52
GRP Infrastructure Water & Sewage Pipes and Fittings

GRP Infrastructure Water & Sewage Pipes and Fittings

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GRP Infrastructure Water & Sewage Pipes and Fittings

GRP InfrastructureWater & Sewage Pipesand Fittings

Page 2: GRP Infrastructure Water & Sewage Pipes and Fittings
Page 3: GRP Infrastructure Water & Sewage Pipes and Fittings

Preface

History

GRP Pipe Advantages

GRP Pipe Properties

GRP Pipe Diameter and Weight Table

GRP Coupling and Properties

GRP Coupling

Performance Standards

Performance Test and Standards

Controls

Quality Control

Performance Tests and Quality Control

Rigidity Classification and Pressure Class

Engineering Service and Velocity of Wave Propagation

GRP Pipe Chemical Table

Installation Procedures

Standart Drain

Genarating Drain Filling

Above Pipe Compress

Installation of Couplings with Elastomer Gasket

GRP Pipe and Fittings

Equal Tee Fittings

Unequal Tee Fittings

Elbows

Flanges

Reductions

WYE (Angled Tee)

Certificates and Documents

2 - 3

4 - 5

6 - 7

8 - 9

10 - 11

12 - 13

14 - 15

16 - 17

18

19

20

21

22 - 23

24

25

26

27 - 28

29

30 - 31

32

33

34 - 36

37

38

39

40

41 - 45

Page 4: GRP Infrastructure Water & Sewage Pipes and Fittings

Esen Plastik, with its continuous investments, presents products ranges above 2000 types to global market.

Prestigious company with its Potable Water,Waste Water, Drainage, Natural Gas, Telecommunication pipes and fittings

Page 5: GRP Infrastructure Water & Sewage Pipes and Fittings

Esen Plastic JSC has been established by 1976 to manufacture plastic pipes and fittings.

Esen Plastic continues its production and all other activities in its 130,000 m² facilities in İzmir Atatürk Organized Industrial Zone and Adana Hacı Sabancı Organized Industrial Zone

Esen Plastic continues to be a pioneer in the market by adding advanced production technologies and market demands to its existing product range. By investing on developing production technologies; Esen Plastic JSC serves with 200,000 tons of capacity in production plants, generates 600 employees, with its engineers and employees. Esen Plastic JSC has employed 20,000 people in Turkey.

GRP Pipes for InfrastructureHDPE Corrugated Sewage Pipes and Fittings,PE 100 Water Network PipesPE 32 Water Network PipesPE 80 Natural Gas PipesHDPE Telecommunication Data PipesHDPE Microduct Fiberoptic Casing TubesPVC Potable Water PipePVC Drainage Pipe

2 / 3

Page 6: GRP Infrastructure Water & Sewage Pipes and Fittings

Esen Plastic, with its factories in İzmir and Adana, aims to become a leader in the infrastructure sector in the domestic and international markets and has taken part in very important & remarkable projects and adopted the main duty of increasing the trust in Turkish goods and its contribution to the economy of our country.

Esen Plastic, continues its investments with the aim of promoting the product and service quality it offers to its customers, providing faster and dynamic service, making production in different regions of our country close to the market and creating employment for the people of our country.

Objective

Page 7: GRP Infrastructure Water & Sewage Pipes and Fittings

GRP PIPEADVANTAGES

ESEN GRP Pipes are produced by using composite material technology using glass fiber, polyester resin and silica sand which have superior properties in terms of performance, quality and economy compared to conventional materials.

High corrosion resistanceLightweight and elastic structureSuperior hydraulic propertiesLong service life Eco-friendly product High strength structure Low operating and maintenance costs Fast and easy installation Compatibility with ground movementsEconomic transportation cost

ESEN GRP Pipes are manufactured from 200 mm to 4000 mm diameter in accordance with international standards. Esen GRP pressurized and unpressurized pipes are used in drinking water, irrigation water and sewage systems.

ESEN GRP Pipes are highly resistant to chemicals. Resistance to chemicals varies according to the type of resin used in the pipe. ESEN GRP Pipes are designed specially according to transported chemical and the fluid temperature.

4 / 5

ESEN GRP Pipe and Fittings

GRP PIPEUSAGE AREAS

Transmission and distribution lines of irrigation projectsTransmission lines and networks of drinking water plantsWaste water transmission, treatment plant and sea discharge linesRain water linePower plant connection linesIndustrial linesRoad crossingRenewal of existing pipe lines by pushing

Page 8: GRP Infrastructure Water & Sewage Pipes and Fittings

Esen Plastik GRP Pipes are manufactured according to AWWA, ASTM, ISO, EN, BS and TSE standards.

It is used to determine the long-term performance values of the products;

Long Term Tensile Corrosion Test (ASTM3681) Circular Deviation Strength Test in Wet Conditions (ISO10471)Long-Term Specific Circle Stiffness (ISO 10468)It successfully meets stringent tests such as the Long Term Damage Pressure Test (ASTM 2992). These tests contain the required physical parameters corresponding to a service life of 50 years.

Resistant and Long Life

Page 9: GRP Infrastructure Water & Sewage Pipes and Fittings

CHEMICAL RESISTANCE GUIDE

ESEN GRP Pipes are highly resistant to chemicals. Resistance to chemicals varies according to the type of resin used in the pipe. ESEN GRP Pipes are specially designed according to the chemicals to be transported. Please inform ESEN Plastik about the chemical you will carry. ESEN Plastic Project Design Team will be proud to help you.

GRP PIPEPROPERTIES

min. max.

Diameters

Rigidity (SN)

Pressure Resistance (PN)

200 mm

500 N/m

1 PN

4000 mm

10.000 N/m

40 PN

2 2

ESEN GRP Pipe and Fittings

6 / 7

SN 2500 SN 5000 SN 10000 PN 32PN 1

STANDART RIGIDITY CLASSESDifferent SN classes can be produced according to your project. The pipes are manufactured in three standard hardness.

STANDARD PRESSURE RANGEPipes are manufactured between PN 1 andPN 32 pressure classes.

INNER SURFACEInner LayerResinGlass Fiber

OUTER SURFACEOuter layerResinGlass Fiber

OUTHER STRUCTURAL LAYER ResinGlass Fiber

MIDDLE SURFACEResinSilica SandGlass Fiber

INNER STRUCTURAL LAYER

ResinGlass Fiber

Page 10: GRP Infrastructure Water & Sewage Pipes and Fittings

200300350400450500600700800900

1000110012001300140015001600170018001900200021002200230024002500260027002800290030003100320033003400350036003700380039004000

GRPPipe

Nominal Diameter(mm)

GRPPipe OD

min.(mm)

GRPPipe OD

max.(mm)

PN 6

SN 2500

GRP PIPE MINIMUM WALL THICKNESSES (mm)

PN 10 PN 16 PN 20 PN 25 PN 32

208311362413464515617719821925

102811301231

1333,5143615381640174218441946204821502252235324552558266027602863296530683170327233743476357836803782388439864088

2,503,303,764,204,715,216,267,264,989,109,99

10,8811,8012,8713,7214,6515,5716,5017,4418,3719,2820,2021,1022,0122,9323,8624,7825,6926,6129,3132,0132,9433,8834,9135,9536,9838,0234,7440,0941,1342,17

2,503,303,744,194,605,035,896,707,558,379,229,98

10,8211,7112,4513,3914,2414,9915,8416,7017,4618,2119,1519,9020,7521,6122,4623,2023,9526,4128,8729,7630,6531,5932,5433,5034,4631,3436,2237,1738,13

2,453,283,664,084,464,875,696,467,278,048,859,62

10,4211,2911,9312,8213,6314,3515,1615,9816,7817,4118,3119,1319,8420,6621,4622,1822,9925,3427,6928,4929,2830,1831,0932,0032,9130,0034,6035,5136,42

