Upload
aditya-pranoto
View
115
Download
16
Tags:
Embed Size (px)
DESCRIPTION
1
Citation preview
PT. GUNANUSA UTAMA
FABRICATORS
ENGINEERS AND CONSTRUCTORS
Fabrication Yard
Head Office
Branch Office
YARD & OFFICE LOCATION
Jl. Bendungan Hilir Raya No.60, Jakarta 10210,
IndonesiaPhone : 62 - 021 - 5703329 Fax. : 62 - 021 – 5703334
Desa Margasari, Bojonegara, Cilegon, Banten, Indonesia
Phone : 62 - 0254 - 500088, 500089
Fax. : 62 - 0254 – 500087
Jl. Bung Tomo RT.23 No.24Sungai Keledang – Smarinda Seberang,
75131East Kalimantan, Indonesia
Phone : 62 - 0541 – 7084123 Fax. : 62 - 0541 – 261565
FOUNDER : Ir. IMAN TAUFIK
ESTABLISHED : 22 DECEMBER 1980
STARTED OPERATION : 01 NOVEMBER 1983
AUGUST, 1999 : CERTIFIED ASME STAMPS (U,U2,S)
FOR MANUFACTURING OF
PRESSURE VESSELS AND BOILER
DECEMBER, 1999 : CERTIFIED ISO 9001- 2000 (LLOYD
REGISTER)
COMPANY HYSTORY
SPECIALIZING IN TURNKEY PROJECT :
1. Oil and Gas Industries, Offshore Platform, Gas
Processing Plant, Pressure Vessel & Module.
2. Petrochemical And Power Plant3. Heavy Industries.4. Infrastructure.
COMPANY EXPERTISE
VISION
To be a world class EPC Company
MISSION
To be a leader in Oil & Gas Construction in Asia
To achieve zero defect and deliver
competitive product on time
To meet International Standard with concern on Health, Safety
and Environment
VISION & MISSION
MANAGEMENT
Our primary asset is the knowledge and experience of our people, The senior staff has over fifteen years of experience.
This strength plus commitment to HSE, on time product delivery and acceptable quality is our competitive advantage and foundation of our culture.
Logistic Manager
HSE Manager
QC Manager
Yard Manager
Contract/Cost Manager
Engineering Manager
Vice President Commercial
Sigit Purwanto
Vice President Commercial
Sigit Purwanto
Vice President Bus.Development Darpin Manggus
Vice President Bus.Development Darpin Manggus
Marketing Manager
Bidding Manager
LegalLegal
President DirectorDR. Samad SolbaiPresident DirectorDR. Samad Solbai
Board Of Commissioners
Board Of Commissioners
Vice President Operations
Eddy Rijanto
Vice President Operations
Eddy Rijanto
Line Of Coordination
Line Of Command
Vice President Finance
John George Ritchie
Vice President Finance
John George Ritchie
Internal Audit
Internal Audit
Senior Procurement
Manager
Procurement Manager
Project Support Manager
HRD Manager
Pers. Adm. & GA Manager
New Business Unit
Finance Manager
Account Manager
MIS Manager
Corporate Affairs
Risk Assessment Manager
Audit CommitteeAudit Committee
QA Manager
* CORPORATE CULTURE *
Team Work, Discipline, Competent And Innovative
• QUALITY POLICY *Committed to Customer’s requirements and satisfaction through
measurable quality objective and continues improvement
QUALITY POLICY & CORPORATE CULTURE
No Fatality
No Lost Time Injury
No Medical Treatment Injury
No Damage ToThe Environment
No Accident Resulting In Lost Or Damage To Company’s
And Contractor’s Assets
HSE ZERO TARGETS
ENGINEERING
PROCUREMENT
FABRICATION&
CONSTRUCTION
INSTALLATION &OFFSHORE HOOK-UP
TESTING AND PRE-COMMISSIONING
COMMISSIONING & START-UP
RANGE OF SERVICES
• IRIS, CAESAR II, NOZZLE PRO
Fully Equipped with Hardware and
Software X-STEEL* AUTO CAD* PDMS
• FINGLOW• PV ELITE • PRIMAVERA
• MS. PROJECT
StructureDrafting
PV Design Reporting
Mechanical & Piping
Construction Engineering
Qualified Experience Personnel
RANGE OF SERVICES (Continue) Engineering
Qualified Experience of Personnel in Oil and Gas Project
Familiar with Materials And Equipment
Specifications in Oil & Gas Industries (ASME, BS, API
etc)
Outsourcing from all over the world,
as per preference vendor list given by
Client
Offices are in Jakarta, Houston and Singapore
Inspection world wide: ITEX (Europe), WISCO
(USA), MOODY INT’L (Asia), DNV, LLOYD
RANGE OF SERVICES (Continue)Procurement
RANGE OF SERVICES (Continue)Fabrication & Construction
OFFSHORE PLATFORMS
MODULE, DECK, JACKET, PIPELINE, ETC
FLOATING FACILITIES EQUIPMENTS
* MOORING BUOY
* FLOATING PRODUCTION
UNIT (FPU)
* TENSION LEG PLATFORM
(TLP)
PROCESS EQUIPMENT
* PRESSURE VESSELS
AND TANKS
* FILTRATION PACKAGES
* BOILERS AND WASTE HEAT RECOVERY BOILERS.
