GridPP2 Status
Tony Doyle
OC Actions
1. GridPP TO PROVIDE DATA ON WHAT FRACTION OF THE REGISTERED USERS WERE MAKING THE GREATEST USAGE OF THE RESOURCES. SEE TALK
2. GridPP TO PROVIDE PPARC WITH A TIER 1 PURCHASE PLAN FOR FY06. DONE3. GridPP to provide data on experiments’ increased usage of Tier 2
resources. DONE4. GridPP to provide an update of the performance metrics. DONE5. GridPP to present a draft GridPP3 proposal to the next meeting. DONE
(version 0.6)6. GridPP to circulate procedures adopted by Grid Security Vulnerability
Group to Committee members. DONE7. GridPP to provide a paper to the next meeting justifying the proposed
Tier 1 hardware spend in FY07 against other spending options. ONGOING
8. GridPP to describe its relationship with the e-Science Core Programme more fully. ONGOING
9. GridPP to provide PPARC, on a post-by-post basis, details of the cost of extending posts finishing before new funding is expected to be in place (end of March 2008). DONE (on March 15th and included as part of GridPP3 proposal)
gLite 3.0
• What is gLite-3.0?• LCG-2.7 and updates • gLite WMS/LB • gLite CE • gLite/LCG WN • gLite/LCG UI • FTS (Service) • FTA (Agents)
WLCG MoU• 17 March 2006• PPARC signed the
Memorandum of Understanding with CERN
• Commitment to UK Tier-1 at RAL and the four UK Tier-2s to provide services and resources.
• Will need to propagate through LFRC..
UK pledges & medium-term planning
RAL, UKPledged Planned to be pledged
2006 2007 2008 2009 2010
CPU (kSI2K) 98014921234
27123943
4206 6321
585710734
Disk (Tbytes) 450841630
14842232
20873300
30205475
Tape (Tbytes) 6641080555
20742115
39344007
57106402
• As defined in summer 2005..
1. Tier-1 (v26b) plan 2007 or Tier-2 GridPP MoU, followed by pessimistic guess
2. August 2005 “minimal Grid”
3.3. GridPP3 proposalGridPP3 proposal (see Dave’s talk)
• Need to update 2007 pledges by Sept. 06
UK, Sum of all Federations
Pledged Planned to be pledged
2006 2007 2008 2009 2010
CPU (kSI2K) 380038401592
48304251
54106127
60109272
Disk (Tbytes) 530540258
6001174
6602150
7203406
Dissemination highlights
• the Grid by numbers (For MPs)
• the BBC..
Tier-0 to Tier-1
• worldwide data transfers > 950MB/s for 1 week• peak transfer rate from CERN of >1.6GB/s• Need high data rate transfers to/from CERN as
a routine activity
Tier-1 to Tier-2
• UK data transfers >1000Mb/s for 3 days• peak transfer rate from RAL of >1.5Gb/s• Need high data rate transfers to/from RAL as a
routine activity
gLite 3.0 deployment• Upgrades are supported from LCG-2.7.0• Appears to work well • Sites need to keep on the upgrade path• A reasonably well-defined deployment release cycle• Release cycle is getting (somewhat) shorter
0
5
10
15
20
25
30
35
40
09/0
4/2
005
23/0
4/2
005
07/0
5/2
005
21/0