2,453,253,634,064,434,825,626,427,217,968,759,54

10,2912,7211,9112,7013,5014,2914,9915,7816,4817,2818,0618,8619,7420,4321,2222,0122,7125,0727,4328,2729,1129,9630,8231,6732,5329,6434,3635,2236,08

PN 6 PN 10 PN 16

2,984,024,625,245,886,537,909,18

10,4711,7012,9014,0215,2016,5017,7018,9020,0921,2922,4923,6924,8926,0927,1228,3129,5030,7231,9228,8734,3037,8041,3042,6143,9245,2746,6247,9749,3244,9852,0153,3654,71

2,983,944,625,215,746,287,418,489,50

10,6811,7412,8113,8614,9916,1217,1418,2519,2520,3821,5022,5123,5024,6225,7426,8627,8828,8729,9831,0634,2437,4138,5939,7741,0242,2643,4544,6440,6946,9948,2549,51

2,493,253,644,024,424,825,646,417,177,988,749,50

10,2712,7211,8812,6513,4114,1814,9415,7816,5517,3118,0818,8419,6020,3721,2221,9821,1424,2327,3128,1228,9429,7930,6431,5232,4029,5834,1635,0135,86

2,913,834,304,755,225,706,627,548,519,439,55

11,2812,2013,1714,0915,0115,9416,8617,8618,7819,7120,6321,5522,4823,4024,3225,2531,9227,0929,8232,5533,6134,6635,7036,7442,3147,8835,4640,9541,9943,03

206309

359,8410,6461,4512,2614

715,8817,6921,4

1023,41125,41226,41328,91431,21533,21635,21737,21839194120432145

2246,82347,62449,62552,62654,42754,22857,22959,23062

3163,93265,83367,73469,63571,63673,43745,33877,23979,14081

2,903,904,454,975,455,967,017,989,00

10,0210,8812,0613,0214,1415,1716,0917,0219,6218,6620,1521,1722,1823,1024,1125,1326,1527,1728,1829,2032,1135,0336,1137,1938,3339,4740,6241,7738,0744,0645,2046,34

SN 5000

The tables are provided for informational purposes

Page 11: GRP Infrastructure Water & Sewage Pipes and Fittings

SN 2500

GRP PIPE MINIMUM WALL THICKNESSES (mm)

SN 10000

2,883,874,414,905,395,886,907,888,909,89

10,8611,8312,8513,8814,7615,8216,9417,8718,8419,8220,7821,7622,7423,6224,6825,7526,7327,6928,6731,5134,3435,5136,6737,7238,7839,9141,0437,4243,3144,3745,42

PN 20 PN 25 PN 32

2,914,964,354,845,325,806,827,808,799,78

10,7311,7112,6613,7314,6715,7016,6517,5918,5419,5720,5121,4622,3923,3124,3226,1326,3627,1828,2331,0533,8834,9636,0537,1538,2539,3540,4636,9042,6543,7244,79

3,604,965,756,577,408,249,99

11,6413,3013,2916,4417,9119,4521,1022,6524,2025,7527,3128,8630,4231,9733,5234,9136,4538,0039,5741,1242,6444,2147,3850,5453,6056,6658,4160,1661,9063,6557,2767,1468,8970,63

4,404,965,756,557,308,029,45

10,9012,2913,7515,2016,6017,9619,4820,9822,3823,7625,2626,6528,0329,5330,9332,3133,7635,0636,5837,7239,3440,8444,9649,0850,6752,2553,8655,4657,0658,6653,4961,8763,4765,07

3,494,825,466,126,787,418,74

10,0511,3612,6813,9915,2616,5417,9119,2220,5421,8323,1424,4525,6626,9628,2729,4830,8732,1933,5034,8635,9937,3041,1144,9246,3447,7549,2350,7052,1653,6348,9156,5757,9859,38

3,454,745,366,006,647,268,549,82

11,0612,3613,6314,9116,1417,5218,7519,9021,3122,5423,6725,0126,3427,4628,7930,1131,3532,5833,9135,1436,3740,0943,8045,1646,5147,9349,3650,7752,1947,7355,0456,4657,88

2,825,667,469,58

11,8314,3920,2627,0734,7843,6954,1464,0675,5888,88

159,19182,28206,87225,10260,83289,02204,05224,74246,29268,58291,77316,05342,55368,36399,86426,32452,77481,61510,46542,49574,52609,06643,61679,63720,82756,50792,18

3,394,685,316,026,547,178,429,67

10,9212,1813,4214,6715,8217,1818,4219,6720,9222,1823,4124,5825,8227,0728,3229,5630,8232,0533,2234,4635,7139,3542,9944,3645,7247,0948,4649,9051,3446,7854,0555,4356,81

2,494,635,265,886,507,108,369,59

10,7812,0813,2714,5015,7417,0218,2619,5020,7421,8923,1224,3625,6026,8327,9829,2230,4631,7032,9334,1635,3238,9242,5243,8545,1946,6148,0349,3950,7546,3253,4754,9056,32

2,863,864,374,865,375,866,857,808,809,82

10,7911,7712,7413,8014,7315,7416,6716,8918,6219,5420,5621,5822,5023,5224,4425,3826,4727,4028,4231,2934,1635,2436,3137,3538,3939,5040,6137,1442,7543,9045,05

5,4311,3015,3820,1325,6331,7846,5065,4383,47

104,98128,84154,57183,08215,50249,30285,57324,30365,49409,13455,25503,83554,86605,60660,85719,12780,60843,71908,00976,81

1046,971117,121193,041268,961350,341431,721518,021604,311692,741786,711882,821978,93

PN 6 PN 10 PN 16 PN 20 PN 25 PN 32 MIN.(kg/mt)

MAX.(kg/mt)

SN 5000WEIGHT

The tables are provided for informational purposes

Page 12: GRP Infrastructure Water & Sewage Pipes and Fittings

ESEN GRPCOUPLING PROPERTIESEsen GRP pipe couplings use EPDM seals which are not deformed. Resistant to chemicals. Precise sealing with excellent dimension tolerances.

Page 13: GRP Infrastructure Water & Sewage Pipes and Fittings

ESEN GRPCoupling Properties

Glass reinforced plastic pipes are attached with pressure and non-pressurized lines and with coupling connection system which provides precise sealing. Couplings are produced using the same raw materials and the same process technique as Standard GRP pipes. Connection sleeves produced from GRP pipes are processed in sleeve manufacturing machine and slots are opened according to EPDM REKA seal and stopper tolerances. Esen Plastik EPDM seals provide double sided sealing with its special structure.

200

300

350

400

450

500

600

700

800

900

1000

1100

1200

1300

1400

1500

1600

1700

1800

1900

270

270

270

270

270

270

330

330

330

330

330

330

330

330

330

330

330

330

330

330

257,4

358,8

413,1

465,1

518,8

572,2

676,3

780,3

886,4

992,5

1097,5

1202,6

1306,6

1418,8

1524,5

1629,6

1734,6

1839,7

1944,7

2049,8

5,17

9,28

11,34

12,84

14,93

17,06

24,79

28,73

34,20

38,40

42,57

47,84

50,11

53,37

58,53

63,54

69,00

74,62

80,02

85,94

Datas have been arranged as 6 BAR for informational purposesEsen Plastik has a right to change the technical details acc. to projects.

10 / 11

2000

2100

2200

2300

2400

2500

2600

2700

2800

2900

3000

3100

3200

3300

3400

3500

3600

3700

3800

3900

4000

330

330

330

330

330

330

360

360

360

360

360

360

360

360

380

380

400

400

400

400

400

2154,9

2259,9

2365,0

2469,0

2574,1

2680,2

2785,2

2888,2

2994,3

3099,9

3205,5

3310,6

3415,8

3521,1

3626,4

3731,8

3837,1

3942,4

4047,8

4153,1

4258,5

91,61

97,83

104,21

110,23

116,91

138,70

159,88

168,52

176,83

183,07

189,30

198,33

207,36

224,04

240,72

252,01

276,74

289,11

301,74

314,74

327,75

NominalDiameter

DN(mm)

OuterDiameter

MAX.(mm)

Coupling Lenght (mm)

Weight MİN.

