grs railway

Embed Size (px)

Citation preview

  • 7/26/2019 grs railway

    1/15

    The speed of tower wagon shall be ___________At a class 'B' station with two aspect signalling, a warner signal will be provided when the speed of trains exceed __________ while passing through the station.When inner distant signal is provided, the distant signal shall have ______ and

    __________ aspects.During night, the calling on signal shall display ______________ light in 'ON' position.The calling - on signal may be provided below any stop signal except ___________

    ____A semi-automatic stop signal is distinguished by ____________________Shunt signal may be provided below any stop signal except _________When a shunt signal is defective ___________________ are the authorities for theloco pilot to pass at ON.Detailed instructions regarding working of shunting permitted indicator will beavailable in _______

    ____________signal does not show any light in any position at any time.Authority to pass defective LSS on double line on automatic block system is ____

    ___________.When a signal is newly erected or re-sited, caution order shall be issued for aperiod of __________Distance between Home signal and B.S.L.B. shall not be less than ____________The train speed while entering terminal goods yards is restricted to____________

    _

    Normal aspect of the fixed signals, except automatic signals, will be______________The speed of train in 1 in 8 1/2 turn-out ( with curved switch on 52/60 kgs rails and PSC sleepers) is restricted to __________The speed over the main line at a non-interlocked station for an express train is ________In an emergency, during night, a material train may be ordered by ______________

    _Anemo-meter is provided for measuring _________________

    __________mark board indicates presence of outlying siding points.Under approved special instructions, when a colour light distant signal is combined with LSS, the aspect in its 'ON' position shall be______________The station warner in its 'OFF' position indicates __________________

    The signal which is provided only at a class 'B' station in T A signalling is ___________In M A signalling, at a station, a single arm home is sufficient when the speedof trains running through station does not exceed __________Visibility Test Post, if provided, shall be located at 180 metres from _________

    _____When IBS is defective, before allowing a train _______________authorities are tobe given.Fog signal post is located at ____ metres from the outermost signal.After testing the signals, result shall be recorded in ________________The SM of rear station shall give __________________ authority for passing a defective stop signal of the advance station.A gate signal is distinguished by __________________________

    Provision of side-lights may be dispensed for_______ and ________ trains.Back light of signal will be visible in___________________ position.

    In emergency a goods train without Guard can be ordered by ________________Reception signals shall be tested by Station Master_______________.Generally at a standard III interlocked station, for receiving a train over a loop line, the speed is restricted to ____________.Slip siding protects_______.Catch siding protects____________________Whenever a Signal Inspector tests a signal, an entry must be made in _______

  • 7/26/2019 grs railway

    2/15

    During thick, foggy & tempestuous weather, impairing visibility SM shall arrangeto place detonators at a distance of 270 metres from ____________Life of a detonator after successful test can be extended by one year each timesubject to maximum of______________ extensions.Wherever two distant signals are provided ____________ board can be dispensed with.Visibility test post is painted ____________ and ____________ alternatively.

    ______number of detonators shall be given to each Fog signal man.On token sections when token is extracted and subsequently misplaced, the authority for the Loco Pilot to start the train is _______________________On single line tokenless sections, when advanced starter is defective, authorityto start the train is _________.On double line when advanced starter is defective, authority for the Loco Pilotto start a train is _______When axle counter of I B signalling is defective, authority for the Loco Pilot to start a train is ________On double line, authority to pass home signal of a class 'C' station at ON is __

    ___________The speed while pushing back with Guard not travelling in Brake Van showing handsignals shall not exceed _________________ kmph.The speed while pushing back with Guard travelling in leading vehicle, a brake-van, showing hand signals to shall not exceed _________When stabled at stations, responsibility for protection of material train lies with _______

    Validity of BPC of a Material train is____________.Shunting of wagons containing explosives shall be carried out only under the supervision of ______Before detaching engine within station limits where gradient is not steeper than1 in 600, hand brakes of _____________ vehicles are to be applied.Fresh declaration in the declaration register shall be obtained from staff whenthey resume after an absence of ____________consecutive days.When the Loco Pilot reports that he experienced lurch while on run, subsequent trains may be allowed into the block section giving caution order to observe a speed restriction of_________ kmph.When SM of a station in rear receives a message from the Loco Pilot who enteredinto block section without authority to proceed, he shall give ____________ as authority to proceed.