5/2
005
04/0
6/2
005
18/0
6/2
005
02/0
7/2
005
16/0
7/2
005
30/0
7/2
005
13/0
8/2
005
27/0
8/2
005
10/0
9/2
005
24/0
9/2
005
08/1
0/2
005
22/1
0/2
005
05/1
1/2
005
19/1
1/2
005
03/1
2/2
005
17/1
2/2
005
31/1
2/2
005
14/0
1/2
006
28/0
1/2
006
11/0
2/2
006
25/0
2/2
006
11/0
3/2
006
25/0
3/2
006
08/0
4/2
006
22/0
4/2
006
06/0
5/2
006
20/0
5/2
006
03/0
6/2
006
17/0
6/2
006
# s
ites a
t rele
ase
LCG-2_6_0 LCG-2_7_0 GLITE-3_0_0 LCG-2_4_0
Project Status
• Good progress, according to plan
• Glass half full....and half empty
• 5000 ex 10000 CPUs
MetricOK
Metric not OK
Tasks Complete
Tasks Overdue
Tasks due in next 60 days
Items Inactive
Tasks not Due
Change Forms
88(91%)
9 127 (49%)
7 19 20 105 3
0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 0.10 0.11 0.12 0.13 0.14 0.15 0.16 0.17 0.100 0.101 0.102 0.103 0.104 0.105 0.106 0.107 0.108 0.109 0.110 0.111 0.112 0.113 0.114 0.115 0.116
0.18 0.19 0.20 0.21 0.22 0.23 0.24 0.25 0.26 0.27 0.28 0.29 0.30 0.31 0.32 0.33 0.34 0.117 0.118 0.119 0.120 0.121 0.122 0.123 0.124 0.125 0.126 0.127 0.128 0.129 0.130 0.131 0.132 0.133
0.35 0.36 0.37 0.38 0.39 0.40 0.41 0.42 0.43 0.44 0.45 0.46 0.47 0.48 0.49 0.50 0.51 0.134 0.135 0.136 0.137 0.138 0.139 0.140 0.141 0.142 0.143 0.144 0.145 0.146 0.1470.52 0.53 0.54 0.55 0.56 0.57 0.58 0.59 0.60 0.61 0.62
2.1 3.1 4.1 5.1 6.11.1.1 1.1.2 1.1.3 1.1.4 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5
1.1.5 2.1.6 2.1.7 2.1.8 2.1.9 2.1.10 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10 4.1.6 4.1.7 4.1.8 4.1.9 4.1.10 5.1.6 5.1.7 5.1.8 5.1.9 5.1.10 6.1.6 6.1.7 6.1.8 6.1.9
2.1.11 2.1.12 3.1.11 3.1.12 3.1.13 4.1.11 4.1.12 5.1.11 5.1.12
2.2 3.2 4.2 5.2 6.21.2.1 1.2.2 1.2.3 1.2.4 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 6.2.1 6.2.2 6.2.3 6.2.4 6.2.5
1.2.5 2.2.6 2.2.7 2.2.8 2.2.9 2.2.10 3.2.6 3.2.7 4.2.6 4.2.7 4.2.8 4.2.9 4.2.10 5.2.6 5.2.7 5.2.8 5.2.9 5.2.10 6.2.6 6.2.7 6.2.8 6.2.9 6.2.10
2.2.11 2.2.12 2.2.13 2.2.14 2.2.15 4.2.11 4.2.12 4.2.13 4.2.14 4.2.15 5.2.11 5.2.12 5.2.13 5.2.14 5.2.15 6.2.11 6.2.12 6.2.13 6.2.14
2.3 3.3 4.3 6.31.3.1 1.3.2 1.3.3 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 4.3.1 4.3.2 4.3.3 4.3.4 4.3.5 6.3.1 6.3.2 6.3.3 6.3.4 6.3.5
2.3.6 2.3.7 2.3.8 2.3.9 2.3.10 3.3.6 3.3.7 3.3.8 3.3.9 3.3.10 4.3.6 4.3.7 4.3.8 4.3.9 4.3.10
2.3.11 3.3.11 3.3.12 3.3.13 4.3.11 4.3.12 4.3.13
2.4 3.4 4.4 6.42.4.1 2.4.2 2.4.3 2.4.4 2.4.5 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 4.4.1 4.4.2 4.4.3 4.4.4 4.4.5 6.4.1 6.4.2 6.4.3 6.4.4
2.4.6 2.4.7 2.4.8 2.4.9 2.4.10 3.4.6 3.4.7 3.4.8 3.4.9 3.4.10 4.4.6 4.4.7 4.4.8 4.4.9
2.4.11 2.4.12 2.4.13 2.4.14 2.4.15 3.4.11 3.4.12 3.4.13 3.4.14 3.4.15
2.5 3.5 60 Days2.5.1 2.5.2 2.5.3 2.5.4 2.5.5 3.5.1 3.5.2 3.5.3 3.5.4 3.5.5
