Upload
trandiep
View
215
Download
0
Embed Size (px)
Citation preview
8/3
/20
18 5
:53
:08
PM
Grace Bible Church - Creekside CampusWilliams Creek Drive, College Station, Texas
Co
nst
ruc
tion D
oc
um
ents
Gra
ce
Bib
le C
hurc
h -
Cre
eks
ide
Ca
mp
us
07/30/2018
Che
cke
r
08/03/2018
00000
1
1.00
1
101.96
00
1.00
00
1.00
0
0
ARCHITECTURAL CRITERIACODES & REGULATIONS
A. Building Code: 2015 International Building CodeB. Fire Code: 2015 International Fire CodeC. Life Safety Code: 2015 NFPA-101 Life Safety CodeD. Mechanical: 2015 International Mechanical CodeE. Plumbing Code: 2015 International Plumbing CodeF. Electrical Code: 2014 National Electrical CodeG. Accessibility: 2015 International Building Code (ADA)
2012 Texas Accessibility Standards (TAS)H. Energy Code: 2015 International Energy Conservation Code (2015 IECC
COMcheck Compliance)
A
00000
UL ASSEMBLIES
FLOOR PLAN
Gyp Bd (Large Scale)
Cont Wood Blocking
Discontinuous Wood Blocking
Wood Hardboard
Rigid Insulation(Large Scale)
Batt Insulation
DEMOLITION PLAN
ABBREVIATIONS SYMBOL LEGEND GENERAL NOTES PROJECT CRITERIA
LOCATION MAP
MATERIALS
Williams Creek Dr.
William D. Fitch Pkwy
Plan North
True North
ABV AboveACC Access, AccessibleACS PNL Access PanelACST AcousticalA/C Air ConditioningADDM AddendumADH AdhesiveADJ Adjacent, AdjustableAFF Above Finish FloorAGGR AggregateALT AlternateALUM AluminumANOD AnodizedAPPROX ApproximateASPH Asphalt
BB Bulletin BoardBITUM BituminousBD BoardBLDG BuildingBLW BelowBM Bench MarkBRG BearingBRZ BronzeBSMT BasementBTWN BetweenBUR Built-up RoofBW Both Ways
CAB CabinetCEM CementCER CeramicCFLG CounterflashingCFMF Cold Formed Metal FramingCH BD ChalkboardCI Cast IronCIR CircleCJ Control JointCLG CeilingCLG HT Ceiling HeightCLO ClosetCLR ClearCMU Concrete Masonry UnitCOL ColumnCONC ConcreteCONSTR ConstructionCONT ContinuousCPT Carpet (ed)CPRS Compress (ed)(ion)(ible)CU FT Cubic FootCU YD Cubic Yard
DEMO Demolish, DemolitionDET DetailDF Drinking FountainDIA DiameterDIAG DiagonalDIM DimensionDMPF DampproofingDR DoorDS DownspoutDWG Drawing
E EastEIFS Exterior Insulation Finish SystemEJ Expansion JointEL ElevationELEC ElectricalELEV ElevatorEQ EqualEQUIP EquipmentEST EstimateEWC Electric Water CoolerEXH ExhaustEXIST ExistingEXP ExposedEXT Exterior
FD Floor DrainFE Fire ExtinguisherFEC Fire Extinguisher CabinetFHC Fire Hose CabinetFIN Finish (ed)FIN FLR Finish FloorFLASH FlashingFLEX FlexibleFLR FloorFLUOR FluorescentFO Face ofFOC Face of ConcreteFR FrameFTG FootingFURG Furring
G GutterGA GageGALV GalvanizedGFRC Glass Fiber Reinforced ConcreteGL Glass, GlazingGYP BD Gypsum Board
HB Hose BibbHC Hollow CoreHDW HardwareHDWD HardwoodHM Hollow MetalHOR HorizontalHT HeightHVAC Heating/Ventilating/Air Conditioning
ID Inside DiameterINCL Include (d)(ing)INSUL Insulate (d)(ion)INT InteriorINV Invert
JAN Janitor
KO KnockoutKIT Kitchen
LAB LaboratoryLAD LadderLAM LaminatedLAV LavatoryLF Lineal FeetLH Left HandLIN LinearLPT Low PointLT LightLVR Louver
MATL MaterialMAX MaximumMECH MechanicalMED MediumMEMB MembraneMFR ManufacturerMH ManholeMIN MinimumMIRR MirrorMISC MiscellaneousMKR BD Marker BoardMO Masonry OpeningMT Mount (ed)(ing)MTL MetalMULL Mullion
N NorthNC Noise CriteriaNIC Not in ContractNOM NominalNRC Noise Reduction CoefficientNTS Not to Scale
OA Outside AirOC On CenterOD Outside DiameterOFOI Owner Furnished Owner InstalledOFCI Owner Furnished Contractor InstalledOGL Obscure GlassOPH Opposite HandOPNG OpeningOPP Opposite
PAR ParallelPBO Provided By OwnerPCF Pounds per Cubic FootPCP Portland Cement Plaster (Stucco)PERIM PerimeterPL Plastic LaminatePLAS PlasterPLYWD PlywoodPNL PanelPNT PaintedPSI Pounds per Square InchPSF Pounds per Square FootPT PaintPTN PartitionPVC Polyvinyl ChloridePVMT Pavement
QRY QuarryQT Quarry TileQTB Quarry Tile BaseQTF Quarry Tile FloorQTR QuarterQTY Quantity