    Speed of engine returning to bring the portion of train left behind in block section during divided train working should not exceed _____________ kmph.If the Diesel Loco Pilot does not whistle and exchange signals with SM he shallintimate to the SM in advance by giving ___________________________________ bellcode.For granting line clear on TALQ single line section at a station not having SLB/Advanced starter, line must be clear upto ____________For granting line clear on double line, MAUQ signaling station having no loop line, line must be kept clear upto _____________________Normal authority to proceed on double line is _______________A Loco Pilot working a train has to look back on run, to see whether the train is following in a ___________ manner.Caution Order is prepared on Form No. ___________________

    In Automatic block system when all signals failed and communications are not available, trains are worked on Form No.____________.In automatic block system single line, when LSS fails, _____________ authority is given to the Loco Pilot to proceed.When trains are run on T/D-912 on automatic block system, the speed shall not exceed _____ kmph.When SM of a station in advance receives a message from the Loco Pilot who entered block section without ATP, he shall give ____________ as ATP.Trollies/Lorries working during night under block protection on double line shall be treated as ____

  • 7/26/2019 grs railway

    3/15

    The lowest rank employee who can organise line block on control telephone is_____When block instrument has failed, next means of communications for obtaining line clear in order of preference is _____________The speed of shunting of wagons containing explosives shall not exceed ____ kmph.The signal that cannot be taken OFF during total interruption of communicationsis __________Before allowing any train to enter a block section in advance during total interruption of communications, it shall be brought to a stop at _______________On double line sections, during total failure of communications when second train has to be sent into block section, there should be a clear time interval of __

    ______________When a motor trolley is sent for opening of communications, it must be accompanied by _________After opening of communications, when light engine is returning with or withouta train attached to it, authority to proceed shall be __________________No. of wagons loaded with explosives allowed by goods train ______.No. of wagons containing explosives that are allowed by parcel/mixed train _____

    ____.Minimum ___ guard wagons are required between wagons containing explosives and apassenger carriage.The maximum speed of the relief engine proceeding on T/A 602 is _________ kmph.If a circumstance outside station limits is to be defined as an averted collisio

    n, the inter-distance between stationary train and the obstruction shall be lessthan ____________On single line tokenless sections, authority for shunting beyond advanced starter and upto opposing FSS is ______________Lost token notice shall remain in force for a period of ___________ months.Token indicator is provided in _________________________ instrumentsWhere trains are booked to stop for less than 5 minutes at a station, outgoing token shall be delivered _______________________________The staff on duty can have only _____ private number books.Colour of route button is ___________To take OFF a signal in Siemen's panel, ___________and __________ button must beoperated.When L S S fails in tokenless territory on single line, the authority shall be _

    _________________Collisionis an example of ____________________accident.When patrolman does not arrive in time after schedule arrival time and marginaltime of 15 minutes, train shall be stopped and caution order has to be issued toproceed with a speed not exceeding_________Pushing back should be done only with the permission of _______When a whole train is shunted across the main line to other lines at any station, shunting must be supervised only by _____________The whistle code to indicate fouling mark not cleared is ____________Eventhough all signals at a station are semaphore, the one signal which can be provided in colour light under approved special instructions is ________________Whistle code to alert SM to exchange all-right signal is ___________Block ticket is prepared in form _____________

    99. A Railway servant directly connected with train passing duties shall not usealcoholic drinks within _____________ hours before the commencement of his duty.100.During foggy weather, impairing visibility in Absolute Block system, the Loco Pilot shall observe a speed restriction of ___________kmph.101. When panel is not in use, it should be ___________________

  • 7/26/2019 grs railway

    4/15

    102. During power failure one generator should not be used for more than ____________ hours.103. During power block _____________________________ train may be allowed.

