Site Plan_Precinct Plan
T16286-da08issuedrawing nº
8/06/2017original sizeprint date
drawing title
Peter Walker, CC2143E
Concept Designreason of issue
EW, EPdrawn by
PWchecked by
accredited designer:
Cradle Mt Gateway
client
Tasmania, 7000
DPIPWE
project
HobartLevel 8
copyright
03 66231 4841
Cumulus Studio Pty [email protected] 1, Hobart, 7000
The copyright for these designs, plans and specificationsbelongs to Cumulus Studio Pty Ltd and must not be used,reproduced or copied without their written permission.
Cumulus Studio(plan)
general notesThese drawings show design intent & are suitable as a guideonly. Do not scale off the drawings. All dimensions inmillimetres. Dimensions of existing building are indicative only -they should not be relied on and are to be verified on sitebefore commencing work. All documents shall be read inconjunction with specifications and any consultants detail. Allwork shall be in accordance with the Building Code ofAustralia, relevant Australian Standards & local authority by-laws and regulations. Any discrepancies, errors or omissionsshall be referred to the Architects. Drawings are not to be usedfor construction until issued Construction
rev date purpose rev date purpose
DA
A3
14,3
50
19,947
8,793
51,946
BUIL
DING
SET
BAC
K FR
OM C
RADL
E M
T RD
151,
476
TWO WAY
TWO WAY
ONE WAY
TWO WAY
TWO WAY
ONE
WAY
TWO WAY
TWO WAY
TWO W
AY
TWO
WAY
TWO WAY
TWO WAY
TWO
WAY
ONE
WAY
ONE
WAY
Car park layout 01
Car park layout 02
Car park layout 03
Car park layout 04
Car park layout 05
CRADLE MT RD
i.
a.
b.
c.
e.
f.f.
h.
j.
j.
n.
k. l.
m.m.m.
CW.01CW.03
f.
IN.01.
d.CW.02
BLD.02.
BLD.03.
BLD.01.m. m.
m.
o.
EX.S
k. k.
g.
p.
Site Plan_Propsed1:20001
1.1 Site Generala. Redirected main road. Redundant section of road dashed to be demolished & revegetated.b. Car-parking (approx 250 spaces incl. 10 equal access spaces)c. Large vehicle parking (35 spaces) plus overflow (300 spaces)d. Coach lay by / drop‑offe. Visitor drop-off & disabled drop-offf. Service & emergency access, hardstand & TFS off-takesg. Petrol refuel lay-by - existing pumps to - existing pumps to be retainedh. Staff parking (10 spaces)i. Shuttle bus parking (20 spaces)j. Coach parking (15 spaces)k. Landscaped open spacel. Lookout & walkers trackm. Future village expansion – Subject to separate development application.n. Bus wash down area, wall & bunded to prevent water run offo. Location of dump stationp. Dotted line to indicate location of required water storage specified in the Servicing Report
1.2 Gateway Precinct BuildingsCW.01 Covered Walkway & BBQ AreaCW.02 Covered Walkway & BBQ AreaBLD.01 Building 01BLD.02 Building 02BLD.03 Building 03VS Visitor Services BuildingEX.S Existing Shed to be retained
1.0 General Notes01. Refer to the individual building Floor Plans for envelop dimensions.02. Refer to the Stormwater Management Plan and the Servicing Report for details of on-site was
water management systems Appendix A & B.03. Refer to Parking Layout Plans for parking arrangements, sizes and turning circle paths04. Refer to Rendered Landscape Plan for all surfacing (incl. car park and access routes) and planting
and plant species.05. All infrastructure including telecommunications cable to be installed underground
Site RatioRoof area: 2770m2 / Site area 112,175m2.Site Coverage: 2.5%
01Launceston, Hobart, [email protected]://www.cumulus.studio
Cumulus Studio
developing great ideas together
CUMULUSSTUDIOarchitecture & design
Site Plan
0 20 50
NRev F - 14.11.2017Gateway Development OptionsGateway Precinct Site Plan (DA)
Cumulus StudioThe copyright for these designs, plans and specifications belongs to CumulusStudio Pty Ltd and must not be used, reproduced or copied without theirwritten permission.
Cumulus Studio
[email protected], Hobart, Melbourne
Cradle Mountain Master Plan - Staging Proposal
http://www.cumulus.studio
Master Plan | Staging Concept | November 2016
CRADLE MT RD i.
