Group asepro. ASEPRO CONSULTING. DECISION FUNCTIONS TO USING, FOR SYSTEMS OF REHABILITATION " WITHOUT DITCH ". Factors to considering, before the capture of decision, on: - the traditional Reinstatement, - or the Rehabilitation. ASEPRO CONSULTING. COSTS. - PowerPoint PPT Presentation

Citation preview

Page 1: Group asepro

Group asepro

Page 2: Group asepro

DECISION FUNCTIONS TO USING, FOR SYSTEMS OF REHABILITATION " WITHOUT DITCH ".

ASEPRO CONSULTING

Page 3: Group asepro

Factors to considering, before the capture of decision, on: - the traditional Reinstatement, - or the Rehabilitation.

ASEPRO CONSULTING

Page 4: Group asepro

Generally lower than the Reinstatement.Besides other many factors to bearing in

mind, as: Sociological, Political, Environmental, Etc.

COSTS

Page 5: Group asepro

.

The Rehabilitation, (in comparison with the Replacement) it diminishes

the distortion of the surroundings:almost to the 10%,

Reason why, in urban zones, it is, - of Maxima utility - and practically essential.

IMPACT ON THE SURROUNDINGS

Page 6: Group asepro

Today already it is possible to be said that most of the systems are of great reliability, by the results obtained during last the 30 years.

Also, by aging tests, that they surpass the 50 years without deterioration, in some systems.

RELIABILITY OF THE SYSTEM

Page 7: Group asepro

ASEPRO CONSULTING

Page 8: Group asepro

GRUPO ASEPROPaseo de la Castellana 114 Esc 2-

2ª28046 Madrid

Telf: +34 915 900 818Fax: +34 917 710 722

Móvil: +34 651 063 814Correo: [email protected]: www.aseproconsulting.com