23
Greater Yellowstone Area Climate Action Plan GYACAP Meeting, 11/03/09 Michael Fiebig

GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

Embed Size (px)

Citation preview

Page 1: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

Greater Yellowstone Area Climate Action Plan

GYACAP Meeting, 11/03/09Michael Fiebig

Page 2: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

2

Today’s Discussion

1. Introduction2. The GYA GHG

Inventory3. The GYA Climate

Action Plan4. E.O. 135145. GAO Report

Greater Yellowstone Coordinating Committee

Page 3: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

3

Sustainable Operations Subcommittee (SOS)Representatives from each GYA unitCoordination and collaboration of sustainable

operations throughout the public lands of the GYA

Focus areas include: GHGs, water, energy, fleet and transportation, waste/recycling, education and outreach

Greater Yellowstone Coordinating Committee

Page 4: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

4

The GHG Inventory3 Federal Agencies10 Agency Units

6 Forests2 Parks2 Refuges

Focus: Operational Control

Greater Yellowstone Coordinating Committee

Page 5: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

5

OverviewFiscal Year 2007 baselineInventory tools:

EPA Climate Leaders (USFS and USFWS)Climate Leadership in Parks – CLIP (NPS)

Anthropogenic emissions of 3 GHGs:Carbon Dioxide (CO2)Methane (CH4)Nitrous Oxide (N2O)

Inventory Completed in April 2009

Greater Yellowstone Coordinating Committee

Page 6: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

6

Emissions SourcesIncluded: Not Included:

• Mobile sources• Stationary sources• Electricity• Employee air travel• Employee commuting

• Prescribed fire & wildfire suppression

• Refrigerants• Fire extinguishers• Gas waste stream • Imported heat • Product transport• Off-site waste disposal

Greater Yellowstone Coordinating Committee

Page 7: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

7

GHG Emissions from Stationary Sources Across the Ecosystem

Greater Yellowstone Coordinating Committee

0

2,000

4,000

6,000

8,000

10,000

6 NationalForests

Grand TetonNational Park

YellowstoneNational Park

2 NationalRefuges

Met

ric T

ons o

f CO

2e

Page 8: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

8

GHG Emissions from Mobile Sources Across the Ecosystem

Greater Yellowstone Coordinating Committee

0

1,000

2,000

3,000

4,000

5,000

6 NationalForests

Grand TetonNational Park

YellowstoneNational Park

2 NationalRefuges

Met

ric T

ons o

f CO

2e

Page 9: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

9

GHG Emissions from Purchased Electricity Across the Ecosystem

Greater Yellowstone Coordinating Committee

0

5,000

10,000

15,000

20,000

25,000

6 NationalForests

Grand TetonNational Park

YellowstoneNational Park

2 NationalRefuges

Met

ric

Tons

of C

O2e

Page 10: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

10

Total GHG Emissions from Across the Ecosystem

Greater Yellowstone Coordinating Committee

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

6 NationalForests

Grand TetonNational Park

YellowstoneNational Park

2 NationalRefuges

Met

ric T

ons o

f CO

2e Stationary

Electricity

Mobile

Total

Page 11: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

11

Some Findings and Differences

Greater Yellowstone Coordinating Committee

Distribution of GHG Emissions from National Forests in GYA

Stationary Sources

15%

Mobile Sources

54%

Employee Commuting

8% Purchased Electricity

22%

Business Air Travel

1%

Page 12: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

12

The GYA Climate Action Plan

Greater Yellowstone Coordinating Committee

The metrics aren’t perfect, but we need to act

Iterative processTiered goals: Unit-

level and GYA-wideCoordinated

implementationNew territory… and a

great opportunity

Page 13: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

13

GYCC Definition of Success1. Setting and meeting a collective,

realistic and credible ecosystem-wide GHG reduction goal

2. Ensuring the capacity and leadership intent to meet the goal

3. Developing/documenting a methodology for GHG accounting and reduction that serves as a model for other footprint areas, other agencies, and the public