050 10 25
N
Gateway Precinct
05.
07.
06.
01. 02.
03.
06.
04.
Proceed with design, documentation and tender of Buildings 1 (as the Visitor Centre, Building 2 (tour operator spaces & cafe) & Building 7 (covered walkway)
Proposed Building Works
Future Building Works
Full Civil Works
01. Visitor Services Building02. TOFD Tenancies & Cafe03. Future - Kiosk04. Visitors Centre05. Landscaping06. Civil Works07. Walkway
Full Civil Works - New Carpark
Gateway Precinct Site Plan 1:1000
06
Building 01Ground Floor
Building 01
T16286-da12issuedrawing nº
25/10/2017original sizeprint date
drawing title
Peter Walker, CC2143E
Concept Designreason of issue
EW, EPdrawn by
PWchecked by
accredited designer:
Cradle Mt Gateway
client
Tasmania, 7000
DPIPWE
project
HobartLevel 8
copyright
03 66231 4841
Cumulus Studio Pty [email protected] 1, Hobart, 7000
The copyright for these designs, plans and specificationsbelongs to Cumulus Studio Pty Ltd and must not be used,reproduced or copied without their written permission.
Cumulus Studio(plan)
general notesThese drawings show design intent & are suitable as a guideonly. Do not scale off the drawings. All dimensions inmillimetres. Dimensions of existing building are indicative only -they should not be relied on and are to be verified on sitebefore commencing work. All documents shall be read inconjunction with specifications and any consultants detail. Allwork shall be in accordance with the Building Code ofAustralia, relevant Australian Standards & local authority by-laws and regulations. Any discrepancies, errors or omissionsshall be referred to the Architects. Drawings are not to be usedfor construction until issued Construction
rev date purpose rev date purpose
DA
A3
Buiding 01GROUND FLOOR
Water TankTFS
Water Tank
Delivery
Outdoor area
F WCM WC
DDA WCAWC
AWC
General NoteRefer to Elevation Drawings for all external claddingmaterials.
Refer to Rendered Landscape Plan for alllandscape detail, planting and surfacing
Timber deck to all external undercover thresholds
TOFD PWS Office25m2 45m2
Waiting/Shop/Interp225m250m2
Toilets50m2
Undercover threshold
Building 01FIRST FLOOR
Void Tenancy below
PWS Open OfficeVoid
kitchen
PWS WC
PWS Change/Lockers
200m2
Building 01 Ground Floor Plan1:2001 Building 01 First Floor Plan
1:2002
Ground Floor Plan 1:200
07
Building 01First Floor
Building 01
T16286-da12issuedrawing nº
25/10/2017original sizeprint date
drawing title
Peter Walker, CC2143E
Concept Designreason of issue
EW, EPdrawn by
PWchecked by
accredited designer:
Cradle Mt Gateway
client
Tasmania, 7000
DPIPWE
project
HobartLevel 8
copyright
03 66231 4841
Cumulus Studio Pty [email protected] 1, Hobart, 7000
The copyright for these designs, plans and specificationsbelongs to Cumulus Studio Pty Ltd and must not be used,reproduced or copied without their written permission.
Cumulus Studio(plan)
general notesThese drawings show design intent & are suitable as a guideonly. Do not scale off the drawings. All dimensions inmillimetres. Dimensions of existing building are indicative only -they should not be relied on and are to be verified on sitebefore commencing work. All documents shall be read inconjunction with specifications and any consultants detail. Allwork shall be in accordance with the Building Code ofAustralia, relevant Australian Standards & local authority by-laws and regulations. Any discrepancies, errors or omissionsshall be referred to the Architects. Drawings are not to be usedfor construction until issued Construction
rev date purpose rev date purpose
DA
A3
Buiding 01GROUND FLOOR
Water TankTFS
Water Tank
Delivery
Outdoor area
F WCM WC
DDA WCAWC
AWC
General NoteRefer to Elevation Drawings for all external claddingmaterials.
