PPRROOGGRREESSSS RREEPPOORRTT JJUULLYY –– DDEECCEEMMBBEERR

22001100

Ministry of Narcotics Control

Narcotics Control Division

Planning and Monitoring Unit

Islamabad

January 2011

Page 2: Green Book July-Dec 2010

1

Page 3: Green Book July-Dec 2010

Government of Pakistan Ministry of Narcotics Control

Progress Report July-December 2010

Planning and Monitoring Unit January 2011

Page 4: Green Book July-Dec 2010

Copyright © 2010 Planning and Monitoring Unit

Ministry of Narcotics Control

Narcotics Control Division

Government of Pakistan

Material in this publication may be freely quoted or reprinted,

But acknowledgement is requested.

Published in 2011

Designed and Printed by Data Processing Officer, PMU MoNC.

Ph # 051-9263270

This publication is available from: House 35, Street 48, Sector F-8/4, Islamabad

Planning and Monitoring Unit, MoNC

House 35, Street 48, Sector F-8/4

Islamabad

Ministry of Narcotics Control

House 30, Street 48, Sector F-8/4

Islamabad

Team for Preparation of the Progress Report

July-December, 2010

Mr. Muhammad Shahid

Mr. Inayatullah Chugatta

Iqrar Ali Soomro

Mr. Zaheer Abbas

With the assistance of:

Mr. Obaid Ali Khan

Ms. Wajeeha Arif

Mr. Nasir Mahmood

Mr. Khurram Shahzad Khan

Page 5: Green Book July-Dec 2010

Contents

Contents:

Executive Summary………………………...…………………………… 4

Organizational Chart and TORs of Planning and Monitoring Unit… 7

Monitoring of Development Projects…………………………………. 12 1. Construction of ANF Academy, Islamabad…………….........…………. 15

2. Construction of ANF HQ Building, Islamabad……................................. 35

3. Construction of ANF Police Station at Kohat..……………..…............... 45 4

4. Model Addiction Treatment & Rehabilitation Centre, Islamabad….. 57 \

5. Model Addiction Treatment & Rehabilitation Centre, Quetta………. 71

6. Treatment Programme for Injecting Drug Users(IDUs)…………….…… 79

7. Community Participation in Drug Demand Reduction……………….. 91

8. Creating Mass Awareness against Drug Abuse……..……...…............. 97

9. Drug Free City Lahore……………………………………..........…..…......... 105

10. Kohistan Area Development Project………………………...……........... 113

11. Linkage of Nara Amazai and Bait Gali District Haripur with Kala

Dhak area of DistrictMansehra……..……………………...……………….

137

12. Kala Dhaka Area Development Project….........................……….…… 155

13. Khyber Area Development Project……………………..……….............. 183

14. Mohmand Area Development Project.......………….……..……………. 205

15. Bajaur Area Development Project……………………….………..…........ 219

Implementation of Anti Narcotics Policy……………………………… 231

Meetings with Stakeholders….……………………………………………. 233

Education Sector…………………...………………………………… .. 237

Health Sector…………………...…………………………………..…… 245

Social Welfare Sector….…………………..……………………..…..… 253

Other Stakeholders...……………………...………………………..…… 261

National Narcotics Control Committee (NNCC)……………..…… 269

Drugs Awareness Campaigns………………..…………………………..… 277

Campaign at Islamabad……………....……………………………… 281

Campaign at Lahore…………………....…………………………….… 321

Campaign at Faisalabad……………....…………………………….… 331

Visit to Pakistan Sports Complex Islamabad……..…………………. 337

Meeting with NGOs………….………………..…………………………..….. 345

Quetta…………….……….……………....……………………………. . 347

Islamabad………….………..…………....…………………………… .. 351

International Cooperation………………………………………………. 353

Colombo Plan…..……………….….……………………………………….. 357 Annual Paris Pact……………….….……………………………………….. 379

Pro

gre

ss R

ep

ort

Ju

ly-D

ec

em

be

r, 2

01

0

Page 6: Green Book July-Dec 2010

1

Page 7: Green Book July-Dec 2010

Executive

Summary

The Anti Narcotics Policy of Pakistan 2010 approved by Cabinet, aims to re-energize existing National Drug Law Enforcement institutions, build the Anti Narcotics Force capacity, develop an effective coordination and control mechanism, and mobilize the people of Pakistan especially youth and institutions (national/international, private/public) to ensure their active participation in eradicating drugs. This policy also seeks to promote international cooperation for mutual support and partnership against narcotic drugs.

The Anti Narcotic Policy 2010 includes establishment of Planning & Monitoring Unit (PMU) in the Ministry Narcotics Control to monitor and evaluate the National Anti Narcotics Policy, Drug Control Master Plan, monitoring of development projects and designing other drug related activities. In pursuance to the Anti Narcotics Policy Project Monitoring Unit, after completing the codal formalities, was made functional in the last week of August 2010. The main activities undertaken by the PMU upto 31st December 2010 are follows:

Drugs Supply Reduction The Anti Narcotics Force is mandated to curb drugs supply in Pakistan. In order to achieve its goals, six development projects costing Rs.966.3 million have been included in the Public Sector Development Programme 2010-11. These projects are for the establishment of Police Stations in Border Areas of Balochistan and at Kohat Tunnel. It also includes development of ANF academy and headquarters building. The Planning & Development Division on account of resource constraints has not released the PSDP allocation for the construction of Police Stations at Quetta, Turbat and Panjgoor. The physical activities at Kohat Tunnel have been affected on account of law and order situation; however the physical activities have again been initiated at site. The Ministry of Narcotics Control accorded highest priority to the completion of academic block of ANF Academy. The work is at an advanced stage of completion and academic block is almost complete. The work on remaining activities is linked with availability of resources.

Ministry of Narcotics Control is also implementing six area development projects in FATA and PATA. The basic objective is to replace poppy cultivation with alternate development activities. These projects are partially financed by NAS. A review of the implementation of these projects indicates that most of the projects are delayed on account of financial constraints and security situation in the area. However these

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

04

Page 8: Green Book July-Dec 2010
Page 9: Green Book July-Dec 2010

projects have an impact on poppy cultivation and the residents have gradually moved towards alternate crops. It has been observed that the releases to the projects are not in accordance with allocations and the implementation of the projects is slowed down. Drugs Demand Reduction Ministry of Narcotics Control is implementing three development projects costing Rs.118.4 million for reduction in demand for drugs. The demand reduction is proposed to be achieved through community participation and mass awareness. Anti Narcotics Force in collaboration with five regional directorates located at Karachi, Quetta, Lahore, Rawalpindi and Peshawar is implementing these projects. The monitoring revealed that the implementation of projects have been effected on account of predictability of releases. The Drug Free City Lahore project has been approved by the DDWP. The project manager has been appointed and the project is at take off stage. Treatment and Rehabilitation Ministry of Narcotics Control is implementing three drug treatment centers including IDUs. These centers, located at Islamabad and Quetta are providing treatment facilities to 90 addicts. The duration of treatment for each addict is 45 days including 15 days for detoxification. The operations of these projects have also suffered on account of inadequate PSDP releases. Meetings with NGOs Ministry of Narcotics Control is creating mass awareness and providing treatment facilities to addicts. In addition to Government initiative, the NGOs are also assisting the Ministry of Narcotics Control to achieve its objective of drug demand reduction. Two consultative meetings were held at Quetta and Islamabad and the matters relating to creating awareness among masses were discussed. The NGOs supported the idea of control room, help line, rapid force, photography and poster competition to create awareness. It was also decided to hold periodical meetings with NGOs. Implementation of Anti Narcotics Policy 2010 The Cabinet has approved the Anti Narcotics Policy 2010. Ministry of Narcotics Control in collaboration with Federal Ministries and Provincial Governments is implementing the Anti Narcotics Policy 2010.

Ministry of Narcotics Control has arranged meetings with the Ministry of Education, Ministry of Health, Provincial Governments and other stakeholders at federal and provincial governments. Each stakeholder has been assigned a specific task to achieve desired objectives.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

05

Page 10: Green Book July-Dec 2010
Page 11: Green Book July-Dec 2010

National Narcotics Control Committee (NNCC) The first meeting of the National Narcotics Control Committee was held on 30th December 2010 under the Chairmanship of Secretary, Narcotics Control Division. The representatives of the federal executing divisions and representatives of the Chief Secretaries of the provincial governments participated in the meeting. The matter relating to establishment of drug addicts wards at District/Tehsil level, training of doctors/paramedical staff, drug awareness campaign, review of curriculum and rehabilitation of addicts were discussed. The committee decided to take appropriate measures to create awareness against drug abuse, treatment and rehabilitation of addicts. Awareness Campaign against Drug Abuse Ministry of Narcotics Control (PMU), as per directive of the Secretary, launched awareness campaign against drug abuse at Islamabad and Lahore. The campaign included display of steamers, banners, distribution of handbills in collaboration with volunteers, lectures on effect of drug on the addict, family and society, along with Poster, Drawing, Slogan and Essay Competition. The best slogan of the campaign was “We are safe, we are drug free”. International Cooperation The Director General, Ministry of Narcotics Control (PMU) participated in Regional Conference on Drug Prevention Best Practices at Hanoi and chaired the technical session of the conference. The following recommendations were approved by the conference:

1. Make appropriate policies in the Government level to integrate preventive drug education as part of curriculum in schools.

2. Build a strong community relationship and ownership of the program in the community.

3. Government must have appropriate policies in support of the sustainability of the program.

4. Promote Youth-to-Youth prevention programs by training more young people to work in drug prevention fields.

5. Establish a better networking and collaboration with the government and non-government organizations in the field of drug prevention practices.

6. Device faith-based approaches in drug prevention by integrating preventive drug education into the religious formation.

7. Colombo Plan must conduct conference of this nature in Colombo Plan member countries on regular basis.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

06

Page 12: Green Book July-Dec 2010

06

Page 13: Green Book July-Dec 2010

Organizational Chart

And Terms of Reference

Planning and Monitoring Unit

(PMU)

Page 14: Green Book July-Dec 2010
Page 15: Green Book July-Dec 2010

Government of Pakistan Ministry of Narcotics Control Planning and Monitoring Unit

Organizational Chart

Secretary

Director General

Director

Monitoring Wing

Dy.Director (I) Dy.Director (II)

MIS Wing

Data Processing

Officer

Computer Operators (I & II)

Administration Wing

Assistant

LDC

Accountant

UDC 08

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

01

0

Page 16: Green Book July-Dec 2010
Page 17: Green Book July-Dec 2010

Planning and Monitoring Unit

Job Descriptions of Officers

1. Director General: Overall Incharge of PMU as Director General/Project Director.

Administrative & financial control, supervision and implementation of the project

as per PC-I.

Prepare monthly, quarterly, half-yearly and annual reviews of development

projects being financed from PSDP, UNODC, NAS, NGOs etc.

Facilitate preparation of development projects and undertake appraisal and

evaluation.

Coordination with UNODC, NAS and other donors.

Facilitate implementation of Anti Narcotics Policy 2010.

Coordination with Government and non-Government organizations to create

awareness against drug abuse.

Any other responsibility/work assigned by the Secretary, Narcotics Control

Division.

2. Director: Supervision of Officers and staff of the PMU and carry out all administrative work.

To prepare, coordinate and furnish material/information relating to development

projects of the Ministry of Narcotics Control, to Planning & Development Division &

Finance Division for carrying out quarterly, mid-year and annual reviews.

Liaise/coordinate with all Wings of the Ministry of Narcotics Control, Planning

Commission, Economic Affairs Division, Finance Division, Project Directors and all

other Stakeholders agencies with regard to project related work & information.

Undertake monitoring and facilitate implementation of development projects of the

Ministry of Narcotics Control.

Analysis of information collected/gathered through field visits by the Monitoring

Officers.

Any other work/responsibility assigned by the Director General.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

01

0

09

Page 18: Green Book July-Dec 2010
Page 19: Green Book July-Dec 2010

Planning and Monitoring Unit Job Descriptions of Officers

3. Deputy Director (I): To plan, prepare and appraise development projects of the Ministry of Narcotics

Control, ANF and other departments/agencies for consideration/approval of DDWP

& CDWP etc.

Collection/compilation and analysis of information relating to allocated projects (list

attached).

Facilitate preparation of cash/work plan/activity chart and prepare status reports of

allocated projects.

Prepare and collect information/material for incorporation in “Green Book”, on

quarterly basis.

Collect information regarding physical and financial progress of each allocated

project, by 5th of each month and to share with MIS section.

Field visits to monitor the allocated projects and preparation of reports with critical

analysis.

Maintain/up-date project’s implementation data electronically with concerned

Project Directors.

Any other work/responsibility assigned by the Director General/Director.

4. Deputy Director (II): To plan, prepare and appraise development projects of the Ministry of Narcotics

Control, ANF and other departments/agencies for consideration/approval of DDWP

& CDWP etc.

Prepare and collect information/material for incorporation in “Green Book”, on

quarterly basis.

Collection/compilation and analysis of information relating to allocated projects (list

attached).

Facilitate preparation of cash/work plan/activity chart and prepare status reports of

allocated projects.

10

Page 20: Green Book July-Dec 2010

06

Page 21: Green Book July-Dec 2010

Planning and Monitoring Unit Job Descriptions of Officers

Collect information regarding physical and financial progress of each allocated

project, by 5TH of each month and to share with MIS section.

Field visits to monitor the allocated projects and preparation of reports with critical

analysis.

Maintain/up-date project’s implementation data electronically with concerned

Project Directors.

Any other work/responsibility assigned by the Director General/Director.

5. Data Processing Officer (DPO) Head of MIS section.

Webpage development of PMU and its linkage with Ministry of Narcotics Control

webpage/website.

Development of database of development projects of Ministry of Narcotics Control.

To process purchases and maintenance etc. of all IT related equipment of PMU.

To ensure efficient networking environment to facilitate communication.

Develop linkage with PMES online system of Project’s Wing of Planning Commission

and furnish project related information to all concerned.

Server management.

Designing and printing of monitoring reports.

Any other work assigned by seniors from time to time.

6. Accountant Maintain Accounts of the project as per guidelines of PIFRA/AGPR/Finance Division

etc.

Prepare bills for all type of expenditures incurred under the project and maintain

record of these expenses.

To act as DDO of the project and reconcile monthly expenditures with AGPR

Prepare budget, revised estimates and NIS for the project and also deal with re-

appropriations, surrender, supplementary grants and all other finance and audit

related matters concerning project.

Facilitate Purchases relating to the project “Establishment of Planning & Monitoring

Unit in the Ministry of Narcotics Control, Islamabad”.

Any other work/responsibility assigned by the DG/Director.

11

Page 22: Green Book July-Dec 2010

11

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

01

0

11

Page 23: Green Book July-Dec 2010

Construction of ANF Academy, Islamabad Construction of ANF HQ Building, Islamabad Construction of ANF Police Station at Kohat Model Addiction Treatment & Rehabilitation Centre, Islamabad Model Addiction Treatment & Rehabilitation Centre, Quetta Treatment Programme for Injecting Drug Users(IDUs) Community Participation in Drug Demand Reduction Creating Mass Awareness against Drug Abuse Drug Free City Lahore Kohistan Area Development Project Linkage of Nara Amazai and Bait Gali District Haripur with Kala

Dhaka of District Mansehra Kala Dhaka Area Development Project Khyber Area Development Project Mohmand Area Development Project Bajaur Area Development Project

Monitoring of Development Projects

Page 24: Green Book July-Dec 2010
Page 25: Green Book July-Dec 2010

Construction of Anti Narcotics Force Academy at Islamabad

Page 26: Green Book July-Dec 2010
Page 27: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

15

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Profile 1 Name of the Project: Construction of ANF Academy Building,

Islamabad 2 Sector Narcotics 3 Location Islamabad 4 Sponsoring Ministry/Agency Narcotics Control Division 5 Executing Agency Pak PWD 6 Name of Project Director Brig. (Retd) Obedullah Khan Niazi 7 Postal Address Anti Narcotics Force HQs, National Park Road,

Rawalpindi 8 Telephone Office: 051-9286040 9 Fax No. 051-9270165

10 E-mail address [email protected]

11 Date of approval by CDWP July 1, 2007

12 Decision of the CDWP The CDWP approved the project with the cost of Rs. 188.891.

13 Objectives of the Project To develop permanent campus of the Anti

Narcotics force Academy for imparting training.

14 Commencement Date As per PC-I Actual July 1, 2007 July 1, 2007

15 Completion Date As per PC-I Expected

June 30, 2009 June 30, 2011

(Million Rs.) 16 Approved Cost of the Project Total FEC 188.891 Million 0

(Million Rs.) 17 Sources of financing Source of Financing Amount

PSDP (Govt. of Pakistan) 188.891

Page 28: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

16

18. Financial Phasing, Releases & Expenditure (Million Rs.)

Year

Phasing as per approved PC-I

(Latest)

PSDP Provision

Actual Amount Released

Actual Expenditure

Total FFC Total FEC Total FEC Total FEC 2007-08 86.725 0.000 64.972 0.000 64.972 0.000 64.972 0.000 2008-09 102.166 0.000 10.000 0.000 7.000 0.000 7.000 0.000 2009-10 0.000 0.000 128.000 0.000 102.115 0.000 102.115 0.000 2010-11 0.000 0.000 40.000 0.000 8.000 0.000 0.000 0.000

Total 188.891 0.000 242.972 0.000 182.087 0.000 174.087 0.000

Note: Expenditure and releases for 2010 are for July - December only.

19. Item-wise cost as per approved PC-I and expenditures (Million Rs.)

S.No

Major Items

PC-1 Cost Estimates

Cumulative Expenditure up to 30th June, 2010.

Expenditure during July

– December 2010

Total Expenditure

up to December,

2010

(A) 1 Administration & Institute Block i Ground Floor 9.916 12.938 0.000 12.938

ii First Floor 9.916 12.873 0.000 12.873 iii Second Floor 8.229 9.558 0.000 9.558 iv Auditorium (Double Height) 5.778 4.022 0.000 4.022 v Future Extension provision in Foundation

for Additional 02 Floor 2.479 3.808 0.000 3.808

Sub Total 36.318 43.199 0.000 43.199 2 Senior Officers & Junior Officers Hostel

i Ground Floor 8.755 11.310 0.000 11.310 ii First Floor 8.767 10.980 0.000 10.980

iii Second Floor 9.315 10.554 0.000 10.554 iv Future Extension provision in Foundation

for Additional 01 Floor 1.459 1.696 0.000 1.696

Sub Total 64.614 77.739 0.000 77.739 3 Commandant Residence

i Cat-II House (01 No) 3.000 0.000 0.000 0.000 Sub Total 67.614 77.739 0.000 77.739

4 Ancilliary Building i Reception/Security Rooms 0.640 0.000 0.000 0.000

ii Cafeteria 1.440 0.000 0.000 0.000 iii Masjid 3.600 0.000 0.000 0.000

Sub Total 73.294 77.739 0.000 77.739 (B) Infrastructure (Civil) 5 Civil

i Water Supply & Sanitary Installation 5.040 2.690 0.000 2.690 ii Underground Water Tank 0.900 0.734 0.000 0.734

iii Overhead water tank 0.650 0.000 0.000 0.000 iv Boundary Wall 1.320 5.582 0.000 5.582 v Paved Open Area 2.009 1.914 0.000 1.914

vi Fire Fighting System 0.840 0.000 0.000 0.000 vii Site development 0.797 0.797 0.000 0.797

Page 29: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

17

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

viii Soil Investigation 0.150 0.377 0.000 0.377 Sub Total 85.000 89.833 0.000 89.833

6 Electro-Mechanical i Electrification (Internal & External) 8.960 5.238 0.000 5.238

ii Gas installations and appliances 1.960 1.498 0.000 1.498 iii Pumping Set with Pumping Room 0.300 0.187 0.000 0.187 iv Telephone Wiring/Exchange, PABX

System (300-lines) 2.520 1.833 0.000 1.833

v Split Unit 1.5 Ton i/c Electric Wiring 1.065 4.509

0.000 4.509 vi Split Unit 2 Ton i/c Electric Wiring 0.420 0.000

vii Split/Packaged Type (Auditorium) 1.260 0.000 viii Fire Alarm system addressable with

repeater Panel 2.128 0.854 0.000 0.854

ix Public Address System 0.450 0.000 0.000 0.000 x Standby DG Set 200 KVA 4.000 4.423 0.000 4.423

xi Substation with VCB HT/LT Panels 400 KVA transformer and HT cables

5.000 1.385 0.000 1.385

7 Hostel furnishing and appliances 4.238 0.000 0.000 0.000 8 Horticulture 0.152 0.000 0.000 0.000

Sub Total 117.453 109.76 0.000 109.76 ( C )

9 Contingencies (3%) 3.524 1.665 0.000 1.665

10 Departmental Charges 7.863 7.243 0.000 7.243 Sub Total 128.840 118.668 0.000 118.668

11 Escalation for 2nd year, 60% of (C ) @6.5%

5.025 3.500 0.000 3.500

Sub Total 133.865 122.168 0.000 122.168 (D) 12

Service Connection

i Electric Connection Charges payable to IESCO including security deposit

5.000 2.300 0.000 2.300

ii Gas connection charges payable to SNGPL

0.500 0.571

0.000 0.571

iii Telephone connection charges payable to SNGPL

0.200 0.000 0.000 0.000

iv W/S connection charges payable to CDA 0.280 0.000 0.000 0.000 Sub Total 139.845 125.039 0.000 125.039

(E) 13

Cost of land (250x300) 49.048 49.048 0.000 49.048

Total 188.891 174.087 0.000 174.087

20. Physical Scope of project as per approved PC-I and achievements (Quantifiable terms)

S.No Major Items Unit Physical Quantity Cumulative achievements upto

Dec 31, 2010

1 Administration & Institute Block 2 Ground Floor Sqr. Ft 8,263 8263 3 First Floor Sqr. Ft 8,263 8263 4 Second Floor Sqr. Ft 6,454 6454 5 Auditorium (Double Height) Sqr. Ft 2,520 2520 6 Future Extension provision in Sqr. Ft 8,263 0

Page 30: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

18

Foundation 7 Hostel Furnishing and

Appliances Jobs 1 0

8 Commandant Residence 9 Cat-II House (01 No) Sqr. Ft 2,500 0

10 Building 11 Reception/Security Rooms Sqr. Ft 800 800 12 Cafeteria Sqr. Ft 1,200 0 13 Masjid Sqr. Ft 3,000 0 14 Infrastructure (Civil) 15 Water Supply & Sanitary

Installation Sqr. Ft 55,999 0

16 Underground Water Tank Gallons 20,000 0 17 Overhead water tank Gallons 10,000 3,000 18 Boundary Wall R.Ft 1,100 1,100 19 Paved Open Area Sqr. Ft 26,784 0 20 Fire Fighting System Sqr. Ft 55,999 0 21 Site development Sqr. Ft 53,141 0 22 Soil Investigation Jobs 1 1 23 Electro-Mechanical 24 Electrification (Internal &

External) Sqr. Ft 55,999 55,999

25 Gas installations and appliances Sqr. Ft 55,999 0 26 Pumping Set with Pumping

Room Jobs 1 0

27 Telephone Wiring/Exchange, PABX System (300-lines)

Sqr. Ft 55,999 0

28 Split Unit 1.5 Ton i/c Electric Wiring

No. 30 0

29 Split Unit 2 Ton i/c Electric Wiring

No. 10 0

30 Split/Packaged Type (Auditorium)

Sqr. Ft 2,520 0

31 Fire Alarm system addressable with repeater Panel

Sqr. Ft 55,999 0

32 Public Address System Jobs 1 0 33 Standby DG Set 200 KVA No. 1 0 34 Substation with VCB HT/LT

Panels 400 KVA transformer and HT cables

Jobs 1 0

35 Horticulture Sqr. Ft 10,100 0 36 Escalation for 2nd year, 60%

@6.5% Lumpsum 1 0

37 Service Connection 38 Electric Connection Charges

payable to IESCO including security deposit

Jobs 1 0

39 Gas connection charges payable to SNGPL

Jobs 1 0

40 Telephone connection charges payable to SNGPL

Jobs 1 0

41 W/S connection charges payable to CDA

Sqr. Ft 55,999 0

Page 31: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

19

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

42 Contingencies (3%) Lumpsum 1 0 43 Cost of land (250x300) Sqr. Ft 8,333 8333 44 Departmental Charges Lumpsum 1 0 45 Senior Officers & Junior Officers (Hostel) 46 Ground Floor Sqr. Ft 7,296 7,296 47 First Floor Sqr. Ft 7,306 7,306 48 Second Floor Sqr. Ft 7,306 7,306 49 Future Extension provision

foundation for additional 02 floor

Sqr. Ft 7,296 Foundation work up to Plinth level

7296

Page 32: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

20

Monitoring Report

Construction of Anti Narcotics Force (ANF), Academy at Islamabad

Approved Capital Cost: Rs.188.891 million Project Duration: April 2007 to September 2010 Phasing of Capital Cost:

(Million Rs)

Year-1 Year-2 Total

86.725 102.166 188.891

Releases and Expenses:

(Million Rs)

Fiscal Year

Releases Expenses

2007-08 64.972 64.972

2008-09 7.000 7.000

2009-10 102.115 102.115

2010-11* 8.00 0.000

Total 182.000 174.000

* July – December Financing: PSDP Sponsoring Agency: Ministry of narcotics Control, Islamabad Executing Agency: Pak PWD Project Site: Plot # 126 & 127 Sector H-11 Islamabad

Objectives

To develop an academy for provision of state of the art

training facilities to the officers and field staff of Anti

Narcotics Force, and officers of the friendly countries.

Scope of Work

Construction of:

Auditorium

Class rooms

Faculty rooms

Syndicate rooms

Administrative Offices

Library

Labs

Hostel

Commandant’s Residence, Cafeteria and Mosque

Furnishing

Key Observations of Monitoring

i. 92% of the capital cost has been utilized while

structure of the academic block and hostel with

partial finishing is complete.

ii. Reception room along the main entrance gate has

been constructed and its finishing work is in

process.

iii. No emergency stairs are provided in the buildings.

iv. Smoke detectors installed in the buildings but

water connections for firefighting are not

provided.

v. No accommodation arrangements are made /

planned for the key supporting staff i.e. Security,

Mess, and Attendants etc.

vi. The approach road utility connections are yet to

be provided.

Page 33: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

21

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

vii. Construction of Mosque and Commandant’s residence is included in the

scope of the project but work has not yet been initiated.

viii. ANF has developed a Project Management Team for better coordination

and facilitation to Pakistan PWD in completing the project. To enable the

team to play an effective role, their responsibilities are yet to be notified by

ANF.

ix. The 150 lines telephone exchange purchased in June 2010, is still in stores

of the Pak PWD. It was proposed in last monitoring report that ANF must

ensure that this exchange is properly stored at Project premises.

x. Compliance report on recommendations made in earlier monitoring report

(September 2010) is not furnished by ANF.

2. Academic Block

i. Structure works, with partial finishes, is complete. According to PWD, the

final finishing will be undertaken when the ANF will take over the Block.

ii. Verandas at the top floor are exposed to rain. As per briefing by Executive

Engineer (Pak PWD), the Verandas will be covered with fiber glass shades.

iii. Steps for fixed seating arrangement in auditorium have been constructed

as per design of the building.

iv. An overhead water tank of 3,000 gallons capacity has been constructed.

3. Hostel

i. The structural works are completed and finishing is in process.

ii. Aluminum windows have been erected, while doors of the rooms and bath

rooms are yet to be erected for which material is available at siite and work

is in progress.

iii. Outer drainage pipes at front of the building are not yet covered.

iv. Bath Room fittings installation is in process.

Page 34: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

22

v. It was recommended in first monitoring report that the electric switches

and power plugs be appropriately located keeping in view the proposed use

of each room. But the plugs and switches are not changed yet.

vi. The furnishing requirement of offices and the hostel rooms have been

reviewed. The dining hall, as per Executive Engineer (Pak PWD), will

accommodate chairs and tables for 200 persons only in two halls and not

300 persons as indicated by ANF authorities earlier.

vii. There will be single room occupancy for officers and double occupancy for

junior officers.

Recommendations

1. ANF should get the leftover work expedited by Pak PWD and arrange to

take over the completed buildings at the earliest.

2. T.O.Rs of the ANF Management Team be notified.

3. ANF must ensure provision of road and utility services to the project.

4. The furnishing of the buildings has been stated to be the responsibility of

NAS. The present status of furnishing be intimated on priority basis.

5. Compliance report on recommendations of the monitoring report be

furnished.

Page 35: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

23

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Pictures

Approach Road to the Project (September 2010)

Approach Road to the Project yet to be developed (December 31, 2010)

Page 36: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

24

Academic Block Front View (September 2010)

Academic Block Front View (December 31, 2010)

Page 37: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

25

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Outer view of Academic Block (September 2010)

Outer view of Academic Block (December 31, 2010)

Page 38: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

26

Inappropriate Design of Auditorium with no steps and stage (September 2010)

Auditorium being developed in accordance with the approved Plan (December 31, 2010)

Page 39: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

27

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Drainage pipes giving ugly look (September 2010)

Drainage pipes covered with fiber glass (December 31, 2010)

Page 40: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

28

View of Academic Block Veranda (September 2010)

View of Academic Block Veranda (December 31, 2010)

Page 41: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

29

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

One of the Bath Rooms on Ground Floor (academic block) December 31, 2010

One of the Bath Rooms on First Floor (academic block) December 31, 2010

Page 42: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

30

Outer View of Hostel Building (September 2010)

Outer View of Hostel Building (December 31, 2010)

Page 43: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

31

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

View of hostel room. Aluminum windows erected, doors yet to be erected. (December 31, 2010)

Overhead water Tank (December 31, 2010)

Page 44: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

32

Standby Power Generator Room

Out Gate (December 31, 2010)

Page 45: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

33

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Construction of Anti Narcotics Force HQ Building, Islamabad

Page 46: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

34

Page 47: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

35

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Profile 1 Name of the Project: Construction of ANF HQ Building, Islamabad

2 Sector Health 3 Location Islamabad 4 Sponsoring Ministry/Agency Narcotics Control Division 5 Executing Agency Pak PWD / ANF 6 Name of Project Director Mian Baber Qayyum, Superintending Engineer 7 Postal Address Project Civil Circle, Pak PWD, G-9/1, Islamabad 8 Telephone Office: 051-9260845 9 Fax No. 051-9260845 10 Date of approval by CDWP April 30, 2007 11 Objectives of the Project To Provide ANF HQ's own Govt. Building 12 Commencement Date As per PC-I Actual July 1, 2007 July 1, 2007 13 Completion Date As per PC-I Expected June 30, 2010 June 30, 2013 14 Approved Cost of the Project Rs. 305.523 million (Million Rs.) 15 Sources of financing Source of Financing Amount PSDP (Govt. of Pakistan) 305.523

16. Financial Phasing, Releases & Expenditure (Million Rs.)

Year

Phasing as per approved PC-I

(Latest)

PSDP Provision

Actual Amount Released

Actual Expenditure

Total FFC Local FEC Total FEC Total FEC 2007-08 83.401 0.000 36.600 0.000 36.600 0.000 36.600 0.000 2008-09 183.019 0.000 11.000 0.000 7.100 0.000 7.100 0.000 2009-10 39.103 0.000 1.000 0.000 1.000 0.000 1.000 0.000 2010-11 0.000 0.000 64.658 0.000 0.000 0.000 0.000 0.000

Total 305.523 0.000 113.258 0.000 44.700 0.000 44.700 0.000

Note: Expenditure and releases for 2010 are for July - December only.

Page 48: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

36

17 Item-wise cost as per approved PC-I and expenditure. (Million Rs.)

S.No. Major Items PC-1 Cost Estimates

Cumulative Expenditure

up to the 30th June,

2010.

Expenditure during July –

December 2010

Total Expenditure

up to December,

2010

1 Office Building 132.196 0.000 0.000 0.000 2 Infrastructure (Civil)

(Majid and boundary wall)

18.749 8.100 0.000 8.100

3 Electrical Works 71.624 0.000 0.000 0.000 4 Horticulture 0.583 0.000 0.000 0.000 5 Escalation 6.5% 14.320 0.000 0.000 0.000 6 Service Connection 9.794 0.000 0.000 0.000 7 Contingency 6.695 0.000 0.000 0.000 8 Other (to be specified)

D.C (Departmental charges)

14.940 0.000 0.000 0.000

9 Land Acquisition 36.623 36.600 0.000 36.600 Total 305.524 44.700 0.000 44.700

18 Physical Scope of project as per approved PC-I and achievements (In quantifiable terms)

S.No. Major Items Unit Physical Quantity Cumulative

Achievements up to Dec 31, 2010

1 Office Building Sqr. Ft 98840 0 2 Infrastructure (Civil) Sqr. Ft 97059 0 3 Electrical Works Sqr. Ft 98840 0 4 Horticulture Sqr. Ft 29136 0 5 Escalation 6.5% Rs. Million 14 0 6 Service Connection Jobs 1 0 7 Contingency Rs. Million 7 0

8 Other (to be specified) D.C (Departmental charges

Lumpsum 1 0

9 Land Acquisition Sqr. Yrd 6222 6222

Page 49: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

37

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Monitoring Report

Construction of ANF Headquarters Building at Islamabad

Approved Capital Cost:

Rs. 305.523 million

Project Duration:

July 1, 2007 to June 30, 2013

Phasing of Capital Cost: (Million Rs)

2007-08

2008-09

2009-10

Total

83.401 183.01 39.103 305.523

Releases and Expenses: (Million Rs)

Fiscal Year

Releases Expenses

2007-08 36.600 36.600

2008-09 7.100 7.100

2009-10 1.000 1.000

2010-11 0.000 0.000

Total 44.700 44.700

Financing:

PSDP

Sponsoring Agency:

Ministry of Narcotics Control, Islamabad

Executing Agency:

Pakistan PWD/Anti Narcotics Force

Project Site:

Plots 42-45, Sector G-10/4,

Mauve Area, Islamabad.

Objectives

To construct ANF’s own building for Headquarters.

Scope of Work

The scope of work includes:

Purchase of Land from CDA

Construction of ANF Headquarter Building

Construction of Mosque

Furnishing and Boundary wall

Internal road and Path.

Key Observations of Monitoring

1. The project was approved by CDWP in its meeting held on April 30, 2007. ANF has not been able to take any concrete steps to implement the scope of work approved by CDWP during the last 44 months.

2. ANF has even not started the process of tendering for the award of civil work. ANF may justify the release of PSDP allocations to the project in view of low priority assigned by ANF.

Recommendations

1. ANF may start the tendering process for

construction of Headquarter Building and

justify the delays in the implementation of

the project.

Page 50: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

38

Project Pictures

Main Construction Area of ANF Headquarter Building

Mosque View from Market

Page 51: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

39

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Mosque main entrance from Market side with no internal boundary wall

Mosque partially Constructed at a cost of Rs. 40 Lacs

Page 52: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

40

Windows open facing to proposed ANF HQ Building

Incomplete Ablution Area

Page 53: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

41

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Old Ablution Area still in use

Mosque rear view

Page 54: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

42

Page 55: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

43

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Construction of ANF Police Station Kohat Tunnel

Page 56: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

44

Page 57: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

45

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Profile

1 Name of the Project: Construction of ANF Police Station Kohat Tunnel

2 Sector Health 3 Location Kohat KPK 4 Sponsoring Ministry/Agency Narcotics Control Division 5 Executing Agency Pak PWD 6 Name of Project Director Executive Engineer 7 Postal Address Central Civil Division Pak, PWD, Bannu Cantt.

Bannu 8 Telephone Office: 0928-9270087 9 Fax No. 0928-9270087

10 E-mail address none

11 Date of approval by DDWP April 14, 2006

12 Decision of the DDWP Project was approved by the DDWP with the cost of Rs. 59.387

13 Objectives of the Project To construct Police Station near the Kohat

Tunnel for checking smuggling of drugs.

14 Commencement Date As per PC-I Actual September 7, 2007 March 5, 2008

15 Completion Date As per PC-I Expected

September 6, 2009 June 6, 2012

16 Approved Cost of the Project Rs. 59.387 million

(Million Rs.) 17 Sources of financing Source of Financing Amount

PSDP (Govt. of Pakistan) 59.387

Page 58: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

46

18. Financial Phasing, Releases & Expenditure (Million Rs.)

Year

Phasing as per approved PC-I

(Latest)

PSDP Provision

Actual Amount Released

Actual Expenditure

Total FFC Total FEC Total FEC Total FEC 2006-07

20.006

0.000 4.000 0.000 0.000 0.000 0.000 0.000 2007-08 0.000 10.000 0.000 7.756 0.000 1.910 0.000 2008-09 0.000 15.092 0.000 2.250 0.000 3.507 0.000 2009-10 0.000 10.000 0.000 2.000 0.000 3.884 0.000

2010-11 15.752 0.000 16.462 0.000 3.200 0.000 3.873 0.000 2011-12 23.629 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Total 59.387 0.000 55.554 0.000 15.206 0.000 13.174 0.000

Note: Expenditure and releases for 2010 are for July - December only.