    104. Signal warning board is located at ____________ distance before stop signal.105. O.D.C may be attached to a goods train with the prior approval of _________

    ____106. Speed of 'C' class O D C on BG shall not exceed ________ kmph.107. Whenever points/signals are disconnected by S&T Dept., SM shall inform cabinman/leverman under exchange of _____________

    108. The minimum vacuum level required in engine and Brakevan of a goods train are

    _____ and ____ cms.109. A R T shall be ready within____ minutes by day and ________ minutes by night.

    110. Accident siren four long, one short indicates _______________ .111. If a wagon escapes into the Block Section, a relief engine shall be sent only after a lapse of ____ minutes more than the running time of the slowest speedgoods train.112. Bell beats for is line clear is _____________ beats.113. Incoming and outgoing bell beats will produce ______________ deflection intheGalvano meter when both stations block instruments are in line closed position.114. The Station Master who gives line clear shall remain on duty till the train

    has arrivedand the _________ signal is given and acknowledged.115. The Station Master taking over charge shall test the block instruments andmake arecord of the result then and there in the ____________116. Verbal directions for shunting have to be accompanied by ________________117. In an accident where the damage to railway property exceeds Rs._________, it is treated as serious accident118. When a colour light distant signal is combined with a gate stop signal prot

    ecting a level crossing, it displays _________________ light in "ON" position.119. Normal authority to proceed for the Loco Pilot of a train on single line intokenless territory is _______120. In double line section where an I.B.H is at 'ON' and telephone fails, the Loco Pilot after stopping for 5 minutes shall proceed with a speed of ______ kmph.121.Automatic stop signal is distinguished by ___________________

  • 7/26/2019 grs railway

    5/15

    122. Whenever a train is stopped on a gradient for any reason, it is essential to apply the________123. When trains are run on T/D 912 in automatic block system, the speed shall not exceed ___124. When any light engine is despatched for opening of communications, cautionorder shall be issued restricting the speed to__________________________125. When the Loco Pilot observes any flasher light in the block section, he must reduce the speed to ____ when view is clear and _____ when view is not clear after putting ON and OFF three times the flasher light provided on his engine andrender help if needed.

    126. The Loco Pilot must be given ______________ authority to start a train at astationhaving common starter in addition to ATP.127. Speed of a train while pushing back shall not exceed ____ Kmph when the Guard istravelling in leading vehicle and _____ Kmph when not travelling in leading vehicle.

    128. In EMU /DMU, the bell code signal O pause O indicates ________.129. Fixed signals out of use shall be distinguished by keeping ___________.130. When the Loco Pilot decides to take the train with a hot axle box wagon upto nextstation from section, the speed shall not exceed ________________ KMPH.131. Restrictions, as a temporary measure imposed, are intimated to the Guards and Loco Pilots through ___________132. When all communications failed in Automatic system on double line and trains are

    worked on time interval basis, the time interval shall be ______133. During TSL working on double line in Absolute Block, speed of second and subsequent trains shall be ________________134. A blank signal under complete power off is to be treated as________________

    _135. The amount of air pressure required in engine of a superfast express trainin F P is _______136. On double line when a number of automatic signals fail, trains are worked under line

    clear system, by giving _______________ authority.137. While at a station, the Loco Pilot is to obey ____________ instructions.138. When the Loco Pilot of an electric loco is not in leading cabin and workingfrom trailing cab, the speed is restricted to ________________139. The authority given, when IBS is defective is _________140. The distance between two yellow lights of a semaphore distant signal showin

  • 7/26/2019 grs railway

    6/15

    g Attention is ____141. Whenever a signal is flickering or bobbing and no aspect is steady for 60 seconds, theLoco Pilot shall treat the signal as ______________ .142. During total interruption of communications, after opening of communications, the speed of the first train shall be restricted to ________ kmph.143. Introduction of Panel interlocking / RRI shall be carried out only under __

    ______144. In 'ON' position, a banner type-repeating signal displays_________ light during nighttime.145. Fresh BPC is required when attaching or detaching of a minimum of _____ units takeplace.146. Authority for the Light Engine to open communication is ________.147.The authority for shunting between LSS and opposing FSS on single line tokensection is _______

    148. At diverging junction in MAUQ, a single arm home signal may be provided, wherespeed does not exceed ________________149. To detach the engine of a goods train having 17 wagons in block section, brakes of________ wagons are to be applied.150. During total interruption of communications when train is detained at FSS for more than _______ minutes, the Loco Pilot must send the Assistant Loco Pilotto the station.151. The Loco Pilot working in Ghat section are to be given _______ LR trips.

