Growing the world’s largest zinc resourceBrian Hearne – Chief Operating Officer Xstrata Zinc Australia
Analyst Visit April 2011
22
Agenda
Introduction
Market Update
Delivering Organic Growth – Xstrata Zinc Australia
Future Growth Options
Conclusion
33Introduction
44
Global Footprint of Xstrata Zinc Operations
Introduction
Xstrata Zinc Canada
Xstrata Zinc Europe
Xstrata Zinc Australia
55
Creating The Leading Global Zinc ProducerThrough M&A And Organic Growth§ Initial platform of European zinc smelters§ M&A growth through MIM (Mount Isa and McArthur River) and Falconbridge
(Brunswick, Kidd, CEZn and Antamina)§ Acquisitions further augmented by organic growth
Industry Ranking - 2010
Top five share: 30%
Source: Brook Hunt
Industry Ranking - 2004
Top five share: 26%
# 8
# 1
Mined Production
Mining Assets: Mount Isa, McArthur River, Brunswick, Kidd, Perseverance, Antamina
Mining assets: Mount Isa, McArthur River
Introduction
0 200 400 600 800
Teck Cominco Limited
Zinifex
Anglo American plc
Noranda
New Boliden
Xstrata
0 200 400 600 800 1000 1200
Xstrata
Vedanta
Teck
MMG
Glencore
66
0
500
1000
1500
2000
2500
0
5
10
15
20
25
30
2004 2010
LTIFRTRIFRDISR
§ Ongoing improvement in Sustainable Development targets– 57% reduction in Total
Recordable Injuries– 78% reduction in Lost Time
Injuries– 86% reduction in Disabling
Injuries
§ Strong production growth – Zn mine production:
312kt à 1.1 Mt (+255%)– Zn metal production capacity:
646kt à 825kt (+28%)
§ Vertical integration of smelting and mine production– Zn mine/Zn metal:
48% à 133% (2004-2010)
Safety
Xstrata Zinc Growth
Introduction
kt
Significant Progress Achieved In Our Strategic Goals In Past 5 Years
0
200
400
600
800
1000
1200
2004 2005 2006 2007 2008 2009 2010
Zinc in ConcentratesZinc Metal Production capacity
77-50
-
50
100
150
200
2,004 2,005 2,006 2,007 2,008 2,009 2,010
EuropeCanadaAustralia
§ Growth in Resources and reserves (2004-2010)
– Zinc mine reserves: 81Mt ore à 179Mt ore (+120%)
§ On-going cost cutting and C1 cash cost improvement (2004-2009)
– Over $600m accumulated savings in past 6 years
Reserve Growth
Real Unit Cost Savings
Mt ore
Introduction
81 (64)
+162 179
0
50
100
150
200
2004 Ore mined Increase in reserves
2010
US$m
Significant Progress Achieved In Our Strategic Goals In Past 5 Years (cont.)
88
§ Transformation of Xstrata Zinc repositioned to bottom half of cost curve– Mt Isa established as tier one asset with low cost position and long mine
life – Xstrata Zinc in first quartile position excluding McArthur River production– Although a competitive producer, McArthur River with a bulk concentrate
should be analyzed separately
Improved cost curve position
0 50th
Cas
h Cos
t
Percentile
cost position
XstrataZinc2010
XZn2006
Generic cost
curve
10th 90th
XstrataZincexcl. MRM
0 50th
Cas
h Cos
t
Percentile
cost position
Mt Isa
2006Generic
cost curve
10th 90th
Mt IsaBrunswick
Perseverance
Brunswick
McArthur River
McArthur River
2010
Significant Progress Achieved In Our Strategic Goals In Past 5 Years (cont.)
