Grantee: The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance Report Grant Number: B-09-NN-MA-0003 Grantee Name: The Community Builders, Inc. LOCCS Authorized Amount: $78,617,630.89 Estimated PI/RL Funds: $127,548,894.00 Obligation Date: Award Date: Contract End Date: Reviewed and Approved Review by HUD: Total Budget: $206,166,524.89 Disasters: NSP Declaration Number N/A Total Obligated Total Projected Budget from All Sources This Report Period Total Budget $215,491,508.84 To Date $190,591,254.30 $195,405,908.84 Overall $0.00 ($1,736,676.29) Narratives Executive Summary: The Community Builders(TCB) NSP2 Program is designed to house families whose incomes are at or below 120 % of AMI, 25% of these funds are to be allocated to households whose income is below 50% of AMI. TCB has created 1834 units, and is projecting to finance an additional 133 units prior to close out. TCB expended the original program funds by February 2013 and expended an additional $75,584,402 of program income. Target Geography: The target geography is the 11 states of Connecticut, Illinois, Indiana, Massachusetts, Maryland, Michigan, North Carolina, New York, Ohio, Pennsylvania, and Virgina. Program Approach: TCB is targetting multifamily structures which are in foreclosure or abandoned in communities with high foreclosure and/or vacancy rates. These multifamily properties will drag down the value, safety and desirability of the single family structures if not addressed. The philosophy is to utilize NSP2 funds for acquisition and rehabilitation, demolition and/or new construction to move projects through the pipeline in an expedited time frame. The expectaton is that the permanent financing will be a multi layered financing structure utilizing typical multifamily funding such as tax credits, first mortgages, bonds, risk sharing, soft second and third loans etc. These funds will be utilized to take out the NSP2 funding. The repaid NSP2 dollars will be recommitted to fund additional projects thereby leveraging the NSP2 funding to the greatest extent feasible. Consortium Members: How to Get Additional Information: Check the TCBinc.org website and check under NSP2 Call D. Morgan Wilson, Program Manager 857 221-8600 Active QPR Contact: Grant Status: Rhianna Trefry ($13,197.61) $153,893,265.36 Total Funds Drawdown Grant Award Amount: $78,617,630.89 1 Community Development Systems Disaster Recovery Grant Reporting System (DRGR)

Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Grantee: The Community Builders, Inc.

Grant: B-09-NN-MA-0003

January 1, 2019 thru March 31, 2019 Performance Report

Grant Number:B-09-NN-MA-0003

Grantee Name:The Community Builders, Inc.

LOCCS Authorized Amount:$78,617,630.89

Estimated PI/RL Funds:$127,548,894.00

Obligation Date: Award Date:

Contract End Date:Reviewed and Approved

Review by HUD:

Total Budget:$206,166,524.89

Disasters:

NSP

Declaration Number

N/A

Total Obligated

Total Projected Budget from All SourcesThis Report Period

Total Budget

$215,491,508.84

To Date

$190,591,254.30

$195,405,908.84

Overall

$0.00

($1,736,676.29)

NarrativesExecutive Summary:

The Community Builders(TCB) NSP2 Program is designed to house families whose incomes are at or below 120 % of AMI, 25% of thesefunds are to be allocated to households whose income is below 50% of AMI.  TCB has created 1834 units, and is projecting to finance anadditional 133 units prior to close out. TCB expended the original program funds by February 2013 and expended an additional $75,584,402of program income. 

Target Geography:

The target geography is the 11 states of Connecticut, Illinois, Indiana, Massachusetts, Maryland, Michigan, North Carolina, New York, Ohio,Pennsylvania, and Virgina.

Program Approach:

TCB is targetting multifamily structures which are in foreclosure or abandoned in communities with high foreclosure and/or vacancy rates. These multifamily properties will drag down the value, safety and desirability of the single family structures if not addressed.  The philosophy isto utilize NSP2 funds for acquisition and rehabilitation, demolition and/or new construction to move projects through the pipeline in anexpedited time frame.  The expectaton is  that the permanent financing will be a multi layered financing structure utilizing typical multifamilyfunding such as tax credits, first mortgages, bonds, risk sharing, soft second and third loans etc. These funds will be utilized to take out theNSP2 funding.  The repaid NSP2 dollars will be recommitted to fund additional projects thereby leveraging the NSP2 funding to the greatestextent feasible.

Consortium Members:

How to Get Additional Information:

Check the TCBinc.org website and check under NSP2Call D. Morgan Wilson, Program Manager857 221-8600

Active

QPR Contact:Grant Status:Rhianna Trefry

($13,197.61) $153,893,265.36Total Funds Drawdown

Grant Award Amount:$78,617,630.89

1

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 2: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

($13,197.61)

$78,617,630.89

$98,713,013.00

$1,722,926.18

$0.00

$75,275,634.47

$0.00

Total Funds Expended

Program Income Drawdown

$493,923.00 $80,063,449.40

Match Contributed

Program Funds Drawdown

$153,960,559.41

Program Income Received

Progress Toward Required Numeric Targets

$14,811,701.91

$0.00

Actual

Limit on Public Services

$99,760,696.00

0.00%0.00%

Overall Benefit Percentage (Projected)

$14,811,701.91

Requirement

Limit on Admin $0.00

$0.00

Limit on Admin/Planning

$0.00

Target

$7,861,763.09

Minimum Non-Federal Match

Progress towards LH25 Requirement $51,541,631.22 $52,406,635.30

Overall Benefit Percentage (Actual)

Most Impacted and Distressed Threshold (Projected) $0.00$0.00

Most Impacted and Distressed Expended $0.00 $0.00

2

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 3: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Progress was made this quarter to advance towards closeout with a goal of submitting the closeout package byDecember 2019. All of the activities are represented in DRGR. Additional progress will be made through out theyear. 

