GridPP Presentation to AstroGrid 13 December 2001
Steve LloydQueen Mary
University of London
GridPP AstroGrid 13 December 2001 Slide 2
GridPP Overview
Provide architecture and middleware
Provide testbeds using simulation data Provide testbeds
using real data
Future LHC Experiments
Running US Experiments
Build prototype Tier-1 and Tier-2s in the UK and implement middleware in experiments
GridPP AstroGrid 13 December 2001 Slide 3
Financial Breakdown
£17M
CERN
Staff
Hardware
DataGrid Staff
GridPP Staff+ Managers
UK Hardware
Displacement
£1.3M
£2.5M
£2.5M
£2.8M
£2.5M
Travel + Training etc
£0.9M
BaBar Tier-A and Prototype LHC Tier-1
15 New posts for Experimental Applications
£4.5M
15 New posts for DataGrid Middleware
Prototype CERN Tier-0
New posts in CERN IT Division
GridPP AstroGrid 13 December 2001 Slide 4
Major Deliverables
Prototype I - March 2002• Performance and scalability testing of components• Testing of the job scheduling and data replication software from
the first DataGrid release.
Prototype II - March 2003• Prototyping of the integrated local computing fabric, with
emphasis on scaling, reliability and resilience to errors. • Performance testing of LHC applications. Distributed HEP and other
science application models using the second DataGrid release.
Prototype III - March 2004• Full scale testing of the LHC computing model with fabric
management and Grid management software for Tier-0 and Tier-1 centres, with some Tier-2 components.
GridPP AstroGrid 13 December 2001 Slide 5
Middleware Deliverables
• Grid Architecture– Assess final DataGrid architecture as used in prototypes.
Compare with other related projects.• Security
– Develop authentication and authorisation scheme using certificates, management of local authorisation, standard interfaces.
• Workload Management– Develop uniform Job Description Language, integrate into
existing schedulers and optimization.• Data Management
– Metadata services to enable data replication, synchronization, data caching and optimisation.
GridPP AstroGrid 13 December 2001 Slide 6
Middleware Deliverables
• Grid Monitoring– Publication of information services, monitoring of static and
dynamic metrics to enable resource allocation algorithms.• Fabric Monitoring
– Automated installation of Grid middleware on multiple sites enabling rapid deployment of components.
• Mass Storage– Interface to various data storage solutions.
• Testbed– Prototype development and tools to enable VOs to share
resources.• Network Services
– Deployment of end to end networking tools, publication of network resource information, deployment of high rate transport solutions and tests of packet prioritisation services.
GridPP AstroGrid 13 December 2001 Slide 7
Application Deliverables
• LHC Experiments– Build Grid Application Frameworks based on DataGrid
Prototype releases. Demonstrate a significant fraction of distributed Grid required for LHC programme.
• BaBar Experiment (SLAC)– Adapt application framework to DataGrid prototype
release. Demonstrate use of Grid for production analysis.
• FermiLab Experiments– Build Grid frameworks based on the SAM Architecture
incorporating Globus components. Demonstrate production data analysis and MC production on the Grid.
• Smaller Experiments and Lattice QCD– Test Grid Technology in smaller environment implementing
modest data management system applicable across experimental domains.
GridPP AstroGrid 13 December 2001 Slide 8
EU DataGrid
Map Centre
http://ccwp7.in2p3.fr/mapcenter/
GridPP AstroGrid 13 December 2001 Slide 9
http://www.gridpp.ac.uk/
GridPP AstroGrid 13 December 2001 Slide 10
GridPP AstroGrid 13 December 2001 Slide 11
GEANT Network
Weathermap
http://www.dante.net/geant/
GridPP AstroGrid 13 December 2001 Slide 12
Project Management Board
Project Leader Tony Doyle Glasgow [email protected] Project Leader John Gordon RAL [email protected] of Collaboration Board Steve Lloyd Queen Mary [email protected] of Technical Board Peter Clarke UCL [email protected] of Experiments Board Nick Brook Bristol [email protected] Chair of EB Roger Barlow Manchester [email protected] Manager Dave Britton IC [email protected] UK Project Leader Robin Middleton RAL [email protected] Liaison Les Robertson CERNe-Science Director Neil Geddes PPARC
See: www.gridpp.ac.uk
GridPP AstroGrid 13 December 2001 Slide 13
UK DataGrid Contacts
UK Co-ordinator Robin Middleton ([email protected])Architecture Task Force Steve Fisher ([email protected])Security Dave Kelsey ([email protected])WP1 Workload Management David Colling ([email protected])WP2 Data Management Tony Doyle
([email protected])WP3 Grid Monitoring Steve Fisher ([email protected])WP4 Fabric Management Paul Anderson ([email protected])WP5 Mass Storage John Gordon ([email protected])WP6 Integration Test Bed Andrew McNab ([email protected])WP7 Network Services Peter Clarke ([email protected])WP8 HEP Applications
GridPP AstroGrid 13 December 2001 Slide 14
GridPP Status
• EU DataGrid started 1st January 2001 (funds 5 UK posts).• GridPP started 1st September 2001.• Management Structure up and running.• Project Manager appointed from 1st September.• PMB meets weekly by VC and monthly in person.• Already allocated ~16 new posts to work on EU DataGrid
- partly in post (mostly middleware development).• About to announce 15 new posts (mostly experimental
implementation). • About to Tender for £900k hardware for Tier-1/A Centre
at RAL and £300k for Tier-0 at CERN.• In process of allocating ~12 joint CERN/PPARC
Fellowships. • First EU DataGrid Testbed deployed - at 11 Dec consists
of CERN, CNAF (Bologna), RAL and Manchester.