Provision of creative and knowledge based servicesin the field of international cooperation
Being a Japanese leading consultant toprovide solutions for issues in social andeconomic development of developingcountriesEstablished in July 1995 as a membercompany of the Nippon Koei GroupCompleted over 500 development studies andCompleted over 500 development studies andprojects in 80 countries in the last 20 yearsCovering all the critical stages of projectdevelopment, including policy and sectoranalysis, master planning, feasibility study,project implementation, monitoring andevaluation
Sector
KRI International Corporation provides integrated consulting services responding to diverse andchanging needs for development. Our main competencies are shown below.
Industrial/SME DevelopmentTrade/Investment PromotionFinance (including PPP Advisory)GovernanceRegional (Urban/Rural) DevelopmentHealthEducation
Major Studies and Projects
Industrial Development/SME Development Trade/Investment Promotion
With meeting the changing and diverse needs of society, we have provided a range of consulting servicesfor development issues. Major studies and projects in each of our competencies are shown below.
Industrial Development/SME Development
Project on SME Developmentbased on Improved Service Delivery in Indonesia
Services: Technical CooperationClient & Funding: JICA
Trade/Investment Promotion
Fast Track Project on the Capacity Developmentof Trade Promotion in Myanmar
Services: Technical CooperationClient & Funding: JICA
To strengthen service delivery system for SMEdevelopment and provide better market oriented
support to SMEs.
To develop better training curriculum on tradethrough capacity building of training instituteand better serving the needs of private sector
Finance
Project on Capacity Building for Public PrivatePartnership (PPP) operation in Indonesia
Governance
Project for Improvement of Local Finance Systemin Palestine
Services: Technical CooperationClient & Funding: JICA
To improve coordination and cooperation amongPPP related agencies, thereby accelerating
formulation of bankable PPP project
Services: Technical CooperationClient & Funding: JICA
To improve the revenue from property taxthrough formulating and institutionalizing
property valuation standard
Major Studies and Projects
Regional Development
Project for the Master Plan Study on High ValueAgriculture Extension and Promotion in Sindhuli
Health
Data Collection Survey on Current Situation andCountermeasures Concerning Non Communicable
Road Corridor in Nepal
Services: Technical CooperationClient & Funding: JICA
To formulate the master plan to promote thecommercialization of agriculture and improve
agricultural extension service
gDiseases in the Pacific Region
Services: Data Collection SurveyClient & Funding: JICA
To review future health service cooperationprograms to prevent and control non
communicable diseases in the pacific regionagricultural extension service communicable diseases in the pacific region
Education
Secondary Science and Mathematics Teacher’sProgram (SESEMAT) in Uganda
Services: Technical CooperationClient & Funding: JICAClient & Funding: JICA
To support teachers in the whole country toprepare and deliver science and mathematics
lessons through SESEMAT
Head Office 5 1 Kojimachi, Chiyoda ku, Tokyo 102 0083, JapanTEL : +81( 0)3 3288 1161, FAX: +81( 0)3 3288 1166E mail: info.kri@kri inter.co.jpWebsite: http://www.kri inter.co.jp/english/index.html
NIPPON KOEI LAC was founded in 2003 in Japan as asubsidiary of the Nippon Koei Group to provide worldclass consulting, engineering and technical services in
INTERNATIONAL ENGINEERING CONSULTANTS
g, g gLatin America and the Caribbean.Our regional headquarters are located in Panama. Fivepermanent regional offices are located in Colombia, ElSalvador, Peru, Paraguay and Brazil.Approximately 320 full time employees are working onnumerous projects throughout the region.