Introduction
Cost curve position of mines
99Market Update
1010
660
680
700
720
740
760
780
800
2008 2009 2010 2011850
900
950
1000
1050
1100
2008 2009 2010 2011
§ Zinc market currently in surplus – Production cuts in downturn reversed on recent higher prices
§ World zinc demand slowly catching up with production§ World lead market is now balanced
Zinc production and consumption Lead production and consumption
Zinc And Lead Market Demand RecoverySlowly Reversing Surplus Built In Downturn
Source: ILZSG Market Update
Metal production Metal consumption
kt zinc (12 month moving total) kt lead (12 month moving total)
1111Source: Brook Hunt, Xstrata Zinc
§ Global zinc demand to grow ~4% in coming years, driven by strong demand in the developing countries
– 5.8% p.a. in developing countries – 1.5% p.a. in mature economies
§ Global lead demand also set for strong growth
– Growth rate of more than 4% driven by China and other developing countries
– Strong growth in lead-acid batteries (~80% of total lead consumption) driven by by robust output of cars, e-bikes, motorbikes as well as by the large replacement sectors of these vehicles
5
10
15
20
25
1960 1970 1980 1990 2000 2010 2020
China
Rest of World
MtForecast CAGR 4%
CAGR 4%
CAGR 0.3%
CAGR 5%
Global Pb consumption
Global Zn consumption
Strong Demand Outlook For Lead And Zinc
Market Update
FORECASTCAGR 4.3%
CAGR2.7%
CAGR1.5%
2468
1012141618
1990 2000 2010 2020
China
Rest of World
1212
§ Several zinc and lead mines are expected to close as reserves become depleted – Capacity closures by 2016:
– Zinc: 1.9Mt – Lead: 0.5Mt
– New projects by 2016:– Zinc: 800kt– Lead: 150kt
Upcoming Mine Closures To Constrain Supply …
Source: Brook Hunt, Xstrata Zinc
Expected zinc and lead mine closures
Zinc Lead
Brunswick PerseveranceSnow/Trout LakeEl Mochito Lisheen
KassandraAngasMt Garnet
CenturyDuck PondGolden Grove
SkorpionMyra FallsMae SodEl ToquiMahr TunnelRauraPomorzany
CanningtonGuemassaCayeli
kt cumulative lost production
-442
-716
-1310
-1720
-1884
-81-143 -182
-228
-470
2500
2000
1500
1000
500
02012 2013 2014 2015 2016 2017
Market Update
1313
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
2003
2005
2007
2009
2011
2013
2015
2017
2019
Zn ProjectsChina Zn mine prodZn mine requirement
Creating A Significant Concentrate Deficit And Difficult Conditions For Custom Smelters
Source: Brook Hunt, Xstrata Zinc Market Update
Growing Chinese
supply gap
§ Zinc mine production in China is expected grow at about 3% in coming years due to declining head grades, closure of end-of-life mines and delayed reserve replacement
§ Large resource base but development projected to lag strong demand growth
§ Characterized by many small producers with government encouraging consolidation and integration
§ China projected to be continued net importer of zinc and lead concentrates contributing to a tight concentrates market going forward
1414Source: Brook Hunt, Xstrata Zinc
Global Zinc And Lead Markets Require Significant Supply Growth To Balance Markets
Market Update
Forecast global zinc mine production and consumption
§ With expected mine closures, zinc industry will need to develop about 7Mt of new mine capacity by 2020 and about 14Mt by 2025 in order to meet expected demand
§ Projects classified as probable would cover only 2.4Mt
§ Although many other projects classified as “possible” could help cover this gap, timing and delivery remains uncertain
Zinc mine production7 Mt needed by 2020 14Mt needed by 2025
Lead mine production 2Mt needed by 20204Mt needed by 2025
0
2
4
6
8
10
12
14
16
18
20
22
2000 2005 2010 2015 2020 2025
Probable projects B
Probable projects A
Zn Mine Production
Mine prod required2025:14 Mt
2020:7 Mt
1515Delivering Organic Growth – XZn Australia
1616
§ 2,070 employees and contractors
§ Mount Isa Mines zinc, Lead and Silver production - George Fisher
underground, Black Star open pit, Handlebar Hill open pit
- Zinc-lead concentrator and lead smelter
- Lady Loretta Project
§ Bowen Coke Works
§ McArthur River Mine - Open pit mine and zinc-
lead concentrator- Bing Bong port loading
facility
Xstrata Zinc Australia
Delivering Organic Growth – XZn Australia
1717
§ Xstrata Zinc has world’s largest zinc resource base, as well as mines of industry-leading quality and scale– Mt Isa* region contains the largest zinc resource in the world at 36Mt– Mc Arthur River follows in 2nd place with 19Mt
Current Production And Future GrowthSupported By A World Class Resource Base
Source: Brook Hunt * Mt Isa includes G. Fisher and the Lady Loretta deposit
Ranking of zinc assets by resource
Mt contained zinc
0 10 20 30 40
Mt Isa
McArthur River
Red Dog
Rampura Agucha
Lanping
Shalkiya Zn
Century
Antamina
Vazante
Neves Corvo
Reserves ResourcesXstrata Mines
Delivering Organic Growth – XZn Australia
1818
Mount Isa Mines Zinc-Lead Operations § Commenced in 1969
§ Products: - Zinc in concentrate - Lead in bullion - Silver in bullion
§ 74% of zinc concentrate exported to Asia and Europe
§ Lead bullion shipped to UK for refining § Current Projects:
− Black Star Deeps− George Fisher Mine Expansion − George Fisher North Crushing Plant − Black Star South
§ All mining projects are planned to ensure full utilisation of the zinc-lead concentrator capacity
Delivering Organic Growth – XZn Australia
1919
§ Significant increase in Mine production since 2005 to above 8.5Mtpa in 2010.