R/A Return AirR Riser, RadiusRCP Reflected Ceiling PlanRD Roof DrainREF ReferenceREG RegisterREM RemoveRET ReturnREV Revision, RevisedRH Right HandRM RoomRO Rough OpeningROW Right of Way
S SouthSC Sealed ConcreteSCHED ScheduleSECT SectionSF Square FeetSHT SheetSHTHG SheathingSIM SimilarSLNT SealantSPEC SpecificationSPKR SpeakerSQ SquareSST Stainless SteelSTD StandardSTO StorageSTRUCT StructuralSUSP SuspendedSYMM Symmetry (ical)SYS System
T TreadTA Toilet AccessoriesTEL TelephoneT&G Tongue & GrooveTNK Thick (ness)THRES ThresholdTK BD TackboardTO Top ofTOC Top of CurbTV TelevisionTVP Typical
UC UndercutUGND UndergroundUL Underwriter's LaboratoriesUNIF UniformUNO Unless Noted OtherwiseUTIL UtilityUR Urinal
VCT Vinyl Composition TileVERT VerticalVIF Verify in FieldVNR VeneerVR Vapor RetarderVWC Vinyl Wall Covering
W WestW/ WithWC Water ClosetWD WoodWGL Wired GlassWH Water HeaterW/O WithoutWP Working PointWP WaterproofingWWF Welded Wire Fabric
Existing Partition To Remain
Existing Partition To Be Removed
Millwork or Fixtures To Be Removed
Compacted Fill
Sand Fill
Brick (Plan)
Plywood (Large Scale)
Crushed Gravel
Concrete Tilt-Up Wall Panels
Partition Type Mark
Room Number
Door Number
Building/Wall Section
Elevation Mark
Window Type
Detail Key
Column Grid
Spot Elevation
Refer to Mechanical Documents & Specifications
Refer to Plumbing & F.P. Documents & Specifications
Refer to Electrical Documents & Specifications
Refer to Structural Documents & Specifications
STRUCTURAL CRITERIA
MECHANICAL CRITERIA
ELECTRICAL CRITERIA
PLUMBING & FIRE PROTECTION CRITERIA
Refer to Sheet A-570
Joseph C
reek C
t.
Carters Creek
1 HR Vertical Shaft Protection: UL U419 (or U415 - Shaftwall)1 HR Roof Assembly (UL P519)2 HR Fire Wall: UL U411 (or U415 - Shaftwall)
PLUMBING REQUIREMENTS
100
300
63
100
100300
Occupant Load Per Room or Seating Section @ 18" Per Person
Occupant Load Per Space
Aggregate Occupant Load Per Exit wayAllowable Occupant Load Per Exit way
Aggregate Occupant Load Per Stair ExitwayAllowable Occupant Load Per Stair Exitway
One Hour Fire Rating Indication
Two Hour Fire Rating Indication
Travel Distance
Fire Extinguisher Cabinet
Fire Extinguisher Bracket
Fire Control Panel
Administration Area - business occupancy calculated at 1 occupant per 100 SF gross
Fixture Mounting Heights Intended for Ages 3-4
Fixture Mounting Heights Intended for Ages 5-8
LIFE SAFETY
100
FEC
FEB
FCP
FIRE RESISTANCE REQUIREMENTS
Per Table 601 (2015 IBC):
Party & Fire Walls: 2 Hour RatingInterior Bearing Walls
Supporting Columns, other Bearing Walls,or More than One Floor 0 Hour Rating
Supporting One Floor Only 0 Hour RatingSupporting One Roof Only 0 Hour Rating
ColumnsSupporting other Columns,
or More than One Floor 0 Hour RatingSupporting One Floor Only 0 Hour RatingSupporting One Roof Only 0 Hour Rating
Beams, Girders, Trusses, & ArchesSupporting Columns,
or More than One Floor. 0 Hour RatingSupporting One Floor Only 0 Hour RatingSupporting One Roof Only 0 Hour Rating
Floors & Floor/Ceiling Constructions 0 Hour RatingRoofs & Roof/Ceiling Constructions 0 Hour Rating
Note: Table 600(p) Fire resistance may be omitted for roof structures over 20' above finish floor.
GENERAL REQUIREMENTS1. Occupancy Classification: Assembly (A-3) / Education (E)2. Construction Type: 2B3. Allowable Building Height: 35'-0" per zoning (Church allowed 50ft)
Actual Height: 38'-0" 4. Maximum Allowable Area: 28,500 per building (Sprinklered)
Allowable Area Increases: Approx. 5,000 S.F. 5. Actual Area:
First Floor: 38,895 SF (Bldg 1 = 29,469 SF | Bldg 2 = 9,426 SF)Second Floor: 10,117 SF (Bldg 1 = 960 SF | Bldg 2 = 9,157 SF)Total: 49,012 SF (Bldg 1 = 30,429 SF | Bldg 2 = 18,583 SF)
FLOOR PLAN NOTES1. Dimensions indicated are to face of partition. Partitions are 4 7/8" thick
unless noted otherwise.2. New partitions are type D6/3 unless noted otherwise. Column furring
are type C1/2 unless noted otherwise. Refer to sheet A-570 for partition types and dimensions.
