~ TOKNSTON RHDTJb ISLAND

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

REPi

STRATUM

DESCRIPTION

FILE NoCHW) BY

EQUIPMENT INSTALLED

314 2 EAS

FIELD SCREENING HNU 11

R

GRAY

BrownOrange SILTS FRACTURE 135

WEATHERED ZONE

01

ORANGE SOFT LARGE CHUCKS OF ROCK

10

BrownOrange Silts 146

LIGHT BROWN

NO

Dark gray with black and red rock chips GRANITE (BrownGray Silts)

152 CREAMGRAY

HARDER NO

BrownRed SILTS

Brighter red

Gray SILTS

BrownHeavier SILT content

162 BROWN

16|OFT ROCK

REDBROWN 166

GRAY ROCK

169

BROWNRED

01 11

brown Silts ND

REMARKS 10 Large highly weathered seaa at 135 to 146 larger chunks of rock in cuttings (borehole remained

11 Large] highly weathered seam at 162 to 166 very bright red silts suspect PID reading - probably

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATE MS OF GROUNDWATER

KAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE 1 BORING NOMW95-ML9

aENCEHOOE ISLANDra muGEOTECHNICALGEOHYDROLOGICAL CONSULTANTS

D B SAMPLE

H w

G S No PENREC

DEPTH (Ft) M INFT

10 10 10 10 10

bull on

10 10 08 08 08

185 08

S-19 GRAB 187 08 05 05 05

190 05 05 05 03 03

195 S-20 GRAB 196 03

03 03 05

200 05 48

08 10 10

205 05 05 0

S-21 GRAB 208 0 0 0

210 0

S-22 GRAB 212 05 05

05 08

215 08 08 08 08

220 08

EE2JIpoundI ^^CENTRAL LANDFILL - OU2 - TASK 4

JOHNS UK RHODt ISLANU

SAMPLE DESCRIPTION STRATUM DESCRIPTION

Burmister CLASSIFICATION 176

PINKCREAMSILT

183

LIGHT BROWN SILT

Dark Gray with Red amp Black Chips (Brown Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt)

BlyeCreawBlackRed Rock Chips (with brownorange Si If some white flecks and Red Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt some white flecks and Red Silts)

WhiteRedDark Gray Chips (Bright Red Silts)

194

BROWNORANGE

199

LIGHT BROWN

205

BROWNREDSILTS

209

GRAYCREAM

BRIGHT RED

MORE LIGHT GRAY

OHW95-HL9sW mdashjL- r B_

FILE Mo CHKD BY fc AS Tr

I EQUIPMENT FIELD

IINSTALLED SCREENING HNU 117 raquo

NO

NO

NO

ND

REMARKS 12 Borehole remains open despite very weathered soft rock with high silt content

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS HAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

12

ISLANDW KBRflr WfoJgmmdash

GEOTECHNICALG EOHYDROLOGICAL CONSULTANTS

I C B A L SAMPLE

I N W G S No

PENREC

DEPTH (Ft) MINFT

10 S-23 GRAB 222 10

10 10

225 05 05 05 05 08

230 08 08 08 0

5

235 S-24 GRAB 235 5

5

5

5

5

240 0 0 0 5 5

245 S-25 grab 245 5

5

5

5

5

250 5 5 5 5 5

255 5 5

S-26 GRAB 258 0 0 0

260 0 0

0

0

0

0

EE REPORT OF BORING NOMW95-ML9 ^ SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No TreTp-2shy JUHNSIUN HHUUh ISLAND CHKD BY -HAS

)

SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD |DESCRIPTION INSTALLED SCREENING

Bunnister CLASSIFICATION HNU 117 t

221 NO

WhiteLight Gray (whitecream WHITE Silts) LIGHT GRAY

226 (Fractured Zone at 226 to 228 13 Bright Red Silts) BRIGHT RED

228SILTS

Soft Zone 229 to 234 Green rock TANGRAY chips (Tan Silts)

234 OLIVETAN NO

HARDER ROCK 8lfcfttsfl5$Dark Gray bull GRADING TO LIGHT GRAY

GrayWhite with Black Flecks (Gray Silts) LIGHT GRAY NO

GRAY SILT GRAYWHITEBLACK ROCK

GreenGrayB^ack Rock Fragments 257 NO (TanOlive Silts) - Possible Fractured Zone TANOLIVE

SILTS

260 BLUEGRAY

REMARKS 13 Deepest observed fracture zone 226 to 228 more bright red Silts

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO NS OF GROUNDWATER

bdquobdquobull NAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE GZA | BORING NOMW95-ML9

REPORT OF BORING NOMU95-M19 gtROVIDENCE RHODE ISLAND

CENTRAL LANDFILL - OU2 - TASK 4 IVflV fe GEOTECHNICALGI iOHYDROLOGICAL CONSULTANTS V JUHNS 1 UN HHOUb 1 bLAHD CHKD BY TAr-

H

270

275

280

285

290

295

300

305

310

SAMPLE DESCRIPTION

Bui-mister CLASSIFICATION

Dark GrayWhiteLight Gray GRANITE (Light Silts)

Dark GrayUhiteLighl Gray GRANITE (Light Slits) did not grab sample

Dark GrayUhiteUght Gray GRANITE (Light Slits) slightly sillier

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

End of Exploration at +310

REMARKS 4 Borehole still making water rock much harder gt 2 gpm rate 5 Drilled to depth of 310 below ground surface a 1414 hrs on 22095 6 After developing the well for 15 ninutes with air well making +5 gpm (measured with calibrated

bucket) bull 17 Hager GeoScience Inc working with Colog Inc performed bqreholenepphysical logging 3-arm

borehole ca(iperanltf fluid temperature testing was performed on 33957 Acoustic Borehole teleshy18 A minimal amount of water was lost to the borehole during drilling On 31095 prior to packer

B SAMPLE

1 PEN DEPTH G S No REC (Ft)

S-27 GRAB 270

S-28 GRAB 288

S-29 GRAB 300

MINFT 10

10

15

15

15

20 20

20

20

20

20

20

20

20

20

20

20

20

20

20 20

20

20

20

20 25

25

25

25

25

25 25

25

25

25

20 20

20

15

15

15

15

15

15 15

STRATUM DESCRIPTION

HARDER ROCK

GRAY GRANITE BEDROCK

303

SLIGHTLY SOFTER

DRILLING

EQUIPMENT INSTALLED

I FIELD

ISCREENING HNU 117 i

ND

14

ND

ND

18

19

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETUEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMU95-ML9

GZA GEOENVIRONMENTAL INC PROJECT REPORT OF BORING NoHWS 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET o ut

CENTRAL LANDFILL -OU2 - TASK FILE No rftTV GEOTECHNICALGEOHYDROLOGICAL CONSULTANTS JuHNVilUN KHWb iSLANU CHKD BY bAS f

SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD S 0 N U PEN DEPTH DESCRIPTION INSTALLED G S No IREC (Ft) HINFT Burmister CLASSIFICATION STOP

REMARKS 18 contd 870

19

ing testing

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATEWATERR AEyELREADINGS_HAVE_BEELEVEL READINGS HAVE BEENN MADMADEE AT TIMES AND UNDER CONDITIONS STATED FLUAT_I1MES_AND_UNDER CONDIIIWISSIATip^FLUCTUATigNS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WEIRE MADEGZA |BORING NOMW95-ML9

--

1

s 1 ltbull

-

OV

ER

ALL

Of to t 5 - bulln t- s 8 s 0

- 9 ~ laquobull bull bull laquo shy

- 1 Ei

i 0

AU

IUW

HO

O

i 1 i i

M IO laquo tobull - 8 - 5 8 n in bull - S shy

I bull bull shy

CO

ND

UC

TIV

ITY

Mgt M o f~ s 8 t 5 s t 8 - 8 ttbull n bull0 raquogbull bullI

() rV

LU DC

a z 1 1 fr t I 1 m I

1 O n LU 1 r I 1 i-~_5 i S i oS sect 1 s sect pound s sect sect

ltraquo g

S s s S

V Vdeg o 2 o 1 ^

111

ID bull- - bull- bull- bull- bull- - - bullshyn mdash mdash

C

HU

OR

O

NIN

OH

E9U

L i 0 o o O o z z Z Z

o laquo t C c Q O Oo O z Z Z Z Z Zz (Dz

2 I 5i i D)D a

- S ui laquo s- pound7 1 8 pound

uT tu Q t bullJ S 1

TR

AC

E(

O Q e e ou o S o o sU o 2 u C1 s A a2 a e z zB D

2

O

cc

V)

f 5gt W cc

o IU

i d

i s 40

O Z

g

8 0

g

i

8 0

deg

I

i

sect

i

I

i

8

Q Z

g

O Z

s

O z

c

O Z

bull Q Z

N

o z

8

i

8

i

g

i

sect

0

1

i

1

i

2

o z

pound

0shyat

-

p

in c

0 O2

fl8

V

i i s s iU

i o n 0 o

En K

O 2

07 V

t- S S c I

b b

O 01

34

0

io

r

O

1 v 0 K b b b - c 1 c ia I S i i s i i sc

111 III UJ bull 13 as 1 s a I | S a z i

Ill

C 0 lt t lt ( C O O (0

-

I CO UJ CC a z

UJ UJ ^

gw -5

-I y 1

CN

o z ^ ltD ii eg

8 o_ UJ bullsect H J bdquo

-8 S 1 -8

u o en

(0

9 S

s I

r K shyozv JOB

GZA GEOENVIRONMENTAL INC SHEET NO OF EngnMrs and ScwnMts

14O BROADWAY PROVIDENCE RHODE BLAND O2903 (4O1J421-414O

CALCULATED BY_

CHECKED BY

DATE

DATE

SCALE L Blocks IO

I

MtU

Co

  1. barcode 3228
  2. barcodetext SEMS Doc ID 3228
Page 6: GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

6) Operable Unit 2 FS Work Plan - Plan will be revised and reissued in final draft form as requested by EPA during April 25 1995 RIRA meeting Anticipated delivery date June 23 to EPA

KEY PERSONAL CHANGES

No substitutions have been made to the GZA project team The team remains for the ozv OU2 RIFS Michael Powers is the Principal in Charge and technical reviewer for the RI Edward Summerly is the Project Manager for the RIFSRA projects and technical lead on the RI project Douglas Larson is the technical lead on the FS project Albert Ricciardelli is the technical reviewer for the FS Gregg McBride is technical reviewer for the RA Lisa Camp is the Human Health risk assessment specialist Timothy Briggs is the wetlands and ecological risk assessment specialist Stephen Kline and Matthew Bellisle are the project engineers and Mark Dalpe is the project field geologist

F1OBSVM030EASPR4RPT

Central Landfill Operable Unit 2 RIFS Progress Report No 4 Page 5 of 5

GZA GEOENVIROI (MENTAL INC PROJECT REPORT OF BOR1NC i NOMW95-ML9 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No ~TI4797~ GEOTECHNICAL GEOHYDROLOGICAL CONSULTANTS JUHN3IUN KMlAJt ISLAND CHKD BY tAS

BORING Co DL MAKER DRILLING COMPANY BORING LOCATION SEE EXPLORATION LOCATION PLAN FOREMAN JOHN tuwtN GROUND SUKr-ACk tLkVAIlUN JAIUf) NuVp GZA ENGINEER PAKK JALPt DATE START 21095 UAIt tNU CICMY3

GROUNDWATER READINGS SAMPLER UNLESS OTHERWISE NOTED SAMPLER CONSISTS OF A 2 SPLIT

SPOON DRIVEN USING A US Ib HAMMER FALLING 30 In DATE TIME WATER CASING STABILIZATION TIME

CASING UNLESS OTHERWISE NOTED CASING DRIVEN USING A 301 3 Ib 31495 1310 106 825 1 MONTH HAMMER FALLING 24 In

CASING SIZE 10 ID OTHER 9 78 AIR HAMME R AND 6 ID 6 AIR HAMMER

E SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD EX f SCREENING M

N W PEN DEPTH DESCRIPTION INSTALLED HNU K H G S NO REC (Ft) BLOWS6 Bur-mister CLASSIFICATION (117) S

(Strati graph lie descriptions are 1 based on thlaquo i examination of FILL drilling cut tmgs and air hammer response)

S-1 GRAB 3-5 BrownBlack coarse to fine SAND J

44 little Wool 1 little-Debris trace Silt J

5

S-2 GRAB 9 coarse to fine SAND 34 10

2

15

TILL

S-3 GRAB 19-20 sarse t9 fine SAND AND 04 20 tie- Silt

25

S-4 GRAB 29-31 TanGray c oarse tdeg fine SAND AND ND 30 tie- Silt

MINFT

2 31+ BEDROCK

2 15 GRANITE

15 35

12 23 Fracture Zone 37 to 38 Brown 37

10 FRACTURE ZONE

10 38 HARDER ROCK GRANITE

S-5 GRAB 39 12 Tan (iron-stained) GRANITE Cuttings NO

REMARKS 1 Soil headspace TVOC screen ng was conducted employing a HNU Systems Model PI-101 Photoionization Detector equipped with an 17 Lamp

2 Mild leachage odor noted fr 3 10 (D steel casing spun to yengt Attenp to advance open borehole - borehole collapses on 21695

continued to advance 10 ca sing to a total depth of 57 below ground surface

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRgt INSITI ONS KAY BE GR ADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED 1LUCTU AT IONS OF GRQ UNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENfs WERE HAD | BORING NOMW95-ML9