SectorsNippon Koei LAC is a diversified consulting firm which provides engineering solutions across awide spectrum of the engineering field:
WATER RESOURCES TRANSPORTWater Resources ManagementFlood Management and MitigationPlanning and Development of Dams
Integrated Transport PlanningTunnels and RoadsBridges
Water SupplySanitation and Environmental ImprovementRiver Improvement and Basin Management
AirportsRailwaysPorts and Coastal Engineering
AGRICULTURE AND RURALDEVELOPMENT URBAN AND REGIONAL DEVELOPMENT
Integrated AgricultureRural Development ProgramsIntegrated Development of Rural
InfrastructureInstitutional DevelopmentRural Community Development
Regional Integrated DevelopmentUrban DrainageRenovation of Urban AreasPlanning and Disaster ManagementUrban Environmental Improvement
y pImproved Irrigation ManagementDevelopment of Irrigation SystemsSupport Services and Training
ENVIRONMENT AND CLIMATE CHANGERenewable EnergySolid Waste ManagementReforestation
Major Projects
Geothermal Study of the Ruiz Volcano, Colombia.Services: Study
Technical Cooperation for the Design of theEcological Corridor in Jalapao Brazil
Most of the professionals recruited to be part of Nippon Koei LAC staff are local, highlyqualified experts in their fields. They actively participate in projects throughout Latin America
& the Caribbean and are trained with the high standard of the Nippon Koei Group.
Services: StudyClient: ISAGENFunding: IDB
The study includes research and modelling of thehydrothermal – magmatic system in areas withgeothermal potential. The long term objective ofhi bi i j i k d f h
Ecological Corridor in Jalapao, Brazil.Services: Technical AssistanceClient & Funding: Ministry of Agriculture
The principal goal of this project is to establishsustainable management practices for theagriculture, forestry, and tourism sectors in theJ l i f B ilthis ambitious project is to take advantage of the
great geothermal potential in this area ofColombia through the construction and operationof a geothermal power plant.
Jalapao region of Brazil.The project consists of:Data Collection and AnalysisFinancial and Economic AssessmentEnvironmental StudiesFormulation and Application of SustainableManagement Practices.
Optimization of the Water Distribution andWastewater Collection Systems in Northern Lima,Peru.Services: Detailed Design, Technical Assistanceand Construction Supervision
Panama Bay Sanitation Program, Panama.Services: Technical Assistance and ConstructionSupervisionClient: Ministry of HealthFunding: JICAand Construction Supervision
Client: Government of PeruFunding: JICAThe objective of the project is to improve thequality, efficiency and sustainability of the waterservices in Northern Lima through rehabilitationof the distribution and collection systems and
Funding: JICA
The project’s main objective is the recovery ofthe environmental conditions of themetropolitan and coastal areas of Panama City.The main components of the project include:Design and construction of a 4.8 km longinterceptor (0 4 m to 1 5 m in diameter)optimization of the water supply network
operation.The main components of the project include:Construction of 22.5 km of new water pipeline.Trenchless and open cut rehabilitation of 573 kmof water pipes and 340 km of sewer pipes.
interceptor (0.4 m to 1.5 m in diameter).Design and construction of a 3.0 m diameter,8.2 km long conveyance tunnel.Design, construction, and operation of a 2.2m3/s secondary WWTP , expandable to 6.2 m3/sin the future.
Major Projects Yellow Line Project, Peru.Services: Cons SupervisionClient: Municipality of LimaFunding: Private funds
Expansion of the Potable Water and Sanita Systems of the City of Cusco, Peru.Services: Cons SupervisionClient: PAPT (Na “Water for All” a ve)Funding: JICA
The Yellow Line project consists of thecons n and n of a new 9-km longurban highway, including a 2-km tunnel underthe Rima River and a series of 11 overpasses.Once , this important City project will:•Enhance the overall capacity o he Lima roadnetwork.
As part o e project, N ippon Koei LAC providedcons n supervision services for upgrades tothe exis ng 0.45 m3/s municipal wastewatertreatment plant. The improvements to the plantincluded, among other things, a new pre-treatment system, new primary clarifiers and
•Reduce transporta on e and costs for localresidents and businesses.•Reduce environmental pollu on.
y , p y fperco ng ters, new secondary clari ers,chlorina on basins, and sludge storage andtreatment systems.
Road Improvements in Rural Areas of Paraguarí,G í d Mi i P
New Container Terminal at the Port of Callao, Peru.S i C S i iGuarí and Misiones, Paraguay.