(kg/mt)

NominalDiameter

DN(mm)

OuterDiameter

MAX.(mm)

Coupling Lenght (mm)

Weight MİN.

(kg/mt)

Page 14: GRP Infrastructure Water & Sewage Pipes and Fittings

ESEN GRPCoupling

ESEN GRP couplings are produced using the same raw materials and same production technique as GRP Pipes. The sealing grooves of the produced couplings are opened with full dimension tolerances in fully automatic machines and the elastomeric EPDM REKA seals are installed to ensure precise sealing.

Esen GRP sleeves allow perfect angular deviations in the laying stage with excellent dimension and working tolerance range. These angular deviations are as follow.

Nominal Pipe Diameter (mm)

NominalAngular

Deflection(Degree)

Nom. Offset (mm) Nom. Radius of Curvature (m)

Pipe Lenght Pipe Lenght

DN≤ 500

500<DN≤900

900<DN≤1800

DN<1800

3

2

1

0,5

157

106

52

26

314

208

105

52

628

419

209

105

57

86

172

344

115

172

344

688

229

344

688

1376

3(m) 6(m) 12(m) 3(m) 6(m) 12(m)

Nominal Pipe Diameter (mm) Nominal Angular Deflection (Degree)

Pressure (PN) Bar

DN≤ 500

500<DN≤900

900<DN≤1800

DN<1800

3

2

1

0,5

1-16

2,5

1,5

0,8

NA

20

2

1,3

0,5

NA

25

1,5

1

0,5

NA

32

Offset

Pipe

Radius of Curvature Angular

Deflection

Coupling

Esen Elastomeric EPDM REKA seals provide safer installation simplicity compared to others and provide absolute water tightness even at high pressures

Page 15: GRP Infrastructure Water & Sewage Pipes and Fittings

The cross section of the Esen GRP Coupling is as shown in the picture above before pressure is applied to the pipeline.

Compared to other couplings manufactured with different machines and different production techniques, ESEN GRP Couplings provide easier and safer installation in all weather conditions and all kinds of ground conditions. Compared to other systems, ESEN GRP Couplings have the same flexural properties as the pipes.

You can see the cross section of the Esen GRP Coupling and the state of the pipeline after the pressure is applied in the picture above.

Elastomeric Epdm Reka Seals; with excellent dimension tolerance, the sealing ring is pressed against the sleeve wall.

The stopper part located between the two seals prevents the ends of the two pipes from hitting each other during damage.

ESEN GRPCoupling

12 / 13

Page 16: GRP Infrastructure Water & Sewage Pipes and Fittings

Performance StandardsStandards developed by ASTM, AWWA and ISO; This includes a range of glass fiber reinforced pipeapplications, including water, domestic wastewater, and chemical transport. The common point of all these standards is that they are all performance-based. In other words, the performance tests required for GRP Pipe are determined in these standards.

Page 17: GRP Infrastructure Water & Sewage Pipes and Fittings

14 / 15

PerformanceStandards

AWWA C950

AWWA M45

ISO 10639

ISO10467

EN 1796

Potable Water Pipe

GRP Design Guide

Potable Water Pipe

Drainage and Waste Water Pipe

Potable Water Pipe

Standard Concept

EN14364

ASTM D3262

ASTM D3517

ASTM D3754

BS 5480

Drainage and Waste Water Pipe

Unpressurized Waste Water Pipe

Potable Water Pipe

Pressurized Waste Water Pipe

Potable or Waste Water Pipe

Standard Concept

ASTM:

Nowadays there are different ASTM Product Standards used for various glass fiber reinforced pipe applications. Hydrostatic pressure test (ASTM D4161) is applied to flexible connection pipes with diameters from 200 mm to 3700 mm to simulate the operating condition. These standards include many quality control and qualification tests. ESEN PLASTIC GRP Pipe has the capacity to meet the requirements of all these ASTM standards.

AWWA:

AWWA C950 is one of the most comprehensive product standards for glass fiber reinforced pipes. This standard includes comprehensive requirements for quality control and prototype proficiency testing for pipes and fittings to be used in pressurized waterline applications. ESEN PLASTIC GRP Pipe is designed to meet the performance requirements of this standard. A new AWWA M-45 booklet contains several sections that include the design of GRP pipes laid underground and above ground.

ISO:

This product standard applies to GRP pipes used in water and wastewater transportation applications between 50 mm and 4000 mm in diameter. It covers pipes of 5 stiffness (SN630 - SN1250 -SN2500-SN5000 and SN10000) for proficiency tests and all product tests for pipes and sleeves and operating pressures from 1 bar to 32 bar. ESEN PLASTIC GRP Pipe is designed to meet the requirements of this standard.

This product standard applies to GRP pipes used in water and wastewater transportation applications with diameters from 100mm to 4000mm.

ESEN PLASTIC GRP pipe has been designed to meet the requirements of this standard.

EN:

Page 18: GRP Infrastructure Water & Sewage Pipes and Fittings

Performance Tests

The minimum performance requirements of the pipe proof of suitability by sampling;

The minimum performance requirements for all standards GRP pipes are both short and long term

ESEN PLASTIC performs the tests of “TS EN 1796, TS EN 14364, ASTM D3517, ASTM D3262, ASTM D3754,AWWA C950, DIN16869, ISO 10467 and ISO 10639”Standards in ISO 17025 Accredited Laboratory to meet the requirements.

ConnectionRing DeflectionLong Term Pressure Strength Corrosion Resistance Capacity

Page 19: GRP Infrastructure Water & Sewage Pipes and Fittings

Performance Tests

RAW MATERIALS :

The raw materials are supplied with certifications conforming to the quality criteria set by ESEN PLASTIC. In addition, all raw materials are subjected to sample tests prior to production. With these tests, it is determined that the raw materials are in compliance with the relevant standards and the criteria of Esen GRP laboratory.

GLASS FIBER :

Direct Winding Roving; The cylindrical package is supplied in coils such that the yarn structures are not damaged.

Cropable Wick; unidirectional continuous fibers. Reinforced glass fibers; The adhesive is held together by means of resin. Fibers of different thicknesses, weights and widths are available. Thanks to the tulle structures on the surface, layers with high resin content are formed.

RESIN :

The polyester resins are dissolved in styrene monomer. Thus, the cross-linking of the resin to the final thermoset structure is achieved. Organic peroxide catalyst is used to cure the polyester resin

SILICA SAND :

Silica Sand is used to increase pipe rigidity and the pipe is located around the neutral axis, the sand used generally has a high silica content.

16 / 17

Page 20: GRP Infrastructure Water & Sewage Pipes and Fittings

Controls

The circumferential and axial load carrying capacities of the produced pipes are proved by routine tests. In addition, the pipe structure and composition are checked and approved by tests

Controls during manufacturing process;

Visual Inspection Barcol Hardness Wall Thickness Measurement Pipe Length Measurement Outer Diameter MeasurementHydrostatic Leak Test

Inspections by taking samples;

Pipe Stiffness Structural damage deflection test without any damageStrapping Tensile Strength Axial Tensile Strength

Page 21: GRP Infrastructure Water & Sewage Pipes and Fittings

QUALITY CONTROL

ESEN PLASTIC GRP Pipe production technology includes detailed quality control program. The compliance of the production and tests of pipes and fittings with international standards and Turkish standards is ensured with this program.