Refer to Rendered Landscape Plan for alllandscape detail, planting and surfacing
Timber deck to all external undercover thresholds
TOFD PWS Office25m2 45m2
Waiting/Shop/Interp225m250m2
Toilets50m2
Undercover threshold
Building 01FIRST FLOOR
Void Tenancy below
PWS Open OfficeVoid
kitchen
PWS WC
PWS Change/Lockers
200m2
Building 01 Ground Floor Plan1:2001 Building 01 First Floor Plan
1:2002
First Floor Plan 1:200
Building 02
T16286-da14issuedrawing nº
24/11/2017original sizeprint date
drawing title
Peter Walker, CC2143E
Concept Designreason of issue
EW, EPdrawn by
PWchecked by
accredited designer:
Cradle Mt Gateway
client
Tasmania, 7000
DPIPWE
project
HobartLevel 8
copyright
03 66231 4841
Cumulus Studio Pty [email protected] 1, Hobart, 7000
The copyright for these designs, plans and specificationsbelongs to Cumulus Studio Pty Ltd and must not be used,reproduced or copied without their written permission.
Cumulus Studio(plan)
general notesThese drawings show design intent & are suitable as a guideonly. Do not scale off the drawings. All dimensions inmillimetres. Dimensions of existing building are indicative only -they should not be relied on and are to be verified on sitebefore commencing work. All documents shall be read inconjunction with specifications and any consultants detail. Allwork shall be in accordance with the Building Code ofAustralia, relevant Australian Standards & local authority by-laws and regulations. Any discrepancies, errors or omissionsshall be referred to the Architects. Drawings are not to be usedfor construction until issued Construction
rev date purpose rev date purpose
DA
A3
Slope 16º
RCL. 01Slope 40º
RCL. 01
RCL. 01
RCL. 01
Slope 13º
Building 02ROOF420m2
Building 02 Ground Floor Plan1:2001 Building 02 Roof Plan
1:2002
T16286-da13issuedrawing nº
8/06/2017original sizeprint date
Peter Walker, CC2143E
Concept Designreason of issue
EW, EPdrawn by
PWchecked by
accredited designer:
project
Cradle Mt Gateway
client
Tasmania, 7000
DPIPWEHobartLevel 8
copyright
Cumulus Studio Pty Ltdlevel 1, Hobart, [email protected] 66231 4841
The copyright for these designs, plans and specificationsbelongs to Cumulus Studio Pty Ltd and must not be used,reproduced or copied without their written permission.
Cumulus Studiodrawing title
Building 01 Roof Plan(plan)
general notesThese drawings show design intent & are suitable as a guideonly. Do not scale off the drawings. All dimensions inmillimetres. Dimensions of existing building are indicative only -they should not be relied on and are to be verified on sitebefore commencing work. All documents shall be read inconjunction with specifications and any consultants detail. Allwork shall be in accordance with the Building Code ofAustralia, relevant Australian Standards & local authority by-laws and regulations. Any discrepancies, errors or omissionsshall be referred to the Architects. Drawings are not to be usedfor construction until issued Construction
rev date purpose rev date purpose
DA
A3
Slope 5º
Slope 25º
RCL. 01
RCL. 01
Slope 30ºRCL. 01
Slope 51ºRCL. 01
TENANCY 01ROOF 410m2
Building 01 Roof Plan1:2001
T16286-da24issuedrawing nº
8/06/2017original sizeprint date
Peter Walker, CC2143E
Concept Designreason of issue
EW, EPdrawn by
PWchecked by
accredited designer:
project
Cradle Mt Gateway
client
Tasmania, 7000
DPIPWEHobartLevel 8
copyright
Cumulus Studio Pty Ltdlevel 1, Hobart, [email protected] 66231 4841
The copyright for these designs, plans and specificationsbelongs to Cumulus Studio Pty Ltd and must not be used,reproduced or copied without their written permission.
Cumulus Studiodrawing title
Building 01 Elevations(elevations)
general notesThese drawings show design intent & are suitable as a guideonly. Do not scale off the drawings. All dimensions inmillimetres. Dimensions of existing building are indicative only -they should not be relied on and are to be verified on sitebefore commencing work. All documents shall be read inconjunction with specifications and any consultants detail. Allwork shall be in accordance with the Building Code ofAustralia, relevant Australian Standards & local authority by-laws and regulations. Any discrepancies, errors or omissionsshall be referred to the Architects. Drawings are not to be usedfor construction until issued Construction
rev date purpose rev date purpose
DA
A3
+874,815
+866,845
3,51
4
+869,845 8,52
3
extent of elevation.
natural timber cladding.
natural timber clad roofingat varying pitches withconcealed folded custommetal gutter
new ground line
sliding glazed doors natural ground line, dashed
maximum height abovenatural ground line
open to undercroft area
hinged glazed door
FG FG FG FG
RCL. 01
CL. 01 FG
Slope 25º
Slope 51º
extent of elevation.