CONTROL BUILDING & WORKSHOP BUILDING
SITE CONSTRUCTION
* OFFSHORE PLATFORM
* PIPING, ELECTRICAL,
INSTRUMENT AND MECHANICAL
* BLOCK STATION
Our Services
Covering all tests, checks and inspections as per specification required.
RANGE OF SERVICES (Continue)Testing & Pre-Commissioning
Installation Execution
Our Services
RANGE OF SERVICES (Continue)Installation & Offshore Hook-Up
Hook-Up ExecutionAnd
To Assist Our Clients During Commissioning And Start-Up
Our Services
RANGE OF SERVICES (Continue)Commissioning & Start-Up
• Total E & P Indonesie
• Unocal Indonesia Company
• ConocoPhillips
• BP Indonesia
• Premier Oil
• Amerada Hess
• Total E & P Indonesie
• Unocal Indonesia Company
• ConocoPhillips
• BP Indonesia
• Premier Oil
• Amerada Hess
• Santos
• CNOOC
• ExxonMobil
• Caltex • Kodeco Energy Co.
Ltd.
• Pertamina
• Santos
• CNOOC
• ExxonMobil
• Caltex • Kodeco Energy Co.
Ltd.
• Pertamina
Others
MAJOR CLIENT LIST
AREA NETWORK
GUNANUSA FABRICATION YARD
YARD LAYOUT
FABRICATION YARD FACILITIES TECHNICAL DATA
Total Area : 176.559 SQMOffice Area : 1.900 SQMShop Area : 10,000 SQMWorking Table : 7.055 SQMBearing Capacity : 37 Tons/SQM (Average)Power Source - PLN : 1,730 KVA Generators : 1,625 KVA Warehouse : 1,400 M2
Fully equipped with fabrication facilities e.g : Crawler Crane 80-225 MT lifting capacity, Air Compressor 725 CFM, Overhead Crane 5-40 MT lifting capacity, Welding machine 400-600 A, Cherry Picker 10-20 MT, etc.
JETTY - I JETTY - II- Module Weight 3,000 Tons 4 Legs 3.000 Tons 4 legs
6,000 Tons Multi Legs 6,000 Tons Multi Legs- Single Load 1300 Tons 1,300 Tons- C/C of Skid Way 12.00 & 20 M 15,24 M- Skid Way Length 300 M 153 M- Water Depth 6 M 7 M- Anchor Dead Man 1,000 T
or 300 Tons Fraction-Standard Skid Shoe 60 CM X 6 M 60 CM X 6 M
FABRICATION YARD PRODUCTION CAPACITY
- Piping Shop : 566,000 M.hrs / year- Pressure Vessel Shop : 258,000 M.hrs / year- Instrument : 100,000 M.hrs / year- Electrical : 80,000 M.hrs / year- Open Area : 2,805,000 M.hrs / year- TOTAL : 3,779,000 M.hrs / year
CANTEEN
CLINIC & AMBULANC
E
ACCOMMODATION
FABRICATION YARD FACILITIES
OFFICE
HEAVY CONSTRUCTION SHOP
FABRICATION YARD FACILITIES
(Con’t)(Con’t)
WAREHOUSE & BONDED AREA
AUTO BLASTING MACHINE SHOP
FABRICATION YARD FACILITIES (Con’t)
ERECTION AREA
FABRICATION YARD FACILITIES (Con’t)
LOAD OUT FACILITIES
JETTY-1
JETTY-2
FABRICATION YARD FACILITIES (Con’t)
WELDING SCHOOL
SISI NUBI PRODUCTION SEPARATION PLATFORM PROJECTSN 1 / EPSC 1
Client : TOTAL E&P INDONESIE
Location : Sisi Nubi Area East Kalimantan
Scope of Works: * EPCI CONTRACT* Weight 3500 MT, 12 Legs, 8000 MT Incl. Site Work
Award Date : December 2004
Project Duration : 23 Months
BP TANGGUH GAS PRODUCTION FACILITIES PROJECT
Client : SAIPEM / BP INDONESIALocation : Tangguh Field ( Irian Jaya )
Scope of Works : • Part Of Procurement + Fabrication Of Two Jackets, Decks and Piles, with total weight 10,900 MT.