QUALITY CONTROL TESTS

Raw materials are tested before production. Tests include the compliance of raw materials and manufactured products (pipe, coupling, fittings) with standards. These tests ensure that the pipe materials used comply with the specified standards.

In ESEN PLASTIC, certification works in accordance with ISO 9001 standards that are provided with the total quality approach implemented with the mutual participation of all employees.

Wall thickness of pipes

Visual Inspection

Pipe Length

Pipe Diameter

Pipe Stiffness

Pipe Rigidity

Pipe Axial Tensile Strength

Pipe Circle Tensile Strenght

Layer Adhesion

%10 of the specified thickness of a single point

Standard

± 60 mm

EN 1796, EN 14364, ISO 10467, AWWA C950 relevant outer diameter series conforms with (Seri – 1) table

Min. 33 Barcol

ASTM D-2412, EN 1228, ISO 7685 Standard

EN 1393, ISO 8513 Standard

EN 1394, ISO 8521 Standard

ASTM Standart D-2584 Standard

Measured Qualifications Limits of Change

Classification of pipes according to working pressure is done according to C 950 Standard project criteria in AWWA and project characteristics in M45

Performance Tests and Quality Control

18 / 19

Page 22: GRP Infrastructure Water & Sewage Pipes and Fittings

Polyester resin

Sand

Chop / Hoop ( Glass Fiber Products )

Seal / Stopper Stiffness

Seal / Stopper Dimension

Visual Control, Pipe ends

Visual Control, Inner and outer surface

Visual Control, Coupling inner and outer surface, coupling conduit

Visual Control, Fittings

Visual Control, Marking ( Pipe coupling, fittings )

Visual Control – Coupling Installation

Pipe/Coupling Inner Diameters Control

Pipe Wall Thickness Control

Pipe Outer Diameter

Pipe DOS, Chamfering and Calibration Control

Pipe Length

Fittings Dimensional Control

(Length, DOS, Angle, Chamfering and Calibration)

Rigidity Test

Crack Control in Inner Surface - Test A

Delamination Control - Test B

Surface Stiffness

Axial Tensile Strength

Ring Tensile Strength

Pipe Leakage Test

Composite Test

Impact Resistance Test

Water Absorbtion Test

Long Term Tensile Corrosion Test

Deviation from Circularity Strength Test in Wet Consitions

Long Term Specific Ring Stiffness

Long Term Impact Pressure Test

Each lot

Each lot

Each lot

Each lot

Each lot

Each lot

Each lot

Each Coupling

Each Fitting

Each Pipe, Coupling, Fittings

Each connection with Coupling

By the beginning of production

Each Pipe

Each Pipe

Each Pipe

Each Pipe

Each Fittings

Once a day or in each 50 pcs pipe

Once a day or in each 50 pcs pipe

Once a day or in each 50 pcs pipe

Each Pipe

Once a day or in each 50 pcs pipe

Once a day or in each 50 pcs pipe

Each pipe

Once a day or in each 50 pcs pipe

In each Shift

Once a day or in each 50 pcs pipe

Type Test

Type Test

Type Test

Type Test

Controlling Process

RAW

MAT

ERIA

LSVI

SUAL

CO

NTR

OL

DIM

ENSI

ON

AL C

ON

TRO

LTE

CHN

ICAL

PAR

AMET

ERS

LON

G T

ERM

TEST

S

PERFORMANCE TESTSand QUALITY CONTROL

Frequency

Page 23: GRP Infrastructure Water & Sewage Pipes and Fittings

SN 500

SN 625

SN 1000

SN 1250

SN 2000

24,4

22,7

19,4

18,0

15,4

40,8

37,8

32,4

30,0

25,7

Class Level A Level B

SN 2500

SN 4000

SN 5000

SN 8000

SN 10000

14,3

12,2

11,3

9,7

9,0

23,9

20,4

18,9

16,2

15,0

Class Level A Level B

Long Term Rigidity : ISO No requirements for long-term stiffness have been specified in ISO and AWWA

PRESSURE CLASSES

In ISO, pressure classes (PN) are made by accepting them in the bar unit to be applied. Nominal pressure classes:1, (2,5) ,(4), 6, (9) ,10,(12), (15), 16, (18), (20), 25, 32

In AWWA C950, the GRP rated pressures are classified as follows. Psi 50, 100, 150, 200, 250

DEFLECTION RATIOS: ISO and AWWA C950 have the same initial deflection requirements. The same classification system is valid in standard.

RIGIDITY CLASSIFICATION

Nominal rigidity values in ISO and AWWA C950 standards;

SN 1250

SN 2500

SN 5000

SN 10000

9 psi

18 psi

36 psi

72 psi

ISO AWWA

PerformanceStandards

20 / 21

Page 24: GRP Infrastructure Water & Sewage Pipes and Fittings

Esen Plastik; Provides engineering support to its customers before and after procurement in order to use the product and technology accurately and efficiently.

Our Expert Engineering Staff

Page 25: GRP Infrastructure Water & Sewage Pipes and Fittings

Esen Plastik with its expert engineers, supports its customers by considering the highest benefit in all stages of the projects.

Engineering services provided by Esen Plastik:

Hydraulic calculationsConcrete fixing mass calculations Connections with different materials Stress analysis of pipelinesTechnical and isometry drawingsField engineering servicesSupervisor service

22 / 23

Engineering Services

COMPOSITE MATERIALTECHNOLOGY

Composite Material is the new material that is formed by combining two or more number of materials , the best properties or combining them to create a new feature.

With the developing technology and industrialization, the need for materials has enabled the exploration and development of new composite materials.

Esen Plastik GRP pipes are composite materials and have all the superior features of this technology.

SN 2500

DN

PN 6 m/s

PN 10 m/s

PN 16 m/s

PN 20 m/s

PN 25 m/s

300

430

430

520

570

580

400

390

420

510

550

570

450

380

420

510

550

570

800

360

410

500

540

560

≥900

350

400

490

530

550

SN 5000

DN

PN 6 m/s

PN 10 m/s

PN 16 m/s

PN 20 m/s

PN 25 m/s

300

440

450

510

550

580

400

420

440

490

530

570

450

390

440

500

530

570

800

370

430

480

520

560

≥900

370

420

480

510

550

SN 10000

DN

PN 6 m/s

PN 10 m/s

PN 16 m/s

PN 20 m/s

PN 25 m/s

300

490

470

510

560

570

400

470

450

500

560

570

450

460

440

510

550

570

800

440

420

490

540

560

≥900

430

410

480

530

560

WAVE PROPAGATION VELOCITY

All data are prepared for information purposes according to 12m pipe. Clear information will vary depending on the pipe laying conditions.

Please contact Esen Plastik for clear data.

Page 26: GRP Infrastructure Water & Sewage Pipes and Fittings

Chemical Chemical

Kimyasal

StandardGRP Pipe

SpecialGRP Pipe

StandardGRP Pipe

SpecialGRP Pipe

Copper Sulphate

Barium Hydroxide

Barium Carbonate

Barium Chloride

Barium Sulfate

Benzoic Acid

Beer

Zinc Chlorate

Distilled Water

Sea Water

Diesel Fuel

Natural Gas

Ethyl Alcohol

Ethylene Glycol

Ferro Chloride

Nitrate Ferro

Ferro Sulphate

Phthalic Acid

Flobonic Acid

Fluosilic Acid

Formic Acid

Phosphoric Acid

Phosphorium Pentoxide

Kerosene

Glycerine

Gluconic Acid

Glucose

Crude Oil, Sour

Crude Oil, Sweet

Bleached Hydrosulphite

Acrylic Acid

Aluminum Oxide

Aluminum Chloride

Aluminum Fluoride

Aluminum Hydroxide

Aluminum Nitrate

Aluminum Potassium Sulfate

Ammonia Gas

Ammonium Carbonate

Amonyum Bisulfat

Ammonium Bicarbonate

Ammonium Chloride

Ammonium Citric Acid

Ammonium Fluoride

Ammonium Hydroxide

Ammonium Nitrate

Ammonium Persulfate

Ammonium Phosphate

Ammonium Sulfate

Analin Sulfat

Acetic Acid

Acidic Chloride

Acid Ferric Nitrate

Acid Ferric Sulfat

Copper Fluoride

Copper Chloride

Copper Nitrate

Copper Cyanide

ESEN GRP Pipes are specially designed according to the chemicals to be transported.The table below is for informational purposes

GRP PIPE Chemical Table

Page 27: GRP Infrastructure Water & Sewage Pipes and Fittings

24 / 25

Pipe Laying Procedure

The appropriate installation procedure for GRP Pipe varies depending on the rigidity of the pipe, the depth of the trench, the width, the natural soil properties, the additional loads on the pipeline and the filling material. In order to support the pipe in a healthy way, the natural ground should be firmly wrapped around the pipe area filler. The following pipe installation procedures are provided to assist in the proper laying of the pipe.