3. Door numbers correspond to room numbers. Where multiple doors serve a room, the symbols a, b, c, etc. Identify specific doors. Refer to door schedule sheet A-600 and other 6 series sheets for door and window information.
4. Locate doors 6" from nearest corner to inside of frame unless dimensioned otherwise.
5. Unless noted otherwise all building angles are 45°, 90° or 135°.6. Partitions that appear to align with other partitions or other architectural
elements shall be assumed to align flush, unless noted otherwise.7. All Exterior signage [with exception of building signage] [with exception
of monument sign] as indicated on civil documents.8. Provide approved street address/suite number positioned such as to
be plainly visible and legible from the street. Numbers shall contrast with their background with a minimum 6” high character with 3/4" stroke recommended.
9. Doors to electric rooms shall be signed as such. Circuit breakers shall be legibly and durably marked.
10. Material mock-ups to be performed in-place of material installation coordinate with owner and architect prior to start of construction.
SITE GRADING PLAN NOTES
1. Refer to civil engineering documents prepared by Mitchell & Morgan. Under separate cover for site demolition, grading, drainage, paving, utilities, etc.
ROOF PLAN NOTES1. Roof plan shows major roof elements and anticipated roof drainage
pattern Refer to Structural and MEP drawings for additional information.2. Refer Detail 1/A-522 for Typical Roof Penetrations
LIFE SAFETY PLAN NOTES
1. The life safety plan is provided for the convenience of the building official and fire marshal. It documents the major life safety features of the project including the exit flow fire separations and fire extinguisher locations.
2. Refer to mechanical drawings for locations of fire and smoke dampers in ductwork.
3. Refer to electrical drawings for locations of fire alarm system devices.
4. Refer to plumbing drawings for standpipe and automatic sprinkler systems information.
5. Refer to reflected ceiling plans and electrical drawings for exit light locations.
6. Fire rated partitions are designated on the life safety plan. Other non-rated partitions constructed to provide sound isolation or other functional purposes do not require opening protection.
7. All fixtures intended to be mounted at adult height unless noted otherwise.
SITE PLAN NOTES1. The site plan is based on a survey prepared by Mitchell & Morgan.
Dated: 10/2017.2. Refer to civil engineering drawings prepared by: "Mitchell & Morgan"
under separate cover for stormwater management system and structures and for extension of utilities for service to this project.
3. Coordinate location of construction fence and gates with owner to accommodate continued operation of this facility during construction.
4. Paving dimensions are to back of curb unless otherwise noted.5. All exterior lighting shall be shielded away from adjacent residential
properties.
FLOOR FINISH PLAN NOTES1. Floor finish plans show extent of multiple finishes within selected
spaces. Refer to room finish schedule for floor finishes in rooms not noted.
2. Floor material transition occurs at the centerline of door when door is in closed position unless otherwise noted.
3. Floor patterns are to indicate flooring material and are not to be considered installation plans, which are to be provided by GC.
4. Refer Finish Legend for floor transitions and locations5. Refer specifications for Restroom thresholds.
FINISH SCHEDULE NOTES1. Refer to floor finish plans for multiple floor finish material locations.2. Refer to interior elevations for multiple wall finish material locations.3. Refer to reflected ceiling plans for multiple ceiling finish material
locations.4. Interior finishes shall comply with Flame spread Class A.
1. Refer to electrical drawings for light fixture types, switching and circuiting.
2. Dimensions are measured Parallel To Floor. Adjust dimensions for slope of ceiling.
3. Locate light fixtures which are not dimensioned in the center of the space or panel.
4. Locate hvac supply, return, and exhaust grilles which are not dimensioned centered between lights along their common centerline or, when in a corner, 9" min. each way from the adjacent partitions.
5. Verify locations of access panels and other items not shown on the reflected ceiling plan which penetrate the ceiling with architect prior to installation.
6. Coordinate placement of light fixtures in mechanical rooms with equipment installed.
7. Interior non-grid ceilings are single layer 5/8" gypsum board unless noted otherwise.
8. Paint items which may be visible through openings in the ceiling system flat black (supports for theatrical lighting, catwalks, framing members, support wires, etc.). Paint items before installation of finish ceiling.
9. Ceiling Elevations indicated are from finished floor elevations.10. Paint supply, return, and exhaust grilles to match adjacent surface.
REFLECTED CEILING PLAN NOTES
REFLECTED CEILING PLAN
Supply Air Register
Return Air Register
Exit Light
Gyp Bd Ceiling
2'x4' Lay-In Fluorescent Fixture
2'x2' Lay-In Fluorescent Fixture
Recessed Downlight
Recessed Wall Washer
Ceiling Height mark
Top Of Slab
Ceiling Height
Ref RCP
Bottom of Struct
Ref StructZONE FOR FIRE SPRINKLER PIPING
4"
4"
ZONE FOR PLUMBING PIPING
6"
Primary Fire Sprinkler Piping at Bottom of Structure (High Point). Sloped for Drainage
Sprinkler Drop
Sprinkler Head (Recessed or Semi-Recessed)
ZONE FOR FLUORESCENT LIGHT TROFFERS
ZONE FOR HVAC UNITS AND DUCT WORK. VERIFY MAX. HEIGHT VS. SPACE AVAILABLE. SHIFT DUCTS
TO AVOID LIGHT FIXTURES TALLER THAN 6"
Stl Beam, Ref Struct
Concrete Floor Slab or Roof Deck, Ref Struct
DIMENSION CONTROL NOTES1. All interior partitions are type D6 height code 3 unless noted
otherwise. Refer to sheet A-570 for Partition Types.2. All walls are height code 3 unless noted otherwise.3. All interior furring are type C1 height code 2 unless noted
otherwise. 4. Refer to life safety plans for rated partition locations.5. For additional dimensions not shown, refer to sheet A-400 &
A-401 for enlarged plan area designations.6. Dimensions to exterior face of CMU partitions are to face of
CMU. Other dimensions are to face of finish.