    152. When double heading is permitted, dead engine can be attached as _______________153. Vehicles shall not be detached from a material train in mid-section on a gradient of_______ or steeper.154. Accident siren three long, one short indicates ____________________________

    ____155."Train entering block section without authority to proceed "is an _______accident.

    156. Neutral section is located between two consecutive ___________________________157. Speed of the train shall not be less than ______ kmph while passing througha neutral section.158. EMU/DMU bell code for zone of speed restriction over, Resume prescribed speed" is___________.159. At every ________ metres, there is an emergency telephone socket provision

  • 7/26/2019 grs railway

    7/15

    in O H E area.160. Caution indicator is located at a distance of ______ metres, before speed/stop indicator.161. Dead engine shall not be attached to__________________________ trains.162. The vacuum level to be registered in the engine before starting a goods train is _______163. The air pressure to be maintained in the engine while clearing a train of 56 BOX N is ____

    164. Special instructions are issued by _____________________165. Route indicators are treated as ________________________166. BSLB is provided on double line section, in __________________ signalling territory.167. Under no circumstances should a train be ____________ over trailed throughpoints.

    168. Provision of warning board is dispensed with, when ____________ signal is provided..169. Only _____ damaged vehicle(s) shall be attached behind rear brake van of goods train.170. The interval from the time the engine is detached from the train and it isagain attachedto a train carrying passenger shall not exceed _________________ minutes.171. Loco Pilots and Guards of trains come to know about the class of each station through ______

    172. Written authority to receive a train to an obstructed line is ______________173. While performing shunting on passenger carrying trains, shunting engine shall first come to a halt at ______ metres from the train.174. _________________ shall not be used for extinguishing fire on electrical equipments.175. Speed of the light engine entering into a block section on block ticket isrestricted to

    ______

    176. Before the introduction of actual non-interlocked working, on the precedingSunday or any day, when the number of trains are less ___________ should be tried during the day shift to ascertain difficulties..177. Vulnerable locations provided with automatic danger level indicators will be notified in the __________________178. Authority to send a light engine on to an occupied block section is________

    __

  • 7/26/2019 grs railway

    8/15

    179. Authority for the trains passing over the temporary single line working is__________180. The empty/load device-operating handle shall be kept in empty position whenthe wagon is empty and also when gross load does not exceed _______ tones.181. The distributor valve isolation cock handle in __________ position indicates that thedistributor valve is in working position.182. The aspect shown by the warner signal in ON position is ___________183. Colour light distant signal is identified by _________________marker.184. Gate signal in automatic block territory shows _______________light when gate isclosed.185. On double line, the authority to perform shunting beyond BSLB is __________

    ___186. In the case of formations tested by vacuum exhauster/compressor, the time taken forstarting the trains after engine is attached shall not exceed ___________ minute

    s.187. Derailment is an example of ________________ accident.188. Whenever a stabled load is cleared from non-TXR point______________ check is to be conducted.189.In a goods train the BP pressure in loco shall be _________ Kg.cm.2 and ____

    ____ Kg.cm.2 in BV.190. When shunting permitted indicator is defective, the Authority given to theLoco Pilot is ______________191. Reduction of B P Pressure causes _____________ in the train formation.