N ES2 REPORT OF BORIN G NOMW95-ML9 aENCE-RHCOE ISLAND ^zsect maK

bull CENTRAL LANDFILL - OU2 - TASK 4 FILE No 3amp79Ugt2-amp~ GEOTECHNICAL GEOHYDROLOGICAL CONSULTANTS 3DHUSTDN RHUJb ISLAND CHKD BY LAS D

f H

C B

BO N U G S No

PEC

SAMPLE DEPTH (Ft) M INFT

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

STRATUM DESCRIPTION

EQUIPMENT INSTALLED

FIELD SCREENING

I |

i NR

NR

NR

NR

1 yen

NR 45

20

20 47 20

20

WEATHERED ZONE at 47 to 48 Brown Silts

WEATHERED ZONE

48

13

20 50

S-6 GRAB 49 20

10

TanGray GRANITE cuttings very highly WEATHERED AND FRACTURED ZONE at 50 to 55

50 05 4

15 FRACTURE ZONE

15 54

55 15 10 TanGray GRANITE Cuttings 55 5

10 J10 casing to 57 57

10

15 IshyNshy

60 S-7 GRAB 59

20

10 TanGray GRANITE Cuttings -

0-N I-

10

15

15

65 15 10 66

03 Silts and rock fragments FRACTURE ZONE

70

S-8 GRAB 67 5

5

0

Highly weathered gray GRANITE rock fragments

67

GRAY GRANITE

03

6 0 0

Fracture Zone at 70 to 73 Red Brown SILTS

70 FRACTURE ZONE

10

75

10

15 BrownGrayTan GRANITE (smaller pieces)

73

15 15

15

15

80 S-9 GRAB 80

20

20

20

Harder rock (small pieces) still a lot of weathering evident _J6 casing to 825

81

825

NO 7 8

10 mdash 10

10 REMARKS 4 Drill water effluent fs si ghtly FOAMY (making approx 30 gpm and borehole collapses at the Fracture Zone

5 Began open-hole drilling w th 978 straight haomer Advanced to 81 6 Large fracture between 70 and 73 making less water laquolaquo bdquo _ _ - _7 6 ID steel casing spon into rock to a depth of 825 on 22095 began drilling open borehole with

6 straight hammer 8 On 22195 the decision was made to leave the 10 casing in the steel ground In prder to protect nearby

borings MW95-47 and MW94-47S the 6 casing was sealed with a layer of fentomte chip from 825 to 54 above which the annular space between the 10 and 6 casings were filled with High Early grout to ground surface

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS KAY BE GR ADUAL 2 WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIONS OF GRO UNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE | BORING NOMW95-ML9

i

GZA GEOENVIRONNENTAL INC PROJECT REPORT OF BORING NOMW95-ML9 140 BROADWAY PROVIDENCE RHODE ISLAND r_laquojpoundv_ CENTRAL LANDFILL - OU2 - TASK 4 FILE No 314792

GtOlbCHNlCALGEOHYDROLOUICAL LONSULIANIS JOHNSTON RHDUb ISLANU CHKD BY fcAS D C B

SAMPLE SAMPLE DESCRIPTION H

50 N W G S No

PENREC

DEPTH (Ft) MINFT Bunmiter CLASSIFICATION

10

10

10

10

90 S-10 GRAB 90 10

07 Gray GRANITE Bedrock (High Quartz)

08

05

05

95 05

05 05

05

05

100 05 10

S-11 GRAB 102 10 Gray GRANITE

10

10

105 10

10

10

05

10

110 S-12 GRAB 110 20 Gray GRANITE

10

10

10 08

115 08

08 05

05

05

120 S-13 GRAB 120 05 Weathered GRANITE (TanBroun

05

04

04

04

125 S-14 GRAB 126

04 04 GrayCream GRANITE

05

08

08

08 OliveTan GRANITE (possible fracture at 129)

REMARKS 9 Large weathered seam from 118 to 129 (borehole remains open)

STRATUM DESCRIPTION

GRAY GRANITE

96

100

GRAY

108

GRAY 111

GRAY

118

LIGHT BROUN ROCK SOFTER ROCK

CHANGES FROM LIGHT BROWN TO CREAM AT 126

FRACTURE 129

EQUIPMENT INSTALLED

(FIELD

jSCREENING HNU 117 gt

NO

NO

NO

ND

ND

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIC NS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

9

GZA GEOENVIRON CENTAL INC140 BROADWAY PROVIDENCE RHODE ISLAND

mdashGEOTECHNICALGI EOHYDROLOGICAL CONSUL ANTS

SAMPLE P

H W

G S No PENREC

DEPTH (Ft) MINFT

10

10 10

10

S-15 GRAB 135 05

05 05

05

05

140 05

05

05

05

05

145 S-15 GRAB 145 05

05

05 05

05

150 05

05

05

08

10

155 S-16 GRAB 155 10

10

10 05

05

160 05

03 S-17 GRAB 162 03

05

03

165 03

03

08

10

10

170 10

10

10

10

10 S-18 GRAB 175 10

PROJECT L^^mdash CENTRAL LANDFILL shy OU2 shy TASK 4

~ TOKNSTON RHDTJb ISLAND

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

REPi

STRATUM

DESCRIPTION

FILE NoCHW) BY

EQUIPMENT INSTALLED

314 2 EAS

FIELD SCREENING HNU 11

R

GRAY

BrownOrange SILTS FRACTURE 135

WEATHERED ZONE

01

ORANGE SOFT LARGE CHUCKS OF ROCK

10

BrownOrange Silts 146

LIGHT BROWN

NO

Dark gray with black and red rock chips GRANITE (BrownGray Silts)

152 CREAMGRAY

HARDER NO

BrownRed SILTS

Brighter red

Gray SILTS

BrownHeavier SILT content

162 BROWN

16|OFT ROCK

REDBROWN 166

GRAY ROCK

169

BROWNRED

01 11

brown Silts ND

REMARKS 10 Large highly weathered seaa at 135 to 146 larger chunks of rock in cuttings (borehole remained

11 Large] highly weathered seam at 162 to 166 very bright red silts suspect PID reading - probably

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATE MS OF GROUNDWATER

KAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE 1 BORING NOMW95-ML9

aENCEHOOE ISLANDra muGEOTECHNICALGEOHYDROLOGICAL CONSULTANTS

D B SAMPLE

H w

G S No PENREC

DEPTH (Ft) M INFT

10 10 10 10 10

bull on

10 10 08 08 08

185 08

S-19 GRAB 187 08 05 05 05

190 05 05 05 03 03

195 S-20 GRAB 196 03

03 03 05

200 05 48

08 10 10

205 05 05 0

S-21 GRAB 208 0 0 0

210 0

S-22 GRAB 212 05 05

05 08

215 08 08 08 08

220 08

EE2JIpoundI ^^CENTRAL LANDFILL - OU2 - TASK 4

JOHNS UK RHODt ISLANU

SAMPLE DESCRIPTION STRATUM DESCRIPTION

Burmister CLASSIFICATION 176

PINKCREAMSILT

183

LIGHT BROWN SILT

Dark Gray with Red amp Black Chips (Brown Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt)

BlyeCreawBlackRed Rock Chips (with brownorange Si If some white flecks and Red Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt some white flecks and Red Silts)

WhiteRedDark Gray Chips (Bright Red Silts)

194

BROWNORANGE

199

LIGHT BROWN

205

BROWNREDSILTS

209

GRAYCREAM

BRIGHT RED

MORE LIGHT GRAY

OHW95-HL9sW mdashjL- r B_

FILE Mo CHKD BY fc AS Tr

I EQUIPMENT FIELD

IINSTALLED SCREENING HNU 117 raquo

NO

NO

NO

ND

REMARKS 12 Borehole remains open despite very weathered soft rock with high silt content

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS HAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

12

ISLANDW KBRflr WfoJgmmdash

GEOTECHNICALG EOHYDROLOGICAL CONSULTANTS

I C B A L SAMPLE

I N W G S No

PENREC

DEPTH (Ft) MINFT

10 S-23 GRAB 222 10

10 10

225 05 05 05 05 08

230 08 08 08 0

5

235 S-24 GRAB 235 5

5

5

5

5

240 0 0 0 5 5

245 S-25 grab 245 5

5

5

5

5

250 5 5 5 5 5

255 5 5

S-26 GRAB 258 0 0 0

260 0 0

0

0

0

0

EE REPORT OF BORING NOMW95-ML9 ^ SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No TreTp-2shy JUHNSIUN HHUUh ISLAND CHKD BY -HAS

)

SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD |DESCRIPTION INSTALLED SCREENING

Bunnister CLASSIFICATION HNU 117 t

221 NO

WhiteLight Gray (whitecream WHITE Silts) LIGHT GRAY

226 (Fractured Zone at 226 to 228 13 Bright Red Silts) BRIGHT RED

228SILTS

Soft Zone 229 to 234 Green rock TANGRAY chips (Tan Silts)

234 OLIVETAN NO

HARDER ROCK 8lfcfttsfl5$Dark Gray bull GRADING TO LIGHT GRAY

GrayWhite with Black Flecks (Gray Silts) LIGHT GRAY NO

GRAY SILT GRAYWHITEBLACK ROCK

GreenGrayB^ack Rock Fragments 257 NO (TanOlive Silts) - Possible Fractured Zone TANOLIVE

SILTS

260 BLUEGRAY

REMARKS 13 Deepest observed fracture zone 226 to 228 more bright red Silts

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO NS OF GROUNDWATER

bdquobdquobull NAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE GZA | BORING NOMW95-ML9

REPORT OF BORING NOMU95-M19 gtROVIDENCE RHODE ISLAND

CENTRAL LANDFILL - OU2 - TASK 4 IVflV fe GEOTECHNICALGI iOHYDROLOGICAL CONSULTANTS V JUHNS 1 UN HHOUb 1 bLAHD CHKD BY TAr-

H

270

275

280

285

290

295

300

305

310

SAMPLE DESCRIPTION

Bui-mister CLASSIFICATION

Dark GrayWhiteLight Gray GRANITE (Light Silts)

Dark GrayUhiteLighl Gray GRANITE (Light Slits) did not grab sample

Dark GrayUhiteUght Gray GRANITE (Light Slits) slightly sillier

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

End of Exploration at +310

REMARKS 4 Borehole still making water rock much harder gt 2 gpm rate 5 Drilled to depth of 310 below ground surface a 1414 hrs on 22095 6 After developing the well for 15 ninutes with air well making +5 gpm (measured with calibrated

bucket) bull 17 Hager GeoScience Inc working with Colog Inc performed bqreholenepphysical logging 3-arm

borehole ca(iperanltf fluid temperature testing was performed on 33957 Acoustic Borehole teleshy18 A minimal amount of water was lost to the borehole during drilling On 31095 prior to packer

B SAMPLE

1 PEN DEPTH G S No REC (Ft)

S-27 GRAB 270

S-28 GRAB 288

S-29 GRAB 300

MINFT 10

10

15

15

15

20 20

20

20

20

20

20

20

20

20

20

20

20

20

20 20

20

20

20

20 25

25

25

25

25

25 25

25

25

25

20 20

20

15

15

15

15

15

15 15

STRATUM DESCRIPTION

HARDER ROCK

GRAY GRANITE BEDROCK

303

SLIGHTLY SOFTER

DRILLING

EQUIPMENT INSTALLED

I FIELD

ISCREENING HNU 117 i

ND

14

ND

ND

18

19

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETUEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMU95-ML9

GZA GEOENVIRONMENTAL INC PROJECT REPORT OF BORING NoHWS 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET o ut

CENTRAL LANDFILL -OU2 - TASK FILE No rftTV GEOTECHNICALGEOHYDROLOGICAL CONSULTANTS JuHNVilUN KHWb iSLANU CHKD BY bAS f

SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD S 0 N U PEN DEPTH DESCRIPTION INSTALLED G S No IREC (Ft) HINFT Burmister CLASSIFICATION STOP

REMARKS 18 contd 870

19

ing testing

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATEWATERR AEyELREADINGS_HAVE_BEELEVEL READINGS HAVE BEENN MADMADEE AT TIMES AND UNDER CONDITIONS STATED FLUAT_I1MES_AND_UNDER CONDIIIWISSIATip^FLUCTUATigNS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WEIRE MADEGZA |BORING NOMW95-ML9

--

1

s 1 ltbull

-

OV

ER

ALL

Of to t 5 - bulln t- s 8 s 0

- 9 ~ laquobull bull bull laquo shy

- 1 Ei

i 0

AU

IUW

HO

O

i 1 i i

M IO laquo tobull - 8 - 5 8 n in bull - S shy

I bull bull shy

CO

ND

UC

TIV

ITY

Mgt M o f~ s 8 t 5 s t 8 - 8 ttbull n bull0 raquogbull bullI

() rV

LU DC

a z 1 1 fr t I 1 m I

1 O n LU 1 r I 1 i-~_5 i S i oS sect 1 s sect pound s sect sect

ltraquo g

S s s S

V Vdeg o 2 o 1 ^

111

ID bull- - bull- bull- bull- bull- - - bullshyn mdash mdash

C

HU

OR

O

NIN

OH

E9U

L i 0 o o O o z z Z Z

o laquo t C c Q O Oo O z Z Z Z Z Zz (Dz

2 I 5i i D)D a

- S ui laquo s- pound7 1 8 pound

uT tu Q t bullJ S 1

TR

AC

E(

O Q e e ou o S o o sU o 2 u C1 s A a2 a e z zB D

2

O

cc

V)

f 5gt W cc

o IU

i d

i s 40

O Z

g

8 0

g

i

8 0

deg

I

i

sect

i

I

i

8

Q Z

g

O Z

s

O z

c

O Z

bull Q Z

N

o z

8

i

8

i

g

i

sect

0

1

i

1

i

2

o z

pound

0shyat

-

p

in c

0 O2

fl8

V

i i s s iU

i o n 0 o

En K

O 2

07 V

t- S S c I

b b

O 01

34

0

io

r

O

1 v 0 K b b b - c 1 c ia I S i i s i i sc

111 III UJ bull 13 as 1 s a I | S a z i

Ill

C 0 lt t lt ( C O O (0

-

I CO UJ CC a z

UJ UJ ^

gw -5

-I y 1

CN

o z ^ ltD ii eg

8 o_ UJ bullsect H J bdquo

-8 S 1 -8

u o en

(0

9 S

s I

r K shyozv JOB

GZA GEOENVIRONMENTAL INC SHEET NO OF EngnMrs and ScwnMts

14O BROADWAY PROVIDENCE RHODE BLAND O2903 (4O1J421-414O

CALCULATED BY_

CHECKED BY

DATE

DATE

SCALE L Blocks IO

I

MtU

Co

  1. barcode 3228
  2. barcodetext SEMS Doc ID 3228
Page 7: GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

