14
Jeju, 13 – 16 May 2013 Standards for Shared ICT GSC-17 Closing Plenary GSC-17 Closing Plenary Summary Report Summary Report KyuJin Wee, Chair KyuJin Wee, Chair Cloe HeeSung Lim, Cloe HeeSung Lim, Rapporteur Rapporteur Document No: GSC17-CL-37 Source: GSC-17 Chair, GSC-17 Rapporteur Contact: KyuJin Wee, [email protected] GSC Session: Closing Plenary Agenda Item: 6.1

GSC-17 Closing Plenary Summary Report

Embed Size (px)

DESCRIPTION

GSC-17 Closing Plenary Summary Report. KyuJin Wee, Chair Cloe HeeSung Lim, Rapporteur. GSC-17 Schedule. GSC-17 Attendance (1). Total of 85 people attended GSC-17 including Members, Observers and Sponsors:. GSC-17 Attendance (2). Members (75 Delegates) : ARIB : 7 ATIS : 7 CCSA : 6 - PowerPoint PPT Presentation

Citation preview

Page 1: GSC-17 Closing Plenary Summary Report

Jeju, 13 – 16 May 2013 Standards for Shared ICT

GSC-17 Closing Plenary GSC-17 Closing Plenary Summary ReportSummary Report

KyuJin Wee, ChairKyuJin Wee, Chair

Cloe HeeSung Lim, RapporteurCloe HeeSung Lim, Rapporteur

Document No:

GSC17-CL-37

Source: GSC-17 Chair, GSC-17 Rapporteur

Contact: KyuJin Wee, [email protected]

GSC Session:

Closing Plenary

Agenda Item:

6.1

Page 2: GSC-17 Closing Plenary Summary Report

GSC17-CL-37

GSC-17, Jeju / Korea 2

GSC-17 ScheduleGSC-17 Schedule

Page 3: GSC-17 Closing Plenary Summary Report

GSC17-CL-37

GSC-17, Jeju / Korea 3

GSC-17 Attendance (1)GSC-17 Attendance (1)

GSC-17 GSC-16 GSC-15

Jeju Halifax Beijing

May. 2013 Nov. 2011 Sep. 2010

Total Attendees 85 105 110

Opening Plenary 85 97 106

GRSC 41 45 41

GTSC 34 40 52

Admin WG 25 13 14

IPR WG 24 20 45

Closing Plenary 85 83

• Total of 85 people attended GSC-17 including Members, Observers and Sponsors:

Page 4: GSC-17 Closing Plenary Summary Report

GSC17-CL-37

GSC-17, Jeju / Korea 4

• Members (75 Delegates) :– ARIB : 7– ATIS : 7– CCSA : 6– ETSI : 8– ISACC : 3– ITU : 2– TIA : 10– TTA : 20– TTC : 9

• Task Force Chairs (5, included above)• Observers (13 representatives, one of which was

also on a PSO delegation)

GSC-17 Attendance (2)GSC-17 Attendance (2)

Page 5: GSC-17 Closing Plenary Summary Report

GSC17-CL-37

GSC-17, Jeju / Korea 5

GSC-17 Attendance (3)GSC-17 Attendance (3)

Page 6: GSC-17 Closing Plenary Summary Report

GSC17-CL-37

GSC-17, Jeju / Korea 6

• http://www.tta.or.kr/English/new/external_relations/gsc17_document.jsp

Meeting DocumentsMeeting Documents

Page 7: GSC-17 Closing Plenary Summary Report

GSC17-CL-37

GSC-17, Jeju / Korea 7

Quantity of ContributionsQuantity of Contributions

Opening Plenary

ADMIN WG

IPR WG GRSC-10 GTSC-10 Closing Plenary

Output Resolutions

84 4 12 16 6 36 28

Page 8: GSC-17 Closing Plenary Summary Report

GSC17-CL-37

GSC-17, Jeju / Korea 8

• GSC-17 Opening Plenary (GSC17-CL-02)– This report was presented and approved at the GSC-17 Closing

Plenary

• GRSC-10(GSC17-CL-03)– This report was presented and approved at the GSC-17 Closing

Plenary

• GTSC-10(GSC17-CL-04)– This report was presented and approved at the GSC-17 Closing

Plenary

• ADMIN WG(GSC17-CL-05r1)– This report was presented and approved at the GSC-17 Closing