Page 28: GRP Infrastructure Water & Sewage Pipes and Fittings

It shows the typical trench section dimensions. The dimension “A” should always be wide enough to ensure that sufficient filling material can be placed and compacted in the pipe basin. Dimension“A” should also be wide enough to allow the clamping equipment to operate in a manner that does not damage the pipe. Typical ’’ A ’’ size, except for very small diameters, the minimum is 0.4 DN. For larger diameters, a smaller value for “A” may be appropriate, depending on the natural substrate, filler material and compression technique.

For example, in the 1st, 2nd and 3rd groups of natural soils, the trench can be kept narrower by using SC1 and SC2 fillers which do not require much compression.

NOTE: If soft, loose, unstable or expanding natural ground is found on the bottom of the trench, it may be necessary to increase the thickness of the bearing pad to provide regular and unchanged support along the pipe.

Standard Trench

Required 300 mm.DN/2 Max.

FililngPipe Basin

Pipe Area

Bearing-Min.100 mm Max.150 mm

Groundwork (if required)

Page 29: GRP Infrastructure Water & Sewage Pipes and Fittings

26 / 27

SC1

SC2

SC3

SC4

Crushed stone containing less than 15% sand, maximum 25% amount of material

Clean coarse materials containing 12% or more fine grains Sandy or fine grains containing less than 70% fine grains

Less than 12% fine grain containing clean coarse materials

Fine-grained materials containing more than 70% fine-grained piecess

FillingMaterialGroup

Definition of Filling Materials

Pipe Trench Filling

The pipes may float due to heavy rainfall or may be exposed to thermal expansion, which may result from high temperature differences between day and night. In order to avoid such noncon-formities, it is recommended that each pipe, which has been completed, be filled to the surface level.

If pieces of the pipe is assembled but the filling process will pass; first, the joints in the middle of each pipe should be filled to the top to prevent movement. Correct selection and tightening of the pipe area filler are crucial for controlling vertical deflection and for pipe performance.

Wrong bearing support

Correct bearing support

Page 30: GRP Infrastructure Water & Sewage Pipes and Fittings

Pipe Trench Filling

Inappropriate basin support.

Providing appropriate basin support.

WRONGCORRECT

It should be ensured that the filling material does not contain trash and foreign materials which may damage the pipe and cause the lateral support to decrease. Located in the basin region between the bottom of the pipe and the bearing. The filling and compression of the material must be carried out before the remaining filling material is placed. The amount of energy consumed in the compression method should be checked as well as the thickness of the compacted fill layer. The appropriate filling process is generally carried out in layers between 100 mm and 300 mm thickness depending on the filling material and the compression method.

Gravel or crushed stone is used as filling material, When these materials are relatively easy to compress. The thickness of the filler layer is 300 mm. Since thinner materials require more compression energy, the thickness of the filler layer should be limited. In order to support the pipe well, it should be ensured that each filling layer is well compacted.

Page 31: GRP Infrastructure Water & Sewage Pipes and Fittings

28 / 29

On-Pipe Compression

When it reaches the top of the pipe, it should not exceed 1.5% of the pipe diameter. This initial amount of ovalization will depend on the amount of energy required to achieve the desired relative degree of compression. High amounts of energy required for SC3 and SC4 fillers can cause this ovalization limit to be exceeded. In this case, can be considered the use of pipes or other filling materials of higher rigidity.

Type SC1

Type SC2

Tip SC1

Tip SC2

100 - 200 mm

100 - 150 mm

Type SC3

Type SC4

Two-time transition provides a good compression.

2-4 transitions depending on desired density and height.

The number of transition and layer height depends on the desired density.Optimal or close moisture content.Check compression.

It may require high compression energy. Check that ifthe moisture content is ideal. Make sure that the compression is done correctly.

Filler Type

Hand Operated Impact Compactor

Hand Operated Vibratory Plate Compactor

Suggestions

With the Type 1 mounting version, the pipe area up to 300 mm in height must be tightened. In areas that will be subject to traffic load, the trench filler is compacted to the natural ground to minimize road surface settlements. It provides the thickness of the soil cover on the pipe required for the operation of various compaction equipment on the pipe. Care should be taken not to apply high compression energy to the top of the pipe, which may cause deformity of the pipe circularity. At the same time, the material in this section should not be left loose and should be reached to the desired density.

Permissible initial vertical deflection values

3

2

WATER- HUMMBER IMPACT :

The impact of the water-hammer is a change in the flow rate of pipe systems caused by the sudden decrease or increase of the system pressure. These changes are caused by sudden opening and closing of the valves, sudden stopping of the pumps in the event of a power failure or sudden operation during commissioning. The water- hummer pressure in the GRP pipes and steel and ductile pipes are is 49.9% . The water-hummer impact pressure in GRP pipes is approximately 39.9% of the rated pressure. The water-hummer stroke is calculated by the following formula.

AASHTO H20 ( C )

BS 153 HA ( C )

ATV LKW 12 ( C )

ATV SLW 30 ( C )

ATV SLW 60 ( C )

Cooper E80

72

90

40

50

100

16000

20000

9000

11000

22000

1

1,5

1

1

1,5

3

Loads Type Strength (Kn)

Strength(Ibs)

Depth of Embedment

(m)

Demiryolu

Minimum pipe area filling floor module is taken as 6.9 Mpa

∆H= (W*∆V)/g ∆H : Change in pressure (m) w: Surge wave celerity (m/sn) ∆V : Change in fluid velocity (m/sn) g: Gravitational acceleration (m/sn²)

Large Diameter (DN 300)Beginning

Small Diameter (DN 250)Beginning

Vertical Deflection ( of Diameter %)

TRAFFIC LOADS

Page 32: GRP Infrastructure Water & Sewage Pipes and Fittings

Double Sided Elastomer Sealed Coupling Mounting

Page 33: GRP Infrastructure Water & Sewage Pipes and Fittings

Double Sided Elastomer Sealed Coupling Mounting

30 / 31

A - REKA COUPLING

The following steps (1-5) must be followed when fitting the Reka couplings.

Step 1 Foundation and Bearing

The bearing should be dug in such a way that at each point of the coupling, the head rests on the coupling to prevent it from hanging and to ensure continuous support of the pipe. After the jointing process is completed, the filling and bearing of the coupling area should be made properly.

Step 2 Cleaning the Coupling

The grooves of the double-sided couplings and the Epdm Reka seal to be placed in the couplings should be thoroughly cleaned until they are clear of dirt and oil.

Step 3 Installing the Seals

The elastomer seal is placed in the groove of the coupling such that the protrusions of the Epdm Reka seal are facing out of the groove. Do not apply lubricant into the groove or on the seal during gasket installation. However, the seal duct can be moistened with water for easy installation of the seals.