    192. COCs of all vehicles shall be kept in ___________ position except the frontside of loco and rear side of last vehicle before starting the train..193. Target time for turning out M R T is ________for direct/indirect dispatch.194. Mock drills for ART/MRT shall be conducted once in ________ months195. The mark at which the infringement of fixed standard dimensions occurs, where two lines cross or join one another is called_____________196. Whenever 'healthy section' is isolated and re-energised, the first train toenter block section shall observe a maximum speed of ________ kmph by day and _

    ____ kmph by night.197. Engine whistle code for alarm chain pulled is _____________198. Coaches with passengers shall not be moved for shunting purposes without the personnel orders of _____ and also ____________ of the train concerned.199. Loco Pilot or Guard observes a signal light is partially burning or not burning brightly enough to give a clear aspect, shall report the same to___________

    ___

  • 7/26/2019 grs railway

    9/15

    200. When wagons are attached at a station, vehicle numbers must be included inthe VG by the ______201. When a bogie coaching vehicle is attached to a goods train, it is taken asequivalent to _________202 __________________ is authorised officer of SCR.203. The number of dead engines that can be attached to a goods train is _______204. On BG a train is protected by keeping last detonator at a distance of not less than ___________205. When train is held up at FSS during normal working, protection is necessarywhen detention exceeds____________206. Minimum amount of vacuum to be maintained in brake-van of a Mail/Express is_________ before starting the train.207. When two white lights are burning horizontally in position light type shuntsignal, the aspect of the signal is _____________208. Whistle code - - 0 0 indicates Guard to _____________

    209. Whistle code for protection in rear is _____________210.Whistle code for train parting is_________211.Whistle code for insufficient vacuum in engine is___________212.A position light shunt signal when placed below a stop signal shall display

    ____________ light in 'ON' position.213.Red target by day and red light by night in the trap indicator indicates that the trap is in ____________ condition

    214.The number of hand brakes to be pinned down before detaching the train engine in block section on a gradient steeper than 1 in 600 is ____________215.Arrivals and departures of passenger trains at a class D station are as perthe instructions given in ___________216.When an averted collision takes place between two trains in the block section, the inter distance between two trains shall be measured and entered in ______

    ____217.The validity of BPC of Material train is _____days, subject to examining byTXR staff once in 7 days.

    218.The securing of vehicles of material train when divided in block section shall be the responsibility of __________219._____ number of coaches is permitted in rear of rear SLR of a passenger carrying trains in case of necessity. (excluding Officers saloon)220.By postal express, race special and __________, officers saloons shall not be moved.221.When the engine of a passenger train is detached in block section to report

  • 7/26/2019 grs railway

    10/15

    an accident to SM in advance, it shall be re-attached within ____________222.Guards of trains provided with air conditioned SLR/LR shall show the all right signal to the Loco Pilot by ___________________223.In case it is necessary to shunt a train from one line to another across themain line, ________ will supervise the shunting.224.The validity of the Competency Certificate issued for guards at Zonal Railway Training Institute, Moula Ali is __________.225.The danger zone in 25 kv area means the zone lying within ___________ of anylive electrical equipment.226.The engine whistle code to indicate to raise the pantograph is _____________

    _227.Loco Pilots and Guards of trains come to know of all temporary speed restrictions through ________228.If any railway servant notices that a train has parted, he shall not show __

    __________ signal to the Loco Pilot.229.Outer, Home and ______________ shall not be taken off for shunting purposes.

    230.The knowledge of the staff who are expected to use the detonators should betested once in ___________ by the Inspecting Official.231.First aid box of a Guard shall be examined by ADMO once in _____________232.When absolutely necessary the guard shall pull Guard emergency handle slowlyand gradually so as to reduce vacuum by __________ cm only.233.Trucks loaded with girders, machinery, long timbers etc. shall be inspectedby Guard at stopping stations to ensure ___________________________234.If an axle box of a vehicle is found running hot at a station, where the C&W

    staff are not provided, the vehicle shall be _________________235.A vehicle involved in an accident shall not be moved from a station where stabled unless permission is obtained from ____________236.Whenever the automatic vacuum brake is applied, the Guard shall send a special report along with __________237.While conducting GDR check the time allotted for checking a formation of 60units is __________238.The isolating handle of distributor valve of an air brake wagon shall be kept in ________ position while working a train.