Building 1 Building 22 Hour Firewall
Copyright 2018 |
We
Be
lieve
| W
e S
erv
e |
We
Cre
ate
22
21
La
kesi
de
Blv
d |
Suite
11
00
Ric
ha
rdso
n T
exa
s 7
50
82
HH
Arc
hite
cts
, In
c.
97
2-4
04
-10
34
8/2/2018 4:47:26 PM
G-002
1713
Project Information
Construction Documents
Gra
ce
Bib
le C
hu
rch
-C
ree
ksi
de
Ca
mp
us
Willia
ms
Cre
ek
Driv
e,
Co
lleg
e S
tatio
n,
Texa
s
7/30/2018
Gra
ce
Bib
le C
hurc
h
Fire Sprinkler Stratum Drawing
Revision Schedule
08/03/2018
WV
WV
WV
WV
SITE PLAN NOTES
1. The site plan is based on a survey prepared by Mitchell & Morgan. Dated: 10/2017.
2. Refer to civil engineering drawings prepared by: "Mitchell & Morgan" under separate cover for stormwater management system and structures and for extension of utilities for service to this project.
3. Coordinate location of construction fence and gates with owner to accommodate continued operation of this facility during construction.
4. Paving dimensions are to back of curb unless otherwise noted.5. All exterior lighting shall be shielded away from adjacent residential
properties.
Playground
Existing Oil Well
Existing Service Drive to Remain
Fire LaneFloodplain Boundary
Floodplain Boundary
Floodplain Boundary
Fire LaneFire Lane (Turn Around)
Dra
inag
eway
Drainageway
Dra
inag
eway
Base Bid: No Paving Across FloodplainAdd/Alternate No. 1: High Water Culvert Crossing
Drainageway / Floodplain
Fire Lane
Will
iam
s C
reek D
r.
Dumpster Enclosure: 8" CMU with Stone Veneer, 6'-0" High, + Steel Gate with 1x6 Fiber Cement Boards at 6 1/2" O.C.
Screening Wall, Ref. Landscape
Playground Equipment & Surface by Others
Covered Drop Off Area
Future Building
Corner of Adjacent Stephen/Anderson Tract
Front Door is Beyond 300'-0" path of Travel to Adjacent Stephen/Anderson Tract
Screening Wall, Ref. Landscape
Light Pole, Refer Electrical Drawings
Pre-Engineered Steel Frame Bridges, Ref. Civil/LA
Council Rings Add/Alternates 3
Add/Alternate 1 Monument Sign and Cross, Ref. LA
Stone Blocks, Add/Alternate 5
Propane in Vacinity, Ref. MEP
Accessible Route
Future Accessible Route
Stabilized Decomposed Granite
Stabilized Decomposed Granite (Accent Color)
Compacted Mulch Pathway
No Work this Area
Sealed Concrete Paving
Stamped Concrete with Integral Concrete Color
SITE PLAN LEGEND
PARKING SYNOPSISPHASE 1Parking Spaces: 294Accessible Spaces (301-400): 9TOTAL PHASE 1: 303
MASTER PLANPhase 1 Parking Spaces: 303Additional Parking Spaces: 355Accessible Spaces (501-1000 = 2%): 14TOTAL MASTER PLAN: 672
1 – Entry monument, including walls, cross and planting2 – Paving enhancements at entrance that cross the road from the monument (including C.2 and S.5) Ref. Landscape3 – Council rings, including walls and lawn4 – Grill stations at back patio Ref. Landscape5 – Stone blocks, trees and planting leading from monument into the campus Ref. Landscape
Add/Alternates
Copyright 2018 |
We
Be
lieve
| W
e S
erv
e |
We
Cre
ate
22
21 L
ake
sid
e B
lvd
| S
uite
1100
Ric
ha
rdso
n T
exa
s 7
508
2
HH
Arc
hite
cts
, In
c.
97
2-4
04
-10
34
8/3/2018 1:07:22 PM
A-101
1713
Site Plan
Construction Documents
Gra
ce
Bib
le C
hurc
h -
Cre
eksi
de
Ca
mp
us
Willia
ms
Cre
ek
Driv
e,
Co
lleg
e S
tatio
n,
Texa
s
7/30/2018
Gra
ce
Bib
le C
hurc
h
SCALE: 1" = 40'-0"1Site Plan
Plan North
True North
0' 20' 40' 80' 160'
Phase One
Revision Schedule
08/03/2018
REFLECTED CEILING PLAN
Supply Air Register
Return Air Register
Exit Light
Gyp Bd Ceiling
2'x4' Lay-In Fluorescent Fixture
2'x2' Lay-In Fluorescent Fixture
Recessed Downlight
Recessed Wall Washer
Ceiling Height mark
1. Refer to electrical drawings for light fixture types, switching and circuiting.
2. Dimensions are measured Parallel To Floor. Adjust dimensions for slope of ceiling.
3. Locate light fixtures which are not dimensioned in the center of the space or panel.
4. Locate hvac supply, return, and exhaust grilles which are not dimensioned centered between lights along their common centerline or, when in a corner, 9" min. each way from the adjacent partitions.
