what is growth policy?
growth policy is…a biennial resolution adopted by the montgomery county council aimed at managing growth to match the adequacy of public facilities. historically, growth policy has focused on the adequacy of roads and schools.
does it matter?the timing of development, in coordination with the provision of public facilities, attempts to keep road congestion and school crowding to a minimum.
growth policy - current
currently, an applicant must mitigate site impacts related to transportation and schools:
transportation - - local area transportation review (latr)- policy area mobility review (pamr)
schools - - projected school enrollment vs projected capacity
current PAMR requires mitigation in 16 policy areas
growth policy - pamr
TRANSIT ARTERIAL
A D
B D
C D
D C
E B
E A
current latr examines intersection capacity near each development site
growth policy - latr
• objective: make sure development does not overwhelm nearby intersections.
• applied to all projects generating 30 or more peak hour trips.
• if intersection fails, developer can make improvements, mitigate trips, or in limited cases – make a payment to the County.
• intersection congestion standards vary by area.
local area transportation review (latr) congestion standards by growth policy area
growth policy - latr
growth policy – transportation mitigation
• priority is trip reduction, non-auto, then roads• pamr and latr can be satisfied concurrently• payment in lieu opportunities
• non-auto facilities apply to pamr and latr• current table derived from latr• rates based on old cost data
growth policy - schools
current school test
compares projected 2014 enrollment with 2014 classroom capacity for each of the 25 high school clusters at the elementary, middle and high levels.
if projected enrollment at any level exceeds 105% of program capacity, residential subdivisions in the affected cluster will be required to make a school facility payment.
if projected enrollment at any level exceeds 120% of program capacity, residential subdivisions in the affected cluster will be under moratorium
2009 growth policy - why change?
does it work?with just 4 percent of its land area available for development, which requires more infill and redevelopment – the tests for the adequacy of our facilities must evolve.
what do we do next?provide a framework for the provision of facilities that contribute to a sustainable community.
2009 growth policy - study
review of smart growth initiatives nationwide, leed nd and california sb375:
2009 growth policy – what is changing?
growth management tool application proposedmaster plans where same
zoning how same
subdivision regulations how same
school capacity when minor change to monetary assessment
LATR when minor changes to mitigation types
PAMR when stay within general bounds of PAMR – encourage smart growth
growth policy only affects APFO
2009-2011 growth policy___________________________________________________________________________
primary changes
- smart growth criteria
- adequate mobility
- apf transferability for transportation and schools
- grandfathering completed applications 12 months prior to moratorium
eleven recommendations
2009-2011 growth policyrecommendation 1.
smart growth criteria- close to transit- mixed use- uses density in zone- energy efficient- affordable housing
PAMR offset to MPDU
spatial coverage of bus and metro stops within ½ mile
2009-2011 growth policyrecommendation 1.
Montgomery County - Smart Growth CriteriaAll projects must meet the following criteria to be considered for an Alternative PAMR Review and PAMR Offset:
Project must be located within ½ mile of an existing or planned major transit stop or high-quality transit corridor. A high-quality transit corridor means a corridor with fixed route bus service where service intervals are no longer than 15 minute during peak commute hours. A project shall be considered to be within one-half mile of a major transit stop if all parcels within the project have no more than 25% of their area farther than one-half mile from a transit stop or corridor and if not more than 10% of the residential units in the project are father than one-half mile from the stop or corridor. A planned transit stop or corridor is one that is funded for construction within the first four years of the Consolidated Transportation Program and/or the Capital Improvement Program and
Project must be mixed-use with a minimum 50% residential use and
Project must seek to achieve the maximum density of the site using 75% or more of the maximum density allowed in the zone (including all applicable bonuses) subject to the limits specified in the master/sector plan and
Building(s) exceeds energy efficiency standards by 17.5% for new buildings or by 10.5% for existing building renovation. Or, building(s) has on-site energy production such that 2.5% of the annual building energy cost is off-set by the renewable production system (LEED New Construction/Major Renovation)
And, the project must provide additional affordable housing, either workforce housing or moderately-priced dwelling units, above and beyond that required for plan approval such that 25 percent of the PAMR mitigation resource being offset is applied to this obligation.
The PAMR Offset will be directed as follows: Fifty percent of the PAMR mitigation resource being offset must be directed to transit infrastructure.
Twenty-five percent of the PAMR mitigation resource being offset must be applied to the provision of additional affordable housing, either workforce housing or moderately-priced dwelling units, above and beyond that required for plan approval.
The remaining twenty-five percent of the PAMR mitigation resource will be retained by the developer.
2009-2011 growth policyrecommendation 2.
adequate mobility
balance between land use and transportation – establish symmetrical treatment of transit and arterial level of service (LOS) standards
2009-2011 growth policyrecommendation 2. continued
how does LOS D or LOS E compare to current conditions?
D
E
2009-2011 growth policyrecommendation 3.
apfo transportation
non-auto facility values – expand the range of candidate non-auto facility types eligible for impact mitigation and set values at $11,000 per vehicle trip
2009-2011 growth policyrecommendation 4.
apf transfer: transportation
apf transferability – allow vested apf rights to be transferred into an urban area from within the parent policy area
2009-2011 growth policyrecommendation 5.
apfo transportation
TOD trip generation rates – lower the residential trip generation rates in MSPAs by 18% based on MWCOG survey data used in other urban areas
2009-2011 growth policyrecommendation 6.
apfo transportation
white flint apf approval process – replace LATR and PAMR with designated public entities and other funding mechanisms, in white flint
2009-2011 growth policyrecommendation 7.
policy area boundary changes – change appropriate policy area boundaries as recommended in draft sector plans including establishment of a life sciences center policy area and revision to white flint, germantown town center and r&d village
2009-2011 growth policyrecommendation 8.
apfo schools
school facility payment threshold – set the threshold for application of a school facility payment at projected enrollment greater than 110% of projected program capacity at any school level by cluster
2009-2011 growth policyrecommendation 9.
apfo schools
moratorium threshold – retain the threshold for moratorium on residential subdivisions at projected enrollment of 120% of projected capacity at any school level by school cluster
2009-2011 growth policyrecommendation 10.
apfo schools
grandfather completed applications – grandfather all applications completed within 12 months prior to a moratorium on residential subdivision as a result of school capacity projected deficits. all grandfathered projects would be required to pay the school facility payment.
2009-2011 growth policyrecommendation 11.
apf transfer:schools
apf transferability – allow vested apf rights to be transferred within a school cluster (sfp transfers with apf)
2009-2011 growth policyrecommendation 12.
future studies
1.biennial growth policy report2.compact subdivision development3.LEED classification as a component of growth policy4.using carbon offsets as an element of sustainable growth5.dedicated transit revenue6.land use impact on vehicle miles travelled7.retail impacts on vmt8.impact tax issues9.highway mobility report funding10.fiscally sustainable development11.options to latr
2009-2011 growth policyfall schedule
september:
county council public hearing 9/22/09
october:
worksessions with the PHED committeepossible worksessions with the MFP committeeworksessions with the full council
november:
growth policy resolution must be adopted by 11/15/09
2009-2011 growth policyerrata
page 36. recommendation 1: transportation and land use-related recommendations
“within Metro Station Policy Areas” should be deleted
page 37. first paragraph
“fifty percent of the transportation impact tax” should read “seventy-five percent of the transportation impact tax”
page 38. heading of graphic
“metro station policy areas” should read “areas with transit proximity”
page 26. population figures by decade
2010 population should be 954,4002030 population should be 1,122,300
page 45. recommendation 7: new life sciences center policy area
life sciences center policy area is within the current R&D village policy area