Upload
yogi-zuckerberg
View
228
Download
0
Embed Size (px)
Citation preview
7/24/2019 GUYED MAST 3LG 72M_23-12-2013
1/16
7/24/2019 GUYED MAST 3LG 72M_23-12-2013
2/16
7/24/2019 GUYED MAST 3LG 72M_23-12-2013
3/16
7/24/2019 GUYED MAST 3LG 72M_23-12-2013
4/16
7/24/2019 GUYED MAST 3LG 72M_23-12-2013
5/16
7/24/2019 GUYED MAST 3LG 72M_23-12-2013
6/16
7/24/2019 GUYED MAST 3LG 72M_23-12-2013
7/16
7/24/2019 GUYED MAST 3LG 72M_23-12-2013
8/16
7/24/2019 GUYED MAST 3LG 72M_23-12-2013
9/16
7/24/2019 GUYED MAST 3LG 72M_23-12-2013
10/16
7/24/2019 GUYED MAST 3LG 72M_23-12-2013
11/16
7/24/2019 GUYED MAST 3LG 72M_23-12-2013
12/16
7/24/2019 GUYED MAST 3LG 72M_23-12-2013
13/16
7/24/2019 GUYED MAST 3LG 72M_23-12-2013
14/16
Project for : Issued Data : 12/23/2013
Site Name : Prepared by : Nuh.ASite ID : Checked by : Nurshahib
Revision :
SN Rev Length Grade
dwg kg/m kg/pc Qty Weight
A PLATE
1 PL1 0 PL 6 56 100 SS400 2.64 0.26 66 17.41
2 PL2 0 PL 6 63 100 SS400 2.97 0.30 6 1.78
3 PL3 0 PL 6 57 100 SS400 2.68 0.27 66 17.72
4 PL4 0 PL 6 67 100 SS400 3.16 0.32 6 1.89
5 PL5 0 PL 6 59 100 SS400 2.78 0.28 66 18.34
6 PL6 0 PL 6 67 100 SS400 3.16 0.32 6 1.89
7 PL7 0 PL 6 60 100 SS400 2.83 0.28 66 18.65
8 PL8 0 PL 8 60 100 SS400 3.77 0.38 6 2.26
9 PL9 0 PL 16 160 160 SS400 20.10 3.22 3 9.65
10 PL10 0 PL 16 160 160 SS400 20.10 3.22 18 57.88
11 PL11 0 PL 16 175 175 SS400 21.98 3.85 3 11.54
12 PL12 0 PL 16 175 175 SS400 21.98 3.85 18 69.24
13 PL13 0 PL 16 195 195 SS400 24.49 4.78 3 14.33
14 PL14 0 PL 16 195 195 SS400 24.49 4.78 18 85.97
15 PL15 0 PL 16 210 210 SS400 26.38 5.54 3 16.6216 PL16 0 PL 16 210 210 SS400 26.38 5.54 18 99.70
17 PL17 0 PL 16 210 210 SS400 26.38 5.54 3 16.62
18 PL18 0 PL 10 100 670 SS400 7.85 5.26 36 189.34
19 PL19 0 PL 10 100 660 SS400 7.85 5.18 36 186.52
20 PL20 0 PL 10 100 645 SS400 7.85 5.06 36 182.28
21 PL21 0 PL 10 100 630 SS400 7.85 4.95 36 178.04
22 PL22 0 PL 8 100 120 SS400 6.28 0.75 24 18.09
23 PL23 C PL 12 150 400 SS400 14.13 5.65 6 33.91
Sub Total : 1,249.65
Profile Weight PerunitMark no.