Awarded Date : March, 2005
Fabrication Duration : 12 Months
HEAT RECOVERY STEAM GENERATOR – ALSTOM
ASTORIA ENERGY PROJECTClient : Alstom Power Inc.Project Location : Astoria District, New York
Scope of Works : Fabrication and Assembly of HRSG module frame (2500 Ton), pipe spool, E&I
Load Out : Multi-wheel MethodSchedule Duration : 8 MonthCompletion : 2005
PECIKO OFFSHORE DEV. PROJECT PHASE 4 / EPSC 2Client : SAIPEM / TOTAL E & P Indonesie Project Location : Peciko Area - East Kalimantan
Scope of Works : Engineering, Procurement, Construction of :* 2 Satellite Wellheads Platform 4 Legs SWP E & K, 1700 Ton/Ea * 2 Jackets 4 Legs SWP E & K, 800 Tons / Ea, * 1 Temporary Drilling Deck * Offshore Hook-Up & Modification of 4 Existing Platform
Major Processing Facilities Supplied :* Pedestal Crane* Wellhead Control Panel* Emergency Diesel Generator* Fire Detection System* Pumps and Mechanical Injection Package* Test Separator BS - 5500* CCTV* Test Separator BS - 5500
Load Out : Skidding MethodProject Schedule Duration : 30 MonthCompletion : 2004
Client : HALLIBURTON / CONOCOProject Location : South Cina Sea
Gunanusa Scope of Works :Supply & Fabrication of WORKSHOP Building with Total Weight 320 Tons
Major Equipment : * Switch Gear Supplied* Fire & Gas System* Transformer* Panels Shop Equipment* HVAC Shop & Lab Equipment
Load Out : Multi-wheel MethodSchedule Duration : 9 MonthCompletion : 2003
WORKSHOP BUILDING FOR
BELANAK FPSO DEV. PROJECT
Client : HALLIBURTON / CONOCO
Project Location : South Cina Sea Scope of Works :Supply & Fabrication of Electrical Building (5 buildings) with Total Weight 1300 Tons.
Major Equipment : Switch Gear Transformer HVAC Fire & Gas System Communication System
Load Out : Multi-wheel MethodSchedule Duration : 14 MonthCompletion : 2003
ELECTRICAL BUILDING FOR BELANAK FPSO DEV.
PROJECT
Major Processing Facilities Supplied : Test Separator Flotation Unit Piping and Equipment Installation HVAC Electrical, Instrumentation, Telecommunication and Control Cold Vent System
Load Out : Skidding MethodProject Schedule Duration : 11 MonthsCompletion : 2003
OILY WATER TREAMENT (OWT) PLATFORM
Client : Total E & P Indonesie
Project Location : Tunu / Tambora, East Kalimantan
Scope of Works : Engineering, Procurement, Construction, Pre-commissioning, Offsite Works And Installation of OWT Platform With 700 MT Deck and 1,500 MT Incl. Site.
Major Processing Facilities Supplied : Pedestal Crane Pumps Wellhead Control Panel Telemetry System Emergency Diesel Generator Thermo Electric Generator (TEG) Test Separator BS – 5500 Burner Drum
Load Out : Skidding MethodProject Schedule Duration : 18 MonthCompletion : 2002
PECIKO OFFSHORE DEV. PROJECT PHASE 3 / EPSC1
Client : TOTAL E & P Indonesie Project Location : Peciko Area, East Kalimantan
Scope of Works : Engineering, Procurement, Construction, Installation of Satellite Wellhead Platform consist of Deck 1200 MT, Jacket 800 MT, Pipeline 4 KM, Duplex Piping 108 MT
ATTAKA OSCAR PLATFORM – UNOCAL PROJECTClient : Unocal Indonesia Company
Project Location : Attaka Field, Tg. Santan
Scope of Works : Engineering, Procurement, Construction, Pre-commissioning and Installation of Deck 541 T, Jacket (4 Legs) 234 T, Pile 352 T, Pipeline 12 ¾” 17 KM (Length)
Major Equipment :
- Wellhead Control Panel- Pressure Vessel- Solar Power Supply Equipment- Utilities air compressor - Chemical Injection Skid- Oil Disposal Tube- Crude Pump- E & I, Telecommunication and Control
Load Out : Skidding MethodProject Schedule Duration : 9 MonthCompletion : 2002
Client : TOTAL E & P IndonesieProject Location : TUNU Field, East Kalimantan
Scope of Works : Engineering, Procurement, Construction and Installation of 16 Legs Platform With 5400 MT.