19. Financial Phasing, Releases & Expenditure (Million Rs.)

S.No

Major Items

PC-1 Cost Estimates

Cumulative Expenditure

upto 30th June, 2010

Expenditure during July

– December 2010

Total Expenditure

up to December,

2010

1 Police Station 29.899 0.000 3.433 3.433 2 AD Residence 1.950 1.754 0.000 1.754 3 Quarter 1.078 1.078 0.000 1.078 4 Interrogation Center 2.526 2.124 0.000 2.124 5 Compound wall with grill 2.475 1.798 0.000 1.798 6 Cost of W/S S/I

(Interal/External) 2.232 0.162 0.000 0.162

7 Electrification (Internal/External)

4.289 1.000 0.000 1.000

8 Overhead & underground water tank

1.300 0.000 0.000 0.000

9 Road & path 1.832 0.000 0.000 0.000 10 Horticulture 0.363 0.000 0.000 0.000 11 Sui Gas Installation 0.827 0.000 0.000 0.000 12 Installation of Tube well

with pumping set 3.000 0.000 0.000 0.000

13 Escalation 6.5% 1.188 0.000 0.000 0.000 14 Contigencies @ 3% 1.036 0.090 0.000 0.090 15 Departmental charges 6.5% 3.462 0.127 0.440 0.567

16 Cost of land (10 kanal) 1.168 1.168 0.000 1.168 Total 57.547 9.301 3.873 13.174

Page 59: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

47

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

20. Physical Scope of project as per approved PC-I and achievements (In quantifiable

terms)

S.No Major Items Unit Physical Quantity

Cumulative achievements up to

Dec 31, 2010

1 Police Station Sqr. Ft 12,416

Concrete work in foundation done, column footing casted. Column in

foundation upto plinth level completed. Filling under plinth in progress.

2 AD Residence Sqr. Ft 1,500 Structural work done.or/window frames fixed. Water supply & sanitation done.

Finishing 95% done.

3 Quarter Sqr. Ft 769 Structural work done.or/window frames fixed. Water supply & sanitation done.

Finishing 95% done.

4 Interrogation Center Sqr. Ft 1804 Structural work done.or/window frames fixed. Water supply & sanitation done.

Finishing 95% done.

5 Compound wall with grill

R.Ft 990 Raising completed on 3 sides. Raising of

front wall and grill in progress.

6 Cost of W/S S/I (Interal/External)

Sqr. Ft 16489 90% completed for covered area 4076 sft.

7 Electrification (Internal/External)

Sqr. Ft 16489 Internal electrification partially

completed for covered area of 4076 sft.

8 Overhead & underground water tank

Gallons 15000 Nil

9 Road & path Sqr. Ft 9900 Nil 10 Horticulture Sqr. Ft 14520 Nil 11 Sui Gas Installation Sqr. Ft 16489 Nil

12 Installation of Tube well with pumping set

Nos. 1 Nil

13 Escalation 6.5% Rs 1 Nil 14 Contigencies @ 3% Rs 1 Nil

15 Departmental

charges 6.5% Rs 2 Nil

16 Cost of land

(10 kanal) Kanals 10 100 %

Page 60: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

48

Monitoring Report

Construction of ANF Police Station at Kohat

Approved Capital Cost: Rs.59.387 million Project Duration: April 14, 2006 to June 6, 2012 Phasing of Capital Cost:

Year Rs (Millions)

2007-08

20.006 2008-09

2009-10

2010-11 15.752

2011-12 23.629

Total 59.387

Releases and Expenses: (Million Rs)

Fiscal

Year Releases Expenses

2007-08 7.756 1.910

2008-09 2.250 3.507

2009-10 2.000 3.884

2010-11* 3.200 3.873

Total 15.206 13.174

* July – December

Financing: PSDP Sponsoring Agency: Ministry of narcotics Control, Islamabad Executing Agency: Anti Narcotics Force Project Site: Near Kohat Tunnel, Kohat, KPK

Objectives

The main objectives of the project are:

(i) To enable the authorities of Narcotics

Control to counter the Drug Trafficking by

provision of a well facilitated Police Station.

(ii) To provide Residential Facilities to the

officials of Anti Narcotics Force to have

better environmental working conditions as

per their operational requirements.

(iii) To reduce the huge expenses arising due to

private building hiring for official and

residential use.

Scope of Work

The scope of work includes the purchase of land and

construction of buildings thereon for:

Police Station

AD Residence

Interrogation Center

Quarter

Boundary Wall

Over Head and Under Ground Water Tank

Internal and External Electrification

Allied Services and Utilities

Key Observations of Monitoring

1. The project was originally approved on April 14,

2006, the physical activities of the project

commenced on March 5, 2008. The Project was

subsequently considered and approved by DDWP in

its meeting held on April 29, 2010.

Page 61: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

49

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

2. The project during entire implementation period has not been able to

utilize released PSDP allocation. The executing agency still has Rs. 3.26

million unutilized releases.

3. The project includes construction of Police Station along with residences of

Assistant Director and Inspector/Sub Inspector and Interrogation Center.

The executing agency has constructed residences, while the main

component i.e. Police Station is the last priority and has been just started.

4. As per the information provided to monitoring team, ANF has not

designated any Project Director. Hence the project lacks ownership.

5. Wooden doors and aluminum windows erected at Assistant Director

Residence, Quarter and Interrogation Center seem to be of low quality. ANF

must ensure its execution as per specifications.

6. The executing agency has not yet initiated the process for provision of gas

and electricity to the constructed buildings.

Recommendations

1. In order to ensure ownership of the project, a Project Director may

immediately be notified under intimation to Ministry of Narcotics Control

(PMU).

2. ANF may justify construction of residences prior to construction of Police

Station building.

3. ANF to provide details of Financial / Physical activities undertaken during

July – December 2010. The Cash / Work Plan of the unspent balance and

proposed allocation of Rs. 2.951 million for January – March 2010, may also

be furnished for its approval.

4. ANF to ensure provision of utilities before completion of the project.

5. ANF may check / improve the quality of wooden doors and aluminum

windows installed in the constructed buildings.

Page 62: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

50

Project Pictures

Exterior view of main entrance of the ANF Police Station

Inside view of main entrance of the ANF Police Station

Page 63: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

51

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Construction work on main building i.e. Police Station started recently is at initial stage

Page 64: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

52

Compound wall constructed. Security grill only on front wall

Exterior view of Quarter

Page 65: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

53

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Internal view of Quarter with low quality doors and windows

Low quality doors erected in three buildings

Page 66: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

54

View of one of the bath room’s damaged fittings

Exterior view of AD Residence

Page 67: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

55

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Model Addiction Treatment & Rehabilitation Centre (MATRC), Islamabad

Page 68: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

56

Page 69: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

57

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Profile 1 Name of the Project: Model Addiction Treatment & Rehabilitation

Centre (MATRC), Islamabad 2 Sector Health 3 Location Islamabad 4 Sponsoring Ministry/Agency Ministry of Narcotics Control 5 Executing Agency Anti Narcotics Force (ANF) 6 Name of Project Director Brig. Shafqat Hayat Khan 7 Postal Address Chak Shahzad, Islamabad. 8 Telephone Office: 9280480 9 Fax No. 051-5591827 10 E-mail address [email protected] 11 Date of approval by DDWP April 29, 2010 12 Decision of the DDWP The project was approved at a cost of Rs.

54.244 million subject to modifications proposed by the representative of Finance Division.

13 Objectives of the Project 1. To setup a 45 bedded facility for drug

addicts, provide detox facilities to 360 addicts per year.

2. To minimize the risk of relapse and to reintegrate the recovering addicts in the society.

3. Provide rehabilitation and vocational training to the detoxified addicts enabling them to be self reliant and become functional again in the society.

14 Commencement Date As per PC-I Actual July 1, 2010 July 1, 2010 15 Completion Date As per PC-I Expected June 30, 2013 June 30, 2013 16 Approved Cost of the Project Rs. 54.244 million (Million Rs.) 17 Sources of financing Source of Financing Amount PSDP (Govt. of Pakistan) 54.244

Page 70: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

58

18. Financial Phasing, Releases & Expenditure (Million Rs.)

Year

Phasing as per approved PC-I

(Latest)

PSDP Provision

Actual Amount Released

Actual Expenditure

Total FFC Total FEC Total FEC Total FEC

2010-11 21.424 0.000 12.347 0.000 3.595 0.000 3.591 0.000 2011-12 16.07 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2012-13 16.75 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Total 54.244 0.000 12.347 0.000 3.595 0.000 3.591 0.000 Note: Expenditure and releases for 2010 are for July - December only.

19 Item-wise cost as per approved PC-I and expenditure. (Million Rs.)

S.No.

Major Items

PC-1 Cost Estimates

Cumulative Expenditure

up to the 30th June,

2010

Expenditure during July –

December 2010

Expenditure up to

December, 2010

1 Establishment (Pay & Allowances)

28.728 0.000 2.096 2.096

2 Medicines 1.875 0.000 0.741 0.741

3 Food 5.099 0.000 0.116 0.116

4 Stationery / Postage 0.270 0.000 0.011 0.011

5 Repair and maintenance of equipment & furniture

0.275 0.000 0.000 0.000

6 POL / Maintenance of Vehicle

2.270 0.000 0.208 0.208

7 Utilities (electricity / Gas / Water / Telephone / Fax)

2.250 0.000 0.266 0.266

8 Building Rent 5.400 0.000 0.000 0.000

9 Advertisement charges 0.150 0.000 0.000 0.000

10 Unforeseen expenditure + physical contingencies + TA / DA

0.600 0.000 0.150 0.150

11 Monitoring & evaluation 0.370 0.000 0.000 0.000

12 Lab kits & Material 0.703 0.000 0.000 0.000

13 Rehabilitation 0.500 0.000 0.002 0.002

14 Purchase of material / vehicle

5.754 0.000 0.000 0.000

Total 54.244 0.000 3.591 3.591

Page 71: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

59

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

20 Physical Scope of project as per approved PC-I and achievements (In quantifiable terms)

S.No. Major Items Unit Physical Quantity Cumulative

Achievements up to Dec 31, 2010

1 Establishment No. 32 29

2 Medicines No. 270 patients

medicines 225

3 Food No. 270 225

4 Stationery / Postage No. As per

requirement 0

5 Repair and maintenance of

equipment & furniture No. - 0

6 POL / Maintenance of Vehicle No. 6 0

7 Utilities (electricity / Gas /

Water / Telephone / Fax)

Monthly

(Rs.) 0.625 0

8 Building Rent Months 36 Pending since July

9 Advertisement No. 4 0

10 Unforeseen expenditure +

physical contingencies + TA / DA No.

As per

requirement 0

11 Monitoring & evaluation Visits Frequently 0

12 Lab kits & Material No. As per

requirement -

13 Rehabilitation No. 360 0

14 Purchase of material / vehicle No. 2 -

Page 72: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

60

Monitoring Report

Model Addiction Treatment & Rehabilitation Center, Islamabad.

Approved Capital Cost:

Rs.54.244 million

Project Duration:

July 1, 2010 to June 30, 2013

Phasing of Capital Cost:

(Million Rs)

2010-11

2011-12

2012-13

Total

22.272 15.662 16.31 54.245

Releases and Expenses:

(Million Rs)

Fiscal Year

Releases Expenses

2010-11 3.595 3.591

Total 3.595 3.591

Financing:

PSDP

Sponsoring Agency:

Ministry of Narcotics Control, Islamabad

Executing Agency:

Anti Narcotics Force

Project Site:

Chak Shazhad, Islamabad.

Objectives

Establishment of Model Treatment and Rehabilitation Center

for Drug Addicts.

Scope of Work

Setting up of 45 bed hospital for drug addicted patients.

Key Observations of Monitoring

1. The MATRC Islamabad has a capacity to treat 45

addicts per month. It has been observed that the

MATRC Islamabad has never been operated at

designed capacity. The details are as under:

Month (2010)

Designed Capacity

Addicts Treated

Capacity utilized

(%)

July 45 32 71%

August 45 39 87%

September 45 41 91%

October 45 38 84%

November 45 39 87%

December 45 36 80%

Total 270 225 83%

2. Cost per patient per month has been calculated at 0%

opportunity cost of capital and the details are as

under

Month (2010)

Expenditure (Rs.)

Addicts Treated

Cost Per Addict (Rs)

July 1,042,040 32 32,564

August 841,619 39 21,580

September 1,018,094 41 24,832

October 1,052,077 38 27,686

November 1,110,837 39 28,483

December 1,126,375 36 31,288

Total 6,191,042 225 27,516

Page 73: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

61

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

3. Delivery cost per patient has been calculated and details are as follows:

Month (2010) Delivery Cost

July 40%

August 50%

September 55%

October 67%

November 64%

December 63%

4. MATRC Islamabad is maintaining macro data of addicts. ANF was requested

to share the statistical data for analysis. The data provided by ANF after

repeated requests lacks trade-wise addicts information.

5. Phase –I of the project has completed in June 2010. Completion report of

Phase – I, in spite of repeated requests, has not been provided on PC-IV.

6. ANF was requested to provide compliance report of the recommendation

of the monitoring report communicated to ANF on 21.09.2010. The

compliance report is still awaited.

Recommendations:

1. The IDUs Project is registering the patients for admission at MATRC

Islamabad. It has been informed that IDUs have a list of hundreds of addicts

waiting for admission at MATRC Islamabad. ANF may inform as to why the

MATRC is being operated at 83% capacity utilization in a situation of long

waiting list of addicts.

2. In order to monitor the admission of addicts at MATRC Islamabad, ANF may

provide the information upto 31st December 2010 as per following format.

a. Addicts admitted at MATRC Islamabad as on 1.1.2011

Name of Addict Registration

Number Date of

Admission Address

Telephone Number

b. Waiting List of Addicts as on 1.1.2010

Page 74: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

62

Name of Addict

Registration Number

Date of Registration

Address Telephone

Number

3. ANF to provide information in respect of fresh admission and registration of

addicts on 3rd day of every month for review.

4. The average cost per addict is Rs. 26,516 per month, out of which 63% is

the delivery cost. The ANF may propose the measures to reduce the

delivery cost to maximize the benefits of investment being made to operate

the MATRC Islamabad.

5. Activities of the MATRC and IDUs are overlapping. It was decided in a

meeting chaired by Secretary, NCD, with the ANF to merge both the

projects for appropriate utilization of available resources. ANF may furnish

the proposal for its consideration immediately.

6. The use / disposal of X-ray unit as communicated by Ministry of Narcotics

Control be implemented in 15 days.

7. Project completion report on revised PC-IV performa may be furnished for

consideration and onward communication to Planning Commission for its

approval.

Page 75: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

63

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Pictures

Front Lobby of Rehabilitation Center

Dispensary of Rehabilitation Center

Page 76: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

64

Pathology Laboratory Apparatus

Pathology Laboratory Apparatus

Page 77: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

65

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Portable X-Ray Machine Purchased in2005: Still to be made operational

Detoxification Ward

Page 78: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

66

Rehabilitation ward

Psychotherapy being carried out by Motivators

Page 79: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

67

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Kitchen

Washroom of Rehabilitation Ward

Page 80: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

68

Page 81: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

69

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Model Addiction Treatment & Rehabilitation Centre, Quetta

Page 82: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

70

Page 83: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

71

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Profile 1 Name of the Project: Model Addiction Treatment & Rehabilitation

Centre, Quetta 2 Sector Health 3 Location Islamabad 4 Sponsoring Ministry/Agency Ministry of Narcotics Control 5 Executing Agency Anti Narcotics Force (ANF) 6 Name of Project Director Brig. Waheed Akhtar 7 Postal Address Regional Directorate Anti Narcotics Force

449/A Musa Road, Quetta 8 Telephone Office: 081-9202797

081-9201569

9 Fax No. 081-9202683 10 E-mail address [email protected] 11 Date of approval by DDWP April 26, 2010 12 Decision of the DDWP The project was supported / approved with a

total cost of Rs.54.244 million subject to modifications proposed by the representatives of the Planning/ Finance Division

13 Objectives of the Project Establishment of Model Treatment and

Rehabilitation Center for Drug Addicts. 14 Commencement Date As per PC-I Actual July 1, 2010 July 1, 2010 15 Completion Date As per PC-I Expected June 30, 2013 June 30, 2013 16 Approved Cost of the Project Rs. 54.244 million (Million Rs.) 17 Sources of financing Source of Financing Amount PSDP (Govt. of Pakistan) 54.244

Page 84: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

72

18. Financial Phasing, Releases & Expenditure (Million Rs.)

Year

Phasing as per approved PC-I

(Latest)

PSDP Provision

Actual Amount Released

Actual Expenditure

Total FFC Total FEC Total FEC Total FEC

2010-11 22.167 0.000 12.347 0.000 3.595 0.000 5.485 0.000 2011-12 15.802 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2012-13 16.326 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Total 54.295 0.000 12.347 0.000 3.595 0.000 5.485 0.000 Note: Expenditure and releases for 2010 are for July - December only.

19 Item-wise cost as per approved PC-I and expenditure. (Million Rs.)

S.No. Major Items PC-1 Cost Estimates

Cumulative Achievements up to 31st Dec, 2010

1 Establishment (Pay & Allowance) 28.728 3.391 2 Medicines for Patients 1.853 0.196 3 Food + Kitchen Items 5.390 0.590 4 Purchase of Stationary 0.270 0.006 5 Repair & Maintenance of Furniture 0.275 0.053 6 POL, Maintenance of Vehicles 2.340 0.099 7 Utilities 2.250 0.146 8 Building Rent 7.200 0.495 9 Advertisement Charges 0.150 0.195

10 Unforeseen Expenditure, Physical Contingencies

0.824 0.107

11 Monitoring and Evaluation 0.370 0.000 12 Lab kits and Material 0.702 0.046 13 Rehabilitation 0.580 0.162 14 Purchase of Material/Vehicles 6.618 0.000

Total 54.244 5.485

20 Physical Scope of project as per approved PC-I and achievements (Quantifiable terms)

S.No

Major Items

Unit

Physical Quantity

Cumulative achievements up to Dec 31, 2010

1 Establishment (Pay & Allowance)

No 32 Payment of 28 Personals

2 Medicines for Patients Lumpsum 0.1 Purchase of medicines for average 35 patients per month

3 Food+Kitchen Items Lumpsum 0.45 Purchase of food for average 35 patients per month

4 Purchase of Stationary Lumpsum 0.01 As per requirement 5 Repair & Maintenance of

Furniture Lumpsum

0 As per requirement

6 POL, Maintenance of Vehicles Lumpsum 0.18 POL for 3 vehicles 7 Utilities Lumpsum 0.15 As per actual

Page 85: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

73

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

8 Building Rent Lumpsum 0.45 As per actual 9 Advertisement Charges Lumpsum 0.05 For awareness

10 Unforeseen Expenditure, Physical Contingencies

Lumpsum 0 As required

11 Monitoring and Evaluation Lumpsum 0 0 12 Lab kits and Material No 0.375 For 35 patients per month 13 Rehabilitation Lumpsum 0.05 For 35 patients per month 14 Purchase of

Material/Vehicles Lumpsum 0.9 0

Page 86: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

74

Monitoring Report

Model Addiction Treatment & Rehabilitation Center, Quetta.

Approved Capital Cost:

Rs.54.244 million

Project Duration:

July 1, 2010 to June 30, 2013

Phasing of Capital Cost:

(Million Rs)

2010-11

2011-12

2012-13

Total

22.272 15.662 16.31 54.245

Releases and Expenses:

(Million Rs)

Fiscal Year

Releases Expenses

2010-11 3.595 5.485

Total 3.595 5.485

Financing:

GoP (PSDP)

Sponsoring Agency:

Ministry of Narcotics Control, Islamabad

Executing Agency:

Anti Narcotics Force

Project Site: Nawa Killi, Musa road Quetta.

Objectives

Establishment of Model Treatment and Rehabilitation

Center for Drug Addicts.

Scope of Work

Setting up of 45 bed hospital for drug addicted patients.

Key Observations of Monitoring

1. The MATRC Quetta has a capacity to treat 45

addicts per month. The capacity of MATRC

Quetta is as under:

Month (2010)

Designed Capacity

Addicts Treated

Capacity Utilized

July 45 43 96% August 45 46 102%

September

45 36 80%

October 45 46 102%

November

45 33 73%

December

45 28 62%

Total 270 232 86%

2. Cost per patient per month has been calculated

at 0% opportunity cost of capital and the details

are as under

Month (2010)

Expenditure (Rs.)

Addicts Treated

Cost Per Addict (Rs)

July 1,023,947 43 23,813 August 854,473 46 18,576

Septembe

r

853,446 36 23,707

October 975,708 46 21,211

Novembe

r

874,374 33 26,496

December 903,136 28 32,255

Total 5,485,084 232 23,643

Page 87: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

75

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

3. Delivery cost per patient has been calculated and details are as follows:

Month (2010) Delivery Cost

July 50%

August 59% September 67%

October 61% November 69% December 67%

4. Phase –I of the project has completed in June 2010. Completion report of

Phase – I, in spite of repeated requests, has not been provided on PC-IV.

Recommendations:

1. The IDUs Project is registering the patients for admission at MATRC Quetta.

It has been informed that IDU Quetta has a waiting list of addicts waiting

for admission at MATRC Quetta. ANF may inform as to why the MATRC is

being operated at 86% capacity utilization in a situation of long waiting list

of addicts.

2. In order to monitor the admission of the addicts at MATRC Quetta, ANF is

requested to provide the information upto 31st December 2010 as per

following format.

a. Addicts admitted in MATRC Quetta as on 1.1.2011

Name of Addict

Registration Number

Date of Admission

Address Telephone

Number

b. Waiting List of Addicts as on 1-1-2011

Name of Addict

Registration Number

Date of Registration

Address Telephone

Number

3. ANF to provide the information in respect of admissions and registration of

addicts for treatment in the above format on 3rd day of every month for

review.

Page 88: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

76

4. The average cost per addict is Rs.23643/- per month, out of which 61% is

the delivery cost. The ANF to propose the measures to reduce the delivery

cost to maximize the benefits of investment being made to operate the

MATRC Quetta.

5. Activities of the MATRC and IDUs are overlapping. It was decided in

meeting chaired by Secretary, NCD, with the ANF, to merge both the

projects for appropriate utilization of available resources. ANF may furnish

its proposal immediately.

6. Project completion report on revised PC-IV Proforma may be furnished for

consideration and onward communication to Planning Commission for its

approval.

Page 89: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

77

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Treatment Programme for Injecting Drug Users, IDUs

Page 90: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

78

Page 91: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

79

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Profile 1 Name of the Project: Treatment Programme for Injecting Drug

Users (IDUs) 2 Sector Health 3 Location Rawalpindi / Islamabad 4 Sponsoring Ministry/Agency Ministry of Narcotics Control 5 Executing Agency Anti Narcotics Force (ANF) 6 Name of Project Director Syed Morevat Ali Shah 7 Postal Address Anti Narcotics Force Headquarters, National

Park Road, Rawalpindi. 8 Telephone Office: 9286033 9 Fax No. 051-9270165 10 E-mail address [email protected] 11 Date of approval by DDWP May 6, 2009 12 Decision of the DDWP The project was approved at a cost of Rs.

39.994 million. 13 Objectives of the Project 1. To treat 50 addicts daily.

2. Protect the patients from immediate harmful effects of addiction.

3. To motivate addicts for their treatment. 4. To provide guidance to the affected families

for proper treatment of addicts. 5. To control the epidemic of HIV/AIDS, HCV,

T.B. and other blood borne diseases. 14 Commencement Date As per PC-I Actual July 1, 2009 July 1, 2009 15 Completion Date As per PC-I Expected June 30, 2012 June 30, 2012 16 Approved Cost of the Project Rs. 39.994 million (Million Rs.) 17 Sources of financing Source of Financing Amount PSDP (Govt. of Pakistan) 39.994

Page 92: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

80

18. Financial Phasing, Releases & Expenditure (Million Rs.)

Year

Phasing as per approved PC-I

(Latest)

PSDP Provision

Actual Amount Released

Actual Expenditure

Total FFC Total FEC Total FEC Total FEC

2009-10 16.380 0.000 16.380 0.000 7.562 0.000 7.562 0.000 2010-11 11.458 0.000 9.877 0.000 2.086 0.000 2.066 0.000 2011-12 12.156 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Total 39.994 0.000 26.257 0.000 9.648 0.000 9.628 0.000 Note: Expenditure and releases for 2010 are for July - December only.

19 Item-wise cost as per approved PC-I and expenditure. (Million Rs.)

S.No Major Items PC-1 Cost Estimates

Cumulative Expenditure up to 30th June, 2010

Expenditure during July –

December 2010

Expenditure up to

December, 2010

1 Establishment (Pay Lump sum) 23.252 4.699 1.610 6.309 2 Procurement of vehicle 4.000 0.000 0.000 0.000 3 Purchase of Equipment 0.726 0.326 0.000 0.326 4 Purchase of furniture & crockery 0.255 0.155 0.000 0.155 5 Rent of Building 2.376 0.692 0.215 0.907 6 POL 1.675 0.225 0.055 0.280 7 Repair & Maintenance of Vehicle 0.360 0.100 0.024 0.124 8 Repair & Maintenance of

equipment and furniture 0.105 0.030 0.017 0.047

9 Tea and light refreshment for addicts @ Rs. 10/- per addicts

1.080 0.360 0.017 0.377

10 Utilities (Electric, Gas, Water and Telephone/Fax)

1.220 0.400 0.068 0.468

11 Stationery 0.550 0.075 0.016 0.091 12 Emergency treatment items 2.350 0.200 0.030 0.230 13 Hair cutting and shaving of addicts 1.075 0.150 0.008 0.158 14 Advertisement charges 0.400 0.150 0.000 0.150 15 Misc 0.570 0.000 0.006 0.006

Total 39.994 7.562 2.066 9.628

20 Physical Scope of project as per approved PC-I and achievements (Quantifiable terms)

S.No

Major Items

Unit

Physical Quantity

Achievements Cumulative achievements up to Dec 31,

2010

Up to June 2010

July-Dec 2010

1 Establishment No. 44 44 0 44 2 Procurement of equipment / Vehicle

i Vehicle No. 1 0 0 0 ii Computers No. 2 1 0 1

iii Printers No. 2 1 0 1 iv Refrigerators No. 2 1 0 1 v Emergency Boxes No. 10 5 0 5

vi Photostat machines No. 2 1 0 1

Page 93: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

81

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

vii Stethoscopes No. 10 5 0 5 viii BP Apparatus No. 10 5 0 5 3 Furniture & Crockery

i Computer tables No. 2 1 0 1 ii Carpets No. 2 1 0 1

iii Corner Racks No. 4 2 0 2 iv Crockery etc No. 2 1 0 1 v Book racks No. 2 1 0 1

vi Computer chairs No. 2 1 0 1 4 Rent of Building Rs. Million 2.376 0.5 0.407 1 5 POL

i Hiace ambulances Rs. Million 1.675

0.12 0.16

0.280 ii Suzuki bolan Rs. Million

iii Motorcycle Rs. Million 6 Repair and Maintenance of vehicles

i Suzuki Bolan No. 2 1 0 1 ii Motorcycles No. 4 1 0 1

7 Repair and Maintenance of Equipment

No. As per requirement 0

8 Tea & Refreshment of Drug Addicts

No. 36000 9000 0 9000

9 Utilities Bills

No. of Months

36 15 0 15

10 Stationary Items Lumpsum As per requirement

As per requirement

11 Emergency Treatment Items

Lumpsum As per requirement As per

requirement 12 Haircutting and

Shaving of addicts Lumpsum 36000 0 9000 9000

13 Advertisement No. 8 8 0 8 14

Miscellaneous Lumpsum As per requirement As per

requirement

Page 94: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

82

Monitoring Report

Treatment Program for Injecting Drug Users (IDUs)

Drop-in Center for Injecting Drug Users (IDPs), Rawalpindi

Approved Capital Cost:

Rs.19.997 million

Project Duration:

July 1, 2009 to June 30, 2012

Phasing of Capital Cost:

(Million Rs)

2009-10

2010-11

2011-12

Total

8.19 5.729 6.078 19.997

Releases and Expenses:

(Million Rs)

Fiscal Year

Releases Expenses

2009-10 7.562 3.781

2010-11 2.086 1.975

Total 9.648 5.756

Financing:

PSDP

Sponsoring Agency:

Ministry of Narcotics Control, Islamabad

Executing Agency:

Anti Narcotics Force

Project Site:

Gulzar e Quaid, Rawalpindi

Objectives

To provide services to the IDUs and motivate them to

undergo comprehensive treatment and rehabilitation

process.

Scope of Work

To provide treatment facilities to at least 25 addicts daily.

Key Observations of Monitoring

1. ANF is not providing the information relating to

operations of the IDU Quetta.

2. The project envisages establishment of two IDU Centers

at Rawalpindi and Quetta. Each IDU Center as per PC-I

was designated to treat / register 750 addicts per

month. Ministry of Narcotics Control has never

received any information relating to performance of

IDU Quetta. The information received from IDU

Rawalpindi has been analyzed and is presented below.

The details are as under:

Capacity Utilization (IDU Rawalpindi)

Month (2010)

Designed Capacity

Addicts Registered

Capacity Utilization (%)

July 750 127 17%

August 750 63 8%

September 750 97 13%

October 750 110 15%

November 750 130 17%

December 750 90 12%

Total 4500 617 14%

Page 95: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

83

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

3. Cost per patient per month has been calculated at 0% opportunity cost of

capital and the details are as under:

Cost Per Addict (IDU Rawalpindi)

Month (2010) Expenditure

(Rs.) Addicts

Registered Registration Cost

Per Addict (Rs)

July 324,825 127 2,558

August 315,767 63 5,012

September 322,819 97 3,328

October 351,581 110 3,196

November 334,699 130 2,575

December 325,806 90 3,620

Total 1,975,497 617 3,201

4. According to PC-I, the Centre had to provide treatment to at least 25

addicts per day. The data shows that around 3.4 addicts at an average are

registered/treated per day. The average cost of registration/outdoor

treatment of one addict during July – December 2010 is Rs. 3,201.

5. The recommendations made in the last Monitoring Report and the replies

of ANF are as follows:

S.No Recommendation Reply of ANF

1.

The projects titled “Model Addiction

Treatment & Rehabilitation Centre” and

“Treatment Program for Injecting Drug

Users (IDUs)” are overlapping the

activities. The activities being undertaken

under both the projects be merged and

both the projects may immediately be

located at one place. The organizational

set up and other administrative matters

will be finalized in consultation with A.N.F.

Statuesque is suggested since

MATRC Islamabad is under

process of transferring to

Ministry of Health.

2.

The Project Management is disposing off

the used syringes in an unprofessional

manner. The Center may immediately

enter into an agreement with a hospital

having incinerator for its proper dispose

off.

RD Rawalpindi has been

instructed to ensure proper

destruction of syringes

including needles, cylinders and

piston / pushers.

3.

The output of the nurses is extremely low.

The management may explore the

possibility of its better utilization.

Direction has been issued to

the RD to take measures to

improve the output of nurses

Page 96: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

84

Similarly, the management may also

explore the possibility of improving the

efficiency of social workers.

and social workers.

4.

The social workers are filling the forms

manually and then handing it over to

computer operator for typing. It would be

more appropriate if the data is directly

entered into the computer and the

services of social workers are utilized more

productively. The data may be stored in

MS Excel to facilitate its analysis.

The proposal is being

technically analyzed for

practicability and comments

have been asked from RD

Rawalpindi.

5.

The scanner gifted by China may

immediately be installed at Quetta Airport

to check smuggling of drugs through

human body.

Scanner belongs to RD Quetta.

RD has been instructed to shift

the scanner. Completion report

will be forwarded in due course

of time.

It transpires from the above that the ANF has instructed the RD Rawalpindi

and Quetta to take actions on the recommendations of monitoring report,

however, RDs / ANF has not informed the outcome of the instructions issued

to them. ANF has not even informed about operationalization of scanner

gifted by China.

Recommendations

1. ANF may justify an output of 14% against the physical targets approved in

the PC-I.

2. The cost of registration of addicts at Rawalpindi is Rs. 3,201 which is not

acceptable by any standard. The registration work can be done by MATRC

receptionist. The justification for continuation of the project may be

provided.

3. ANF may provide the status of implementing the recommendations made

by the Ministry of Narcotics Control (PMU) communicated to ANF on 7-9-

2010.

4. ANF may immediately provide requisite information relating to operations

of IDU Quetta.

5. ANF to confirm operationalization or otherwise of the scanner gifted by

China

Page 97: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

85

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Pictures

Registration Office of IDUs

Male Nurses

Page 98: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

86

Medicine Stock

Medical Officer/ Incharge

Page 99: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

87

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Barber Room

Recreation Room for Addicts & Families

Page 100: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

88

Psychologists’ Room

Body Scanners gifted by China still to be made operational

Page 101: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

89

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Community Participation in Drug Demand Reduction

Page 102: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

90

Page 103: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

91

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Profile 1 Name of the Project: Community Participation in Drug Demand

Reduction 2 Sector Health 3 Location All over Pakistan 4 Sponsoring Ministry/Agency Narcotics Control Division 5 Executing Agency Anti Narcotics Force 6 Name of Project Director Syed Morevat Ali Shah 7 Postal Address Anti Narcotics Force Headquarters, National

Park Road, Rawalpindi. 8 Telephone Office: 9286033 9 Fax No. 051-9270165

10 E-mail address [email protected]

11 Date of approval by DDWP May 6, 2009

12 Decision of the DDWP The project was approved at a cost of Rs. 39.500 million.

13 Objectives of the Project 1. To create awareness amongst target groups

about the hazards associated with drug abuse.

2. To promote healthy living among general population of the country and discourage them from taking drugs.

3. To provide the target group with positive alternatives for leisure time and stay indulging in healthy activities.

4. To support the NGOs / Civil Society Organizations / Sport Associations, who are involved in drug demand reduction activities.

14 Commencement Date As per PC-I Actual July 1, 2009 July 1, 2009

15 Completion Date As per PC-I Expected

June 30, 2012 June 30, 2012

16 Approved Cost of the Project Rs. 39.5 million (Million Rs.)

17 Sources of financing Source of Financing Amount PSDP (Govt. of Pakistan) 39.500

Page 104: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

92

18. Financial Phasing, Releases & Expenditure (Million Rs.)

Year

Phasing as per approved PC-I

(Latest)

PSDP Provision

Actual Amount Released

Actual Expenditure

Total FFC Total FEC Total FEC Total FEC 2009-10 14.554 0.000 14.550 0.000 8.183 0.000 8.183 0.000 2010-11 12.527 0.000 12.347 0.000 2.358 0.000 2.277 0.000 2011-12 12.419 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Total 39.500 0.000 26.897 0.000 10.541 0.000 10.460 0.000

Note: Expenditure and releases for 2010 are for July - December only.

19. Item-wise cost as per approved PC-I and expenditures (Million Rs.)

S.No

Major Items

PC-1 Cost Estimates

Cumulative Expenditure

upto 30th June, 2010

Expenditure during July –

December 2010

Total Expenditure

up to December,

2010

1 Establishment Charges i Pay of staff 13.051 1.175 1.723 2.898

Sub Total 13.051 1.175 1.723 2.898 2 Procurement

i Equipment 0.480 0.480 0.000 0.480 ii Furniture and stationery 1.254 1.254 0.000 1.254

Sub Total 1.734 1.734 0.000 1.734 3 Healthy alternative activities

i Inter-college quiz competitions

0.700 0.350 0.000 0.350

ii Posters and painting competitions

0.420 0.140 0.000 0.140

iii Tableaus in schools and colleges

0.700 0.350 0.000 0.350

iv Setting-up of stalls at mellas and fun fairs

0.375 0.125 0.000 0.125

v Free medical camps 1.000 0.500 0.000 0.500 vi Walks 2.160 0.600 0.025 0.625

vii Musical concerts 1.200 0.600 0.107 0.707 viii Other 0.945 0.100 0.018 0.118 Sub Total 7.500 2.765 0.150 2.915

4 Support to NGOs and Sports Associations i support to NGOs 4.000 1.047 0.104 1.151

ii Support to sports associations

6.000 1.177 0.300 1.477

Sub Total 10.000 2.224 0.404 2.628 5 Material Production

i Preparation and Distribution of Informational material

3.000 0.000 0.000 0.000

ii Preparation and Distribution of Promotional material

3.000 0.000 0.000 0.000

Sub Total 6.000 0.000 0.000 0.000 6 Monitoring and evaluation

Page 105: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

93

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

i Visit to RDs for M&E 0.715 0.211 0.000 0.211 Sub Total 0.715 0.211 0.000 0.211

7 Advertisement i Advertisement in

newspapers for recruitment of staff and purchase of equipment and furniture

0.500 0.074 0.000 0.074

Sub Total 0.500 0.074 0.000 0.074 Grand Total 39.500 8.183 2. 277 10.460

20. Physical Scope of project as per approved PC-I and achievements (In quantifiable terms)

S.No

Major Items

Unit

Physical Quantity

Achievements Cumulative achievements up to Dec 31,

2010 up to

June 2010 July-Dec

2010

1 Establishment Charges i Pay of staff No. 11 10 10 10 2 Procurement i Equipment No. 6 1 0 1

ii Furniture and stationery

No. 33 0 0 0

3 Healthy alternative activities

i Inter-college quiz competitions

No. 10 5 0 5

ii Posters and painting competitions

No. 6 2 0 2

iii Tableaus in schools and colleges

No. 10 5 0 5

iv Setting-up of stalls at mellas and fun fairs

No. 15 5 0 5

v Free medical camps No. 10 5 0 5

vi Walks No. 18 6 1 7 vii Musical concerts No. 2 1 1 2

viii Other No. 0 0 0 0 4 Support to NGOs and Sports Associations i Support to NGOs

Rs. Million

10 2.224 0 2.224 ii Support to sports associations

5 Material Production i Preparation and

Distribution of Informational material

No. various 0 0 0

ii Preparation and Distribution of Promotional material

No. various 0 0 0

6 Monitoring and evaluation i Visit to RDs for M&E No. Various 0 0 0

7 Advertisement Rs. Million

0.5 0.074 0 0.074

Page 106: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

94

Monitoring Report

Community Participation in Drug Demand Reduction

Approved Capital Cost:

Rs. 39.5 million

Project Duration:

July 1, 2009 to June 30, 2012

Phasing of Capital Cost: (Million Rs)

2009-10 2010-11 2011-12 Total

14.554 12.527 12.419 39.5

Releases and Expenses: (Million Rs)

Fiscal Year

Releases Expenses

2009-10 8.183 8.183

2010-11 2.358 2. 277

2011-12 0.000 0.000

Total 10.541 10.460

Financing:

PSDP

Sponsoring Agency:

Ministry of Narcotics Control, Islamabad.