Overall Progress Narrative:

Project SummaryProject #, Project Title This Report To Date

Program FundsDrawdown

Project FundsBudgeted

Program FundsDrawdown

AA, Administrative Costs $0.00 $15,141,347.12 $8,752,336.76

B, Purchase/rehab abandon/foreclosed properties for< LMI $0.00 $40,804,441.00 $19,562,498.27

B-2, Purchase/rehab abandon/foreclosed properties LH 25 $0.00 $46,979,432.00 $24,344,141.79

D, Demolish Blighted Structures $0.00 $2,036,090.96 $178,287.06

E, Redevelop demolished/vacant properties as housing $0.00 $53,568,221.00 $16,318,280.84

E-2, Redevelop demolished/vacant properties as housing $0.00 $44,164,853.00 $9,462,086.17

Z, Cincinnati Housing Improvement Fund $0.00 $1,500,000.00 $0.00

3

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 4: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Activities

B / Purchase/rehab abandon/foreclosed properties for< LMIProject # /

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$797,502.37

NSP Only - LMMI The Community Builders

Total Projected Budget from All Sources

Match Contributed

$797,502.37

$0.00

$0.00

$0.00

$778,120.53

$0.00

Total Budget

National Objective:

Program Income Drawdown

Activity Status:

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

NSP20100600-H

($67,846.05)

$0.00

($67,846.05)

Jan 1 thru Mar 31, 2019

Activitiy Category:

$561,832.86

$0.00

N/A

11/20/2016

$0.00

To Date

11/12/2013

Direct ( HouseHold )

$642,428.43

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Rehabilitation/reconstruction of residential structures Completed

Activity Description:

Walnut Hills Estates was purchased as part of a larger portfolio by TCB Cincinnati MF LLC from FNMA, subsequent to FNMA’sforeclosure on the portfolio. The plan for these properties was unable to be realized, so TCB sold the properties on 11/10/2016and fully repaid all the NSP2 dollars that were invested and removed the Land Use Restriction Agreement (LURA) and allNSP2 obligations. The repayment has since been transferred to the CHIF PI account and cancelled. CHIF PI account is howTCB program income was transferred to the City of Cincinnati - see activity NSP20CHIF Cincinnati Housing Improvement Fundfor more deails.

Location Description:

Walnut Hills Scattered Sites Apartments, census tracts: 39061003700 and 39061026700  address: Lincoln Ave, 2652 StantonAve, 846-849 Oak Street, 718-722 Wayne Street, Cincinnati, OH

Activity Progress Narrative:

TCB Cincinnati MF H WH EstatesActivity Title:

Project Number:

B

Project Title:

Purchase/rehab abandon/foreclosed properties for<

$710,274.48($67,846.05)The Community Builders

$0.00 Program Funds Drawdown $80,595.57

$710,274.48($67,846.05)Total Funds Expended

4

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 5: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

During the period vouchers were revised to apply credit from this activity to other activities that are delivering a nationalobjective. The budget was revised to reflect the actual expenditures.

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

No Accomplishments Performance Measures

Accomplishments Performance Measures

No Beneficiaries Performance Measures found.

Beneficiaries Performance Measures

5

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 6: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$3,100,000.00

NSP Only - LMMI The Community Builders

Total Projected Budget from All Sources

Match Contributed

$3,100,000.00

$0.00

$0.00

$0.00

$3,100,000.00

$0.00

Total Budget

National Objective:

Program Income Drawdown

Activity Status:

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

NSP20100643

$8,481.34

$168,667.63

$8,481.34

Jan 1 thru Mar 31, 2019

Activitiy Category:

$2,870,336.93

$0.00

N/A

08/30/2017

08/30/2017

$0.00

To Date

12/01/2012

Direct ( HouseHold )

$2,916,350.43

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Rehabilitation/reconstruction of residential structures Completed

Activity Description:

Avondale II is one phase of a multi-phase, scattered redevelpoment of highly-distressed housing in the Avondale neighborhood.It will be combined with the Avondale I NSP2 Activity. Avondale II is broken into a rehab and new construction component. ThisActivity will be combine dwith the housing development portion of the FY12 Avondale Choice grant. Phase II involves the rehabof 59 units acquired from FNMA plus the renovation/new construction of 60 additional units. This phase uses 4% LIHTC andHTC Credits to leverage the Choice Neighborhood funding.This project is paired with Avondale Redevelopment Phase I ( 100622 ), a 9% LIHTC phase that will rehab 81 assisted unitsfrom the Cincinnati MF portfolio.

Avondale Housing II LPActivity Title:

Project Number:

B

Project Title:

Purchase/rehab abandon/foreclosed properties for<

$2,916,350.43$8,481.34The Community Builders

$0.00 Program Funds Drawdown $46,013.50

Ancillary Activities

ResponsibleOrganization

Program IncomeAccountActivity Type Project # Grantee Activity # Activity Title

Avondale Housing IILP Rehab Activity

DeliveryNSP20100643BB

Rehabilitation/reconstruction of residential

structuresThe Community Builders General Account

Association Description:Associating the activity that tracks grantee costs related to delivering the Avondale II activites.

$2,916,350.43$8,481.34Total Funds Expended

6

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 7: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Location Description:

These properties are located in Cincinnait's Avondale neighborhood, also the target area for TCB's FY12 ChoiceNeighborhoods Implementation Grant.3415 Reading Road, Cincinnati, OH; census tract: 39061006700722 Gholston Ave, Cincnnati, OH; census tract: 390610068003639 Reading Road, Cincinnati, OH; census tract: 39061006800610 Maple Ave, Cincinnati, OH; census tract: 39061006700615 Maple Ave, Cincinnati, OH; census tract: 39061006700802 Blair Ave, Cincinnati, OH; census tract: 390610067003580 Reading Road, Cincinnati, OH; census tract: 39061006600

Expenses related to radon testing and installation of equipment.

Activity Progress Narrative:

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

Accomplishments Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Total Total

5/4# of Properties 0

47/47#Replaced thermostats 0

47/47#Replaced hot water heaters 0

47/47#Refrigerators replaced 0

47/47#Low flow toilets 0

47/47#Low flow showerheads 0

0/0#Units exceeding Energy Star 0

5/4#Sites re-used 0

This Report Period Cumulative Actual Total / Expected

Total Total

47/47# of Housing Units 0

47/47# of Multifamily Units 0

Beneficiaries Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Low Mod Total Low Mod Total Low/Mod

0 0/0 0/35 0/47# of Households 0 0 0

0 0/0 0/35 0/47# Renter Households 0 0 0

B-2 / Purchase/rehab abandon/foreclosed properties LH 25Project # /

Grantee Activity Number:

Activity Status:

NSP200100494

Activitiy Category:

Rehabilitation/reconstruction of residential structures Completed

West VillageActivity Title:

7

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 8: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Projected Start Date:

Benefit Type:

Overall

$5,084,287.95

NSP Only - LH - 25% Set-Aside The Community Builders

Total Projected Budget from All Sources

Match Contributed

$5,084,287.95

$0.00

$0.00

$354,090.00

$5,084,287.95

$0.00

Total Budget

National Objective:

Program Income Drawdown

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

$0.00

$3,637,593.57

$0.00

Jan 1 thru Mar 31, 2019

$326,827.51

$0.00

N/A

12/19/2012

$0.00

To Date

04/30/2011

Direct ( HouseHold )

$5,084,287.95

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Activity Description:

West Village is an acquisition and rehabilitation of 127 units, 93 of which house tenants with households at or below 50% ofAMI and will count toward the LH-25 set aside. The remaining 34 units will be tracked under a separate "B" Activity. All of theunits are restricted with a Land Use Restriction Agreement that is recorded and runs with the land. TCB owns and manages theproperty. Leases are for one year, and rents are set according to the lowest program set aside for the unit. For the NSP2program the low HOME rents are used.