Major Processing Facilities Supplied :Gas Turbine, Slug Catcher, Generator Package & Fuel Gas Package, Gas Compressor Suction & Discharge Scrubber, Gas Compressor Discharge Air Coolers, Piping & Equipment Installation, HVAC, Condensate, Coloumn, Tank & Press. Vessels, Electrical Distribution, Instrumentation & Control (DSC & PLC), Telecommunication (SCADA System), Flare Boom & Burn Pit
Load Out : Skidding MethodCompletion : 2002
TUNU FIELD DEVELOPMENT PHASE 8
Client : TOTAL E & P IndonesieProject Location : TUNU Field, East Kalimantan
Scope of Works : Engineering, Procurement, Construction and Installation of 16 Legs Platform with 4900 MT, Offsite Work and Modification of CPU 1 & 2.
Major Processing Facilities Supplied :Gas Turbine, Slug Catcher, Generator Package, Gas Compressor Suction & Discharge Scrubber, HVAC, Column, Tank & Press. Vessels, E & I, Telecommunication (SCADA System), Flare Boom & Burn Pit
Load Out : Skidding MethodCompletion : 2000
TUNU COMPRESSION PLATFORM (TCP) PHASE 7
Client : ELF Brunei / Bougues Offshore Project Location : Brunei Darussalam Scope of Works :Construction of SWP, CP Platform, And Temporary Drilling Deck (400 MT), Jacket (4 Legs) 950 MT, Pile 60” (1100 MT), Conductor 30” (504 MT), Boat Landing 82 MT, Deck 1050 MT, Vent Boom 60 MT.
Schedule duration : 16 MonthsCompletion : 1999
MAHARAJALELAJAMALULALAM PROJECT
NPU & ASSOCIATED OFFSITES & CAMP FACILITIES
Client : TOTAL E & P IndonesieProject Location : Terentang River, East Kalimantan
Scope of Works :Engineering, Procurement, Construction, Installation And Offsite Work Of Platforms (14 Legs) With 4200 MT.
Major Processing Facilities Supplied :Gas Compressor Suction, HVAC, Column, Tank & Press. Vessels, Control (DSC & PLC), Telecommunication (SCADA System).
Load Out : Skidding MethodSchedule Duration : 20 MonthCompletion : 1998
SITE CONSTRUCTION
Site Work For NPU TUNU Project TOTAL E & P INDONESIE
Scope Of Work :
Camp Facilities, Helipad, Jetty, All Civil Work, FWP Platform 450 MT, Telecom Tower, 2 Flare Tower, Diesel Storage Tank, Walkway, And Associated Facilities, others.
Site Work For CPU 1 & 2 ProjectsTOTAL E & P INDONESIE
SITE CONSTRUCTION
Scope Of Work :Offsite Facilities, Flare Stack (65 m), Burn Pit, Etc.
SITE INSTALLATION
Installation Of NCP DeckTOTAL E & P INDONESIE
SITE INSTALLATION
Installation Of TCP Deck (ACSF)TOTAL E & P INDONESIE
GUNANUSA SAFETY AWARD
SAFETY AWARD
SAFETY AWARD
SAFETY AWARD
SAFETY AWARD
SAFETY AWARD
GUNANUSA STANDARD QUALITY
STANDARD QUALITY
STANDARD QUALITY
STANDARD QUALITY
STANDARD QUALITY
STANDARD QUALITY
PT.GUNANUSA UTAMA FABRICATORSBusiness Development Division
Jl. Bendungan Hilir Raya no. 60, Jakarta 10210 Indonesia
Phone : 62 - 021 - 5703329 Fax : 62 - 021 - 570 3334
PT.GUNANUSA UTAMA FABRICATORSBusiness Development Division
Jl. Bendungan Hilir Raya no. 60, Jakarta 10210 Indonesia
Phone : 62 - 021 - 5703329 Fax : 62 - 021 - 570 3334
E-mail : [email protected]
Website : http://www.gunanusautama.com