2.5.6 2.5.7 2.5.8 2.5.9 2.5.10 3.5.6 3.5.7 3.5.8 3.5.9 Monitor OK 1.1.1
2.5.11 Monitor not OK 1.1.1
Milestone complete 1.1.1
2.6 3.6 Milestone overdue 1.1.1
2.6.1 2.6.2 2.6.3 2.6.4 2.6.5 3.6.1 3.6.2 3.6.3 3.6.4 3.6.5 Milestone due soon 1.1.1
2.6.6 2.6.7 2.6.8 2.6.9 2.6.10 3.6.6 3.6.7 3.6.8 3.6.9 3.6.10 Milestone not due soon 1.1.1
2.6.11 2.6.12 2.6.13 Item not Active 1.1.1
Workload
6
1.2
Development
Dissemination
Project Execution
BaBarMetadata
Storage
GridPP2 Goal: To develop and deploy a large scale production quality grid in the UK for the use of the Particle Physics community
2 3
Knowledge Transfer
LHCb
GANGA
ATLAS
InteroperabilitySamGrid
Engagement
Production Grid Milestones Production Grid Metrics
1LCG External
4M/S/N
5Non-LHC Apps Management
Navigate downExternal link
PhenoGrid
LHC Apps
1.1
1.3
Security
InfoMon
Design
Service Challenges
Other Link Network LHC Deployment
Project Planning
CMS
Portal
Status Date - 31/Dec/05 + next
UKQCD
Update
Clear
Know your users..
1. GridPP TO PROVIDE DATA ON WHAT FRACTION OF THE REGISTERED USERS WERE MAKING THE GREATEST USAGE OF THE RESOURCES.
Active Users (All VOs)
Job success? Overview
Job Success by LHC experiment
ALICE
CMS
ATLAS
LHCb
Active Users by LHC experiment
ALICE (8)
CMS (150)
ATLAS (70)
LHCb (40)
Fine-grained: active users at RAL
Number of registered users (exc. DTEAM)
Quarter: 05Q4 06Q2 Value: 1342 1831Number of active users (> 10 jobs)Quarter: 05Q4 06Q1 06Q2Value: 83 166 201Fraction [%]: 6.2 11.0Number of active UK users at RALQuarter: 05Q1 05Q2 05Q3 05Q4 06Q1 06Q2Value: 10 19 29 37 44 55
Number of jobs/UK Grid user on RAL resources (06Q2)
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
1 6 11 16 21 26 31 36 41 46 51
Worldwide “Data Protection Act”: non-UK sites requested APEL NOT to include this data by default (hence not switched
on at most UK sites).
Complied in order to ensure APEL is widely deployed.
Where are we now?• Since the last oversight committee meeting a lot has happened.. 1. Progress has been made in the release of gLite-3.0
(first middleware fully integrating all EGEE and LCG components) 2. gLite-3.0 efficiently deployed at 11 UK sites3. Tier-2 resources on the Production Grid beginning to be fully utilised 4. Many measured performance improvements (see Jeremy’s talk) 5. The GridPP2 Project is halfway through:
49% of its targets met, 91% of the metrics within specification5000 ex ~10000 computers on the Grid
6. EGEE phase I reviewed – commended by the EU 7. Dissemination: lead news on BBC technology web site, GridPP
overview for MPs circulated. 8. In March 2006 PPARC signed the worldwide LCG MoU 9. Significant planning performed for GridPP3 (see Dave’s talk)10.Work starting on large-scale experiment-specific file transfers and
improving site performance..