MIM Zinc mining and concentrate production (kt Zn)
Mount Isa Mines Zinc Mine Production
Delivering Organic Growth – XZn Australia
2020
Mining infrastructure for expansion of George Fisher Mine
Crushing Station & Hoisting Shaft
L72VENTSURFACE
SOUTH NORTH4.5Mtpa
55Mt
20Mt
35Mt
Haulage
1.2 Mtpa 3.3 Mtpa
20Mt
10L
14L
19L
12L13L
§ Expand extraction capacity and ore production by 1Mtpa from 3.5 to 4.5Mtpa and access new 20Mt mining block
– Estimated capex $274m in next 3years (underground crusher, new shaft at GF North, underground mine development for new 20Mt mining block, mobile equipment, etc.)
– Production to start in early 2013
Mount Isa MinesGeorge Fisher Mine ExpansionApproved September 2010
Delivering Organic Growth – XZn Australia
2121
Exhaust Shaft
Fresh Air Shaft Exhaust Shaft
Decline Development
George Fisher Mine Expansion5% Complete
Delivering Organic Growth – XZn Australia
2222
§ Around 40% of zinc-lead ore crushing currently conducted in Mount Isa being relocated to GFM
§ $36 million development announced in December and to be complete late 2011
§ Replaces 3 mobile crushing units
§ New facility will service the GFM operations for the life of mine at expanded production rate
§ Eliminates double handling of ore, lowers operating costs, reduces diesel consumption and reduces emissions
George Fisher Mine ExpansionNew Crushing Facility
Delivering Organic Growth – XZn Australia
2323
Profile of Black Star Open Pit
Mount Isa MinesBlack Star Deeps ProjectApproved April 2010
§ Deepening of Black Star Open Pit
– Access to 15mt of ore @ 4.3% Zn and 2.5% Pb
– Estimated capex $113m
– Project approved in April 2010
– Production to start at the end of 2011
§ Opportunity to extend the life of mine by 3 to 4 years to 2016
§ Maintains current employment levels of 190 employees
§ Up to 100 temporary contractors employed during development phase
§ Maintains current production profile of 4.5Mtpa
Delivering Organic Growth – XZn Australia
2424
§ Construction progressing as scheduled on time and on budget
§ BSOC Deeps starter projects
- R67 refrigeration relocation- completed - Water management & drainage - Portal relocation- Road net work revamp- WWD waste rock dump upgrade- Equipment & labour reinforcements
§ Stage 4 Ore & Stage 5 waste stripping
§ Sustain lead and dust management
§ Maintain vigilance over Void Management process
Black Star Deeps ProjectCivil Works 95% Complete / Pre-strip 15% Complete
Delivering Organic Growth – XZn Australia
2525
§ Extension of Black Star to the South– 13.4Mt ore @ 5.6% Zn and
4.2%Pb– 1.5Mt ore @ 1.1% Cu– Mine Plan Variation submitted
for Queensland Government approval in February 2011
– Mine life extension to 2018
§ Black Rock Open Pit– 1st stage 9Mt copper ore– 2nd stage: 12Mt Zn ore @ 3.5% Zn,
3.1%Pb and 15Mt Cu ore @ 1.1% Cu
§ Rio Grande open pit– 6 million tonnes ore; 2.4%
Zn, 3.6%Pb
Mount Isa MinesAdditional Growth Options – Mount Isa
Delivering Organic Growth – XZn Australia
2626
§ Currently operates as a swing mine utilising Black Star resources and fleet
§ Proposed extension of Handlebar Hill open pit mine through a single stage cutback – approved in March
§ Extension allows access to deeper ore and ore to north-east that is outside the currently approved Stage 2 pit design
§ Additional targeted reserves generate approximately 3Mt of ore @ 6.8% zinc and 2.7% lead
§ Estimated capex: $38m
Delivering Organic Growth – XZn Australia
Mount Isa MinesAdditional Growth Options – Handlebar Hill
2727
§ Approx 900km south east of Darwin
§ 60km from Borroloola
§ 120km from Bing Bong port loading facility
§ 24 hour operation mining zinc, lead and silver§ One of the world’s largest zinc resources
§ Supplies 70% of world zinc bulk concentrate market.
Delivering Organic Growth – XZn Australia
McArthur River Mining
2828
§ Underground mine established in 1995
§ Converted to open pit operations in a project completed in 2009
§ Phase 3 Development Project announced in March 2011
Delivering Organic Growth – XZn Australia
McArthur River – Open Pit Conversion
2929
§ Significant increase in Mine production since 2005 to above 2.2Mtpa in 2010.