4,94
3
screen door
screen to tanks
natural timber cladding
natural timber clad roofingat varying pitches withconcealed folded custommetal gutter
new ground line
natural ground line dashed
maximum height abovenatural ground line
RCL. 01
CL. 02
CL. 01Slope 25º
Slope 51º
+874,815
+869,845 6,746
maximum height abovenatural ground line
FG FG FG FG FG FG FG FG FG FG
FG
RCL. 01
CL. 02CL. 01+866,845
top hung window
timber clad roofing atvarying pitches with
concealed folded custommetal gutter
timber clad doorground line new
natural ground line, dashed
timber garage door, raw finish
timber cladding, raw finish
FGSlope 5º
4,65
8
maximum height abovenatural ground line
RCL. 01
CL. 01
natural timber cladding
natural timber clad roofingat varying pitches with
concealed folded custommetal gutter
ground line, new
natural ground line, dashed
Slope 30ºSlope 5º
Building 01 Elevation 011:2001 Building 01 Elevation 02
1:2002
Building 01 Elevation 031:2003 Building 01 Elevation 04
1:2004
CL. 01
CL. 02
RCL. 01
Timber board and batten cladding. Timber left unfinished.
90x45mm Timber battens on steel SHS frame180mmcentres. Timber left unfinished and frame to be finished inB64 Charcoal in accordance with the AS 2700 - 996.
Timber battens over sheet metal roof. Timber left unfinished.Timber cladding to match slope.
Material Note:All external materials other than natural stone,earth, timber or glass are finished in B64 Charcoaldefined in Australian Standard AS 2700 – 996,Colour Standards for General Purposes.
08Cumulus StudioLaunceston, Hobart, [email protected]://www.cumulus.studio
developing great ideas together
CUMULUSSTUDIOarchitecture & design
Building 02Ground Floor
Gateway Development OptionsRev F - 14.11.2017
Ground Floor Plan 1:200
Building 02GROUND FLOOR420m2
Undercroft
Wat
er Ta
nkTF
S
Delivery
Tenancy 01 Tenancy 02 Tenancy 03 Tenancy 04
Kitchen
Dry Store
Cold Store
Servery
Order &Takeaway
Coffee & Bar
Airlock
DDA WC
Amb WC
Building 02
T16286-da14issuedrawing nº
8/06/2017original sizeprint date
drawing title
Peter Walker, CC2143E
Concept Designreason of issue
EW, EPdrawn by
PWchecked by
accredited designer:
Cradle Mt Gateway
client
Tasmania, 7000
DPIPWE
project
HobartLevel 8
copyright
03 66231 4841
Cumulus Studio Pty [email protected] 1, Hobart, 7000
The copyright for these designs, plans and specificationsbelongs to Cumulus Studio Pty Ltd and must not be used,reproduced or copied without their written permission.
Cumulus Studio(plan)
general notesThese drawings show design intent & are suitable as a guideonly. Do not scale off the drawings. All dimensions inmillimetres. Dimensions of existing building are indicative only -they should not be relied on and are to be verified on sitebefore commencing work. All documents shall be read inconjunction with specifications and any consultants detail. Allwork shall be in accordance with the Building Code ofAustralia, relevant Australian Standards & local authority by-laws and regulations. Any discrepancies, errors or omissionsshall be referred to the Architects. Drawings are not to be usedfor construction until issued Construction
rev date purpose rev date purpose
DA
A3
Slope 16º
RCL. 01Slope 40º
RCL. 01Slope 40º
RCL. 01
RCL. 01
Slope 13º
TENANCY 02ROOF420m2
Building 02 Roof Plan1:2002
Building 02 Elevations
T16286-da25issuedrawing nº
8/06/2017original sizeprint date
drawing title
Peter Walker, CC2143E
Concept Designreason of issue
EW, EPdrawn by
PWchecked by
accredited designer:
Cradle Mt Gateway
client
Tasmania, 7000
DPIPWE
project
HobartLevel 8
copyright
03 66231 4841
Cumulus Studio Pty [email protected] 1, Hobart, 7000
The copyright for these designs, plans and specificationsbelongs to Cumulus Studio Pty Ltd and must not be used,reproduced or copied without their written permission.
