DECISION FUNCTIONS TO USING, FOR SYSTEMS OF REHABILITATION " WITHOUT DITCH ".
ASEPRO CONSULTING
Factors to considering, before the capture of decision, on: - the traditional Reinstatement, - or the Rehabilitation.
ASEPRO CONSULTING
Generally lower than the Reinstatement.Besides other many factors to bearing in
mind, as: Sociological, Political, Environmental, Etc.
COSTS
.
The Rehabilitation, (in comparison with the Replacement) it diminishes
the distortion of the surroundings:almost to the 10%,
Reason why, in urban zones, it is, - of Maxima utility - and practically essential.
IMPACT ON THE SURROUNDINGS
Today already it is possible to be said that most of the systems are of great reliability, by the results obtained during last the 30 years.
Also, by aging tests, that they surpass the 50 years without deterioration, in some systems.
RELIABILITY OF THE SYSTEM