GZA GEOENVIROI (MENTAL INC PROJECT REPORT OF BOR1NC i NOMW95-ML9 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No ~TI4797~ GEOTECHNICAL GEOHYDROLOGICAL CONSULTANTS JUHN3IUN KMlAJt ISLAND CHKD BY tAS

BORING Co DL MAKER DRILLING COMPANY BORING LOCATION SEE EXPLORATION LOCATION PLAN FOREMAN JOHN tuwtN GROUND SUKr-ACk tLkVAIlUN JAIUf) NuVp GZA ENGINEER PAKK JALPt DATE START 21095 UAIt tNU CICMY3

GROUNDWATER READINGS SAMPLER UNLESS OTHERWISE NOTED SAMPLER CONSISTS OF A 2 SPLIT

SPOON DRIVEN USING A US Ib HAMMER FALLING 30 In DATE TIME WATER CASING STABILIZATION TIME

CASING UNLESS OTHERWISE NOTED CASING DRIVEN USING A 301 3 Ib 31495 1310 106 825 1 MONTH HAMMER FALLING 24 In

CASING SIZE 10 ID OTHER 9 78 AIR HAMME R AND 6 ID 6 AIR HAMMER

E SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD EX f SCREENING M

N W PEN DEPTH DESCRIPTION INSTALLED HNU K H G S NO REC (Ft) BLOWS6 Bur-mister CLASSIFICATION (117) S

(Strati graph lie descriptions are 1 based on thlaquo i examination of FILL drilling cut tmgs and air hammer response)

S-1 GRAB 3-5 BrownBlack coarse to fine SAND J

44 little Wool 1 little-Debris trace Silt J

5

S-2 GRAB 9 coarse to fine SAND 34 10

2

15

TILL

S-3 GRAB 19-20 sarse t9 fine SAND AND 04 20 tie- Silt

25

S-4 GRAB 29-31 TanGray c oarse tdeg fine SAND AND ND 30 tie- Silt

MINFT

2 31+ BEDROCK

2 15 GRANITE

15 35

12 23 Fracture Zone 37 to 38 Brown 37

10 FRACTURE ZONE

10 38 HARDER ROCK GRANITE

S-5 GRAB 39 12 Tan (iron-stained) GRANITE Cuttings NO

REMARKS 1 Soil headspace TVOC screen ng was conducted employing a HNU Systems Model PI-101 Photoionization Detector equipped with an 17 Lamp

2 Mild leachage odor noted fr 3 10 (D steel casing spun to yengt Attenp to advance open borehole - borehole collapses on 21695

continued to advance 10 ca sing to a total depth of 57 below ground surface

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRgt INSITI ONS KAY BE GR ADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED 1LUCTU AT IONS OF GRQ UNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENfs WERE HAD | BORING NOMW95-ML9

N ES2 REPORT OF BORIN G NOMW95-ML9 aENCE-RHCOE ISLAND ^zsect maK

bull CENTRAL LANDFILL - OU2 - TASK 4 FILE No 3amp79Ugt2-amp~ GEOTECHNICAL GEOHYDROLOGICAL CONSULTANTS 3DHUSTDN RHUJb ISLAND CHKD BY LAS D

f H

C B

BO N U G S No

PEC

SAMPLE DEPTH (Ft) M INFT

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

STRATUM DESCRIPTION

EQUIPMENT INSTALLED

FIELD SCREENING

I |

i NR

NR

NR

NR

1 yen

NR 45

20

20 47 20

20

WEATHERED ZONE at 47 to 48 Brown Silts

WEATHERED ZONE

48

13

20 50

S-6 GRAB 49 20

10

TanGray GRANITE cuttings very highly WEATHERED AND FRACTURED ZONE at 50 to 55

50 05 4

15 FRACTURE ZONE

15 54

55 15 10 TanGray GRANITE Cuttings 55 5

10 J10 casing to 57 57

10

15 IshyNshy

60 S-7 GRAB 59

20

10 TanGray GRANITE Cuttings -

0-N I-

10

15

15

65 15 10 66

03 Silts and rock fragments FRACTURE ZONE

70

S-8 GRAB 67 5

5

0

Highly weathered gray GRANITE rock fragments

67

GRAY GRANITE

03

6 0 0

Fracture Zone at 70 to 73 Red Brown SILTS

70 FRACTURE ZONE

10

75

10

15 BrownGrayTan GRANITE (smaller pieces)

73

15 15

15

15

80 S-9 GRAB 80

20

20

20

Harder rock (small pieces) still a lot of weathering evident _J6 casing to 825

81

825

NO 7 8

10 mdash 10

10 REMARKS 4 Drill water effluent fs si ghtly FOAMY (making approx 30 gpm and borehole collapses at the Fracture Zone

5 Began open-hole drilling w th 978 straight haomer Advanced to 81 6 Large fracture between 70 and 73 making less water laquolaquo bdquo _ _ - _7 6 ID steel casing spon into rock to a depth of 825 on 22095 began drilling open borehole with

6 straight hammer 8 On 22195 the decision was made to leave the 10 casing in the steel ground In prder to protect nearby

borings MW95-47 and MW94-47S the 6 casing was sealed with a layer of fentomte chip from 825 to 54 above which the annular space between the 10 and 6 casings were filled with High Early grout to ground surface

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS KAY BE GR ADUAL 2 WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIONS OF GRO UNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE | BORING NOMW95-ML9

i

GZA GEOENVIRONNENTAL INC PROJECT REPORT OF BORING NOMW95-ML9 140 BROADWAY PROVIDENCE RHODE ISLAND r_laquojpoundv_ CENTRAL LANDFILL - OU2 - TASK 4 FILE No 314792

GtOlbCHNlCALGEOHYDROLOUICAL LONSULIANIS JOHNSTON RHDUb ISLANU CHKD BY fcAS D C B

SAMPLE SAMPLE DESCRIPTION H

50 N W G S No

PENREC

DEPTH (Ft) MINFT Bunmiter CLASSIFICATION

10

10

10

10

90 S-10 GRAB 90 10

07 Gray GRANITE Bedrock (High Quartz)

08

05

05

95 05

05 05

05

05

100 05 10

S-11 GRAB 102 10 Gray GRANITE

10

10

105 10

10

10

05

10

110 S-12 GRAB 110 20 Gray GRANITE

10

10

10 08

115 08

08 05

05

05

120 S-13 GRAB 120 05 Weathered GRANITE (TanBroun

05

04

04

04

125 S-14 GRAB 126

04 04 GrayCream GRANITE

05

08

08

08 OliveTan GRANITE (possible fracture at 129)

REMARKS 9 Large weathered seam from 118 to 129 (borehole remains open)

STRATUM DESCRIPTION

GRAY GRANITE

96

100

GRAY

108

GRAY 111

GRAY

118

LIGHT BROUN ROCK SOFTER ROCK

CHANGES FROM LIGHT BROWN TO CREAM AT 126

FRACTURE 129

EQUIPMENT INSTALLED

(FIELD

jSCREENING HNU 117 gt

NO

NO

NO

ND

ND

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIC NS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

9

GZA GEOENVIRON CENTAL INC140 BROADWAY PROVIDENCE RHODE ISLAND

mdashGEOTECHNICALGI EOHYDROLOGICAL CONSUL ANTS

SAMPLE P

H W

G S No PENREC

DEPTH (Ft) MINFT

10

10 10

10

S-15 GRAB 135 05

05 05

05

05

140 05

05

05

05

05

145 S-15 GRAB 145 05

05

05 05

05

150 05

05

05

08

10

155 S-16 GRAB 155 10

10

10 05

05

160 05

03 S-17 GRAB 162 03

05

03

165 03

03

08

10

10

170 10

10

10

10

10 S-18 GRAB 175 10

PROJECT L^^mdash CENTRAL LANDFILL shy OU2 shy TASK 4

~ TOKNSTON RHDTJb ISLAND

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

REPi

STRATUM

DESCRIPTION

FILE NoCHW) BY

EQUIPMENT INSTALLED

314 2 EAS

FIELD SCREENING HNU 11

R

GRAY

BrownOrange SILTS FRACTURE 135

WEATHERED ZONE

01

ORANGE SOFT LARGE CHUCKS OF ROCK

10

BrownOrange Silts 146

LIGHT BROWN

NO

Dark gray with black and red rock chips GRANITE (BrownGray Silts)

152 CREAMGRAY

HARDER NO

BrownRed SILTS

Brighter red

Gray SILTS

BrownHeavier SILT content

162 BROWN

16|OFT ROCK

REDBROWN 166

GRAY ROCK

169

BROWNRED

01 11

brown Silts ND

REMARKS 10 Large highly weathered seaa at 135 to 146 larger chunks of rock in cuttings (borehole remained

11 Large] highly weathered seam at 162 to 166 very bright red silts suspect PID reading - probably

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATE MS OF GROUNDWATER

KAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE 1 BORING NOMW95-ML9

aENCEHOOE ISLANDra muGEOTECHNICALGEOHYDROLOGICAL CONSULTANTS

D B SAMPLE

H w

G S No PENREC

DEPTH (Ft) M INFT

10 10 10 10 10

bull on

10 10 08 08 08

185 08

S-19 GRAB 187 08 05 05 05

190 05 05 05 03 03

195 S-20 GRAB 196 03

03 03 05

200 05 48

08 10 10

205 05 05 0

S-21 GRAB 208 0 0 0

210 0

S-22 GRAB 212 05 05

05 08

215 08 08 08 08

220 08

EE2JIpoundI ^^CENTRAL LANDFILL - OU2 - TASK 4

JOHNS UK RHODt ISLANU

SAMPLE DESCRIPTION STRATUM DESCRIPTION

Burmister CLASSIFICATION 176

PINKCREAMSILT

183

LIGHT BROWN SILT

Dark Gray with Red amp Black Chips (Brown Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt)

BlyeCreawBlackRed Rock Chips (with brownorange Si If some white flecks and Red Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt some white flecks and Red Silts)

WhiteRedDark Gray Chips (Bright Red Silts)

194

BROWNORANGE

199

LIGHT BROWN

205

BROWNREDSILTS

209

GRAYCREAM

BRIGHT RED

MORE LIGHT GRAY

OHW95-HL9sW mdashjL- r B_

FILE Mo CHKD BY fc AS Tr

I EQUIPMENT FIELD

IINSTALLED SCREENING HNU 117 raquo

NO

NO

NO

ND

REMARKS 12 Borehole remains open despite very weathered soft rock with high silt content

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS HAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

12

ISLANDW KBRflr WfoJgmmdash

GEOTECHNICALG EOHYDROLOGICAL CONSULTANTS

I C B A L SAMPLE

I N W G S No

PENREC

DEPTH (Ft) MINFT

10 S-23 GRAB 222 10

10 10

225 05 05 05 05 08

230 08 08 08 0

5

235 S-24 GRAB 235 5

5

5

5

5

240 0 0 0 5 5

245 S-25 grab 245 5

5

5

5

5

250 5 5 5 5 5

255 5 5

S-26 GRAB 258 0 0 0

260 0 0

0

0

0

0

EE REPORT OF BORING NOMW95-ML9 ^ SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No TreTp-2shy JUHNSIUN HHUUh ISLAND CHKD BY -HAS

)

SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD |DESCRIPTION INSTALLED SCREENING

Bunnister CLASSIFICATION HNU 117 t

221 NO

WhiteLight Gray (whitecream WHITE Silts) LIGHT GRAY

226 (Fractured Zone at 226 to 228 13 Bright Red Silts) BRIGHT RED

228SILTS

Soft Zone 229 to 234 Green rock TANGRAY chips (Tan Silts)

234 OLIVETAN NO

HARDER ROCK 8lfcfttsfl5$Dark Gray bull GRADING TO LIGHT GRAY

GrayWhite with Black Flecks (Gray Silts) LIGHT GRAY NO

GRAY SILT GRAYWHITEBLACK ROCK

GreenGrayB^ack Rock Fragments 257 NO (TanOlive Silts) - Possible Fractured Zone TANOLIVE

SILTS

260 BLUEGRAY

REMARKS 13 Deepest observed fracture zone 226 to 228 more bright red Silts

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO NS OF GROUNDWATER

bdquobdquobull NAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE GZA | BORING NOMW95-ML9

REPORT OF BORING NOMU95-M19 gtROVIDENCE RHODE ISLAND

CENTRAL LANDFILL - OU2 - TASK 4 IVflV fe GEOTECHNICALGI iOHYDROLOGICAL CONSULTANTS V JUHNS 1 UN HHOUb 1 bLAHD CHKD BY TAr-

H

270

275

280

285

290

295

300

305

310

SAMPLE DESCRIPTION

Bui-mister CLASSIFICATION

Dark GrayWhiteLight Gray GRANITE (Light Silts)

Dark GrayUhiteLighl Gray GRANITE (Light Slits) did not grab sample

Dark GrayUhiteUght Gray GRANITE (Light Slits) slightly sillier

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

End of Exploration at +310

REMARKS 4 Borehole still making water rock much harder gt 2 gpm rate 5 Drilled to depth of 310 below ground surface a 1414 hrs on 22095 6 After developing the well for 15 ninutes with air well making +5 gpm (measured with calibrated

bucket) bull 17 Hager GeoScience Inc working with Colog Inc performed bqreholenepphysical logging 3-arm

borehole ca(iperanltf fluid temperature testing was performed on 33957 Acoustic Borehole teleshy18 A minimal amount of water was lost to the borehole during drilling On 31095 prior to packer

B SAMPLE

1 PEN DEPTH G S No REC (Ft)

S-27 GRAB 270

S-28 GRAB 288

S-29 GRAB 300

MINFT 10

10

15

15

15

20 20

20

20

20

20

20

20

20

20

20

20

20

20

20 20

20

20

20

20 25

25

25

25

25

25 25

25

25

25

20 20

20

15

15

15

15

15

15 15

STRATUM DESCRIPTION

HARDER ROCK

GRAY GRANITE BEDROCK

303

SLIGHTLY SOFTER

DRILLING

EQUIPMENT INSTALLED

I FIELD

ISCREENING HNU 117 i

ND

14

ND

ND

18

19

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETUEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMU95-ML9

