GPMC 7500T-120-WS LIFTBOAT Multipurpose Offshore Well Intervention and Accommodation Support Liftboat
Air gap: 20 m
Wat
er d
epth
: 60
m
Penetration: 12 m
Leg
leng
th: 1
05 m
HELIPAD 12.8 MT Helicopter 22.2 m ‘D’ value
ACCOMMODATION 120 Complements 14x4-men/28x2-men/8x1-man
CRANES 50 MT and 120 ft boom 50 MT and 110 ft boom
CLASSIFICATION ABS: A1 Self Elevating Drilling Unit AMS
DESIGN ENVIRONMENT Max Water Depth : 60m to 75 m Min Water Depth : 8 m Air Gap : 8 m to 20 m Max Wave Height : 11 m Surface Current : 1.5 knots Wind Speed : 70 knots Leg Penetration : 3 m to 12 m
GPMC7500T-100-WS Rev A6
MAIN FEATURES Drilling and Well Servicing operations Accommodation support during offshore con-
struction and platform maintenance. Offshore Hook-up and Commissioning support
GREEN PALM MARINE CONSULTANCY
SPUDCAN Area: 70 m² Max bearing pressure : 50 MT/m² in Preload Conditions
OVERALL DIMENSIONS Hull Length : 65.55 m Hull Beam : 42.00 m Hull Depth: 6.00 m Transit Draught: ~3.67 m
TUNNEL THRUSTERS 2 x 750 kW
JACKING SYSTEM Fixed Type, Rack and Pinion (Electric) Number: 4 x 18 (= 72) Pinions Normal Jacking: 100 MT/pinion Preload Jacking: 125 MT/pinion Normal Holding Capacity: 160 MT/pinion Storm Holding Capacity: 210 MT/pinion Jacking Speed: 3 ft/min for hull 4 ft/min for legs
ENDURANCE 21 days Autonomy for Fuel and Fresh Water
GREEN PALM MARINE CONSULTANCY
MAIN FEATURES Drilling and Well Servicing operations Accommodation support during offshore con-
struction and platform maintenance. Offshore Hook-up and Commissioning support
GPMC 7500T-120-WS LIFTBOAT Multipurpose Offshore Well Intervention and Accommodation Support Liftboat
X-SKIDDING 15.25m (50ft)
Y-SKIDDING 6.096m (20ft)
CANTILEVER PACKAGE Cantilever Reach: 15.24mx6.10m (50ft x 20ft) Hook Load Capacity: 227 MT (500 kips) Cantilever Length x Width: 34.00m x 10.50m Derrick Working Height: 35.05 m (115ft) Draw works: - Power 858 kW (1150 hp) Mud Pump: 552 kW (750 hp), 345 bar (5,000 psi ) (2 Nos) Cementing Unit: 690 bar (10,000 psi) Cementing manifold: 3”; 10,000 psi design pressure
VARIABLE LOADS Transit : 1200 MT Survival: 950 MT Jacking: 1200 MT
DECK AREA 800 m² (useful)
AZIMUTH THRUSTERS 2 x 1200 kW Transit Speed: 6 knots
MUD CLEANING EQUIPMENTS Shale shaker Degasser Desilter Centrifuge
MACHINERY Main Generators: 5 x 1600 kW CAT 3516 TB (Diesel) Emergency Genset: 1 x 480 kW CAT 3412C (Diesel)
Green Palm Marine Consultancy (GPMC) offers new multi-purpose self-elevating, self-propelled platform (Liftboat) designs and customized MODU Jackup solutions (rig conver-sions and upgrades) to serve a wide range of operations related to offshore construction, platform maintenance, accommodation support, well services, coil tubing, etc. The solutions are customized to client requirements, comply-ing with international standards on operations and safety.
For enquiries and further information, please contact us at: [email protected], [email protected], [email protected], [email protected] www.greenpalmconsultancy.com
GPMC LIFTBOAT SERIES
DISCLAIMER: The information contained in this brochure are thought to be correct at the time of going to print. GPMC reserves the right to change, modify or update any such information without prior notice.
GPMC 4500C-150 GPMC 7500T-250 GPMC 6000T-200
GREEN PALM MARINE CONSULTANCY
MAIN FEATURES Drilling and Well Servicing operations Accommodation support during offshore con-
struction and platform maintenance. Offshore Hook-up and Commissioning support
GPMC 7500T-120-WS LIFTBOAT Multipurpose Offshore Well Intervention and Accommodation Support Liftboat
ACTIVE MUD PITS 2x56.4 m³
KILL MUD PIT 96 m³
BULK & CEMENT TANKS 85 m³
MIXING AREA 32 m²
SACK STORAGE ROOM 64 m²
RESERVE MUD PIT 1x57.5 m³ + 1x56.2 m³