5. Verify locations of access panels and other items not shown on the reflected ceiling plan which penetrate the ceiling with architect prior to installation.
6. Coordinate placement of light fixtures in mechanical rooms with equipment installed.
7. Interior non-grid ceilings are single layer 5/8" gypsum board unless noted otherwise.
8. Paint items which may be visible through openings in the ceiling system flat black (supports for theatrical lighting, catwalks, framing members, support wires, etc.). Paint items before installation of finish ceiling.
9. Ceiling Elevations indicated are from finished floor elevations.10. Paint supply, return, and exhaust grilles to match adjacent surface.
REFLECTED CEILING PLAN NOTES
Vestibule
101
Worship
119
Kitchen
144
Vestibule
118
Vestibule
128
Worship Lobby
102
Office
109
Office
107
Office
106
Conf.
104
Office
111
Corridor
105
Office
112
Recpt.
103
Flex Space
113
Platform
120
Green Room / AVLSuite
121
10' - 0" 10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
11' - 0"
Breakroom
116
Office
110
Office
108
Women
139
Men
133
Prop Storage
123
A B C D E F
1
2
3
4
5
4.5
10' - 4"
1.8
3.8
F.2
4' - 6 3/8" 8' - 0 1/4" 7' - 10" 7' - 10" 7' - 10" 7' - 10" 7' - 10" 7' - 10" 7' - 10" 7' - 10" 7' - 10" 7' - 10" 7' - 10" 7' - 10" 8' - 0 1/2" 4' - 6 1/2"
Cove Lighting Type F
10' - 0"
10' - 0"
8' - 6"
4' - 0"
EQ
6' -
0"
6' -
0"
EQ
6' - 0" 6' - 0" 4' - 9"
Comm.
115
RR
114
6' -
0"
4' -
0"
Janitor
183
Family
132
12' - 3"
10' - 0"
8' - 6"
8' - 6"
8' - 6"
10' - 0"
Toilet
122Riser Room
127
9' - 0"
Baptistry Corridor
134Pump
136A
Baptistry
136
AVL Suite
174
Storage
135
Interim Room(Ph1)
184
Interim Room(Ph1)
185
1.5
E.5
10' - 0"
9' - 6"
10' - 0"
9' - 0"
6' -
0"
4' -
0"
2' -
6"
4' -
10
"2
' -
6"
2' -
6"
4' -
10
"2
' -
6"
C.5 D.5
Matc
hlin
e -
Are
a B
Matc
hlin
e -
Are
a A
Matc
hlin
e -
Are
a B
Matc
hlin
e -
Are
a A
A-402
1
10' - 0"
6
A-530
4
A-530
EQ
5' -
6"
5' -
6"
EQ
EQ 7' - 0" EQ
EQ
4' -
6"
EQ
C.A CC CD
4
A-315
3
A-316
EQ 4' - 6" EQ
4.9
1' - 11" 6' - 0" 6' - 0" 6' - 0"
4.7
B.5
EQ5' - 8"5' - 8"EQ
2' -
6"2' -
8 1
/4"
2.3
2.7
CJ
CJ CJ CJ CJ CJ CJ
CJ
CJCJ
CJ CJ
CB
3.5
3.4
3.2
A-530
10
A-530
11
13
A-530
Refer to Sheet A-412
D.2 D.8 E.3 E.9C.7C.4
EQ
6' -
7"
6' -
7"
EQ
WSW
A
B
Plan North
True North
Copyright 2018 |
We
Be
lieve
| W
e S
erv
e |
We
Cre
ate
22
21 L
ake
sid
e B
lvd
| S
uite
1100
Ric
ha
rdso
n T
exa
s 7
508
2
HH
Arc
hite
cts
, In
c.
97
2-4
04
-10
34
8/2/2018 4:13:54 PM
A-113A
1713
Level One ReflectedCeiling Plan A
Construction Documents
Gra
ce
Bib
le C
hu
rch
-C
ree
ksi
de
Ca
mp
us
Willia
ms
Cre
ek
Driv
e,
Co
lleg
e S
tatio
n,
Texa
s
7/30/2018
Gra
ce
Bib
le C
hurc
h
SCALE: 1/8" = 1'-0"1 Level One Reflected Ceiling Plan A
Revision Schedule
08/03/2018
DC
CWO CWI
JG H
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
Hospitality Rm.
143
Kitchen
144
Vestibule
128
Youth / College
147
Toddlers
163
Pre-School
158
Children'sCheck-In
170
Resource
157
Elevator
Elev.