GZA GEOENVIRONMENTAL INC PROJECT REPORT OF BORING NoHWS 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET o ut

CENTRAL LANDFILL -OU2 - TASK FILE No rftTV GEOTECHNICALGEOHYDROLOGICAL CONSULTANTS JuHNVilUN KHWb iSLANU CHKD BY bAS f

SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD S 0 N U PEN DEPTH DESCRIPTION INSTALLED G S No IREC (Ft) HINFT Burmister CLASSIFICATION STOP

REMARKS 18 contd 870

19

ing testing

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATEWATERR AEyELREADINGS_HAVE_BEELEVEL READINGS HAVE BEENN MADMADEE AT TIMES AND UNDER CONDITIONS STATED FLUAT_I1MES_AND_UNDER CONDIIIWISSIATip^FLUCTUATigNS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WEIRE MADEGZA |BORING NOMW95-ML9

--

1

s 1 ltbull

-

OV

ER

ALL

Of to t 5 - bulln t- s 8 s 0

- 9 ~ laquobull bull bull laquo shy

- 1 Ei

i 0

AU

IUW

HO

O

i 1 i i

M IO laquo tobull - 8 - 5 8 n in bull - S shy

I bull bull shy

CO

ND

UC

TIV

ITY

Mgt M o f~ s 8 t 5 s t 8 - 8 ttbull n bull0 raquogbull bullI

() rV

LU DC

a z 1 1 fr t I 1 m I

1 O n LU 1 r I 1 i-~_5 i S i oS sect 1 s sect pound s sect sect

ltraquo g

S s s S

V Vdeg o 2 o 1 ^

111

ID bull- - bull- bull- bull- bull- - - bullshyn mdash mdash

C

HU

OR

O

NIN

OH

E9U

L i 0 o o O o z z Z Z

o laquo t C c Q O Oo O z Z Z Z Z Zz (Dz

2 I 5i i D)D a

- S ui laquo s- pound7 1 8 pound

uT tu Q t bullJ S 1

TR

AC

E(

O Q e e ou o S o o sU o 2 u C1 s A a2 a e z zB D

2

O

cc

V)

f 5gt W cc

o IU

i d

i s 40

O Z

g

8 0

g

i

8 0

deg

I

i

sect

i

I

i

8

Q Z

g

O Z

s

O z

c

O Z

bull Q Z

N

o z

8

i

8

i

g

i

sect

0

1

i

1

i

2

o z

pound

0shyat

-

p

in c

0 O2

fl8

V

i i s s iU

i o n 0 o

En K

O 2

07 V

t- S S c I

b b

O 01

34

0

io

r

O

1 v 0 K b b b - c 1 c ia I S i i s i i sc

111 III UJ bull 13 as 1 s a I | S a z i

Ill

C 0 lt t lt ( C O O (0

-

I CO UJ CC a z

UJ UJ ^

gw -5

-I y 1

CN

o z ^ ltD ii eg

8 o_ UJ bullsect H J bdquo

-8 S 1 -8

u o en

(0

9 S

s I

r K shyozv JOB

GZA GEOENVIRONMENTAL INC SHEET NO OF EngnMrs and ScwnMts

14O BROADWAY PROVIDENCE RHODE BLAND O2903 (4O1J421-414O

CALCULATED BY_

CHECKED BY

DATE

DATE

SCALE L Blocks IO

I

MtU

Co

  1. barcode 3228
  2. barcodetext SEMS Doc ID 3228
Page 8: GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

N ES2 REPORT OF BORIN G NOMW95-ML9 aENCE-RHCOE ISLAND ^zsect maK

bull CENTRAL LANDFILL - OU2 - TASK 4 FILE No 3amp79Ugt2-amp~ GEOTECHNICAL GEOHYDROLOGICAL CONSULTANTS 3DHUSTDN RHUJb ISLAND CHKD BY LAS D

f H

C B

BO N U G S No

PEC

SAMPLE DEPTH (Ft) M INFT

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

STRATUM DESCRIPTION

EQUIPMENT INSTALLED

FIELD SCREENING

I |

i NR

NR

NR

NR

1 yen

NR 45

20

20 47 20

20

WEATHERED ZONE at 47 to 48 Brown Silts

WEATHERED ZONE

48

13

20 50

S-6 GRAB 49 20

10

TanGray GRANITE cuttings very highly WEATHERED AND FRACTURED ZONE at 50 to 55

50 05 4

15 FRACTURE ZONE

15 54

55 15 10 TanGray GRANITE Cuttings 55 5

10 J10 casing to 57 57

10

15 IshyNshy

60 S-7 GRAB 59

20

10 TanGray GRANITE Cuttings -

0-N I-

10

15

15

65 15 10 66

03 Silts and rock fragments FRACTURE ZONE

70

S-8 GRAB 67 5

5

0

Highly weathered gray GRANITE rock fragments

67

GRAY GRANITE

03

6 0 0

Fracture Zone at 70 to 73 Red Brown SILTS

70 FRACTURE ZONE

10

75

10

15 BrownGrayTan GRANITE (smaller pieces)

73

15 15

15

15

80 S-9 GRAB 80

20

20

20

Harder rock (small pieces) still a lot of weathering evident _J6 casing to 825

81

825

NO 7 8

10 mdash 10

10 REMARKS 4 Drill water effluent fs si ghtly FOAMY (making approx 30 gpm and borehole collapses at the Fracture Zone

5 Began open-hole drilling w th 978 straight haomer Advanced to 81 6 Large fracture between 70 and 73 making less water laquolaquo bdquo _ _ - _7 6 ID steel casing spon into rock to a depth of 825 on 22095 began drilling open borehole with

6 straight hammer 8 On 22195 the decision was made to leave the 10 casing in the steel ground In prder to protect nearby

borings MW95-47 and MW94-47S the 6 casing was sealed with a layer of fentomte chip from 825 to 54 above which the annular space between the 10 and 6 casings were filled with High Early grout to ground surface

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS KAY BE GR ADUAL 2 WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIONS OF GRO UNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE | BORING NOMW95-ML9

i

GZA GEOENVIRONNENTAL INC PROJECT REPORT OF BORING NOMW95-ML9 140 BROADWAY PROVIDENCE RHODE ISLAND r_laquojpoundv_ CENTRAL LANDFILL - OU2 - TASK 4 FILE No 314792

GtOlbCHNlCALGEOHYDROLOUICAL LONSULIANIS JOHNSTON RHDUb ISLANU CHKD BY fcAS D C B

SAMPLE SAMPLE DESCRIPTION H

50 N W G S No

PENREC

DEPTH (Ft) MINFT Bunmiter CLASSIFICATION

10

10

10

10

90 S-10 GRAB 90 10

07 Gray GRANITE Bedrock (High Quartz)

08

05

05

95 05

05 05

05

05

100 05 10

S-11 GRAB 102 10 Gray GRANITE

10

10

105 10

10

10

05

10

110 S-12 GRAB 110 20 Gray GRANITE

10

10

10 08

115 08

08 05

05

05

120 S-13 GRAB 120 05 Weathered GRANITE (TanBroun

05

04

04

04

125 S-14 GRAB 126

04 04 GrayCream GRANITE

05

08

08

08 OliveTan GRANITE (possible fracture at 129)

REMARKS 9 Large weathered seam from 118 to 129 (borehole remains open)

STRATUM DESCRIPTION

GRAY GRANITE

96

100

GRAY

108

GRAY 111

GRAY

118

LIGHT BROUN ROCK SOFTER ROCK

CHANGES FROM LIGHT BROWN TO CREAM AT 126

FRACTURE 129

EQUIPMENT INSTALLED

(FIELD

jSCREENING HNU 117 gt

NO

NO

NO

ND

ND

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIC NS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

9

GZA GEOENVIRON CENTAL INC140 BROADWAY PROVIDENCE RHODE ISLAND

mdashGEOTECHNICALGI EOHYDROLOGICAL CONSUL ANTS

SAMPLE P

H W

G S No PENREC

DEPTH (Ft) MINFT

10

10 10

10

S-15 GRAB 135 05

05 05

05

05

140 05

05

05

05

05

145 S-15 GRAB 145 05

05

05 05

05

150 05

05

05

08

10

155 S-16 GRAB 155 10

10

10 05

05

160 05

03 S-17 GRAB 162 03

05

03

165 03

03

08

10

10

170 10

10

10

10

10 S-18 GRAB 175 10

PROJECT L^^mdash CENTRAL LANDFILL shy OU2 shy TASK 4

~ TOKNSTON RHDTJb ISLAND

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

REPi

STRATUM

DESCRIPTION

FILE NoCHW) BY

EQUIPMENT INSTALLED

314 2 EAS

FIELD SCREENING HNU 11

R

GRAY

BrownOrange SILTS FRACTURE 135

WEATHERED ZONE

01

ORANGE SOFT LARGE CHUCKS OF ROCK

10

BrownOrange Silts 146

LIGHT BROWN

NO

Dark gray with black and red rock chips GRANITE (BrownGray Silts)

152 CREAMGRAY

HARDER NO

BrownRed SILTS

Brighter red

Gray SILTS

BrownHeavier SILT content

162 BROWN

16|OFT ROCK

REDBROWN 166

GRAY ROCK

169

BROWNRED

01 11

brown Silts ND

REMARKS 10 Large highly weathered seaa at 135 to 146 larger chunks of rock in cuttings (borehole remained

11 Large] highly weathered seam at 162 to 166 very bright red silts suspect PID reading - probably

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATE MS OF GROUNDWATER

KAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE 1 BORING NOMW95-ML9

aENCEHOOE ISLANDra muGEOTECHNICALGEOHYDROLOGICAL CONSULTANTS

D B SAMPLE

H w

G S No PENREC

DEPTH (Ft) M INFT

10 10 10 10 10

bull on

10 10 08 08 08

185 08

S-19 GRAB 187 08 05 05 05

190 05 05 05 03 03

195 S-20 GRAB 196 03

03 03 05

200 05 48

08 10 10

205 05 05 0

S-21 GRAB 208 0 0 0

210 0

S-22 GRAB 212 05 05

05 08

215 08 08 08 08

220 08

EE2JIpoundI ^^CENTRAL LANDFILL - OU2 - TASK 4

JOHNS UK RHODt ISLANU

SAMPLE DESCRIPTION STRATUM DESCRIPTION

Burmister CLASSIFICATION 176

PINKCREAMSILT

183

LIGHT BROWN SILT

Dark Gray with Red amp Black Chips (Brown Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt)

BlyeCreawBlackRed Rock Chips (with brownorange Si If some white flecks and Red Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt some white flecks and Red Silts)

WhiteRedDark Gray Chips (Bright Red Silts)

194

BROWNORANGE

199

LIGHT BROWN

205

BROWNREDSILTS

209

GRAYCREAM

BRIGHT RED

MORE LIGHT GRAY

OHW95-HL9sW mdashjL- r B_

FILE Mo CHKD BY fc AS Tr

I EQUIPMENT FIELD

IINSTALLED SCREENING HNU 117 raquo

NO

NO

NO

ND

REMARKS 12 Borehole remains open despite very weathered soft rock with high silt content

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS HAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

12

ISLANDW KBRflr WfoJgmmdash

GEOTECHNICALG EOHYDROLOGICAL CONSULTANTS

I C B A L SAMPLE

I N W G S No

PENREC

DEPTH (Ft) MINFT

10 S-23 GRAB 222 10

10 10

225 05 05 05 05 08

230 08 08 08 0

5

235 S-24 GRAB 235 5

5

5

5

5

240 0 0 0 5 5

245 S-25 grab 245 5

5

5

5

5

250 5 5 5 5 5

255 5 5

S-26 GRAB 258 0 0 0

260 0 0

0

0

0

0

EE REPORT OF BORING NOMW95-ML9 ^ SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No TreTp-2shy JUHNSIUN HHUUh ISLAND CHKD BY -HAS

)

SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD |DESCRIPTION INSTALLED SCREENING

Bunnister CLASSIFICATION HNU 117 t

221 NO

WhiteLight Gray (whitecream WHITE Silts) LIGHT GRAY

226 (Fractured Zone at 226 to 228 13 Bright Red Silts) BRIGHT RED

228SILTS

Soft Zone 229 to 234 Green rock TANGRAY chips (Tan Silts)

234 OLIVETAN NO

HARDER ROCK 8lfcfttsfl5$Dark Gray bull GRADING TO LIGHT GRAY

GrayWhite with Black Flecks (Gray Silts) LIGHT GRAY NO

GRAY SILT GRAYWHITEBLACK ROCK

GreenGrayB^ack Rock Fragments 257 NO (TanOlive Silts) - Possible Fractured Zone TANOLIVE

SILTS

260 BLUEGRAY

REMARKS 13 Deepest observed fracture zone 226 to 228 more bright red Silts

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO NS OF GROUNDWATER

bdquobdquobull NAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE GZA | BORING NOMW95-ML9

REPORT OF BORING NOMU95-M19 gtROVIDENCE RHODE ISLAND

CENTRAL LANDFILL - OU2 - TASK 4 IVflV fe GEOTECHNICALGI iOHYDROLOGICAL CONSULTANTS V JUHNS 1 UN HHOUb 1 bLAHD CHKD BY TAr-

H

270

275

280

285

290

295

300

305

310

SAMPLE DESCRIPTION

Bui-mister CLASSIFICATION

Dark GrayWhiteLight Gray GRANITE (Light Silts)

Dark GrayUhiteLighl Gray GRANITE (Light Slits) did not grab sample

Dark GrayUhiteUght Gray GRANITE (Light Slits) slightly sillier

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

End of Exploration at +310

REMARKS 4 Borehole still making water rock much harder gt 2 gpm rate 5 Drilled to depth of 310 below ground surface a 1414 hrs on 22095 6 After developing the well for 15 ninutes with air well making +5 gpm (measured with calibrated

bucket) bull 17 Hager GeoScience Inc working with Colog Inc performed bqreholenepphysical logging 3-arm

borehole ca(iperanltf fluid temperature testing was performed on 33957 Acoustic Borehole teleshy18 A minimal amount of water was lost to the borehole during drilling On 31095 prior to packer

