17
October 2016 Green Stormwater Infrastructure Project Development City of Newark, New Jersey Maria Watt, PE Passaic River Symposium Montclair State University 7 th Floor, University Hall Montclair, New Jersey

Green Stormwater Infrastructure Project Development€¦ · Green Stormwater Infrastructure Project Development City of Newark, New Jersey Maria Watt, PE Passaic River Symposium Montclair

Embed Size (px)

Citation preview

October2016

Green Stormwater Infrastructure

Project Development CityofNewark,NewJersey

Maria Watt, PE Passaic River Symposium Montclair State University 7th Floor, University Hall Montclair, New Jersey

•  Whygreenstormwaterinfrastructure(GSI)inNewark?

•  PotenEalpilotsiteselecEon–  3neighborhoods–  12locaEons–  Conceptdesigns

•  Programdevelopment–  HorEculturalmanual–  StandarddrawingsandspecificaEons–  Procurement–  Maintenance–  Outreach–  Funding

Overview

Newark’sSustainabilityAcEonPlanidenEfiedtheimplementaEonofGSIasamajorstrategyavailabletotheCitytomanagestormwaterandcreateamoresustainableenvironment.

WhyGSIinNewark?

NewarkisinprocessofdevelopingacomprehensivegreeninfrastructureprogramtopromoteGSIon:• CityproperEes

• Newdevelopment(tobeaddressedthroughamendmentstoStormwaterOrdinance)

• ExisEngprivatedevelopment(tobeaddressedthroughcombinaEonofgrant-fundedvoluntaryprojectsandincenEvescreatedbyfees,whichcanbereducedthroughGSIcredits)

ProgramIniEaEvesforUrbanTransformaEonusingGSI

TheLong-TermControlPlanoffersanimportantopportunityto:

•  IdenEfypotenEalGSIlocaEonswithinproblemsewersheds•  EvaluateGSIeffecEvenessforaddressingcombinedsewer

overflows(CSOs)•  CollaborateamongCitydepartmentsandpartnerson

advancingGSI•  EngagestakeholdersonGSI

LeveragingGSItoReduceCombinedSewerOverflow

•  IdenEfyanddevelopconceptdesignsforarangeofbroadlyreplicableGSIforNewark

•  DevelopapproachesforsiteidenEficaEon,cost-efficientintervenEonsandcombinaEonsofintervenEons,performancecharacterisEcs,andselecEonofappropriatevegetaEon

•  LaythegroundworktoadvanceseveralGSIpilotprojectsandhelpidenEfystewardshipopportuniEesformaintenancesupport

ProjectPurpose

GISData•  CSOArea•  Imperviouscover•  TaxParcel

•  City-owned•  City-owned

foreclosure•  Vacant/derelict

•  ElevaEon(DEM)•  LandUse/LandCover

GSINeighborhoodandSiteSelecEon

CommunityConsideraEons•  NeighborhoodCharacter•  CommunityGroups/Partners•  Development/Redevelopmentplans•  MunicipalCIP•  Visibility•  PoliEcal/socialequity

NeighborhoodFocusforthisproject:•  EastFerry,Fairmont,andLowerBroadway

PotenEalPilotSiteSelecEon:•  12locaEonsforneighborhoodconceptdesign

EastFerryConceptDesigns

FairmontConceptDesigns

LowerBroadwayConceptDesigns

•  ManyciEesareimplemenEngGSI;manygo-byexamplesavailable,andlessonslearned

•  ConceptdesignsformostallGSIhavebeendeveloped

•  SpecificaEonsarealsoavailablefromGSIciEes

GreenStormwaterInfrastructureDesign

•  WorktowardsexpandingtheinsEtuEonalcapacityofCitydepartmentstoimplementandmanageGSIthoughtraining,workflowandorganizaEonalalignment,partnerdevelopment,andstaffaddiEons

•  Considerbuildingin-housedesignsupportforstandard/replicableinstallaEons.

•  GSIshouldbebuiltintoexisEngassetmanagementprograms,withsufficientstaffavailabilityandbudgetformaintenance.

GSIProgramDevelopment:InternalCapacity

•  ContractorexperEsew/GSIvarieswidely.Considerpre-qualifyingexperiencedcontractors.Oncesufficientcapacityisdevelopedwithinthecontractorcommunity,considerunit-basedcontracEng.

•  Designshouldfullyconsiderfuturemaintenance

needs(trashremoval,replacementofvegetaEon,maintenanceofdrainagesystem,etc.)–  ManyGSIprogramsareengagingneighborhoodresidentsaspartners;creaEngasenseofownership

–  GSImaintenancecreatesopportunityfornew“green”jobs!

GSIProgramDevelopment:ExternalConstrucEonandMaintenanceCapacity

•  ConEnueworkingwithstakeholderstowardsasharedpublicvisionforstormwatermanagementandcommunitygreeningthrough–  OutreachandcoordinaEonwithkeyneighborhoodassociaEonstosupportdesigninsightandmaintenance

–  LeveragetheLong-TermControlPlanningprocessforpubliceducaEonandengagement

GSIProgramDevelopment:StakeholderCoordinaEon

•  NewUSEPArequirementsforreducingCSOswillrequirespendingthatissignificantlygreaterthanpastbudgetallocaEons

•  Increasethefinancialresourcestoimplementgreeninfrastructurethroughgrants,partnerships,andpotenEallyadedicatedrevenuestreamthroughuElityfees

GSIProgramDevelopment:DiversifyGSIFunding/Revenue

•  InmanycasesGSI/LowImpactDevelopment(LID)costsaresimilartoorlessthanthecostsoftradiEonalgreypipedandlargevolumestorage

TransformingUrbanSpaces

Discussion