GS-AIS On-going work
IMWG 12-Mar-2013
Eloy Reguero Fuentes, Cédric Garino
Activities created after 08 Jan 2012
Total: 1632 activities
Previous totals:X-mas break: 817 activities TS3: 848 activitiesTS2: 950 activitiesTS1: 994 activities
AD-Ring
AD-Targe
tAlice Atla
sCMS
Computing Faci
lities
East
Hall Ta
rget
HiRadMat
ISOLD
ELEI
RLH
CLH
Cb
LINAC 2
LINAC 3 PS
PS Booste
rSP
S
Surfa
ce - n
o coord
ination
nTOF
0
100
200
300
400
500
600
700
Activities per facility / week since the 08th Jan 2012
0
50
100
150
200
250
300
350
400
450
Surface - no coordinationSPSPS BoosterPSnTOFLINAC 3LINAC 2LHCbLHCLEIRISOLDEHiRadMatEast Hall TargetComputing FacilitiesCMSAtlasAliceAD-TargetAD-Ring
This week
Approvals
1439
501
155
119
16 8 2
Facility Coordinator
Safety Approval
RP Approval
Meeting Approval
Information
Location Coordinator
Other
Activities with participants > 100 #Activity Participants Title Facility15953 302 LHCb access to UX85A - Operation LHCb24074 201 PS STANDARD : Visites et Inspections - Sécurité PS24414 199 TT2 STANDARD : Visites et Inspections - Sécurité PS24309 191 PS STANDARD : Visites et Inspections - OP PS24316 191 PSB STANDARD : Visites et Inspections - OP PS Booster24654 155 BTVSS Point 2 LHC24677 155 BTVSE Point 6 LHC24676 155 BTVM Point 4 LHC24678 155 BTVST Point 8 LHC24679 155 BTVSI Point 8 LHC24663 155 BTVST Point 2 LHC24664 155 BTVSI Point 2 LHC24658 155 BTVSS Point 8 LHC24665 155 BTVM Point 3 LHC24767 130 LHCb access to UX85A - Operation - LS1 LHCb24382 123 TT2 STANDARD : maintenances générales instrumentation PS23380 122 RF commutation switch at BPMSW.1L5 LHC22100 122 Head-Tail & WCM Maintenance LHC24526 122 PSB STANDARD : maintenances générales syst. de l'instrumentation PS Booster24088 122 PS STANDARD : maintenances générales instrumentation PS22072 115 Inspection, tournée de vérification, correctifs en UW25 LHC25535 115 Piquet TE-VSC P4 LHC24440 109 UX85 - Travaux câblage new UPS LHCb23948 108 RP ALIMS-LHC SPS LHC23950 108 RP ALIMS-LHC SPS LHC24207 108 IMPACT STANDARD: maintenance générale syst refr. et ventilation SPS23923 108 RP ALIMS LDM AD-Target23949 108 RP ALIMS-LHC SPS LHC23908 108 RP ALIMS LDM PS22692 104 QU (CRYO UNDERGROUND) Maintenance CRYOPLANTS en CAVERNES - TS#4 2012 LHC20190 104 QU (CRYO UNDERGROUND) Maintenance CRYOPLANTS en CAVERNES - TS#3 2012 LHC22693 102 QU (CRYO UNDERGROUND) Préparation LS1 - CRYO TUNNEL - TS#4 2012 LHC20189 102 QU (CRYO UNDERGROUND) Préparation LS1 - CRYO TUNNEL - TS#3 2012 LHC
2.3 New features
• Public APIs (read / write / approve)• New facility “Computer facilities“• Participant notifications– Email: 1220– SMS: 901
• New RP fields (job code, specific job code, equipment code)
2.4 New features
• Visits• View / browse mode• Bulk approval• Activity scheduler refactoring• New pdf report “Activity Responsible”• New field “Individual dose alarm per intervention [uSv]”• Operational dosimetry: Impact -> Mirion
Demo as Peter : https://devpptevm.cern.ch/impact/?work_as=432750
Integration IMPACT / DOSISERVView data exposed to DOSISERV
Gather dose data from DOSISERV (v.2.5)
IMPACT: 12345IMPACT: 98765