Location Description:

West Village is located at 52 Howe Street, New Haven, CT 06511 in census tract 09009140700.

Project Number:

B-2

Project Title:

Purchase/rehab abandon/foreclosed properties LH

$0.00 Program Funds Drawdown $4,757,460.44

Ancillary Activities

ResponsibleOrganization

Program IncomeAccountActivity Type Project # Grantee Activity # Activity Title

West Village projectdelivery

NSP200100494BB-2Rehabilitation/reconstru

ction of residentialstructures

The Community Builders General Account

Association Description:Associating the activity that tracks grantee costs related to the delivery of the West Village and West Village Bactivities.

$5,084,287.95$0.00Total Funds Expended

8

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 9: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Activity Progress Narrative:

No Activity Locations found.

Activity Locations

Other Funding Sources Amount

Neighborhood Stabilization Program 2 $6,800,000.00

$0.00Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

Accomplishments Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Total Total

1/1# of Properties 0

1/1#Additional Attic/Roof 0

1/1#High efficiency heating plants 0

1/1#Replaced hot water heaters 0

93/93#Refrigerators replaced 0

93/93#Low flow toilets 0

93/93#Low flow showerheads 0

93/93#Units with bus/rail access 0

93/93#Units exceeding Energy Star 0

This Report Period Cumulative Actual Total / Expected

Total Total

93/93# of Housing Units 0

93/93# of Multifamily Units 0

Beneficiaries Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Low Mod Total Low Mod Total Low/Mod

0 93/93 0/0 93/93# of Households 0 0 100.00

0 93/93 0/0 93/93# Renter Households 0 0 100.00

9

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 10: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$5,201,040.81

NSP Only - LH - 25% Set-Aside The Community Builders

Total Projected Budget from All Sources

Match Contributed

$5,201,040.81

$0.00

$0.00

$119,833.00

$5,201,040.81

$0.00

Total Budget

National Objective:

Program Income Drawdown

Activity Status:

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

NSP20100506

$0.00

$4,959,195.83

$0.00

Jan 1 thru Mar 31, 2019

Activitiy Category:

$22,784.54

$0.00

N/A

05/25/2012

$0.00

To Date

01/10/2011

Direct ( HouseHold )

$5,201,040.81

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Rehabilitation/reconstruction of residential structures Completed

Activity Description:

The project is the acquisition and rehabilitation of eight buildings with 32 units.  The units are all 2 bedroom. All 32 units arerestricted to low-income households and count towards the LH-25 setaside. All of the units are restricted with a Land UseRestriction Agreement that is recorded and runs with the land. The Community Builders owns the property and HallKeenManagement is managing the residential units. Leases are for one year and rents are set according to the lowest program setaside for the unit. For the NSP2 program the low HOME rents are used.The rehab will includes new exterior finishes and entryway details, new high efficiency mechanical systems, new energy starappliances, new insulated windows with low e glass, upgraded finishes and open green space.

Location Description:

Depot CrossingActivity Title:

Project Number:

B-2

Project Title:

Purchase/rehab abandon/foreclosed properties LH

$0.00 Program Funds Drawdown $5,178,256.27

Ancillary Activities

ResponsibleOrganization

Program IncomeAccountActivity Type Project # Grantee Activity # Activity Title

Depot CrossingProgram Delivery

NSP20100506BB-2Rehabilitation/reconstru

ction of residentialstructures

The Community Builders General Account

Association Description:Associating the activity that tracks grantee costs related to the delivery of the Deopt Crossing activity.

$5,201,040.81$0.00Total Funds Expended

10

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 11: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

The project is located at 125 Minot Rd. Wareham, MA, 02538, census tract  25023545400.

Activity Progress Narrative:

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

Accomplishments Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Total Total

8/8# of Properties 0

8/8#Additional Attic/Roof 0

32/32#High efficiency heating plants 0

32/32#Refrigerators replaced 0

32/32#Low flow toilets 0

32/32#Low flow showerheads 0

32/32#Units exceeding Energy Star 0

0/0# ELI Households (0-30% AMI) 0

This Report Period Cumulative Actual Total / Expected

Total Total

32/32# of Housing Units 0

32/32# of Multifamily Units 0

Beneficiaries Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Low Mod Total Low Mod Total Low/Mod

0 32/32 0/0 32/32# of Households 0 0 100.00

0 32/32 0/0 32/32# Renter Households 0 0 100.00

11

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 12: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$342,858.31

NSP Only - LMMI The Community Builders

Total Projected Budget from All Sources

Match Contributed

$342,858.31

$0.00

$0.00

$0.00

$342,858.31

$0.00

Total Budget

National Objective:

Program Income Drawdown

Activity Status:

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

NSP20100600B

$0.00

$0.00

$0.00

Jan 1 thru Mar 31, 2019

Activitiy Category:

$112,008.06

$0.00

N/A

12/31/2018

12/31/2018

$0.00

To Date

05/01/2012

Direct ( HouseHold )

$342,858.31

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Rehabilitation/reconstruction of residential structures Completed

Activity Description:

This account pays for overhead and salary related to the acquisition and rehabilitation of the FNMA Cincinnati portfolio.

Location Description:

Activity Progress Narrative:

FNMA Cincinnati Portfolio Activity DeliveryActivity Title:

Project Number:

B-2

Project Title:

Purchase/rehab abandon/foreclosed properties LH

$342,858.31$0.00The Community Builders

No Accomplishments Performance Measures

Accomplishments Performance Measures

$0.00 Program Funds Drawdown $230,850.25

$342,858.31$0.00Total Funds Expended

12

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 13: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

No Activity Locations found.

Activity Locations

Other Funding Sources Amount

Neighborhood Stabilization Program 2 $0.00

$0.00Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

No Beneficiaries Performance Measures found.

