Guidelines for Slope Management in Subdivisions Cardinia Shire Council – Pakenham East Precinct Structure Plan Prepared by Urban Design & Management Pty Ltd December 2017

Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

Embed Size (px)

Citation preview

Page 1: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

Guidelines for Slope Management in Subdivisions Cardinia Shire Council – Pakenham East Precinct Structure Plan

Prepared by Urban Design & Management Pty Ltd

December 2017

Page 2: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council

Page 2

Purpose These guidelines have been developed to ensure that development of land on the hillsides within the Pakenham East PSP area is appropriately designed to respond to the undulating topography and identified view sheds, and to minimise the amount of disturbance to the natural topography through earthworks associated with building construction, and construction of roads and associated infrastructure.

The more significant areas with a slope of greater than 10% within the PSP area are located on visually prominent hillsides. It is important that the future development within the PSP area responds to the visual and landscape qualities of the area

These guidelines seek to ensure that the design response in these areas allows the retention of existing landscape and amenity values and creates a built environment that is responsive to these conditions.

Where do the guidelines apply? Any area zoned for residential purposes with a pre-development slope greater than 10% within the Pakenham East Precinct Structure Plan area in the Shire of Cardinia.

When are the guidelines required? The guidelines require that a Slope Management Plan is submitted with any planning permit application for subdivision on any land that includes an existing pre-development slope of greater than 10%.

What is a Slope Management Plan? A Slope Management Plan will be used to demonstrate that subdivision, as well as the subsequent development on lots created by the subdivision will respond to and respect the natural topography of the land. A Slope Management Plan will ensure that:

Earthworks are minimised, and utilised to provide a suitable space for future buildings; The use of retaining walls is appropriate to the overall design of the subdivision, and takes

into account the potential development on each lot; Drainage within the lots is considered and responds to the overall earthworks design of

the development; Earthwork compaction is minimised to allow appropriate landscaping and allowance is

made to ensure there is adequate space for landscaping post-construction, considering the extent of earthworks required;

Ensures that any erosion from earthworks during construction is managed and mitigated and that the final built form mitigates against erosion;

Excessive use of retaining walls is avoided, and if they are required, they are appropriately located, designed and respond to the surrounding amenity; and

The height of free standing retaining walls is limited.

Definition of Sloping Land The following tables provide assistance in interpreting the definition and categories of slope:

Flat Land with a slope gradient less than 5% Moderate Slope Land with a slope gradient of between 5% and 10% Steep Land with a slope gradient of between 10% and 15% Very Steep Land with a slope gradient of between 15% and 20% Extremely Steep Land with a slope gradient of more than 20%

Page 3: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council

Page 3

What should a slope management plan include? A Slope Management Plan submitted with a planning permit application for subdivision must include:

A site description and design response. The site description must include a plan of pre-development slope (contours) and categorise the slope into areas of less than 10%, 10-15% and 15-20% and greater than 20% (as applicable). The design response (proposed subdivision) must explain how the design derives from and responds to the slope, proposed neighbourhood character and site description.

A statement describing how any land with a pre-development slope over 10% will be subdivided and/or developed to complement adjacent land.

Subdivision that will result in buildings and works on any areas of land with slope over 20% will not be supported. The areas of slope in excess of 20% are limited within the Pakenham East PSP area, and as such, may be able to be suitably dealt with in an overall design response to land with slope of over 10%. Any design response must detail how areas of slope over 20% will be mitigated through the implementation of the Slope Management Plan.

A statement and/or diagrams detailing the proposed landscape and urban design outcomes that will be achieved to complement the slope and mitigate any impacts of retaining walls and batters.

A geotechnical report and designs by a suitably qualified engineer to confirm the stability of the natural slope and man-made soil deposits and assess risks posed by the site conditions and proposed earthworks and drainage, unless otherwise approved by the Responsible Authority (Example: to confirm soil type will support a benched outcome and drainage relating to cut).

Proposed road cross sections and long sections to demonstrate how slopes over 10% are being responded to through the design.

Details of all proposed batters, cut and fill earthworks, retaining walls, driveway crossover locations and drainage solutions required for the subdivision of land that includes an existing pre-development slope of greater than 10%.

Details of any proposed retaining walls, including overall height, staggering of retaining walls, finished levels, construction materials and associated fencing required.