Cumulus Studio(elevations)
general notesThese drawings show design intent & are suitable as a guideonly. Do not scale off the drawings. All dimensions inmillimetres. Dimensions of existing building are indicative only -they should not be relied on and are to be verified on sitebefore commencing work. All documents shall be read inconjunction with specifications and any consultants detail. Allwork shall be in accordance with the Building Code ofAustralia, relevant Australian Standards & local authority by-laws and regulations. Any discrepancies, errors or omissionsshall be referred to the Architects. Drawings are not to be usedfor construction until issued Construction
rev date purpose rev date purpose
DA
A3
+873,990
+867,200
6,65
7
maximum height abovenatural ground line
natural timber clad roofingat varying pitches with
concealed folded custommetal gutter
natural timber cladding
natural ground line, dashedground line, new
RCL. 01
CL. 02
CL. 01
garage door
Slope 16º
maximum height abovenatural ground line
natural timber cladding
natural timber clad roofingat varying pitches with
concealed folded custommetal gutter
natural ground line, dashedground line, new
RCL. 01
CL. 01
fixed glazed window
Slope 13º
Slope 40º
+873,987
+867,200
7,17
4
20,439
maximum height abovenatural ground line
natural timber cladding
natural timber clad roofingat varying pitches with
concealed folded custommetal gutter
natural ground line, dashedground line, new
FG FG FG FG FG FG FG FG
RCL. 01
CL. 01
fixed glazed window
Slope 13º
Slope 40º
maximum height abovenatural ground line
natural timber clad roofingat varying pitches with
concealed folded custommetal gutter
natural ground line, dashedground line, new
natural timber cladding
RCL. 01
CL. 01
Slope 16ºSlope 40º
Building 02 Elevation 031:2003 Building 02 Elevation 04
1:2004
Building 02 Elevation 011:2001 Building 02 Elevation 02
1:2002
CL. 01
CL. 02
RCL. 01
Timber board and batten cladding. Timber left unfinished.
90x45mm Timber battens on steel SHS frame180mmcentres. Timber left unfinished and frame to be finished inB64 Charcoal in accordance with the AS 2700 - 996.
Timber battens over sheet metal roof. Timber left unfinished.Timber cladding to match slope.
Material Note:All external materials other than natural stone,earth, timber or glass are finished in B64 Charcoaldefined in Australian Standard AS 2700 – 996,Colour Standards for General Purposes.
rev date purpose
#
CW.01 Plan
T16286-da20issuedrawing nº
8/06/2017
project:
DPIPWE
Tasmania, 7000Hobart
Cradle Mt Gateway
client:
original sizeprint date
drawing title
Level 8
Peter Walker, CC2143E
Concept Designreason of issue
EW, EPdrawn by
PWchecked by
accredited designer:
copyright
03 66231 4841
Cumulus Studio Pty [email protected] 1, Hobart, 7000
The copyright for these designs, plans and specificationsbelongs to Cumulus Studio Pty Ltd and must not be used,reproduced or copied without their written permission.
(plan)
general notesThese drawings show design intent & are suitable as a guideonly. Do not scale off the drawings. All dimensions inmillimetres. Dimensions of existing building are indicative only -they should not be relied on and are to be verified on sitebefore commencing work. All documents shall be read inconjunction with specifications and any consultants detail. Allwork shall be in accordance with the Building Code ofAustralia, relevant Australian Standards & local authority by-laws and regulations. Any discrepancies, errors or omissionsshall be referred to the Architects. Drawings are not to be usedfor construction until issued Construction
CUMULUSSTUDIO
A3
Line of walkwaycanopy
line of road edge below
outline of roof edge
colour bond sheet roofingat minimal fall toconcealed edge guttercolour: charcoal
outline of roof edge
colour bond sheetroofing at minimal fall toconcealed edge guttercolour: charcoal
+867,520
+868,900
01
02
03
rubbish andrecycling bins
BBQ hotplates
BUILDING 05GROUND FLOORTavern & Bottleshop225m2
Retail 05.Bottleshop
Retail 05.Store
Retail 05.M WC
Retail 05.F WC
Retail 05.DDA WC
Water TankTFS
Water Tank
Water Tank
Undercroft
Store
Kiosk
ATM
Retail 05.Bar
Kiosk
BBQ AREA
TENANCY 03GROUND FLOOR100m2
Store
Line of walkwaycanopy
outline of walkway roofabove (shown dashed)structural columns
refer landscape plan forall surface treatment
line of road edge
refer landscape plan forall surface treatment
EX.SGROUND FLOOR220m2
structural columns
refer landscape plan for allsurface treatment
line of road edge
+867,065
Building 03GROUND FLOORKiosk & Stage110m2
CW.01GROUND FLOORWalkway & BBQ Area730m2
outline of future building
CW.01 Roof Plan1:5002
CW.01 Ground Floor Plan1:5001
CW Elevations
T16286-da29issuedrawing nº
8/06/2017original sizeprint date
drawing title
Peter Walker, CC2143E
Concept Designreason of issue
EW, EPdrawn by
PWchecked by
accredited designer:
Cradle Mt Gateway
client
Tasmania, 7000
DPIPWE
project
HobartLevel 8
copyright
03 66231 4841
Cumulus Studio Pty [email protected] 1, Hobart, 7000
The copyright for these designs, plans and specificationsbelongs to Cumulus Studio Pty Ltd and must not be used,reproduced or copied without their written permission.