Greater Yellowstone Coordinating Committee

Page 14: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

14

Where We Are

Greater Yellowstone Coordinating Committee

UNIT | YEAR BY 2020

B-D NF 20%

B-T NF 20%

C-T NF 20%

Custer NF 20%

Gallatin NF 20%

Grand Teton NP 20%

National Elk WR 100%

RRL NWR 100%

Shoshone NF 20%

Yellowstone NP 43%

GYA-wide Total: Approx. 40%

Mitigation and Avoidance actions organized by emissions source and timeline for each unit

A commitment by each unit to reduce their GHG emissions by a minimum of 20% before 2020

Currently tracking at around a 40% reduction ecosystem-wide by 2020

Page 15: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

15

Where We Are

Greater Yellowstone Coordinating Committee

So far, it reduces GYA emissions by 5542 tons of carbon, or the equivalent of…

Annual electricity use of 2557 homes

Annual emissions from 3376 passenger vehicles

Burning 42,871 barrels of oil

Burning 96.3 rail cars of coal

Contained in 789,108 propane tanks – gas grills

Page 16: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

16

Where We’re Going

Greater Yellowstone Coordinating Committee

Further planning, analysis, and goal-setting

NREL Technical Assistance grant

Coordinated implementation

Documentation of our methodology

Expansion and Outreach

Page 17: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

17

Some AssumptionsWe make natural resources management

“decisions” every day though our operational practices

The anthropogenic drivers of climate change are certain

We know enough to reduce risk through implementing avoidance actions

Metrics and data quality will comeCollaboration and integration will be key

components to success, as well as the resources and synergies that they provide

Greater Yellowstone Coordinating Committee

Page 18: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

18

E.O. 13514

Greater Yellowstone Coordinating Committee

Signed October 5, 2009Within 90 days, agencies

must set Scope 1 & 2 GHG reduction targets for 2020 (Jan, 2010)

Within 240 days, agencies must set a Scope 3 reduction target for 2020 (June)

Within 15 months, agencies must inventory GHG emissions using a FY 2010 baseline (Jan, 2011)

Page 19: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

19

E.O. 13514

Greater Yellowstone Coordinating Committee

Also addresses footprint reduction targets for:EnergyFleetWaterWasteSustainable

CommunitiesGreen BuildingContractingGreen Purchasing

Office of Sustainability

Page 20: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

20

GAO Report on Climate Change Adaptation “Adapting to climate change requires

making policy and management decisions that cut across traditional economic sectors, jurisdictional boundaries, and levels of government.”

“Top leadership involvement and clear lines of accountability are critical to overcoming natural resistance to change, marshalling needed resources, and building and maintaining the commitment to new ways of doing business.”

Greater Yellowstone Coordinating Committee

Page 21: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

21

GAO Report on Climate Change AdaptationChallenges: Recommendations:Available attention and

resources are focused on immediate needs

Insufficient site-specific data on expected changes

Lack of clear roles and responsibilities among federal, state, and local agencies

Emerging activities are carried out in an ad hoc manner and not well coordinated

Define federal priorities (related to adaptation)

Clarify roles, responsibilities and working relationships

Identify mechanisms to increase capacity

Address how resources will be made available for implementation

Build on and integrate ongoing federal planning efforts

Greater Yellowstone Coordinating Committee

Page 22: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

22

Ideas for GYCC Subcommittee Collaboration?

Greater Yellowstone Coordinating Committee

Are there ways that the SOS and the GYACAP can work together?

Other subcommittee, agency or outside partnership opportunities?

GYCC Project Proposals for FY 2010-2011 are due Nov. 16.

Page 23: GYACAP Meeting, 11/03/09 Michael Fiebig. Today’s Discussion 1. Introduction 2. The GYA GHG Inventory 3. The GYA Climate Action Plan 4. E.O. 13514 5. GAO

23

Any Questions? Comments?

Greater Yellowstone Coordinating Committee

Michael Fiebig, [email protected]