Building envelopes (or an alternative design response) to respond to the slope management methods utilised.

A response to any relevant requirements and guidelines within the Pakenham East Precinct Structure Plan.

Slope gradient (rise: run)

Slope Gradient (%)

Slope Angle (Degrees)

1:3 33% 18.43 1:4 25% 14.04 1:5 20% 11.31

1:6.7 15% 8.49 1:10 10% 5.71 1:20 5% 2.86

Page 4: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council

Page 4

Slope Management Design Principles To assist in preparing a Slope Management Plan, the following key principles should be considered when designing subdivision on land that includes an existing pre-development slope of greater than 10%.

1. Street design 1A Design the street network to utilise the natural slope of the land, and consider how

the street design will impact on the need for earthworks on lots accessing the street (Council will consider up to 20% grade for a driveway). In addition to this consideration, the design of the streets should also consider how the lots will be best designed to retain view lines to and from the ridgelines.

Figure 1: Street design principles

1B Streets should be designed to respond to the natural landform, and this means they will either be located:

Following the contour line; or

Directly up/down the slope.

Alternative solutions, such as a split level divided carriageway can provide site specific solutions to grade issues where appropriate.

Figure 2: Cross-section view, Streets running along the contour

Page 5: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council

Page 5

Figure 3: Cross-section view, Streets running up/down the contour

1C In street design, the following key design criteria must be considered when deciding where to locate the streets:

Streets following the contour: cross fall grade must be 10% or less unless interfacing open space to the satisfaction of Council.

Streets up/down the slope: Preferred maximum longitudinal grade is 10%.

2. Lot layout and design 2A Based on a street design solution that responds to the design criteria above, the lot

and building solutions should be developed in conjunction with the earthworks design. This will enable a lot design solution that responds specifically to the topography, and allows for the most appropriate slope management methods to be used.

2B Lot design should respond to the street network design, and the topography of the land along the street:

Where streets are running up the slope, lot shapes should allow for building designs to manage the side to side fall of the lot through the minimsation of retaining wall height and benching between lots. This could involve wider frontages to allow for building separation and landscaping between lots, or could involve narrower lot frontages to minimise retaining wall heights and overall fencing heights on boundaries.

Figure 4: Lots could be wider to accommodate cross fall on lots with larger side setbacks where streets run up/down slope, or alternatively narrower to minimise the heights of retaining walls on side boundaries between smaller lots with minimal side setbacks

Page 6: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council

Page 6

Where streets run across the slope, lot shapes could be narrower and deeper, so that the fall from the street can be taken up across the length of the building and the lot.

Figure 5: Lots designed to be narrower and deeper to accommodate fall from front to rear/rear to front of lot

This should assist in minimising the amount of excavation and retaining walls required.

2C Depending on the extent of slope, the direction of the fall and the location of adjoining development, different lot and building options should be considered in addition to conventional slab on ground construction.

Some lot design and building considerations that may address slope more effectively than mass earthworks include solutions such as:

Split level designs;

Providing for larger lots to ensure adequate space to cater for slope management and effective landscaping around buildings;

Including single and double storey components to the building design, to address a sloping site; and if cutting and filling deeper than 1.0 metre is required, retaining walls should be staggered with a minimum of 1.0 metres between each stagger to allow for the inclusion of landscaping.

Figure 6: Examples of site response - Natural Grade 10-15% (road up/down contour)

Page 7: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council

Page 7

Figure 7: Examples of site response - Natural Grade 10% -15% (road along contour)

Figure 8: Example of site response - 15-20% Natural Grade (street along contour)

Innovative medium-high density design solutions that integrate the design with the topography and landscape. These could include split level townhouses with under croft garaging, interlocking apartments/townhouses (ie. designed as one building, accessed independently from either the low or high side adjacent streets as separate dwellings). These types of solutions will ensure that the building forms work with the natural slope, have minimal intervention with the natural grade, and can be of a scale that does not dominate the hillside.

Page 8: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council

Page 8

Figure 9: Examples of townhouse design solutions (maximum grade 20%)

Figure 10: Alternative site responsive medium density solutions to slopes in excess of 15%

The slope management plan should identify any lots that are designated for a non-conventional style of construction (as outlined above), and special design guidelines may be prepared and approved for these lots as a requirement of any planning permit issued for subdivision to ensure the outcomes are a requirement on future purchasers of the lot/s.