Services: Detailed Design and Cons SupervisionClient: Ministry of Public Works and CommunicaFunding: JICAThis strategic projec ntends to increase the
Services: Construc on SupervisionClient: OSITRAN
This important capital improvements projectincludes the constru on of a new containerterminal at one o he largest ports on the P ccoast of South America The new terminal willeconomic compe veness of this remote area
and raise living standards among the ruralpopula on by improving the level of service fora substan al part o he local primary roadnetwork. Among other things, the programprovides suppor o local s for therehabilita n and maintenance of the road
coast of South America. The new terminal willallow for an l storage of approximately500,000 containers.
Construc on o he new terminal required a totalof 1.5 million cubic meters o l to reclaim anarea of 18 hectares from the sea. The project alsoincludes the installa on of port infrastructure,f
network in eastern Paraguay.f p f ,
access roads, and storage areas.
Nippon Koei LAC 58 Street, Samuel Lewis Avenue, ADR Building, 9th Floor. Panama City, PANAMA. Tel: +507 [email protected] www.nklac.com
Nippon Koei India Pvt. Ltd. (NKI) is a wholly owned subsidiary of Nippon Koei Co., Ltd. (Nippon Koei) of
projects in India and SAARC countries.
scope of service and provides consulting services in the following service sectors:
・ Roads, Bridges and Tunnels・・ Railways・
・ Construction Supervision・ Facility planning (water supply facilities,
water reduction)・・
・・・・・・・ ・・
・・・・
RAJASTHAN RURAL WATER SUPPLY &FLUOROSIS MITIGATION PROJECT (NAGAUR)
WEST BENGAL FOREST AND BIODIVERSITYCONSERVATION PROJECT (WBFBCP)
Nagaur is centrally located district of Rajasthan State which has
by constructing surface water supply facilities, thereby reducing
project is an extension of the “Lift Water Supply Project - I”, which is already under execution.
needs, assessing feasibility of project activities, proposing
State of West Bengal is the only state in India having both
second highest in India. Because of rapid increase of population the west Bengal states faces huge biotic pressure on forest resources.
and conserve biodiversity by undertaking afforestation,
over state of West Bengal.
The necessity and priority of the project has been conceived
are:・ Afforestation and allied activities・ Biodiversity Conservation・・
MAJOR PROJECTSUTTAR PRADESH PARTICIPATORY FOREST
MANAGEMENT AND POVERTY ALLEVIATIONPROJECT (UP-PFMPAP)
RAJASTHAN FORESTRY AND BIODIVERSITYPROJECT - PHASE 2 (RFBP-2)
andalleviating poverty in project area through (i) Participatory
To achieve these overall goals, the Project has the following
livelihood options.
of Rajasthan. The broad objective of the project is “to enhance forest area and livelihood opportunity of the forest dependent people and conserve biodiversity”. It covers project villages across 15 districts and in & around of 7 Wild life sanctuaries
Sikar, Banswara,
needs, assessing feasibility of project activities, proposing
CONSTRUCTION OF EIGHT LANE ACCESSCONTROLLED EXPRESSWAY AS OUTER RING
ROAD TO HYDERABAD CITY IN THE STATE OFANDHRA PRADESH
CONSTRUCTION OF DEDICATED FREIGHTCORRIDOR PROJECT
ENGINEERING SERVICE 1, ENGINEERINGSERVICE 2 & PROJECT MANAGEMENT
CONSULTANCY PHASE 1
Andhra Pradesh and Telangana in the south of India. In recent
biotechnology industries, leading to a rapid increase in the
radially at the city center, resulting in severe congestion where
ring road.
construction of double track railway Lines capable of handling 25 ton axle load initially and 32.5 ton axle load eventually
increase in productivity and reduction in unit transportation
The objective of this consultancy contract is to engage Project
Vadodara to Rewari through Contract Package 1 to 6 (excluding
Works).
KHULNA – MONGLA PORT RAIL LINE PROJECT DHAKA MASS RAPID TRANSITDEVELOPMENT PROJECT-MRT LINE 6
NKICEG JV on June 14, 2012 for Consulting Services for construction of Broad Gauge Rail link to connect Khulna City
Services and Construction Supervision. The total length of the
bridges.The project consists of following three phases:
Phase-III: Construction Supervision Services.