Vestibule
142
Pre-School
161
Toddlers
164
Nursery
166
Pre-School
160
Family
154
Nursing Mothers
169
Toilet
165
ST-1
ST-1
Sleeping
168
Office
151
Stor
156
Hospitality Lobby
140
Toilet
162
Cafe
141
Secure Corridor
150A
Cafe
141B
Equipt
145
F
1
2
3
4
5
4.5
X11XA
XB
XC
XD
X9
X8
X7
X6
X5
X3
X2
11' - 2"
1.8
3.3
3.8
F.8F.2 G.4 H.2
XE
XC.7
XC.5
X10
EQ
18' - 0"
EQ
EQ
12' - 0"
EQ
EQ
16' - 0"
EQ
EQ
18' - 0"
EQ
Elec.
153
Jan
152
Check-in
167
Toilet
159
Pre-School
155
UC
UC
9' - 0"
9' - 0"9' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
UC
UC
UC
UC
18' - 9"
2" Black Duct Liner
P-07
P-07
P-07
P-8
UC
19' - 7"
5' - 9"3' - 6"
Dry Goods Stor.
144A
Laundry
144B
1.5
10' - 0"
9' - 0"
9' - 0"
10' - 0"
10' - 0"
8' - 0"
9' - 0"
9' - 0"
X4
Matc
hlin
e -
Are
a B
Matc
hlin
e -
Are
a A
Matc
hlin
e -
Are
a B
Matc
hlin
e -
Are
a A
EQ
7' -
0"
7' -
0"
7' -
0"
7' -
0"
7' -
0"
7' -
0"
7' -
0"
7' -
0"
EQ
P-8 at Deck
EQ
20' - 0"
18' - 0"
EQ
EQ
12' - 0"
EQ
EQ
20' - 0"
EQ
EQ
18' - 0"
EQ
A-402
2
1
A-530
P-3
P-3
1
A-530
EIFS Soffit
4
A-315
1
A-315
2
A-315
EQ
16' - 0"
EQ
10' - 0"3
A-315
X1
X1
4.9
XC.3
1
A-316
2
A-316
5
A-315
EQ 6' - 0" EQ
EQ
4' -
0"
EQ
XA.8
X9.5
K
2.3
2.7
6' - 0"
6' - 0"
6' - 0"
6' - 0"
6' - 0"
6' - 0"
6' - 0"
5' - 6"
3' -
4"
3' -
4"
3' -
2"
2' -
6"
14' - 6"
2' - 7 1/2"
2' - 7 1/4"
14' - 6"
5
A-312
5' -
10"
5' -
0"
5' -
0"
4' -
0"
5' - 6"4' - 0"
4' -
6"
4' - 6"Secure Corridor
150B
Secure Corridor
150C
1. Refer to electrical drawings for light fixture types, switching and circuiting.
2. Dimensions are measured Parallel To Floor. Adjust dimensions for slope of ceiling.
3. Locate light fixtures which are not dimensioned in the center of the space or panel.
4. Locate hvac supply, return, and exhaust grilles which are not dimensioned centered between lights along their common centerline or, when in a corner, 9" min. each way from the adjacent partitions.
5. Verify locations of access panels and other items not shown on the reflected ceiling plan which penetrate the ceiling with architect prior to installation.
6. Coordinate placement of light fixtures in mechanical rooms with equipment installed.
7. Interior non-grid ceilings are single layer 5/8" gypsum board unless noted otherwise.
8. Paint items which may be visible through openings in the ceiling system flat black (supports for theatrical lighting, catwalks, framing members, support wires, etc.). Paint items before installation of finish ceiling.
9. Ceiling Elevations indicated are from finished floor elevations.10. Paint supply, return, and exhaust grilles to match adjacent surface.
REFLECTED CEILING PLAN NOTES
REFLECTED CEILING PLAN
Supply Air Register
Return Air Register
Exit Light
Gyp Bd Ceiling
2'x4' Lay-In Fluorescent Fixture
2'x2' Lay-In Fluorescent Fixture
Recessed Downlight
Recessed Wall Washer
Ceiling Height mark
A
B
Plan North
True North
Copyright 2018 |
We
Be
lieve
| W
e S
erv
e |
We
Cre
ate
22
21 L
ake
sid
e B
lvd
| S
uite
1100
Ric
ha
rdso
n T
exa
s 7
508
2
HH
Arc
hite
cts
, In
c.