Page 9: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council

Page 9

3. Lot Access 3A Driveway grades can often become an issue due to the street design grade and lot

gradient and retaining wall/benching design. A maximum driveway grade of 20% (1 in 5) is allowable.

3B Depending on whether the street runs up/down the slope or follows the contour, there can be challenges with the driveway grade, and also the relationship of the driveway to road cross fall. The Slope Management Plan will need to demonstrate how lot access will be provided to enable safe access to lots from the street.

3C In particular, where streets are designed to run up/down the slope, in most cases it will be preferable to locate the driveway crossover on the low side of the lot, to ensure the driveway can be constructed with a minimal grade.

Figure 11: Up slope streets, crossovers preferred on low side of lot

4. Drainage 4A The Slope Management Plan must consider the implications of any proposed

benching and retaining walls on the drainage requirements for all lots. The Plan must indicate how drainage is going to be provided for given the proposed earthworks, to Council standards.

5. Retaining walls 5A Retaining walls are often used to assist in managing the grade change across an

area of residential development, and are generally proposed along lot boundaries to provide for a suitable buildable area on each residential lot. The Slope Management Plan must indicate the location, height and proposed materials for all retaining walls.

5B Retaining walls should be designed and located based on the following key principles. Any retaining structures should be:

No more than 1.0 metres in height between a building and a public space (ie. street open space or pathway), or where visible from a public space;

Where constructed on a boundary between two lots, either set back at least 1.0m from a building envelope, or designed to be integral to the overall building design;

Figure 12: Retaining wall setbacks

Low side crossovers minimise cut and fill and longitudinal grade of driveway

Retaining walls a minimum of 1m from the boundary, or alternatively, integrated with the overall building design

Page 10: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council

Page 10

Staggered with a minimum of 1.0 distance between each stagger to allow for the inclusion of landscaping, where cutting and filling is deeper than 1.0 metres and a retaining wall higher than 1.0m would otherwise be required;

Figure 13: Possible retaining wall solutions

Positioned so that associated drainage infrastructure and structural foundations are fully located within the same lot; and

A maximum overall height for a staggered wall of no more than 2.0 metres, to avoid unreasonable impacts from overshadowing of adjacent development.

5C Design of retaining walls will need to be cognisant of the implications on other lot infrastructure (physical services locations, fencing, and lot access). The design will need to also consider the impacts the retaining wall location will have on the buildable area on a lot, as well as how it impacts the buildable area on adjacent lots.

Figure 14: Examples of stone retaining walls (ideal for street boundaries and public space edges) and concrete sleeper walls (most suitable for retaining walls at side or rear boundaries)

Page 11: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council

Page 11

6. Lot Benching 6A Lot Benching is an earthworks construction method used in sloping areas to provide

relatively flat pads for building on, avoiding the need for retaining walls (or in conjunction with retaining walls where a combination of methods are considered the more desirable outcome). Benching may be used so that slope can be taken up in the front and rear of lots, so that a flat building pad can be provided.

Figure 15: Lot has been graded or benched with a combination of retaining walls and lot grading to ensure a flat building pad is provided

6B Lot benching must be planned across the whole ‘street block’ to ensure that it provides a manageable outcome for all future allotments. Issues arise when an area has been benched, and subsequently individual lot purchasers significantly change the earth forms, thereby creating detrimental impacts on adjoining properties as a result of their individual earthworks.

6C Slope of batters to benches on lots must be no more than 1:4 (25%).

6D The Slope Management Plan must show the location of all batters and benched areas, and the gradient and dimensions of benched areas so that the buildable area of individual lots can be considered. Details of who is responsible for these works (land subdivider or lot purchaser) must be provided.

7. Buildable Areas/ Building Envelopes 7A Subject to the design of any proposed retaining walls and /or lot benching, and

through the lot design process, buildable areas of lots should be shown on the Slope Management Plan to indicate the area and dimensions of each lot available for building. This will (once approved) need to be included in information provided to lot purchasers, so that they are aware of the area of the lot available for building.

