Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Green Technology
4 Sustainable Development
Green Expo 2015
Luciano Giannini
Mexico City 23.09.2011
Energy relation with Global Issues
Today world wide we all are sharing the following socio-economic issues :
Poverty
Immigration Pressure
Co2
Global warming
Without the availability of relaiable clean and chip energy system we are not able to contribute to the solution of the above issues.
2
Key Countries Electricity Consumption (Mwh/person x year)
• Norway 23,0
• USA 15,0
• Germany 7,0
• Russia 6,5
• Italy 5,5
• China 3.0
• Mexico 2.2
• India 0,7
• Africa 0,6
Energy : a new apprach is required
Conventional large Power Plants using fossil fuels
(coal, gas, oil) are not able to solve the above
global issues as they :
are capital intensive;
require time to be operational;
need an efficient grid to evacuate electricity;
will experience reduced availability of gas & oil;
contribute to the global warming.
4
Worldwide Solar Radiation Map
5
New apprach for a sustainable development
Renewable energy plants coupled with the use of appropriate clean technologies might contribute to accellerate a sustainable development as they:
are not capital intensive;
do not need long time to be operational;
do not need an efficient grid (off grid system);
are enviromentally friendly;
use renewable inexhustaustible sources;
can generate local jobs;
are easier to finance.
6
Renewable Energy Solutions
PV Systems
Mini Hydro plants
Wind plants
Biogas plants
Waste to energy plants
-------
Clean Tecnologies
7
Mexico
Has an average sum of global irradiation per square meter on
year basis more than 2200 kWh/m2 (one of the highest);
Has a very privileged geographic condition to produce power
through a Photovoltaic Plants in very reliable and , safety way.
With a PV plant with a nominal power of 1.0 Kw an average of
electricity of 1800 Kwh can be generated.
Has to develop photovoltaic technology as a huge opportunity
for a sustainable development of the Country.
YIELD ASSESSMENT OF THE PV PLANT
Site : Ecatepec de Morelos, Messico
Elevation a.s.l.: 2254 m
Annual global in-plane irradiation: 2387 kWh/m2
PV system info:
Installed power: 1.0 kWp
Type of modules: crystalline silicon (c-Si)
Azimuth/inclination: 180° (south) / 30°
Annual average electricity production: 1888 kWh
Average performance ratio: 78.7%
Location on the map: http://solargis.info/imaps/#tl=Google:satellite&loc=19.55979,-99.052734&z=4
Italian Companies as Partners
Following the 1973 oil crisis Italy has been putting in
place many initiatives to assure the country energy
security:
Define Regulations,
Energy Efficiency and Conservation Programs,
Feed in tarif for renewable energy development.
These initiatives have allowed Italian companies to grow
to acquire experience and know-how to develop
innovation, networking that today we would like to share
with you to support your initiatives in a sustainable way.
11
Italy
Renewable Energy (Mw)
YEAR PV Wind Bio Renew./Total (%)
2008 430 3.500 1.550 16
2010 3.470 5.800 2.350 22
2012 16.350 8.000 3.800 27
Our Role as your Partner
Having been grown within the Italian context, with all the
experience acquired, as an EPC operator, in terms of :
• technology,
• integration,
• innovaton
• finance,
• networking and partnerships
today we are able to design in a strategic way the most
appropriate solutions along the whole production chain of
renewable energy and Clean technology.
13
Agro-industrial
Clean Technology Model
14
Food
Processing
H2O Pumping
H2OTreatment
Fruit
washing PV Biogas
CONCLUSIONS
• In Italy to design the optimal solutions in terms of cost
time quality and performancies we operate also
through a network of competent companies as
partners.
• In Mexico we would like to operate with you as a
partner to design and support your economic
development.
15
More than 100 MW installed since 2007
More than 700 rooftop projects:
Turnkey projects
From retail to commercial and utility scale
EPC, including grid connection + O&M contracts
20 ground based projects:
Turnkey projects
Utility scale
EPC, including grid connection + O&M contracts
International projects:
2MW plant in Uzbekistan
Projects Track of Record
16
International Experience and Strategy
17
Myenergy’s Seniors Partners have an international and broad experience acquired in
previous key international Global Companies operating mostly in the energy business
sector (ENI, ENEL, ABB, Alstom, GE,etc)
In order to take advantage of the experience and the high level of competitiveness
acquired, and to exploit all opportunities, one of the main goals of Myenergy is to cover
the O&M activities on third parties plants.
Myenergy is now at the stage to replicate the EPC and O&M business model successfully
implemented in the Italian market in overseas markets, and bringing its in-depth know-
how earned in building and maintain turnkey rooftop and ground based PV plants.