97
2-4
04
-10
34
8/3/2018 4:14:39 PM
A-113B
1713
Level One ReflectedCeiling Plan B
Construction Documents
Gra
ce
Bib
le C
hu
rch
-C
ree
ksi
de
Ca
mp
us
Willia
ms
Cre
ek
Driv
e,
Co
lleg
e S
tatio
n,
Texa
s
7/30/2018
Gra
ce
Bib
le C
hurc
h
SCALE: 1/8" = 1'-0"1 Level One Reflected Ceiling Plan B
Revision Schedule
08/03/2018
M M
M
Worship
119
Platform
120
C D E F
1
2
3
4
5
4.5
1.8
3.3
3.8
F.2
19.0
0°
5.00
°
24.00°
5.00°24.00°
5.00°
24.00°
5.00°
19.00°
8' - 7 1/2" 8' - 7 1/2" 8' - 7 1/2" 8' - 7 1/2"
2' -
0"
10
' -
0"
10
' -
0"
10
' -
0"
10
' -
0"
8.00°
8.00°
Prop Storage
123
Riser Room
127
Vestibule
119B
9' - 10" 16' - 0"
EQ16' - 0" 19' - 0" 13' - 0" 16' - 0" 16' - 0"
EQ
10
' -
3"
10
' -
0"
16' - 0" 9' - 10"
1.5
E.5
10
' -
0"
9' -
3"
9' -
0"
9' -
0"
3' -
0"
5' - 8" 28' - 0" 5' - 8" 5' - 8" 28' - 0" 5' - 8" 5' - 8" 28' - 0" 5' - 8"
5' - 8" 28' - 0" 5' - 8" 5' - 8" 12' - 0" 21' - 8" 18' - 2" 16' - 0" 5' - 2"
4' - 0 1/2" 11' - 3" 6' - 7 1/4"
8' -
6"
6' -
10
"
C.5 D.5
Matc
hlin
e -
Are
a B
Matc
hlin
e -
Are
a A
Matc
hlin
e -
Are
a B
Matc
hlin
e -
Are
a A
5' - 8" 28' - 0" 5' - 8" 5' - 8" 28' - 0" 5' - 8" 5' - 8" 28' - 0"
3
A-530
3
A-316
125' - 2"
4.9
6' -
0"
1' -
0"
1' -
0"
3' - 1 3/8" 6' - 0"
7' - 0"
7' - 0"
7' - 0"
14
' -
0"
3' - 0" 5' - 0"
5
A-316
4.7
B.5
2.3
2.7
Acoustic Batts on Top of Clouds Typ.
3.5
3.4
3.2
2" Black Duct Liner 50% of Exposed Roof Deck
12
A-530
14
A-530
D.2 D.8 E.3 E.9C.7C.4
EQ EQEQ EQ
6' -
0"
1. Refer to electrical drawings for light fixture types, switching and circuiting.
2. Dimensions are measured Parallel To Floor. Adjust dimensions for slope of ceiling.
3. Locate light fixtures which are not dimensioned in the center of the space or panel.
4. Locate hvac supply, return, and exhaust grilles which are not dimensioned centered between lights along their common centerline or, when in a corner, 9" min. each way from the adjacent partitions.
5. Verify locations of access panels and other items not shown on the reflected ceiling plan which penetrate the ceiling with architect prior to installation.
6. Coordinate placement of light fixtures in mechanical rooms with equipment installed.
7. Interior non-grid ceilings are single layer 5/8" gypsum board unless noted otherwise.
8. Paint items which may be visible through openings in the ceiling system flat black (supports for theatrical lighting, catwalks, framing members, support wires, etc.). Paint items before installation of finish ceiling.
9. Ceiling Elevations indicated are from finished floor elevations.10. Paint supply, return, and exhaust grilles to match adjacent surface.
REFLECTED CEILING PLAN NOTES
REFLECTED CEILING PLAN
Supply Air Register
Return Air Register
Exit Light
Gyp Bd Ceiling
2'x4' Lay-In Fluorescent Fixture
2'x2' Lay-In Fluorescent Fixture
Recessed Downlight
Recessed Wall Washer
Ceiling Height mark
A
B
Plan North
True North
Copyright 2018 |
We
Be
lieve
| W
e S
erv
e |
We
Cre
ate
22
21 L
ake
sid
e B
lvd
| S
uite
1100
Ric
ha
rdso
n T
exa
s 7
508
2
HH
Arc
hite
cts
, In
c.
97
2-4
04
-10
34
8/3/2018 1:16:43 PM
A-123A
1713
Level Two Reflected CeilingPlan A
Construction Documents
Gra
ce
Bib
le C
hurc
h -
Cre
eksi
de
Ca
mp
us
Willia
ms
Cre
ek
Driv
e,
Co
lleg
e S
tatio
n,
Texa
s
7/30/2018
Gra
ce
Bib
le C
hurc
h
SCALE: 1/8" = 1'-0"1 Level Two Reflected Ceiling Plan A
Revision Schedule
08/03/2018
1. Refer to electrical drawings for light fixture types, switching and circuiting.
2. Dimensions are measured Parallel To Floor. Adjust dimensions for slope of ceiling.
3. Locate light fixtures which are not dimensioned in the center of the space or panel.
4. Locate hvac supply, return, and exhaust grilles which are not dimensioned centered between lights along their common centerline or, when in a corner, 9" min. each way from the adjacent partitions.
5. Verify locations of access panels and other items not shown on the reflected ceiling plan which penetrate the ceiling with architect prior to installation.
6. Coordinate placement of light fixtures in mechanical rooms with equipment installed.
7. Interior non-grid ceilings are single layer 5/8" gypsum board unless noted otherwise.
8. Paint items which may be visible through openings in the ceiling system flat black (supports for theatrical lighting, catwalks, framing members, support wires, etc.). Paint items before installation of finish ceiling.
9. Ceiling Elevations indicated are from finished floor elevations.10. Paint supply, return, and exhaust grilles to match adjacent surface.
REFLECTED CEILING PLAN NOTES
REFLECTED CEILING PLAN
Supply Air Register
Return Air Register
Exit Light
Gyp Bd Ceiling
2'x4' Lay-In Fluorescent Fixture
2'x2' Lay-In Fluorescent Fixture
Recessed Downlight
Recessed Wall Washer
Ceiling Height mark
JG H
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
10' - 0"
Family
212
Balcony
201
Children'sCheck-in
220
6th Grade
205
5th Grade
204
4th Grade
218
Kinder
217
1st Grade
216
2nd Grade
215
3rd Grade
214
Assembly
213
Girls
208
Jan.