PQ Evaluation is underway.
extension upto Jatrabari. No of stations to be constructed are
The Consultants will conduct planning, engineering design and construction supervision of the railway infrastructure and
carried out:Review feasibility study, preparation of basic design, carry out detail design for civil works, electrical works, signaling,
OFFICE LOCATIONS
4164 6436
Established in January 2012 as a wholy owned subsidiaryof Nippon Koei Co., Ltd.
INTERNATIONAL ENGINEERING CONSULTANTS
Headquarter located in Hanoi, Vietnam, targeting toundertake projects in Vietnam and some otherdeveloping countries nearby.Undertaking 3 major projects in the fields of sea port,highway and forestry.71 staff, including 31 permanent staff (10 engineers and21 administration staff) and 40 project based staff21 administration staff) and 40 project based staffTotal paid in capital VND13,000,000,000
Port and CoastAirport and Aviation
Afforestation
‐ Farm
‐
Lach Huyen Port Infrastructure Construction Project,Vietnam
Protection Forests Restoration andSustainable Management Project,
Major Projects
Services: Construction SupervisionClient: Vietnam Maritime AdministrationFunding: Japanese ODA Loan
VietnamServices: Project ManagementClient: Ministry of Agriculture & RuralDevelopmentFunding: Japanese ODA Loan
Ca Pass Road Tunnel Construction Investment Project, VietnamServices: Detail Design & Construction SupervisionClient: Deo Ca Investment Joint Stock CompanyFunding: PrivateFunding: Private
NIPPON KOEI VIETNAM INTERNATIONAL CO., LTD.
C Add 10th fl T A H di R B ildi 521 Ki M S B Di hContact: Address
TelFaxEmailWebsite
:
::::
10th floor, Tower A, Handi Resco Building, 521 Kim Ma Street, Ba DinhDistrict, Hanoi, Vietnam84 4 3724 653584 4 3724 [email protected]
MYANMAR KOEI INTERNATIONAL LTD.
Established in April 2013, Myanmar KoeiInternational Ltd. (MKI) is an affiliate of Nippon KoeiCo., Ltd. (NK), the first Japanese independent, ( ), p pconsulting engineering firm in Tokyo founded by Mr.Kubota Yutaka in 1946.
From 1954 1960, Mr. Kubota was principally involvedin the planning, design and construction of theBaluchaung No. 2 Hydropower Project (LawpitaPower Station), one of the key hydropower plants inMyanmar, and the first overseas project of NipponKoei. Since then, the project has entered expansionand rehabilitation plans and presently provides areliable supply of electricity to millions of people formore than half a century. The BaluchaungHydropower Project stands as a symbolic cooperationbetween Japan and Myanmar.
To continue the generation of technical and financialcollaboration between the two countries, MKI iscommitted to provide excellent engineeringconsulting services for infrastructure development inMyanmar.
i id f fi ld i l diMKI operates in a wide range of fields including:
•Dams and Hydropower Development•Power Generation, Transmission and Distribution,
Rural Electrification•Urban and Regional Development•Agriculture and Irrigation/Rural Development
Water S ppl and Se erage/Waste Disposal and•Water Supply and Sewerage/Waste Disposal andRecycling
•Environmental Studies and Assessment•Architectural Design and Buildings•Roads, Bridges, and Railways
MAJOR PROJECTS:
EIA Study for Coal Fired PowerPlant in Yangon
Electric Power Development in Thilawa AreaServices: Detailed Design & Construction SupervisionClient: Myanma Electric Power Enterprise
Yangon City Electricity Supply Board
MYANMAR KOEI INTERNATIONAL LTD.
