GS-AIS On-going work

IMWG 12-Mar-2013

Eloy Reguero Fuentes, Cédric Garino

Page 2: GS-AIS On-going work IMWG 12-Mar-2013 Eloy Reguero Fuentes, Cédric Garino

Activities created after 08 Jan 2012

Total: 1632 activities

Previous totals:X-mas break: 817 activities TS3: 848 activitiesTS2: 950 activitiesTS1: 994 activities

AD-Ring

AD-Targe

tAlice Atla

sCMS

Computing Faci

lities

East

Hall Ta

rget

HiRadMat

ISOLD

ELEI

RLH

CLH

Cb

LINAC 2

LINAC 3 PS

PS Booste

rSP

S

Surfa

ce - n

o coord

ination

nTOF

0

100

200

300

400

500

600

700

Page 3: GS-AIS On-going work IMWG 12-Mar-2013 Eloy Reguero Fuentes, Cédric Garino

Activities per facility / week since the 08th Jan 2012

0

50

100

150

200

250

300

350

400

450

Surface - no coordinationSPSPS BoosterPSnTOFLINAC 3LINAC 2LHCbLHCLEIRISOLDEHiRadMatEast Hall TargetComputing FacilitiesCMSAtlasAliceAD-TargetAD-Ring

This week

Page 4: GS-AIS On-going work IMWG 12-Mar-2013 Eloy Reguero Fuentes, Cédric Garino

Approvals

1439

501

155

119

16 8 2

Facility Coordinator

Safety Approval

RP Approval

Meeting Approval

Information

Location Coordinator

Other

Page 5: GS-AIS On-going work IMWG 12-Mar-2013 Eloy Reguero Fuentes, Cédric Garino

Activities with participants > 100 #Activity Participants Title Facility15953 302 LHCb access to UX85A - Operation LHCb24074 201 PS STANDARD : Visites et Inspections - Sécurité PS24414 199 TT2 STANDARD : Visites et Inspections - Sécurité PS24309 191 PS STANDARD : Visites et Inspections - OP PS24316 191 PSB STANDARD : Visites et Inspections - OP PS Booster24654 155 BTVSS Point 2 LHC24677 155 BTVSE Point 6 LHC24676 155 BTVM Point 4 LHC24678 155 BTVST Point 8 LHC24679 155 BTVSI Point 8 LHC24663 155 BTVST Point 2 LHC24664 155 BTVSI Point 2 LHC24658 155 BTVSS Point 8 LHC24665 155 BTVM Point 3 LHC24767 130 LHCb access to UX85A - Operation - LS1 LHCb24382 123 TT2 STANDARD : maintenances générales instrumentation PS23380 122 RF commutation switch at BPMSW.1L5 LHC22100 122 Head-Tail & WCM Maintenance LHC24526 122 PSB STANDARD : maintenances générales syst. de l'instrumentation PS Booster24088 122 PS STANDARD : maintenances générales instrumentation PS22072 115 Inspection, tournée de vérification, correctifs en UW25 LHC25535 115 Piquet TE-VSC P4 LHC24440 109 UX85 - Travaux câblage new UPS LHCb23948 108 RP ALIMS-LHC SPS LHC23950 108 RP ALIMS-LHC SPS LHC24207 108 IMPACT STANDARD: maintenance générale syst refr. et ventilation SPS23923 108 RP ALIMS LDM AD-Target23949 108 RP ALIMS-LHC SPS LHC23908 108 RP ALIMS LDM PS22692 104 QU (CRYO UNDERGROUND) Maintenance CRYOPLANTS en CAVERNES - TS#4 2012 LHC20190 104 QU (CRYO UNDERGROUND) Maintenance CRYOPLANTS en CAVERNES - TS#3 2012 LHC22693 102 QU (CRYO UNDERGROUND) Préparation LS1 - CRYO TUNNEL - TS#4 2012 LHC20189 102 QU (CRYO UNDERGROUND) Préparation LS1 - CRYO TUNNEL - TS#3 2012 LHC

Page 6: GS-AIS On-going work IMWG 12-Mar-2013 Eloy Reguero Fuentes, Cédric Garino

2.3 New features

• Public APIs (read / write / approve)• New facility “Computer facilities“• Participant notifications– Email: 1220– SMS: 901

• New RP fields (job code, specific job code, equipment code)

Page 7: GS-AIS On-going work IMWG 12-Mar-2013 Eloy Reguero Fuentes, Cédric Garino

2.4 New features

• Visits• View / browse mode• Bulk approval• Activity scheduler refactoring• New pdf report “Activity Responsible”• New field “Individual dose alarm per intervention [uSv]”• Operational dosimetry: Impact -> Mirion

Demo as Peter : https://devpptevm.cern.ch/impact/?work_as=432750

Page 8: GS-AIS On-going work IMWG 12-Mar-2013 Eloy Reguero Fuentes, Cédric Garino

Integration IMPACT / DOSISERVView data exposed to DOSISERV

Gather dose data from DOSISERV (v.2.5)

IMPACT: 12345IMPACT: 98765