16
TRAFFICWARE CONNECTED VEHICLE MODULE GULF REGION ITS 2016 CONNECTED VEHICLE: THE “T ALKING INTERSECTION

GULF REGION ITS 2016 · GULF REGION ITS 2016 ... –Shared ATMS-CV Server (High Power Server) –Tandem CV Server •Bandwidth – Minimum 5Mbps DL/UL ... Red Max Ped Preempt Cycle

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GULF REGION ITS 2016 · GULF REGION ITS 2016 ... –Shared ATMS-CV Server (High Power Server) –Tandem CV Server •Bandwidth – Minimum 5Mbps DL/UL ... Red Max Ped Preempt Cycle

TRAFFICWARE CONNECTED VEHICLE MODULE

GULF REGION ITS 2016

CONNECTED VEHICLE:

THE “TALKING INTERSECTION”

Page 2: GULF REGION ITS 2016 · GULF REGION ITS 2016 ... –Shared ATMS-CV Server (High Power Server) –Tandem CV Server •Bandwidth – Minimum 5Mbps DL/UL ... Red Max Ped Preempt Cycle

TRAFFICWARE CONNECTED VEHICLE MODULE

CONNECTED VEHICLES • Vehicle Connectivity to Infrastructure, Devices, Peers

• Broad Topic with Several Subsets

• Requires Vehicle Connectivity and Platforms for Data Transfer

• Standards, Protocols, Cooperation

Page 3: GULF REGION ITS 2016 · GULF REGION ITS 2016 ... –Shared ATMS-CV Server (High Power Server) –Tandem CV Server •Bandwidth – Minimum 5Mbps DL/UL ... Red Max Ped Preempt Cycle

TRAFFICWARE CONNECTED VEHICLE MODULE

TRAFFIC SIGNALS: WHERE DO WE FIT?

• Autonomous Vehicles (AV)

• Vehicle to Vehicle (V2V)

• Vehicle to Infrastructure (V2I)

• Infrastructure to Vehicle (I2V)

Page 4: GULF REGION ITS 2016 · GULF REGION ITS 2016 ... –Shared ATMS-CV Server (High Power Server) –Tandem CV Server •Bandwidth – Minimum 5Mbps DL/UL ... Red Max Ped Preempt Cycle

TRAFFICWARE CONNECTED VEHICLE MODULE

INFRASTRUCTURE TO VEHICLE

• Real Time Traffic Signal Data

– Signal Status

– Detection Status

– Event Status

– Signal Timing Settings/Parameters

• Future: Feedback Systems (V2I)

Page 5: GULF REGION ITS 2016 · GULF REGION ITS 2016 ... –Shared ATMS-CV Server (High Power Server) –Tandem CV Server •Bandwidth – Minimum 5Mbps DL/UL ... Red Max Ped Preempt Cycle

TRAFFICWARE CONNECTED VEHICLE MODULE

AVAILABLE SOLUTIONS

ATMS Aggregation DSRC

SPaT, MAP, non-standardized SPaT, MAP, standardized

No Additional Hardware Radios in Each Cabinet

Mobility (b/c more latency) Safety (b/c less latency)

Broader Applications Specific Applications

They are not competing solutions. They are solving two different problems.

Page 6: GULF REGION ITS 2016 · GULF REGION ITS 2016 ... –Shared ATMS-CV Server (High Power Server) –Tandem CV Server •Bandwidth – Minimum 5Mbps DL/UL ... Red Max Ped Preempt Cycle

TRAFFICWARE CONNECTED VEHICLE MODULE

BANDWIDTH AND AVAILABILITY TRENDS

image from Nielsen Normal Group https://www.nngroup.com/articles/law-of-bandwidth/

image from Aventurine http://www.aventurine.com/moores-law-where-is-it-headed/

image from WiFiConnecticut Blog https://wificonnecticut.wordpress.com/

Page 7: GULF REGION ITS 2016 · GULF REGION ITS 2016 ... –Shared ATMS-CV Server (High Power Server) –Tandem CV Server •Bandwidth – Minimum 5Mbps DL/UL ... Red Max Ped Preempt Cycle

TRAFFICWARE CONNECTED VEHICLE MODULE

PROJECTS/MODULES Several agencies are exploring or already deployed

Page 8: GULF REGION ITS 2016 · GULF REGION ITS 2016 ... –Shared ATMS-CV Server (High Power Server) –Tandem CV Server •Bandwidth – Minimum 5Mbps DL/UL ... Red Max Ped Preempt Cycle

TRAFFICWARE CONNECTED VEHICLE MODULE

Silicon Valley: Palo Alto

NATIONAL IMPORTANCE OPEN SOURCE TRAFFIC SIGNAL DATA:

Palo Alto will provide access to traffic signal data for connected vehicle applications via an “open source” model.