Step 4 Apply Lubricant to Elastomer Seal

Then apply a thin layer of lubricant to Epdm Reka Seal. The amount of lubricant that should be used in each coupling must be kept constant.

Step 5 Cleaning the Pipe Opening and Applying Lubricant

The pipe opening that will pass into the coupling must be cleaned from sand, dust, dirt and oil. Check the sealing surface of the pipe opening for any damage. Apply a thin layer of lubricant to the area of the pipe up to the Pieces marked with a black strip. Make sure that the coupling and the pipe opening remain clean after the lubricant has been applied. A plastic sheet of approximately 1 m² or a clean cloth to be placed under the jointing area has been found to be an effective way of ensuring that the pipe ends and seals remain clean.

Page 34: GRP Infrastructure Water & Sewage Pipes and Fittings

REDUCER

TEE PIECES

ELBOW

FLANGE

A L=2.5 x (DL-DS) B

LL

LL

DLDS

DLDS

A L=2.5 x (DL-DS) B

C PIECES - WYE (Angled Tee)

LL

R

α

L

L

R

Esen GRP Pipeand Fittings

DN

Smooth Flange

H

F

t

A

B

L

DL

Ds

Page 35: GRP Infrastructure Water & Sewage Pipes and Fittings

32 / 33

300350400450500600700800900

1000110012001300140015001600170018001900200021002200230024002500260027002800290030003100320033003400350036003700380039004000

1000,41200,41300,41400,41500,41700,41900,42100,42200,42400,42600,42800,42900,43100,43300,43400,43600,43700,43900,44000,44200,44300,44500,44600,44800,45000,45100,45300,45400,45600,45700,45900,46100,46300,46500,46600,46800,47000,47100,47300,4

450,4530,4610,4660,4720,4790,4870,4970,4

1050,41150,41220,41320,41400,41480,41590,41660,41740,41810,41890,41970,42040,42120,42190,42270,42370,42450,42520,42600,42680,42750,42830,42900,43010,43130,43230,43280,43380,43460,43540,43610,4

1000,41200,41300,41400,41500,41700,41900,42100,42200,42400,42600,42800,42900,43100,43300,43400,43600,43700,43900,44000,44200,44300,44500,44600,44800,45000,45100,45300,45400,45600,45700,45900,46100,46300,46500,46600,46800,47000,47100,47300,4

450,4530,4610,4660,4720,4790,4870,4970,4

1050,41150,41220,41320,41400,41480,41590,41660,41740,41810,41890,41970,42040,42120,42190,42270,42370,42450,42520,42600,42680,42750,42830,42900,43010,43130,43230,43280,43380,43460,43540,43610,4

1200,41400,41500,41600,41700,41800,42100,42400,42600,42800,43000,43200,43500,43700,43900,44100,44300,44500,44800,45000,45200,45300,45600,45700,45900,46100,46200,46400,46600,46700,46900,47100,4

−−−−−−−−

550,4630,4690,4740,4820,4870,4990,4

1120,41250,41350,41450,41550,41680,41780,41890,42010,42110,42210,42340,42470,42540,42620,42740,42790,42900,43000,43070,43150,43250,43300,43400,43500,4

−−−−−−−−

GRP FITTINGS

Equal TEE Pieces

D(mm)

PN ( 1 - 6 )L (max.) mm H (max.)mm L (max.)mm H (max.)mm L (max.)mm H (max.)mm

PN 10 PN 16

Fitting lengths and diameters may vary according to project pipe length, Pn and project specifications.

D

D

B

L

H

D

D

B

L

H

Page 36: GRP Infrastructure Water & Sewage Pipes and Fittings

150

200

250

150

200

250

150

200

250

150

200

250

150

200

250

300

400

450

200

400

600

200

400

600

300

500

800

300

500

800

500

800

1000

500

800

1000

300

350

400

450

500

600

700

800

900

1000

1100

1200

800,4

900,4

900,4

800,4

900,4

900,4

800,4

900,4

900,4

800,4

900,4

900,4

800,4

900,4

1000,4

1000,4

1300,4

1400,4

900,4

1400,4

1800,4

900,4

1500,4

1800,4

1300,4

1700,4

2100,4

1300,4

1800,4

2200,4

1700,4

2100,4

2400,4

1800,4

2200,4

2400,4

400,4

430,4

430,4

430,4

450,4

450,4

460,4

490,4

490,4

480,4

510,4

510,4

510,4

540,4

570,4

620,4

720,4

740,4

660,4

790,4

870,4

710,4

870,4

940,4

870,4

1000,4

1050,4

950,4

1070,4

1120,4

1150,4

1200,4

1220,4

1220,4

1270,4

1300,4

800,4

900,4

900,4

800,4

900,4

900,4

800,4

900,4

900,4

800,4

900,4

900,4

800,4

900,4

1000,4

1000,4

1300,4

1400,4

900,4

1400,4

1800,4

900,4

1500,4

1800,4

1300,4

1700,4

2100,4

1300,4

1800,4

2200,4

1700,4

2100,4

2400,4

1800,4

2200,4

2400,4

400,4

430,4

430,4

430,4

450,4

450,4

460,4

490,4

490,4

480,4

510,4

510,4

510,4

540,4

570,4

620,4

720,4

740,4

660,4

790,4

870,4

710,4

870,4

940,4

870,4

1000,4

1050,4

950,4

1070,4

1120,4

1150,4

1200,4

1220,4

1220,4

1270,4

1300,4

800,4

1000,4

1000,4

800,4

1000,4

1000,4

800,4

1000,4

1000,4

800,4

1000,4

1100,4

800,4

1000,4

1100,4

1200,4

1500,4

1600,4

1000,4

1600,4

2000,4

1000,4

1700,4

2100,4

1500,4

2000,4

2400,4

1600,4

2100,4

2500,4

2000,4

2500,4

2800,4

2100,4

2500,4

2800,4

430,4

480,4

480,4

450,4

500,4

500,4

490,4

540,4

540,4

510,4

590,4

590,4

540,4

620,4

640,4

720,4

790,4

820,4

690,4

890,4

970,4

760,4

990,4

1070,4

1000,4

1120,4

1200,4

1100,4

1220,4

1300,4

1300,4

1370,4

1420,4

1370,4

1450,4

1300,4

D(mm)

d(mm)

PN ( 1 - 6 ) PN 10 PN 16

Fitting lengths and diameters may vary according to project pipe length, Pn and project specifications.