Reference Documents March 2013, Pakenham East PSP – Slope Analysis and Design Principles for development on sloping land, SMEC Urban

Draft Pakenham East Precinct Structure Plan

Page 12: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council

Page 12

Attachments

1. Cross Sections showing analysis of possible slope responses, Pakenham East PSP

2. Photographs of poor examples of retaining wall design responses

3. Slope Analysis Plan – Pakenham East PSP

Page 13: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council

Attachment 1

Cross Sections showing analysis of possible slope responses - Pakenham East PSP

Page 14: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

General Design Principles used to achieve flat pads for slab construction:Road designed to achieve VPA Engineering guideline crossfall requirements.1:4 (25%) maximum batter.1:50 flat pad for slab construction.Aim for no higher than 1m retaining walls - if higher than 1m, to be stepped.

10 x 32m Lot product:Lots fronting park and streets require 1:4 batters at front and rear.All side boundaries require retaining to keep walls at less than 1m high (generally range from 0.7 - 0.9m, or stepped if necessary). Minimal side setbacks (1m on one boundary, 0m on other) provide limited landscaping opportunity.Integrated design required to achieve built to boundary solutions given need for retaining walls (which limits product selection on narrower lots unless they are built together).

0.7m high retaining walls plus 1:4 batters to minimise level difference between garages on same boundary

1:4 batter at street edge, plus 1`:4 batter and stepped low (0.25 and 0.5m) retaining walls at rear to take up fall

32m10m 10m 10m 10m 10m 10m 10m 10m 16m

22m4m

LOC

AL

STRE

ET

32m16m 10m

LOC

AL

STRE

ET

PARK

B

B

NATURAL SURFACE SLOPE RANGES FROM 7.7-9.5%

Section B: 10m wide lot product

L

General Design Principles used to achieve flat pads for slab construction:Road designed to achieve VPA Engineering guideline crossfall requirements.1:4 (25%) maximum batter.1:50 flat pad for slab construction.Aim for no higher than 1m retaining walls - if higher than 1m, to be stepped.

16 x 32m Lot product:Lots fronting park and streets require 1:4 batters at front and rear.Most side boundaries require retaining to keep walls at less than 1m high , and there is some opportunity to provide 1:4 batters rather than retaining walls. More opportunity to avoid built to boundary wall solutions that can impact on retaining walls given wider lot product.

Opportunity to provide batters rather than retaining walls given lower grades in some areas

1:4 batter at street edge, plus 1:4 batter and stepped low (0.25 and 0.5m) retaining walls at rear to take up fall

NATURAL SURFACE SLOPE RANGES FROM 7.7-9.5%

B

BPA

RK

LOC

AL

STRE

ET

4m

32m

LOC

AL

STRE

ET

16m 32mm6116m 16m m6116m

4m

16m

m22

22m

16m

1:4 batter at street edge, plus 1:4 batter and 1m retaining wall at rear

Section B: 16m wide lot product

General Design Principles used to achieve flat pads for slab construction:Road designed to achieve VPA Engineering guideline crossfall requirements.1:4 (25%) maximum batter.1:50 flat pad for slab construction.Aim for no higher than 1m retaining walls - if higher than 1m, to be stepped.

20 x 32m Lot product:Lots fronting park and streets require 1:4 batters at front and rear.A mix of low (less than 1m) retaining walls and 1:4 batters along side boundaries.More opportunity to avoid built to boundary wall solutions that can impact on retaining walls given wider lot product, and significantly more opportunity to provide landscaping solutions to mitigate impact of cut and fill.

Opportunity to provide batters rather than retaining walls given lower grades in some areas1:4 batter at street edge, plus 1:4

batter at rear to take up fall

1:4 batter at street edge, plus 1:4 batter and 0.5m retaining wall at rear

32m

LOC

AL

STRE

ET

PARK

16m

22m4m

32m

LOC

AL

STRE

ET

16m

m22 4m

20m 20m 20m 20m 20m

B

B

NATURAL SURFACE SLOPE RANGES FROM 7.7-9.5%

Section B: 20m wide lot product

1:4 batter plus retaining wall at street edge

Medium Density fronting park with 1:4 batter at front, will require a split level/ combination of single and two storey elements to resolve siting, with garage fronting laneway at lane level

Section B: 10m wide lot product with MDH fronting park

10 x 32m Lot product and Medium Density:All side boundaries require retaining to keep walls at less than 1m high (generally range from 0.7 - 0.9m). Minimal side setbacks (1m on one boundary, 0m on other) provide limited landscaping opportunity.Medium Density fronting park will sit beow street level to achieve suitable batters. Dwelling will need to be split level to accommodate garage access from rear lane at ground level.