Cumulus Studio(elevations)
general notesThese drawings show design intent & are suitable as a guideonly. Do not scale off the drawings. All dimensions inmillimetres. Dimensions of existing building are indicative only -they should not be relied on and are to be verified on sitebefore commencing work. All documents shall be read inconjunction with specifications and any consultants detail. Allwork shall be in accordance with the Building Code ofAustralia, relevant Australian Standards & local authority by-laws and regulations. Any discrepancies, errors or omissionsshall be referred to the Architects. Drawings are not to be usedfor construction until issued Construction
rev date purpose rev date purpose
DA
A3
868,392
871,253
3,30
0
2,86
0colour bond sheet roof withconcealed gutter edge
all steel columns and framingto have paint finish, colourB64 Charcoal
natural ground line, dashedground line, new
timber BBQ bench with SS benchtop.
3,60
0
871,253
867,653
all steel columns and framingto have paint finish, colourB64 Charcoal
colour bond sheet roof withconcealed gutter edge
natural ground line, dashedground line, new
871,253
868,388
2,86
5
all steel columns and framingto have paint finish, colourB64 Charcoal
colour bond sheet roof withconcealed gutter edge
natural ground line, dashedground line, new
866,117
869,484
3,36
7
natural ground lineground line
steel columns, painted finishcolour: charcoal
colour bond sheet roofingwith concealed edge guttercolour: charcoal
timber bbq bench withstainless steel top
CW.01 Elevation 011:2001
CW.01 Elevation 021:2002
CW.01 Elevation 031:2003
CW.02 Elevation1:2004
CW Elevations
T16286-da30issuedrawing nº
8/06/2017original sizeprint date
drawing title
Peter Walker, CC2143E
Concept Designreason of issue
EW, EPdrawn by
PWchecked by
accredited designer:
Cradle Mt Gateway
client
Tasmania, 7000
DPIPWE
project
HobartLevel 8
copyright
03 66231 4841
Cumulus Studio Pty [email protected] 1, Hobart, 7000
The copyright for these designs, plans and specificationsbelongs to Cumulus Studio Pty Ltd and must not be used,reproduced or copied without their written permission.
Cumulus Studio(elevations)
general notesThese drawings show design intent & are suitable as a guideonly. Do not scale off the drawings. All dimensions inmillimetres. Dimensions of existing building are indicative only -they should not be relied on and are to be verified on sitebefore commencing work. All documents shall be read inconjunction with specifications and any consultants detail. Allwork shall be in accordance with the Building Code ofAustralia, relevant Australian Standards & local authority by-laws and regulations. Any discrepancies, errors or omissionsshall be referred to the Architects. Drawings are not to be usedfor construction until issued Construction
rev date purpose rev date purpose
DA
A3
867,019
869,852
2,83
4
steel columns, painted finishcolour: charcoal
colour bond sheet roofingwith concealed edge guttercolour: charcoal
869,529
866,043
3,48
7
all steel columns and framingto have paint finish, colourB64 Charcoal
colour bond sheet roof withconcealed gutter edge
natural ground line, dashedground line, new
timber BBQ bench with SS benchtop.
IN.01 Elevation1:2002
CW.03 Evlevation1:2001