211
Resource
219
Stor.
204B
Boys
209
10' - 0"
F
1
2
3
4
5
4.5
X11XA
XB
XC
XD
X9
X8
X7
X6
X5
X3
X2
1.8
3.3
3.8
F.8F.2 G.4 H.2
XE
XC.7
XC.5
X10
Elec.
210
Classroom
206
UC
UC
UC
UC
1.5
10' - 0"
10' - 0"
3' -
10"
5' -
0"
9' - 0"
2' - 10"
26' - 0"
5' - 2"
5' - 11"
22' - 0"
2' - 0"2' - 7"
8' - 0"
2' - 7"
52' - 4"
19' - 21/2"
28' - 97/8"
27' - 9"
10
' -
0"
40
' -
8"
9' -
11
7/8
"
31' - 9" 9' - 8"
10' - 5" 31' - 9"
X4
Matc
hlin
e -
Are
a B
Matc
hlin
e -
Are
a A
Matc
hlin
e -
Are
a B
Matc
hlin
e -
Are
a A
20' - 0" 1' - 6" 2' - 6" 20' - 0"
34' - 0"
30' - 0"
13' - 2"
4' - 6"
25' - 0"
4' - 6"
1
A-530
1
A-530
2' - 10"
26' - 0"
5' - 2"
5' - 11"
22' - 0"
2' - 0"2' - 7"
8' - 0"
2' - 7"
4' -
9"
8' -
8"
8' -
8"
8' -
8"
12' -
11"
2' - 0"
30' - 0"
2' - 0"
2' - 0"
26' - 0"
2' - 0"
2' - 7"8' - 0"
2' - 7"
9' - 0"
4
A-315
1
A-315
2
A-315
A-402
4
6' -
8"
10
' -
0"
9' -
8"
9' -
6"
9' -
8"
10
' -
0"
5' -
8"
8' - 0"
3
A-315
X1
4.9 4.9
XC.3
Storage
214A
1
A-316
2
A-316
6
A-501
5
A-315
5
A-316
6' - 0"
6' - 0"
6' - 0"
6' - 0"
6' - 0"
6' - 0"
6' - 0"
3' - 6"
3' -
4"
3' -
2"
XA.8 X9.5
K
2.3
2.7
5
A-312
5' -
0"
2' -
6"
15' - 6"
1' - 8"1' - 7 7/8"
15' - 6"
5' -
6"
5' -
6"
4' -
6"
P-1
P-1
P-1
A
B
Plan North
True North
Copyright 2018 |
We
Be
lieve
| W
e S
erv
e |
We
Cre
ate
22
21
La
kesi
de
Blv
d |
Suite
11
00
Ric
ha
rdso
n T
exa
s 7
50
82
HH
Arc
hite
cts
, In
c.
97
2-4
04
-10
34
8/2/2018 8:24:52 PM
A-123B
1713
Level Two Reflected CeilingPlan B
Construction Documents
Gra
ce
Bib
le C
hu
rch
-C
ree
ksi
de
Ca
mp
us
Willia
ms
Cre
ek
Driv
e,
Co
lleg
e S
tatio
n,
Texa
s
7/30/2018
Gra
ce
Bib
le C
hurc
h
SCALE: 1/8" = 1'-0"1 Level Two Reflected Ceiling Plan B
Revision Schedule
08/03/2018
Worship Level
100' - 0"
T.O. Parapet
136' - 0"
J G
T.O. Steel
128' - 0"
H
Matc
hlin
e -
Are
a B
Matc
hlin
e -
Are
a A
ABCDEF
Platform
102' - 6"
F.8 F.2G.4H.2 E.5 C.5D.5 CCCDB.5K
CBD.2D.8E.3E.9 C.7 C.4
High Impact EIFS to Horizontal Control Joint
T.O. Parapet
136' - 0"
Hospitality Level
98' - 0"
Education Level
96' - 0"
Level Two
111' - 0"
JG
T.O. Steel
128' - 0"
T.O. Steel
122' - 0"
H
Matc
hlin
e -
Are
a B
Matc
hlin
e -
Are
a A
A B C D E F F.8F.2 G.4 H.2E.5C.5 D.5CC CD B.5 K
D.2 D.8 E.3 E.9C.7C.4
Copyright 2018 |
We
Be
lieve
| W
e S
erv
e |
We
Cre
ate
22
21 L
ake
sid
e B
lvd
| S
uite
1100
Ric
ha
rdso
n T
exa
s 7
508
2
HH
Arc
hite
cts
, In
c.
97
2-4
04
-10
34
8/3/2018 3:22:26 PM
A-200
1713
Overall Exterior Elevations
Construction Documents
Gra
ce
Bib
le C
hu
rch
-C
ree
ksi
de
Ca
mp
us
Willia
ms
Cre
ek
Driv
e,
Co
lleg
e S
tatio
n,
Texa
s
7/30/2018
Gra
ce
Bib
le C
hurc
h
SCALE: 3/32" = 1'-0"1Overall West Elevation
SCALE: 3/32" = 1'-0"2Overall East Elevation
Revision Schedule
08/03/2018