General Design Principles used to achieve flat pads for slab construction:Road designed to achieve VPA Engineering guideline crossfall requirements.1:4 (25%) maximum batter.1:50 flat pad for slab construction.Aim for no higher than 1m retaining walls - if higher than 1m, to be stepped.

0.7m high retaining walls plus 1:4 batters to minimise level difference between garages on same boundary

1:4 batter at street edge, plus 1:4 batter and stepped low (0.25 and 0.5m) retaining walls at rear to take up fall

B

B

NATURAL SURFACE SLOPE RANGES FROM 7.7-9.5%

PARK

LOC

AL

STRE

ET

30m

22m4m

32m

LOC

AL

STRE

ET

16m6m

10m10m 10m 16m10m 10m 10m 10m 10m 10m

LAN

EWA

Y

© Urban Design and Management Pty Ltd www.urbandesignmgt.com.au ABN 62 525 443 156

Scale 1:500 @ A1

0 5 10 15 20m

N

Plan Ref: 15042_XS-B Rev. A Date 28 June 2017 Drawn MH

Section B-B: PEPSP Southern SlopePEPSP - Urban Design and Slope Review

NOTE This plan has been prepared based on preliminary information only. Detailed site and internal dimensions will need to be confirmed by survey. The plan is subject to review and approval by relevant authorities, and is subject to change.

UrbanDesign and management

Land Development | Project Management Planning | Urban Design | Civil Engineering

Page 15: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

Section A: 10m wide lot product

32mLO

CA

L ST

REET

LOC

AL

STRE

ET

PARK

16m 10m 10m 10m 10m 10m 10m 10m 10m 12m 16m

22m4m

A

A

General Design Principles used to achieve flat pads for slab construction:Road designed to achieve VPA Engineering guideline crossfall requirements.1:4 (25%) maximum batter.1:50 flat pad for slab construction.Aim for no higher than 1m retaining walls - if higher than 1m, to be stepped.

10 x 32m Lot product:Lot fronting park requires 1:4 batters at front and rear.All side boundaries require retaining to keep walls at less than 1m high (generally range from 0.7 - 0.9m). Minimal side setbacks (1m on one boundary, 0m on other) provide limited landscaping opportunity.

To achieve garage party wall solution, retaining on one lot boundary will be around 1.5m total height

1:4 batter plus retaining wall at street edge

NATURAL SURFACE SLOPE RANGES FROM 9-9.5%

A

A

General Design Principles used to achieve flat pads for slab construction:Road designed to achieve VPA Engineering guideline crossfall requirements.1:4 (25%) maximum batter.1:50 flat pad for slab construction.Aim for no higher than 1m retaining walls - if higher than 1m, to be stepped.

16 x 32m Lot product:Lot fronting park requires 1:4 batters at front and rear.Most side boundaries require retaining to keep walls at less than 1m high , and there is some opportunity to provide 1:4 batters rather than retaining walls. More opportunity to avoid built to boundary wall solutions that can impact on retaining walls given wider lot product.

To achieve a boundary with 1:4 batters and no retainining wall, the adjacent lot walls will need to be 1.4-1.5m high

1:4 batter plus 1m retaining wall at rear boundary to remove wall at street edge

NATURAL SURFACE SLOPE RANGES FROM 9-9.5%

32m

LOC

AL

STRE

ET

PARK

LOC

AL

STRE

ET

16m 16m 16m 32m 16m16m16m

22mm4

m61 16m

All lots with 1m retaining wall and 1:4 batters as required

Section A: 16m wide lot product

NATURAL SURFACE SLOPE RANGES FROM 9-9.5%

Opportunity to provide batters rather than retaining walls given lower grades in some areas

1:4 batter at street edge, plus 1:4 batter at rear to take up fall

1:4 batter at street edge, plus 1:4 batter and 0.5m retaining wall at rear

General Design Principles used to achieve flat pads for slab construction:Road designed to achieve VPA Engineering guideline crossfall requirements.1:4 (25%) maximum batter.1:50 flat pad for slab construction.Aim for no higher than 1m retaining walls - if higher than 1m, to be stepped.