    239.The brake power of Mail/Express trains shall not be less than ______________

    _ per cent en-route.240.The engine whistle code for Guard to come to engine is___________241.Averted collision is an example of ____________ accident.242.The first objective to be achieved in case of an accident is _______________

  • 7/26/2019 grs railway

    11/15

    243.The amount of air pressure required to be registered in the BP gauge of theB/V of a passenger carrying train is __________244.The amount of air pressure required to be registered in the FP gauge of theBV of a passenger carrying train is ___________245.W.T.T. is published on the orders of _______________246.The restricted speed of a train passing an automatic stop signal at ON is __

    ________247. The number of trains which can be run on a section in 24 hours is termed as_____________.248. In Scottss formula, C = 1440x E what is meant by T _________T+t249. Section will be considered saturated (related to line capacity) if the number of trains run daily are _______________________ of the charted capacity.250. The following are some of the methods available for determining the Line capacity. (1)___________ ________ (2) ________________________.251. Names of two coal loading stations in S.C.Railway are __________________and__________________.252. Names of two cement loading stations are __________ and__________________

    253. FOIS means_______________________.254. COIS means ________________________255. Formula for calculating wagon turn round is ___________________256. Wagon turn round performance is denoted in terms of ________________.257. If the number of wagon turn round days is more, the performance isconsidered to be _______________.258. SLO means _____________________________________.259. Wagon census is conducted once in ____________________________260. The ordering of goods trains depends on the availability of ____________,Locomotive, Path and crew.

    261. NR cell means _________________________.262. The time occupied for clearing a block section by a train which runs at maximum permissible speed is called___________________________.263. At Zonal level the management of Passenger Traffic is looked after by _____.264. Time Tables are issued _______________________year.265. Accidents are classified under __________________ heads.266. Train accidents are divided into _________________ and ________ accidents.267. An example of breach of block rule is ________________

    268. All accidents falling under the purview of section 113 of Railway Act 1989are termed as ____________269. A fire accident to a passenger carrying trains comes under class __________

    __ in accident classification.270. The ADMOs shall check all the First Aid Boxes in their jurisdiction at thestation once in a______________271. Chapter VIII of Station Working Rules deals ___________________

  • 7/26/2019 grs railway

    12/15

    272. The Loco Pilot of a train can save _______ by coasting.273. The optimum number of trains which can be run on the section economically is known as ___________

    274. In Scotts formula C=1440 X E, if T is the running time of the slowest T+t moving goods Train over a critical block section, and E is the efficiency factor,then = __________275. ____________ method is the most practical way of assessing linecapacity.GOODS TRAIN OPERATION.276. _____ train is an integral movement of goods, usually one commodity, movingfrom a single origin to single destination on a regular schedule.277. An example of non-pooled wagon is ________________278. At Railway Board, presently the inter-change of wagons are monitored by ___

    ____

    279. The speed of goods trains with loaded wagons of carrying capacity +6T +2T shall be _______________________ and the speed goods trains with loaded wagons ofcarrying capacity +4T +2T shall be __________________280. The traffic comes under priority A in priority schedule is ______________281. The speed of the goods train carrying C class ODC shall not exceed ____ KMPH282. The wagon turn round (latest) for S. C. Railway is nearly ________________283. The wagon turn round (latest) for Indian Railways is __________________

    284. CONCOR means ____________________________285. IRCTCL means _____________________________286. __________________ is known as Dry port also.287. Roll on-Roll off concept was first introduced in ___________________288. Ranjitpura is known mainly for _____________________ loading.289. Ramagundam is known mainly for __________________ loading.290. The validity of super intensively checked trains brake power certificate is

    __________.291. The management of Freight Operation at Zonal Headquarters is looked after by __________________292. Stock reports are daily repeated at _______________293. __________________ wagons may be loaded to other Railways but the Railwaysreceiving them should return (load/empty) wagons to the owningrailway.