Delivering Organic Growth – XZn Australia
McArthur RiverMining And Concentrate Production
MRM mining and concentrate production (kt)
3030
Base caseOEFExtension
ExistingNorthOEF
PitExpansion
ExistingPit
Mill
Camp
Airstrip
McArthur River Channel
Bund
ExistingTSF
Base caseTSFUpgrade
McArthur RiverPhase 3 Development Project
§ $270 million development project
§ Increases mine production to around 5 million tonnes per annum and 800kt of bulk concentrate
§ Open pit will expand within existing bund wall
§ Approximately 110 additional personnel in operation
§ Extends mine life by 6 years to 2033.
2011:Submission of environmental assessment report.SUBJECT TO INTERNAL AND GOVERNMENT APPROVALS2012 Commence development works.2014 Commence operations at higher rate of production
3131
Xstrata’s proprietary hydrometallurgy technology offers strategic advantages for Xstrata Zinc through the recovery of base and precious
metals from refractory sulphide ores
§ Allows integrated expansion of McArthur River Mine, doubling its current production- Significant conversion of resources to reserves- Significant on-site cost reduction
§ Allows integrated expansion of Xstrata Zinc’s smelters with corresponding cost reductions
§ Facilitates improvement of Brunswick Lead smelter
McArthur RiverXstrata Zinc’s Technology Advantage
3232
ExistingProduction
§ Expansion of Xstrata Zinc European smelters would be sufficient to absorb the expanded production of McArthur River mine
– Demonstration plant commissioned in July 2010 at San Juan de Nieva and another to be commissioned in Nordenham in early 2011
§ Lead by-product from the smelters could be processed at the Brunswick lead smelter
Expanded Volume
San Juan Spain
Nordenham Germany
ExistingCustomers
(Asia, Europe)
Brunswick Pb Smelter
Bulk Zn/Pbconcentrate flow Lead by-product
flow
Mc Arthur River Mine Europe Zn Smelters Brunswick Pb Smelter
McArthur RiverXstrata Zinc’s Technology Advantage
3333
§ Xstrata’s proprietary hydrometallurgy technology will enable MRM to increase production and reduce unit costs
§ Doubling production capacity to 5mtpy will result in ~20% reduction of on-site costs
– Zinc contained would increase to 370ktpy
§ Cost reduction would give added benefit by converting large share of resources into reserves
– Mineable reserves expected to increase about 70Mt
– LOM extended about 6 years to 2033 at higher production rate
MRM Reserves (Mt)
43
115
0
20
40
60
80
100
120
At 2.5Mtpy At 5Mtpy
Enables 72Mt
increase
McArthur River - Phase 3 Development ProjectSignificantly Improving The Cost Base
3434
§ 2009 Independent Monitors’ report found no issues requiring urgent investigation
− Improvements in water management and dust mitigation− Monitoring programs appropriate− MRM acted to eliminate previously identified risks§ No adverse impact on the McArthur River or Gulf environments from mining
operations
§ Rehabilitation of McArthur River and Barney Creek Channel continuing and escalating
− 40,000 plants in 2010 equals amount planted in previous 2 years
McArthur RiverEnvironmental Performance
3535
§ MRM Community Benefits Trust formed in 2007
§ $7 million invested to date
MRM Community Benefits Trust Grant Allocations as at July 2010.
McArthur RiverCommunity Engagement
3636
§ Indigenous employment increased from 9% in 2006 to 21% in 2010
§ Effective traineeship program engaging with local youth (men and women)
§ Provides pathways to employment through on-the- job training, formal instruction and apprenticeships
§ Heavy machinery simulator popular and effective
§ New programs have improved retention rates
McArthur RiverIncreased Indigenous Employment
3737Future Growth Options
3838Future Growth Options
Other Australian Greenfield Growth Options
§ Lady Loretta (100%)- Transaction to acquire remaining 25%
from joint venture partner, Cape Lambert, settled on 1 April for $30 million
- Greenfield development subject to review
- Located 140 kilometres north-north west of Mount Isa
- 13.6Mt resource @ 17% Zn, 6% Pb- Indicative capex $460m- Investigating processing options at
Mount Isa
View of underground mine
3939Conclusion
4040Conclusion
§ Zinc supply and demand fundamentals remain attractive in the medium-long term
§ Xstrata Zinc Australia achieved significant growth in the past few years through organic growth and improved operational efficiencies
§ Xstrata Zinc Australia achieved significant year-on-year cost reductions at its operations─ Improved cost position from the upper part of the curve in the past
years to within the second quartile in 2010 ─ Continued cost improvement of all operations
§ Xstrata Zinc Australia has portfolio of projects to facilitate further organic growth and maintain group’s leading position in the Zinc industry
Conclusion
41
Questions?
Questions ?