Beneficiaries Performance Measures

13

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 14: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$4,640,887.99

NSP Only - LH - 25% Set-Aside The Community Builders

Total Projected Budget from All Sources

Match Contributed

$4,640,887.99

$0.00

$0.00

$0.00

$4,640,887.99

$0.00

Total Budget

National Objective:

Program Income Drawdown

Activity Status:

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

NSP20100643-2

$14,061.18

$279,633.18

$14,061.18

Jan 1 thru Mar 31, 2019

Activitiy Category:

$4,396,904.26

$0.00

N/A

08/30/2017

08/30/2017

$0.00

To Date

10/31/2014

Direct ( HouseHold )

$4,473,189.80

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Rehabilitation/reconstruction of residential structures Completed

Activity Description:

Avondale II is one phase of a multi-phase, scattered redevelopment of highly-distressed housing in the Avondale neighborhood.It will be combined with the Avondale I NSP2 Activity. Avondale II is broken into a rehab and new construction component. ThisActivity will be combine with the housing development portion of the FY12 Avondale Choice grant. Phase II involves the rehabof 59 units acquired from FNMA plus the renovation/new construction of 60 additional units. This phase will be undertakenusing 4% LIHTC and HTC Credits to leverage the Choice Neighborhood funding.

Location Description:

These properties are located in Cincinnait's Avondale neighborhood, also the target area for TCB's FY12 ChoiceNeighborhoods Implementation Grant.3415 Reading Road, Cincinnati, OH; census tract: 39061006700722 Gholston Ave, Cincnnati, OH; census tract: 390610068003639 Reading Road, Cincinnati, OH; census tract: 39061006800610 Maple Ave, Cincinnati, OH; census tract: 39061006700615 Maple Ave, Cincinnati, OH; census tract: 39061006700802 Blair Ave, Cincinnati, OH; census tract: 390610067003580 Reading Road, Cincinnati, OH; census tract: 39061006600

Expenses related radon testing and equipment installation.

Activity Progress Narrative:

Avondale II Rehab B-2Activity Title:

Project Number:

B-2

Project Title:

Purchase/rehab abandon/foreclosed properties LH

$4,473,189.80$14,061.18The Community Builders

$0.00 Program Funds Drawdown $76,285.54

$4,473,189.80$14,061.18Total Funds Expended

14

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 15: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

Accomplishments Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Total Total

5/5# of Properties 0

54/54#Replaced thermostats 0

54/54#Replaced hot water heaters 0

54/54#Low flow toilets 0

54/54#Low flow showerheads 0

5/5#Sites re-used 0

This Report Period Cumulative Actual Total / Expected

Total Total

54/54# of Housing Units 0

54/54# of Multifamily Units 0

No Beneficiaries Performance Measures found.

Beneficiaries Performance Measures

D / Demolish Blighted StructuresProject # /

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$1,328,002.70

NSP Only - LMMI The Community Builders

Total Projected Budget from All Sources $1,328,002.70

$0.00Total Budget

National Objective:

Activity Status:

Projected End Date:

Completed Activity Actual End Date:

NSP20100600-F

Jan 1 thru Mar 31, 2019

Activitiy Category:

N/A

05/31/2017

To Date

11/12/2016

Area ( )

Responsible Organization:

Clearance and Demolition Completed

TCB Cincinnati MF F Hale AptsActivity Title:

Project Number:

D

Project Title:

Demolish Blighted Structures

15

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 16: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Match Contributed $0.00

$0.00

$1,328,002.70

$0.00

Program Income Drawdown

Program Income Received

Total Funds Drawdown

Total Obligated

$0.00

$0.00

$0.00 $948,416.83

$0.00

$0.00

$1,060,762.10

Most Impacted and Distressed Expended $0.00

Activity Description:

Hale apartments was purchased as part of a larger portfolio by TCB Cincinnati MF LLC from FNMA, subsequent to FNMA’sforeclosure on the portfolio. After significant effort to maintain the building as affordable housing, the developer, the City ofCincinnati, and HUD Multi-Family have come to the conclusion that the best result for the neighborhood would be to port theHAP Contract, relocate the residents, and demolish the building. The demolition of this building will remove blight in an areawhere more than 51% of the residents are at or below 120% AMI, therefore meeting the area benefit national objective.

Location Description:

Hale Apartments, census tract: 39061027000, address: 518 Hale Avenue, Cincinnati, OH in between Hallwood Place andHarvey Ave.

Activity Progress Narrative:

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

$1,060,762.10$0.00The Community Builders

Accomplishments Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Total Total

1/1# of Properties 0

No Beneficiaries Performance Measures found.

Beneficiaries Performance Measures

$0.00 Program Funds Drawdown $112,345.27

$1,060,762.10$0.00Total Funds Expended

E / Redevelop demolished/vacant properties as housingProject # /

Grantee Activity Number:

Activity Status:

NSP20100557-2

Activitiy Category:

Noda MillsActivity Title:

16

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 17: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Projected Start Date:

Benefit Type:

Overall

$4,571,204.79

NSP Only - LMMI The Community Builders

Total Projected Budget from All Sources

Match Contributed

$4,571,204.79

$0.00

$0.00

$0.00

$4,571,204.79

$0.00

Total Budget

National Objective:

Program Income Drawdown

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

$0.00

$0.00

$0.00

Jan 1 thru Mar 31, 2019

$4,571,204.79

$0.00

N/A

10/01/2019

$0.00

To Date

01/31/2013

Direct ( HouseHold )

$4,571,204.79

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Construction of new housing Under Way

Activity Description:

Noda Mills is the master planning component of a multi-phase mill redevelopment project. The Meckelenberg Mills "B" Activityis one of the phases. The Noda Mills Activity will deliver newly constructed units.

Location Description:

The Activity is located in Charlotte, NC, in census tract 37119001400.

Activity Progress Narrative:

Project Number:

E

Project Title:

Redevelop demolished/vacant properties as housing

No Accomplishments Performance Measures

Accomplishments Performance Measures

No Beneficiaries Performance Measures found.

Beneficiaries Performance Measures

$0.00 Program Funds Drawdown $0.00

$4,571,204.79$0.00Total Funds Expended

17

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 18: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

18

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 19: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$1,350,000.00

NSP Only - LMMI The Community Builders

Total Projected Budget from All Sources

Match Contributed

$1,350,000.00

$0.00

$0.00

$0.00

$1,350,000.00

$0.00

Total Budget

National Objective:

Program Income Drawdown

Activity Status:

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

NSP20100571

$46.02

$0.00

$46.02

Jan 1 thru Mar 31, 2019

Activitiy Category:

$1,349,999.99

$0.00

N/A

07/15/2019

$0.00

To Date

06/15/2018

Direct ( HouseHold )

$1,349,999.99

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Construction of new housing Under Way

Activity Description:

The Clarion redevelopment site comprises 11 contiguous, vacant parcels. Eight of the parcels are owned by the City of Bostonwith the remainder owned by Habitat for Humanity - Boston (1) and Roxbury Multi-Service Center (2). The Clarion is theproposed new construction of a single, 39 unit, multi-family apartment building with over 5,000 SQFT of commercial space and32 parking spaces. the project will be along Blue Hill Ave between Quincy Street and Holborn Street in Roxbury, MA. Thedevelopment with be a mix of 1-, 2-, 3-bedroom units and will target households earning up to 30%, 60%, 100%, and 120%AMI. 