B SAMPLE

1 PEN DEPTH G S No REC (Ft)

S-27 GRAB 270

S-28 GRAB 288

S-29 GRAB 300

MINFT 10

10

15

15

15

20 20

20

20

20

20

20

20

20

20

20

20

20

20

20 20

20

20

20

20 25

25

25

25

25

25 25

25

25

25

20 20

20

15

15

15

15

15

15 15

STRATUM DESCRIPTION

HARDER ROCK

GRAY GRANITE BEDROCK

303

SLIGHTLY SOFTER

DRILLING

EQUIPMENT INSTALLED

I FIELD

ISCREENING HNU 117 i

ND

14

ND

ND

18

19

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETUEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMU95-ML9

GZA GEOENVIRONMENTAL INC PROJECT REPORT OF BORING NoHWS 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET o ut

CENTRAL LANDFILL -OU2 - TASK FILE No rftTV GEOTECHNICALGEOHYDROLOGICAL CONSULTANTS JuHNVilUN KHWb iSLANU CHKD BY bAS f

SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD S 0 N U PEN DEPTH DESCRIPTION INSTALLED G S No IREC (Ft) HINFT Burmister CLASSIFICATION STOP

REMARKS 18 contd 870

19

ing testing

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATEWATERR AEyELREADINGS_HAVE_BEELEVEL READINGS HAVE BEENN MADMADEE AT TIMES AND UNDER CONDITIONS STATED FLUAT_I1MES_AND_UNDER CONDIIIWISSIATip^FLUCTUATigNS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WEIRE MADEGZA |BORING NOMW95-ML9

--

1

s 1 ltbull

-

OV

ER

ALL

Of to t 5 - bulln t- s 8 s 0

- 9 ~ laquobull bull bull laquo shy

- 1 Ei

i 0

AU

IUW

HO

O

i 1 i i

M IO laquo tobull - 8 - 5 8 n in bull - S shy

I bull bull shy

CO

ND

UC

TIV

ITY

Mgt M o f~ s 8 t 5 s t 8 - 8 ttbull n bull0 raquogbull bullI

() rV

LU DC

a z 1 1 fr t I 1 m I

1 O n LU 1 r I 1 i-~_5 i S i oS sect 1 s sect pound s sect sect

ltraquo g

S s s S

V Vdeg o 2 o 1 ^

111

ID bull- - bull- bull- bull- bull- - - bullshyn mdash mdash

C

HU

OR

O

NIN

OH

E9U

L i 0 o o O o z z Z Z

o laquo t C c Q O Oo O z Z Z Z Z Zz (Dz

2 I 5i i D)D a

- S ui laquo s- pound7 1 8 pound

uT tu Q t bullJ S 1

TR

AC

E(

O Q e e ou o S o o sU o 2 u C1 s A a2 a e z zB D

2

O

cc

V)

f 5gt W cc

o IU

i d

i s 40

O Z

g

8 0

g

i

8 0

deg

I

i

sect

i

I

i

8

Q Z

g

O Z

s

O z

c

O Z

bull Q Z

N

o z

8

i

8

i

g

i

sect

0

1

i

1

i

2

o z

pound

0shyat

-

p

in c

0 O2

fl8

V

i i s s iU

i o n 0 o

En K

O 2

07 V

t- S S c I

b b

O 01

34

0

io

r

O

1 v 0 K b b b - c 1 c ia I S i i s i i sc

111 III UJ bull 13 as 1 s a I | S a z i

Ill

C 0 lt t lt ( C O O (0

-

I CO UJ CC a z

UJ UJ ^

gw -5

-I y 1

CN

o z ^ ltD ii eg

8 o_ UJ bullsect H J bdquo

-8 S 1 -8

u o en

(0

9 S

s I

r K shyozv JOB

GZA GEOENVIRONMENTAL INC SHEET NO OF EngnMrs and ScwnMts

14O BROADWAY PROVIDENCE RHODE BLAND O2903 (4O1J421-414O

CALCULATED BY_

CHECKED BY

DATE

DATE

SCALE L Blocks IO

I

MtU

Co

  1. barcode 3228
  2. barcodetext SEMS Doc ID 3228
Page 9: GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

i

GZA GEOENVIRONNENTAL INC PROJECT REPORT OF BORING NOMW95-ML9 140 BROADWAY PROVIDENCE RHODE ISLAND r_laquojpoundv_ CENTRAL LANDFILL - OU2 - TASK 4 FILE No 314792

GtOlbCHNlCALGEOHYDROLOUICAL LONSULIANIS JOHNSTON RHDUb ISLANU CHKD BY fcAS D C B

SAMPLE SAMPLE DESCRIPTION H

50 N W G S No

PENREC

DEPTH (Ft) MINFT Bunmiter CLASSIFICATION

10

10

10

10

90 S-10 GRAB 90 10

07 Gray GRANITE Bedrock (High Quartz)

08

05

05

95 05

05 05

05

05

100 05 10

S-11 GRAB 102 10 Gray GRANITE

10

10

105 10

10

10

05

10

110 S-12 GRAB 110 20 Gray GRANITE

10

10

10 08

115 08

08 05

05

05

120 S-13 GRAB 120 05 Weathered GRANITE (TanBroun

05

04

04

04

125 S-14 GRAB 126

04 04 GrayCream GRANITE

05

08

08

08 OliveTan GRANITE (possible fracture at 129)

REMARKS 9 Large weathered seam from 118 to 129 (borehole remains open)

STRATUM DESCRIPTION

GRAY GRANITE

96

100

GRAY

108

GRAY 111

GRAY

118

LIGHT BROUN ROCK SOFTER ROCK

CHANGES FROM LIGHT BROWN TO CREAM AT 126

FRACTURE 129

EQUIPMENT INSTALLED

(FIELD

jSCREENING HNU 117 gt

NO

NO

NO

ND

ND

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIC NS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

9

GZA GEOENVIRON CENTAL INC140 BROADWAY PROVIDENCE RHODE ISLAND

mdashGEOTECHNICALGI EOHYDROLOGICAL CONSUL ANTS

SAMPLE P

H W

G S No PENREC

DEPTH (Ft) MINFT

10

10 10

10

S-15 GRAB 135 05

05 05

05

05

140 05

05

05

05

05

145 S-15 GRAB 145 05

05

05 05

05

150 05

05

05

08

10

155 S-16 GRAB 155 10

10

10 05

05

160 05

03 S-17 GRAB 162 03

05

03

165 03

03

08

10

10

170 10

10

10

10

10 S-18 GRAB 175 10

PROJECT L^^mdash CENTRAL LANDFILL shy OU2 shy TASK 4

~ TOKNSTON RHDTJb ISLAND

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

REPi

STRATUM

DESCRIPTION

FILE NoCHW) BY

EQUIPMENT INSTALLED

314 2 EAS

FIELD SCREENING HNU 11

R

GRAY

BrownOrange SILTS FRACTURE 135

WEATHERED ZONE

01

ORANGE SOFT LARGE CHUCKS OF ROCK

10

BrownOrange Silts 146

LIGHT BROWN

NO

Dark gray with black and red rock chips GRANITE (BrownGray Silts)

152 CREAMGRAY

HARDER NO

BrownRed SILTS

Brighter red

Gray SILTS

BrownHeavier SILT content

162 BROWN

16|OFT ROCK

REDBROWN 166

GRAY ROCK

169

BROWNRED

01 11

brown Silts ND

REMARKS 10 Large highly weathered seaa at 135 to 146 larger chunks of rock in cuttings (borehole remained

11 Large] highly weathered seam at 162 to 166 very bright red silts suspect PID reading - probably

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATE MS OF GROUNDWATER

KAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE 1 BORING NOMW95-ML9

aENCEHOOE ISLANDra muGEOTECHNICALGEOHYDROLOGICAL CONSULTANTS

D B SAMPLE

H w

G S No PENREC

DEPTH (Ft) M INFT

10 10 10 10 10

bull on

10 10 08 08 08

185 08

S-19 GRAB 187 08 05 05 05

190 05 05 05 03 03

195 S-20 GRAB 196 03

03 03 05

200 05 48

08 10 10

205 05 05 0

S-21 GRAB 208 0 0 0

210 0

S-22 GRAB 212 05 05

05 08

215 08 08 08 08

220 08

EE2JIpoundI ^^CENTRAL LANDFILL - OU2 - TASK 4

JOHNS UK RHODt ISLANU

SAMPLE DESCRIPTION STRATUM DESCRIPTION

Burmister CLASSIFICATION 176

PINKCREAMSILT

183

LIGHT BROWN SILT

Dark Gray with Red amp Black Chips (Brown Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt)

BlyeCreawBlackRed Rock Chips (with brownorange Si If some white flecks and Red Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt some white flecks and Red Silts)

WhiteRedDark Gray Chips (Bright Red Silts)

194

BROWNORANGE

199

LIGHT BROWN

205

BROWNREDSILTS

209

GRAYCREAM

BRIGHT RED

MORE LIGHT GRAY

OHW95-HL9sW mdashjL- r B_

FILE Mo CHKD BY fc AS Tr

I EQUIPMENT FIELD

IINSTALLED SCREENING HNU 117 raquo

NO

NO

NO

ND

REMARKS 12 Borehole remains open despite very weathered soft rock with high silt content

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS HAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

12

ISLANDW KBRflr WfoJgmmdash

GEOTECHNICALG EOHYDROLOGICAL CONSULTANTS

I C B A L SAMPLE

I N W G S No

PENREC

DEPTH (Ft) MINFT

10 S-23 GRAB 222 10

10 10

225 05 05 05 05 08

230 08 08 08 0

5

235 S-24 GRAB 235 5

5

5

5

5

240 0 0 0 5 5

245 S-25 grab 245 5

5

5

5

5

250 5 5 5 5 5

255 5 5

S-26 GRAB 258 0 0 0

260 0 0

0

0

0

0

EE REPORT OF BORING NOMW95-ML9 ^ SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No TreTp-2shy JUHNSIUN HHUUh ISLAND CHKD BY -HAS

)

SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD |DESCRIPTION INSTALLED SCREENING

Bunnister CLASSIFICATION HNU 117 t

221 NO

WhiteLight Gray (whitecream WHITE Silts) LIGHT GRAY

226 (Fractured Zone at 226 to 228 13 Bright Red Silts) BRIGHT RED

228SILTS

Soft Zone 229 to 234 Green rock TANGRAY chips (Tan Silts)

234 OLIVETAN NO

HARDER ROCK 8lfcfttsfl5$Dark Gray bull GRADING TO LIGHT GRAY

GrayWhite with Black Flecks (Gray Silts) LIGHT GRAY NO

GRAY SILT GRAYWHITEBLACK ROCK

GreenGrayB^ack Rock Fragments 257 NO (TanOlive Silts) - Possible Fractured Zone TANOLIVE

SILTS

260 BLUEGRAY

REMARKS 13 Deepest observed fracture zone 226 to 228 more bright red Silts

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO NS OF GROUNDWATER

bdquobdquobull NAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE GZA | BORING NOMW95-ML9

REPORT OF BORING NOMU95-M19 gtROVIDENCE RHODE ISLAND

CENTRAL LANDFILL - OU2 - TASK 4 IVflV fe GEOTECHNICALGI iOHYDROLOGICAL CONSULTANTS V JUHNS 1 UN HHOUb 1 bLAHD CHKD BY TAr-

H

270

275

280

285

290

295

300

305

310

SAMPLE DESCRIPTION

Bui-mister CLASSIFICATION

Dark GrayWhiteLight Gray GRANITE (Light Silts)

Dark GrayUhiteLighl Gray GRANITE (Light Slits) did not grab sample

Dark GrayUhiteUght Gray GRANITE (Light Slits) slightly sillier

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

End of Exploration at +310

REMARKS 4 Borehole still making water rock much harder gt 2 gpm rate 5 Drilled to depth of 310 below ground surface a 1414 hrs on 22095 6 After developing the well for 15 ninutes with air well making +5 gpm (measured with calibrated

bucket) bull 17 Hager GeoScience Inc working with Colog Inc performed bqreholenepphysical logging 3-arm

borehole ca(iperanltf fluid temperature testing was performed on 33957 Acoustic Borehole teleshy18 A minimal amount of water was lost to the borehole during drilling On 31095 prior to packer

B SAMPLE

1 PEN DEPTH G S No REC (Ft)

S-27 GRAB 270

S-28 GRAB 288

S-29 GRAB 300

MINFT 10

10

15

15

15

20 20

20

20

20

20

20

20

20

20

20

20

20

20

20 20

20

20

20

20 25

25

25

25

25

25 25

25

25

25

20 20

20

15

15

15

15

15

15 15

STRATUM DESCRIPTION

HARDER ROCK

GRAY GRANITE BEDROCK

303

SLIGHTLY SOFTER

DRILLING

EQUIPMENT INSTALLED

I FIELD

ISCREENING HNU 117 i

ND

14

ND

ND

18

19

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETUEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMU95-ML9

GZA GEOENVIRONMENTAL INC PROJECT REPORT OF BORING NoHWS 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET o ut

CENTRAL LANDFILL -OU2 - TASK FILE No rftTV GEOTECHNICALGEOHYDROLOGICAL CONSULTANTS JuHNVilUN KHWb iSLANU CHKD BY bAS f

SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD S 0 N U PEN DEPTH DESCRIPTION INSTALLED G S No IREC (Ft) HINFT Burmister CLASSIFICATION STOP

REMARKS 18 contd 870

19

ing testing

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATEWATERR AEyELREADINGS_HAVE_BEELEVEL READINGS HAVE BEENN MADMADEE AT TIMES AND UNDER CONDITIONS STATED FLUAT_I1MES_AND_UNDER CONDIIIWISSIATip^FLUCTUATigNS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WEIRE MADEGZA |BORING NOMW95-ML9