Executing Agency:

Anti Narcotics Force (ANF)

Project Site:

All over Pakistan

Objectives

To create awareness among the masses in Pakistan by involving community against the dangers associated with drug abuse.

Scope of Work

The scope of work includes:

Inter-college quiz competitions

Posters and painting competition

Arranging tableus in schools and colleges

Setting up of stalls at melllas and fun fairs.

Free medical camps

Key Observations of Monitoring

1. ANF is implementing the project in collaboration with force commanders located at Rawalpindi, Peshawar, Lahore, Quetta and Karachi. The physical achievements of each force commander need to be reviewed separately.

2. Financial analysis of the expenditure incurred during July – December 2010 indicates that 76% of the expenditure has been incurred for payment of salaries, 18% for support to NGOs and sports associations and 5% for musical concerts.

Recommendations

1. ANF to provide details of each activity undertaken in

the project alongwith project completion report of

each NGO and sport organization financed from the

project.

2. Project has employed 10 personnel including 5 drug

demand reduction Officers. ANF to provide month-

wise activities of each officer for examination.

3. Public sector role in demand reduction is symbolic and volunteers have to be included in the campaign. The executing agency may provide the details of involvement of volunteers and other organizations in achieving desired objectives.

Page 107: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

95

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Creating Mass Awareness Against Drug Abuse

Page 108: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

96

Page 109: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

97

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Profile 1 Name of the Project: Creating Mass Awareness Against Drug Abuse

2 Sector Health 3 Location All over Pakistan 4 Sponsoring Ministry/Agency Narcotics Control Division 5 Executing Agency Anti Narcotics Force (ANF) 6 Name of Project Director Syed Morevat Ali Shah 7 Postal Address Anti Narcotics Force Headquarters, National

Park Road, Rawalpindi. 8 Telephone Office: 9286033 9 Fax No. 051-9270165 10 E-mail address [email protected] 11 Date of approval by DDWP May 6, 2009 12 Decision of the DDWP The project was approved at a cost of Rs. 39.00

million. 13 Objectives of the Project 1. Increase knowledge about drugs and effect

on individual, family, and society. 2. Increase positive attitude towards

personalized risk of getting involved in drug use.

3. Increase skills and behaviors enabling the youth to say "No to drugs".

4. Advocacy meetings / sensitization sessions with stakeholders.

14 Commencement Date As per PC-I Actual July 1, 2009 July 1, 2009 15 Completion Date As per PC-I Expected June 30, 2012 June 30, 2012 16 Approved Cost of the Project Rs. 39.00 million (Million Rs.) 17 Sources of financing Source of Financing Amount PSDP (Govt. of Pakistan) 39.000

Page 110: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

98

18. Financial Phasing, Releases & Expenditure (Million Rs.)

Year

Phasing as per approved PC-I

(Latest)

PSDP Provision

Actual Amount Released

Actual Expenditure

Total FFC Total FEC Total FEC Total FEC 2007-08 9.800 0.000 9.800 0.000 5.360 0.000 5.360 0.000 2010-11 12.000 0.000 9.877 0.000 1.086 0.000 1.072 0.000 2011-12 17.200 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Total 39.000 0.000 19.677 0.000 6.446 0.000 6.432 0.000 Note: Expenditure and releases for 2010 are for July - December only.

19 Item-wise cost as per approved PC-I and expenditure. (Million Rs.)

S.No. Major Items PC-1 Cost Estimates

Cumulative Expenditure up to 30th June, 2010.

Expenditure during July –

December 2010

Total

Expenditure up to

December, 2010

1 Media i Talk shows 1.000 0.300 0.000 0.300

ii Musical programs 3.000 0.600 0.500 1.100 iii Drama serial 4.000 0.000 0.000 0.000 iv Tele Film 1.000 0.000 0.200 0.200 v Advertisements in print and

electronic media 12.000 1.887 0.000 1.887

Sub Total 21.000 2.787 0.700 3.487 2 Anti Drug Awareness Activities

i Lectures 0.300 0.100 0.000 0.100 ii Workshops 4.000 0.643 0.035 0.678

iii Walks 0.700 0.150 0.050 0.200 iv Debate and Declamation 0.700 0.175 0.000 0.175 v Sports events 1.800 0.250 0.050 0.300

vi Cycle Race 0.300 0.063 0.000 0.063 vii Stage Shows 0.300 0.100 0.000 0.100

viii Funfair 0.300 0.100 0.000 0.100 ix Painting competition 0.300 0.075 0.000 0.075 x Others 0.300 0.100 0.100 0.200

Sub Total 9.000 1.756 0.235 1.991 3 Hajj Campaign

i Distribution of informational and promotional items

1.500 0.000 0.000 0.000

ii Advertisements in print and electronic media

3.500 0.817 0.000 0.817

Sub Total 5.000 0.817 0.000 0.817 4 Material Production

i Preparation and Distribution of informational and promotional / information items

4.000 0.000 0.137 0.137

Sub Total 4.000 0.000 0.137 0.137 Grand Total 39.000 5.360 1.072 6.432

Page 111: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

99

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

20. Physical Scope of Project as per approved PC-I and Expenditure

S.No

Major Items

Unit

Physical Quantity

Achievements Cumulative achievements up to Dec 31,

2010

Up to June 2010

July-Dec 2010

1 Media i Talk shows No. 18 6 0 6 ii Musical

programmes No. 9 3 1 4

iii Drama serial No. 1 0 0 0 iv Tele Film No. 1 0 1 1 v Advertisements in

print and electronic media

No. Various 175 0 175

2 Anti Drug Awareness Activities i Lectures No. 300 100 0 100 ii Workshops No. 15 5 1 6 iii Walks No. 15 6 1 7 iv Debate and

Declamation / Painting

No. 18 5 0 5

v Sports events No. 15 15 2 17 vi Cycle Race No. 5 1 1 1 vii Stage Shows No. 2 1 1 1 viii Funfair No. 5 0 0 0 ix Others No. Various 0 2 2 3 Hajj Campaign i Distribution of

informational and promotional items

Various Various 0 0 0

ii Advertisements in print and electronic media

Various Various 0 0 0

4 Material Production i Preparation and

Distribution of informational and promotional / information items

Various Various 0 137000 137000

Page 112: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

100

Monitoring Report

Creating Mass Awareness against Drug Abuse

Approved Capital Cost:

Rs. 39.00 million

Project Duration:

July 1, 2009 to June 30, 2012

Phasing of Capital Cost:

(Million Rs)

2009-10

2010-11

2011-12

Total

9.800 12.00 17.200 39.00

Releases and Expenses:

(Million Rs)

Fiscal Year

Releases Expenses

2009-10 5.360 5.360

2010-11 1.086 1.072

Total 6.446 6.432

Financing:

PSDP

Sponsoring Agency:

Ministry of Narcotics Control, Islamabad

Executing Agency:

Anti Narcotics Force (ANF)

Project area:

All over Pakistan

Objectives

To create awareness among masses by educating

them against the ill effects of drugs.

Scope of Work

The scope of work includes:

Media campaigns against drugs.

Anti drug awareness activities including:

lectures, workshops, walks, debates, painting

competitions, stage shows, fun fairs etc.

Distribution of informational and promotional

items during Hajj season.

Preparation and distribution of informational

and promotional material among general

masses.

Key Observations of Monitoring

1. ANF is implementing the project in

collaboration with force commanders located

at Rawalpindi, Peshawar, Lahore, Quetta and

Karachi. The physical achievements of each

force commander need to be reviewed

separately.

2. An analysis of the expenditure incurred by the

project during July – December 2010 indicates

that 67% of the expenditure have been

incurred on Musical show, 19% on Telefilm,

22% on walks, workshops and other activities

and 13% on Material Production.

Page 113: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

101

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

3. It has been observed that a number of activities proposed in the project are

duplication of Community Participation project.

4. ANF has spent Rs. 2.704 million on advertisement on electronic and print

media, which is 42% of the total expenditure on the project.

Recommendation

1. The theme and objective of the advertisement undertaken under the

project along with names of electronic and print media be provided.

2. ANF to propose that how the overlapping activities among two projects can

be avoided.

3. Month-wise activities by each force commander undertaken in the project

including its location, date, target group, completion report etc be

furnished for review.

Page 114: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

102

Page 115: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

103

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Drug Free City Lahore

Page 116: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

104

Page 117: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

105

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Profile 1 Name of the Project: Drug Free City Free City Lahore

2 Sector Health 3 Location Lahore 4 Sponsoring Ministry/Agency Narcotics Control Division 5 Executing Agency Anti Narcotics Force 6 Name of Project Director Force Commander Regional Directorate Lahore 7 Postal Address Regional Directorate Anti Narcotics Force Lahore

8 Telephone Office: Nil 9 Fax No. Nil

10 E-mail address [email protected]

11 Date of approval by DDWP January 5, 2011

12 Decision of the DDWP The project was supported / approved with a total cost of Rs.60 million subject to modifications proposed by the representatives of the Planning/ Finance Division

13 Objectives of the Project 1. Enforcement:

i. Drying up all Sources of drugs into the City ii. Smashing/liquidating of drug dens.

iii. Stopping of sale of narcotics in the streets/ peddlers by strict policing and batter co-ordination between Anti Narcotics Force and Police.

2.Prevention:

i. To create awareness among target groups about the hazards associated with drug abuse.

ii. To promote the idea of healthy living among general population of the city and discourage use of drugs.

iii. To encourage the NGOs, Civil Society Organizations / Associations which are involved in Drug Demand Reduction Activities.

iv. To utilize all other possible channels available to convey the drug message to the masses.

14 Commencement Date As per PC-I Actual July 1, 2010 July, 2010

Page 118: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

106

15 Completion Date As per PC-I Expected June 30, 2013 June 30, 2013

16 Approved Cost of the Project Rs. 60 million

(Million Rs.) 17 Sources of financing Source of Financing Amount

PSDP (Govt. of Pakistan) 60.00

18. Financial Phasing, Releases & Expenditure (Million Rs.)

Year

Phasing as per

approved PC-I

(Latest)

PSDP Provision

Actual Amount

Released

Actual

Expenditure

Total FFC Total FEC Total FEC Total FEC

2010-11 23.747 0.000 20.578 0.000 4.062 0.000 0.100 0.000

2011-12 17.601 0.000 0.000 0.000 0.000 0.000 0.000 0.000

2012-13 18.653 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Total 60.000 0.000 20.578 0.000 4.062 0.000 0.100 0.000

Note: Expenditure and releases for 2010 are for July - December only.

19. Financial Phasing, Releases & Expenditure (Million Rs.)

S.No

Major Items

PC-1 Cost

Estimates

Cumulative

Expenditure up to

31st Dec, 2011

1 Establishment (Pay & Allowance) 11.640 0.100

2 Travel & transport 0.450 0.000

3 Equipment/Machinery 11.390 0.000

4 Furniture/Furnishing/Fixture 0.250 0.000

5 Operational Expenses 4.770 0.000

6 Law enforcement 11.000 0.000

7 Public Awareness including advertisement 18.000 0.000

8 Contingencies 2.500 0.000

Total 60.000 0.100

Page 119: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

107

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

20. Physical Scope of project as per approved PC-I and achievements (In quantifiable

terms)

S.No Major Items Unit Physical Quantity

Cumulative achievements upto

Dec 31, 2010

1 Establishment (Pay & Allowance) No 27 1

2 Equipment/Machinery No 14 0

3 Furniture/Furnishing/Fixture Lumpsum 27 0

4 Operational Expenses Lumpsum 0 0

5 Law enforcement Lumpsum 0 0

6 Public Awareness including

advertisement Lumpsum 0 0

7 Contingencies Lumpsum 0 0

8 Travel & transport Lumpsum 0 0

Page 120: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

108

Monitoring Report

Drug Free City Lahore

Approved Capital Cost:

Rs.60.00 million

Project Duration:

July 1, 2010 to June 30, 2013

Phasing of Capital Cost:

Year Rs (Millions)

2010-11 23.747

2011-12 17.601

2012-13 18.653

Total 60.000

Releases and Expenses: (Million Rs)

Fiscal

Year

Releases Expenses

2010-11 4.062 0.100

Total 4.062 0.100

Financing:

PSDP

Sponsoring Agency:

Ministry of narcotics Control,

Islamabad

Executing Agency:

Anti Narcotics Force

Project Site:

Anti Narcotics Force

Regional Directorate, Lahore

Objectives

i. Drying up all Sources of drugs, liquidating of drug

dens. Stopping of sale of narcotics in the streets.

ii. To create awareness, promote the idea of healthy

living, encourage the NGOs, Civil Society

Organizations / Associations which are involved in

Drug Demand Reduction.

Scope of Work

Law Enforcement

Public Awareness

Treatment of Drug Addicts

Rehabilitation of Drug Addicts

Incentive and Rewards

Key Observations of Monitoring

i. Advertisement for hiring of staff was published in

the nationwide newspapers on 25-10-2010.

Against which project Manager has been selected

and joined on 1-12-2010. Selection of remaining

staff is in progress.

ii. The First Steering Committee meeting of Drug

Free City Lahore was held on 24-12-2010 and

work plan of the project was approved

Page 121: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

109

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

iii. The success of the project depends on the management of the project. A

number of activities including zoning of Lahore City, selection of NGOs,

award of one Zone to one NGO and involvement of LEA’s in reducing

supply of drugs do not need any finances. The executing agency has yet to

take initiatives to start above activities.

iv. ANF has yet to prepare quarter-wise work plan to achieve the physical

targets presented by ANF and approved by Steering Committee for 2011.

Recommendations

1. ANF to prepare quarter wise physical targets on the basis of overall physical

targets 2011 presented by ANF and approved by Steering Committee.

2. Zoning of Lahore along with allocation of NGo’s be immediately completed

and share with MoNC (PMU) for review.

3. ANF to confirm the sharing of information with CCPO Lahore in light of

Steering Committee decision.

Page 122: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

110

Page 123: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

111

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Kohistan Area Development Project (Phase-I)

Page 124: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

112

Page 125: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

113

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Profile 1 Name of the Project: Kohistan Area Development Project (Phase-I) 2 Sector Development 3 Location District Kohistan 4 Sponsoring

Ministry/Agency Special Development Unit, P&D Development Government of Khyber Pakhtun Khwa through Ministry of Narcotics Control Government of Pakistan

5 Executing Agency Project Management Unit (PMU) P&D Dept. Government

of Khyber Pakhtun Khwa through line Departments 6 Name of Project

Director/PM Mr. Ameen ul Haq / Mr. Aurangzeb

7 Postal Address PMU KHADP, H. No.1 at Rural Health Centre, Dassu

Kohistan 8 Telephone Office: 0998-407002 9 Fax No. 0998-407001 10 E-mail address [email protected],[email protected] 11 Date of approval by CDWP February 25, 2006 12 Date of approval by ECNEC April 04, 2006 13 Decision of the CDWP The Government of Pakistan share should be capped to

the upper limit of Rs.38.00 million for the project. The earth quake measurers should be kept in view before implementation of the project.

14 Decision of the ECNEC The Executive Committee of the National Economic Council considered the Summary dated 24th March, 2006 submitted by the Planning and Development Division on "Kohistan Area Development Project" and approved the Project at an estimated cost of Rs. 933.35 million, including Rs. 600.000 million (64.28%) to be provided by NAS USG, and Rs. 37.59 million (4.03%) by Government of Pakistan and Rs. 295.78 million (31.69%) by Government of KPK, as proposed in Para 16 of the summary.

15 Objectives of the Project Eradication of poppy cultivation and socio-economic development of the area, through alternate development programs.

16 Commencement Date As per PC-I Actual January 1, 2006 January 1, 2006

Page 126: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

114

16 Completion Date As per PC-I Expected December 31, 2010 June 30, 2015

17 Approved Cost of the

Project Total Local FEC

933.350 295.760 600.000 (Million Rs.) 18 Sources of financing Source of Financing Amount Narcotics Affairs Section, US

Embassy 600.000

Government of Pakistan 37.590 Government of Khyber

Pakhtun Khwa 295.960

18. Financial Phasing, Releases & Expenditure (Million Rs.)

Year

Phasing as per approved PC-I

(Latest)

PSDP Provision

Actual Amount Released

Actual Expenditure

Total FFC Total FEC Total FEC Total FEC 2006-07 126.360 74.290 52.070 132.950 117.778 66.879 35.992 11.951 2007-08 165.030 102.790 83.725 41.999 58.768 0.000 53.719 18.139 2008-09 201.830 126.290 64.409 23.860 67.225 4.350 86.765 24.226 2009-10 226.020 150.850 82.645 37.500 99.353 22.563 99.101 26.032 2010-11 214.110 145.780 142.168 48.500 33.395 31.000 30.140 27.748

Total 933.350 600.000 425.017 284.809 376.519 124.792 305.717 108.096 Note: Expenditure and releases for 2010 are for July - December only.

20. Item-wise cost as per approved PC-I and expenditure. (Million Rs.)

S.No Major Items PC-1 Cost Estimates

Cumulative Expenditure up to 30th June, 2010

Expenditure during July

– December 2010

Expenditure up to

December, 2010

1 Technical Assistance 15.000 0.000 0.000 0.000 2 Blacktopped Roads 507.000 70.261 26.210 96.471 3 Irrigation & Hydal Power 25.000 2.500 0.000 2.500 4 Drinking Water Supply

Schemes (NAS funded) 20.000 0.000 0.000 0.000

5 Agriculture Extension 30.000 7.587 1.538 9.125 6 Vehicles 3.000 0.000 0.000 0.000 Sub-Total (NAS)-A 600.000 80.348 27.748 108.096

7 Salaries of Staff/TA/DA/ Wages/Contingency

20.200 80.348 2.392 82.740

8 Purchases (GOP) 8.200 5.878 0.000 5.878 9 PMU Building & Hostel

Construction 9.190 0.000 0.000 0.000

Sub-Total (GOP)-B 37.590 20.461 2.392 22.853 10 Shingle Road 129.020 71.090 0.000 71.090 11 Drinking Water Supply

Schemes (GoKPK funded) 98.800 60.125 0.000 60.125

Page 127: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

115

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

12 Forest/Environment 6.560 3.915 0.000 3.915 13 Soil Conservation 22.080 14.470 0.000 14.470 14 Fisheries 9.831 4.930 0.000 4.930 15 Livestock & Dairy

Development 19.184 14.898 0.000 14.898

16 PMU POL, Office Supply, Electricity

10.283 5.340 0.500 5.840

Sub-total (Gop KPK)-C 295.760 174.768 0.000 174.768 Total 933.350 275.577 30.140 305.717

21. Physical Scope of project as per approved PC-I and achievements (In quantifiable

terms)

S.No

Major Items

Unit

Physical Quantity

Achievements Cumulative achievements up to Dec 31,

2010

Up to June 2010

July-Dec 2010

1 Works & Services

i Const. of blacktopped roads (NAS)

Km 95 14 0 14

ii Const. of Jeep able Bridges (NAS)

No. 5 0 0 0

iii Const. of shingle roads (KPK)

Km 50 8.2 0 8.2

2 Irrigation & Hydel Power

i Construction of Irrigation Channels

No. 24 4 0 4

ii Small Hydel Power Schemes

No. 20 0 0 0

3 Agriculture Extension (NAS)

i Cereal crops (Maize & Wheat)

Acer 3200 752 0 752

ii Onion Crops Acer 1230 250 0 250 iii Potato Crop Acer 170 34 0 34 iv Oil seed Crop Acer 75 5 0 5 v Tomato Acer 1100 250 0 250

vi Pea (off season) Acer 650 65 0 65

vii Turnip (off season) + Radish

Acer 362 88 0 88

viii Cabbage (Off Season) Acer 200 10 0 10 ix Pulses (Beans +Mash) Acer 324 73 0 73 x Fruit Orchards Acer 185 56 0 56

xi Spray Pumps No 125 39 0 39 xii Field Days No 50 4 0 4

xiii Farmers Training No 15 4 0 4

xiv Provision of Agro-Chemicals

Acer 200 25 0 25

4 Local Government & Rural Development Department

i Drinking Water Supply Schemes (NAS)

No. 50 0 0 0

ii Drinking Water Supply Schemes ( KPK)

No. 249 131 0 131

Page 128: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

116

iii Small Hydel Power Schemes

No. 20 0 0 0

5 Forest/Environment (KPK) i Communal Plantation Ac 500 100 0 100

ii Check Damming/Gully Plugging

CFT 250000 55000 0 55000

iii Nursery CFT 2 2 0 2 6 Soil Conservation Activities (KPK)

i Stream Bank and Flood Protection Bund

CFT 100000 58692 0 58692

ii Land Terracing CFT 300000 198975 0 198975 iii Small Water Ponds No. 135 59 0 59

7 Fisheries (KPK) i Construction of Fish Ponds No. 100 20 0 20

ii Extension of Dubair trout fish hatchery

8 Livestock & Dairy Development (KPK) i De-worming of Animals No. 100000 77376 0 77376

ii Vaccination of Animals No. 200000 89164 0 89164 iii Natural Insemination No.

10000

0

iv Distribution of Rams No. 114 0 114 v Distribution of Buks No. 114 0 114

vi Distribution of Bulls No. 9 0 9

9

PMU (Salaries & Allowances, Office, Vehicle, O & M), const. of buildings purchase of 2 No. vehicles by NAS for Line Dept.

Lump

sum 19 19 0 19

i Salaries of Staff/TA/DA/Wage/Contingency

No. 19 19 0 19

ii Vehicle KPK No. 2 2 0 2

iii Purchases (Furniture & Equipment)

Sets 8 8 0 8

iv PMU Building & Hostel Construction

No. 3 0 0 0

10 NAS Technical Assistance Lum

p sum

1 1 0 1

11 Vehicles for line dept. NAS No. 2 0 0 0

Page 129: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

117

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Monitoring Report

Kohistan Area Development Project Phase

Approved Capital Cost:

Rs.933.350 million

Project Duration:

1st January 2006 to 30th December 2010

Phasing of Capital Cost: (Million Rs)

Year Total FEC

2006-07 126.360 74.290

2007-08 165.030 102.790

2008-09 201.830 126.290

2009-10 226.020 150.850

2010-11 214.110 145.780

Total 933.350 600.000

Releases and Expenses: (Million Rs)

Year

Actual Amount Released

Actual Expenditure

Total FEC Total FEC

2006-07

117.778 66.879 35.992 11.951

2007-08

58.768 0.000 53.719 18.139

2008-09

67.225 4.350 86.765 24.228

2009-10

99.353 22.563 99.101 26.032

2010-11

33.395 31.000 30.140 27.748

Total 376.519 124.792 305.717 119.416

Financing: PSDP, US Government, Govt of KPK

Sponsoring Agency:

Ministry of Narcotics Control, Islamabad.

Executing Agency:

P&D Deptt. Govt of KPK

Project Site: District Kohistan

Objectives

Eradication of poppy cultivation and socio-

economic development of the area, through

alternate development programmes.

Scope of Work

Construction of Blacktopped and Shingle

Roads

Irrigation & Hydel Power projects

Drinking Water Supply Schemes

Agriculture Extension

Forest/Environment

Soil Conservation

Fisheries

Livestock & Dairy Development

PMU Building & Hostel Construction

Key Observations of Monitoring

1. The project has not been able to achieve its

objectives as envisaged in the PC-I during its

planned implementation period

2. The project has already been delayed by at

least three years

3. The project in its approved implementation

period has utilized 32.25% of the capital cost.

4. The project has completed 14.3% black top

roads 16.40% Shingle roads, 16% Irrigation &

channels and 21.1% agriculture activities

during 2006-10.

5. The executing agency has not undertaken any

activity in construction of Jeepable bridges,

small Hydel power schemes, Drinking water

supply schemes(NAS).

Page 130: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

118

vi. The financing aspect of the project is as follows:

Sr. No

Funding Agency Approved PC-I

Financing Actual

Financing %age

1 Narcotics Affairs

Section, US Embassy 600.000 119.416 19.9

2. Government of

Pakistan 37.590 20.461 54.44

3 Govt of KPK 295.960 174.768 59.05

vii. NAs releases are around 19.9% of its commitment during the last 4 years.

Construction of Roads

Black top Roads Completed by NAS fund till June 2010

The details of the 14 Km completed blacktop roads are as under

S.No Name of

Road Length (KM)

PC-I Cost

Tendered cost

Actual Expenditure

Cost Per Km

Date of Completion

i Dubair

Valley (New Alignment)

5 25.45 33.5 33.5 6.70 20.02.2009

ii Chowadara

Valley (Widening )

5 25.45 18.24 18.24 3.65 20-2-2009

iii

Sharakot Valley (New

Alignment)

4 20.36 30 30 7.50 10/6/2008

Total 14 71.26 81.74 81.74 17.848

• The above table shows that the executing agency has awarded the contracts at

14% over and above the PC-I cost.

• The 5 km Dubair and 4 km Blacktop road of Sharakot Valley has been damaged

by the recent rains. These roads were handed over to the Provincial

government. However the provincial government has yet to plan maintenance

work.

Black top Roads in progress

Page 131: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

119

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

S.No Name of

Road Length (KM)

PC-I Cost

Tendered cost

Actual Expenditure

Cost Per Km

Date of Completion

i Sharakot Valley 5-9

Km 5 25.45 42.000 14.761 8.40 13-4-2012

Total

5 25.45 42.000 14.761 8.400

It shows that contact was awarded at 65% higher costs then the PC-I.

Shingle Roads Completed till June 2010

• The details of the 8.3Km completed shingle Roads are as under

S.No Name of

Road Length (KM)

PC-I Cost

Tendered cost

Actual Expenditure

Cost Per Km

Date of Completion

i Jalkot to

Sput Valley

3.20 8.26 16.10 16.10 5.03 20-6-2008

ii

Nari to Maidan (Dubari Valley)

5.00 12.90 25.00 25.00 5.00 20-6-2009

Total 8.20 21.16 41.10 41.10 10.03

The above table shows that contract have been awarded at 94% over and

above the PC-I cost

Shingle Roads in progress

S.No Name of

Road Length (KM)

PC-I Cost

Tendered cost

Actual Expenditure

Cost Per Km

Date of Completion

i. Jalkot to

Sput Vally 2 5.16 18.6

29.99

9.30 24.3-2012

ii. Shitial to

Asper 3 7.74 16 5.33 24.3-2012

Total

5.00 12.90 34.60 29.99 14.63

The above table show the contracts have been awarded at 168.2% above

the PC-I cost .

Agriculture Extension

Page 132: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

120

• Agriculture department is distributing seed and fertilizer to farmers. However

executing agency does not have any SOP for distribution of inputs.

• The agriculture extension activities are carried out at Dassu and Pattan in 38

union councils of Kohistan.

Achievements till June 2010

• The executing agency has provided seeds to 1583 acres against the target

of 7496 acres which is 21% of target indicated in the PC-I. The activities

includes

• Provision of improved seed, varieties of cereal crops along with technical

expertise and training for increasing productivity of land by using modern

techniques of cultivation.

• Provision of pesticides and necessary equipment .i.e. spray pumps for

protection against pests’ hazards.

• Provision of fruit trees, i.e. to increase average income and also to protect

the land from erosion.

• Each year Agriculture Department distributes seeds with the help of field

assistants of the agriculture department.

Achievements During July-December 2010

The executing agency has distributed onion seeds and fertilize for, 82 acres

and 153 acres of wheat seeds and fertilize in 2nd quarter of CFY and

utilized Rs.1.538 million This show that cost per acre is Rs.6510/-

Drinking Water Supply Schemes (DWSS)

• The executing agency has not undertaken any drinking water supply scheme

against a target of 50 to be financed by NAS.

• Against the target of 209 DWSS schemes to be funded by KPK government 151

DWSS schemes have been completed till June,2010 which is 72.24% of the

target indicated in the PC-I.

• The cost per person in provision of DWSS scheme at 0% opportunity cost is

Rs.4531.25/-.

Page 133: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

121

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Irrigation Channels and Irrigation & Hydel Power

i. Four irrigation channels have been constructed, which are located in Dachi,

Barilue, Sharakot and Chowadar against the PC-I target of 24 which is 16.6%

of the total target indicated in the PC-I. The average cost of one irrigation

channel is Rs.0.625 million

ii. No Hydel power unit has been constructed so far against a target of 20

indicated in the PC-I

Live Stock and Dairy Development

i. The activities are being executed at Pattan and Dassu. The Dewarming and

vaccination of animals is being carried out throughout the year.

ii. The executing agency has utilized 77.6% of the total allocated cost for Live

Stock and Dairy Development. According to sponsors 77% of de-worming

and 44% of vaccination has been achieved.

iii. Residents of the project area were hesitant about the artificial

insemination. The line department converted the artificial insemination to

natural insemination after the approval of Project Review Board (PBR).

iv. For natural insemination 9 bulls have been purchased. These animals are

rotated among the villages for insemination. Cost per Bulls is Rs.60,000/-

which totals to Rs.0.54 million.

v. Total 288 (144 each) rams and bucks each have been purchased and

distributed among 38 union councils .Unit cost per Ram and Buck is

Rs.10,000/- which totals to Rs.2.80 million.

vi. The Live Stock Department has utilized 77.6% of the allocated amount.

However the physical performance is far less then targets.

Fisheries Development

The Executing agency has utilized Rs.4.930 million against the PC-I target of

Rs.9.831 million which is 50.2% of the total cost of this scheme. The executing

agency had developed fish farms in March 2009. The Project Manager has

informed that these farms have been washed away by rains and the expenditure

of Rs.4.93 million has not yielded any result.

Page 134: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

122

Forest Department

The executing agency was purchasing plants from the market for distribution

among farmers. However it was informed that most of the plants have not grown

on account of many reasons. Executing agency has lately developed its own

nursery for distribution of Plants to farmers. It transposes that forest department

after spending Rs.3.915 million has not been able to have any impact on area

under forests.

Project Management Unit (PMU)

• The executing agency has hired 18 personals (4 officers and 14 supporting

staff) under the project

• The executing agency with the interference of PMU of MoNC has finalized the

site for construction of PMU building

Recommendations

1. The financing by NAS is 12% of the capital cost against a target of 64%. The

delay in contribution by NAS has delayed the implementation of the

project. Ministry of Narcotics Control may immediately take-up the matter

with NAS to accelerate project implementation.

2. The PMU /SDU have surrendered 19% of the released amount on account

of lack of planning and capacity to utilize the released funds. Project

Management must ensure the utilization of released finances.

3. Executing agency may indicate the authority approving the award of work

over and above the approved PC-I cost.

4. The activities undertaken by forest and fisheries department were wastage

of public resources. The government of KPK was requested to investigate

the matter and take appropriate actions against those involved under

intimation to MoNC. The activities be capped till the finalization of report.

The report of Government ok KPK is still awaited.

5. The SDU/Government of KPK was requested to develop SOP’s for provision

of agriculture inputs to the farmers. The government of KPK may

immediately provide SOPs for consideration.

Page 135: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

123

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Pictures

Sharakot valley 4 km

Sharakot Valley Boulders after Floods

Page 136: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

124

Sharakot Valley 5-9 km (road completely damaged)

Shingle Road from Nari to Madin and Sput Village 3.2 km

Page 137: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

125

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Shingle Road Shitial to Asper 3 km

Drinking Water scheme at Dassu Kohistan

Page 138: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

126

Irrigation Water Channel at Sput Valley

Irrigation Channel

Page 139: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

127

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Water Pond at Pattan

Water pond at Dassu Kohistan

Page 140: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

128

DWSS Scheme at Dassu

DWSS Scheme at Dassu

Page 141: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

129

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Flood protective bund at Sharakot

Check Dam at Sharakot road

Page 142: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

130

Flood Protective Bund at Pattan

Flood Protective Bund

Page 143: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

131

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Land Terracing at Pattan

Land Terracing at Dassu

Page 144: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

132

Onion Crop at Razika Kohistan

Maize Crop Cultivation at Razika

Page 145: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

133

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Off-Season Vegetables (Peas & Turnip)

Potato Crop in Kohistan

Page 146: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

134

Bare rooted & Tube plant Nursery at Pattan

Site for Construction of PMU Building

Page 147: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

135

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Linkage of Nara Amazai and Bait Gali District Haripur with Kala Dhaka Area of District

Mansehra

Page 148: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

136

Page 149: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

137

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Profile 1 Name of the Project: Linkage of Nara Amazai and Bait Gali District

Haripur with Kala Daka Area of District Mansehra 2 Sector Infrastructure Development 3 Location District Haripur 4 Sponsoring Ministry/Agency Ministry of Narcotics Control 5 Executing Agency Special Development Unit (SDU), Planning and

Development Department Government of Khyber Pakhtun Khwa/ Project Management Unit (PMU), Works & Services Department Haripur

6 Name of Project Director/PM Mr. Anwar Zeb / Mr. Shahab Hameed 7 Postal Address District Coordination Officer (DCO)/Project Director,

Mansehra 8 Telephone Office: 0997-305513 9 Fax No. 0997-301975 10 E-mail address [email protected]

11 Date of approval by CDWP April 10, 2007 12 Decision of the CDWP The project was approved by the CDWP at a total

cost of Rs.193.403 million. A summary will be submitted for information of ECNEC accordingly.

13 Objectives of the Project To provide better communication facilities to the

locals of area in District Haripur. To improve the natural economy of the area as a whole with a view to attain parity in living standards of the area with other areas of Khyber Pakhtun Khwa.

14 Commencement Date As per PC-I Actual July 1, 2007 July 1, 2007 15 Completion Date As per PC-I Expected June 30, 2009 June 30, 2011 16 Approved Cost of the Project Rs. 193.403 million (Million Rs.) 17 Sources of financing Source of Financing Amount PSDP (Govt. of Pakistan) 193.403

Page 150: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

138

18. Financial Phasing, Releases & Expenditure (Million Rs.)

Year

Phasing as per approved PC-I

(Latest)

PSDP Provision

Actual Amount Released

Actual Expenditure

Total FFC Total FEC Total FEC Total FEC

2007-08 55.199 0.000 35.000 0.000 35.000 0.000 35.000 0.000

2008-09 138.204 0.000 158.403 0.000 87.060 0.000 87.060 0.000

2009-10 0.000 0.000 71.000 0.000 40.000 0.000 40.000 0.000

2010-11 0.000 0.000 35.344 0.000 8.887 0.000 8.887 0.000

Total 193.403 0.000 299.747 0.000 170.947 0.000 170.947 0.000

Note: Expenditure and releases for 2010 are for July - December only.

19. Financial Phasing, Releases & Expenditure (Million Rs.)

S.No Major Items PC-1 Cost Estimates

Cumulative Expenditur

e up to 30th June,

2010

Expenditure during July –

December 2010

Expenditure up to

December, 2010

1 Construction of BTR from Gali to kawal Darra Dhaka kala via Bait gali

61.820 33.300 8.887 42.187

2 Construction of BTR from Kund Kur to Gandwala Kala Dhaka via Purba

47.940 50.153 0.000 50.153

3 Construction of BTR Shangir to Saldar 27.020 28.817 0.000 28.817 4 Const. of Blacktopped(BTR) road

from Gali to Kinary 56.040 48.970 0.000 48.970

5 Sub engineer Slary Fixed 0.288 0.288 0.000 0.288 6 Computer Set SDU 0.055 0.550 0.000 0.550

Total 193.403 162.078 8.887 170.947

20. Physical Scope of project as per approved PC-I and achievements (In quantifiable

terms)

Major Items Unit

Physical Qty

Achievements Cumulative achievements up to Dec 31,

2010

Up to June 2010

July- Dec 2010

Construction of Roads

1 Construction of BTR from Gali to kawal Dara via Bati Gali

Km 8 1 0 1

3 Construction of BTR from Kund Kur to Gandwala

Km 19 18 0 18

2 Construction of BTR Shangir to Saldar

Km 4 3 0 3

4 Const. of Blacktopped(BTR) road from Gali to Kinary

Km 9 5 0 5

5 Sub engineer Salary Fixed Lumsum 0.288 0.288 0 0.288 6 Computer Set SDU No. 1 1 0 1

Page 151: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

139

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Monitoring Report

Linkage of Nara Amazai and Bait Gali District Haripur with Kala Daka Area of

District Mansehra

Approved Capital Cost:

Rs.193.403 million

Project Duration:

1st July 2007 to 30th June 2011

Phasing of Capital Cost: (Million Rs)

Year Total

2007-08 55.199

2008-09 138.204

2009-10 -

2010-11 -

Total 193.403

Releases and Expenses: (Million Rs)

Year Releases Expenditure

Total Total

2007-08 35.000 35.000

2008-09 87.060 87.060

2009-10 40.000 40.000

2010-11 8.887 8.887

Total 170.947 170.947

Source of Financing: PSDP

Sponsoring Agency:

Ministry of Narcotics Control, Islamabad

Executing Agency: Special Development Unit(SDU), Govt of KPK , / (PMU), Works & Services Department Haripur

Project Site: Nara Amazai and Bait Gali District Haripur

Objectives

To improve the natural economy of the area as a whole

with a view to attain parity in living standards of the

area with other areas of Khyber Pakhtun Khwa.