Health Facilities Construction in the Central RegionServices: Construction SupervisionClient: Ministry of Health, Myanmar
Plant in YangonServices: Study (EIA)Client & Funding: Private Firm
Yangon City Electricity Supply Board(Ministry of Electric Power, Myanmar)
Funding: Japanese Yen Loan
y , yFunding: Japanese Grant Aid
Power Transmission and Distribution Improvement ProjectServices: Feasibility StudyClient : Ministry of Electric Power, Myanmar
BOP Business on Development ofFood Supply Chains in MyanmarServices: StudyClient & Funding: JICA
Infrastructure Survey for Commercial & HousingDevelopment Projects in YangonServices: StudyClient & Funding: Private Firm
y yFunding: Asian Development Bank (ADB)
Tender Assistance for ThilawaSpecial Economic Zone (Class A)Services: Tender AssistanceClient & Funding: Private Firm
Water and Electric Supply toHakha City in Chin StateServices: StudyClient & Funding: Private Firm
Design for Vehicles Showroom in Nay Pyi TawServices: Basic Design & Detailed DesignClient & Funding: Private Firm
Myanmar Koei International/Nippon Koei Yangon OfficeAddress: No. 1042, Waizayantar Road, Ward No. (4),
South Okkalapa Township, Yangon, MyanmarTel/ Fax: +95 1 579 932Email: MKI : [email protected]
NK YGN : [email protected]
The 1st holding company in Nippon Koei group companiesCompanyEstablished at Gaborone, the Capital of Botswana in 2012Business target area is Sub Saharan AfricaThe 1st subsidiary company at Maputo, Mozambique in 2013Two or more companies are in progress for stock participationConsulting services through the subsidiary companies by
jointly utilizing NK group’s human resources
Policies
jointly utilizing NK group s human resources
INTERNATIONAL
ENGINEERING
Organization of NK Group in Sub Saharan Africa
CONSULTANTS
NK Group in Sub-Saharan Africa and Latin America consists of the following subsidiary companies:
Project Developments along Economic Corridors in AfricaDar es Salaam
LobitoTanzania
&
Nacala
Trans Caprivi
Zambia
Mozambique
Angola
Zimbabwe
Malawi
Beira, Sena & Tete
Maputo
Trans KalahariNorth South 0 Scale 1,000 km
South Africa
BotswanaNamibia
Urban Transportation
Transportation
Project Sectors in Sub Saharan Africa
ResourcesEnergy
Marine Port
Roads & Bridges
Urban Transportation
Railways Sewerage
Urban Drainage
Resources
Water Supply
Coal & Gas Thermal
Energy
Hydropower
Geothermal Marine Port
Airport
ContactsAgriculture
Urban Drainage
Transmission Line
Geothermal
Contacts
Oldest consulting firm in Japan, founded in 1946Nippon Koei Africa (Botswana) in association withNippon Koei LAC (Panama) created Nippon KoeiMozambique in Maputo on 10th December 2012.We plan, design, and manage infrastructure projectsin Mozambique and neighboring countries, withlocal partnershiplocal partnership.local partnership.
SectorNippon Koei has operated in Mozambique since 2000, with the rehabilitation ofChokwe Irrigation Scheme.Nippon Koei Group provides the comprehensive consulting services andengineering solutions across a wide spectrum of disciplines:
ENERGY TRANSPORTATIONENERGY TRANSPORTATIONHydropowerPower Generation, Transmission and
DistributionRenewable EnergyThermal Power
RailwaysRoads and BridgesPorts & Coastal Area WorksAirports & Aviation ServicesUrban Transport and Urban Planning
PPP Project Planningp g
Industrial Parks & SEZ
WATER RESOURCE DEVELOPMENT ENVIRONMENT and AGRICULTUREWater Resources ManagementFlood Management
Environmental Science and EngineeringClimate Change Issues
Water SupplySewerage & Urban DrainageSolid Waste ManagementDisaster Management
Agriculture and Rural DevelopmentIrrigationAgricultural Marketing and Regional
Development
Major Projects in Mozambique
Rehabilitation of Chokwe Irrigation Scheme Clean Coal Town (CCT) Plan Project
We have provided engineering consulting services in all areas of our expertise in Mozambique.Major projects are shown below.