--

1

s 1 ltbull

-

OV

ER

ALL

Of to t 5 - bulln t- s 8 s 0

- 9 ~ laquobull bull bull laquo shy

- 1 Ei

i 0

AU

IUW

HO

O

i 1 i i

M IO laquo tobull - 8 - 5 8 n in bull - S shy

I bull bull shy

CO

ND

UC

TIV

ITY

Mgt M o f~ s 8 t 5 s t 8 - 8 ttbull n bull0 raquogbull bullI

() rV

LU DC

a z 1 1 fr t I 1 m I

1 O n LU 1 r I 1 i-~_5 i S i oS sect 1 s sect pound s sect sect

ltraquo g

S s s S

V Vdeg o 2 o 1 ^

111

ID bull- - bull- bull- bull- bull- - - bullshyn mdash mdash

C

HU

OR

O

NIN

OH

E9U

L i 0 o o O o z z Z Z

o laquo t C c Q O Oo O z Z Z Z Z Zz (Dz

2 I 5i i D)D a

- S ui laquo s- pound7 1 8 pound

uT tu Q t bullJ S 1

TR

AC

E(

O Q e e ou o S o o sU o 2 u C1 s A a2 a e z zB D

2

O

cc

V)

f 5gt W cc

o IU

i d

i s 40

O Z

g

8 0

g

i

8 0

deg

I

i

sect

i

I

i

8

Q Z

g

O Z

s

O z

c

O Z

bull Q Z

N

o z

8

i

8

i

g

i

sect

0

1

i

1

i

2

o z

pound

0shyat

-

p

in c

0 O2

fl8

V

i i s s iU

i o n 0 o

En K

O 2

07 V

t- S S c I

b b

O 01

34

0

io

r

O

1 v 0 K b b b - c 1 c ia I S i i s i i sc

111 III UJ bull 13 as 1 s a I | S a z i

Ill

C 0 lt t lt ( C O O (0

-

I CO UJ CC a z

UJ UJ ^

gw -5

-I y 1

CN

o z ^ ltD ii eg

8 o_ UJ bullsect H J bdquo

-8 S 1 -8

u o en

(0

9 S

s I

r K shyozv JOB

GZA GEOENVIRONMENTAL INC SHEET NO OF EngnMrs and ScwnMts

14O BROADWAY PROVIDENCE RHODE BLAND O2903 (4O1J421-414O

CALCULATED BY_

CHECKED BY

DATE

DATE

SCALE L Blocks IO

I

MtU

Co

  1. barcode 3228
  2. barcodetext SEMS Doc ID 3228
Page 10: GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

GZA GEOENVIRON CENTAL INC140 BROADWAY PROVIDENCE RHODE ISLAND

mdashGEOTECHNICALGI EOHYDROLOGICAL CONSUL ANTS

SAMPLE P

H W

G S No PENREC

DEPTH (Ft) MINFT

10

10 10

10

S-15 GRAB 135 05

05 05

05

05

140 05

05

05

05

05

145 S-15 GRAB 145 05

05

05 05

05

150 05

05

05

08

10

155 S-16 GRAB 155 10

10

10 05

05

160 05

03 S-17 GRAB 162 03

05

03

165 03

03

08

10

10

170 10

10

10

10

10 S-18 GRAB 175 10

PROJECT L^^mdash CENTRAL LANDFILL shy OU2 shy TASK 4

~ TOKNSTON RHDTJb ISLAND

SAMPLE DESCRIPTION

Burmister CLASSIFICATION

REPi

STRATUM

DESCRIPTION

FILE NoCHW) BY

EQUIPMENT INSTALLED

314 2 EAS

FIELD SCREENING HNU 11

R

GRAY

BrownOrange SILTS FRACTURE 135

WEATHERED ZONE

01

ORANGE SOFT LARGE CHUCKS OF ROCK

10

BrownOrange Silts 146

LIGHT BROWN

NO

Dark gray with black and red rock chips GRANITE (BrownGray Silts)

152 CREAMGRAY

HARDER NO

BrownRed SILTS

Brighter red

Gray SILTS

BrownHeavier SILT content

162 BROWN

16|OFT ROCK

REDBROWN 166

GRAY ROCK

169

BROWNRED

01 11

brown Silts ND

REMARKS 10 Large highly weathered seaa at 135 to 146 larger chunks of rock in cuttings (borehole remained

11 Large] highly weathered seam at 162 to 166 very bright red silts suspect PID reading - probably

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATE MS OF GROUNDWATER

KAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE HADE 1 BORING NOMW95-ML9

aENCEHOOE ISLANDra muGEOTECHNICALGEOHYDROLOGICAL CONSULTANTS

D B SAMPLE

H w

G S No PENREC

DEPTH (Ft) M INFT

10 10 10 10 10

bull on

10 10 08 08 08

185 08

S-19 GRAB 187 08 05 05 05

190 05 05 05 03 03

195 S-20 GRAB 196 03

03 03 05

200 05 48

08 10 10

205 05 05 0

S-21 GRAB 208 0 0 0

210 0

S-22 GRAB 212 05 05

05 08

215 08 08 08 08

220 08

EE2JIpoundI ^^CENTRAL LANDFILL - OU2 - TASK 4

JOHNS UK RHODt ISLANU

SAMPLE DESCRIPTION STRATUM DESCRIPTION

Burmister CLASSIFICATION 176

PINKCREAMSILT

183

LIGHT BROWN SILT

Dark Gray with Red amp Black Chips (Brown Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt)

BlyeCreawBlackRed Rock Chips (with brownorange Si If some white flecks and Red Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt some white flecks and Red Silts)

WhiteRedDark Gray Chips (Bright Red Silts)

194

BROWNORANGE

199

LIGHT BROWN

205

BROWNREDSILTS

209

GRAYCREAM

BRIGHT RED

MORE LIGHT GRAY

OHW95-HL9sW mdashjL- r B_

FILE Mo CHKD BY fc AS Tr

I EQUIPMENT FIELD

IINSTALLED SCREENING HNU 117 raquo

NO

NO

NO

ND

REMARKS 12 Borehole remains open despite very weathered soft rock with high silt content

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS HAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

12

ISLANDW KBRflr WfoJgmmdash

GEOTECHNICALG EOHYDROLOGICAL CONSULTANTS

I C B A L SAMPLE

I N W G S No

PENREC

DEPTH (Ft) MINFT

10 S-23 GRAB 222 10

10 10

225 05 05 05 05 08

230 08 08 08 0

5

235 S-24 GRAB 235 5

5

5

5

5

240 0 0 0 5 5

245 S-25 grab 245 5

5

5

5

5

250 5 5 5 5 5

255 5 5

S-26 GRAB 258 0 0 0

260 0 0

0

0

0

0

EE REPORT OF BORING NOMW95-ML9 ^ SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No TreTp-2shy JUHNSIUN HHUUh ISLAND CHKD BY -HAS

)

SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD |DESCRIPTION INSTALLED SCREENING

Bunnister CLASSIFICATION HNU 117 t

221 NO

WhiteLight Gray (whitecream WHITE Silts) LIGHT GRAY

226 (Fractured Zone at 226 to 228 13 Bright Red Silts) BRIGHT RED

228SILTS

Soft Zone 229 to 234 Green rock TANGRAY chips (Tan Silts)

234 OLIVETAN NO

HARDER ROCK 8lfcfttsfl5$Dark Gray bull GRADING TO LIGHT GRAY

GrayWhite with Black Flecks (Gray Silts) LIGHT GRAY NO

GRAY SILT GRAYWHITEBLACK ROCK

GreenGrayB^ack Rock Fragments 257 NO (TanOlive Silts) - Possible Fractured Zone TANOLIVE

SILTS

260 BLUEGRAY

REMARKS 13 Deepest observed fracture zone 226 to 228 more bright red Silts

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO NS OF GROUNDWATER

bdquobdquobull NAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE GZA | BORING NOMW95-ML9

REPORT OF BORING NOMU95-M19 gtROVIDENCE RHODE ISLAND

CENTRAL LANDFILL - OU2 - TASK 4 IVflV fe GEOTECHNICALGI iOHYDROLOGICAL CONSULTANTS V JUHNS 1 UN HHOUb 1 bLAHD CHKD BY TAr-

H

270

275

280

285

290

295

300

305

310

SAMPLE DESCRIPTION

Bui-mister CLASSIFICATION

Dark GrayWhiteLight Gray GRANITE (Light Silts)

Dark GrayUhiteLighl Gray GRANITE (Light Slits) did not grab sample

Dark GrayUhiteUght Gray GRANITE (Light Slits) slightly sillier

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

End of Exploration at +310

REMARKS 4 Borehole still making water rock much harder gt 2 gpm rate 5 Drilled to depth of 310 below ground surface a 1414 hrs on 22095 6 After developing the well for 15 ninutes with air well making +5 gpm (measured with calibrated

bucket) bull 17 Hager GeoScience Inc working with Colog Inc performed bqreholenepphysical logging 3-arm

borehole ca(iperanltf fluid temperature testing was performed on 33957 Acoustic Borehole teleshy18 A minimal amount of water was lost to the borehole during drilling On 31095 prior to packer

B SAMPLE

1 PEN DEPTH G S No REC (Ft)

S-27 GRAB 270

S-28 GRAB 288

S-29 GRAB 300

MINFT 10

10

15

15

15

20 20

20

20

20

20

20

20

20

20

20

20

20

20

20 20

20

20

20

20 25

25

25

25

25

25 25

25

25

25

20 20

20

15

15

15

15

15

15 15

STRATUM DESCRIPTION

HARDER ROCK

GRAY GRANITE BEDROCK

303

SLIGHTLY SOFTER

DRILLING

EQUIPMENT INSTALLED

I FIELD

ISCREENING HNU 117 i

ND

14

ND

ND

18

19

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETUEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMU95-ML9

GZA GEOENVIRONMENTAL INC PROJECT REPORT OF BORING NoHWS 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET o ut

CENTRAL LANDFILL -OU2 - TASK FILE No rftTV GEOTECHNICALGEOHYDROLOGICAL CONSULTANTS JuHNVilUN KHWb iSLANU CHKD BY bAS f

SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD S 0 N U PEN DEPTH DESCRIPTION INSTALLED G S No IREC (Ft) HINFT Burmister CLASSIFICATION STOP

REMARKS 18 contd 870

19

ing testing

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATEWATERR AEyELREADINGS_HAVE_BEELEVEL READINGS HAVE BEENN MADMADEE AT TIMES AND UNDER CONDITIONS STATED FLUAT_I1MES_AND_UNDER CONDIIIWISSIATip^FLUCTUATigNS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WEIRE MADEGZA |BORING NOMW95-ML9

--

1

s 1 ltbull

-

OV

ER

ALL

Of to t 5 - bulln t- s 8 s 0

- 9 ~ laquobull bull bull laquo shy

- 1 Ei

i 0

AU

IUW

HO

O

i 1 i i

M IO laquo tobull - 8 - 5 8 n in bull - S shy

I bull bull shy

CO

ND

UC

TIV

ITY

Mgt M o f~ s 8 t 5 s t 8 - 8 ttbull n bull0 raquogbull bullI

() rV

LU DC

a z 1 1 fr t I 1 m I

1 O n LU 1 r I 1 i-~_5 i S i oS sect 1 s sect pound s sect sect

ltraquo g

S s s S

V Vdeg o 2 o 1 ^

111

ID bull- - bull- bull- bull- bull- - - bullshyn mdash mdash

C

HU

OR

O

NIN

OH

E9U

L i 0 o o O o z z Z Z

o laquo t C c Q O Oo O z Z Z Z Z Zz (Dz

2 I 5i i D)D a

- S ui laquo s- pound7 1 8 pound

uT tu Q t bullJ S 1

TR

AC

E(

O Q e e ou o S o o sU o 2 u C1 s A a2 a e z zB D

2

O

cc

V)

f 5gt W cc

o IU

i d

i s 40

O Z

g

8 0

g

i

8 0

deg

I

i

sect

i

I

i

8

Q Z

g

O Z

s

O z

c

O Z

bull Q Z

N

o z

8

i

8

i

g

i

sect

0

1

i

1

i

2

o z

pound

0shyat

-

p

in c

0 O2

fl8

V

i i s s iU

i o n 0 o

En K

O 2

07 V

t- S S c I

b b

O 01

34

0

io

r

O

1 v 0 K b b b - c 1 c ia I S i i s i i sc

111 III UJ bull 13 as 1 s a I | S a z i

Ill

C 0 lt t lt ( C O O (0

-

I CO UJ CC a z

UJ UJ ^

gw -5

-I y 1

CN

o z ^ ltD ii eg

8 o_ UJ bullsect H J bdquo

-8 S 1 -8

u o en

(0

9 S

s I

r K shyozv JOB

GZA GEOENVIRONMENTAL INC SHEET NO OF EngnMrs and ScwnMts

14O BROADWAY PROVIDENCE RHODE BLAND O2903 (4O1J421-414O

CALCULATED BY_

CHECKED BY

DATE

DATE

SCALE L Blocks IO

I

MtU

Co

  1. barcode 3228
  2. barcodetext SEMS Doc ID 3228
Page 11: GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

aENCEHOOE ISLANDra muGEOTECHNICALGEOHYDROLOGICAL CONSULTANTS

D B SAMPLE

H w

G S No PENREC

DEPTH (Ft) M INFT

10 10 10 10 10

bull on

10 10 08 08 08

185 08

S-19 GRAB 187 08 05 05 05

190 05 05 05 03 03

195 S-20 GRAB 196 03

03 03 05

200 05 48

08 10 10

205 05 05 0

S-21 GRAB 208 0 0 0

210 0

S-22 GRAB 212 05 05

05 08

215 08 08 08 08

220 08

EE2JIpoundI ^^CENTRAL LANDFILL - OU2 - TASK 4

JOHNS UK RHODt ISLANU

SAMPLE DESCRIPTION STRATUM DESCRIPTION

Burmister CLASSIFICATION 176

PINKCREAMSILT

183

LIGHT BROWN SILT

Dark Gray with Red amp Black Chips (Brown Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt)

BlyeCreawBlackRed Rock Chips (with brownorange Si If some white flecks and Red Silts)