Scope of Work

Construction of 8 km Black Topped Road (BTR)

from Gali to kawal Dara via Bait Gali

Construction of 19 km BTR from Kund Kur to

Gandwala

Construction of 4 km BTR Shangir to Saldar.

Const. of 9 km Black Topped Road (BTR) from

Gali to Kinary

Key Observations of Monitoring

i. The Project was approved by CDWP in its

meeting held on 26-6-2007. The Project was

planned to be completed in June 2009.

ii. The implementation of project has been

delayed by 2 years mainly on account of delay

in release of funds.

iii. There is lack of coordination between the C&W

department and SDU/PMU.

iv. No site engineer remains available at site and

SDO Haripur occasionally visits the work sites,

therefore the quality of work and material

mixing is not being examined/checked at site.

v. So far, 12.5% work on package-I, 94% on package-

II, 75% on package-III and 55.5% work on package

–IV has been completed.

Page 152: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

140

Package-I “Construction of 8 km Black Topped Road from Gali to Kawal Dara via

Bait Gali”

60% of the funds have been utilized and 12.5% work has been completed. Two km

base course has been completed and blacktop is in progress Detail is as under.

Blacktop Road in Progress (Rs in million)

S.No Name of

Road Length(KM)

PC-I

Cost

Tendered

cost

Actual

Expenditure

Cost

Per

Km

Date of

Completion

i 8 km Gali

to Kawal

Dara (New

Alignment)

8 61.82 61.5 42.187 7.690 30-6-2011

Total 8 61.82 61.5 42.187 7.690

Package-II “19 km Blacktop road (BTR ) from Kund Kur to Gandwala”

104.6% of the funds have been utilized and 94.7% work has been completed.

Detail is as under

Blacktop Completed till June 2010 (Rs in million)

S.No Name of

Road

Length

(KM)

PC-I

Cost

Tendered

cost

Actual

Expenditure

Cost

Per Km

Date of

Completion

i 1st phase 1-3

km Kur

3 7.569 8.762 8.762 2.92 30-6-2007

ii 2nd phase 7-

14 km

8 20.18 20.512 20.512 2.56 30-6-2009

Total

11 27.749 29.274 29.274 5.485

Blacktop Road in Progress ( Rs in million)

S.No Name of Road Length

(KM)

PC-I

Cost

Tendered

cost

Actual

Expenditure

Cost Per

Km

Date of

Completion

i 3rd phase 15-

22 km

8 20.18 22.004 20.878 2.75 30-6-2011

Total

8 20.180 22.004 20.878 2.751

The design of last 3 km road is defective as there are no retaining walls, breast

walls and side drains.

Page 153: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

141

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Package III “Construction of 4 km Blacktop Shangir to Saldar

Blacktop Completed till June 2010 (Rs in million)

S.No Name of

Road

Length

(KM)

PC-I

Cost

Tendered

cost

Actual

Expenditure

Cost Per

Km

Date of

Completion

i Shangir to

Saldar

4 27.017 28.896 28.896 7.22 30-6-2009

Total

4 27.017 28.896 28.896 7.224

Package IV “Construction of 9 km Blacktopped road from Gali to Kinary

87.3% of the funds have been utilized and 55.5% work has been completed.

Detail is as under.

Blacktop Completed till June 2010 (Rs in million)

S.No Name of Road Length

(KM)

PC-I

Cost

Tendered

cost

Actual

Expenditure

Cost Per

Km

Date of

Completion

i 1st phase 1- 4

km

4 25.08 27.000 27.000 6.75 30-6-2008

Total 4 25.080 27.000 27.000 6.750

Blacktop Road in Progress (Rs in million)

S.No Name of

Road

Length

(KM)

PC-I

Cost

Tendered

cost

Actual

Expenditure

Cost Per

Km

Date of

Completion

i Phase II, 5 -9

km 5 31.35 22.248 48.97 4.45 30-6-2011

Total 5 31.35 22.248 48.97 4.4496

The executing agency has paid 120% over the approved cost to the

contractor.

The original contract was expired in June, 2009 and extension till June 2010

was granted which has further been extended up-till June, 2011.

Page 154: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

142

Recommendations

1. Coordination between C&W department and SDU be improved for effective

implementation of the project.

2. Executing agency may indicate the authority approving the award of work

over and above the approved PC-I cost.

3. Approval of the competent authority for 120% over and above the tendered

cost payment to contractor be provided.

Project Pictures

Package-I “Construction of 8 km from Gali to kawal Dara via Bait Gali” at Union Council Bait Gali

Page 155: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

143

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Gali to kawal Dara 1 Km BTR End Point

Gali to kawal Dara Next 2 km BTR in progress

Page 156: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

144

Gali to kawal Dara 2 km BTR Partly Completed

Gali to kawal Dara 5 km alignment complete with structural work

Page 157: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

145

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Package II 19 km BTR from Kund Kur to Gandwala

Package II (1st

phase 3 kilometer Kund Kur)

Page 158: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

146

End Point 1-3 Km phase –I

Package II (Starting Point Phase-II 8 km)

Page 159: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

147

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Road Damaged by Flood in Phase-II 8 km

Phase-II 8 Km end point

Page 160: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

148

Phase-III 8km

Phase-III 7 km completed 1 km Base course work

Page 161: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

149

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Phase-III 1km end point

Phase-III BTR damaged due to no retention walls

Page 162: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

150

Package III “Construction of 4 km BTR Shangir to Saldar” at Union Council Nara Amazai

Package IV Phase-II “Const. of 9 km (BTR) road from Gali to Kinary” at Union Council Bait Gali

Page 163: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

151

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Gali to Kinary Land Sliding due to Current Rains

Gali to Kinary Land Sliding due to Current Rains

Page 164: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

152

Phase-II 3Km Base Course Damaged by Current Rains

Phase-II 3Km road Damaged by current rains

Page 165: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

153

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Kala Dhaka Area Development Project

Page 166: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

154

Page 167: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

155

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Profile 1 Name of the Project: Kala Dhaka Area Development Project (Phase -I) 2 Sector Area Development /Rural Development 3 Location Kala Dhaka Area District Mansehra 4 Sponsoring Ministry/Agency Ministry of Narcotics Control 5 Executing Agency Special Development Unit (SDU), Planning and

Development Department Government of Khyber Pakhtun Khwa / Project Management Unit (PMU)

6 Name of Project Director/PM Mr. Anwar Zeb Khan / Mr. Shahab Hameed 7 Postal Address Project Management Unit (PMU) KDADP, Office of

the District Coordination Officer (DCO) Mansehra. 8 Telephone Office: 0997-314148 9 Fax No. 0997-301975 10 E-mail address [email protected]

11 Date of approval by CDWP February 25, 2006 12 Date of approval by ECNEC April 04, 2006 13 Decision of the CDWP The project was recommended to ECNEC subject to

following Provisions. 1. The GoP share should be capped to the upper

limit of Rs.40.00 million for the project. 2. The earthquake measures should be kept in view

before the implementation of the project. 14 Decision of the ECNEC 1. The Executive Committee of the National

Economic Council considered the summary dated 24th March, 2006 submitted by the Planning and Development Division on " Kala Dkaha Area Development Project (Phase-I)" and approved the Project at a cost of Rs. 667.91 million, including Rs. 420.05 million (62.90%) to be provided by NAS USG, and Rs. 39.21 million (5.90%) by Government of Pakistan and Rs. 208.65 million (31.20%) by Government of KPK, as proposed in Para 16 of the summary.

2. The ECNEC directed that provision for road connectivity and linkage of Nara Amazai and Bait Gali Union Council of District Haripur be also included in the execution of the Project.

15 Objectives of the Project Eradication of poppy cultivation and socio-economic development of the area, through alternate development programs.

Page 168: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

156

16 Commencement Date As per PC-I Actual January 1, 2005 January 1, 2006 17 Completion Date As per PC-I Expected December 30, 2010 June 30, 2011 18 Approved Cost of the Project Rs. 667.910 million (Million Rs.) 19 Sources of financing Source of Financing Amount Narcotics Affairs Section, US

Embassy 420.050

Government of Pakistan 39.210 Government of KPK 208.650

20. Financial Phasing, Releases & Expenditure (Million Rs.)

Year

Phasing as per approved PC-I (Latest)

PSDP Provision

Actual Amount Released

Actual Expenditure

Total KPK NAS (PSDP)

Total KPK NAS (PSDP)

Total KPK NAS (PSDP)

Total KPK NAS (PSDP)

06-07

106.06 28.84 59.53 17.20 28.84 0.000 128.296 30.004 82.425 106.805 27.991 69.580

07-08

114.68 37.21 70.30 41.50 37.21 30.000 237.352 45.000 182.822 199.485 42.00 151.912

08-09

137.66 51.68 81.62 76.688 51.68 70.688 125.396 29.000 90.396 114.100 25.000 83.290

09-10

165.81 49.42 111.62 135.27 49.42 80.000 119.034 79.000 34.148 163.163 65.587 85.009

10-11

143.70 41.45 96.98 14.816 41.45 34.804 53.392 36.450 15.313 16.287 1.399 13.256

Total 667.91 208.6 420.05 285.474 208.6 215.492 663.470 219.454 405.104 599.896 161.977 403.050

Note: Expenditure and releases for 2010 are for July - December only.

21. Financial Phasing, Releases & Expenditure (Million Rs.)

S.No Major Items PC-1 Cost Estimates

Cumulative Expenditure up to 30th June, 2010

Expenditure during July –

December 2010

Expenditure up to

December, 2010

1 Works & Services i Const. of blacktopped roads 367.00 350.644 13.000 363.644

ii Construction of Shingle Roads 148.88 120.496 0.000 120.496 2 Agriculture Extension

i Cereal crops (Maize & Wheat)

15.097

10.085

0.000 10.085

ii Vegetables iii Fruit orchards iv Pulses & Oil Seeds v Spray pumps

vi Field Days vii Farmers Training

viii Operational Cost 3 Drinking Water Supply and Irrigation Schemes and Irrigation Channels and Hydel

Power Schemes

Page 169: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

157

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

i Drinking Water Supply and Irrigation Schemes

65.7 39.002 0.518 39.520 ii Irrigation Channel iii Small Hydal Power Generation

Units 4 Forest and Environment

Department 4.553 4.266 0.000 4.266

5 Live Stock and Dairy Development

5.375 4.791 0.000 4.791

6 PMU 39.210 35.865 2.769 38.634 i Building 9.100 0.000 0.000 0.000

7 NAS Technical Assistance 10.000 15.000 0.000 15.000 8 NAS Vehicle 3.000 3.000 0.000 3.000 Total 667.910 583.149 16.287 599.896

22. Physical Scope of project as per approved PC-I and achievements (In quantifiable

terms)

Major Items Unit Physical

Qty

Achievements Cumulative achievements up to Dec 31,

2010

Up to June 2010

July-Dec

2010

1 Works & Services i Const. of blacktopped roads Km 90.4 31 0 31

ii Construction of Shingle Roads Km 25 45.35 0 45.35 2 Agriculture Extension i Cereal crops (Maize & Wheat) Acer 2600 1512.5 332 1844.5

ii Vegetables Acer 1150 482 48 530 iii Fruit orchards Acer 190 210.5 0 210.5 iv Pulses & Oil Seeds Acer 1070 161 0 161 v Spray pumps No. 100 33 0 33

vi Field Days No. 50 20 0 20 vii

Farmers Training No. 15 9 0 9

3 Drinking Water Supply and Irrigation Schemes and Irrigation Channels and Hydel Power Schemes

i Drinking Water Supply and Irrigation Schemes

No. 122 210.5 0 210.5

ii Irrigation Channel No. 17 161 0 161 iii Small Hydal Power Generation

Units No. 8 0 2 2

4 Forest Department i Communal Plantation Acer 400 404 0 404

ii Check dam/Gully Plugging Cft 150,000

150,000

0 150,000

5 Live stock & Dairy Development i Dewarming of Animals No. 22,000 42312 0 42312

ii Animals Vaccination No. 50,000 52716 0 52716 iii Bull Purchasing No. 0 40 0 40 6 PMU No. 20 19 0 19 i Building No. 3 0 0 0

7 NAS Technical Assistance Lsm

10 15 0 15

Page 170: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

158

Monitoring Report

Kala Dhaka Area Development Project (Phase -I)

Approved Capital Cost:

Rs.667.91 million

Project Duration:

1st January 2006 to 30th December 2010

Phasing of Capital Cost: (Million Rs)

Year Total FEC

2006-07 106.06 59.530 2007-08 114.68 70.300 2008-09 137.66 81.620

2009-10 165.81 111.620 2010-11 143.7 96.980

Total 667.91 420.050

Releases and Expenses: (Million Rs)

Year

Actual Amount Released

Actual Expenditure

Total FEC Total FEC

2006-07

128.296 82.425 107.225 69.580

2007-08

237.352 182.822 199.485 151.912

2008-09

125.396 90.396 114.100 83.290

2009-10

119.034 34.148 163.163 85.009

2010-11

53.392 15.313 16.287 13.282

Total 663.470 405.104 600.361 403.073

Source of Financing: GOP(PSDP),NAS, Govt. of KPK

Sponsoring Agency: Ministry of Narcotics Control, Islamabad

Executing Agency: Special Development Unit(SDU), Planning and Development Department Govt of KPK / Project Management Unit (PMU)

Project Site: Kala Dhaka Area, Mansehra.

Objectives

Eradication of poppy cultivation and socio-

economic development of the area, through

alternate development programmes.

Scope of Work

Construction of Roads

Agriculture Extension

Drinking Water Supply Schemes &

forestry development

Live Stock and Dairy Development

Key Observations of Monitoring

1. The project was approved by ECNEC in its

meeting held on 22nd April, 2006. The

project was planned to be completed by

December 2010.

2. The project during its approved

implementation period has utilized 89.9%

of the capital cost.

3. The project has completed 34.29% Black

top roads 180.6% Shingle roads, 49.18%

Drinking water supply schemes and

irrigation channels schemes, 45%,

agriculture activities, 100% forest

activities,99% Live Stock and Dairy

Development activities during 2006-10.

Page 171: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

159

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

4. According to PC-I, an amount of Rs.367.00 million was proposed to be funded

by NAS for construction of 73.4 km blacktop roads, out of which 62% of the

roads (31 km blacktop roads and 14.6 km shingle) have been completed, and

93% of the funds have been utilized.

5. The executing agency has incurred Rs.15 million on NAS technical assistance

against an allocation of Rs.10 million without re-appropriation of funds.

Roads Black top Roads Completed from NAS fund till June 2010

The executing agency has awarded the work at average of Rs.3.383 million over

and above the PC-I approved cost. Details are as under.

(Rs in million)

S.No Name of

Road Length (KM)

PC-I Cost

Tendered Cost

Actual Expenditure

Cost Per KM

Date of Completion

i. 1

Thakot

Darban

(Phase-I)

13 65 89.05 89.05 6.85 25-06-2009

ii. 2

Thakot

Darban

(Phase-II)

7.3 36.5 64.01 64.01 8.8 17-9-2009

iii. 3

Thakot

Darban

(Phase-III)

2.7 13.5 39.15 39.145 14.5 25-9-2010

iv. 4

Zeezari to

Shingle Dar

Phase-I

8 40 67.64 67.643 8.45 27-09-2008

Total 31 155 259.85 259.848 38.6

Page 172: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

160

Road In progress (Rs in millions)

The executing agency has awarded the work at 50% higher than the approved

cost.

Shingle Roads completed from NAS Fund till June 2010

There was no provision in the PC-I for the construction of Shingle Roads. Whereas

executing agency has constructed 14.6 km of Shingle Road without the approval of

competent forum. Details areas under

(Rs in million)

S.No Name of Road Length (KM)

Tendered Cost

Cost Per Km

Date of Completion

i. Maira Mada

Khel to Dadam (phase-I) 8 37.227 4.653 20-2-2009

ii. Mera mada

khel to Dadam (phase-II) 2.5 13.514 5.40 28-3-2010

iii. Zeezari to Shingle Dar

(phase-II) 3.2 20.343 6.300 25-5-2010

iv. Maira Mada Khel to Dadam

(phase-III) 0.9 8.48 0.940 28-3-2010

Total 14.6 96.112 6.583

S.No Name of

Road Length (KM)

PC-I Cost

Tendered Cost

Actual Expenditure

Cost Per KM

Date of Completion

i

Thakot

Darban

(Phase-

IV)

3 15 30 7.675 10 30-06-2011

Total 3 15 30 7.675 10

Page 173: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

161

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Blacktop Road approved in work plan 2010-11 from NAS Fund

(Rs in millions)

S.No Name of

Road

Length

(KM)

PC-I

Cost

Proposed

Cost

Actual

Expenditure Cost Per

Km

Date of

Completion

i. Thakot to

Darban (Phase-V)

8 40 88 0 11 Just approved

Total 8 40 88

The proposed cost for the road is 120% higher than the approved PC-I cost.

Shingle Roads Funded from Go KPK fund and completed by June 2010.

As per PC-I, 17 km Blacktop roads and 25 km shingle roads were proposed to be

financed by KPK government. The executing agency has completed 30.75 km

Shingle Roads and did not construct any Blacktop road. Details are as under.

(Rs in millions)

S. No Name of

Road Length (KM)

PC-I Cost

Tendered Cost

Actual Expenditure

Cost Per KM

Date of Completion

i.

Bartoni to

Faqirabad

Phase-I

2.5 5.75 6 6 2.4 30-6-2007

ii.

Cheer to

Gagiani

Phase-I

3 6.9 9.5 9.5 3 .17 30-6-2007

iii.

Gangit to

Chaprra tilli

Phase-I

2.75 6.325 7.8 7.8 2.84 30-6-2007

iv.

Bartoni to

Faqirabad

Phase-II

2 4.6 5.01 5.01 2.51 30-6-2008

v.

Gangit to

Chaprra tilli

Phase-II

2.5 5.75 6.285 6.285 2.51 30-6-2009

Page 174: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

162

vi.

Cheer to

Gagiani

Phase-II

2.5 5.75 6.255 6.255 2.5 30-6-2009

vii. Kotli to

Balkot 2 4.6 5 5 2.5 30-6-2009

viii.

Dandah to

Shingaldar

Phase-II

2 4.6 5 5 2.5 30-6-2009

ix. Kandar to

Bio 2.5 5.75 6.25 6.25 2.5 30-6-2009

x. Kunhary to

Tilli 3.5 8.05 14.73 12.098 3.46 30-12-2010

xi. Shanaya to

DobaBala 1.5 3.45 7.27 7.185 4.79 30-12-2010

xii. Garhi

Payeen 1.5 3.45 7.32 6.851 4.57 30-12-2010

xiii.

Mera

Madakhel

to Goodar

2.5 5.75 14.19 12.463 4.99 30-6-2010

Total 30.75 70.725 100.61 95.697 41.24

The executing agency has awarded the work of shingle roads at 35% higher than

the approved PC-I and also did not constructed the Blacktop roads.

Drinking Water Supply Schemes (DWSS), Irrigation and Hydel Power

i. Against the target of 17 irrigation schemes to be funded by NAS, 22

schemes have been completed which is 35% higher than PC-I target.

Details are as under

Page 175: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

163

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

S.No Name of Scheme Cost

1. Rehabilitation of Irrigation Channel at Laid Akazai. 0.650

2. Rehabilitation of Irrigation Channel at Darbani Akazai. 0.700

3. Rehabilitation of Irrigation Channel New Killay Akazai. 0.650

4. Irrig: Channel at Shahdag Basi Khal. 0.500

5. Irrig: Channel at Deray Sadu Khan B. K 0.425

6. Irrig: Channel at Kunharay Hassan Zai. 0.425

7. Irrigation Channel at Maira Jaba.B/K 0.330

8. Irrigation Channel at Bilkot N.K 0.450

9. Const/Rehab: of Irrig: Channel at Dor Payen Zezari area Thakot

Darband Road 0.600

10. Const/Rehab: of Irrig: Channel at Dor Bala Zezari area Thakot Darband

Road 0.575

11. Const/Rehab: of Irrig: Channel at Jigal Sydan Thakot Darband Road 0.760

12. Const. of Irrigation Channel at Shahgay (New channel at road right

side) Thakot Darband Road 0.500

13. Rehabilitation of irrig: Channel at Laid Aka Zai Phase-II 0.400

14. Rehabilitation of irrig: Channel at New Kily Aka Zai Phase-II 0.400

15. Const/Rehab: of Irrig: Channel at Judbah 0.500

16. Irrigation channel at Zareef 0.495

17. Irrig: Channel at Darbani Aka Zai Ph-II 0.273

18. Irrig: Channel at (extention) Jigal ,Saidan, phase II 0.171

19. Irrig: Channel at Dor area Basi Khail Phase I 0.401

20. Irrig: Channel at Jood Bah Basi Khail Phase II 0.429

21. Improvement of Irrigation Channel at Kotlay Vill: Phase II 0.196

22. Irrigation Channel at Shagay Shadug area 0.700

Total 10.530

Page 176: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

164

ii. Against the target of 22 DWSS schemes to be funded by NAS, 22 DWSS

schemes have been completed. Details are as under.

S.No Name of Scheme Cost

1. Rehabilitation of Water Supply Scheme Kandar Tohara 0.500

2. DWSS at Zezari Saidan Area . 0.300

3. DWSS at Cheer 0.697

4. DWSS at Sways 0.500

5. DWSS at Mareer 0.500

6. DWSS Payyan Bassi Khail. 0.400

7. DWSS at Gaven Basi Khail 0.300

8. DWSS Bilyani Akazai. 0.500

9. DWSS Mangri Danda Basikahil. 0.300

10. DWSS Surey Dada Basikhail. 0.300

11. DWSS Balbori Basi Khel 0.300

12. DWSS at Dheri Luqman 0.300

13. DWSS Nikka Hassan Zai 0.300

14. DWSS Muhafizabad Basi Khail 0.200

15. DWSS at Pagar Bassi Khel 0.300

16. DWSS at Gavi (Rest House) 0.722

17. Power Supply Scheme at Gavi(R. House) 0.250

18. *Supplementary DWSS Dilo Pain. 0.669

19. Supplementary DWSS at Teetay Mada Khail 0.645

20. *Supplementary DWSS at Shaloon , Daba go peeza 0.570

21. *Supplementary DWSS Maira Abad Seri Kohani H/Z. 0.263

22. DWSS(New) Banj Karoon B/K 0.738

Total 9.554

Page 177: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

165

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

iii. Against the target of 100 DWSS schemes to be funded by Go KPK, 38 DWSS

schemes have been completed. Details are as under.

S.No Name of Scheme Cost

1. DWSS Cowng 1.000

2. DWSS Achar 0.500

3. DWSS Cherr 1.000

4. DWSS Kotli 1.000

5. DWSS at Geto Basi ;Khel. 0.500

6. DWSS Utlair Basikhel. 0.500

7. DWSS Wallah M/K 0.500

8. DWSS Dogha Hassan Zai. 0.500

9. DWSS at Harnail Ph-2nd 0.695

10. DWSS Manganoo Sado Khan Badar. 0.350

11. DWSS at Damosa 0.400

12. DWSS Karay Haider Khan Phase-II 0.400

13. DWSS Sargay Basikhail. 0.650

14. DWSS Garhi Hassan zai. 0.350

15. DWSS Palosa Kaka Khail. 0.400

16. DWSS at Tarau Sando Khan 0.500

17. DWSS at Rahim Zarin Gido 0.655

18. DWSS Khane Mulah. 0.600

19. *Supplementary DWSS Kandao to Zarshad Ali Dehri M/K 0.697

20. Extn: of DWSS Khadang Ph-II 0.104

21. Supp: DWSS Matoor B/K (New) 0.110

22. Extn: DWSS Nask Ph-II 0.100

23. Extn: of DWSS Machra Ph-II 0.070

24. DWSS Jagna Aka Zai 0.040

25. DWSS Bakarahi Hassan Zai 0.219

26. *Supplementary DWSS at Shadi to Zewar Khan Banda M/K 0.391

Page 178: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

166

27. *Supplementary DWSS at Khadang Aka Zai 0.783

28. Rehabilitation of DWSS for vill: Machra Akazai. 0.313

29. Rehabilitation of DWSS for Vill: Muhammadiya Akazai 0.355

30. Rehabilitation of DWSS for vill: Sunatay Maira Mada Khail 0.449

31. DWSS (New) at vill: Nask H/Z 0.394

32. Rehabilitation of DWSS for Vill: Surmal N/K 0.406

33. Rehabilitation of DWSS for vill: Torang Akazai 0.420

34. Construction of DWSS Reerh B/K 0.476

35. Construction of DWSS Jango Aka Zai 0.188

36. Rehabilitation of DWSS Shagai. 0.626

37. Supp: DWSS Tangroo (New) 0.364

38. DWSS Umer Banda (New) 0.169

Total 17.173

iv. Executing agency has completed 7 irrigation channels with Go KPK funds

whereas, there was no provision in the PC-I. Details are as under.

S.No Name of Scheme Cost

i. 1 Irrig: Channel at Zareef, phase II 0.500

ii. 2 Irrig: Channel at Kunhary H/K Phase II 0.438

iii. 3 Extn: of irrigation channel Shadug Ph-II 0.365

iv. 4 Extn: of irrigation channel Mishkot Tili 0.237

v. 5 Extn: of irrigation channel Darbani 0.062

vi. 6 Extn: of irrigation channel Sadu Khan 0.142

vii. 7 Extn: of irrigation channel Bilkot 0.050

Total 1.795

v. Two small Hydel power schemes against the target of 8 have been

completed during the last three months at a cost of Rs.0.8 million each. The

schemes are located in Shah Dagh and Kunray. Each unit will produce 5

KVA to 50 KVA of electricity depending upon the availability of water.

Page 179: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

167

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Agriculture Extension

i. Agriculture department is distributing seed and fertilizer to farmers.

However executing agency does not have any SOP for distribution of inputs.

ii. Agriculture extension activities are carried-out at five tribes of Kala Dhaka.

The executing agency has provided seeds for 2811.7 acres against a target

of 5110 acres which is 55% of target indicated in the PC-I by utilizing 72.0%

of the cost. The activities includes

Provision of improved seed, fruit trees along with technical

expertise and training for increasing productivity of land by using

modern techniques of cultivation.

Provision of pesticides and necessary equipment .i.e. spray pumps

for protection against pests’ hazards.

Forest Department

i. The executing agency planted trees at 404 acres and completed 150,000 cft

of check dam and utilized Rs.4.266 million. These activities are

concentrated at two locations .

ii. This year executing agency has proposed to carry out the plantation along

the 84 km Thakot Darban road to protect the road from soil erosion upon

the recommendations of the MoNC (PMU) communicated to executing

agency through letter dated 8-11-2010.

Live Stock and Dairy Development(LSDDW)

i. The executing agency has vaccinated 52716 animals against a PC-I target of

50,000.

ii. The executing agency has de-wormed 42312 animals against a PC-I target

of 22,000

iii. Residents of the project area were hesitant about the artificial

insemination. The line department converted the artificial insemination to

natural insemination after the approval of Project Review Board (PBR).

Page 180: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

168

iv. For natural insemination bulls were purchased from Bahadur Nagar Okara.

So far, 40 Bulls have been purchased at a unit cost of Rs.60,000/- each were

distributed to locals

Project Management Unit (PMU) i. The activities under PMU are financed by Federal Government. The

Executing Agency has hired 19 personnel out of 20 (6 officers and 14

supporting staff).

ii. The site for construction of PMU building has been finalized which is

located in Jodbah. PMU have forwarded their request to C&W department,

Mansehra, to prepare the detailed design cost estimates and scope of

work.

Recommendations

1. Life of project has expired on 31-12-2010 and Physical and financial scope

of work is incomplete. The executing agency may obtain approval of time

extension in implementation period.

2. Executing agency may indicate the authority approving the award of work

over and above the approved PC-I cost.

3. The agency was directed to get the NAS technical assistance head re-

appropriated from competent authority (Secretary MoNC) to regularize

excess expenditure of Rs.5.0 million to avoid audit observations. The

proposal is still awaited.

4. PMU / SDU were directed to provide list of DWSS along with cost, period

of implementation and population being benefitted and capacity of each

water tank along with length of distribution network. Executing agency

has provided only name and cost of each scheme up till know. The leftover

information may be furnished.

Page 181: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

169

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Pictures

Thakot Darban 7.3 km ends

Thakot to Durbun 2.7 km

Page 182: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

170

Thakot to Durbun 2.7 Km (Road Damaged by Land Slide)

Thakot to Durbun 2.7 Km (Road Damaged by Land Slide)

Page 183: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

171

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Thakot to Durbun 3 km Road in progress near Jodbah

13 km Road from Thakot to Durbun (Basi Khel)

Page 184: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

172

Zeezari to Shingle Dar 8 km

Shingle Road Maira Mada Khel to Dadum 8km

Page 185: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

173

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Irrigation Channel at Shah Dagh (Basi Khel)

Construction of Small Hydal at Shah Dagh (Under Construction)

Page 186: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

174

Maize farm at Aka Zai Tribe

Orange Orchard at Aka Zai Tribe

Page 187: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

175

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Maize farm at Shah Dagh Village

Drinking Water Supply Schemes (DWSS) at Aka zai

Page 188: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

176

Drinking Water Scheme

Water tank of DWSS

Page 189: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

177

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

DWSS near Jodbah

Communal Plantation near Jodbah

Page 190: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

178

Check Daming/Gully at Basi khel

Communal Plantation at Zeezari Shindal Dar Road

Page 191: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

179

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Live Stock Filed Office at Jodbah

Medicine Distribution Register

Page 192: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

180

Page 193: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

181

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Khyber Area Development Project

Page 194: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

182

Page 195: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

183

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Profile 1 Name of the Project: Khyber Area Development Project Phase II, FATA 2 Sector Area Development 3 Location Jamrud Khyber Agency 4 Sponsoring Ministry/Agency Ministry of Narcotics Control 5 Executing Agency Civil Secretariat, FATA through Project

Implementation Unit (PMU) & Concerned Line (DOP) Department & in the Agency.

6 Name of Project Director/PM Mr. Shafirullah Khan Wazir /Mr. Shahid Sohail Khan 7 Postal Address Khyber House Peshawar 8 Telephone Office: 091-9211302-5 9 Fax No. 091-9211900 10 E-mail address [email protected]

11 Date of approval by CDWP June 03, 2007 12 Date of approval by ECNEC February 06, 2008 13 Decision of the CDWP The revised project was recommended for the

consideration of the ECNEC at the revised cost of Rs.896.128 million including Government of Pakistan share of Rs.66.993 million

14 Decision of the ECNEC The Executive Committee of National economic

Council (ECNEC) considered the summary dated 25th January, 2008 submitted by the Planning Commission/ Planning and Development Division on "Khyber Area Development Project (Revised)” and approved the project at a revised cost of Rs.896.128 million. Including the Foreign Aid of Rs.829.13 million and Rs.66.993 million share of Government of Pakistan.

15 Objectives of the Project Eradication of Poppy through infrastructure development and crop substitution.

16 Commencement Date As per PC-I Actual July 1, 2001 July 1, 2001 17 Completion Date As per PC-I Expected June 30, 2011 June 30, 2011 18 Approved Cost of the Project Rs. 896.128 million

(Million Rs.)

Page 196: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

184

19 Sources of financing Source of Financing Amount United State Government 829.135 PSDP 66.993

20. Financial Phasing, Releases & Expenditure (Million Rs.)

Year Phasing as per approved PC-I

(Latest) PSDP Provision

Actual Amount Released

Actual Expenditure

Total FEC Total FEC Total FEC Total FEC

2001-02 74.380 62.806 44.820 40.820 41.031 038.276 41.031 38.2760

2002-03 89.392 82.573 48.829 42.809 53.369 049.955 53.369 49.9550

2003-04 116.135 112.715 54.000 51.000 41.695 038.695 41.695 38.6950

2004-05 150.155 146.353 61.780 56.400 40.525 035.945 40.525 35.9450

2005-06 128.248 124.690 131.390 124.620 69.654 066.299 69.654 66.2990

2006-07 0.000 0.000 72.425 65.925 71.176 065.925 71.176 65.9250

2007-08 0.000 0.000 114.817 109.317 114.817 109.317 114.817 109.3170

2008-09 99.716 86.000 150.000 134.110 68.483 058.648 68.483 58.6480

2009-10 120.695 109.000 70.000 55.000 24.350 013.450 24.350 13.4500

2010-11 117.106 105.000 61.733 61.733 9.903 007.000 8.265 5.362

Total 896.128 829.135 824.772 741.734 535.003 483.51 533.365 481.872

Note: Expenditure and releases for 2010 are for July - December only.

21. Financial Phasing, Releases & Expenditure (Million Rs.)

S.No Major Items PC-1 Cost Estimates

Cumulative Expenditure up to 30th June, 2010

Expenditure during July

– December 2010

Expenditure up to

December, 2010

1 Works and services Dept(Construction Roads) i Black Top Road 516.390 301.089 0.000 301.089

ii Shingle Road 140.000 39.997 0.000 39.997 2 Local Government and Ruler Development

i Open Wells 10.937 3.900 0.000 3.900 ii Irrigation Channels 16.970 14.597 0.000 14.597

iii Micro Hydel Power Units

14.196 4.500 0.000 4.500

iv Water Supply Schemes

16.000 5.370 0.000 5.370

3 Agriculture Extension

i Distribution of wheat seed and

7.078 3.500 0.000 3.500

Page 197: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

185

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

fertilizers ii Distribution of maize

seed fertilizers 6.100 3.630 0.000 3.630

iii Distribution of Pulse / Oil Seeds

3.629 3.131 0.000 3.131

iv Distribution of Vegetable seeds and fertilizers

8.310 4.051 0.000 4.051

v Distribution of fruit Plants

2.800 2.430 0.000 2.430

vi Filed days/ farmers Tanning

1.225 1.285 0.000 1.285

4 Technical Assistance (NAS)

85.500 87.894 5.362 93.256

5 Establishment charges of Project Management Unit (PMU)

66.993 50.193 2.903 53.096

Total 896.128 525.567 8.265 533.365

22. Physical Scope of project as per approved PC-I and achievements (In quantifiable

terms)

Major Items Unit Physical

Qty

Achievements Cumulative achievements up to Dec 31,

2010

Up to June 2010

July-Dec

2010

1 Works and services Dept(Construction Roads) i Black Top Road km 80 60 0 60

ii Shingle Road km 38 22 0 22 2 Local Government and Ruler Development

i Open Wells No 63 39 0 39 ii Irrigation Channels No 50 42 0 42

iii Micro Hydel Power Units No 32 12 0 12 iv Water Supply Schemes No 30 10 0 10

3 Agriculture Extension i Distribution of wheat seed and

fertilizers Acres 2816 2652 70 2772

ii Distribution of maize seed fertilizers

Acres 2816 2384 0 2384

iii Distribution of Pulse / Oil Seeds Acres 1000 770 0 770 iv Distribution of Vegetable seeds

and fertilizers Acres 686 449 50 499

v Distribution of fruit Plants Acres 2600 1980 0 1980 vi Filed days/ farmers Tanning Acres 800 650 0 650

4 Technical Assistance (NAS) Lms - - 0 -

5 Establishment charges of Project Management Unit (PMU)

No 16 14 0 14

Page 198: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

186

Monitoring Report

Khyber Area Development Project Approved Capital Cost: Rs.896.128 million Project Duration: 1st July 2001 to 30th June 2011 Phasing of Capital Cost: (Million Rs)

Year Total FEC

2001-02 74.380 62.806 2002-03 89.392 82.573 2003-04 116.135 112.715

2004-05 150.155 146.353 2005-06 128.248 124.690

2006-07 0.000 0.000

2007-08 0.000 0.000

2008-09 99.716 86.000

2009-10 120.695 109.000

2010-11 117.407 104.998 Total 896.128 829.135

Releases and Expenses: (Million Rs)

Year Actual Amount Released

Actual Expenditure

Total FEC Total FEC

2001-02 41.031 38.276 41.031 38.276

2002-03 53.369 49.955 53.369 49.955

2003-04 41.695 38.695 41.695 38.695

2004-05 40.525 35.945 40.525 35.945

2005-06 69.654 66.299 69.654 66.299

2006-07 71.176 65.925 71.176 65.925

2007-08 114.817 109.317 114.817 109.317

2008-09 68.483 58.648 68.483 58.648

2009-10 24.350 13.450 24.350 13.450

2010-11 9.903 7.000 8.269 5.362

Total 535.003 483.510 533.365 481.872

Financing: PSDP, NAS Sponsoring Agency: Ministry of Narcotics Control, Islamabad, US Government Executing Agency: FATA Secretariat, Peshawar. Project Site: Khyber Agency

Objectives

Eradication of Poppy through infrastructure

development activities

Scope of Work

Works and services

Dept(Construction of Roads)

Local Government and Ruler

Development

Agriculture Extension

Key Observations of Monitoring

i. The project in its approved

implementation period has utilized

59% of the capital cost.

ii. The project has completed 75% black

top roads 57.8% Shingle roads, 54.18%

Local Government activities and

79.72% of agriculture activities against

PC-I target during 10 years of the

implementation.

iii. Keeping in view the pace of the

development activities the project

may not achieve its targets by June,

2011; the completion date of the

project.

