    Project Status

    GRAND CONCOURSE CAPITAL PROJECT

    • 161st St to 166th St (Phase 1) - Completed

    • 166th St to 171st St (Phase 2) - Under Construction

    • 171st St to 175th St (Phase 3) - Planned

    • 175th St to Fordham Rd (Phase 4) - Future

    2

    Grand Concourse

    & 167th St

    Grand Concourse

    & 164th St

  • 8/16/2019 Grand Concourse Reconstruction Phase 3

    3/8

    nyc.gov/dot 3

    PROJECT AREA

    • Vision Zero Priority Corridor• 70 pedestrians Killed or

    Severely Injured (KSI)(2009-2013)

    • 12.8 pedestrian KSI per mile(2009-2013)

    • 1 of 4 “Great Streets” identified

    for capital funding by City

    • Phase 3

    • CB 4: 171st St – Cross BronxExpressway

    • CB 5: Cross Bronx

    Expressway to 175th St• Phase 4

    • Workshop to discuss ideasand receive community inputin Fall 2016

  • 8/16/2019 Grand Concourse Reconstruction Phase 3

    4/8

    nyc.gov/dot

    Curbside Congestion

    EXISTING ISSUES

    • Vehicles frequently block existing buffered curbside bicycle lane

    • Numerous requests to improve design to better protect bicyclists

    4

  • 8/16/2019 Grand Concourse Reconstruction Phase 3

    5/8

    nyc.gov/dot 5

    Cross Section

    In future,

    bicycle lane

    would be raised

    on mountable

    curb

    Buffered

    bicycle lane

    along

    median

    Bufferedbicycle lane

    along

    parking

    Existing

    Existing

    Proposed – Short Term

    Proposed – Long Term

  • 8/16/2019 Grand Concourse Reconstruction Phase 3

    6/8

    nyc.gov/dot

    EXAMPLE – QUEENS BOULEVARD

    6

    Bike lane on median

    side of service road

    Vehicles entering and

    exiting main line yield

    to traffic and bicycles

  • 8/16/2019 Grand Concourse Reconstruction Phase 3

    7/8nyc.gov/dot 7

    BENEFITS

    • Reduces conflicts

    between bicyclists and

    curbside vehicles

    • Reduces bicyclists

    weaving into moving

    lane and improves

    vehicle flow

    • Improves safety for all

    roadway users

  • 8/16/2019 Grand Concourse Reconstruction Phase 3

    8/8nyc.gov/dot

    Thank You