20 x 32m Lot product:Lots fronting park and streets require 1:4 batters at front and rear.Still mostly low (up to 1m) retaining walls along side boundaries, with some opportunity on lower gradients for 1:4 batters.More opportunity to avoid built to boundary wall solutions that can impact on retaining walls given wider lot product, and significantly more opportunity to provide landscaping solutions to mitigate impact of cut and fill.

A

32m

PARK

LOC

AL

STRE

ET

LOC

AL

STRE

ET

20m 20m m0220m

6m

m23 m6120m16m

22mm4

Retaining walls still mostly required to accommodate crossfall (max 1m high)

A

Section A: 20m wide lot product

General Design Principles used to achieve flat pads for slab construction:Road designed to achieve VPA Engineering guideline crossfall requirements.1:4 (25%) maximum batter.1:50 flat pad for slab construction.Aim for no higher than 1m retaining walls - if higher than 1m, to be stepped.

10 x 32m Lot product and Medium Density:All side boundaries require retaining to keep walls at less than 1m high (generally range from 0.7 - 0.9m). Minimal side setbacks (1m on one boundary, 0m on other) provide limited landscaping opportunity.Medium Density fronting park will sit beow street level to achieve suitable batters. Dwelling will need to be split level to accommodate garage access from rear lane at ground level.

To achieve garage party wall solution, retaining on one lot boundary will be around 1.5m total height

1:4 batter plus retaining wall at street edge

NATURAL SURFACE SLOPE RANGES FROM 9-9.5%

A

ALOC

AL

STRE

ET

LOC

AL

STRE

ET

LAN

EWA

Y

PARK

30m16m 10m 10m 10m 10m 10m 10m 10m 10m 12m 16m

6m

Medium Density fronting park with 1:4 batter at front, will require a split level/ combination of single and two storey elements to resolve siting, with garage fronting laneway at lane level

Section A: 10m wide lot product with MDH fronting park

© Urban Design and Management Pty Ltd www.urbandesignmgt.com.au ABN 62 525 443 156

Scale 1:500 @ A1

0 5 10 15 20m

N

Plan Ref: 15042_XS-A Rev. A Date 28 June 2017 Drawn MH

Section A-A: PEPSP Northern SlopePEPSP - Urban Design and Slope Review

NOTE This plan has been prepared based on preliminary information only. Detailed site and internal dimensions will need to be confirmed by survey. The plan is subject to review and approval by relevant authorities, and is subject to change.

UrbanDesign and management

Land Development | Project Management Planning | Urban Design | Civil Engineering

Page 16: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council

Attachment 2

Photographs of poor examples of retaining wall design responses

: Examples of what we are trying to avoid

High Retaining walls with step driveways No ability to park in driveway

Flat pad on significant cross fall with no retaining

House in a hole

Retaining walls with batters, and more retaining walls

Not dealing with the slope at all

No sense of streetscape due to wall height

Issues of overlooking and overshadowing

Page 17: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council

Attachment 3

Slope Analysis Plan – Pakenham East PSP

Page 18: Guidelines for Slope Management in Subdivisions · Guidelines for Slope Management in Subdivisions PEPSP - Cardinia Shire Council Page 2 Purpose These guidelines have been developed

LEGENDPEPSP Area1Slope > 20%Slope 15-20%Slope 10-15%Transmission EasementContours (2.5m intervals)44

© Urban Design and Management Pty LtdScale 1:15,000 @ A3

0 150 300 450m

N

Plan Ref: 15042_SA-10% Rev. A Date December 2017 Drawn MH

Slope over 10%Pakenham East PSP

NOTE This plan has been prepared based on preliminary information only. Detailed site and internal dimensions will need to be confirmed by survey. The plan is subject to review and approval by relevant authorities, and is subject to change.

Land Development | Project Management Planning | Urban Design | Civil Engineering

UrbanDesign and management

RYA

N R

OA

D

MT A

RARA

T RO

AD

SOUT

H

MT A

RARA

T RO

AD

NO

RTH

DORE

RO

AD

OA

KVIE

W LA

NE

PRINCES FREEWAY

PRINCES HIGHWAYPRINCES HIGHWAY

CC

DEEP

CRE

EKDE

EP C

REEK

HANC

OCK

S

GUL

LY

HAN

CO

CKS G

ULLY

CANTY LANE