Page 199: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

187

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

iv. The financing aspect of the project is as follows : (Rs in Million)

Sr. No.

Funding Agency Approved

PC-I

Financing

Actual

Financing %age

1 Narcotics Affairs

Section, US Embassy 829.136 480.510 53.62

2 Government of

Pakistan 66.993 50.193 74.92

v. NAs releases are around 59% of its commitment during the last 10 years.

vi. The executing agency has incurred Rs.90.194 million on NAS technical

assistance against an allocation of Rs.85.5 million without re-appropriation of

funds.

Roads

i. The executing agency claimed that Rs.342.086 million has been utilized against

the construction of 60 km Blacktop road 22 km Shingle Road. Whereas the

details provided by executing agency indicated that Rs.240.03 million has been

utilized against construction of 53.8 km Blacktop road and 12 km shingle. This

shows that Rs.101.786 million are still unutilized with the C& W department.

The details of completed roads till June 2010 are as under

Roads Completed Till June 2010

Sr. No.

Name of Road Length (KM)

Cost (million)

Cost per kilometer (million)

Date of completion

i. B/t road along Bara river from

Wallay to Mastaq (Km 8 to 18) 11 31.950 2.905 30.6.2006

ii. B/T along Bara River from

Surkats to Saryana Km 1 to 5 5 18.900 3.780 30.6. 2008

iii.

B/T Sarobi Piquet to Koz

Shinolo via Samsai Bar Shinolo

Loe Shilman (Phase-I)

3 10.500 3.500 30.6. 2008

iv. B/T Saryana to Wocha Wanai

Tirah (Phase-I) 3.3 Kms 3.3 14.000 4.242 30.6. 2008

v. B/T from Benai to Stoori Khel

(Phase-I) 5 Kms 5 16.500 3.300 30.6. 2008

vi.

B/Tsuspension bridge

constructed out of KPP at

Saddaq Killi Bara 3 Kms

3 9.000 3.000 30.6. 2008

Page 200: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

188

vii

B/T link road from Mangal

Bagh to Laiq Killi, Bokar Bara

Khyber Agency.

2 8.600 4.30 30.6. 2008

viii

B/T link road from Mastaq

Narai Baba road to Mulviano

Killi, Bokar area, Khyber

Agency.

1.2 4.500 3.750 30.6. 2008

Ix

B/T of link road from Mastaq

Narai Baba road to Paindi

Bokar area, Khyber Agency.

0.8 2.300 2.870 30.6. 2008

x

B/T road from Sarobi Piquet to

Koz Shanilo via Samsai and Bar

Shanilo L. Shalman including 1

Km Shingle road to Samsai

Village, Khyber Agency (Phase -

II).

4.2 17.100 4.071 30.6. 2008

xi B/T of road Momal to Lawata

Phase – I 3.3 18.000 5.455 36.6. 2008

xii B/T of raod in ShinPokh,

Shilman area. (7km)(New Road 7 34.180 4.883 30.6. 2008

xiii B/T Zawo village Bara Sub-

Division 3 18.000 6.000 26.07. 2008

xiv B/T in Kajori Bara Sub-Division 2 9.000 4.500 26.07. 2008

xv

Shingle road from Masoom

Baba to Safari Jamrud Sub-

Division

3 18.000 6.000 26.07. 2008

xvi Ghaibi Baba to Mastak (Wally) 7 18.000 2.571 30.6. 2006

xvii Shaheed Dag to Shin Kamar

(Bara) 2 8.600 4.30 30.6. 2008

Total 65.8 240.3 3.65

Incomplete Road

Sr. No.

Name of Road Length (KM)

Cost Rs(million)

Cost per kilometer Rs(million)

Remarks

i.

B/T road along Bara

River from Mastaq to

Narai Baba

(Km 19 to 33)

15 48.50 3.200

Worked

stopped due

to law and

order

situation.

Page 201: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

189

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

ii. An amount of Rs.29 million has been allocated in PSDP 2010-11 for construction

of Blacktop road. Details are as under.

Local Government and Rural Development Activities

i. The activities completed by Local Government and Rural Development till June,

2010 are as under

Open Wells

ii. In Sub Division Bara 10 Wells at a cost of Rs.1.117 million have been constructed

which is 25.6% of the target. Detail is as under.

Sr. No.

Description of Scheme with Location Cost

(million)

Date of completion

i. Dug Well at Payo Jan Killi Ziaudin Area Bara Sub-

Division

0.117 30.06.2003

ii Dug Well at Raees Khan Killi Ziaudin Area Bara Sub-

Division 0.117 30.06.2003

iii Dug Well at Lala Jan Ziaudin Area Bara Sub-Division 0.117 30.06.2003

iv Dug Well at Tirah Gul Ziaudin Area Bara Sub-Division 0.117 30.06.2003

v Dug Well at Faulad Khan Killi Ziaudin Area Bara Sub-

Division 0.117 30.06.2003

vi Dug Well at Hayat Khan Killi Ziaudin Area Bara Sub-

Division 0.117 30.06.2003

vi Dug Well at Marwat Khan Killi Ziaudin Area Bara Sub-

Division 0.117 30.06.2003

vi Dug Well at Qazi Khel Killi Ziaudin Area Bara Sub-

Division 0.117 30.06.2003

vii Dug Well at Kajoor Khan Killi Ziaudin Area Bara Sub-

Division 0.117 30.06.2003

viii Dug Well at at Ziam Ali Khan Killi Ziaudin Area Bara

Sub-Division 0.117 30.06.2003

Total 1.17

Sr. No.

Name of Road Length (KM)

Cost Rs(million)

Cost per kilometer Rs(million)

Remarks

i. Shinpokh to Ogda

Area Phase-I 2 20 10 Just

approved

ii. Shalmna to Tangi

Village(Landikotal) 1.5 9 6 Just

approved

Page 202: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

190

iii. In Sub Division Landikotal 29 Wells at cost of Rs.2.5 million have been

constructed which is 74.3% of the total claimed physical target. Details are as

under:

Sr. No.

Description of Scheme with Location Cost

(million)

Date of completion

i. Construction of 15 No Open Wells in Bazar Zakha

Khel Area Landikotal Sub-Division 1.25 30.06.2009

ii Construction of 14 No Open Wells in Bazar Zakha

Khel Area Landikotal Sub-Division 1.25 30.06.2009

Total 2.5

iv. No Open well has been constructed in Sub Division Jamrud.

Irrigation Channels

v. In Sub Division Bara 18 irrigation channels at a cost of Rs.5.915 million have been constructed which is 42% of the total claimed physical target. Details are as under

Sr. No.

Description of Scheme with Location Cost

(million)

Date of completion

i. Construction of Irrigation Channel at Malik Din Khel,

Bara Sub-Division 0.296 30.06.2005

ii Construction of Irrigation Channel at Stoori Khel Bara

Sub-Division 0.327 30.06.2005

iii Construction of Irrigation Channel at Aka Khel Mirgat

Khel 0.228 30.06.2005

iv Construction of Irrigation Channel at Sandana Sepah

Bara Sub-Division 0.302 30.06.2005

v Construction of Irrigation Channel at Barkiaran Bara

Sub-Division 0.301 30.06.2005

vi Construction of Irrigation Channel at Sokh Khula

Kamar Khel Bara Sub-Division

0.154 30.06.2005

vii Construction of Irrigation Channel at Anjano Area

Bara Sub-Division 0.343 30.06.2005

viii Construction of Irrigation Channel at Stoori Khel

Phase-II Bara Sub-Division 0.257 30.06.2005

ix Construction of Irrigation Channel at Stoori Khel Bara

Sub-Division 0.346 30.06.2005

x Construction of Irrigation Channel at Tarkho Kass 0.466 30.06.2005

Page 203: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

191

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

vi. In Sub Division Jamrud 11 irrigation channels at cost of Rs.3.668 million have

been constructed which is 26% of the claimed physical target. Details are as

under:

Sr. No.

Description of Scheme with Location Cost

Rs(million)

Date of completion

i. Construction of 6 No Irrigation Channels in

Choora Valley Jamrud Sub-Division 2.2 30.06.2008

ii Construction of 1 Nos Irrigation Channel at Sra

Wela Khaist Khula Sub-Division 0.228 30.06.2008

iii Construction of Irrigation Channel at Tor Dara

Kuki Khel Sub-Division 0.44 30.06.2008

iv Construction of Irrigation Channel at Karshi

Kata Khaist Khula Sub-Division 0.485 30.06.2008

v Construction of Irrigation Channel at Bragat

Sub-Division 0.315 30.06.2008

Total 3.668

xi Construction of Irrigation Channel at Dre Wanda

Sepah Bara Sub-Division 0.34 30.06.2005

xii Construction of Irrigation Channel at Nakkai Malik Din

Khel Bara Sub-Division 0.346 30.06.2007

xiii Construction of Irrigation Channel at Spina Krapa

Bara Sub-Division 0.38 30.06.2007

xiv Construction of Irrigation Channel at Saddaq Killi Bara

Sub-Division 0.445 30.06.2007

xv Construction of Irrigation Channel at left side of Bara

River Bara Sub-Division 0.47 30.06.2007

xvi Construction of Irrigation Channel at Spina Krapa

Ziaudin Area Bara Sub-Division 0.133 30.06.2007

xvii Construction of Irrigation Channel at Yar khel Wela

Garhi Bara Sub-Division 0.481 30.06.2007

xviii Construction of Irrigation Channels at Awal Khel 0.3 30.06.2007

Total 5.915

Page 204: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

192

vii. In Sub Division Landikotal 03 irrigation channels at cost of Rs.0.836 million

have been constructed which is 7.14% of the target. Details are as under:

Sr. No.

Description of Scheme with Location Cost

(million)

Date of completion

i. Construction of 1 Nos Irrigation Channel at

Khasrogy Bazar Zakha Khel Landikotal Sub-

Division

0.315 30.06.2010

ii Construction of 1 Nos Irrigation Channel at

Shan Khel Area Landikotal Sub-Division 0.301 30.06.2010

iii Construction of 1 Nos Irrigation Channel at

Shan Khel Area Landikotal Sub-Division 0.22 30.06.2010

Total 0.836

Micro Hydel Power Schemes

viii. In Sub Division Bara 08 Micro Hydel Power units at a cost of Rs.3.348 million

have been constructed which is 66.7% of the total target. Details are as

under:

Sr. No.

Description of Scheme with Location Cost

Rs(million)

Date of completion

i. Construction of Micro Hydel Power Unit at

Lawata 0.3 30.06.2007

ii Construction of Micro Hydel Power Unit at Sra Ghara Sepah Bara Sub-Division

0.35 30.06.2007

Iii Construction of Micro Hydel Power Unit at Sokh Khula Kamar Khel Bara Sub-Division

0.3 30.06.2007

Iv Construction of Micro Hydel Power Unit at Left side of Bara River Bara Sub-Division

0.47 30.06.2007

v Construction of Micro Hydel Power Unit at Boi Khula Bara Sub-Division

0.472 30.06.2007

vi Construction of Micro Hydel Power Unit Yar Khel

0.472 30.06.2007

vii Construction of Micro Hydel Power Unit at Spina Krapa Bara Sub-Division

0.492 30.06.2007

viii Construction of Micro Hydel Power Unit at Amal Khel Bara Sub-Division

0.492 30.06.2007

Total 3.348

Page 205: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

193

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

ix. In Sub Division Jamrud 02 Micro Hydel Power units at a cost of Rs.0.778 million

have been constructed which is 16.6% of the total target. Details are as under:

Sr. No.

Description of Scheme with Location Cost

Rs(million)

Date of completion

i.

Construction of 1 Nos Micro Hydel Power Unit

at Katia Khel Sub-Division 0.4 30.06.2009

ii Construction of 1 Nos Micro Hydel Power Unit

Karshi Kata Sub-Division 0.378 30.06.2009

Total 0.778

x. In Sub Division Landikotal no Micro Hydel Power units have been constructed.

Water Supply Schemes

The executing claims that 33.3% of the physical target has been achieved against

the financial utilization of 33.5%. Where as no detail has been provided by the

agency against it.

Agriculture Extension

The activities completed under agriculture extension till June, 2010 are as under

i. Wheat Seeds and Fertilizers

Seeds to 3284 acres were provided at a cost of Rs. 4.4 million. Details are as under.

Sr. No. Division Cost

(million)

Acres

i. Sub-Bara 2 1642

ii Sub- Division Jamrud 1.2 821

iii Sub- Division Landikotal 1.2 821

Total 4.4 3284

ii. Maize Seeds and Fertilizers

Seeds to 1401 acres were provided which is at a cost of Rs.2.74. Details are:

Sr. No. Division Cost

(million)

Acres

i. Sub-Bara 1.5 701

ii Sub- Division Jamrud 0.62 350

iii Sub- Division Landikotal 0.62 350 Total 2.74 1401

Page 206: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

194

iii. Vegetable Seeds and Fertilizers

The agency has provided the details of 2736 acres distribution of vegetable seeds

at a cost of Rs.3.77million. Details are as under.

iv. Fruit Plants and Fertilizers

The agency has provided the details of 751 acres distribution of fruit plants at a

cost of Rs 0.9 million. Details are as under:

Sr. No. Division Cost

(million)

Acres i. Sub-Bara 0.5 225

ii Sub- Division Jamrud 0.2 263 iii Sub- Division Landikotal 0.2 263 Total 0.9 751

v. Oil Seeds and Fertilizers

The agency has provided the details of 836 acres distribution of sunflower seeds at

a cost of Rs1.245 million Details are as under:

Sr. No.

Division Description of activity Cost

(million)

Acres

i. Sub-Bara Distribution of Onion seed with Fertilizer for, 500

Acres 0.6 500

ii Sub-Bara Distribution of Tomato seed with Fertilizer for,

475 Acres 0.65 475

iii Sub-Bara Distribution of Chilly seed with Fertilizer for, 245

Acres 0.3 245

iv Sub- Division

Jamrud

Distribution of Onion seed with Fertilizer for ,250

Acres 0.35 250

v Sub- Division

Jamrud

Distribution of Tomato seed with Fertilizer for,

233 Acres 0.36 233

vi Sub- Division

Jamrud

Distribution of Chilly seed with Fertilizer for ,275

Acres 0.4 275

vii Sub- Division

Landikotal

Distribution of Onion seed with Fertilizer for ,250

Acres 0.35 250

viii Sub- Division

Landikotal

Distribution of Tomato seed with Fertilizer for,

233 Acres 0.36 233

ix Sub- Division

Landikotal

Distribution of Chilly seed with Fertilizer for 275

Acres 0.4 275

Total 3.77 2736

Sr. No. Division Cost

(million)

Acres i. Sub- Division Bara 0.465 418

ii Sub- Division Jamrud 0.39 209 iii Sub- Division Landikotal 0.39 209 Total 1.245 836

Page 207: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

195

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

vi. Rs.4.0 million has been allocated in PSDP 2010-11 for the agriculture extension

activity which includes the following distribution of seeds.

Wheat seeds=170 acre

Maize=130 acre

Sunflower=70 acre

Mung Beans=40 acre

Onion=132

Tomato=120

Peas=22

Fruit Plants=10 acre

vii. The executing agency has distributed wheat seeds and fertilize for, 70 acres

among 130 farmers in Jamrud against current year target of 170 acre. The

agriculture activities are not possible to be undertaken at Landikotal and Bara

due to law and order situation.

viii. 50 acres of onion seeds (2 kg = 1 acres) and fertilizers have been distributed among the farmers in Jamrud against current year target of 132 acres for demonstration plots.

Recommendations

1. The management of the project is extremely weak and the project during

its 10 years of implementation has never achieved its physical targets.

2. Inconsistencies in financial and physical data provided by executing agency

have been observed.

3. Executing agency to justify unspent releases to C&W department and

furnish its utilization plan immediately.

4. PMU / SDU may provide list of DWSS along with cost, period of

implementation and population being benefitted. The capacity of each

water tank along with length of distribution network be provided.

5. There is cost overrun of 20.8% in NAS technical assistance head which

need to be re-appropriated with the approval of Secretary MoNC.

Page 208: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

196

Project Pictures

Gahibi Bbab to Mastaq 7 km) Bara Sub-Division

Road in Kajuri Bara Sub-Division)

Page 209: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

197

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Road in Zawo Village Bara Sub-Division

Road in Samsai Village Landi Kotal Sub-Division

Page 210: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

198

Irrigation Channel in Bara Tirah Area

MPHU in Khyber Agency

Page 211: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

199

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Water Supply Scheme in Shalman Area

Water Supply Scheme in Shalman Area

Page 212: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

200

Wheat Crop Cultivation

Wheat Crop in Jamrud Division

Page 213: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

201

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Wheat Crop in Sub Division Jamrud

Wheat Crop in Sub Division Jamrud

Page 214: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

202

Demo Onion Plots in Jamrud Division

Orange Orchid in Sub Division Jamrud

Page 215: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

203

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Mohmand Area Development Project

Page 216: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

204

Page 217: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

205

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Profile 1 Name of the Project: Mohmand Area Development Project Phase III

(Revised) 2 Sector Area Development 3 Location Mohmand Agency at Ghallanai 4 Sponsoring Ministry/Agency Ministry of Narcotics Control 5 Executing Agency Directorate of projects, FATA Secretariat, through

Project Implementation Unit & Concerned Line (DOP) Department & in the Agency.

6 Name of Project Director/PM Mr. Amjad Ali Khan / Mr. Syed Ahmed Jan 7 Postal Address Political Agent/Project Director Mohamand Area

Development Project, at Ghallanai 8 Telephone Office: 0924-290189 9 Fax No. 0924-290249 10 E-mail address [email protected]

11 Date of approval by CDWP June 30, 2007 (Original)

April 30, 2009 (Revised)

12 Decision of the CDWP The CDWP approved the Project at a total cost of Rs. 125.000 (Million) including USG grant of Rs. 100.0 million.

13 Objectives of the Project To make the area accessible to political

administration to eradicate poppy cultivation. 14 Commencement Date As per PC-I Actual July 1, 2007 July 1, 2007 15 Completion Date As per PC-I Expected June 30, 2011 June 30, 2011 16 Approved Cost of the Project Rs. 125.00 million (Million Rs.) 17 Sources of financing Source of Financing Amount United States Government 100.00 Government of Pakistan 25.00

Page 218: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

206

18. Financial Phasing, Releases & Expenditure (Million Rs.)

Year

Phasing as per approved PC-I

(Latest)

PSDP Provision

Actual Amount Released

Actual Expenditure

Total FFC Total FEC Total FEC Total FEC

2007-08 23.770 18.50 20.000 14.750 19.900 14.650 19.370 14.650 2008-09 46.156 41.50 50.900 45.250 30.725 25.600 30.725 25.600 2009-10 27.223 20.00 22.680 15.480 40.100 32.900 30.100 22.900 2010-11 27.851 20.00 29.876 23.292 11.986 10.000 1.986 0.000

Total 125.00 100.00 123.456 98.772 102.711 83.150 82.181 63.150

Note: Expenditure and releases for 2010 are for July - December only.

19. Financial Phasing, Releases & Expenditure (Million Rs.)

S.No Major Items PC-1 Cost Estimates

Cumulative Expenditur

e up to 30th June,

2010

Expenditure during July –

December 2010

Expenditure up to

December, 2010

1 Construction of Roads 91.000 58.400 0.000 58.400 2 Local Government and Rural

Development (Drinking water supply)

5.000 2.000 0.000

2.000

3 Agriculture Extension Activities

2.500 1.250 0.000 1.250

4 Technical Assistance 1.500 1.500 0.000 1.500 5 PMU/PIU

(Salaries & Allowances) 25.000 17.045 1.986 19.031

Total 125.000 80.195 1.986 82.181

20. Physical Scope of project as per approved PC-I and achievements (In quantifiable

terms)

S.No Major Items Unit Physical

Qty

Achievements Cumulative achievements up to June 30,

2010

Up to June 2010

July-Dec

2010

1 Construction of Roads i Black Topped Road Km 10 12.1 0 12.1

ii Shingle Road Km 8 4 0 4 2 Local Government and

Rural Development (Drinking water supply)

No. 11 6 0 6

3 Distribution of seeds, fertilizer and fruits plants for demonstration plots

Acres 560 300 0 300

4 Technical Assistance (NAS)

Rs. million

1.5 1.5 0 1.5

5 PMU-PIU (Staff position) No. 18 18 0 18

Page 219: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

207

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Monitoring Report

Mohmand Area Development Project Phase III (Grant)

Approved Capital Cost:

Rs.125 million

Project Duration:

1st July 2007 to 30th June 2011

Phasing of Capital Cost: (Million Rs)

Year Total FEC

2007-08 23.770 18.500

2008-09 46.156 41.500

2009-10 27.223 20.000

2010-11 27.851 20.00

Total 125.000 100.00

Releases and Expenses: (Million Rs)

Year ActualAmount

Released Actual

Expenditure

Total FEC Total FEC 2007-08 19.900 14.650 19.370 14.650 2008-09 30.725 25.600 30.725 25.600 2009-10 40.100 32.900 40.100 22.900

2010-11 11.986 10.000 1.986 0.000

Total 102.711 83.150 82.181 63.150

Financing: GOP(PSDP), Narcotics Affairs Section US Government

Sponsoring Agency: Ministry of Narcotics Control, Islamabad.

Executing Agency: Directorate of projects, FATA Secretariat, through Project Implementation Unit & Concerned Line Department.

Project Site: Mohmand Agency

Objectives

Eradication of poppy cultivation and socio-

economic development of the area, through

alternate development programmes.

Scope of Work

Construction of:

Infrastructure development

a. Black Topped Road

b. Shingle Road

Water Resource Development Scheme

(Drinking water supply)

Distribution of seeds, fertilizer and fruits

plants for demonstration plots

Technical Assistance (NAS)

PMU-PIU

Key Observations of Monitoring

i. The project has achieved its major target

of construction of blacktop road during its

implementation period, however the

targets relating to shingle road, drinking

water and agriculture are behind

schedule.

ii. The executing agency is constructing 5

Km of road approved in the work plan

2009-10.

iii. The C&W Department of Government of

KPK has unutilized releases amounting to

Rs.15 million.

Page 220: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

208

Blacktop Roads (BTR)

75.1% of the funds have been utilized to construct 12.1 km blacktop roads against

the target of 10 km road. Details are as under.

Sr. No.

Name of Road Length (KM)

Total Cost (million)

Cost per kilometer Rs(million)

i. Blacktopping from Krakana

to Manarai 2 3.00 1.5

ii. Stabilizing of shoulders of

Bucha Yousaf baba Road 1 0.90 0.90

iii. Blacktopping from Krakana

to Manarai (Phase-II) 2.5 10.90 4.36

iv. Blacktopping from Krakana

to Manarai 3.30 19.00 5.75

v. Widening and Blacktopping

from Babosar to Kotagai 3.30 19.00 5.75

Total 12.1 52.8 18.26

Roads in progress

Sr. No.

Name of Road Length (KM)

Total Cost

(million) Remarks

i. Blacktopping from

Manarai to Dabar 3 18.00

Blacktopping of 2.25 km has been

completed

ii. Blacktopping from

Manarai to Dabar 2 12.00 Base course has

been laid off

Total 5 20.00

Shingle Roads

Against the target of 8 km shingle road, 4 km (50 %) of the Shingle roads has been

constructed. Details are as under

Sr. No.

Name of Road Length (KM)

Total Cost Rs(million)

Cost per kilometer Rs(million)

i. Shingle Road from Dabar

(Phase-IV) 2.5 7.8 3.12

ii. Shingle Road from Dabar

to Sawat

1.5 6.10 4.0

Total 4 13.9 7.12

Page 221: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

209

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Local Government and Rural Development (Drinking water supply)

Against the target of 11 DWS schemes the executing agency has completed 6

schemes up to June, 2009 by utilizing an amounting to Rs. 2.0 million. This activity

has been suspended by NAS as NAS diverted the funds to construction of roads.

Agriculture Extension

The agriculture inputs were provided for 300 acres, which includes distribution of

seed, fertilizer and fruit plants for demonstration plots, which is 50.7% of the

target. The activity on remaining 260 acres was suspended as the areas are now

inaccessible due to law and order situation.

Recommendations

i. Executing agency to ensure utilization of unspent releases amounting to Rs.

15 million by C&W department before any fresh release.

1. Executing agency may provide list of DWSS along-with cost, period of

implementation and population being benefitted. The capacity of each

water tank along with length of distribution network be provided.

Page 222: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

210

Project Pictures

Karkhana Manarea 2 km

Karkhana Manarea 2.5 km

Page 223: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

211

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Krakana to Manarai 3.3 Km

Babosar to Kotagai 3.3 Km

Page 224: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

212

Manarai to Dabar 3km (2.25 Completed)

Manarai to Dabar in appropriate Design 3km (2.25 completed)

Page 225: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

213

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Manarai to Dabar 3km in progress road

Manarai to Dabar 2km base course laid off

Page 226: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

214

Shingle Road from Dabar (Phase-IV) 2.5 Km

Shingle Road from Dabar to swat 1.5 km end point

Page 227: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

215

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Tomato Plot Produce (American Super Blocky)

Onion Plot Produce (Swat1 Variety)

Page 228: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

216

Citrus Orchards

Apricot Orchards established in Mohmand Agency

Page 229: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

217

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Bajaur Area Development Project

Page 230: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

218

Page 231: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

219

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Project Profile 1 Name of the Project: Bajaur Area Development Project Phase-III

(Revised)

2 Sector Area Development

3 Location Bajaur Agency Khar

4 Sponsoring Ministry/Agency Ministry of Narcotics Control

5 Executing Agency Directorate of projects, FATA Secretariat, through Project Implementation Unit & Concerned Line Department in the Agency.

6 Name of Project Director/PM Mr. Zakir Hussain Afredi / Mr. Syed Ahmed Jan

7 Postal Address Political Agent/Project Director, Bajaur Area Development (BADP), Khar.

8 Telephone Office: 0942-220559

9 Fax No. 0942-220388

10 E-mail address [email protected]

11 Date of approval by CDWP April 30, 2009

12 Decision of the CDWP CDWP approved the Project at total cost of Rs.100.000 million as foreign aid.

13 Objectives of the Project Eradication of poppy cultivation and socio-economic

development of the area, through alternate development programs.

14 Commencement Date As per PC-I Actual July 1, 2007 July 1, 2007

15 Completion Date As per PC-I Expected June 30, 2011 June 30, 2011

16 Approved Cost of the Project Rs. 100.00 million (Million Rs.)

17 Sources of financing Source of Financing Amount United States Government 100.00

Page 232: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

220

18. Financial Phasing, Releases & Expenditure (Million Rs.)

Year

Phasing as per approved PC-I

(Latest)

PSDP Provision

Actual Amount Released

Actual Expenditure

Total FFC Total FEC Total FEC Total FEC

2007-08 20.00 20.00 20.00 20.00 12.210 12.210 12.21 12.21 2008-09 40.00 40.00 40.00 40.00 37.790 37.790 37.79 37.79 2009-10 20.00 20.00 20.00 20.00 32.750 32.750 26.00 26.00 2010-11 20.00 20.00 16.25 16.25 6.277 6.277 0.00 0.00

Total 100.00 100.00 96.25 96.25 89.027 89.027 76.00 76.00

Note: Expenditure and releases for 2010 are for July - December only.

19. Financial Phasing, Releases & Expenditure (Million Rs.)

S.No. Major Items Revised PC-1 Cost Estimates

Cumulative Expenditure up to 30th June, 2010.

Expenditure during July

– December 2010

Expenditure up to

December, 2010

1 Works and services Dept(Construction Roads) i Black Top Road 72.500 61.023 0.000 61.023

ii Shingle Road 18.500 9.500 0.000 9.500 2 Local Government and Ruler Development

i Construction of Drinking Water Supply Schemes (DWSS)

5.000 2.000 0.000

2.000

3 Agriculture Extension i Distribution of seeds (Wheat,

Sunflower,& Maize) Fertilizers

1.068 0.534 0.000

0.534

ii Distribution of seeds (Tomato, Citrus, Apricot & Onion ) Fertilizers

1.070 0.535 0.000 0.535

4 Technical Assistance (NAS) 1.500 2.500 0.000 2.500 Total 100.000 76.000 0.000 76.000

20. Physical Scope of project as per approved PC-I and achievements

S.No Major Items Unit Physical

Qty

Achievements Cumulative achievements up to Dec 31,

2010

Up to June 2010

July-Dec

2010

1 Works and services Dept(Construction Roads) i Black Top Road km 10 14 0 14 ii Shingle Road km 8 2 0 2 2 Local Government and Ruler Development i Construction of Drinking Water

Supply Schemes(DWSS) No 12 6 0 6

3 Agriculture Extension i Distribution of seeds (Wheat,

Sunflower,& Maize) Fertilizers Acers 300 200 0 200

ii Distribution of seeds Fertilizers Acers 291 100 0 100 4 Technical Assistance (NAS) Lms 1.500 2.5 0 2.5

Page 233: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

221

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Monitoring Report

Bajaur Area Development Project Phase-III (Grant)

Approved Capital Cost:

Rs.100.0 million

Project Duration:

1st July 2007 to 30th June 2011

Phasing of Capital Cost: (Million Rs)

Year Total FEC

2007-08 20.000 20.000

2008-09 40.000 40.000

2009-10 20.000 20.000

2010-11 20.000 20.000

Total 100.000 100.000

Releases and Expenses: (Million Rs)

Year

Actual Amount Released

Actual Expenditure

Total FEC Total FEC

2007-08 12.21

0 12.210 12.210 12.210

2008-09 37.79

0 37.790 37.790 37.790

2009-10 32.75

0 32.750 32.750 26.000

2010-11* 6.277 6.277 0.00 0.00

Total 89.02

7 89.027 76.00 76.00

*July – December 2010

Financing: NAS

Sponsoring Agency: Ministry of Narcotics Control

Executing Agency:

Directorate of Projects FATA Secretariat. Peshawar

Project Site: Bajaur Agency Khar

Objectives

Eradication of Poppy cultivation through

infrastructural development activities and

improving lot of the people.

Scope of Work

Works and services

o Construction of Roads

Local Government and Rural

Development

o Drinking Water Supply Schemes

Agriculture

o Agriculture Extension

Key Observations of Monitoring

i. The project has achieved its major

target of construction of blacktop road

during its implementation period.

However the targets relating to shingle

road, drinking water and agriculture are

behind schedule.

ii. Ministry of Narcotics Control released

Rs.6.277 million vide its sanction letter#

1-19/2010-Deve-1, dated 27th August,

2010, but DDO (Political Agent Bajaur)

has yet to sign the cheque for transfer

of PSDP releases to the line

departments.

Page 234: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

222

iii. No work plan for the year 2010-11 has been prepared. The executing

agency is still implementing the activities approved in 2009-10.

iv. The C&W Department of Government of KPK has unutilized releases

amounting to Rs.6.75 million.

v. Against an allocation of Rs.1.5 million under NAS Technical Assistance

head, the executing agency has utilized Rs.2.5 million without seeking re-

appropriation

Blacktop Roads

i. Since 2007, 14 km against a target of 10 km black top road has been

constructed by utilizing an amount of Rs.67 million (92.3%) of the cost of

construction of blacktop roads. Details are as under.

Sr. No.

Name of Road Length (KM)

Total Cost (million)

Cost per kilometer (million)

i.

Blacktopping of main

Sharbatai Road 4 19.0 4.75

ii. Blacktopping from Sharbatai

to Painda Khel Targhaw

4 19.0 4.75

iii.

Widening and blacktopping

of main Sharbatai road 16-

17 km

2 10.75 5.375

iv. Blacktopping of main

Sharbatai road (Phase-IV)

2 7.50 3.75

v.

Widening and blacktopping

of main Sharbatai road

18-19 km

2 10.75 5.375

Total 14 67.00 4.78

4.78

ii. Widening and blacktopping of Main Sharbatai road 16-17 km section of

road (item iv in above table) has been blacktopped with TST (Triple Surface

Treatment) of low quality. The various parts of road need major

improvement.

Shingle roads

Since 2007, two km of shingle road against the target of 8 km has been

constructed, which is 25% of the target. Details are as under:

Page 235: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

223

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Sr. No.

Name of Road Length (KM)

Total Cost (million)

Cost per kilometer (million)

i. Shingle road from Asil

Targhaw to Swat River

2 9.5 4.75

l Total 2 9.5 4.75

Road in progress:

Sr. No.

Name of Road Length (KM)

Total Cost (million)

Cost per kilometer (million)

i. Shingle road from Asil

Targhaw to Swat River

1.5 13.5 9.0

l Total 1.5 13.5 9.0

Local Government and Ruler Development

Against the target of 12 Drinking Water Supply Schemes (DWSS) the executing

agency has completed 6 schemes upto the year 2009-10 by utilizing Rs. 2.0 million.

Agriculture Extension

The agriculture inputs were provided for 300 acres, which includes distribution of

seed, fertilizer and fruit plants for demonstration plots, which is 50.7% of the

target. The activity on remaining 260 acres was suspended as the areas are now

inaccessible due to law and order situation.

Recommendations

i. Executing agency should ensure utilization of unspent releases amounting

to Rs. 6.75 million. The C&W department be released additional funds on

effective utilization of unspent releases.

ii. Rs.2.5 million has been utilized against the PC-I provision of Rs.1.5 million

under NAS Technical Assistance head. The over and above expenditure by

Project Management needs to be regularized to avoid audit objections.

Page 236: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

224

iii. The payment to contractor for the work of Widening and blacktopping of

main Sharbatai (16-17) km may not be made until the repair of road work

is undertaken by the contractor.

iv. Executing agency may also provide list of DWSS along-with cost, period of

implementation and population being benefitted under each scheme.

Project Pictures

Blacktopping of Sharbatai to Painda Khel road, 4 Kms

Page 237: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

225

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Blacktop Main Sharbatai road 2 km

Main Sharbatai Road (4KM)

Page 238: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

226

Main Sharbatai Road (2KM) 16-17 Km

Main Sharbatai Road (2KM) 16-17 km poor quality carpeted section

Page 239: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

227

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Main Sharbatai Road (2KM) 16-17 km site damaged by resident

Main Sharbatai Road (2KM) 16-17 cracks developed on fresh concrete of site walls

Page 240: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

228

Main Sharbatai Road (2KM) 16-17 poor quality TST

Main Sharbatai road (18-19 km) 2km start point

Page 241: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

229

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Water Tank at Pindakhel (Capacity 30,000 gallons)

Water Tank at Sharbatai (Capacity 30,000 gallons)

Page 242: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

230

Water Storage Tank for Irrigation in Sharbatai Area (Bajaur)

Water Storage Tank

Page 243: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

231

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Meetings with Stakeholders

o Education o Health o Social Welfare o Other Stakeholders

Drugs Awareness Campaign in Islamabad

Activities in Faisalabad city for creating

awareness against drugs Visit to Pakistan Sports Complex Islamabad

to analyze facilities Meetings with NGOs

o Quetta o Islamabad

Implementation of Anti Narcotics Policy

Page 244: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

232

Page 245: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

233

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Meetings with Stakeholders

Page 246: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

234

Page 247: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

235

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Education Sector

Page 248: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

236

Page 249: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

237

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

EDUCATION SECTOR

A meeting under the chairmanship of Secretary, Narcotics Control Division was held

21.09.2010 in the Committee Room of the Ministry of Narcotics Control to develop a

strategy vis-à-vis Education Sector for implementing the Anti-Narcotics Policy 2010.

2. The Secretary, Narcotics Control Division (NCD) informed the participants that

Anti Narcotics Policy 2010 is based on three pronged policy objectives i.e. Drug Supply

Reduction, Drug Demand Reduction and International Cooperation. In order to

achieve the objectives of Anti narcotics Policy law enforcement agencies are being

strengthened through Inter Agency Task Force on Narcotics Control and Provincial and

District Narcotics Control Committees. The implementation of the policy will be

reviewed by National Anti Narcotics Council (NANC) chaired by the Prime Minister of

Pakistan and represented by Chief Ministers of the Provinces. The 1st meeting of the

NANC is scheduled to be held in January 2011.

3. Director General, Anti Narcotics Force (ANF), stressed the need for community

participation to eradicate drug abuse. He highlighted the role and efforts of ANF in

combating this menace and informed that ANF has seized significant amounts of

hashish, heroin, morphine and charas etc. Pakistan is among the top 03 countries

where confiscation rate and seizure of narcotic drugs and substances is high.

4. The Director General (M&E) of PMU/NCD informed that different studies have

suggested that the drug addicts are growing @ 7% per annum. Sharing available

statistics, it was informed that around 4 addicts are being added every minute in the

community of addicts. Emphasis was therefore laid to create awareness among youth

against drugs. The Director General informed that the following five policy points

have been indicated in the Anti Narcotics Policy 2010:

i. Develop education policy and curriculum against drug abuse.

ii. Publish anti-drug messages in text books/notebooks for schools, colleges

and universities.

iii. Develop a model drug-free education institute.

iv. Promote extra curriculum sports and other activities among students

through educational institutions; and

Page 250: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

238

v. Support university research and assessment studies on drug abuse.

5. The chair requested the participants to favour with their views on the five

points of Anti Narcotics Policy pertaining to Education sector. The following are the

views of the participants.