BlyeCreamB lackRed Rock Chips (with brownorange Silt some white flecks and Red Silts)

WhiteRedDark Gray Chips (Bright Red Silts)

194

BROWNORANGE

199

LIGHT BROWN

205

BROWNREDSILTS

209

GRAYCREAM

BRIGHT RED

MORE LIGHT GRAY

OHW95-HL9sW mdashjL- r B_

FILE Mo CHKD BY fc AS Tr

I EQUIPMENT FIELD

IINSTALLED SCREENING HNU 117 raquo

NO

NO

NO

ND

REMARKS 12 Borehole remains open despite very weathered soft rock with high silt content

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS HAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMW95-HL9

12

ISLANDW KBRflr WfoJgmmdash

GEOTECHNICALG EOHYDROLOGICAL CONSULTANTS

I C B A L SAMPLE

I N W G S No

PENREC

DEPTH (Ft) MINFT

10 S-23 GRAB 222 10

10 10

225 05 05 05 05 08

230 08 08 08 0

5

235 S-24 GRAB 235 5

5

5

5

5

240 0 0 0 5 5

245 S-25 grab 245 5

5

5

5

5

250 5 5 5 5 5

255 5 5

S-26 GRAB 258 0 0 0

260 0 0

0

0

0

0

EE REPORT OF BORING NOMW95-ML9 ^ SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No TreTp-2shy JUHNSIUN HHUUh ISLAND CHKD BY -HAS

)

SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD |DESCRIPTION INSTALLED SCREENING

Bunnister CLASSIFICATION HNU 117 t

221 NO

WhiteLight Gray (whitecream WHITE Silts) LIGHT GRAY

226 (Fractured Zone at 226 to 228 13 Bright Red Silts) BRIGHT RED

228SILTS

Soft Zone 229 to 234 Green rock TANGRAY chips (Tan Silts)

234 OLIVETAN NO

HARDER ROCK 8lfcfttsfl5$Dark Gray bull GRADING TO LIGHT GRAY

GrayWhite with Black Flecks (Gray Silts) LIGHT GRAY NO

GRAY SILT GRAYWHITEBLACK ROCK

GreenGrayB^ack Rock Fragments 257 NO (TanOlive Silts) - Possible Fractured Zone TANOLIVE

SILTS

260 BLUEGRAY

REMARKS 13 Deepest observed fracture zone 226 to 228 more bright red Silts

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO NS OF GROUNDWATER

bdquobdquobull NAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE GZA | BORING NOMW95-ML9

REPORT OF BORING NOMU95-M19 gtROVIDENCE RHODE ISLAND

CENTRAL LANDFILL - OU2 - TASK 4 IVflV fe GEOTECHNICALGI iOHYDROLOGICAL CONSULTANTS V JUHNS 1 UN HHOUb 1 bLAHD CHKD BY TAr-

H

270

275

280

285

290

295

300

305

310

SAMPLE DESCRIPTION

Bui-mister CLASSIFICATION

Dark GrayWhiteLight Gray GRANITE (Light Silts)

Dark GrayUhiteLighl Gray GRANITE (Light Slits) did not grab sample

Dark GrayUhiteUght Gray GRANITE (Light Slits) slightly sillier

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

End of Exploration at +310

REMARKS 4 Borehole still making water rock much harder gt 2 gpm rate 5 Drilled to depth of 310 below ground surface a 1414 hrs on 22095 6 After developing the well for 15 ninutes with air well making +5 gpm (measured with calibrated

bucket) bull 17 Hager GeoScience Inc working with Colog Inc performed bqreholenepphysical logging 3-arm

borehole ca(iperanltf fluid temperature testing was performed on 33957 Acoustic Borehole teleshy18 A minimal amount of water was lost to the borehole during drilling On 31095 prior to packer

B SAMPLE

1 PEN DEPTH G S No REC (Ft)

S-27 GRAB 270

S-28 GRAB 288

S-29 GRAB 300

MINFT 10

10

15

15

15

20 20

20

20

20

20

20

20

20

20

20

20

20

20

20 20

20

20

20

20 25

25

25

25

25

25 25

25

25

25

20 20

20

15

15

15

15

15

15 15

STRATUM DESCRIPTION

HARDER ROCK

GRAY GRANITE BEDROCK

303

SLIGHTLY SOFTER

DRILLING

EQUIPMENT INSTALLED

I FIELD

ISCREENING HNU 117 i

ND

14

ND

ND

18

19

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETUEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMU95-ML9

GZA GEOENVIRONMENTAL INC PROJECT REPORT OF BORING NoHWS 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET o ut

CENTRAL LANDFILL -OU2 - TASK FILE No rftTV GEOTECHNICALGEOHYDROLOGICAL CONSULTANTS JuHNVilUN KHWb iSLANU CHKD BY bAS f

SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD S 0 N U PEN DEPTH DESCRIPTION INSTALLED G S No IREC (Ft) HINFT Burmister CLASSIFICATION STOP

REMARKS 18 contd 870

19

ing testing

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATEWATERR AEyELREADINGS_HAVE_BEELEVEL READINGS HAVE BEENN MADMADEE AT TIMES AND UNDER CONDITIONS STATED FLUAT_I1MES_AND_UNDER CONDIIIWISSIATip^FLUCTUATigNS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WEIRE MADEGZA |BORING NOMW95-ML9

--

1

s 1 ltbull

-

OV

ER

ALL

Of to t 5 - bulln t- s 8 s 0

- 9 ~ laquobull bull bull laquo shy

- 1 Ei

i 0

AU

IUW

HO

O

i 1 i i

M IO laquo tobull - 8 - 5 8 n in bull - S shy

I bull bull shy

CO

ND

UC

TIV

ITY

Mgt M o f~ s 8 t 5 s t 8 - 8 ttbull n bull0 raquogbull bullI

() rV

LU DC

a z 1 1 fr t I 1 m I

1 O n LU 1 r I 1 i-~_5 i S i oS sect 1 s sect pound s sect sect

ltraquo g

S s s S

V Vdeg o 2 o 1 ^

111

ID bull- - bull- bull- bull- bull- - - bullshyn mdash mdash

C

HU

OR

O

NIN

OH

E9U

L i 0 o o O o z z Z Z

o laquo t C c Q O Oo O z Z Z Z Z Zz (Dz

2 I 5i i D)D a

- S ui laquo s- pound7 1 8 pound

uT tu Q t bullJ S 1

TR

AC

E(

O Q e e ou o S o o sU o 2 u C1 s A a2 a e z zB D

2

O

cc

V)

f 5gt W cc

o IU

i d

i s 40

O Z

g

8 0

g

i

8 0

deg

I

i

sect

i

I

i

8

Q Z

g

O Z

s

O z

c

O Z

bull Q Z

N

o z

8

i

8

i

g

i

sect

0

1

i

1

i

2

o z

pound

0shyat

-

p

in c

0 O2

fl8

V

i i s s iU

i o n 0 o

En K

O 2

07 V

t- S S c I

b b

O 01

34

0

io

r

O

1 v 0 K b b b - c 1 c ia I S i i s i i sc

111 III UJ bull 13 as 1 s a I | S a z i

Ill

C 0 lt t lt ( C O O (0

-

I CO UJ CC a z

UJ UJ ^

gw -5

-I y 1

CN

o z ^ ltD ii eg

8 o_ UJ bullsect H J bdquo

-8 S 1 -8

u o en

(0

9 S

s I

r K shyozv JOB

GZA GEOENVIRONMENTAL INC SHEET NO OF EngnMrs and ScwnMts

14O BROADWAY PROVIDENCE RHODE BLAND O2903 (4O1J421-414O

CALCULATED BY_

CHECKED BY

DATE

DATE

SCALE L Blocks IO

I

MtU

Co

  1. barcode 3228
  2. barcodetext SEMS Doc ID 3228
Page 12: GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

ISLANDW KBRflr WfoJgmmdash

GEOTECHNICALG EOHYDROLOGICAL CONSULTANTS

I C B A L SAMPLE

I N W G S No

PENREC

DEPTH (Ft) MINFT

10 S-23 GRAB 222 10

10 10

225 05 05 05 05 08

230 08 08 08 0

5

235 S-24 GRAB 235 5

5

5

5

5

240 0 0 0 5 5

245 S-25 grab 245 5

5

5

5

5

250 5 5 5 5 5

255 5 5

S-26 GRAB 258 0 0 0

260 0 0

0

0

0

0

EE REPORT OF BORING NOMW95-ML9 ^ SHEET

CENTRAL LANDFILL - OU2 - TASK 4 FILE No TreTp-2shy JUHNSIUN HHUUh ISLAND CHKD BY -HAS

)

SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD |DESCRIPTION INSTALLED SCREENING

Bunnister CLASSIFICATION HNU 117 t

221 NO

WhiteLight Gray (whitecream WHITE Silts) LIGHT GRAY

226 (Fractured Zone at 226 to 228 13 Bright Red Silts) BRIGHT RED

228SILTS

Soft Zone 229 to 234 Green rock TANGRAY chips (Tan Silts)

234 OLIVETAN NO

HARDER ROCK 8lfcfttsfl5$Dark Gray bull GRADING TO LIGHT GRAY

GrayWhite with Black Flecks (Gray Silts) LIGHT GRAY NO

GRAY SILT GRAYWHITEBLACK ROCK

GreenGrayB^ack Rock Fragments 257 NO (TanOlive Silts) - Possible Fractured Zone TANOLIVE

SILTS

260 BLUEGRAY

REMARKS 13 Deepest observed fracture zone 226 to 228 more bright red Silts

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN HADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO NS OF GROUNDWATER

bdquobdquobull NAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE GZA | BORING NOMW95-ML9

REPORT OF BORING NOMU95-M19 gtROVIDENCE RHODE ISLAND

CENTRAL LANDFILL - OU2 - TASK 4 IVflV fe GEOTECHNICALGI iOHYDROLOGICAL CONSULTANTS V JUHNS 1 UN HHOUb 1 bLAHD CHKD BY TAr-

H

270

275

280

285

290

295

300

305

310

SAMPLE DESCRIPTION

Bui-mister CLASSIFICATION

Dark GrayWhiteLight Gray GRANITE (Light Silts)

Dark GrayUhiteLighl Gray GRANITE (Light Slits) did not grab sample

Dark GrayUhiteUght Gray GRANITE (Light Slits) slightly sillier

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

End of Exploration at +310

REMARKS 4 Borehole still making water rock much harder gt 2 gpm rate 5 Drilled to depth of 310 below ground surface a 1414 hrs on 22095 6 After developing the well for 15 ninutes with air well making +5 gpm (measured with calibrated

bucket) bull 17 Hager GeoScience Inc working with Colog Inc performed bqreholenepphysical logging 3-arm

borehole ca(iperanltf fluid temperature testing was performed on 33957 Acoustic Borehole teleshy18 A minimal amount of water was lost to the borehole during drilling On 31095 prior to packer

B SAMPLE

1 PEN DEPTH G S No REC (Ft)

S-27 GRAB 270

S-28 GRAB 288

S-29 GRAB 300

MINFT 10

10

15

15

15

20 20

20

20

20

20

20

20

20

20

20

20

20

20

20 20

20

20

20

20 25

25

25

25

25

25 25

25

25

25

20 20

20

15

15

15

15

15

15 15

STRATUM DESCRIPTION

HARDER ROCK

GRAY GRANITE BEDROCK

303

SLIGHTLY SOFTER

DRILLING

EQUIPMENT INSTALLED

I FIELD

ISCREENING HNU 117 i

ND

14

ND

ND

18

19

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETUEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMU95-ML9

GZA GEOENVIRONMENTAL INC PROJECT REPORT OF BORING NoHWS 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET o ut

CENTRAL LANDFILL -OU2 - TASK FILE No rftTV GEOTECHNICALGEOHYDROLOGICAL CONSULTANTS JuHNVilUN KHWb iSLANU CHKD BY bAS f

SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD S 0 N U PEN DEPTH DESCRIPTION INSTALLED G S No IREC (Ft) HINFT Burmister CLASSIFICATION STOP

REMARKS 18 contd 870

19

ing testing

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATEWATERR AEyELREADINGS_HAVE_BEELEVEL READINGS HAVE BEENN MADMADEE AT TIMES AND UNDER CONDITIONS STATED FLUAT_I1MES_AND_UNDER CONDIIIWISSIATip^FLUCTUATigNS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WEIRE MADEGZA |BORING NOMW95-ML9

--

1

s 1 ltbull

-

OV

ER

ALL

Of to t 5 - bulln t- s 8 s 0

- 9 ~ laquobull bull bull laquo shy

- 1 Ei

i 0

AU

IUW

HO

O

i 1 i i

M IO laquo tobull - 8 - 5 8 n in bull - S shy

I bull bull shy

CO

ND

UC

TIV

ITY

Mgt M o f~ s 8 t 5 s t 8 - 8 ttbull n bull0 raquogbull bullI

() rV

LU DC

a z 1 1 fr t I 1 m I

1 O n LU 1 r I 1 i-~_5 i S i oS sect 1 s sect pound s sect sect

ltraquo g

S s s S

V Vdeg o 2 o 1 ^

111

ID bull- - bull- bull- bull- bull- - - bullshyn mdash mdash

C

HU

OR

O

NIN

OH

E9U

L i 0 o o O o z z Z Z

o laquo t C c Q O Oo O z Z Z Z Z Zz (Dz

2 I 5i i D)D a

- S ui laquo s- pound7 1 8 pound

uT tu Q t bullJ S 1

TR

AC

E(

O Q e e ou o S o o sU o 2 u C1 s A a2 a e z zB D

2

O

cc

V)

f 5gt W cc

o IU

i d

i s 40

O Z

g

8 0

g

i

8 0

deg

I

i

sect

i

I

i

8

Q Z

g

O Z

s

O z

c

O Z

bull Q Z

N

o z

8

i

8

i

g

i

sect

0

1

i

1

i

2

o z

pound

0shyat

-

p

in c

0 O2

fl8

V

i i s s iU

i o n 0 o

En K

O 2

07 V

t- S S c I

b b

O 01

34

0

io

r

O

1 v 0 K b b b - c 1 c ia I S i i s i i sc

111 III UJ bull 13 as 1 s a I | S a z i

Ill

C 0 lt t lt ( C O O (0

-

I CO UJ CC a z

UJ UJ ^

gw -5

-I y 1

CN

o z ^ ltD ii eg

8 o_ UJ bullsect H J bdquo

-8 S 1 -8

u o en

(0

9 S

s I

r K shyozv JOB

GZA GEOENVIRONMENTAL INC SHEET NO OF EngnMrs and ScwnMts

14O BROADWAY PROVIDENCE RHODE BLAND O2903 (4O1J421-414O

CALCULATED BY_

CHECKED BY

DATE

DATE

SCALE L Blocks IO

I

MtU

Co

  1. barcode 3228
  2. barcodetext SEMS Doc ID 3228
Page 13: GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