  • 7/26/2019 grs railway

    13/15

    PASSENGER TRAIN OPERATION.294. In train No. 2723, the first number 2 indicates _________________295. Primary train examination is generally conducted at ___________________296. The number of berths available in WGSCN is _______________297. Movements of military special are organized and monitored by ______________298. Working time tables are issued by __________________299. Recovery time is generally given short of _________________300. Z R U C C means _______________________301. Zonal Time table meeting is organized by _____________________302. The detention to an Electrical for one hour costs Rs.______ and Diesel lococosts Rs.______303. For a special train, Registration fee cum security deposit is______________

    OPERATING CONTROL.304. The Divisional Control Office is under the Administrative control of_______

    ____305. The standard time signal is given daily at _______ hours by Section Controller.306. Under the scheme of rationalization of parcels, Parcels should not be bookedfrom and to those stations, by express trains, wherever the halt is less than

    ___________ minutes.

    307. The right time start of a goods train is ________________308. ______________________ is a centralized, coordinated loco and traffic crewbooking organisation which also deals with the train ordering.309. All defects in OHE are to be reported to ____________________310. Power block is given by ___________________311. Auxiliary paths for movement of trains are suitable for ____________ trains.312. Every chart is printed normally for _________________ hours.

    313. In a control chart, the station names are printed in ______________ rows.314. In a control chart the horizontal row indicates _____________________315. Weather warning messages are issued by _____________________316. Bans are imposed by ______________________317. Restrictions are imposed by ___________________

  • 7/26/2019 grs railway

    14/15

    MARSHALLING YARDS.318. If the holding of wagons in a yard is more than the working capacity, it leads to __________________319. The functions of a marshalling yards are reception of train, sorting, _____

    _______ and _______________320. Receiving more trains and despatching less leads to ________________321. Yard congestion is statistically indicated through ________________ of a yard.322. The first step to reduce the yard congestion is _____________323. Cut memos are prepared by ________________324. Irregularity memo is issued to indicate ____________________ in yard.STATISTICS.325. Operating ratio = Total earnings?326. If the working expenses are increased and total earnings are decreased, ope

    rating ratio performance becomes ___________________327. The operating ratio (latest) of the Railways is ___________________328. The lesser the operating ratio _______________________ is the performance.329. Wagon KM per wagon day indicates the ____________ wagon.330. The net Tonne KM per wagon day = ?___________ Wagon days on line331. Average speed of a goods train = Train KM ?332. An example of Derived unit is ______________________333. Engine KM per engine day on line gives ______________ of an engine.

    334. The net Tonne KM per train engine hour =335. Number of wagons dealt per shunting engine hour is =STATION WORKING RULES.336. SWR contains _________ paras and __________ appendices.337. SWR copies in electrified areas are jointly signed by ______________338. Any modification in SWR is issued in the form of __________________

    339. The SWR shall be reviewed once in _____________________340. Assurance register for SWR are to be signed by staff whenever _________341. L.C. gate working is given in the ___________ appendix of SWR.INSPECTIONS.342. An ideal time for surprise inspection is _____________________343. Regular inspection are to be conducted once in _____________

  • 7/26/2019 grs railway

    15/15

    344. An example of non-detailed inspection is ________________345. Different types of Inspections are _________________, _______________surprise, L.C. gate, foot-plate inspections.COMMISSIONER OF RAILWAY SAFETY.346. Approved special instructions are issued by ______________________347. Office of the Chief Commissioner of Railway Safety is located at ________348. Section 6 of Railway Act 1989 deals with ______________________349. Presently the total number of circle offices of Commissioner of Railway Safety is _____350. Statutory enquiry has to be commenced by CRS within ______ days of anoccurrence of a passenger train accident.351. Section ______ sub-section (2) stipulates an obligation on the RailwayAdministration to give a notice of accident to CRS.352. CRS will submit his detailed report to CCRS and other authorities inD+_______ days.

    SAFETY ORGANISATION ON RAILWAY.At Railway Board, ___________________ is the head of the Safety organisation.At Zonal level, ______________ is the head of the Safety organisation.General Rules are issued by ____________TMS means ______________________An ON LINE REAL TIME system based on absolute current state of art technology and efficient communication system is _______________

    AVERAGE SPEED OF GOODS TRAIN.Running more number of trains and increasing load per train increases______Average speed of a goods train in Indian Railway approximately is _________The formula for calculating the average speed of a goods train is ___________