6. Planning & Development Division

The existing Policy, Curriculum and text books be reviewed to identify the

extent up to which these documents carry out provisions of Anti Narcotics

Policy 2010. Consultants may be hired for this purpose, who may also

provide recommendations for future improvement.

Seminars and meetings be arranged in educational institutions particularly

in colleges and universities with full participation of students and teachers

to highlight injurious effects associated with drug abuse and their control in

students.

International best practices in the field of Narcotics Control among

students be explored for which services of consultants may be hired. These

consultants may make recommendations based on the success stories so

that these may be adopted for Pakistan.

Training should be arranged for all stakeholders including parents and

teachers.

Capacity building of District authorities may be ensured to facilitate them in

implementation of the Anti Narcotics Policy 2010.

The writers, poets, cartoonists may be encouraged by providing incentives

for preparing/writing short stories, cartoons etc.

Research Studies in the field of drug abuse at university level may be

sponsored.

Implementation of Government Policy regarding smoke free environment

in public offices, especially in educational institutions may be ensured.

Drug abuse should be included in social protection programme.

Page 251: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

239

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

7. Ministry of Education

Curriculum Wing of Ministry of Education has improved curriculum at

school and higher school level in 50 subjects.

The Ministry of Education is considering inclusion of emerging issues i.e.

Disaster Risk Management, Clean Drinking Water, Population and

Development etc in the curriculum. The aspect of drugs will also be

included in the emerging issues.

Awareness among teachers against drugs can play a vital role in Narcotics

Control. Teachers Training Curriculum therefore needs revision.

Ministry of Education is holding meeting of curriculum review committee

every Tuesday. It will consider provision of contents in the text books

against drugs. Ministry of Narcotics Control was invited to participate in

the meeting.

8. Higher Education Commission (HEC)

HEC has constituted National Curriculum Development Committee to

review and update the Curriculum. The said Committee will be directed to

take up the issue of drug abuse as well.

HEC is in the process of developing a curriculum for four years Bachelor of

Education degree programme. The aspect of drugs will be included in the

curriculum.

HEC Punjab representative informed that drugs is a burning issue and

assured to gear-up extra-curricular activities in educational institutions to

control the use of drugs.

9. Khyber Pakhtunkhwa

Curriculum, both for students as well as for pre-service teacher’s training,

needs to be revised to highlight new issues like the narcotic drugs.

The public sector investment in education is low and the schools do not

have enough funds for extracurricular activities. Ministry of Narcotics may

consider provision of sports gears to schools.

Page 252: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

240

Drugs and HIV messages be considered for inclusion in the curriculum.

Encourage inter school tournaments and debates.

Curriculum of Physical Education needs to be improved to meet present

day needs.

Provision of books containing Anti Narcotics material for libraries in each

school.

10. UNODC

Drug abuse prevention message as a joint venture of UNODC and Curriculum

Wing Ministry of Education was introduced in various schools subjects in 1993.

11. Punjab

Seriousness against drugs at grass roots level among teachers and students

do not exist.

The smoking by teachers in school promises be banned.

Appreciation letters be issued to No Smoking/Drug free schools.

Education Departments/Ministry of Narcotics Control to facilitate

educational institutions in undertaking sports activities.

12. Gilgit Baltistan

Committed to facilitate implementation of Anti Narcotics Policy 2010.

Requirement of resources to undertake healthy extra curricular activities.

13. Decisions

The following decisions were taken:

Ministry of Narcotics Control to develop formal and informal interaction

with all stakeholders of Education Sector.

Participants to provide ideas for conversion into projects. Ministry of

Narcotics control to facilitate in designing proposals along with UNODC.

Planning & Development Division to include drug related issues in short

and medium term plans.

Ministry of Education and Provincial Governments to include material in

Page 253: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

241

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

the curriculum of schools, colleges and universities to discourage use of

drugs among students and teachers.

Ministry of Narcotics Control/UNODC to provide short term consultants to

review curriculum at primary secondary and higher secondary school level

(if required).

Ministry of Narcotics Control will participate in next weekly meeting of

Ministry of Education to review curriculum.

The Provinces to identify stakeholders for prevention treatment and

rehabilitation of drug addicts.

HEC to encourage universities to undertake research on different aspects of

drugs.

Page 254: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

242

Page 255: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

243

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Health Sector

Page 256: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

244

Page 257: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

245

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

HEALTH SECTOR

A meeting under the chairmanship of Secretary, Narcotics Control Division, was

held 21.10.2010 at 11.00 a.m. in the Committee Room of Ministry of Narcotics

Control to review the implementation of the Anti Narcotics Policy relating to

Health Sector.

2. The Secretary, Narcotics Control Division (NCD) welcomed the participants

and shared the main features of the Anti Narcotics Policy approved by the Cabinet.

It was informed that the Policy will be reviewed by the Prime Minister of Pakistan

alongwith Chief Ministers of the Provinces in January 2011. The success of Anti

Narcotics Policy depends on the cooperation of the Federal Ministries and

Provincial Governments. The participants were informed that the Health Sector is

responsible to take following initiatives as per Anti Narcotics Policy 2010:

Establish special wards in Government hospitals for drug treatment.

Register drug treatment centres run by the private sector and NGOs.

Arrange programmes for training of doctors and paramedical staff in

treatment and detoxification of drug users.

Ensure the strict enforcement of the prescription code.

Effectively control the manufacturing and sale of medicines which can be

abused.

Develop best medical practices for treatment of drug users

3. The Director General (M&E), Planning and Monitoring Unit (NCD) informed

that different studies suggest that the drug addicts are growing @ 7% per annum.

Sharing available statistics, it was informed that around 70 addicts are being added

every hour in the community of addicts. Emphasis was, therefore, laid to create

awareness among youth against drugs.

4. The Deputy Director General, Anti Narcotics Force (ANF), stressed the need

for community participation to eradicate drug abuse. He highlighted the role and

efforts of ANF in combating this menace and informed that ANF has seized

significant amounts of hashish, heroin, morphine and charas etc. Pakistan is among

Page 258: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

246

the top 03 countries where confiscation rate and seizure of narcotic drugs and

substances is high.

5. The chair requested the participants to give their views on the five points

of Anti Narcotics Policy pertaining to Health Sector. The following are the views of

the participants.

6. Planning & Development Division

Needs to develop a mechanism for implementation of Anti Narcotics

Policy 2010.

Efforts to be made to identify the gaps in delivery and take appropriate

steps to achieve the goals.

Public Sector Development Progamme 2010-11 had a little allocation

for treatment of addicts while the Provincial Governments have not

allocated any funds for the treatment of addicts.

Institutional mechanism may be developed between the Federal and

Provincial Governments for better coordination and increase financial

allocations to address the drug related issues.

7. Ministry of Health

18th amendment of the constitution of Pakistan have transferred the

implementation of the health related issues to the Provincial

Governments. Therefore, the Provincial Governments have to play a

proactive role to achieve desired objectives.

Federal and Provincial Governments should allocate beds in hospitals

for treatment of addicts as a first step.

Registration of drug treatment centres is the responsibility of the

Provincial Governments and Ministry of Health will coordinate the

activity.

Curriculum of doctors and Paramedical Staff be reviewed and necessary

changes be introduced. .

Prescription of medicines by doctors falls under the domain of

Page 259: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

247

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Provincial Governments. The Provincial Governments to regulate the

activity.

Ministry of Narcotics Control to provide results of the survey to find out

differences between use and abuse of medicine.

Ministry of Narcotics Control to arrange follow up meetings to review

implementation of Anti Narcotics Policy periodically.

Professor Rizwan Taj, PIMS

Pakistan has the expertise to develop standard operating procedures

for the treatment of drug addicts.

PIMS in collaboration with Kings College London have trained two

officers of the Anti Narcotics Force.

PMDC and Medical Colleges to introduce prescription as a subject in the

final year of MBBS curriculum.

Pharmacies to sell medicines only after its prescription by a doctor.

Proposed big push to develop addicts wards at Federal and Provincial

hospitals.

8. Punjab

Supported the idea of creating separate ward in hospitals upto District

levels.

Master trainers from each District be trained to handle addicts by the

Federal Government.

9. Sindh

Supported proposal of establishment of separate wards and informed

that a hospital for addicts is already operational at Hyderabad.

Ministry of Health not to relax quota for the import of restricted

medicines.

10. Khyber Pakhtunkhwa

KPK is in the process of establishing separate wards for the addicts.

Established Health Regulatory Authority for the registration of

Page 260: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

248

treatment centres.

Prescription law is also enforced and 500 licenses have been issued.

11. AJK

AJK does not have any skills to treat addicts. Doctors and paramedical

staff of AJK be trained by Federal Government.

The localities around shrines and religious places be included in the

awareness campaign.

12. Gilgit Baltistan

Proposed drug demand survey to include behavior change.

Gilgit Baltistan has few addicts. However, legislation to address addicts

issues have been prepared and expected to be discussed by the

Legislative Assembly soon.

Decisions

Ministry of Narcotics Control to develop formal and informal interaction

with all stakeholders of Health Sector.

The National Narcotics Control Committee under the Chairmanship of

Secretary Narcotics Control Division will meet twice a year while follow

up will be undertaken periodically by the Project Management Unit.

Planning & Development Division to include drug treatment in short

and medium term plans.

The Provincial Governments will prepare projects addressing drug

related issues for financing by the UNODC, Global UN Aids Fund and

Narcotics Control Fund.

Ministry of Narcotics Control will facilitate provision of training to

Provincial Governments at Interpol level.

The Ministry of Health will establish separate wards at Federal

Government Hospitals i.e. Federal Government Services Hospital and

PIMS Islamabad, JPMC Karachi and Sheikh Zayed Hospital, Quetta. The

Cabinet Division will also be requested for the establishment of a

separate ward at Sheikh Zayed Hospital, Lahore.

Page 261: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

249

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Provincial Governments to establish separate wards for addicts

treatment from the available beds on priority basis.

Ministry of Narcotics Control/UNODC will undertake drug abuse survey

in collaboration with Provinces.

Ministry of Narcotics Control will notify the establishment of task force

for developing treatment protocol for drug addicts by 1st November

2010. The task force will complete the task by 15th December 2010.

16 Volunteer doctors from UK would be at Lahore for training in patient

safety in January 2011. The Punjab province can avail this opportunity

to train their Doctors/Paramedical staff.

Ministry of Health/Provincial Governments will nominate

Doctors/Paramedical staff for training in drug treatment. Ministry of

Narcotics Control will arrange their training.

The addicts hospital established by the Government of Sindh at

Hyderabad would be visited by the Project Management Unit, while the

Provincial Government of Sindh will visit ANF Treatment Centre at Lyari

established by the Anti Narcotics Force/MoNC.

Government of AJK to immediately establish addicts treatment ward at

Muzaffarabad and Project Management Unit, Ministry of Narcotics

Control, will visit the ward by the end of November 2010.

Government of Gilgit Baltistan will inform the Council meeting, to be

chaired by the Prime Minister of Pakistan, about the initiatives being

taken to address the drug related issues.

Ministry of Narcotics will support the project proposals to be prepared

by the Gilgit Baltistan and will facilitate its financing by UNODC and

other donors.

Page 262: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

250

Page 263: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

251

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Social Welfare Sector

Page 264: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

252

Page 265: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

253

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

SOCIAL WELFARE SECTOR

A meeting under the chairmanship of Secretary, Narcotics Control Division, was

held 29.10.2010 at 10.00 a.m. in the Committee Room of Ministry of Narcotics

Control to review the implementation status of the activities relating to the Social

Welfare Sector.

2. The Secretary, Narcotics Control Division (NCD), welcomed the participants

and shared the main features of the Anti Narcotics Policy approved by the Cabinet.

It was informed that the Policy will be reviewed by the Prime Minister of Pakistan

alongwith Chief Ministers of the provinces in January 2011. The success of Anti

Narcotics Policy depends on the cooperation of the Federal Ministries and

Provincial Governments. The participants were informed that the Social Welfare

Sector is responsible to undertake following initiatives as per Anti Narcotics Policy

2010:

Identify and support NGOs working on anti-drug programs.

Ensure NGO treatment and rehabilitation centres and functioning

effectively.

3. Director General, Anti Narcotics Force (ANF), stressed the need for

community participation to eradicate drug abuse. He highlighted the role and

efforts of ANF in combating this menace and informed that ANF has seized

significant amounts of hashish, heroin, morphine and charas etc. Pakistan is among

the top 3 countries where confiscation rate and seizure of narcotic drugs and

substances is high.

4. The Director General (M&E) of PMU/NCD informed that different studies

have suggested that the drug addicts are growing @ 7% per annum. Sharing

available statistics, it was informed that around 70 addicts are being added every

hour in the community of addicts. Emphasis was therefore laid to create

awareness among youth against drugs.

5. The chair requested the participants to favor with their views on the Anti

Narcotics Policy pertaining to Social Welfare Sector. The following are the views of

the participants.

Page 266: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

254

6. Planning & Development Division

Narcotics control needs to be included in the development strategies

being developed by Planning & Development Division.

In order to provide social support, the addicts be treated as victims

instead of criminals.

NGOs are considered to be responsible for creating awareness against

drugs. Federal and Provincial Governments may also contribute to

accelerate awareness campaign.

Special Development Centres, Vocational Rehabilitation Centres,

Community Development Centres and Social Welfare Treatment

Projects developed by Ministry of Social Welfare be involved in

treatment and rehabilitation of the addicts.

Ministry of Narcotics Control to consider involvement of special case

workers in initial investigation of addicts.

7. Ministry of Social Welfare

Students of Social Welfare and Psychology Departments of the

Universities will be involved as volunteers in creating awareness

against drug abuse.

Ministry of Social Welfare has developed 21 Community Development

Centres and 20 hospitals at the provincial level. Ministry of Narcotics

Control can benefit from the services of these Centres by providing

training against drug abuse to the employees of these centres.

Ministry of Social Welfare can provide information relating to social

case workers to facilitate initial interrogation.

Ministry of Social Welfare has developed a data base of 45,000

registered NGOs. The NGOs working against drugs after scrutiny can

be utilized to create awareness and provide treatment to the addicts.

Ministry of Social Welfare and Narcotics Control may enter into a

Memorandum of Cooperation to jointly undertake activities against

drug abuse.

Page 267: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

255

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

8. National Council for Social Welfare

Council is providing financial assistance to three NGOs recommended

by Provincial Governments.

Council offered to provide training to the social workers and other

concerned against drug abuse.

9. Bait-ul-Maal

Bait-ul-Maal has established Vocational Training Centres for ladies in

each district. The female drug addicts can avail the facility to be

productive.

Bait-ul-Maal can provide financial assistance for treatment of

deserving addicts as being provided to deserving patients in public

sector hospitals.

Individual financial assistance to deserving addicts for rehabilitation.

10. AJK

AJK to be included in the proposed survey on drugs being undertaken

by UNODC in collaboration with Ministry of Narcotics Control.

Training to employees of District Coordination Council can facilitate

handling addicts against drug abuse.

11. Balochistan

Established Drugs Treatment Complex at 5.5 acres for 250 addicts.

The detoxification process takes 15 to 20 days while treatment ranges

from 3 to 6 months.

Hospital developed by Government of Balochistan lacks trained

human resources to handle addicts.

Management Information System needs to be developed to collect

data from each district on drug related issues.

12. Sindh

No work initiated at District level for creating awareness against

addicts.

Page 268: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

256

Project for drug addicts at Karachi, Hyderabad and Sukhar prepared

but still to be approved.

13. Khyber Pakhtunkhwa

No base-line survey undertaken to determine the drug addicts in the

Province.

Five centres with a capacity to handle 120 drug addicts are functional.

Database of NGOs associated with drug related issues developed.

Lack of coordination between ANF and Provincial Governments in

undertaking activities relating to drug supply reduction and drug

demand reduction.

Establishing protection centre for addicts.

14. UNODC

UNODC is undertaking out-reach activities in collaboration with NGOs.

Networking with NGOs and other departments involved in drugs

prevention, treatment and rehabilitation needs to be developed.

Management Information System software being developed and

expected to be completed by end of November 2010.

Proposed survey on drug abuse to include FATA, AJK, Gilgit Baltistan.

Participants to share ideas to address drug related issues.

Consider facilitation of families of addicts, facing hardship on account

of addicts attitude.

Decisions

Ministry of Narcotics Control to develop formal and informal interaction

with all stakeholders of Social Welfare Sector.

The National Narcotics Control Committee under the chairmanship of

Secretary Narcotics Control Division will meet twice a year while follow up

will be undertaken regularly by the Project Management Unit.

Planning & Development Division to include prevention, treatment and

rehabilitation of addicts in Five Year and Annual Plan.

Page 269: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

257

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Memorandum of Understanding to be signed between Ministry of Social

Welfare and Ministry of Narcotics Control to utilize the existing facilities

against drug abuse.

Ministry of Social Welfare and Ministry of Narcotics Control to jointly

develop a strategy of introduction of volunteer programme in the

Universities.

Ministry of Social Welfare to share registration data relating to NGOs with

Ministry of Narcotics Control.

Social case workers concept at initial investigation stage to be introduced in

Lahore Drug Free City Project.

National Council of Social Welfare to provide training to the concerned

workers at Federal and Provincial levels. A detailed programme of training

to be shared with Ministry of Narcotics Control by the 15th November 2010.

Ministry of Narcotics Control (PMU) and Bait-ul-Maal to finalize the

modalities for provision of financial assistance for the treatment of drug

addicts and individual financial assistance.

Training facilities to the female addicts at Ladies Vocational Centres being

operated by Bait-ul-Maal be explored.

Government of AJK to provide list of master trainers to be trained

alongwith venue.

MoNC (PMU), UNODC and ANF to visit Quetta to review the performance

of addicts hospital developed by the Social Welfare Department,

Government of Balochistan, during November 2010.

Explore possibility of merger of MATRC with the Social Welfare Department

Hospital.

Task Force being notified for the development of SOPs for drug addicts

under the chairmanship of Dr. Rizwan Taj to consider drug addicts

Page 270: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

258

treatment procedure being followed at addicts hospital at Quetta.

ANF to work closely with the concerned departments of Federal and

Provincial Governments in provision of treatment and rehabilitation

activities.

Government of KPK and Sindh to share addicts treatment and rehabilitation

development projects with MoNC.

Page 271: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

259

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Other Stakeholders

Page 272: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

260

Page 273: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

261

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

OTHER STAKEHOLDERS

A meeting under the chairmanship of Secretary, Narcotics Control Division, was

held on 03-11-2010 at 10.00 a.m. in the Committee Room of Ministry of Narcotics

Control to review the implementation status of the Anti Narcotics Policy.

2. The Secretary, Narcotics Control Division (NCD) welcomed the participants

and shared the main features of the Anti Narcotics Policy approved by the Cabinet.

It was informed that the Policy will be reviewed by the Prime Minister of Pakistan

alongwith Chief Ministers of the provinces in January 2011. The success of Anti

Narcotics Policy depends on the cooperation of the Federal Ministries and

Provincial Governments.

3. Deputy Director General, Anti Narcotics Force (ANF), stressed the need for

community participation to eradicate drug abuse. He highlighted the role and

efforts of ANF in combating this menace and informed that ANF has seized

significant amounts of hashish, heroin, morphine and charas etc. Pakistan is among

the top 3 countries where confiscation rate and seizure of narcotic drugs and

substances is high.

4. The Director General (M&E) of PMU (NCD) informed that different studies

have suggested that the drug addicts are growing @ 7% per annum. Sharing

available statistics, it was informed that around 70 addicts are being added every

hour in the community of addicts. Emphasis was therefore laid to create

awareness among youth against drugs.

5. The chair requested the participants to favour with their views on Anti

Narcotics Policy pertaining to respective Ministries. The following are the views of

the participants.

6. Ministry of Interior

Ministry of Interior fully supports the Anti Narcotics Policy 2010

approved by the Cabinet and assured full cooperation in its

implementation.

Page 274: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

262

Ministry of interior will coordinate with provinces for promoting drug

free culture in prisons.

Facilitate training of drug law enforcement agencies.

Law Enforcing Agencies to adopt proactive approach to address drug

supply.

7. Ministry of Commerce

Ministry of Narcotics Control to undertake a study on emergence of

substitute precursor chemicals and share it with Ministry of

Commerce.

8. Ministry of Finance

Ministry of Finance while supporting the Anti Narcotics Policy informed

that assets monitoring is not assigned to FMU.

Drug related assets information can be shared with law and

enforcement agencies.

Role of Federal Board of Revenue in implementation of Anti Narcotics

Policy needs to be identified.

9. Ministry of Foreign Affairs

Committed to promote international understanding and cooperation

to combat drugs.

10. Ministry of Human Rights

Support to treat addicts as victims and not criminals.

Committed to facilitate in implementation of Anti Narcotics Policy

2010 relating to Human Rights through NGOs.

11. Ministry of Information and Broadcasting

Facilitate in delivery of public service message on print and electronic

media.

Representative of Ministry of Information to discuss the modalities

with Ministry of Narcotics Control.

Page 275: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

263

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

12. Ministry of Labour and Manpower

Bureau of Immigration can facilitate Ministry of Narcotics Control in

creating awareness against drugs by distributing handbills and

pamphlets.

HRD wing of National Training Bureau offered to provide training to

the treated addicts.

Teaching material against drugs to be included in the curriculum of skill

development.

13. Planning & Development Division

Planning & Development Division supports Anti Narcotics Policy and

assured facilitation in approval of projects.

Adequate PSDP allocation to development projects being implemented

by Ministry of Narcotics Control.

14. Ministry of Population Welfare

Population Welfare is managing 15 reproductive health institutions.

The teaching material against drugs to be included in the curriculum.

Public service message of population welfare also to include message

against drugs.

15. Ministry of Railways

Pakistan Railways as a policy has no restriction to check passengers

having drugs.

Pakistan Railways can provide land to Ministry of Sports for

establishment of sports facilities.

Pakistan Railways offered to create awareness campaign at railway

stations and passenger coaches in collaboration with Ministry of

Narcotics Control.

Page 276: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

264

16. Ministry of Religious Affairs

Proposed involvement of religious leaders to develop drug free society.

Ministry of Religious Affairs to bring narcotics as agenda item in its

regional and international conferences.

17. Ministry of Law and Justice

Anti Narcotics Policy needs to be converted into law.

Ministry of Narcotics Control to review the existing laws and propose

amendments for consideration by Ministry of Law.

18. Ministry of Youth Affairs

Youth Policy was revised in 2009 and is under implementation.

Ministry of Youth Affairs is arranging a Youth Festival.

19. Ministry of Women Development

No representative of Ministry of Women Development participated in

the meeting.

20. Ministry of Sports

Ministry of Sports has completed 7 development projects at

Islamabad.

Land for the creation of sports facilities being provided by the

Provincial Governments while Ministry of Sports creates facilities from

the releases by the Federal Government through PSDP.

Decisions

Ministry of Narcotics Control to develop formal and informal interaction

with all stakeholders of Social Welfare Sector.

The National Narcotics Control Committee under the chairmanship of

Secretary Narcotics Control Division will meet twice a year while follow-up

will be undertaken regularly by the Project Management Unit.

Ministry of Interior to prepare an action plan 2010-11 to implement the

Page 277: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

265

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

National Anti Narcotics Policy 2010 pertaining to Ministry of Interior and

share the same with Ministry of Narcotics Control on priority basis.

Ministry of Finance to identify the role of Federal Board of Revenue for

implementation of Anti Narcotics Policy 2010.

Ministry of Foreign Affairs to adopt pro-active approach to obtain

international cooperation.

Ministry of Human Rights to ensure supremacy of human rights.

Ministry of Narcotics Control (PMU) and Ministry of Information to develop

a public awareness strategy within two weeks.

The Anti Narcotics Force to provide pamphlets against drug abuse to

Bureau of Immigration for distribution to migrants at Airports.

Ministry of Narcotics Control (PMU) to workout the details of training

program to be implemented at National Training Bureau of Ministry of

Labour and Manpower.

Planning & Development Division to ensure consideration of development

projects relating to Narcotics on priority basis.

Planning & Development Division may ensure adequate releases to the

development projects relating to drug supply reduction and drug demand

reduction.

Ministry of Population Welfare and Ministry of Narcotics Control to sign a

Memorandum of Understanding in providing training at reproductive

centers for creating awareness against drugs.

Ministry of Narcotics Control and Ministry of Railways to finalize awareness

campaign within two weeks.

Ministry of Railways to identify land for development of sports facilities and

communicate the same to Ministry of Narcotics Control.

Ministry of Religious Affairs to create awareness against drugs in

collaboration with Ulemas.

The use of force on religious leaders be avoided.

Ministry of Law and Justice to facilitate Ministry of Narcotics Control in

reviewing/approval of laws from the parliament.

Ministry of Youth Affairs to share holding of youth festival with Ministry of

Page 278: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

266

Narcotics Control.

The Youth Policy 2009 be placed at the website of Ministry of Narcotics

Control.

Ministry of Sports to provide list of 7 sports facilities completed at

Islamabad.

Ministry of Narcotics Control (PMU) and UNODC to jointly visit the

completed projects.

Page 279: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

267

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

National Narcotics Control Committee

(NNCC)

Page 280: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

268

Page 281: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

269

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

NATIONAL NARCOTICS CONTROL COMMITTEE (NNCC)

A meeting of the National Narcotics Control Committee (NNCC) was held under the

chairmanship of Secretary, Narcotics Control Division, on 30th December, 2010 in

the Committee Room of the Ministry of Narcotics Control, Islamabad.

2. The Secretary, Narcotics Control Division (NCD), after welcoming the

participants informed that Ministry of Narcotics Control (PMU) has developed a

video to create awareness against drug abuse. The video titled “Tell Me Why” was

displayed. After this, the chair informed the participants that National Anti

Narcotics Policy 2010 approved by the Cabinet is based on three pronged strategy

i.e. Drug Supply Reduction, Drug Demand Reduction and International

Cooperation. It was informed that concerted efforts by all stakeholders including

federal and provincial governments are required to save our generations from drug

menace. The chair highlighted the importance of better coordination among all

stakeholders including law enforcement and intelligence agencies. The

constitution of ‘Inter-Agency Task Force on Narcotics Control’, ‘Provincial Narcotics

Control Committees’ and ‘District Narcotics Control Cells’ will be important to

achieve desired objectives.

3. The Secretary Narcotics Control Division also shared the steps taken for

enhancing international cooperation and impressed upon all stakeholders to

prepare short, medium & long-term development projects in the fields of drug

demand and supply reduction, creating mass awareness against drugs, treatment

and rehabilitation of drug addicts etc. Ministry of Narcotics Control (PMU) can

facilitate all concerned in preparation of development projects. It was informed

that Federal Government has launched a Project titled “Drug free City Lahore” in

collaboration with the Punjab Government. The chair encouraged the Provincial

Governments to prepare similar projects.

4. Director General, Anti Narcotics Force (ANF), stressed the need for

community participation to eradicate drug abuse. He highlighted the role and

efforts of ANF in combating this menace and informed that ANF has seized

significant amount of hashish, heroin, morphine and charas etc. Pakistan is among

the top 3 countries where confiscation rate, seizure of narcotic drugs and

Page 282: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

270

precursor chemicals is high. He informed that FATA is now accessible and

operations have already been carried out by ANF.

5. The Director General, Planning & Monitoring Unit, Ministry of Narcotics

Control informed that different surveys have revealed that 65% of the total

number of drug addicts in Pakistan fall within the age group of 15 to 30 years and

one person in each minute is being added to the community of addicts. Keeping in

view the severity of the problem all concerned have to play a vital role to manage

drug demand reduction. The following major issues were identified for

consideration:

• Review the curriculum/environment of schools and colleges to discourage

the use of drugs among students and teachers.

• Promote extra-curricular activities i.e sports, seminars, special lectures and

debates to create awareness against drug abuse.

• Provide incentives to writers, poets and cartoonists to highlight ill effects of

drug abuse.

• Prepare an action plan 2010-11 by Ministry of Interior to implement

National Anti Narcotics Policy-2010.

• Implementation of supply reduction strategies through Law Enforcement

Agencies.

• Promoting drug free culture in prisons and make Adyala Jail as model for

treatment of addict prisoners.

• Monitor the import and use of prohibited precursor chemicals.

• Public awareness strategies against drug abuse both at print and electronic

media.

• Mobilize women within the community to participate in the social

movement against drugs.

• Separate wards for treatment of drug addicts in government hospitals and

placement of Model Addiction, Treatment and Rehabilitation Center

(MATRC) and IDU project located in Quetta at social security hospital.

• Enhancing role of “Quality Control Board” and Chief Drug Inspectors to

ensure the purchase of psychotropic medicines as per doctor’s prescription.

Page 283: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

271

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

• Registration of Drug Treatment Centers being operated by federal and

provincial governments, private sector and NGOs.

The Chair requested the participants to favour with their views on the issues

identified by Ministry of Narcotics Control. The following are the views of the

participants:-

Government of Punjab

Support initiatives taken by the Ministry of Narcotics Control to address

drug demand reduction.

The meeting of the Provincial Narcotics Control Committee was held on 29-

10-2010 to finalize the targets.

Government of Punjab does not have organizational structure and

infrastructure to handle drug abuse and needs support of Ministry of

Narcotics Control to undertake the activities.

Government of Punjab has nominated Secretary Excise and Taxation as a

focal person to coordinate the drug related activities.

Government of Punjab needs training in investigation and prosecution.

Government of Sindh

Government of Sindh like Punjab does not have organizational structure

and infrastructure for handling drug related issues.

Government of Sindh will nominate a focal person with the approval of

Chief Secretary.

Government of Sindh to investigate poppy cultivation in the border areas of

Sindh and Balochistan.

The Government of Sindh to arrange a meeting under the chairmanship of

Chief Secretary to identify the focal department/person and capacity

building of LEAs and finalize quantifiable targets to control drug abuse..

Government of KPK

Government of KPK has allocated 120 beds in 11 hospitals for the

treatment of drug addicts and Health Regulatory Authority has been

established to manage drug related issues.

Page 284: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

272

Appropriate actions are being taken to destroy poppy cultivation in

Malakand and Kala Dhaka.

2% of the development budget is allocated for creation of sports facilities in

KPK. Government of KPK has developed 7 sports complexes and is

organizing National games to involve youth in healthy activities. The

allocated budget for sports cannot be re-appropriated.

Government of KPK to nominate a focal person in consultation with Chief

Secretary.

Government of Balochistan

Government of Balochistan lacks human resources and experiencing

financial constraints to implement the policy.

The proposal of locating MATRC Quetta alongwith IDU project at social

security hospital, Government of Balochistan, was supported.

Government of Gilgit Baltistan

Support the initiatives taken by the Federal Government to control drug

abuse.

The representatives of Ministry of Narcotics Control and UNODC to visit

Gilgit Baltistan to facilitate implementation of National Anti Narcotics Policy

2010.

Government of AJK

The Government of AJK has allocated 10 beds in two hospitals at

Muzaffarabad for treatment of addicts.

The focal department and person will be communicated with the approval

of Chief Secretary.

Ministry of Health

Provincial Governments to prepare drug control master plans to facilitate

implementation of Anti Narcotics Policy 2010.

Provincial Governments to provide clinical and enforcement training to

facilitate operation of drug addicted wards.

Page 285: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

273

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Ministry of Women Development

The Ministry of Women Development is not implementing any

development project for the drug addicted women. However, it needs help

from Ministry of Narcotics Control for its preparation/implementation.

Ministry of Religious Affairs

Ulema can play an important role in disseminating of messages against

drug abuse.

Ministry of Narcotics Control can communicate its messages against drug

abuse at Seerat Conference being organized by the Ministry of Religious

Affairs.

Ministry of Interior

Ministry of Interior agreed to prepare an action plan on capacity building of

LEAs on priority basis.

Ministry of Education

The education policy approved by the Cabinet includes school health and

safety concept. The Provincial Governments to prioritize teachers training.

The Government schools are directed to allocate two periods each week for

sports and daily one period for PT.

Ministry of Narcotics Control should participate in knowledge festival being

organized at Islamabad from 21st to 28th January 2011 to create awareness

against drug abuse.

Ministry of Commerce

Ministry of Commerce is monitoring import/export of precursor chemicals.

Ministry of Information

Ministry of Information to facilitate Ministry of Narcotics Control in

disseminating information against drug abuse.

Page 286: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

274

Ministry of Railway

Identification of land for developing sports facilities is in progress. Ministry

of Narcotics Control to be informed shortly.

Ministry of Narcotics Control to train doctors and paramedical staff for

treatment of drug addicts.

DECISIONS

1. All stakeholders (federal and provincial governments) to nominate focal

persons to handle the matters relating to drug abuse in two weeks.

2. Provinces to hold meetings of Provincial Narcotics Control Committees by

10th January, 2011.

3. Ministry of Narcotics Control (PMU) to provide training/guidance for

preparation of development projects relating to drug addicts treatment,

rehabilitation and awareness to all concerned.

4. The Ministry of Health and Provincial Governments to establish separate

wards for drug addicts as per Anti Narcotics Policy 2010 approved by the

Cabinet on priority basis.

5. Each Provincial Government to nominate 10 doctors for clinical training of

drug addicts by 10th January, 2011 to Ministry of Narcotics Control.

Similarly Government of AJK, Gilgit Baltistan and Pakistan Railways to

nominate 5 doctors for participation in the training programme.

6. Provincial Governments to identify sports needs for the youth to be

addressed by UNODC.

7. Ministry of Narcotics Control (PMU), ANF and Government of Balochistan

to finalize the modalities for locating MATRC and IDU Quetta at social

security hospital.

8. Ministry of Narcotics Control (PMU) and UNODC to visit Gilgit Baltistan to

facilitate creation of drug related activities.

9. Provinces to implement SOP’s for treatment of addicts in all the Public and

Private Hospitals.

Page 287: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

275

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

10. Ministry of Religious Affairs to prepare a hand bill based on Islamic

teachings for its printing by Ministry of Narcotics Control and distribution to

Madaras by Ministry of Religious Affairs.

11. Ministry of Interior to finalize the action plan by 30th January, 2011 to

address drug supply reduction.

12. Ministry of Interior to prepare proposal for capacity building of Police to be

financed by the UNODC.

13. Ministry of Narcotics Control to notify a Task Force on curriculum to

identify gaps.

14. ANF to immediately prepare a plan for participation in the knowledge

festival being organized by Ministry of Education at Islamabad.

15. Ministry of Commerce to ensure that strict precursor control regime is

followed in the Afghan trade agreement.

16. Ministry of Information to ensure telecast/print of the public service

messages on drug abuse as corporate responsibility.

17. Ministry of Narcotics Control/ANF to provide material for creating

awareness at railway stations and passenger coaches.

Page 288: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

276

Page 289: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

277

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Drugs Awareness Campaigns

Page 290: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

278

Page 291: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

279

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Campaign at Islamabad

Page 292: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

280

Page 293: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

281

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

MASS AWARENESS CAMPAIGN AGAINST DRUG ABUSE AT ISLAMABAD

Ministry of Narcotics Control started a mass awareness campaign against drugs at

Islamabad financed by the National Fund on Narcotics. The awareness was

undertaken in collaboration with Peoples Sustainable Development Programme. As

a part of awareness campaign a series of lectures/discussions were arranged at

Educational Institutions of Islamabad. The speakers of the Peoples Sustainable

Development Programme (PSDP) delivered lectures on different aspects of drugs in

the following educational institutions:

Imperial International College F-10 Islamabad

Islamabad College of Arts and Sciences G-11 Islamabad

Federal Government Girls Secondary School Saidpur Islamabad

Federal Government Boys Secondary School Saidpur Islamabad

AASAS International School F-8 Islamabad

PAF Finishing School, Islamabad

Islamabad Science School and College F-11 Islamabad

Federal Government Boys Secondary School Barakahu Islamabad

The University of Lahore

Iqra University Islamabad

Bahria University Islamabad

Mohammad Ali Jinnah University Islamabad

Comsats Institute of Information Technology Islamabad

International Islamic University Islamabad

Quaid –e- Azam University Islamabad

The lectures include a documentary highlighting the types of drugs and addicts’

lives. The presenters explained how easy it is to be an addict in our society.

Statistical facts about the ratio of addicts were also part of the presentation. The

different types of drugs and its use by addicts were also discussed. Students

actively participated in the discussions in exploring the harmful effects of drugs on

the addict as well as on the society. Activities like drawing pictures, essay/poem

writing, slogan competition and questionnaire were part of the programme.

Students actively participated in all activities and volunteered to take part in

awareness campaign.