L (max.)mm H (max.)mm L (max.)mm H (max.)mm L (max.)mm H (max.)mm

GRP FITTINGS

Unequal TEE Pieces

d

D

B

L

H

d

D

B

L

H

max max

Page 37: GRP Infrastructure Water & Sewage Pipes and Fittings

34 / 35GRP FITTINGS

Unequal TEE Pieces

500

800

1000

500

800

1000

500

800

1000

500

800

1000

500

800

1000

500

800

1000

500

800

1000

500

800

1000

800

1000

1200

800

1000

1200

800

1000

1200

1200

1600

2000

1200

1600

2000

1200

1600

2000

1300

1400

1500

1600

1700

1800

1900

2000

2100

2200

2300

2400

2500

2600

1800,4

2200,4

2500,4

1800,4

2200,4

2500,4

1900,4

2300,4

2600,4

1900,4

2300,4

2600,4

1900,4

2300,4

2600,4

2000,4

2400,4

2600,4

2000,4

2400,4

2600,4

2000,4

2400,4

2700,4

2400,4

2700,4

3000,4

2500,4

2700,4

3000,4

2500,4

2700,4

3000,4

3000,4

3500,4

4000,4

3000,4

3600,4

4100,4

3000,4

3600,4

4100,4

1300,4

1350,4

1380,4

1360,4

1410,4

1430,4

1440,4

1490,4

1510,4

1510,4

1560,4

1590,4

1560,4

1610,4

1640,4

1640,4

1690,4

1710,4

1690,4

1740,4

1760,4

1770,4

1820,4

1840,4

1870,4

1890,4

1920,4

1940,4

1970,4

1990,4

1990,4

2020,4

2040,4

2120,4

2170,4

2220,4

2200,4

2250,4

2300,4

2270,4

2320,4

2370,4

1800,4

2200,4

2500,4

1800,4

2200,4

2500,4

1900,4

2300,4

2600,4

1900,4

2300,4

2600,4

1900,4

2300,4

2600,4

2000,4

2400,4

2600,4

2000,4

2400,4

2600,4

2000,4

2400,4

2700,4

2400,4

2700,4

3000,4

2500,4

2700,4

3000,4

2500,4

2700,4

3000,4

3000,4

3500,4

4000,4

3000,4

3600,4

4100,4

3000,4

3600,4

4100,4

1300,4

1350,4

1380,4

1360,4

1410,4

1430,4

1440,4

1490,4

1510,4

1510,4

1560,4

1590,4

1560,4

1610,4

1640,4

1640,4

1690,4

1710,4

1690,4

1740,4

1760,4

1770,4

1820,4

1840,4

1870,4

1890,4

1920,4

1940,4

1970,4

1990,4

1990,4

2020,4

2040,4

2120,4

2170,4

2220,4

2200,4

2250,4

2300,4

2270,4

2320,4

2370,4

2200,4

2600,4

2900,4

2200,4

2700,4

3000,4

2300,4

2700,4

3000,4

2400,4

2800,4

3100,4

2400,4

2900,4

3200,4

2500,4

2900,4

3200,4

2500,4

3000,4

3300,4

2600,4

3000,4

3300,4

3000,4

3300,4

3600,4

3000,4

3300,4

3600,4

3100,4

3400,4

3700,4

3700,4

4300,4

5000,4

3800,4

4400,4

5100,4

3900,4

4500,4

5200,4

1480,4

1550,4

1600,4

1560,4

1630,4

1680,4

1640,4

1710,4

1760,4

1740,4

1810,4

1860,4

1810,4

1890,4

1940,4

1890,4

1960,4

2010,4

1960,4

2040,4

2090,4

2040,4

2120,4

2170,4

2170,4

2220,4

2270,4

2220,4

2270,4

2320,4

2320,4

2370,4

2420,4

2470,4

2570,4

2720,4

2550,4

2650,4

2800,4

2650,4

2750,4

2900,4

D(mm)

d(mm)

PN ( 1 - 6 ) PN 10 PN 16

Fitting lengths and diameters may vary according to project pipe length, Pn and project specifications.

L (max.)mm H (max.)mm L (max.)mm H (max.)mm L (max.)mm H (max.)mm

d

D

B

L

H

d

D

B

L

H

max max

Page 38: GRP Infrastructure Water & Sewage Pipes and Fittings

GRP FITTINGS

Unequal TEE Pieces

1000

1600

2000

1000

1600

2000

1000

1600

2000

1000

1600

2000

1000

1600

2000

1000

1600

2000

1000

1600

2000

1600

2400

3000

1600

2400

3000

1600

2400

3000

1600

2400

3000

1600

2400

3000

1600

2400

3000

1600

2400

3000

2700

2800

2900

3000

3100

3200

3300

3400

3500

3600

3700

3800

3900

4000

3000,4

3600,4

4100,4

2900,4

3700,4

4200,4

3000,4

3700,4

4200,4

3000,4

3700,4

4200,4

3000,4

3700,4

4200,4

3000,4

3800,4

4300,4

3000,4

3800,4

4300,4

3000,4

4800,4

5600,4

3000,4

4800,4

5600,4

3000,4

4900,4

5600,4

3000,4

4900,4

5600,4

3000,4

4900,4

5700,4

3000,4

4900,4

5700,4

3000,4

5000,4

5700,4

2300,4

2370,4

2420,4

2370,4

2450,4

2500,4

2430,4

2500,4

2550,4

2500,4

2580,4

2630,4

2550,4

2630,4

2680,4

2630,4

2700,4

2750,4

2680,4

2760,4

2810,4

2830,4

2930,4

3010,4

2880,4

2980,4

3060,4

2960,4

3060,4

3130,4

3010,4

3110,4

3180,4

3090,4

3190,4

3260,4

3140,4

3240,4

3310,4

3210,4

3310,4

3390,4

3000,4

3600,4

4100,4

2900,4

3700,4

4200,4

3000,4

3700,4

4200,4

3000,4

3700,4

4200,4

3000,4

3700,4

4200,4

3000,4

3800,4

4300,4

3000,4

3800,4

4300,4

3000,4

4800,4

5600,4

3000,4

4800,4

5600,4

3000,4

4900,4

5600,4

3000,4

4900,4

5600,4

3000,4

4900,4

5700,4

3000,4

4900,4

5700,4

3000,4

5000,4

5700,4

2300,4

2370,4

2420,4

2370,4

2450,4

2500,4

2430,4

2500,4

2550,4

2500,4

2580,4

2630,4

2550,4

2630,4

2680,4

2630,4

2700,4

2750,4

2680,4

2760,4

2810,4

2830,4

2930,4

3010,4

2880,4

2980,4

3060,4

2960,4

3060,4

3130,4

3010,4

3110,4

3180,4

3090,4

3190,4

3260,4

3140,4

3240,4

3310,4

3210,4

3310,4

3390,4

3600,4

4500,4

5200,4

3600,4

4500,4

5200,4

3700,4

4600,4

5300,4

3700,4

4600,4

5300,4

3700,4

4600,4

5300,4

3800,4

4700,4

5400,4

2650,4

2800,4

2950,4

2700,4

2850,4

3000,4

2800,4

2950,4

3100,4

2850,4

3000,4

3150,4

2900,4

3050,4

3200,4

3000,4

3150,4

3300,4

D(mm)

d(mm)

PN ( 1 - 6 ) PN 10 PN 16

Fitting lengths and diameters may vary according to project pipe length, Pn and project specifications.

L (max.)mm H (max.)mm L (max.)mm H (max.)mm L (max.)mm H (max.)mm

d

D

B

L

H

d

D

B

L

H

max max

Page 39: GRP Infrastructure Water & Sewage Pipes and Fittings

36 / 37GRP FITTINGS

Elbows

300350400450500600700800900

1000110012001300140015001600170018001900200021002200230024002500260027002800290030003100320033003400350036003700380039004000

450,4450,4525,4600,4675,4750,4900,4

1050,41170,41200,41270,41320,41370,41420,41470,41570,41670,41770,41870,41970,42070,42170,42270,42370,42470,42600,42700,42800,42900,43000,43100,43200,43300,43400,43500,43600,43700,43800,43900,44000,4

285,4285,4285,4335,4335,4335,4335,4410,4410,4410,4435,4485,4485,4510,4510,4560,4610,4685,4685,4710,4710,4785,4785,4810,4810,4

1100,41000,41100,41100,41200,41200,41300,41300,41300,41300,41400,41400,41500,41500,41500,4

320,4320,4310,4360,4385,4385,4410,4435,4460,4485,4510,4535,4535,4560,4585,4660,4685,4785,4785,4810,4820,4885,4885,4910,4910,4

1200,41200,41200,41200,41200,41300,41300,41300,41400,41400,41500,41500,41500,41500,41500,4

320,4320,4310,4360,4385,4385,4410,4435,4460,4485,4510,4535,4535,4560,4585,4660,4685,4785,4785,4810,4820,4885,4885,4910,4910,4

1200,41200,41200,41200,41200,41300,41300,41300,41400,41400,41500,41500,41500,41500,41500,4

410,4410,4435,4485,4535,4535,4610,4660,4710,4735,4760,4810,4835,4885,4900,4

1125,41200,41300,41300,41400,41400,41500,41600,41700,41800,41800,41800,41900,41900,42000,42000,42100,42100,42200,42200,42300,42300,42400,42400,42500,4

460,4460,4510,4560,4635,4635,4710,4785,4860,4885,4935,4

1100,41125,41175,41200,41350,41400,41500,41600,41600,41600,41700,41700,41800,41800,42000,42100,42200,42100,42200,42200,42300,42300,42400,42400,42500,42600,42600,42600,42700,4

660,4660,4710,4810,4960,4960,4

1175,41200,41450,41500,41550,41650,41700,41750,41800,42000,42100,42300,42400,42500,42500,42700,42800,42900,42900,43100,43100,43300,43300,43500,43500,43700,43700,43900,43900,44100,44100,44300,44300,44500,4

Fitting lengths and diameters may vary according to project pipe length, Pn and project specifications.