Rehabilitation of Chokwe Irrigation SchemeServices: Basic and Detailed Design & ConstructionSupervisionClient: Ministry of Agriculture and Rural DevelopmentFunding: Japanese Grant Aid
Clean Coal Town (CCT) Plan ProjectServices: StudyClient: Japan Coal Energy Centre (JCOAL) /Ministry of Mineral ResourcesFunding: JOGMEC
IntakeBio briquettefor domestic
energy
General CanalHousehold Survey for CCT Plan
Comprehensive Urban Transport MasterPlan for Greater MaputoServices: Master PlanClient & Funding: JICA
(1) Technical Due Diligence on Hidroeléctrica de CahoraBassa, and (2) Environmental and Social Impact Studyfor Cahora Bassa NorthService: StudyClient & Funding: (1) Hidroeléctrica de Cahora Bassa(HCB), Government of Portugal, Government ofMozambique (2) HCBMozambique, (2) HCB
NIPPON KOEI AFRICA 1st Floor, Unit #4, Lake View Park, Plot 145, Gaborone Intl. Finance Park,Gaborone, BOTSWANA TEL: +267 319 1926
NIPPON KOEIMOZAMBIQUE
Rua Joaquim Marra 71, Maputo, MOZAMBIQUETEL : +258 21494966
PT. INDOKOEI INTERNATIONAL
History and Development
Geographical Distribution ofGeographical Distribution ofIndokoei’sIndokoei’s ServicesServices
ESTABLISHMENT: 1992SHAREHOLDERS: Nippon
to Whole Indonesia
from Jakarta
Koei Co., Ltd. , Japan(80%) & PT. Trans IntraAsia, Indonesia (20%)BOARD OF DIRECTORS:Soehono SalimAkira SaitoSaiful BachriBesar HatmayaA Ek T ih k
Jl. SultanJl. Sultan HasanuddinHasanuddin No. 45No. 45KebayoranKebayoran BaruBaru (Blok M) 12160(Blok M) 12160
A. Eko TrihatmokoCLIENTS: Private Sectors,International FundingAgencies , Nippon KoeiCo., Ltd. Group,Overseas Organization,and JICA
Overall Services and Major Field of Expertise
Industrial Estate,
including housing estateincluding housing estate
& logistics
infrastructures, and
Mini Hydro Power Plant
t jare two major
Indokoei’s field of
expertise.
Major Project PrThe below displayed projects are transparently showing
Indokoei’s core exper se in Industrial Estate and Mini Hydro Power Plant (MHPP) Development Projects in Private Sector during last 20 years
KARAWANG IKARAWANG INTERNATIONALNTERNATIONAL IINDUSTRIALNDUSTRIAL CCITYITY
PeriodPeriod : : 1992 1992 -- 20132013ServicesServices :: Master Plan, Basic Design, DED, Master Plan, Basic Design, DED,
Cons Supervision & Cons Supervision & MaintenanceMaintenancentnt :: PT. Maligi Permata Industrial
EstatePT. Maligi Permata Industrial Estate
PT. PT. Karawang Tatabina Industrial EstateKarawang Tatabina Industrial EstatePT. Harapan Anang Bakri & Son’sPT. Harapan Anang Bakri & Son’s
FundingFunding : : Private InvesmentPrivate InvesmentLoca nLoca n :: Karawang,Karawang, WestWest JavaJavaTota Land AreaTota Land Area : : 1302 Ha1302 HaIndustr Area Industr Area : : 1038 Ha1038 HaMajor ComponentsMajor Components: : Road Network & Drainage System, Road Network & Drainage System, Water System & Water System & Sewerage System , Power Sewerage System , Power & Te ecommunica on System& Te ecommunica on System
MM2100 INDUSTRIAL TOWN MM2100 INDUSTRIAL TOWN DELTAMAS DELTAMAS CCITYITY DDEVELOPMENTEVELOPMENT
& Te ecommunica on System& Te ecommunica on System
PeriodPeriod : : 1997- 2012ServicesServices : : Master Plan, Basic Design, DED
Cons Supervision
PeriodPeriod : : 1995 – 2006 ServicesServices : : Basic Design, DED & Cons Supervision
nt nt : PT. Megalopolis Manunggal Industrial Development FundingFunding :: Private Investment
Cons Supervisionntnt :: PT. Pembangunan Deltamas