Page 294: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

282

Pictures of the Drugs Awareness Campaign at Imperial International College

Islamabad

Drawing activity

Essay/Poem writing activity

Page 295: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

283

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of the Drugs Awareness Campaign at Islamabad College of Arts and Sciences G-11, Islamabad on 22nd November 2010

Students attending the lecture during the campaign at ICAS G-11, Islamabad

Drawing activity

Page 296: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

284

Pictures of the Drugs Awareness Campaign at Islamabad College of Arts and Sciences G-11, Islamabad on 22nd November 2010

A Student participating in discussion

Essay/Poem writing activity

Page 297: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

285

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of the Drugs Awareness Campaign at Federal Government Girls Secondary School Saidpur, Islamabad on 24th November 2010

Students attending the lecture during the campaign at Federal Government Girls Secondary

School Saidpur, Islamabad

Drawing activity

Page 298: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

286

Pictures of the Drugs Awareness Campaign at Federal Government Boys Secondary School Saidpur, Islamabad on 24th November 2010

Students attending the lecture during the campaign at Federal Government Boys Secondary

School Saidpur, Islamabad

Drawing activity

Page 299: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

287

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of the Drugs Awareness Campaign at ASAS International School F-8, Islamabad on 25th November 2010

Students attending the lecture during the campaign at ASAS International School F-8,

Islamabad

Essay/Poem writing activity

Page 300: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

288

Pictures of the Drugs Awareness Campaign at ASAS International School F-8, Islamabad on 25th November 2010

Drawing activity

Drawing activity

Page 301: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

289

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of the Drugs Awareness Campaign at Islamabad Science School and College F-11 Islamabad on 25th November 2010

Students attending the lecture during the campaign at Islamabad Science School and College F-11 Islamabad

Drawing activity

Page 302: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

290

Pictures of the Drugs Awareness Campaign at Islamabad Science School and College F-11 Islamabad on 25th November 2010

Drawing activity

Lecture Delivered during the campaign at Islamabad Science School and College F-11 Islamabad

Page 303: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

291

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of the Drugs Awareness Campaign at Federal Government Boys Secondary School Barakahu, Islamabad on 13th December 2010

Students of the school attending the Drugs Awareness Lecture

Volunteer students of the F.G Boys Secondary School Barakahu, Islamabad

Page 304: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

292

Pictures of the Drugs Awareness Campaign at The Lahore University Islamabad on 6th December 2010

Students attending the lecture during the campaign

Speaker from PSDP delivering Drugs Awareness lecture

Page 305: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

293

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of the Drugs Awareness Campaign at The Lahore University Islamabad on 6th December 2010

Students attending the lecture during the campaign

Drawing Competition among the students

Page 306: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

294

Pictures of the Drugs Awareness Campaign at Iqra University Islamabad on 9th December 2010

Slogans written by the students of IQRA University

Page 307: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

295

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of the Drugs Awareness Campaign at Iqra University Islamabad on 9th December 2010

Paintings by the students of IQRA University Islamabad

Paintings by the students of IQRA University Islamabad

Page 308: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

296

Pictures of the Drugs Awareness Campaign at Iqra University Islamabad on 9th December 2010

Students attending the lecture

Volunteer Students of the IQRA University Islamabad

Page 309: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

297

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of the Drugs Awareness Campaign at Bahria University Islamabad on 10th December 2010

Speaker from the Peoples Sustainable Development Programme delivering Drugs Awareness Lecture

Students of the Bahria University attending the Drugs Awareness lecture

Page 310: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

298

Pictures of the Drugs Awareness Campaign at Bahria University Islamabad on 10th December 2010

DG Mr. Mohammad Shahid (PMU) Ministry of Narcotics Control along with Mr. Agha Sabah Ul Hassan from Anti Narcotics Force attending the Campaign’s awareness lecture

DG Mr. Mohammad Shahid (PMU) Ministry of Narcotics Control, sensitizing the issue with his thoughts

Page 311: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

299

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of the Drugs Awareness Campaign at Bahria University Islamabad on 10th December 2010

Students of the Bahria University Islamabad participated in drawing Competition

Essay/Poem writing competition among the students

Page 312: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

300

Pictures of the Drugs Awareness Campaign at Bahria University Islamabad on 10th December 2010

The Director of Bahria University appreciating the initiative taken by the Ministry of Narcotics Control for creating awareness about Drugs for the Youth

Volunteer Students of the Bahria University Islamabad

Page 313: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

301

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of the Drugs Awareness Campaign at Comsats Institute of Information Technology Islamabad on 22nd December 2010

Speaker from the Peoples Sustainable Development Programme delivering Lecture

Students attending the Drugs Awareness lecture

Page 314: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

302

Pictures of the Drugs Awareness Campaign at Comsats Institute of Information Technology Islamabad on 22nd December 2010

Students attending the Drugs Awareness lecture

Volunteer Students of Comsats Institue of Information Technology Islamabad

Page 315: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

303

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of Steamers and Banners displayed during the Mass Awareness

Campaign at different locations of Islamabad

Displaying of Steamers and Banners:

Steamers and Banners against drugs and to promote healthy life were also part of

this mass awareness campaign. The steamers and banners were displayed at the

following locations of Islamabad from 23rd November 2010 to 25th November 2010

and from 14th December to 16th December 2010.

Sector F-6 Islamabad

Sector F-8 Islamabad

Sector F-10 Islamabad

Sector F-11 Islamabad

Abpara Market

Pak Secretariat towards Sector F-6 Islamabad

Serena Hotel towards Islamabad Club

Zero point towards Jinnah Avenue Underpass

Karal Chowk towards Islamabad Airport

Steamers displayed in at Karal Chowk near Islamabad Airport

Page 316: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

304

Pictures of Steamers and Banners displayed during the Mass Awareness

Campaign at different locations of Islamabad

Banner Displayed near Abpara Market Islamabad

Steamers Displayed in a chowk in front of the Convention Center Islamabad

Page 317: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

305

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of Steamers and Banners displayed during the Mass Awareness

Campaign at different locations of Islamabad

Steamers Displayed in front of the Serena Hotel Islamabad

Steamers Displayed near Dhokari Chowk Islamabad

Page 318: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

306

Pictures of Steamers and Banners displayed during the Mass Awareness

Campaign at different locations of Islamabad

Steamers displayed near F-6 Super market Islamabad

Steamers displayed at School Road F-6 Super Market Islamabad

Page 319: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

307

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of Steamers and Banners displayed during the Mass Awareness

Campaign at different locations of Islamabad

Steamers displayed at F-8 markaz Islamabad

Steamers displayed at F-8 markaz Islamabad

Page 320: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

308

Pictures of Steamers and Banners displayed during the Mass Awareness

Campaign at different locations of Islamabad

Steamers displayed at Mcdonal Chowk F-10 Islamabad

Steamers displayed at F-10 Islamabad

Page 321: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

309

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of Steamers and Banners displayed during the Mass Awareness

Campaign at different locations of Islamabad

Steamers at F-11 Islamabad

Steamers at F-11 Islamabad

Page 322: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

310

Pictures of Steamers and Banners displayed during the Mass Awareness

Campaign at different locations of Islamabad

Steamers displayed at the Pak-Secritariat Chowk Islamabad

Steamers at a road towards Pak-Secritariat near Marriot Hotel

Page 323: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

311

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of Steamers and Banners displayed during the Mass Awareness

Campaign at different locations of Islamabad

Steamers at the Jinnah Avenue Underpass Islamabad

Banners Displayed at the Jinnah Avenue Underpass Islamabad

Page 324: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

312

Pictures of Pamphlets and Handbills distributed during the Mass Awareness

Campaign at different locations of Islamabad

Pamphlets for distribution at stalls of different products

Member of the Peoples Sustainable Development Programme distributing Pamphlets

Page 325: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

313

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of Pamphlets and Handbills distributed during the Mass Awareness

Campaign at different locations of Islamabad

Member of the Peoples Sustainable Development Programme distributing Pamphlets among families

Attendees displaying the Pamphlets they received

Page 326: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

314

Pictures of Pamphlets and Handbills distributed during the Mass Awareness

Campaign at different locations of Islamabad

Young generation showing their interest in the campaign

Volunteer students for the Handbills distribution campaign

Page 327: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

315

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of Pamphlets and Handbills distributed during the Mass Awareness

Campaign at different locations of Islamabad

Distribution of Handbills at F-6 Islamabad

Distribution of Handbills near Parliament House Islamabad

Page 328: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

316

Pictures of Pamphlets and Handbills distributed during the Mass Awareness

Campaign at different locations of Islamabad

Distribution of Handbills at Marriot Hotel Islamabad

Appreciating the awareness message of the campaign

Page 329: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

317

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of the Award Distribution Ceremony in the International Islamic

University Islamabad on 23rd December 2010

Minister for Narcotics Control Division, Mr Arbab Muhammad Zahir along with Joint Secretay NCD, Director General (PMU) and Rector International Islamic University attending the Drugs

Awareness Lecture

Minister for Narcotics Control Division Mr. Arbab Muhammad Zahir sharing his views in his

speech with the students of International Islamic University

Page 330: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

318

Pictures of the Award Distribution Ceremony in the International Islamic

University Islamabad on 23rd December 2010

Minister for Narcotics Control Division distributing award to the participants of the Mass

Awareness Campaign in Islamabad

Minister for Narcotics Control Division distributing award to the participants of the Mass

Awareness Campaign in Islamabad

Page 331: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

319

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Campaign at Lahore

Page 332: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

320

Page 333: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

321

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

MASS AWARENESS CAMPAIGN AGAINST DRUG ABUSE AT ISLAMABAD

The awareness campaign was undertaken at Lahore in collaboration with Phoenix

Foundation for Research and Development. As part of awareness Campaign a

series of lectures/discussions were arranged at the following educational

institutions of Lahore:

1. Govt. Practicing Girls High School, Township Lahore

2. Chaudry Rehmat Ali School Sadiq Chowk

3. Govt. Islamia High School for Boys, Khazana Gate Lahore

4. Grand Charter School Link Road, Model Town (Boys)

5. Grand Charter School Link Road, Model Town (Girls)

6. Govt. Madre Millat School, Masjid Chowk, Green Town

7. Govt. Muslim High School No 2, Civil Lines, Lahore

8. Govt. Saleem Model High School, Lower Mall

9. City District Government Boys High School Islampura

10. Govt. Central Model High School Saman, Lahore

11. Govt. Chuburji Garden High School

12. Govt. New Model Girls High School, Dev Samaj Road, Lahore

13. Eagle Education House, Main Boulevard, Gulshan e Ravi

14. Sky Bird Grammar School, Saman Abad

15. Govt. High School for Girls Sanat Nagar, Lahore

16. Government Central Model School, Ratigun Road

17. Qazi Grammer High School

18. The Noble Rasheed Public School

19. Al Mustafa High School for Girls

20. Govt Islamia High School, Sanat Nagar, Lahore

21. Govt. Higher Secondary School For Girls, Dev Samaj Road, Lahore

22. Govt. Girls High School, Walton Road, Lahore

23. City District Govt. High School Walton Gulberge III

24. Al Mustafa High School, for Boys, Chungi Amar Sidhu

25. New Quaid High School

26. M. A Raoof Public School, Singh Pura Lahore

27. M. A Raoof Public School, Wandala Road, Shahdra Lahore

28. The Educator, Sehar Campus, Wahdat Road

29. The Educator, Sehar Campus, Shadbagh

30. The Educator, Sehar Campus, Batapur

Page 334: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

322

Pictures of the Drugs Awareness Lectures delivered in the educational

institutions of Lahore

Students attending the drugs awareness lecture session

Students participating in slogan writing activity during the awareness campaign

Page 335: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

323

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of the Drugs Awareness Lectures delivered in the educational

institutions of Lahore

Students attending the drugs awareness lecture session

Lecture delivered by the speaker from the Phoenix Foundation for Research and

Development

Page 336: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

324

Pictures of the distribution of Handbills in Lahore

Distribution of Handbills

Distributing Handbills on the road

Page 337: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

325

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of the distribution of Handbills in Lahore

Distributing Handbills on the road

Distribution of Handbill among children

Page 338: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

326

Pictures of the award and certificate giving ceremony in Lahore

Chief guest Mr. Altaf Qamar, DDG ANF giving certificate to participant students

Chief guest Mr. Altaf Qamar, DDG ANF giving medal to participant student

Page 339: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

327

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures of Posters made by students from Lahore

Poster made by a student

Poster made by a student for the poster making competition

Page 340: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

328

Page 341: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

329

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Campaign at Faisalabad

Page 342: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

330

Page 343: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

331

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

VISIT TO FAISALABAD CITY

The total population of Faisalabad city is about 7 million out of which about 10,000

people are Drug addicts and are mainly residing in Ghulam Muhammad Abad,

Saman Abad, Allama Iqbal Colony, Dhaddi Wala, Mansoor Abad, Nishatabad,

Christian Towns ( Waris Pura and Model Town). These addicts are taking Heroin,

Opium, Charas and now shifting to innovative drugs like Sheessa, Gru pan, Naswar

and Sammad bond. In 1985 government established a detoxification ward in DHQ

Hospital Faisalabad. Since then approximately 8005 patients have been detoxified

and 195 Drug abuse awareness seminars, 20 walks, 22 medical camps and 960

video films have been played.

It was informed that that 90% of drug peddlers are beggars. The district

government is hitting hard and has succeeded in eradicating beggars from the city

which has also resulted in decrease in supply of the drugs.

In public awareness, currently district government is involved in activities which

are as follows.

Banners

Flexes, hand Bills(Through daily Dry Bakery products)

Stickers

Electronic and Print Media

Talk Shows

The city administration has mainly focused educational sector to disseminate drug

abuse information among the masses. In this regard, the following activities are

being undertaken.

Speech Contests

Poster Competitions

Awareness sessions for Teachers

Stage Dramas

Skits by Children

Page 344: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

332

Students who secure 1st, 2nd and 3rd position in above mentioned competitions will

be awarded Rs. 100,000/- , 50,000/- and 25,000/- respectively and out of which

50% amount will go to the allied teacher. Simultaneously, the name and picture of

the student standing first will be displayed on 30x60 billboards in various chowks

of the city. All the above mentioned activities are being sponsored by the

community under the supervision of DCO.

The government institutions which are actively participating in removing this

menace from the society are

Punjab Police

ANF Police Station

Excise and Taxation Department

Police is helping District Government in raiding the paddlers in the above

mentioned areas of the city. Citizens have been provided with a toll free number to

give information about the peddlers and the number has been disseminated

among the masses and it has been assured that once information has been

provided, the law enforcement agencies will not contact him again, and only act

upon the information provided.

DCO added that at this moment following treatment and rehabilitation center

working in Faisalabad.

Fatima Ward DHQ Hospital

Surayya Majeed(Trust ) Hospital

Private Hospitals

NGOs / Civil Societies

Owner of Surayya Majeed Trust wants to donate hospital to District Government

for detoxification purpose and district government is confident to provide all

necessary supplies from its own resources .i.e. donations from community

Page 345: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

333

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Recommendations

The Director General (M&E) appreciated the steps taken by District Government in

eradicating drugs from Faisalabad and stated that Ministry of Narcotics Control

fully support the city Government initiatives. The following recommendations are

being made to accelerate the awareness campaigns.

i. Federal Government (Ministry of Narcotics Control) will provide funds of

approx Rs.120,000/- to District Government to hire a professional for preparing

the SOPs under the supervision of DCO for the initiatives undertaken by city

Government.

ii. ANF to direct ANF, Police Station Faisalabad to work in close coordination with

the District Government to effectively control drug paddlers.

iii. All the activities in Faisalabad are being undertaken with Public support. City

Government does not need any finances from the Government to create

awareness. MoNC therefore may not involve any NGO at Faisalabad in creating

awareness.

Page 346: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

334

Page 347: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

335

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Visit to Pakistan Sports Complex

Islamabad

Page 348: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

336

Page 349: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

337

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

PAKISTAN SPORTS COMPLEX VISIT

The Pakistan Sports Board was visited by DG (PMU) Ministry of Narcotics Control,

along with Dr. Nadeem UNODC visited Pakistan Sports Board (PSB) on Friday 3rd

December, 2010. The Director PSB along with his team arranged a visit to main

facilities at sports complex Islamabad. These facilities include Jogging track, GYM for

professional players, Liaquat gymnasium, Hameedi Hall along with sports medical

center.

The facilities created by Pakistan Sports Board are of international standard and

Pakistani players participating in the international events are provided final training at

these facilities. The Director PSB informed that these facilities are confined to the

national players only. The Director informed that Public is allowed to use facilities

relating to Tennis, Badminton, and Swimming etc. The educational Institutions from

all over Pakistan are allowed to hold tournaments at Sports Complex.

The visit to Sports Complex Islamabad facilities revealed that the facilities created at

PSB can be utilized for holding tournaments The matter was discussed with the

officials of PSB and subsequently with Dr. Fazal ur Rehman President Islamabad

Football Association and UNODC (Dr. Nadeem). On the basis of consultations it is

proposed to arrange a football tournament at Islamabad with the following salient

features. The tournament will be named Drug Free Islamabad Football Championship.

The Duration of the tournament will be 15-20 days.

34 teams of Islamabad will participate in the tournament.

Initially the matches will be arranged at football grounds of different sectors

of Islamabad

Each team consisting of 20 players. These players will be provided a uniform

kit displaying Drugs related Logo like” We are safe, we are Drug Free”

The semi final /final can be arranged at Sports Complex Islamabad or any

agreed ground.

Islamabad football Association will arrange the tournament on behalf of

Ministry of Narcotics Control.

The banners used for awareness Campaign will be displayed at the grounds at

the day of tournament.

The opening and closing ceremony is proposed to be impressive and media

Page 350: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

338

will be Invited to the ceremonies.

The Drug free Islamabad Cup will be awarded to 1st 2nd and 3rd position holder

team. Shields will be presented to other concerned

The estimated cost of the tournament will be around Rs.600,000/-. Dr. Nadeem of

UNODC also supported the proposal and proposed to hold these events periodically.

The tournament can either be financed by UNODC or by the Ministry of Narcotics

Control from Narcotics Fund.

Pakistan Sports Board has also developed a sports Medical center. This medical

center contains latest machines for physiotherapy of the players. It was observed that

while Medical Center has a pathology lab, it lacks Radiology facilities. The MATRC

Islamabad has a portable X-Ray machine which has not been utilized for the last five

years. Monitoring undertaken by MONC suggested that either X-ray machine be

utilized or gifted to needy Institution. The ANF has informed that there is no provision

of technical staff in the PC-I to operate this machine. In view of the above it is

proposed that portable X-Ray machine be gifted to PSB medical center. This will not

only be a contribution by Ministry of Narcotics Control to PSB but will also empower

the medical center to undertake X-Rays of the injured players.

Submissions

The proposal relating to “Drug Free Islamabad Football Championship” and gifting of

“Portable XC-Ray” machine to Medical Center Pakistan Sports board may kindly be

approved.

Page 351: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

339

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures Pakistan Sports Complex Islamabad

GYM for National and International Players

GYM for National and International Players

Page 352: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

340

Pictures Pakistan Sports Complex Islamabad

GYM for National and International Players

Liaquat Gymnasium for National and International Indoor Games

Page 353: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

341

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures Pakistan Sports Complex Islamabad

Hameedi Hall Multipurpose Court

Multipurpose Ground at Pakistan Sports Complex

Page 354: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

342

Pictures Pakistan Sports Complex Islamabad

Football and Hockey Ground

Lawn Tennis Courts

Page 355: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

343

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Pictures Pakistan Sports Complex Islamabad

Sports Medical Center

Physiotherapy and Exercise Machines

Page 356: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

344

Pictures Pakistan Sports Complex Islamabad

Pathology Lab

Lowe Limbs and Whole body BTL

Page 357: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

345

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Meetings with NGOs

Page 358: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

346

Page 359: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

347

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

MEETING WITH NGOs AT QUETTA

A meeting with N.G.O’s involved in drug related issues in Baluchistan was held on

19-08-2010 at ANF office Quetta. The basic objective of the meeting was to

introduce the induction of Project Management Unit in the Ministry of Narcotics

Control and review the activities of N.G.O’s in Baluchistan.

2. The participants were informed that Ministry of Narcotics Control has

developed a Master Plan (2010-14) and Narcotics Control Policy to address matters

relating to supply and demand reduction of drugs and seek more international

cooperation to curb its supply and trading.

3. Nine NGO’s involved in treatment, awareness and sports activities

participated in the meeting. The following are the main activities of the N.G.O’s:-

Three NGO’s are involved in treatment of addicts. Two NGO’s are charging

to the addicts and one is providing free of cost treatment. The charges

from the patients vary from Rs.6000 to Rs.12000. One NGO has involved

local shopkeepers in financing the treatment of addicts. Each shopkeeper /

Businessman is contributing a fixed amount per month for treatment of

addicts. The other source of income is skin of goats etc collected at Eid-ul-

Azha.

Three NGO’s involved in awareness campaign are arranging walks, quiz

competition, drama’s etc. They are mainly dependent on the financing by

the Government and donors.

Three NGO’s are arranging sports events like karate and cricket matches.

The financing of these events is also dependent on Government and

donors.

4. The participants informed that relapse cases vary from 70 to 90 percent of

the treated patients. The main reasons are the easy availability of drugs, behavior

of the family towards addict after treatment and rejoining the old friends involved

in drugs etc. It was agreed that prevention and creating awareness among

vulnerable groups is the key to eliminate use of drugs. The participants also

agreed that walk, quiz competition, dramas etc are traditional ways of creating

awareness. A need was therefore felt to introduce new initiatives to create

awareness. The ideas like helpline, establishment of control room by law enforcing

agencies, Rapid Force and improved policing prepared by the Director General

Ministry of Narcotics Control were appreciated and recommended for

consideration. The participants appreciated the initiatives of Ministry of Narcotics

control in involving NGO’s in reviewing the Anti Narcotics initiatives of the

Government of Pakistan.

5. The Chief Executive of MILO Shaheed Trust shared the statistical data of

9685 treated patients from September 1989 to December 2009. It reveals that

99.8% of the treated patients are male. The main characteristics of the treated

Page 360: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

348

patients are as follows:

Gender Distribution of Addicts:

Tribe Percentage Share

Pakhtoon 37.71

Baloch 18.87

Afghan 15.12

Punjabi 10.02

Sindhi 5.33

Others 12.95

Educational Qualification of Addicts:

Educational Qualification Percentage Share

Illiterate 46.79

Primary 19.44

Middle 12.98

Matric 11.60

Intermediate 5.12

Graduate and Other 4.06

Occupation wise Addicts:

Occupation Percentage Share

Unemployed 43.61

Skilled 16.05

Labourer 13.59

Government Servant 11.10

Businessmen 8.33

Zamindars 5.52

Page 361: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

349

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Students 1.27

Others 0.52

Age Group wise Addicts:

Age (Years) Percentage Share

15-20 9.95

21-30 51.33

31-40 26.73

41-50 9.30

Others 3.20

Marital Status Addicts:

Marital Status Percentage Share

Married 54.72

Single 45.00

Others 0.28

Drug wise Addicts:

Drug Percentage Share

Heroin 79.72

Hashish 10.86

Opium 6.43

Tranquilizer 2.25

Others 0.73

Administration of drugs:

Drug Administration Percentage Share

Panni 77.48

Page 362: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

350

Smoking 15.03

Oral 3.26

Injection 3.37

Others 0.86

Analysis:

The analysis reveals that in Baluchistan 66.23% of the drug addicts are illerate or

educated up to primary level. They are either Pakhtoon or Baloch. Majority of

them are unemployed and fall under age group of 21 to 40 years. Most of them are

married and are taking Heroin or Hashish mainly through Panni.

Recommendations:

Needs to develop awareness campaign for unemployed and illiterate

population of the Province.

Consider provision of assured jobs by C&W Department, Government of

Baluchistan for 100 days a year as a Social Safety Net measure to the

unemployed, unskilled labor of Baluchistan.

Ministry of Narcotics Control to develop a periodic screening process of

NGO’s to ensure participation of effective NGO’s selected for involvement

in creating awareness.

Ministry of Narcotics control to hold periodical regional meeting with

NGO’s to seek feedback of different initiatives of the Ministry.

ANF to share all the data of registered NGO’s with the Ministry of Narcotics

control for review and screening.

The performance of each NGO be reviewed on the basis of information

provided by NGO. The NGO performing the best be awarded with the

award titled “NGO of the quarter”. The achievements of NGO will be

placed on the web site of Ministry of Narcotics control for three months.

The payment of cash prize can also be considered.

Page 363: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

351

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

MEETING WITH NGOs AT ISLAMABAD

A meeting under the Chairmanship of Director General (M&E), Ministry of

Narcotics Control was held on 02-09-2010. The basic objective was to introduce

the induction of Project Management Unit in the Ministry of Narcotics Control and

review the activities of NGO’s in Islamabad/Rawalpindi.

The participants were informed that Ministry of Narcotics Control has developed a

Master Plan 2014 and Narcotics control Policy to address matters relating to supply

and demand reduction of drugs and to seek more international cooperation to

address the abuse. 14 NGOs involved in treatment and awareness activities

participated in the meeting. Following are the main points emerged from the

meeting:-

The participants shared the traditional instruments of creating awareness

i.e. walks, debates, quiz competition sports and musical events etc. It was

informed that Ministry of Narcotics Control is considering few new

initiatives i.e. helpline, control room for law enforcement agencies,

introduction of rapid force, use of print and electronic media for public

service messages photographic competition etc. The participants endorsed

the proposed initiatives.

The NGO’s involved in treatment of addicts proposed that a system of

better communication with families of the addicts have to be developed to

provide social protection to the addicts after its treatment. The

participants proposed that a periodical follow up of the addicts after its

treatment be ensured to help the addicts from relapsing.

The participants were of the view that policing is the most important

element to reduce demand of drugs. It was informed that drugs are easily

available in Islamabad/Rawalpindi. The information being provided by the

addicts needs to be used to take action against those involved in trading of

drugs.

The main source of income of the NGO’s has been stated to be donations

from businessmen/traders and financing arrange by the Government and

donors. It was proposed that the NGO’s performing better be facilitated by

MoNC.

The Director General floated the idea of zoning of the cities and

involvement of elders to keep an eye on the resident of the area to ensure

that the residents do not join the addict’s community. The participants

debated the proposal and suggested that those having leadership qualities

be only involved in the process.

Page 364: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

352

Recommendations:

i) The Ministry of Narcotics Control may develop a pro-activity Policy

to create awareness among masses against use of drugs.

ii) The idea of control room, helpline, rapid force, photographic

competition etc. may be materialized on priority basis.

iii) The performance of NGO’s be reviewed periodically to assess the

effectiveness.

iv) The participant recommended the proposal of involvements of

elders in the campaign against drugs for consideration.

Page 365: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

353

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Colombo Plan Annual Paris Pact

International Cooperation

`

Page 366: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

354

Page 367: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

355

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Colombo Plan

`

Page 368: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

356

Page 369: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

357

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

DRUG PREVENTION BEST PRACTICES

The Regional Conference on Drug Prevention Best Practices was held at Intercontinental Hotel, Hanoi, from 27 September-1 October 2010. 79 delegates from 20 Asia and Pacific countries participated in the conference and shared their prevention practices. The conference was opened by Dato Patricia Yoon-Moi Chia, Secretary General of the Colombo Plan and Pol. Col. Hoang Anh Tuyen, Deputy Director of the Standing Office of Drugs and Crime of Vietnam. The conference had a technical session on Concepts and Strategies on Drug Prevention, three Plenary sessions and three concurrent workshops on Drug Prevention Practices among school children, among youth and in Communities. Delegates from Vietnam, Afghanistan, Thailand and Indonesia shared their best practices in Drug Prevention in community in the Plenary 1 chaired by Mr. Mohammad Shahid, Director General, Ministry of Narcotics Control Pakistan and delegates from Philippines, Singapore, Sri Lanka and Malaysia shared about the Drug Prevention among the Youth in the Plenary 2 chaired by Fr. George K Joseph, director, sumanahali Hospital, Bangalore, India. Three concurrent workshops were held on three different areas of Drug prevention, namely Preventive Drug Education in Schools, Drug prevention in communities and Drug Prevention among the youth. The participants in each workshop got ample chance to share their prevention practices, the effectiveness of each strategy and came out with an action plan best suited to the region. The presentations made by different speakers summarized as under.

REGIONAL CONFERENCE ON DRUG PREVENTION BEST PRACTICES With its foundations in 1950 the Colombo Plan has the aim to promote interest and support for the economic and social development of Asia and the Pacific and also to promote technical cooperation and assist in the sharing and transfer of technology among member countries. Drug Advisory Program (DAP) is one of the basic programs of the Colombo Plan which was launched on 2ng August 1973 in response to the serious drug threat in member countries. DAP initiated the establishment of the National Drug Focal Point in Asian countries. Since 1995, the CPDAP has trained over 12,000 participants in drug demand reduction, such as drug abuse prevention, treatment and rehabilitation, and law enforcement. Drug Prevention principles:

Prevention programs should enhance protective factors and reverse or reduce risk factors

Prevention programs should address all forms of drug abuse, alone or in combination, including the underage use of legal drugs (e.g., tobacco or alcohol); the use of illegal drugs (e.g., marijuana or heroin); and the inappropriate use of legally obtained substances (e.g., inhalants), prescription medications, or over-the-counter drugs.

Family-based prevention programs should enhance family bonding and relationships and include parenting skills; practice in developing, discussing,

Page 370: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

358

and enforcing family policies on substance abuse; and training in drug education and information

Prevention programs for elementary school children should target improving academic and social-emotional learning to address risk factors for drug abuse, such as early aggression, academic failure, and school dropout.

Prevention programs for middle or junior high and high school students should increase academic and social competence with the following skills:

o study habits and academic support; o communication; o peer relationships; o self-efficacy and assertiveness; o drug resistance skills; o reinforcement of antidrug attitudes; and o Strengthening of personal commitments against drug abuse.

Community prevention programs should combine two or more effective programs, such as family-based and school-based programs.

Prevention programs should be long-term with repeated interventions (i.e., booster programs) to reinforce the original prevention goals.

Prevention programs are most effective when they employ interactive techniques, such as peer discussion groups and parent role-playing, that allow for active involvement in learning about drug abuse and reinforcing skills.

Colombo Plan’s Drug Abuse Prevention Best Practices:

Mobilising youths through Youth-to-Youth drug prevention activities: Asian Youth Congresses, and in-country Youth Congresses. (eg. Afghanistan, Pakistan, the Philippines).

Preventive Drug Education in School. o Develop the School-Based Prevention Program manual for teachers o Train a pool of trainers (TOT) for implementation o Implement the School-Based Preventive Drug Education Program

through the Health Science curriculum in Elementary and Middle Schools in Afghanistan.

Counter Narcotics Public Information (CNPI) Campaign in Afghanistan.

Regional Training on Drug Abuse Prevention. o The training to raise the bar of the demand reduction practitioners

in the region. o Participants were give training in school-based prevention,

workplace prevention, community-based prevention, monitoring and evaluation strategies, campaign advocacy and life skills.

Mosque-Based Prevention and Aftercare Program in Afghanistan. o Initiated in 2005, currently 16 centers operational in 15 provinces. o Mullah are tasked to implement prevention, early intervention,

treatment referral and aftercare o 109,578 beneficiaries in 2009.

Pesantren-Based Drug Demand Reduction Program in Indonesia.

Page 371: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

359

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

o The Colombo Plan initiative since 2005, 12 Pesantrens (Islamic boarding schools) in Indonesia were supported with the aim of establishing “Drug Free Communities through Drug Free Pesantrens”.

o Focus on primary prevention, early intervention, aftercare and referral services.

CONCEPT AND STRATEGIES OF DRUG ABUSE PREVENTION

During the period 1960-2000, the number of adolescents and young adults doubled from 284 million to 615 million in Asia. The Asian shift from traditional agriculture toward an industrial, export-based economy showed dramatic changes in young people’s lives. The dramatic changes effects in the rising levels of:

Smoking

Drinking

Drug use

Unprotected sex

Trends in Drug Abuse use:

Age wise downward.

Urban to rural.

Mild to hard drugs.

Higher personal consumption.

Class wise spread.

Sex wise extension.

Prevention Strategies: 1. Information: Knowledge and beliefs about consequences of using

substances and personal beliefs which put one at risk. 2. Pledge: Personal commitment not to use drugs. Taking drugs and alcohol

‘morally wrong’. 3. Values Clarification: Relationship of personal values and consequences of

behaviour. 4. Goal Setting: Teaching skills to set and attain personal goals. Effects of

alcohol / drug behaviour on desired goals. 5. Stress Management: Teaching skills for managing and coping with stress.

Facing psychologically difficult situations. 6. Self Esteem: Individual feelings of self-worth and value. With discussions

and group reinforcement of personal qualities improve self-esteem conducive to resisting “harmful” influences

7. Resistance Skills Training: Teaching students to identify and assertively resist pressure to use substances.

8. Life Skills Training: Skills for communication and gaining social acceptance as well as resolving inter personal problems reduce need to rely on crutches like substances.

9. Norm Setting: Establishing norms regarding use of substance. Correcting erroneous perceptions about the prevalence and acceptability of substance use.

Page 372: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

360

10. Alternatives: Provide experience in activities that are incompatible with substance use. Reduced time of exposure at-risk situations.

11. Assistance Programs:

Intervention

Counseling

Treatment

Rehabilitation

Strategies for different Stages:

Strategy for Green Zone: Primary Prevention: Awareness

Strategy for Amber Zone: Secondary Prevention: Assistance

Strategy for Red Zone: Tertiary Prevention: Rehabilitation

Characteristics of Effective Prevention Programs: 1. Program Comprehensiveness and intensity:

Target multiple systems and multiple strategies

Target whole community

Target all youth

Long term duration

Sufficient quantity for prevention

Integration of prevention activities

Building supportive environment 2. Program Strategies:

Information

Alternatives

Develop life skills

Training of impactors

Change social policy: school, family, communities

3. Program Process:

Sound process of programme planning

Collaborative – key actors involvement

Realistic multiple and measurable goals

Evaluate effectiveness

Flexible and adaptable

Careful marketing

STATEMENT BY DIRECTOR GENERAL MINISTRY OF NARCOTICS CONTROL The Director General Ministry of Narcotics chaired 1st plenary session regarding drug abuse prevention in communities. He shared the initiatives taken by the Government of Pakistan relating to drug demand reduction. It was informed that the production, processing and trading of drug is a major concern in Pakistan. The incident of drug use is experienced in high income group as demonstration affect and low income group on account of depression. The majority of the addicts falls under the age group 15 to 30 years. The reduction in demand for drug can be achieved through:-

Page 373: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

361

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

i) Community mobilization ii) Creating awareness in masses iii) Provision of better environment to the youth. iv) Improvement of working condition of the employees.

2. It was informed that Government of Pakistan has taken following initiatives to address the drug abuse:-

Drug Control Master Plan 2010-14

National Anti Narcotics Policy 2010

UNODC Pakistan Country Programme 201-14 Introduced New initiatives to Mobilize Community

Help Line

Control Room managed by Law enforcement agencies

Zoning of cities, (Lahore to be 1st city)

Public Service Message on media

Use of Print and Electronic Media

Developing S.O.P for treatment of addicts

Linkage between rehabilitation centres and technical training institutes

Provision of 100 days job in a year

Picture and Poster competition

Involvement of NGO’s in awareness campaign

Switched over from activity based financing to performance based rewards

Inclusion of Drugs relate information in curriculum

Declared M/o Narcotics Control as smoking free Ministry

COMMUNITY BASED DRUG PREVENTION IN VIETNAM

With a population of about 86 million Vietnam is the 13th most populous country in the world. The country is divided into 63 administrative units (provinces and cities) with about 600 districts and 11000 communities. Out of the total population there were 146000 drug addicts at the end of the year 2009. 80% of the drug addicts are Heroin addicts. Out of 11000 communities 56% communities have drug users. Since 1997 Drug Control Action/Master Plans have been successfully completed. 3 major pillars of the Drug Control Master Plans are Supply, Demand and Reduction. Drug prevention is always the most important to solve the drug problem. The idea that worked in Vietnam was Community-Based Drug Prevention because drug threat comes from the community and therefore it should be solved by the people in the community. The Community-Based Drug Prevention is sub divided into:

Primary Drug Prevention: which focus on general population to reduce on set of taking drugs.

Secondary Drug Prevention: Aims to the high risk groups.

Treatment and Harm Reduction interventions that deal with drug users.

Page 374: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

362

To perform Anti-drug propaganda and Anti-drug education programs and for the purpose of Drug-Based Prevention activities the first step was the cooperation among relevant agencies, such as Ministry of Culture, Sport, Youth Affairs, Tourism etc. Best Practices for Building up Drug-Free Community Program:

Conducting a drug situation survey.

Integrate cultural and sport events with drug prevention activities.

Giving a specific tasks to each sector, branches.

Allocating financial sources to maintain drug prevention activities.

Instruct mass media agencies to open especially Anti-drug columns, etc.

The “Building up new life style” campaigns.

Anti-Drug promotion speeches.

Signing contract on building up drug free community.

Organize prevention/awareness campaigns in remote areas.

School drug prevention campaigns.

Capacity building training courses for the stakeholders, outreach workers in communities.

Monitoring hot spots to detect drug dealers and timely inform Law Enforcement officers about abnormal behavior of strangers or local people.

The head of the communes, head of the religions, ethnic minorities are good model for the drug control campaigns in the communes.

Campaigns like “Knock each house’s door to detect drug users” should be implemented as it has shown effective way to prevent new drug takers.

Best Practices for Community-Based Treatment Modality:

Detox at commune infirmary.

Define specific persons to help drug users.

Assistance from the local authority through micro credit system so that drug users re-integrate themselves into the community.

Monitoring, assisting drug users in the process of integration a long with the discrimination.

Assign people to assist drug users who completed treatment to prevent relapse.

Achievement:

Drug user prevalence has been under control

The number of drug users in the state-run sectors sharply decreased

The number of drug addicts who are students, teachers are decreasing

Social order, and other harm relating to drug use have been improved

Relapse rate decreases Conclusion:

Drug Prevention is best way to solve drug problem from both cost-effective and durable point

Community – based drug prevention is best way to mobilize all potential efforts of the community

Page 375: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

363

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Role of the civil society and political organization should be seriously considered.

Without the financial sources, capacity building for the community no single anti – drug program can be successful.