Location Description:

census tract: 25025082000  address: 1 Quincy Terrace, 281A, 287, 295, 299, 303, 307, 309, 311 Blue Hill Ave, 48 & 46Holborn Street, Boston, MA

The ClarionActivity Title:

Project Number:

E

Project Title:

Redevelop demolished/vacant properties as housing

$1,349,999.99$46.02The Community Builders

$0.00 Program Funds Drawdown $0.00

Ancillary Activities

ResponsibleOrganization

Program IncomeAccountActivity Type Project # Grantee Activity # Activity Title

The Clarion ActivityDelivery

NSP20100571BEConstruction of new

housingThe Community Builders General Account

Association Description:Linking the activity delivering the national objective to the activity that accounts for the grantee's legal and staff time.

$1,349,999.99$46.02Total Funds Expended

19

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 20: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Construction will be wrapping up in Q2 2019.

Activity Progress Narrative:

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

No Accomplishments Performance Measures

Accomplishments Performance Measures

No Beneficiaries Performance Measures found.

Beneficiaries Performance Measures

20

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 21: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$1,160.00

NSP Only - LMMI The Community Builders

Total Projected Budget from All Sources

Match Contributed

$1,160.00

$0.00

$0.00

$0.00

$1,160.00

$0.00

Total Budget

National Objective:

Program Income Drawdown

Activity Status:

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

NSP20100613

$0.00

$0.00

$0.00

Jan 1 thru Mar 31, 2019

Activitiy Category:

$1,160.00

$0.00

N/A

04/30/2018

04/30/2018

$0.00

To Date

05/01/2015

Direct ( HouseHold )

$1,160.00

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Rehabilitation/reconstruction of residential structures Completed

Activity Description:

This project will result in 60 units of housing across 9 buildings, including a mix of substantial rehab and new construction. 15%of the units will target veteran households, and 25 units will be dedicated for seniors. Two of the buildings, 602 and 400 CraigStreet, are historic schools. Complementing the school conversions, TCB will address the blighting effect of abandoned housesalong Stanley and Emmett Streets. Three of the existing 2-family houses will be rehabilitated, while others will be demolishedand replaced with new structures. TCB will develop on site management offices and improve side lots with playgrounds andgardens.

Location Description:

This project is located in the Hamilton Hill neighborhood of Schenectady, NY.

Hillside ViewActivity Title:

Project Number:

E

Project Title:

Redevelop demolished/vacant properties as housing

$1,160.00$0.00The Community Builders

$0.00 Program Funds Drawdown $0.00

Ancillary Activities

ResponsibleOrganization

Program IncomeAccountActivity Type Project # Grantee Activity # Activity Title

Hillside View ActivityDelivery

NSP20100613BERehabilitation/reconstru

ction of residentialstructures

The Community Builders General Account

Association Description:Associating the activity that tracks grantee costs related to the delivery of the Hillside View activities.

$1,160.00$0.00Total Funds Expended

21

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 22: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Activity Progress Narrative:

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

Accomplishments Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Total Total

0/12# of Properties 0

0/2#High efficiency heating plants 0

0/9#Efficient AC added/replaced 0

0/3#Replaced thermostats 0

0/5#Replaced hot water heaters 0

0/60#Refrigerators replaced 0

0/0#Clothes washers replaced 0

0/60#Dishwashers replaced 0

0/39#Units with solar panels 0

0/74#Low flow toilets 0

0/60#Low flow showerheads 0

0/60#Units with bus/rail access 0

0/60#Units exceeding Energy Star 0

0/5#Sites re-used 0

0/7#Units deconstructed 0

0/60#Units ¿ other green 0

0/9# of Elevated Structures 0

This Report Period Cumulative Actual Total / Expected

Total Total

0/60# of Housing Units 0

0/60# of Multifamily Units 0

Beneficiaries Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Low Mod Total Low Mod Total Low/Mod

0 0/0 0/60 0/60# of Households 0 0 0

0 0/0 0/60 0/60# Renter Households 0 0 0

22

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 23: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$14,320.94

NSP Only - LMMI The Community Builders

Total Projected Budget from All Sources

Match Contributed

$14,320.94

$0.00

$0.00

$0.00

$14,320.94

$0.00

Total Budget

National Objective:

Program Income Drawdown

Activity Status:

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

NSP20100613B

$0.00

$0.00

$0.00

Jan 1 thru Mar 31, 2019

Activitiy Category:

$14,320.94

$0.00

N/A

09/30/2018

09/30/2018

$0.00

To Date

05/01/2015

Direct ( HouseHold )

$14,320.94

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Rehabilitation/reconstruction of residential structures Completed

Activity Description:

This is the Activity Delivery component of the Hillside View Project E Activity. Performance metrics will be reported under theactivities delivering the national objective.

Location Description:

This is the Activity Delivery component of the Hillside View Project E Activity.

Activity Progress Narrative:

Hillside View Activity DeliveryActivity Title:

Project Number:

E

Project Title:

Redevelop demolished/vacant properties as housing

No Accomplishments Performance Measures

Accomplishments Performance Measures

No Beneficiaries Performance Measures found.

Beneficiaries Performance Measures

$0.00 Program Funds Drawdown $0.00

$14,320.94$0.00Total Funds Expended

23

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 24: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

24

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 25: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$1,736,725.00

NSP Only - LMMI The Community Builders

Total Projected Budget from All Sources

Match Contributed

$1,736,725.00

$0.00

$0.00

$0.00

$48.71

$0.00

Total Budget

National Objective:

Program Income Drawdown

Activity Status:

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

NSP20100617

$0.00

$0.00

$0.00

Jan 1 thru Mar 31, 2019

Activitiy Category:

$48.71

$0.00

N/A

05/23/2016

05/23/2016

($1,736,676.29)

To Date

03/13/2014

Direct ( HouseHold )

$48.71

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Construction of new housing Completed

Activity Description:

The project includes acquisition of a vacant lot adjacent to two buildings at Cottage Place Gardens, combining the lots into asingle tax parcel, demolishing the two existing buildings and constructing an affordable development consisting of a single 4+story, 45,000 sq .ft. , 51 unit family building with 79 parking spaces. Twenty-five of the units are restricted to low-income whilethe remaining 26 are restricted to moderate income. All of the units are restricted with a Land Use Restriction Agreement that isrecorded and runs with the land. TCB owns and manages the property. Leases are for one year, and rents are set according tothe lowest program set aside for the unit. For the NSP2 program the low HOME rents are used.