Plenary

• IPR WG(GSC17-CL-06)– This report was presented and approved at the GSC-17 Closing

Plenary

Meeting Reports (1)Meeting Reports (1)

Page 9: GSC-17 Closing Plenary Summary Report

GSC17-CL-37

GSC-17, Jeju / Korea 9

• HoD meeting– GSC HoD Adhoc was created for the restructuring of GSC– ToR agreed as contained in the ADMIN WG report (GSC17-CL-

05r1)– Chair (Jim MacFie, ISACC), Vice Chair (Steve Barclay, ATIS)

were approved – Target date for making recommendation was agreed as 1st

January 2014

Meeting Reports (2)Meeting Reports (2)

Page 10: GSC-17 Closing Plenary Summary Report

GSC17-CL-37

GSC-17, Jeju / Korea 10

Output Resolutions (1)Output Resolutions (1)Resolution

NumberSource Title Status

GSC-17/01 PlenaryContinuing Cooperation on IMT Standardization

Revised

GSC-17/02 Plenary Emergency Communications Reaffirmed

GSC-17/03 Plenary Network Aspects of Identification Systems Reaffirmed

GSC-17/04 PlenaryIdentity Management and Identification Systems

Reaffirmed

GSC-17/06 Plenary IPTV Standards Revised

GSC-17/08 Plenary ICT and the Environment Revised

GSC-17/10 GTSCFuture Networks including enhancements of Next Generation Networks (NGN)

Revised

GSC-17/11 Plenary Cybersecurity Reaffirmed

GSC-17/12 Plenary Home Networking Reaffirmed

GSC-17/13 GRSCGlobal UWB Standardization including UWB radar and Sensor/Imaging Applications

Reaffirmed

Page 11: GSC-17 Closing Plenary Summary Report

GSC17-CL-37

GSC-17, Jeju / Korea 11

Output Resolutions (2)Output Resolutions (2)

Resolution Number

Source Title Status

GSC-17/14 PlenaryIntelligent Transport Systems (ITS) task Force

Revised

GSC-17/15 GRSC Reconfigurable Radio Systems Revised

GSC-17/17 GRSC Mobile Multimedia Broadcast and Multicast Reaffirmed

GSC-17/19 PlenaryFacilitating Liaison in Relation to Measurement Methodologies, associated Measurement Uncertainty and Calibration

Reaffirmed

GSC-17/20 GRSCRadio Microphones and Cordless Audio Standardization

Reaffirmed

GSC-17/21 GRSCBroadband Wireless Access, RLANs and ad-hoc Networking

Revised

GSC-17/22 IPR WG Intellectual Property Rights Policies Reaffirmed

GSC-17/23 IPR WG Cooperation with Patent Trademark Offices Reaffirmed

GSC-17/24 IPR WG Open Standards Reaffirmed

Page 12: GSC-17 Closing Plenary Summary Report

GSC17-CL-37

GSC-17, Jeju / Korea 12

Output Resolutions (3)Output Resolutions (3)Resolution

NumberSource Title Status

GSC-17/25 PlenaryPersonally Identifiable Information Protection

Reaffirmed

GSC-17/27 PlenaryUser Needs, Considerations and Involvement

Withdrawn

GSC-17/27 Plenary ICT Accessibility Reaffirmed

GSC-17/28 Plenary Interoperability Reaffirmed

GSC-17/29 Plenary Smart Grid Revised

GSC-17/30 Plenary Machine to Machine Revised

GSC-17/31 Plenary Service Oriented Networks Reaffirmed

GSC-17/32 Plenary Cloud Computing Revised

GSC-17/33 GRSCRadio Aspects of Electronic Article Surveillance

Withdrawn

GSC-17/34 Plenary Wireless Charging System (WCS) Revised

Page 13: GSC-17 Closing Plenary Summary Report

GSC17-CL-37

13

GSC-17 CommuniquGSC-17 Communiquéé

• Communiqué published in GSC17-CL-36r1

Page 14: GSC-17 Closing Plenary Summary Report

GSC17-CL-37

GSC-17, Jeju / Korea 14

• Sequence of hosts and locations for future GSC meetings – GSC-18, hosted by ETSI, 21st July 2014, Sophia Antipolis– GSC-19, hosted by ITU– GSC-20, hosted by ATIS/TIA– GSC-21, hosted by CCSA– GSC-22. hosted by ARIB/TTC

GSC-17 and BeyondGSC-17 and Beyond