REPORT OF BORING NOMU95-M19 gtROVIDENCE RHODE ISLAND

CENTRAL LANDFILL - OU2 - TASK 4 IVflV fe GEOTECHNICALGI iOHYDROLOGICAL CONSULTANTS V JUHNS 1 UN HHOUb 1 bLAHD CHKD BY TAr-

H

270

275

280

285

290

295

300

305

310

SAMPLE DESCRIPTION

Bui-mister CLASSIFICATION

Dark GrayWhiteLight Gray GRANITE (Light Silts)

Dark GrayUhiteLighl Gray GRANITE (Light Slits) did not grab sample

Dark GrayUhiteUght Gray GRANITE (Light Slits) slightly sillier

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

Dark GrayUhiteLight Gray GRANITE (Light Slits) slightly bluer

End of Exploration at +310

REMARKS 4 Borehole still making water rock much harder gt 2 gpm rate 5 Drilled to depth of 310 below ground surface a 1414 hrs on 22095 6 After developing the well for 15 ninutes with air well making +5 gpm (measured with calibrated

bucket) bull 17 Hager GeoScience Inc working with Colog Inc performed bqreholenepphysical logging 3-arm

borehole ca(iperanltf fluid temperature testing was performed on 33957 Acoustic Borehole teleshy18 A minimal amount of water was lost to the borehole during drilling On 31095 prior to packer

B SAMPLE

1 PEN DEPTH G S No REC (Ft)

S-27 GRAB 270

S-28 GRAB 288

S-29 GRAB 300

MINFT 10

10

15

15

15

20 20

20

20

20

20

20

20

20

20

20

20

20

20

20 20

20

20

20

20 25

25

25

25

25

25 25

25

25

25

20 20

20

15

15

15

15

15

15 15

STRATUM DESCRIPTION

HARDER ROCK

GRAY GRANITE BEDROCK

303

SLIGHTLY SOFTER

DRILLING

EQUIPMENT INSTALLED

I FIELD

ISCREENING HNU 117 i

ND

14

ND

ND

18

19

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETUEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATER LEVEL READINGS HAVE BEEN MADE AT TIMES AND UNDER CONDITIONS STATED FLUCTUATIO MS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WERE MADE | BORING NOMU95-ML9

GZA GEOENVIRONMENTAL INC PROJECT REPORT OF BORING NoHWS 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET o ut

CENTRAL LANDFILL -OU2 - TASK FILE No rftTV GEOTECHNICALGEOHYDROLOGICAL CONSULTANTS JuHNVilUN KHWb iSLANU CHKD BY bAS f

SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD S 0 N U PEN DEPTH DESCRIPTION INSTALLED G S No IREC (Ft) HINFT Burmister CLASSIFICATION STOP

REMARKS 18 contd 870

19

ing testing

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATEWATERR AEyELREADINGS_HAVE_BEELEVEL READINGS HAVE BEENN MADMADEE AT TIMES AND UNDER CONDITIONS STATED FLUAT_I1MES_AND_UNDER CONDIIIWISSIATip^FLUCTUATigNS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WEIRE MADEGZA |BORING NOMW95-ML9

--

1

s 1 ltbull

-

OV

ER

ALL

Of to t 5 - bulln t- s 8 s 0

- 9 ~ laquobull bull bull laquo shy

- 1 Ei

i 0

AU

IUW

HO

O

i 1 i i

M IO laquo tobull - 8 - 5 8 n in bull - S shy

I bull bull shy

CO

ND

UC

TIV

ITY

Mgt M o f~ s 8 t 5 s t 8 - 8 ttbull n bull0 raquogbull bullI

() rV

LU DC

a z 1 1 fr t I 1 m I

1 O n LU 1 r I 1 i-~_5 i S i oS sect 1 s sect pound s sect sect

ltraquo g

S s s S

V Vdeg o 2 o 1 ^

111

ID bull- - bull- bull- bull- bull- - - bullshyn mdash mdash

C

HU

OR

O

NIN

OH

E9U

L i 0 o o O o z z Z Z

o laquo t C c Q O Oo O z Z Z Z Z Zz (Dz

2 I 5i i D)D a

- S ui laquo s- pound7 1 8 pound

uT tu Q t bullJ S 1

TR

AC

E(

O Q e e ou o S o o sU o 2 u C1 s A a2 a e z zB D

2

O

cc

V)

f 5gt W cc

o IU

i d

i s 40

O Z

g

8 0

g

i

8 0

deg

I

i

sect

i

I

i

8

Q Z

g

O Z

s

O z

c

O Z

bull Q Z

N

o z

8

i

8

i

g

i

sect

0

1

i

1

i

2

o z

pound

0shyat

-

p

in c

0 O2

fl8

V

i i s s iU

i o n 0 o

En K

O 2

07 V

t- S S c I

b b

O 01

34

0

io

r

O

1 v 0 K b b b - c 1 c ia I S i i s i i sc

111 III UJ bull 13 as 1 s a I | S a z i

Ill

C 0 lt t lt ( C O O (0

-

I CO UJ CC a z

UJ UJ ^

gw -5

-I y 1

CN

o z ^ ltD ii eg

8 o_ UJ bullsect H J bdquo

-8 S 1 -8

u o en

(0

9 S

s I

r K shyozv JOB

GZA GEOENVIRONMENTAL INC SHEET NO OF EngnMrs and ScwnMts

14O BROADWAY PROVIDENCE RHODE BLAND O2903 (4O1J421-414O

CALCULATED BY_

CHECKED BY

DATE

DATE

SCALE L Blocks IO

I

MtU

Co

  1. barcode 3228
  2. barcodetext SEMS Doc ID 3228
Page 14: GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

GZA GEOENVIRONMENTAL INC PROJECT REPORT OF BORING NoHWS 140 BROADWAY PROVIDENCE RHODE ISLAND SHEET o ut

CENTRAL LANDFILL -OU2 - TASK FILE No rftTV GEOTECHNICALGEOHYDROLOGICAL CONSULTANTS JuHNVilUN KHWb iSLANU CHKD BY bAS f

SAMPLE SAMPLE DESCRIPTION STRATUM EQUIPMENT FIELD S 0 N U PEN DEPTH DESCRIPTION INSTALLED G S No IREC (Ft) HINFT Burmister CLASSIFICATION STOP

REMARKS 18 contd 870

19

ing testing

NOTES 1) STRATIFICATION LINES REPRESENT APPROXIMATE BOUNDARY BETWEEN SOIL TYPES TRANSITIONS MAY BE GRADUAL 2) WATEWATERR AEyELREADINGS_HAVE_BEELEVEL READINGS HAVE BEENN MADMADEE AT TIMES AND UNDER CONDITIONS STATED FLUAT_I1MES_AND_UNDER CONDIIIWISSIATip^FLUCTUATigNS OF GROUNDWATER

MAY OCCUR DUE TO OTHER FACTORS THAN THOSE PRESENT AT THE TIME MEASUREMENTS WEIRE MADEGZA |BORING NOMW95-ML9

--

1

s 1 ltbull

-

OV

ER

ALL

Of to t 5 - bulln t- s 8 s 0

- 9 ~ laquobull bull bull laquo shy

- 1 Ei

i 0

AU

IUW

HO

O

i 1 i i

M IO laquo tobull - 8 - 5 8 n in bull - S shy

I bull bull shy

CO

ND

UC

TIV

ITY

Mgt M o f~ s 8 t 5 s t 8 - 8 ttbull n bull0 raquogbull bullI

() rV

LU DC

a z 1 1 fr t I 1 m I

1 O n LU 1 r I 1 i-~_5 i S i oS sect 1 s sect pound s sect sect

ltraquo g

S s s S

V Vdeg o 2 o 1 ^

111

ID bull- - bull- bull- bull- bull- - - bullshyn mdash mdash

C

HU

OR

O

NIN

OH

E9U

L i 0 o o O o z z Z Z

o laquo t C c Q O Oo O z Z Z Z Z Zz (Dz

2 I 5i i D)D a

- S ui laquo s- pound7 1 8 pound

uT tu Q t bullJ S 1

TR

AC

E(

O Q e e ou o S o o sU o 2 u C1 s A a2 a e z zB D

2

O

cc

V)

f 5gt W cc

o IU

i d

i s 40

O Z

g

8 0

g

i

8 0

deg

I

i

sect

i

I

i

8

Q Z

g

O Z

s

O z

c

O Z

bull Q Z

N

o z

8

i

8

i

g

i

sect

0

1

i

1

i

2

o z

pound

0shyat

-

p

in c

0 O2

fl8

V

i i s s iU

i o n 0 o

En K

O 2

07 V

t- S S c I

b b

O 01

34

0

io

r

O

1 v 0 K b b b - c 1 c ia I S i i s i i sc

111 III UJ bull 13 as 1 s a I | S a z i

Ill

C 0 lt t lt ( C O O (0

-

I CO UJ CC a z

UJ UJ ^

gw -5

-I y 1

CN

o z ^ ltD ii eg

8 o_ UJ bullsect H J bdquo

-8 S 1 -8

u o en

(0

9 S

s I

r K shyozv JOB

GZA GEOENVIRONMENTAL INC SHEET NO OF EngnMrs and ScwnMts

14O BROADWAY PROVIDENCE RHODE BLAND O2903 (4O1J421-414O

CALCULATED BY_

CHECKED BY

DATE

DATE

SCALE L Blocks IO

I

MtU

Co

  1. barcode 3228
  2. barcodetext SEMS Doc ID 3228
Page 15: GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

--

1

s 1 ltbull

-

OV

ER

ALL

Of to t 5 - bulln t- s 8 s 0

- 9 ~ laquobull bull bull laquo shy

- 1 Ei

i 0

AU

IUW

HO

O

i 1 i i

M IO laquo tobull - 8 - 5 8 n in bull - S shy

I bull bull shy

CO

ND

UC

TIV

ITY

Mgt M o f~ s 8 t 5 s t 8 - 8 ttbull n bull0 raquogbull bullI

() rV

LU DC

a z 1 1 fr t I 1 m I

1 O n LU 1 r I 1 i-~_5 i S i oS sect 1 s sect pound s sect sect

ltraquo g

S s s S

V Vdeg o 2 o 1 ^

111

ID bull- - bull- bull- bull- bull- - - bullshyn mdash mdash

C

HU

OR

O

NIN

OH

E9U

L i 0 o o O o z z Z Z

o laquo t C c Q O Oo O z Z Z Z Z Zz (Dz

2 I 5i i D)D a

- S ui laquo s- pound7 1 8 pound

uT tu Q t bullJ S 1

TR

AC

E(

O Q e e ou o S o o sU o 2 u C1 s A a2 a e z zB D

2

O

cc

V)

f 5gt W cc

o IU

i d

i s 40

O Z

g

8 0

g

i

8 0

deg

I

i

sect

i

I

i

8

Q Z

g

O Z

s

O z

c

O Z

bull Q Z

N

o z

8

i

8

i

g

i

sect

0

1

i

1

i

2

o z

pound

0shyat

-

p

in c

0 O2

fl8

V

i i s s iU

i o n 0 o

En K

O 2

07 V

t- S S c I

b b

O 01

34

0

io

r

O

1 v 0 K b b b - c 1 c ia I S i i s i i sc

111 III UJ bull 13 as 1 s a I | S a z i

Ill

C 0 lt t lt ( C O O (0

-

I CO UJ CC a z

UJ UJ ^

gw -5

-I y 1

CN

o z ^ ltD ii eg

8 o_ UJ bullsect H J bdquo

-8 S 1 -8

u o en

(0

9 S

s I

r K shyozv JOB

GZA GEOENVIRONMENTAL INC SHEET NO OF EngnMrs and ScwnMts

14O BROADWAY PROVIDENCE RHODE BLAND O2903 (4O1J421-414O

CALCULATED BY_

CHECKED BY

DATE

DATE

SCALE L Blocks IO

I

MtU

Co

  1. barcode 3228
  2. barcodetext SEMS Doc ID 3228
Page 16: GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

I CO UJ CC a z

UJ UJ ^

gw -5

-I y 1

CN

o z ^ ltD ii eg

8 o_ UJ bullsect H J bdquo

-8 S 1 -8

u o en

(0

9 S

s I

r K shyozv JOB

GZA GEOENVIRONMENTAL INC SHEET NO OF EngnMrs and ScwnMts

14O BROADWAY PROVIDENCE RHODE BLAND O2903 (4O1J421-414O

CALCULATED BY_

CHECKED BY

DATE

DATE

SCALE L Blocks IO

I

MtU

Co

  1. barcode 3228
  2. barcodetext SEMS Doc ID 3228
Page 17: GZA GeoEnvironmental, Inc.oz\ 140 Broadway Providence Rhode Island 02903 401-421 4140 FAX 401-751-8613 . A Subsidiary of GZA GeoEnvironmental Technologies, Inc . GZA GeoEnvironmental,

r K shyozv JOB

GZA GEOENVIRONMENTAL INC SHEET NO OF EngnMrs and ScwnMts

14O BROADWAY PROVIDENCE RHODE BLAND O2903 (4O1J421-414O

CALCULATED BY_

CHECKED BY

DATE

DATE

SCALE L Blocks IO

I

MtU

Co

  1. barcode 3228
  2. barcodetext SEMS Doc ID 3228