MARKET RESPONSE: SHOVEL READY:

Using an infrastructure that already exists, with a communications network and processing power that’s readily accessible, could make this transformative.

Page 9: GULF REGION ITS 2016 · GULF REGION ITS 2016 ... –Shared ATMS-CV Server (High Power Server) –Tandem CV Server •Bandwidth – Minimum 5Mbps DL/UL ... Red Max Ped Preempt Cycle

TRAFFICWARE CONNECTED VEHICLE MODULE

LAS VEGAS CES 2014

Page 10: GULF REGION ITS 2016 · GULF REGION ITS 2016 ... –Shared ATMS-CV Server (High Power Server) –Tandem CV Server •Bandwidth – Minimum 5Mbps DL/UL ... Red Max Ped Preempt Cycle

TRAFFICWARE CONNECTED VEHICLE MODULE

CONNECTED VEHICLE MODULE • Real Time Traffic Signal Data

• Installed along side ATMS.now Server

• Dual Broadcast Mechanisms – Standalone Broadcast System

– Third Party Connections

• User Preferences, Broadcast Definitions

• Secure Sockets Layer (SSL) Authentication

• Broadcasts to Specified IP/Port

Page 11: GULF REGION ITS 2016 · GULF REGION ITS 2016 ... –Shared ATMS-CV Server (High Power Server) –Tandem CV Server •Bandwidth – Minimum 5Mbps DL/UL ... Red Max Ped Preempt Cycle

TRAFFICWARE CONNECTED VEHICLE MODULE

INFORMATION FLOW

Intersections ATMS Aggregator/ Distributor

Public

Page 12: GULF REGION ITS 2016 · GULF REGION ITS 2016 ... –Shared ATMS-CV Server (High Power Server) –Tandem CV Server •Bandwidth – Minimum 5Mbps DL/UL ... Red Max Ped Preempt Cycle

TRAFFICWARE CONNECTED VEHICLE MODULE

REQUIREMENTS

• ATMS.now – Aggregates Data & Settings

• Connected Vehicle (CV) Server

– Shared ATMS-CV Server (High Power Server)

– Tandem CV Server

• Bandwidth – Minimum 5Mbps DL/UL

Page 13: GULF REGION ITS 2016 · GULF REGION ITS 2016 ... –Shared ATMS-CV Server (High Power Server) –Tandem CV Server •Bandwidth – Minimum 5Mbps DL/UL ... Red Max Ped Preempt Cycle

TRAFFICWARE CONNECTED VEHICLE MODULE

INFORMATION CONTENT Lights Times Detects Events Sync

Red Max Ped Preempt Cycle

Yellow Min Veh Bus Pattern

Green Ped Bike Train Sequence

Walk Split

Ped Clear

Don’t Walk Intersections

Page 14: GULF REGION ITS 2016 · GULF REGION ITS 2016 ... –Shared ATMS-CV Server (High Power Server) –Tandem CV Server •Bandwidth – Minimum 5Mbps DL/UL ... Red Max Ped Preempt Cycle

TRAFFICWARE CONNECTED VEHICLE MODULE

APPLICATIONS • Improve Fuel Usage

– Engine Start/Stop, Ideal Speed

• Improve Driver Awareness – Notifications/Warnings on Light Changes

• Improve Public Access to Information – Congestion Reporting, Routing

• Improve Logistical Operations – Access to Historical Data

Aggregator/ Distributor

Public

Page 15: GULF REGION ITS 2016 · GULF REGION ITS 2016 ... –Shared ATMS-CV Server (High Power Server) –Tandem CV Server •Bandwidth – Minimum 5Mbps DL/UL ... Red Max Ped Preempt Cycle

TRAFFICWARE CONNECTED VEHICLE MODULE

WHAT HAVE WE LEARNED? • This is a service, not an income stream…

– This is about increasing mobility, safety, and efficiency to your public by leveraging data you already have.

• If you build it, they will come… – Agencies have “hidden” their data for years. So, people are just now exploring and

seeing the possibilities. No one can predict the “killer app”

• Share and let the “crowd” provide solutions… – The ROI is massive. By sharing the data, you enable third parties to solve problems

and improve traffic at little to no cost to the agency.

Page 16: GULF REGION ITS 2016 · GULF REGION ITS 2016 ... –Shared ATMS-CV Server (High Power Server) –Tandem CV Server •Bandwidth – Minimum 5Mbps DL/UL ... Red Max Ped Preempt Cycle

TRAFFICWARE CONNECTED VEHICLE MODULE

Discussion and Q/A

GULF REGION ITS 2016