Location Description:

188 WarburtonActivity Title:

Project Number:

E

Project Title:

Redevelop demolished/vacant properties as housing

$48.71$0.00The Community Builders

$0.00 Program Funds Drawdown $0.00

Ancillary Activities

ResponsibleOrganization

Program IncomeAccountActivity Type Project # Grantee Activity # Activity Title

188 WarburtonActivity Delivery

NSP20100617BEConstruction of new

housingThe Community Builders General Account

Association Description:Associating the activity that tracks grantee costs related to the delivery of the 188 Warburton activity.

$48.71$0.00Total Funds Expended

25

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 26: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

188 Warburton is the first on-site phase of the Cottage Place Gardens redevelopment and will provide family housing on a 0.99acre site in southwest Yonkers.The address is 188 Warburton Ave, Yonkers, NY 10701, located in census tract: 36119000402

Beneficiary metrics are incorrect, but error messages are preventing corrections.

Activity Progress Narrative:

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

Accomplishments Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Total Total

33/59#Low flow toilets -26

25/57#Low flow showerheads -32

25/51#Units exceeding Energy Star -26

1/1#Sites re-used -1

0/12# ELI Households (0-30% AMI) -12

This Report Period Cumulative Actual Total / Expected

Total Total

25/51# of Housing Units -26

25/51# of Multifamily Units -26

Beneficiaries Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Low Mod Total Low Mod Total Low/Mod

0 37/25 26/26 63/51# of Households 25 25 100.00

0 37/25 26/26 63/51# Renter Households 25 25 100.00

26

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 27: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$1,000,000.00

NSP Only - LMMI The Community Builders

Total Projected Budget from All Sources

Match Contributed

$1,000,000.00

$0.00

$0.00

$0.00

$1,000,000.00

$0.00

Total Budget

National Objective:

Program Income Drawdown

Activity Status:

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

NSP20100643E

$1,785.55

$35,508.97

$1,785.55

Jan 1 thru Mar 31, 2019

Activitiy Category:

$365,437.72

$0.00

N/A

08/30/2017

08/30/2017

$0.00

To Date

05/15/2013

Direct ( HouseHold )

$375,124.84

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Rehabilitation/reconstruction of residential structures Completed

Activity Description:

This Activity will provide 8 middle-income NSP2 units. Together with the other Avondale II Activities, they will produce 119 unitsof new or redeveloped housing in the Avondale neighborhood.

Location Description:

These properties are located in Cincinnait's Avondale neighborhood, also the target area for TCB's FY12 ChoiceNeighborhoods Implementation Grant.3415 Reading Road, Cincinnati, OH; census tract: 39061006700722 Gholston Ave, Cincnnati, OH; census tract: 390610068003639 Reading Road, Cincinnati, OH; census tract: 39061006800610 Maple Ave, Cincinnati, OH; census tract: 39061006700615 Maple Ave, Cincinnati, OH; census tract: 39061006700802 Blair Ave, Cincinnati, OH; census tract: 390610067003580 Reading Road, Cincinnati, OH; census tract: 39061006600

Expenses related to radon testing and equipment installation.

Activity Progress Narrative:

Avondale Housing II LP New ConstActivity Title:

Project Number:

E

Project Title:

Redevelop demolished/vacant properties as housing

$375,124.84$1,785.55The Community Builders

$0.00 Program Funds Drawdown $9,687.12

$375,124.84$1,785.55Total Funds Expended

27

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 28: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

Accomplishments Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Total Total

1/1# of Properties 0

8/8#Replaced thermostats 0

8/8#Replaced hot water heaters 0

8/8#Refrigerators replaced 0

8/8#Low flow toilets 0

8/8#Low flow showerheads 0

1/1#Sites re-used 0

This Report Period Cumulative Actual Total / Expected

Total Total

8/8# of Housing Units 0

8/8# of Multifamily Units 0

No Beneficiaries Performance Measures found.

Beneficiaries Performance Measures

28

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 29: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$1,273.40

NSP Only - LMMI The Community Builders

Total Projected Budget from All Sources

Match Contributed

$1,273.40

$0.00

$0.00

$0.00

$1,273.40

$0.00

Total Budget

National Objective:

Program Income Drawdown

Activity Status:

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

NSP20100661

$0.00

$0.00

$0.00

Jan 1 thru Mar 31, 2019

Activitiy Category:

$1,273.40

$0.00

N/A

11/08/2016

11/08/2016

$0.00

To Date

06/09/2014

Direct ( HouseHold )

$1,273.40

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Construction of new housing Completed

Activity Description:

The Activity project is a follow-up to the highly successful Broad Creek HOPE VI collaboratation between TCB and the NorfolkHousing & Redevelopment Authority (NRHA). The Activity will develop 10 out of 50 units of replacement housing for formerMoton Circle public housing residents. The remaining 40 units are in activity NSP20100661 Broac Creek V E-2. All of the unitsare restricted with a Land Use Restriction Agreement (LURA) that is recorded and runs with the land. TCB owns and managesthe property. Leases are for one year, and rents are set according to the lowest program set aside for the unit. For the NSP2program the low HOME rents are used.

Location Description:

Broad Creek VActivity Title:

Project Number:

E

Project Title:

Redevelop demolished/vacant properties as housing

$1,273.40$0.00The Community Builders

$0.00 Program Funds Drawdown $0.00

Ancillary Activities

ResponsibleOrganization

Program IncomeAccountActivity Type Project # Grantee Activity # Activity Title

Broad Creek VActivity Delivery

NSP20100661BEConstruction of new

housingThe Community Builders General Account

Association Description:Associating the activity that tracks grantee costs related to the delivery of the Broad Creek V activities.

$1,273.40$0.00Total Funds Expended

29

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 30: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

The Activity will take place on two census tracts. Census tract number 517100043.00 and 517100044.00. The address is 2500 -2592 Joe Austin Drive, Norfolk, VA 23504

Activity Progress Narrative:

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

Accomplishments Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Total Total

10/10#Low flow toilets -40

10/10#Low flow showerheads -40

10/10#Units with bus/rail access -40

10/0#Units exceeding Energy Star -40

This Report Period Cumulative Actual Total / Expected

Total Total

10/10# of Housing Units -40

10/10# of Multifamily Units -40

Beneficiaries Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Low Mod Total Low Mod Total Low/Mod

0 0/0 10/10 10/10# of Households 0 0 100.00

0 0/0 10/10 10/10# Renter Households 0 0 100.00

30

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 31: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$1,250,000.00

NSP Only - LMMI The Community Builders

Total Projected Budget from All Sources

Match Contributed

$1,250,000.00

$0.00

$0.00

$0.00

$1,250,000.00

$0.00

Total Budget

National Objective:

Program Income Drawdown

Activity Status:

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

NSP20100684

$28,042.42

$0.00

$28,042.42

Jan 1 thru Mar 31, 2019

Activitiy Category:

$1,141,648.83

$0.00

N/A

12/28/2018

$0.00

To Date

11/06/2017

Direct ( HouseHold )

$1,141,648.83

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Rehabilitation/reconstruction of residential structures Under Way

Activity Description:

The 38 new apartments on the upper floors of the Aurora Arts Centre will provide the opportunity for residents to live in theheart of the Fox Valley Region’s greatest and growing arts district. We expect these apartments to attract working artists fromthroughout Chicagoland in search of a supportive atmosphere and affordable rents. All the units will be restricted to moderateincome households using a Land Use Restriction Agreement that is recorded and runs with the land. The Community Builders,Inc will own and manage the property. Leases are for one year, and rents are set according to the lowest program set aside forthe unit. For the NSP2 program the low HOME rents are used.