PT. Pura Delta LestariFunding Funding : : Private Investment
Loca nLoca n : : Cikarang, West Java
Tota Land AreaTota Land Area : : 3600 HaIndustr Area : Industr Area : 1350 HaMajor Components:Major Components:Funding Funding : : Private Investment
Loca n Loca n : : Cikarang, Bekasi, West JavaTota Land AreaTota Land Area : : 805 HaIndustr AreaIndustr Area : : 693 HaMajor Components:Major Components:Road Network ; Drainage and Reten on PondWater Fa Waste Water Treatment nt;
and Te ecommunica on Network
Major Components:Major Components:Road Network Drainage SystemWater System Sewerage SystemPower SystemTe ecommunica on Line
Major Project Pr
JAVA INTEGRATED JAVA INTEGRATED INDUSTRIAL PORTS & ESTATE INDUSTRIAL PORTS & ESTATE JABABEKA DEVELOPMENT JABABEKA DEVELOPMENT
PeriodPeriod : : 2012 - 2015ServicesServices : : Topographic Survey, Soil Inves ga , Bathymetric Survey, Master Plan, Basic Design, DED, Technical Advisory, Cons Supervision
ntnt :: PT. Kawasan Berkah Manyar FundingFunding : : Private Investment
PeriodPeriod : : 2009 2009 -- 20112011ServicesServices : : Master Plan, Basic Design, DED, Master Plan, Basic Design, DED, Technical AdvisoryTechnical Advisory
ntnt :: PT. Jababeka InfrastructurePT. Jababeka InfrastructureFundingFunding : : Private InvestmentPrivate InvestmentLoca nLoca n : : Cikarang, West JavaCikarang, West JavaTota Land AreaTota Land Area : : 5600 Ha5600 HaDry Port Area: Dry Port Area: 200 Ha200 Ha
HaIndustr AreaIndustr Area : : 1760Ha
Major Components:Major Components:Road and Bridge
Structure/Drainage & Dyke Prot
Water & Waste Water System
Road Ligh g System
yyMajor Components:Major Components:Yard FaYard FaDry Port Gate In & Out, CY Inbound, Dry Port Gate In & Out, CY Inbound, Outbound & Empty, Workshop MT Depot & Outbound & Empty, Workshop MT Depot & Truck, g, Main Drainage System Truck, g, Main Drainage System & Grading eva n& Grading eva n
Road Ligh g System
SEGARA 2 SEGARA 2 MMINIINI HHYDROPOWERYDROPOWER PPLANTLANT
PeriodPeriod : : Dec 2011 - Apr 2014ServicesServices : : Pre FS, Review of FS & Detailed Engineering Design, Design Review, Turbine Study
ntnt :: PT. Suar Inves oLoca nLoca n :: Lombok West Nusa Tenggara
LEBAK TUNDUN LEBAK TUNDUN MMINIINI HHYDROPOWERYDROPOWER PPLANTLANT
PeriodPeriod : : AprApr-- Jul 2012Jul 2012ServicesServices : : Detailed DesignDetailed Design
ent ent : : PT. Tamaris PT. Tamaris HidroHidroLoca nLoca n : : BantenBantenFunding Funding :: Private Private
InvestmentInvestmentLoca n Loca n : : Lombok, West Nusa TenggaraFunding Funding : : Private Investment
Technica DataTechnica DataPower Capacity Power Capacity :: 8 MW8 MW
hh kk 22
TypeType ofof TurbineTurbine : Francis type is for the 2.30 MWPelton type is for 1.00 MW
Catchment Area : Catchment Area : 85 km85 km2 2
E ec ve Head : E ec ve Head : 100 m100 mDischarge :Discharge : 10.11 m3/sec10.11 m3/secDimension of Weir : Dimension of Weir : Width 30 m; Height 4 mWidth 30 m; Height 4 mType of Turbine : Type of Turbine : Francis Type, Horizontal ShaFrancis Type, Horizontal Sha
Technic Data Technic Data PowerPower CapacityCapacity :: 6.60 MWCatchmentCatchment AreaArea : 82 km2
H dH d 144HeadHead :: 144 mDischargeDischarge :: 7.00 m3 /secDimensionDimension ofof WeirWeir :: Width 35 m; Height 5.5 m
Tota Land AreaTota Land Area : : 2898
Loca nLoca n : : Gresik, East Java
Major Project Pr
BALIASEBALIASE A MA MINIINI HHYDROPOWERYDROPOWER PPLANTLANT
