Prepared by: Public Works Department Design/Construction Division Sandy Forks Road - Greenroads Project City Council Presentation Date: February 18, 2014 Greenroads and the related logo is a trademark owned by the University of Washington and is used with permission.

Greenroads Sandy Forks 2014.02.18 · Sandy Forks Road - Greenroads Project City Council Presentation Date: February 18, 2014 Greenroadsand the related logo is a trademark owned by

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Greenroads Sandy Forks 2014.02.18 · Sandy Forks Road - Greenroads Project City Council Presentation Date: February 18, 2014 Greenroadsand the related logo is a trademark owned by

Prepared by:Public Works DepartmentDesign/Construction Division

Sandy Forks Road - Greenroads ProjectCity Council PresentationDate: February 18, 2014

Greenroads and the related logo is a trademark owned by the University of Washington and is used with permission.

Page 2: Greenroads Sandy Forks 2014.02.18 · Sandy Forks Road - Greenroads Project City Council Presentation Date: February 18, 2014 Greenroadsand the related logo is a trademark owned by

Sandy Forks Road Widening

What is a Greenroad?“A Greenroad is defined as a roadway project that has been designed and constructed to a level of sustainability that is substantially higher than current common practice.”

2

Page 3: Greenroads Sandy Forks 2014.02.18 · Sandy Forks Road - Greenroads Project City Council Presentation Date: February 18, 2014 Greenroadsand the related logo is a trademark owned by

Sandy Forks Road Widening

Background and History Greenroads Rating System is a sustainability rating 

system for roadway design and construction projects Awards points for sustainable design/construction, 

similar to LEED certification for green buildings Rating system managed by Greenroads Foundation 

(third party non‐profit corporation) Over 120 projects rated around the world, most 

completed during five years of research/development at the University of Washington 

Currently around 50 registered projects, mostly western US, also Texas, Michigan, Colorado, North Carolina (City of Charlotte), and Canada

3

Page 4: Greenroads Sandy Forks 2014.02.18 · Sandy Forks Road - Greenroads Project City Council Presentation Date: February 18, 2014 Greenroadsand the related logo is a trademark owned by

What sustainability topics are covered? Project Requirements – environmentally responsible 

decision making processes/plans Environment & Water – best practices related to 

stormwater management and ecological resources Access & Equity – safety, access, and mobility Construction Activities –construction management Materials & Resources – recycle, reuse, reduce waste Pavement Technologies – pavement innovations Custom Credits – innovations/ideas not in manual

4

Sandy Forks Road Widening

Page 5: Greenroads Sandy Forks 2014.02.18 · Sandy Forks Road - Greenroads Project City Council Presentation Date: February 18, 2014 Greenroadsand the related logo is a trademark owned by

Rating System Details 108 Total Points possible (excluding custom credits) Bronze Certified (32‐42 points, PR +30% VC) Silver Certified (43‐54 points , PR +40% VC) Gold Certified (55‐63 points , PR +50% VC) Evergreen Certified (64+ points , PR +60% VC)

5

Sandy Forks Road Widening

Page 6: Greenroads Sandy Forks 2014.02.18 · Sandy Forks Road - Greenroads Project City Council Presentation Date: February 18, 2014 Greenroadsand the related logo is a trademark owned by

Why Rate your Project? Reduce costs (initial and long term lifecycle costs) Create green jobs Reduce environmental impacts Promote sustainability practices

• Communicate to stakeholders• Demonstrate leadership• Collaboration among the project team• Early engagement of stakeholders

Increase property values near Greenroads projects Environmentally, socially, and fiscally responsible spending 

of taxpayer dollars

6

Sandy Forks Road Widening

Page 7: Greenroads Sandy Forks 2014.02.18 · Sandy Forks Road - Greenroads Project City Council Presentation Date: February 18, 2014 Greenroadsand the related logo is a trademark owned by

Sandy Forks RD2013

Sandy Forks Rd. Improvements

Sandy Forks Road Widening

Page 8: Greenroads Sandy Forks 2014.02.18 · Sandy Forks Road - Greenroads Project City Council Presentation Date: February 18, 2014 Greenroadsand the related logo is a trademark owned by

Sandy Forks RD2013

• Poor Pavement Condition• Alligator Cracking and Pot Holes• No Pedestrian Facilities• Lack of turn lanes• Inadequate Drainage• Not Aesthetically Pleasing

Sandy Forks Road Widening

Page 9: Greenroads Sandy Forks 2014.02.18 · Sandy Forks Road - Greenroads Project City Council Presentation Date: February 18, 2014 Greenroadsand the related logo is a trademark owned by

Sandy Forks RD2013

2 - 11’ Lanes, 16.5’ Median, 6’ Sidewalks5’ Bike Lanes, 81.5’ ROW

Sandy Forks Road Widening

Page 10: Greenroads Sandy Forks 2014.02.18 · Sandy Forks Road - Greenroads Project City Council Presentation Date: February 18, 2014 Greenroadsand the related logo is a trademark owned by

10

Sandy Forks Road Widening

Sidewalks & Bicycle LanesStormwater managementLandscaping & LED Street Lighting

Page 11: Greenroads Sandy Forks 2014.02.18 · Sandy Forks Road - Greenroads Project City Council Presentation Date: February 18, 2014 Greenroadsand the related logo is a trademark owned by

Greenroads CostProject Registration ‐ $495A‐Lined Assessment ‐ $1000Certification ‐ $4995 (projects under $10 Million)Staff will analyze benefits/feasibility of completing a project through Greenroads program and any effects certification has on final construction costs

11

Sandy Forks Road Widening

Page 12: Greenroads Sandy Forks 2014.02.18 · Sandy Forks Road - Greenroads Project City Council Presentation Date: February 18, 2014 Greenroadsand the related logo is a trademark owned by

Sandy Forks RD2013

12

Questions

Sandy Forks Road Widening