MATERIAL LIST
SAKERNAN
-
C
GUYED MAST TOWER 3LG 72M
PT.TRANSPORTASI GAS INDONESIA
7/24/2019 GUYED MAST 3LG 72M_23-12-2013
15/16
Site ID :
Vendor :
Project : Guyed Mast Tower 3LG 72M
Site Name : Sakernan
Tower Height : 72M
Scope of Works : Guyed Mast Tower and Foundation
Project Manager :
Issued Date : 12/23/2013
No Qty Unit Unit Price IDR Total Price IDR Amount IDR Comment
I Site Preparation -
1 Site Survey
- Java - Ls
- Outside Java 1.00 Ls
- Islands - Ls
2 Mobilization dan Demobilization
- Java - Ls
- Outside Java 1.00 Ls
- Islands - Ls
II Steel Material Tower -
1 Steel Material and Fabrication
- Plate, Round Bar and Pipe Included Bolt, Nuts and Washer 6,000.00 kg
- Plate and Angle Included Bolt, Nuts and Washer - kg
2 Delivery 6,000.00 kg
3 Galvanizing (Hot Deep and Cold Galvanizing) 6,000.00 kg
4 Erection 6,000.00 kg
5 Painting 6,000.00 kg
III Finishing of Works -
1 Site Recondition - Ls2 Dock for ATP and Site Binder (BAST) - Ls
IV Base Frame Shelter of Works -
1 Base frame WF - 200 x 100 x 5.5 x 8 (Hot Deep Galvanized) - kg
2 HILTI + Chemical Fishes M16mm - 240mm - set
V Foundation Tower Strengthening of Works -
1 - m3
2 Foundation Bore Pile diameter 40 cm 132.00 m'
3 HILTI - HIT RE - 500 (with rebar) / Fisher FIS380C - set
4 HILTI HVU+HAS-N (8.8) M20-280 - set
5 HILTI HIT RE 500 - set
6 HILTI HIT RE 500 HAS E-F (M16-150mm) - set
7 HILTI - HVU - HAS - E - F (M16 - 500mm) - set
8 HILTI - HVU - HAS - E - F (M20 - 300mm) - set
9 HILTI - HVU - HAS - E - F (M24 - 290mm) - set
10 HILTI - HVU - HAS - E - F (M27 - 340mm) - set
11 Chipping existing footing / building floor (Included water profing) - set
12 Casing Concrete Diameter 80cm -100cm (Material) - m'
13 Short Well Digging Diameter 100cm (Excavation) - m'
14 SIKAGROUT 214 -11 Injection (Zak@25 kg) Grouting - point
15 SIKATOP 107 - SEAL (Zak@25 kg) Waterproofing - m2
16 SIKADUR - 31 - (Zak@6 kg/set) Coring - point
17 SIKADUR - 752 - (Zak@10 kg/set) Crack - m2
18 Welding - point
19M ov in g M at er ia l Tower fo r E xt en d & St re ng th eni ng In cl ud ed Ac cesso ri es to Roof Top B ui ld ing - kg
20 Moving Material to Roof Top Building
- Poles 3 meter Included Accessories - pcs
- Poles 6 meter Included Accessories - pcs
- Poles 9 meter Included Accessories - pcs
- Poles 12 meter Included Accessories - pcs
- Poles 15 meter Included Accessories - pcs
21 Guy Wire dia 10mm Included Accessories - m'
Guyed Mast Tower 3LG 72M Project 2013
Item Works
Concrete pouring with reinforcement steel bar (incl uded excavation and compaction)
7/24/2019 GUYED MAST 3LG 72M_23-12-2013
16/16
Site ID :
Vendor :
Project : Guyed Mast Tower 3LG 72M
Site Name : Sakernan
Tower Height : 72M
Scope of Works : Guyed Mast Tower and Foundation
Project Manager :
Issued Date : 12/23/2013
No Qty Unit Unit Price IDR Total Price IDR Amount IDR Comment
Guyed Mast Tower 3LG 72M Project 2013
Item Works
22 Guy Wire dia 12mm Included Accessories
- Guy Wire dia 12mm (IWRC) 1,056.84 m'
- Cable Clamp / Wire Clip for Wire M12 (Gunnebo) 144.00 pcs
- Turnbucle Eye and Eye M12 (Gunnebo) 24.00 pcs
- Thimble (Gunnebo) 48.00 pcs
- Steel Cable End Crimp Shoe (IWRC) 48.00 pcs
- Steel Wire Turnbuckle Anti Rotation Loop M6 (IWRC) 6.00 pcs
- Cable Clamp / Wire Clip for Wire M6 (Gunnebo) 12.00 pcs
- Shackle(Gunnebo) 24.00 pcs
VI Supply, Delivery and Install Antenna Mounting (FR + MW) -
1 - set
2 - set
VII Supply, Delivery and Install Grounding System -
1 Splitzen + Aluminum 60 mm - set
2 Steel Cable Wire 80mm - m'
3 AAC 70mm2 (Aluminum) - m'
4 Copper Lightning Arrester 30 cm - pcs
5 Aluminum Busbar 300mm x 50mm x 8m - pcs
6 PVC Pipe 1'' (Inch) - m'
7 PVC Pipe 1'' Flexible 1'' (Inch) - m'8 Repositioning Lightning rod and Support - Ls
9 Repositioning OB-Light and Support - Ls
VIII -
1 38.296 m3
2 4,972.222 kg
-
-
PT. TGI Vendor
Supply, Delivery and Install Antenna Mounting 3 Sectoral for poles included U-bouts, nuts, bouts and washer
Supply, Delivery and Install Antenna Mounting 1 Sectoral for poles included U-bouts, nuts, bouts and washer
Rounding
Miscellaneous of Works
Concrete Works ( K-225 With SK SNI 03.2002 Standard) Include Volume of Bored Pile
Steel Weight (SNI 07.2052 1990/JIS G-3112 Standard)
Grand total Included Overhead + Profit