Period Period : : Jun Jun –– Dec 2013Dec 2013ServicesServices : : Feasibility StudyFeasibility Study
Loca nLoca n : : North North LuwuLuwu,,South Sulawesi South Sulawesi
CARINGIN MINI HYDRO POWER PLANT CARINGIN MINI HYDRO POWER PLANT
PeriodPeriod : : Jan-Feb 2014ServicesServices : : Technical Due
Loca nLoca n : : West Java FundingFunding : : Private
Funding Funding : : Private InvestmentPrivate Investmentent ent :: PT. PT. KaKa m Global Jaya Global Jaya
Diligence Investmententent : : Armstrong Asset Management
Technic DataTechnic Data Technic Data Technic Data Power Capacity Power Capacity :: 7 MW7 MWCatchment Area : Catchment Area : 288.2 km2 288.2 km2 E ec ve Head : E ec ve Head : 41.50 m41.50 mDischarge : Discharge : 19 m3/sec19 m3/secDimension of Weir : Dimension of Weir : Width 45.80; & Height 6.00 mWidth 45.80; & Height 6.00 mType of Turbine : Type of Turbine : Francis type with horizontal Francis type with horizontal
PowerPower CapacityCapacity:: :: 4.30 MWCatchmentCatchment AreaArea: :: 190.9 km2E ec veE ec ve HeadHead :: 45 mAnnua DischargeDischarge :: 20.92 m3/secDimensionDimension ofof WeirWeir :: Width 32 m; Height 4 mTypeType ofof TurbineTurbine : Francis type with Ver cal
Sha
FOLLOWFOLLOW--UP SURVEY OF THE MASTER PLAN UP SURVEY OF THE MASTER PLAN STUDY OF HYDROPOWER DEVELOPMENT STUDY OF HYDROPOWER DEVELOPMENT PeriodPeriod : : Feb – Mar 2012ServicesServices : : Survey
nt/Fundingnt/Funding :: JICALoca nLoca n : : Ordi & Bila, North Sumatera
TTHEHE CCONSULTANTONSULTANT SSERVICESERVICES OFOF BBUILDINGUILDING DDESIGNESIGN & & CCONSTRUCTIONONSTRUCTION SSUPERVISIONUPERVISION FORFOR SSCHOOLCHOOL BBUILDINGSUILDINGSATAT UPUP TOTO 67 S67 SITESITES OFOF PPERMANENTERMANENT SSCHOOLCHOOL PPROJECTROJECT
PeriodPeriod : : Dec 2006 Dec 2006 –– Aug 2010Aug 2010ServicesServices : : Detailed Engineering Design Detailed Engineering Design
& Cons Supervision& Cons Supervisionnt/Fundingnt/Funding :: UNICEFUNICEF
l dl dLoca nLoca n : : NiasNias IslandsIslands
veveTo provide architectural To provide architectural and engineering design and engineering design services, and services, and cons cons management and management and
veve::Dra ing a proposal for further developmentplans for Ordi river and Bila river in NorthSumatera, which were iden ed as two opriority projects within the Master plan.
supervision support, for supervision support, for up to 67 school loca s up to 67 school loca s across Nias which is to be across Nias which is to be undertaken in a undertaken in a consulta ve manner with consulta ve manner with maximum involvement of maximum involvement of the local community.the local community.
Contact:Te Fax (+62 21) 723 7620 / (+62 21) 7279 6068
Emai [email protected] h www.indokoei.co.id
Client: Department of Public Works and Highways, Government of the PhilippinesDetailed Design and Construction Supervision
Client: Department of Agrarian Reform, Government of the PhilippinesProject Management, Institution Building, Infrastructure Planning
Client: Ministry of Infrastructure, Government of the Democratic Republic of Timor-LesteDetailed Design, Tender Assistance, and Construction Supervision
Client: Bases Conversion Development Authority, Government of the PhilippinesDetailed Design and Construction Supervision
Client: Ministry of Health (MOH), Government of the Democratic Republic of Timor-LesteDetailed Design
Client: Manila North Tollways Corporation (MNTC)Structure Condition Survey, Detailed Engineering Design