Location Description:

Aurora Scattered SitesActivity Title:

Project Number:

E

Project Title:

Redevelop demolished/vacant properties as housing

$1,141,648.83$28,042.42The Community Builders

$0.00 Program Funds Drawdown $0.00

Ancillary Activities

ResponsibleOrganization

Program IncomeAccountActivity Type Project # Grantee Activity # Activity Title

Aurora ScatteredSites Activity DeliveryNSP20100684BE

Rehabilitation/reconstruction of residential

structuresThe Community Builders General Account

Association Description:Associating the activity that tracks grnatee costs related to the delivery of the Aurora Scattered Sites activitie.

$1,141,648.83$28,042.42Total Funds Expended

31

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 32: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

The project address is: 5 E. Galena Boulevard, Aurora, IL in census tract: 17089853700

Construction will be complete in Q2 2019.

Activity Progress Narrative:

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

No Accomplishments Performance Measures

Accomplishments Performance Measures

No Beneficiaries Performance Measures found.

Beneficiaries Performance Measures

32

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 33: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$27,580.56

NSP Only - LMMI The Community Builders

Total Projected Budget from All Sources

Match Contributed

$27,580.56

$0.00

$0.00

$0.00

$27,580.56

$0.00

Total Budget

National Objective:

Program Income Drawdown

Activity Status:

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

NSP20100684B

$0.00

$0.00

$0.00

Jan 1 thru Mar 31, 2019

Activitiy Category:

$27,580.56

$0.00

N/A

12/28/2018

$0.00

To Date

11/06/2017

Direct ( HouseHold )

$27,580.56

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Rehabilitation/reconstruction of residential structures Under Way

Activity Description:

This activity is the activity delivery component of Aurora Scattered Sites NSP20100684. The benficiaries and performancemetrics will be reported under the activity delivering the national objective.

Location Description:

The project address is: 5 E. Galena Boulevard, Aurora, IL in census tract: 17089853700

Activity Progress Narrative:

Aurora Scattered Sites Activity DeliveryActivity Title:

Project Number:

E

Project Title:

Redevelop demolished/vacant properties as housing

No Accomplishments Performance Measures

Accomplishments Performance Measures

No Beneficiaries Performance Measures found.

Beneficiaries Performance Measures

$0.00 Program Funds Drawdown $0.00

$27,580.56$0.00Total Funds Expended

33

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 34: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

E-2 / Redevelop demolished/vacant properties as housingProject # /

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$8,581,365.44

NSP Only - LH - 25% Set-Aside The Community Builders

Total Projected Budget from All Sources

Match Contributed

$8,581,365.44

$0.00

$0.00

$20,000.00

$8,581,365.44

$0.00

Total Budget

National Objective:

Program Income Drawdown

Activity Status:

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

NSP20100522-1

$0.00

$20,000.00

$0.00

Jan 1 thru Mar 31, 2019

Activitiy Category:

$1,597,745.79

$0.00

N/A

12/28/2012

$0.00

To Date

12/20/2010

Direct ( HouseHold )

$8,581,365.44

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Construction of new housing Completed

Activity Description:

Northtown Village Senior E-2Activity Title:

Project Number:

E-2

Project Title:

Redevelop demolished/vacant properties as housing

$0.00 Program Funds Drawdown $6,983,619.65

$8,581,365.44$0.00Total Funds Expended

34

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 35: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

The project is a new construction four story elevator building containing 56 one bedroom units for the elderly. Forty of the unitsare restricted to households earning 50% AMI or below and will be tracked in this E-2 Activity. The remaining 16 units will betracked under a separate E Activity.  All of the units are restricted with a Land Use Restriction Agreement that is recorded andruns with the land. Hispanic Housing Development Corp. is managing the residential units. Leases are for one year, and rentsare set using low HOME rents.The project exceeds energy star ratings.   The Indiana EPA approved the site remediation plan.  That plan was also approvedby HUD.

Location Description:

Northtown Village Senior is located in East Chicago, Indiana in census tracts 18089031000 and 18089030200. The address is2320 Broadway, East Chicago, IN, 46312

Activity Progress Narrative:

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

Accomplishments Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Total Total

48/0#Units with solar panels 0

48/40#Low flow toilets 0

48/40#Low flow showerheads 0

48/40#Units with bus/rail access 0

48/40#Units exceeding Energy Star 0

1/1#Sites re-used 0

48/22# ELI Households (0-30% AMI) 0

This Report Period Cumulative Actual Total / Expected

Total Total

48/40# of Housing Units 0

48/40# of Multifamily Units 0

Beneficiaries Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Low Mod Total Low Mod Total Low/Mod

0 48/40 0/0 48/40# of Households 0 0 100.00

0 48/40 0/0 48/40# Renter Households 0 0 100.00

35

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 36: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$1,736,123.79

NSP Only - LH - 25% Set-Aside The Community Builders

Total Projected Budget from All Sources

Match Contributed

$1,736,123.79

$0.00

$0.00

$0.00

$1,736,123.79

$0.00

Total Budget

National Objective:

Program Income Drawdown

Activity Status:

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

NSP20100617E-2

$0.00

$0.00

$0.00

Jan 1 thru Mar 31, 2019

Activitiy Category:

$1,736,676.29

$0.00

N/A

05/23/2016

05/23/2016

$0.00

To Date

03/13/2014

Direct ( HouseHold )

$1,736,676.29

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Construction of new housing Under Way

Activity Description:

The project includes acquisition of a vacant lot adjacent to two buildings at Cottage Place Gardens, combining the lots into asingle tax parcel, demolishing the two existing buildings and constructing an affordable development consisting of a single 4+story, 45,000 sq .ft. , 51 unit family building with 79 parking spaces. Twenty-five of the units are restricted to low-income whilethe remaining 26 are restricted to moderate income. All of the units are restricted with a Land Use Restriction Agreement that isrecorded and runs with the land. TCB owns and manages the property. Leases are for one year, and rents are set according tothe lowest program set aside for the unit. For the NSP2 program the low HOME rents are used.