COUNTER NARCOTICS PUBLIC INFORMATION CAMPAIGN AFGHANISTAN

Afghanistan’s total area is 647,500 square Kilometers and a population of 30 million with 940,000 drug users recorded in the year 2009. The country is divided into 34 provinces and almost every kind of drug user exists in this country. From the year 2005 to 2009 the users of opium and heroin increased with a percentage of 53% and 140% respectively. For the purpose of controlling the drug problem in the country a national policy strategy was development which is named as the National Drug Control Strategy (NDCS). The national strategy has the following pillars:

Public awareness

Demand reduction

Regional and international cooperation

Alternative livelihoods

Law enforcement

Criminal justice

Eradication

Institutional building

Counter Narcotics Public Information Campaign: Counter Narcotics Public Information Campaign is one of the above pillars of the NDCS. Under the national policy the CNPI Campaign has start working accordingly in 28 provinces of the country with the following effects:

26 Drug treatment and rehabilitation centers and 1-Out reach drop in center.

Mosque based Drug Prevention and Aftercare Centers in 15 provinces of the country.

Drug abuse prevention program in schools of 4 provinces and youths prevention programs.

Shelter for war and violence affected girls and women. The CNPI campaign has three seasons:

Pre-planting (June - September)

Planting (October - December)

Eradication (January – May) The goal of the CNPI campaign is to combine these three separate seasonal campaigns into one continuous Public Information effort, with target messages during the different seasons.

Page 376: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

364

Key Activities of the CNPI Campaign: Outreach Activities:

Provincial Jirga at each province with the participants like Governor, District Governors, Police chiefs, Ulema, elders, farmers, Ministers. They decide to disseminate messages to the different parts of the community.

District Jirga held in 137 targeted districts of the country with participants District administrator, police chief, head of council, head of departments, elders and farmers. Special messages were delivered to specific audience.

Youth, Women, CN Mainstreaming events: ANPI covers all parts of the community: youth (workshops, poem, quiz, drawing competitions, sports), women(workshops, tailoring trainings, handicrafts), farmers(agricultural workshops), elders, police, health workers workshops.

Mass Media Campaign:

Producing and disseminating print materials; posters, pen, note books, school bags, water pot, lunch box, kites, banners, comics books, calendars, shopping bags, Installing billboards in important localities at provinces, etc

Producing and broadcasting radio and television spots and drama series and documentary films.

Achievement:

2007 2008 2009

Poppy Cultivation(hectors) 193000 157000 123000

Poppy Free Provinces 13 18 20

Conclusion:

1. Traditional means of communications is very effective in prevention practices

2. Specific messages should be designed for segments of the population 3. Role of Religious leaders is effective 4. Mass Media Campaigns cover large population.

DRUG ABUSE PREVENTION IN WORKPLACES IN THAILAND

With a population of about 67,070,000, 72000 are drug users in Thailand. Out of 72000 88% users are 18years and above. 3 main causes of drug abuse in workplaces:

1.

fun

2.

Hours, 3.

e.g. workers in construction

i.e.

Page 377: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

365

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Guidelines for drug abuse prevention and control in workplaces: s s

Seek c census

Step V: Plan program action integrating prevention, demand reduction and management.

Step IX: Maintain the standard and continuously inspect the situation Drug abuse in workplaces prevention and control programs of the Government:

o D nd

o Post ing

o a

o all with

o

o To mobilize participation of target populations in positive activities o To promote social reintegration by advocating employers and

employees to give a chance to employees who have drugs abuse problem to undergo treatment and rehabilitation

Two examples of best practice in workplace in Thailand:

SUMITOMO Electric Wiring Systems

Thep Pitak Seafood Company Limited, Pattani Province

Achievements:

SUMITOMO (Thailand) has sustained drugs prevention and control programme for 10 years (2001 – 2010)

“White Factory” certificate from Dept. of Labour Welfare and Protection

Page 378: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

366

Conclusion:

Where drugs are already available, prevention should not and cannot be a stand alone project. Law enforcement on the supply side and treatment and rehabilitation of drugs users are also needed.

Involvement and ownership are key factors for the success and sustainability of the project

Workplaces must have interaction with communities to let them know what workplaces are doing because employees do interact with communities where they live and work.

LEGAL MATTERS ON EXTRADITION FOR DRUG CONTROL WORK

Constraints:

Lack of donor interest

Change in priority areas of support

Delays in project formulation, approval and implementation processes

Limitations to fulfil the amended Addendum on Partnership Solutions:

UNODC and MOU countries are reactive in their commitment and response and therefore we have to move towards being more proactive

Knowledge sharing and better aligned between UNODC, MOU Countries and donors has to be achieved. Consideration should be given to using the adopted SAP as a baseline document to approach donors

Action Plan: 1. UNODC continues to raise awareness on/about MOU/SAP at related donor

seminars, conferences etc 2. MOU specific donor conference 3. Organize field visits/study visits to successful sites such as BLO/CBT/DDR 4. Scale down project size 5. Increase financial and in-kind contribution by MOU Countries 6. Make use of existing resources such as linkage with global projects like

Treatment for demand reduction or available resources

Future Activities:

Demand Reduction o Regional seminar on ATS treatment. o Regional seminar on the prevention at schools

Drugs and HIV/AIDS o Regional seminar on drugs and HIV/AIDS

Alternative Development o Training for the upgrade of AD products in Lao PDR and Myanmar

Law Enforcement - Action Plan o Regional Workshop for Cross-border cooperation

Judicial Cooperation o Recommendations has been consolidated into a new project by

UNODC.

Page 379: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

367

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

DRUG FREE VILLAGE

Goal: Reduce the number of Out of School Youths (OSY) population using drugs. Objective: By 2015, the number of out of school youths using drugs in the community will be reduced by 20% Activities/Strategies

• Situational analysis/assessment • Training of implementers • Outreach immersion • Identification of OSY using drugs • Individual assessment • Intervention according to their needs • Literacy • Technical/vocational skills • Livelihood Projects • Counseling and family programs • Community mobilization

Time Frame • 3rd week of October 2010 for situational analysis/assessment • 1st week of November 2010 for Training of implementers • 2nd week of November 2010 for outreach immersion • 1st week of December 2010 for identification of OSY using drugs • January 2011 for individual assessment

Expected Outcome • OSY drug users identified • Trainers/implementers • Increased community awareness of the program • Recruited learners (OSY) • Assessed OSY • Employed OSY • Educated OSY • Engaged in small business/entrepreneurship • Strong family ties • Networking and linkages with all community stakeholders

Recommendations • Evaluation of the program will be on a regular basis (quarterly) • Networking and linkages to stakeholders • Integration of drug education program in basic curriculum and modules in

Alternative Learning Systems (ALS) or non-formal • Building a strong community relationships and ownership of the program • Government should have appropriate policy in support of the sustainability

of the programs • Colombo Plan should conduct conferences of this nature in Colombo Plan

member countries on a regular basis

Page 380: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

368

PREVENTIVE DRUG EDUCATION IN SCHOOL, THAILAND Best Practices in Thailand:

Launched 3D School Policy

Ministry of Education launched 3D school policy, Decency Democracy and Drug-free in school to prevent drug problem in school.

Trained 7,000 scout leaders to implement 3D scout proficiency curriculum in teaching and learning system in school.

Develop student care system

Screening to identify the risky group and involving drug group.

Provide appropriate activity i. Family relationship project. (risky group parent

teacher) ii. Behavior change camp (drug use group)

iii. Refer to treatment and rehabilitation center. (addicted group)

Data system development

MOE developed web-based for data system. i. Classify school performance into 4 groups (A B C D) base

on school anti drug competency, once a year. ii. Survey drug use in school, twice a year

Youth network against drugs

Support youth campaign activities

Set up the theme, prepare the event, promote and organize activities at national level/ regional level and provincial level.

Watch-out / reflect drug problem, deviance behaviors and risky areas.

Increase “space for youth”

Home After school Project to provide good area and activities for youth as their creative and safe way out after classroom.

Capacity Building

Promoting teacher’s skill and fencing school from drugs danger project, training teachers in private vocational school.

Enhancing student clubs in school such as friend for friend club, To Be No 1 club etc. to create volunteering mind to participate in anti-drug activities.

Developed training “DADDY” project. (Desired Activities for Drug Defense among the Youth). The project encourages youth to transfer their knowledge in drug prevention to their friends by using edutainment activity.

Knowledge Management

Promote the role of religious organizations

Training Buddhist monks as a trainer in high risk group training.

Drug Abuse Resistance Education (D.A.R.E)

Training uniformed police officers work as a D.A.R.E. teachers in formal classes.

D.A.R.E. is very successful in Police Commission Region 1.

27,079 grade 6 students participated in D.A.R.E. program.

Page 381: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

369

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

DRUG EDUCATION PROGRAM PHILIPPINES

Mission: We are committed to increase access to quality basic education with adequate facilities, supportive and empowered stakeholders, and high performing teachers and students.

National Drug Education Program

To prevent drug abuse among students in basic education through the development of desirable values, attitudes and practices.

To maximize utilization of school resources which can contribute to the child’s cognitive, affective and psychomotor development relative to drug abuse prevention.

To strengthen parent and community participation through viable linkages with multi-sectoral organizations involved in the anti-drug abuse campaign

To provide in-service training of teachers and other school officials to enable them to help young people enhance their life skills which relate to the prevention of drug abuse.

To initiate researches/studies in support of the total program. Five Components of NDEP:

1. Curriculum and Instruction:

Support instructional materials on Drug Abuse Prevention for integration in elementary curriculum

2. Co-Curricular Activities and Ancillary Services

Scouting integration in national drug education program

Regional Workshops

Random Drug Testing (RDT)

Training on Drug Abuse

3. Teachers/Staff Development

Orientation Training

In-Service Training

Cross-Posting 4. Parent Education and Community Outreach

Drug Abuse Prevention and Effective Parenting Education (Meetings/Conferences)

5. Research and Evaluation

Built-in assessment of the different components of the programs

Conducted regular monitoring of activities at various stages of the program to assess the extent of implementation and other aspects of administration

Conducted evaluative researches on the appropriateness of Instructional Materials for the different target groups.

Page 382: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

370

PREVENTIVE DRUG EDUCATION MEDIA CAMPAIGNS IN SINGAPORE

Singapore’s Holistic: Demand and Supply Reduction through the following channels:

Central Narcotics Bureau o Preventive Drug Education o Tough Laws and Enforcement

Prison o Treatment and Rehabilitation

SCORE o Aftercare and Continued Rehabilitation

Central Narcotics Bureau Anti Drug Strategy: National Consensus towards Zero Tolerance for Drug Abuse

Anti-Drug Legislation

Drug Law Enforcement

Preventive Education Program

CNB’s Role in Preventive Drug Education

National Council Against Drug Abuse (NCADA) o Advises the government and agencies on various anti-drug

measures

Central Narcotics Bureau (CNB) o Organizes and coordinates PDE activities o Leads and operationalises Strategy

Coordinating Committee (COC) o Maps strategies for a comprehensive national drug prevention

program o Promotes and co-ordinates prevention activities

Focus of Preventive Drug Education

To target the youth below 25 years old

Drug information in school syllabus

To target Parents and Counsellors

Media Campaigns in Singapore: Media Campaigns by National Council Against Drug Abuse (NCADA)

Partnership for a Drug Free Singapore

“Heroin is Living Hell” in 1997

“Don’t Let Heroin Control Your Life” in 1999

“Road Sign Campaign” in 2000

“Passport Photo Campaign” in 2000

“Drugs Make You Look Stupid” in 2003

NCADA Media Campaigns targeted at youths:

Take ECSTASY and You’re the Guinea PIG (1998)

Heroin (1999)

Page 383: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

371

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

o If you think parents & teachers control your life, heroin is the all powerful drug that will control you not just now but for the rest of your life

Ketamine (2003) o Make You Look Stupid

Psychotropic Drugs (2007/2008) o Drugs. If you play, you pay

Inhalant Abuse (2008/2009) Conclusion:

Increasing popularity and participation in our programs

Develop more innovative & effective programs with the firm support from external agencies and community partners

To foster and sustain a nation with zero-tolerance towards any form of drug abuse.

CATCH THEM YOUNG FOR EFFECTIVE DRUG DEMAND REDUCTION SRILANKA Needs:

To understand drugs and drug dependencies.

The youth needs to understand the myths and other factors to use drugs.

To enhance specific measures to resist drugs.

To understand and comprehend the behavior of the youth.

Resource mobilization. Child and factors of influence:

Parents

Media

Teachers

Clergy

Peers Tobacco:

Known as a killer

Used for the purposes of o Smoking o Chewing

Each year 4 million deaths from tobacco.

10 million estimated to die by 2020

As it is one of the most common and dangerous addiction from which the youth is being poisoned around the globe its growth should be controlled.

Drug prevention education:

• Need for experts to intervene in the development of : • Strategies • Human Resources • Materials • Opportunities

• Need to reach all communities

Page 384: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

372

Monitoring and Evaluation:

For implementation

To Assess the impact

DRUG SCREENING IN SCHOOLS, MALAYSIA

Introduction: • 18th Jun 1998 - Drug Prevention in School Committee chaired by Minister of

Education had agreed to implement drug screening in schools. • The decision was made after 537 students in secondary schools were found

positive in a random drug screening and 54 of them were positive in confirmatory test.

• Drug screening in schools – started with selected few. • 24th July 1998 – A circular on drug screening in schools was sent by Ministry

of Education to all state directors of education department to implement the program.

Rationale: • It was initiated to counter the drug abuse problems among school children. • It is not enforcement but prevention. • Using urine strips to screen the students is practical, cost effective and able

to do quick screening. • Early intervention works best; it is very important to prevent drug abuse

from starting; easier to intervene whenever warning signs emerge Objectives:

• To identify students that are at risk. • To give early interventions to those students who are involved in drugs. • To nurture and develop the family’s commitment to deal with drug abuse

problem. • To carry out follow up program for the students and the family involved as

to curb future addiction. Implementation: 1st phase - Drug Screening / Student Detection

• Coordinating meeting with the implementing agencies • Selection of students that has to be screened • Carry out urine screening • Send urine positive samples to hospital for confirmatory test • Send report of urine test to State Education Department • Open confidential file for student • Send letter to parents for further discussion • Meeting with parents.

2nd phase - Student Intervention Camp • 50 – 60 students each session, twice a year for every state • Participants are those at risk & positive in drug screening • Trainers are from NADA, Ministry of Education & other relevant agencies • 4-5 days of intensive program • Components; spiritual, physical, motivation, intellectual, skills giving

(problem solving, handling emotion & stress, assertiveness) & evaluation • Methods : group discussions, games, role play, sharing of experience,

talks & video sessions

Page 385: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

373

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

3rd phase – Follow up Program • Participants: those who attended the camp • Continuous support for parents (telephone calls, home visits) • Drug Preventive Education in Schools • Random drug screening • Refer to NADA officers

Conclusion: • Drug screening in schools is a very significant tool to identify students at

risk of drug use at early stage. • Effective and continuous interventions are important to change the course

of future addiction.

RANDOM DRUG TESTING PROGRAM

Random Drug Testing (RDT) is a procedure to determine the presence of a drug substance in the body and the selection of students is through an unbiased process of generating random numbers using a computer or a scientific calculator. Objectives: To determine the prevalence of drug users among the students. To assess the effectively of school-based and community-based prevention

programs. To deter adolescents from initiating the use of illegal drugs. To give adolescents a reason to resist peer pressure to use illegal drugs To facilitate the referral/treatment of drug users and dependents To strengthen the collaboration efforts of identified agencies against the

use of illegal drugs and in the treatment of drug users and dependents.

Information Sheet on Random Drug Testing:

All students and their parents shall be notified in writing on the process and manner by which the random drug testing shall be conducted.

The whole student population of the school selected shall be included in the random drug sampling.

The selection process shall be random through a lottery which may be computerized

The random selection of students and the drug testing shall be done on the same day

The laboratory shall follow the DOH prescribed guidelines in the collection of urine specimens.

The monitor assigned to ensure the integrity of the collection process should be of the same sex as the student.

The drug testing shall be done in the school and conducted by duly accredited drug testing laboratory.

The Drug Testing Coordinator shall ensure the confidentiality and integrity of the random drug testing for the students, teachers, administrators and personnel of the school.

The results of the test shall be strictly confidential. No school shall publish or post results whether positive or negative

Page 386: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

374

The laboratory shall place the drug test result in a sealed envelope and deliver the same via personal service to the drug testing Coordinator.

In case the test results are positive, the Drug Testing Coordinator shall inform both the student and parent concerned that a confirmatory test shall be conducted.

Activities/Accomplishment:

Issuance of department memoranda and orders was done before and during the conduct of the random drug testing

Random drug testing was done in 188 schools starting November 19-27,2009 and February 23-March 10,2010

Results of the RDT were submitted to the Secretary, Department of Education.

Consultative meetings were undertaken with school principals and head of the Health and Nutrition Unit/ Section where confirmed positive cases were found.

Case conferencing with students found using drugs and their principals/parents was conducted.

ALTERNATIVE DEVELOPMENT (AD)

Alternative Development objectives in the SAP The elimination of illicit opium production, consumption reduced and recidivism prevented.

Collect relevant data, exchange information and best practices.

Support regional interventions to national strategies for drug control involving sustainable alternative development program.

Support advocacy, communication, and program and resource mobilization. Constraints in SAP Implementation

Insufficient Funding

Overemphasis of poppy elimination (ignoring key role of law enforcement).

Under-emphasis of AD’s role in providing alternative livelihoods, reducing poverty, and providing environmental sustainability after poppy eliminated.

To restate the objective for ad in the sap as a part of a balanced approach by which poppy cultivation becomes unappealing for farmers who then permanently adopt other livelihoods. Sub Regional AD Accomplishments 2009-2010 National Activities:

Collect relevant data, exchange information and best practices o Conducted surveys in Lao PDR, Myanmar and Thailand

Support Regional Interventions to National Strategies for Drug Control involving Sustainable Alternative development Programs

o Lao PDR National Drug Control Master Plan (2009-2010)

o Myanmar Drug control and illicit crop reduction integrated into long

term national planning by two key national agencies.

Page 387: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

375

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Support Advocacy, Communication, Program Development and Resource Mobilization

o China: Support of opium elimination in Wa Region, Kokang, and

Special Region 4 through donations of food and other assistance.

o Lao PDR: AD projects developed or continued with support from

different donors. o Oudomxay:

UNODC-UNIDO Post Opium Surpass Project completed and evaluated.

o Phongsaly: Midterm evaluation completed and updated baseline survey

conducted showing increase in annual farmer income by 125%.

o Myanmar: Activities in Wa Development Project completed and handed

over to government and other agencies o Thailand:

New 4-year Master Plan for Opium Cultivation Control (2009-2013) as a part of the National Socio-Economic Development Plan (covering 200 ha. where poppy cultivation continues by 4,425 households).

New Alternative Development Strategy: Objective: Support AD as part of a balanced approach to drug control integrated into national poverty reduction policies

Support exchanges of ideas, networking, and coordination of efforts.

Actively advocate AD through media and websites.

Increase South-South collaboration, especially among MOU countries.

Support comprehensive strategy integrating national and sub regional work plans and objectives.

Devise and support post-opium scenario to facilitate food security, life skills, and better livelihoods for the farmers after opium cultivation by which other agencies begin work in target areas.

CONCLUDING CEREMONY

The Director General Ministry of Narcotics Control made a concluding speech on behalf of participants in the concluding ceremony. The following was proposed for consideration of the Colombo Plan:

Best Professional of the year award.

Drug addiction as one of the indicator in the Millennium Development Goals.

Development of a website to share experience against drug abuse.

Page 388: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

376

SUMMARY OF RECOMMENDAITONS OF DRUG PREVENTION BEST PRACTICES

1. Make appropriate policies in the Government level to integrate preventive

drug education as part of curriculum in schools. 2. Build a strong community relationship and ownership of the program in the

community. 3. Government must have appropriate policies in support of the sustainability

of the program. 4. Promote Youth-to-Youth prevention programs by training more young

people to work in drug prevention fields. 5. Establish a better networking and collaboration with the government and

non-government organizations in the field of drug prevention practices.

6. Device faith-based approaches in drug prevention by integrating preventive drug education into the religious formation.

7. Colombo Plan must conduct conference of this nature in Colombo Plan member countries on regular basis.

Page 389: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

377

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Annual Paris Pact

`

Page 390: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

378

Page 391: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

379

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

ANNUAL PARIC PACT

United Nation office on Drugs and Crime (UNODC) organized a meeting of senior

representatives of Paris Pact Policy consultative group at Vienna on 22-23

November, 2010. The basic objective of the meeting was to review the expert

round table recommendations made in 2010. The meeting also assigns priorities

for 2011 relating to future round table and thematic working groups. The holding

of third ministerial conference in Vienna in early 2011 was also discussed. The

recommendations approved by the committee in respect of drug supply and

demand reduction are as follows.

Expert Round Table on Central Asia to Counter-Narcotics Enforcement

Law Enforcement:

1. In addition to enhancing border control measures, Paris Pact partners, with

the assistance of UNODC where needed, are encouraged to increase their

efforts in building law enforcement capacity, both within the country (e.g.

through random checks and the use of risk-based analysis) and outside.

2. Paris Pact partners are encouraged to address the entire opiate trade

supply chain by facilitating back-tracking investigations.

3. In consultation with the competent authorities of Paris Pact partners,

UNODC is invited to develop and disseminate model standard operating

procedures for the preparation and conduct of international controlled

deliveries. This can be done, for example, through expert working groups.

4. In order to enhance fully CARICC's UNODC-supported capacity as an

intelligence analysis centre:

National authorities of Paris Pact partners should be encouraged to

copy to CARICC relevant drug related information, including

INTERPOLS.T. messages;

CARICC is encouraged to develop case studies and lessons learned

regarding investigations, seizures, emerging trends, typologies,

methodologies and to share them with relevant national competent

authorities in Central Asia.

National liaison officers at CARICC are encouraged to follow up with

their national competent authorities on any relevant information;

5. Paris Pact partners are strongly encouraged to support investigations

conducted by other partners and to acknowledge their joint operational

successes.

6. Paris Pact partners in Central Asia are encouraged to streamline and

coordinate their operational efforts in counter-narcotics at the national

level.

7. Paris Pact partners are encouraged to study and implement practical

measures to combat the impact of corruption on counter-narcotics efforts.

Page 392: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

380

Judicial Cooperation:

Paris Pact partners in Central Asia and neighbouring countries are encouraged:

To revise their domestic legal framework to expedite and streamline

mutual legal assistance and extradition procedures;

To harmonize the de minimis levels used for authorizing investigations and

prosecutions in relevant criminal offences in order to allow judicial

cooperation under the dual criminality principle;

To utilize UNTOC as a tool for enhancing mutual legal assistance and

extradition procedures;

To participate fully in the existing peer review mechanism for UNCAC and

the forthcoming review process for UNTOC;

To consider allowing direct liaison between judicial authorities on either

side of national borders;

To develop an advanced legal and practical framework for financial

investigation, confiscation and asset recovery in drug related cases.

Working Group on Drug Demand Reduction

1. Prevention of drug use = healthy & safe development of children and

youth

Increase the range of evidence-based prevention activities

implemented in the region, particularly with regard to school.

Increase the coverage of successful activities, if evaluated to be

effective, for example parenting skills training or innovative activities.

Improve evaluation of interventions: calculate coverage where it might

be possible and undertake at least a pre- and post- evaluation.

2. Services in the community

Universal access to drug dependence treatment, health care and social

protection for people using drugs and suffering from drug dependence

in the community.

Increase the range and the coverage of a continuum of care of drug

treatment, health care and social protection services accessible to

people using drugs and suffering from drug dependence in the

community which are evidence-based and ethical.

Improve the integration of services to move towards the ultimate aim

of delivery of services through a 'one-stop shop'.

Page 393: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

381

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

3. Services in the criminal justice system and the prison setting

Universal access to drug dependence treatment, health care and social

protection for people using drugs and suffering from drug dependence

in prison setting.

Develop a continuum of care with a range of drug treatment, health

care and social protection services offered for people using drugs and

suffering from drug dependence in the prison setting which are

evidence-based and ethical.

Expand the system for the provision of treatment as an alternative to

criminal justice sanctions.

4. Data collection and monitoring systems

Maintain existing systems and increase systematic data collection on

key indicators, with particular attention to youth, treatment demand

data, emergency visits, and mortality.

Harmonise data collection systems to reconcile different estimates and

avoid duplication of efforts.

Expert Round Table on Afghanistan and Neighboring Countries to Counter-Narcotics Enforcement

1. Paris Pact partners are encouraged to increase their political, financial and

technical support to Afghanistan and neighboring countries to allow

efficient regional cooperation by upgrading the national capacity levels for

the development and implementation of the National Drug Control

Strategies.

2. UNODC facilitating an innovative regional programme for Afghanistan and

neighboring countries is welcomed and experts emphasise that such

efforts should result in added financial and technical resources directed to

the field level with the aim to obtain operational impact, concrete

objectives and activities.

3. Paris Pact partners are encouraged to develop a more integrated regional

strategy to deal with drug trafficking, chemical precursor control and drug-

related criminal intelligence, as well as improving the use of special

investigative techniques such as controlled delivery, and develop

compatible standard operating procedures within the regional framework,

from a regional, institutional and law enforcement perspective.

4. Taking stock of the results of the working group on financial flows (Orange

Paper), Paris Pact partners are encouraged to develop comprehensive anti

money-laundering strategies at national and regional level following

international standards and norms with the aim of detecting, tracing and

confiscating criminal assets.

Page 394: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

382

5. Paris Pact partners who have not yet answered the questionnaire on

Financial Flows linked to the Illicit Production and Trafficking of Afghan

Opiates are urged to do so. Failure to complete this questionnaire has

already resulted in a delay of the second working group meeting.

6. Being aware that the Paris Pact focuses on illicit trafficking of opiates, the

emerging threat of cannabis cultivation and trafficking in Afghanistan and

the wider region warrants specific attention by the Policy Consultative

Group Meeting to take specific measures.

7. Joint operations have demonstrated the importance of intelligence-led

interventions. This is first and foremost to be achieved by building the

national intelligence capacity. Secondly, regional intelligence sharing

mechanisms should be enhanced through a fully operational JPC, finalizing

and expanding the Border Liaison Offices (BLOs), regular meetings of the

Drug Liaison Officers (DLOs), providing cross border communication and

improved intelligence sharing among regional information centres such as

CARICC.

8. Through intelligence-led investigations, the identification of illicit

laboratories and disruption of the precursor chemical flows should be

enhanced. This is to be followed up by backtracking investigations with the

aim of dismantling criminal networks. To do so, support of the

establishment and better use of existing two-ways communication channels

(information / feedback) among law enforcement agencies within the

region is recommended.

9. The need for providing technical equipment including secure border

communication systems was emphasized, in order to tackle opiate and

chemical precursor trafficking to the region. It was noted that the

conclusions of the working group on communications of the Triangular

Initiative is awaiting the approval of the Senior Officials Meeting (scheduled

on 24-25 November 2010 in Islamabad) before being able to move forward.

10. The potential for chemical substitutes of acetic anhydride in the region is

duly noted and Paris Pact partners are recommended to consider

appropriate measures to prevent the use of these substances in the

production of illicit drugs and psychotropic substances.

11. Recognizing potential legal implications, Paris Pact partners are

recommended to examine the possibility for law enforcement agencies to

assess whether it would be possible to benefit from arms, equipment and

assets confiscated from criminal networks.

In addition, if not yet done, they are encouraged to sign memoranda

of understanding facilitating operational cooperation among

partners.

Page 395: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

383

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

12. With the aim to prevent the reintroduction of seized materials into illicit

distribution channels, Paris Pact partners are encouraged to examine

enacting legislation allowing pre-trial disposal of these materials especially

drugs and precursor chemicals.

13. Successes of the UNODC-WCO Container Control Programme were noted

and its further continuation in the region is recommended.

14. The upcoming senior official and ministerial meetings of the Triangular

Initiative planned for November in Islamabad, and the Paris Pact Policy

Consultative Group Meeting should consider giving specific attention to the

Afghan provinces that have seen an increase in opium cultivation.

15. Given the problems faced by the region, the need for enhanced capacity

building in all law enforcement and criminal justice fields, priorities should

be given to the provision of necessary technical equipment and training.

16. The partners of the Triangular Initiative and Dublin Group are encouraged

to take necessary measures to improve their cooperation to cope with

regional drug problems.

Working Group on Drug Demand Reduction

The following were issues that were flagged as needing the attention of all relevant

stakeholders (international community, national Governments, civil society) if drug

use and drug dependence in the region are to be addressed effectively:

Coverage of services is low and should be increased.

Financial, technical and political support of some major stakeholders and

UNODC was recognized. However, this is insufficient and stronger and

concrete mobilization of stakeholders at all levels and in all sectors is

needed. Drug use and dependence in the region is significant and, if it does

not decrease, it will keep on fuelling supply.

Integration of evidence-based drug dependence treatment, health care and

social protection services, as described in the Political Declaration endorsed

by CND in 2009, is key.

Prevention of drug use needs to be strengthened. In particular, there is a

need for a regional and global sharing of experiences in this field.

Too many children in the region are exposed to drug use at too young an

age. This is a very vulnerable group that needs careful but urgent services

to be developed.

Drug dependence treatment can be a cost-effective alternative to criminal

justice sanctions.

Page 396: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

384

Expert Working on Precursors to Counter-Narcotics Enforcement

1. At national level, law enforcement agencies, regulatory bodies and the

private sector should establish or maintain close cooperation, improving

awareness and exchange of information in order to monitor and prevent

the diversion and smuggling of precursors. This should include measures

such as educating industry and trade about the regulatory procedures and

compliance; how to identify suspicious operations and notify the

competent authority and persuading the industry to establish and

implement a code of conduct. The codes of conduct and other best

practices currently in use among Paris Pact Partners should be provided to

UNODC to be shared among Partners. INCB code of practice should be fully

implemented by all partners.

2. After proper assessment of the current national legal and regulatory

framework, Partners should adopt/update adequate legislation and

regulatory measures governing legal trade in precursors as well as

legislation in the area of countering their illicit trafficking as well as

measures for monitoring the entire trade and supply chain (including

brokers) of precursors chemical and avoid their diversion.

3. Governments are strongly encouraged to make full use of the PEN system,

and involving the private sector appropriately. Paris Pact Partners, who

haven’t yet done so, especially those sharing a border with Afghanistan,

should ensure that under the mechanism envisaged in paragraph 10, Article

12, of the 1988 Convention, and relevant UN resolutions, including Security

Council resolution 1817, imports of all precursors that maybe used in the

illicit manufacture of heroin, be subject to a mandatory pre-export

notification by the exporting countries.

4. Technical Assistance, most importantly capacity building and equipment

should be provided to Afghanistan and most affected transit countries, by

Paris Pact partners. This should include training for all relevant law

enforcement officials on how to examine documents and profile/ target

suspicious shipments related to the import/export and transit of precursor

consignments, as well as the physical examination of the chemicals; training

of law enforcement on special investigative techniques, such as controlled

deliveries, related to precursor trafficking and training for enhanced judicial

responses.

5. The next iteration of Operation TARCET, wherever feasible and

appropriate, should include a specific focus by participating states on

follow-up investigations; should move beyond a reliance on checkpoints

and border inspections to include controlled delivery of illicit precursor

shipments between participating countries; and should usefully incorporate

intelligence – sharing elements of the Triangular Initiative/JPC, CARICC, and

Container Control Programme Port Control Units.

Page 397: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

385

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

6. Regional cooperation between Afghanistan and its neighbours should be

supported and promoted with specific emphasis on information and

criminal intelligence sharing among all Paris Pact Partners and more

specifically between CARICC, JPC, National Contact Points and other

relevant law enforcement agencies, such as the Tactical Operations Centre

(TOC) of the Islamic Republic of Afghanistan, with the aim of gaining a

better understanding of the trade supply chain and criminal network, in

order to launch more intelligence-led operations against trafficking

networks.

7. Based on the principles of common and shared responsibility, more

attention should be paid to backtracking investigations and the utilization

of controlled deliveries with the aim of identifying routes from producing

to recipient countries and techniques used by persons and entities involved

in offences relating to precursor chemicals. In this regard, Governments

should harmonize their relevant legal framework, based on international

standards to allow special law enforcement techniques, exchange of

intelligence, and joint operations.

8. Governments should strengthen national capacity to provide forensic

support for law enforcement and the criminal justice authorities in

investigating offences involving the diversion and trafficking of precursors.

Enhanced frameworks for the exchange of forensic information (including

packaging, labelling and container information) among law enforcement

agencies should be promoted.

9. As a step towards matching supply and demand, Governments who have

not yet done so, especially those sharing a border with Afghanistan, make

an internal assessment of the licit requirements of all controlled

precursors that may be used in the manufacture of heroin, and share it

with INCB through form D mechanism.

10. Experts determined that while states should continue to examine the

scientific basis for the safety and utility of chemical tracing of heroin

precursors, in accordance with the Political Declaration and Plan of Action,

chemical tagging is not a viable solution at this time for the identification

of points of diversion, criminal networks, or illicit trafficking, which is

recognized as most frequently to occur after point of manufacture.

Page 398: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

386

Paris Pact Project- Phase – III (GLOK 31)

Update on funding situation

(November, 2010)

Total budget $ 2,943,000

Current total funding $ 1,862,000

Unopent funds to be transferred to

phase-III in early 2011 $ 437,000

Short fall $ 643,992

India offered to finance $ 2, 00,000 to the programme.

USA, UK, Canada, will inform the Paris Pact Project after consultations with

their Governments.

Automated Donor Assistance Mechanisim (ADAM)

The Paris Pact initiatives have developed a website to share information/date in

respect of drugs. The address of the website is. https://www.paris-pact.net.

National Strategic Analysis

UNODC presented National Strategic Analysis in the meeting. The main features of

the presentation are as follows:

Afghanistan Drug Seizures (Kg):

Drug 2008 2009

Heroin 2865.5 2446

Opium 25357.1 52236.8

Precursor chemicals 83598 113040

Hashish 314790 86803.3

Destroyed Heroin Labs 52 48

Average Whole Sale Drug Prices US$/kg: Drug 2008 2009

Heroin 2267 2186

Opium 95 64

Cannabis 56 50

Page 399: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

387

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Drug Users (2009): 940,000

Azerbaijan Drug Seizures (Kg):

Drug 2008 2009

Heroin 144.2 234.8

Opium 190.2 207.5

Cannabis 213.7 213.8

Hashish 1569.3 1827.4

Average Whole Sale Drug Prices US$/kg: Drug 2008 2009

Heroin 20000-25000 20000-22000

Opium 3500-5000 4500-5000

Cannabis N/A 5000-6000

Hashish N/A 3000-4000

Drug Users (2006): 45,000

Central Asian Countries Drug Seizures (Kg):

Drug KAZ KYR TAJ TURKM UZB

Heroin 733.0 341.2 1132.2 754.7 754.7

Opium 171.9 376.2 1040.6 1259.2 625.8

Cannabis 26,331 2028.7 2372.8 227.6 1372.2

Hashish 556.9 718.0 N/A 327.2 48.0

Whole Sale Drug Prices US$/kg: Drug KAZ KYR TAJ UZB

Heroin 8000-50000 4000-10000 1500-4000 7500-22000

Opium 800-15000 800-14000 200-800 1600-3500

Cannabis 300-3000 500-1200 100-1000 300-800

Hashish 1000-15000 600-1200 100-1200 800-3000

Page 400: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

388

Drug Users (2006):

KAZ KYR TAJ UZB

103000 26000 23000 131000

Iran Drug Seizures (Kg):

Drug 2008 2009

Heroin 23129 23391

Morphine 8977 16139

Opium 562059 579400

Hashish 75092 69222

Whole Sale Drug Prices US$/kg: Drug 2007 2008

Opium 390.8 420.5

Heroin 2073.7 2121.0

Morphine 1849.1 1958.3

Drug Users (2007): 1,200,000

It was informed that main suppliers of drug labs in Afghanistan are

Germany, China and India.

The Representative of the Germany enquired about the source of

information. The UNODC informed that it is the information collected from

the field. It was also informed that there is a possibility of supplying the labs

through 3rd source.

Drug Trafficking

Central Asia 21%

Iran 31%

Pakistan 48%

Page 401: Green Book July-Dec 2010

Planning and Monitoring Unit, Ministry of Narcotics Control, Islamabad.

389

Pro

gres

s R

epo

rt J

uly

-Dec

emb

er, 2

010

Proposal for Round Table meetings in 2011

The following proposals were approved.

Legal framework in cross border co-operation

Precursor control

Organization of 3rd Ministerial Conference

The participants were generally of the view that such a conference must be

result oriented with predetermined objectives.

Russia will prepare a concept paper for consideration of the Paris Pact

Consultative group. The participating countries will seek guidance from

respective government and inform the Paris Pact Secretariat accordingly.

Pakistan’s offer of holding roundtable conference

The representative of Pakistan informed the meeting that Pakistan intend

to held a round table conference in 2011 and a formal letter have also been

communicated to Executive Director UNODC. The Chairperson appreciated

the Pakistan’s initiative.

The announcement of holding of round table conference in Pakistan had

neutralized the announcement of contribution of $200,000 by India.

Conclusion

The participation in the meeting had provided an opportunity to share the recent

activities being undertaken by Pakistan to address Drugs supply and demand. The

participants of UNODC were also briefed about the initiatives taken by Pakistan.

The participants of UNODC were excited to visit Pakistan by end December 2010 or

early January 2011.