Target countries for EPC and O&M PV services:
Europe
Africa, Middle East ,Gulf Area, Central Asia.
Central South America
0
20
40
60
80
100
120
2007 2008 2009 2010 2011 2012 2013
Cumulated mln €
cumulated mln €
18
Cumulated Revenues
19
0
20
40
60
80
100
120
2007 2008 2009 2010 2011 2012 2013
Cumulated installed capacity (MW)
cumulatedinstalledcapacity
Cumulated Installed Capacity
20
Cumulated Designed Capacity
0
10
20
30
40
50
60
70
80
90
2007 2008 2009 2010 2011 2012 2013
Cumulated designed capacity (MW)
Cumulated designedcapacity
Myenergy certifications
21
ISO 9001: Quality management system
ISO 14001: Environmental
management system
ISO 18001: Health and safety management
systems
22
Reference list and Selected Project Experience
www.myenergy.it
POWER: 4 MW DESCRIPTION: Ground based (on exausted garbage dump)
LOCATION: Conversano (BA) TYPE: Stabilizing Mass System
www.myenergy.it
POWER: 4 MW DESCRIPTION: Ground based (on exausted garbage dump)
LOCATION: Conversano (BA) TYPE: Stabilizing Mass System
www.myenergy.it
POWER: 4 MW DESCRIPTION: Ground based (on exausted garbage dump)
LOCATION: Conversano (BA) TYPE: Stabilizing Mass System
www.myenergy.it
POWER: 2 MW DESCRIPTION: Ground based
LOCATION: Castelvisconti (CR) TYPE: Rod System
www.myenergy.it
POWER: 2 MW DESCRIPTION: Ground based
LOCATION: Brindisi (BR) TYPE: Rod System
www.myenergy.it
POWER: 1,250 MW DESCRIPTION: Ground based LOCATION: Ortucchio (AQ)
TYPE: Rod System
www.myenergy.it
POWER: 1 MW DESCRIPTION: Over Greenhouse
LOCATION: Conversano (BA) TYPE: Rod System
www.myenergy.it
POWER: 1 MW DESCRIPTION: Over Greenhouse
LOCATION: Noicattaro (BA) TYPE: Rod System
www.myenergy.it
POWER: 1 MW DESCRIPTION: Over Greenhouse
LOCATION: Conversano (BA) TYPE: Rod System
www.myenergy.it
POWER: 1 MW DESCRIPTION: Ground based (on exausted garbage dump)
LOCATION: Pontirolo Nuovo (BG) TYPE: Stabilizing Mass System
www.myenergy.it
POWER: 2,4 MW DESCRIPTION: Rooftop based
LOCATION: Pieve Emanuele (MI) TYPE: totally integrated in roof
www.myenergy.it
POWER: 999 kW
DESCRIPTION: Greenhouse
LOCATION: Racale (LE)
TYPE: totally integrated in greenhouse’s roof
www.myenergy.it
POWER: 735 kW
DESCRIPTION: Roof based
LOCATION: Pombia (NO)
TYPE: totally integrated in roof
www.myenergy.it
POWER: 850 kW
DESCRIPTION: Rooftop based
LOCATION: Genga (AN)
TYPE: totally integrated in roof
www.myenergy.it
POWER: 885 kW
DESCRIPTION: Rooftop based, asbestos removal, energy efficiency
LOCATION: Milan
TYPE: totally integrated in roof.
INDOOR: SMD LED waterproof light fixtures
OUTDOOR: HP LED waterproof spotlights
INDOOR lighting
OUTDOOR lighting
Before After Differences
Lighting tipology A - Fluorescence
B – Na gas-discharge HP
A – LED HE
B – POWER-LED HE Technological innovation
Lighting energy
consumption
(H24 – 5/7dd)
A – 343.111,68 kWh/year
B – 29.200,00 kWh/year
A – 141.004,80 kWh/year
B – 8.760,00 kWh/year
Saving 58,90%
Saving 70,00%
-114.225,00 kgs CO2
- 61,00 toe
Myenergy S.p.A. Headquarters: San Donato Milanese (MI), Via Angelo Moro 109
Tel: +39 02 5175151
Fax +39 02 51621694
www.myenergy.it
P. I. 05528670960
38
Develop your Energy…
Customized turnkey projects
Complete process - from concept design to
connection to the grid through the permitting
process, supply and installation of materials
Selection of materials in order to maximize
investors’ ROI
Performance bond (bank or insurance) during
the construction phase
Operations and maintenance with performance
guarantee
Wind plants
39