Location Description:

188 Warburton is the first on-site phase of the Cottage Place Gardens redevelopment and will provide family housing on a 0.99acre site in southwest Yonkers.

The address is 188 Warburton Ave, Yonkers, NY 10701, located in census tract: 36119000402

Reported performance metrics and expenditures this quarter.

Activity Progress Narrative:

188 Warburton E-2Activity Title:

Project Number:

E-2

Project Title:

Redevelop demolished/vacant properties as housing

$1,736,123.79$1,736,123.79The Community Builders

$0.00 Program Funds Drawdown $0.00

$1,736,123.79$1,736,123.79Total Funds Expended

36

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 37: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

Accomplishments Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Total Total

32/25#Low flow showerheads 32

25/25#Units exceeding Energy Star 25

This Report Period Cumulative Actual Total / Expected

Total Total

25/25# of Housing Units 25

25/25# of Multifamily Units 25

Beneficiaries Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Low Mod Total Low Mod Total Low/Mod

0 25/25 0/0 25/25# of Households 25 25 100.00

0 25/25 0/0 25/25# Renter Households 25 25 100.00

37

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 38: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$500,000.00

NSP Only - LH - 25% Set-Aside The Community Builders

Total Projected Budget from All Sources

Match Contributed

$500,000.00

$0.00

$0.00

$0.00

$500,000.00

$0.00

Total Budget

National Objective:

Program Income Drawdown

Activity Status:

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

NSP20100643E-2

$2,231.93

$44,386.22

$2,231.93

Jan 1 thru Mar 31, 2019

Activitiy Category:

$456,797.14

$0.00

N/A

08/30/2017

08/30/2017

$0.00

To Date

05/15/2013

Direct ( HouseHold )

$468,905.93

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Construction of new housing Completed

Activity Description:

This Activity will provide 10 low-income NSP2 units. Together with the other Avondale II Activities, they will produce 119 units ofnew or redeveloped housing in the Avondale neighborhood.

Location Description:

These properties are located in Cincinnait's Avondale neighborhood, also the target area for TCB's FY12 ChoiceNeighborhoods Implementation Grant.3415 Reading Road, Cincinnati, OH; census tract: 39061006700722 Gholston Ave, Cincnnati, OH; census tract: 390610068003639 Reading Road, Cincinnati, OH; census tract: 39061006800610 Maple Ave, Cincinnati, OH; census tract: 39061006700615 Maple Ave, Cincinnati, OH; census tract: 39061006700802 Blair Ave, Cincinnati, OH; census tract: 390610067003580 Reading Road, Cincinnati, OH; census tract: 39061006600

Expenses related to radon testing and equipment installation.

Activity Progress Narrative:

Avondale II New Construction E-2Activity Title:

Project Number:

E-2

Project Title:

Redevelop demolished/vacant properties as housing

$468,905.93$2,231.93The Community Builders

$0.00 Program Funds Drawdown $12,108.79

$468,905.93$2,231.93Total Funds Expended

38

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 39: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

Accomplishments Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Total Total

10/10#Low flow toilets 0

10/10#Units with bus/rail access 0

1/1#Sites re-used 0

This Report Period Cumulative Actual Total / Expected

Total Total

10/10# of Housing Units 0

10/10# of Multifamily Units 0

No Beneficiaries Performance Measures found.

Beneficiaries Performance Measures

39

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 40: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

Grantee Activity Number:

Projected Start Date:

Benefit Type:

Overall

$1,741,596.11

NSP Only - LH - 25% Set-Aside The Community Builders

Total Projected Budget from All Sources

Match Contributed

$1,741,596.11

$0.00

$0.00

$0.00

$1,741,596.11

$0.00

Total Budget

National Objective:

Program Income Drawdown

Activity Status:

Program Income Received

Total Funds Drawdown

Projected End Date:

Completed Activity Actual End Date:

Total Obligated

NSP20100661E-2

$0.00

$0.00

$0.00

Jan 1 thru Mar 31, 2019

Activitiy Category:

$1,741,596.11

$0.00

N/A

11/08/2016

11/08/2016

$0.00

To Date

06/09/2014

Direct ( HouseHold )

$1,741,596.11

Most Impacted and Distressed Expended

Responsible Organization:

$0.00

Construction of new housing Completed

Activity Description:

The Activity project is a follow-up to the highly successful Broad Creek HOPE VI collaboratation between TCB and the NorfolkHousing & Redevelopment Authority (NRHA). The Activity will develop 40 of 50 units of replacement housing for former MotonCircle public housing residents. All of the units are restricted with a Land Use Restriction Agreement (LURA) that is recordedand runs with the land. TCB owns and manages the property. Leases are for one year, and rents are set according to thelowest program set aside for the unit. For the NSP2 program the low HOME rents are used.

Location Description:

The Activity will take place on two census tracts. Census tract number 517100043.00 and 517100044.00. The address is 2500 -2592 Joe Austin Drive, Norfolk, VA 23504

Reported performance metrics this period.

Activity Progress Narrative:

Broad Creek V E-2Activity Title:

Project Number:

E-2

Project Title:

Redevelop demolished/vacant properties as housing

$1,741,596.11$0.00The Community Builders

$0.00 Program Funds Drawdown $0.00

$1,741,596.11$0.00Total Funds Expended

40

Community Development SystemsDisaster Recovery Grant Reporting System (DRGR)

Page 41: Grantee:The Community Builders, Inc. Grant: B-09-NN-MA ... · 31/03/2019  · Grantee:The Community Builders, Inc. Grant: B-09-NN-MA-0003 January 1, 2019 thru March 31, 2019 Performance

No Activity Locations found.

Activity Locations

No Other Funding Sources Found

Other Funding Sources Amount

Total Other Funding Sources

No Other Match Funding Sources Found

Other Funding Sources Budgeted - Detail

Accomplishments Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Total Total

40/40#Low flow toilets 40

40/40#Low flow showerheads 40

40/40#Units with bus/rail access 40

This Report Period Cumulative Actual Total / Expected

Total Total

40/40# of Housing Units 40

40/40# of Multifamily Units 40

Beneficiaries Performance MeasuresThis Report Period Cumulative Actual Total / Expected

Low Mod Total Low Mod Total Low/Mod

20 20/40 20/0 40/40# of Households 20 40 100.00

20 20/40 20/0 40/40# Renter Households 20 40 100.00

41