DN R L11.25

L22.5

L30

L45

L60

L90

LL

R

α

L

L

R

Page 40: GRP Infrastructure Water & Sewage Pipes and Fittings

GRP FITTINGS

Flanges

300350400450500600700800900

1000110012001300140015001600170018001900200021002200230024002500260027002800290030003100320033003400350036003700380039004000

40,445,445,450,450,460,465,470,475,480,490,495,4

100,4105,4105,4110,4115,4120,4125,4130,4135,4140,4145,4150,4160,4165,4170,4175,4180,4185,4190,4195,4200,4205,4210,4215,4220,5225,5230,5235,5

20,423,423,425,425,430,433,435,438,440,445,448,450,453,453,455,458,460,463,465,468,470,473,475,478,481,483,486,488,491,494,497,4

100,4103,4106,4108,4111,4114,4117,4120,4

700700700700700

10001000100010001000100010001000100010001000100010001000100013001300130013001300130013001300130015001500150015001500150015001500150015001500

Fitting length and diameters can be changed according to project specifications.

NominalDia (DN) mm

PN 0 -16 (bar)F (mm) T (mm) H (mm)

DN

Smooth Flange

H

F

t

Page 41: GRP Infrastructure Water & Sewage Pipes and Fittings

Fitting length and diameters can be changed according to project specifications.

38 / 39GRP FITTINGS

Reducers

300300350350400400450450500500600600700700800800900900

1000100011001100120012001300130014001400150015001600160017001700180018001900190020002000

200,4250,4250,4300,4300,4350,4350,4400,4350,4400,4400,4500,4500,4600,4600,4700,4700,4800,4800,4900,4900,4

1000,41000,41100,41100,41200,41200,41300,41300,41400,41500,41400,41500,41600,41400,41600,41700,41800,41600,41800,4

400,4400,4400,4400,4400,4400,4400,4400,4400,4400,4400,4400,4400,4400,4400,4400,4400,4400,4400,4400,4400,4400,4500,4500,4500,4500,4500,4500,4500,4500,4600,4600,4600,4600,4600,4600,4600,4600,4600,4600,4

250,4125,4250,4125,4250,4125,4250,4125,4375,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4250,4500,4500,4250,4

1000,4500,4500,4250,4

1000,4500,4

1050,4925,4

1050,4925,4

1050,4925,4

1050,4925,4

1175,41050,41300,41050,41300,41050,41300,41050,41300,41050,41300,41050,41300,41050,41500,41250,41500,41250,41500,41250,41500,41250,41450,41700,41700,41450,42200,41700,41700,41450,42200,41700,4

DL(mm)

DS(mm)

A=B(mm)

L(mm)

LL

(mm)

2100210022002200230023002400240025002500260026002700270028002800290029003000300031003100320032003300330034003400350035003600360037003700370038003900390040004000

1900,42000,42000,42100,42100,42200,42200,42300,42300,42400,42400,42500,42500,42600,42600,42700,42700,42800,42800,42900,42900,43000,43000,43100,43100,43200,43200,43300,43300,43400,43400,43500,43500,43600,43600,43700,43700,43800,43800,43900,4

600,4600,4600,4600,4600,4600,4600,4600,4750,4750,4750,4750,4750,4750,4750,4750,4750,4750,4750,4900,4900,4900,4900,4900,4900,4900,4900,4900,4

1050,41050,41050,41050,41050,41050,41050,41050,41100,41100,41100,41100,4

500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4500,4250,4

1700,41450,41700,41450,41700,41450,41700,41450,42000,41750,42000,41750,42000,41750,42000,41750,42000,41750,42000,41750,42300,42050,42300,42050,42300,42050,42300,42050,42600,42350,42600,42350,42600,42350,42600,42350,42700,42450,42700,42450,4

DL(mm)

DS(mm)

A=B(mm)

L(mm)

LL

(mm)

LL

DLDS

A L=2.5 x (DL-DS) B

LL

DLDS

A L=2.5 x (DL-DS) B

Page 42: GRP Infrastructure Water & Sewage Pipes and Fittings

GRP FITTINGS

WYE (Angled Tee )

300300350350350400400400450450450500500500600600600700700700800800800

200300250300350300350400350400450300400500400500600500600700600700800

600,4700,4650,4700,4750,4700,4750,4800,4750,4800,4850,4700,4800,4900,4800,4900,4

1000,4900,4

1000,41100,41000,41100,41200,4

624,4695,4660,4695,4730,4695,4730,4766,4730,4766,4801,4695,4766,4836,4766,4836,4904,4836,4907,4978,4907,4978,4

1049,4

1100,41200,41200,41200,41200,41200,41200,41200,41250,41250,41300,41200,41250,41300,41250,41350,41400,41350,41400,41500,41400,41500,41550,4

NominalDia DL

(mm)

NominalDia DS

(mm)B

(mm)A

(mm)L

(mm)

900900900

100010001000120012001200140014001400160016001600180018001800200020002000240024002400

700800900800900

1000100011001200120013001400120014001600140016001800160018002000180020002400

1100,41200,41300,41200,41300,41400,41400,41500,41600,41600,41700,41800,41600,41800,42000,41800,42000,42200,42000,42200,42400,42200,42400,42800,4

978,41049,41119,41049,41119,41190,41190,41261,41331,41331,41402,41473,41331,41473,41614,41473,41614,41756,41614,41756,41897,41756,41897,42180,4

1500,41550,41600,41550,41600,41700,41700,41750,41800,41850,41900,41900,41850,42000,42100,42000,42100,42200,42100,42200,42300,42200,42400,42600,4

NominalDia DL

(mm)

NominalDia DS

(mm)B

(mm)A

(mm)L

(mm)

A

B

L

DL

Ds

Fitting lengths and diameters may vary according to project pipe length, Pn and project specifications.

Page 43: GRP Infrastructure Water & Sewage Pipes and Fittings

40 / 41Certificates andOur documents

Page 44: GRP Infrastructure Water & Sewage Pipes and Fittings

Certificates andOur documents

Page 45: GRP Infrastructure Water & Sewage Pipes and Fittings

42 / 43Certificates andOur documents

Page 46: GRP Infrastructure Water & Sewage Pipes and Fittings

Certificates andOur documents

Page 47: GRP Infrastructure Water & Sewage Pipes and Fittings

44 / 45Certificates andOur documents

Page 48: GRP Infrastructure Water & Sewage Pipes and Fittings

Certificates andOur documents

Page 49: GRP Infrastructure Water & Sewage Pipes and Fittings
Page 50: GRP Infrastructure Water & Sewage Pipes and Fittings
Page 51: GRP Infrastructure Water & Sewage Pipes and Fittings

www.esenplastik.com.tr

Page 52: GRP Infrastructure Water & Sewage Pipes and Fittings

Izmir Plant:Atatürk Organize Sanayi Bölgesi 10006 Sk. No:71 B.Çiğli - İzmir / TÜRKİYETel: 0232 376 70 11 Fax: 0232 376 70 10

[email protected] www.esenplastik.com.tr