Upload
others
View
20
Download
0
Embed Size (px)
Citation preview
-
GOVERNMENT OF RAJASTHAN
RURAL DEVELOPMENT & PANCHAYATI RAJ DEPARTMENT
Watershed Development & Soil Conservation Department Rajasthan, Jaipur
DETAILED PROJECT REPORT
INTEGRATED WATERSHED MANAGEMENT PROGRAMME
JAISALMER JSM/(IWMP) 10/10-11,
BLOCK- JAISALMER
----------------&&&&&&&&----------------
PROJECT IMPLEMENTING AGENCY
ASSISTANT ENGINEER
(W.D. & S.C.)
PANCHAYAT SAMITI - JAISALMER
DETAILED PROJECT REPORT
INTEGRATED WATERSHED MANAGEMENT PROGRAMME
JAISALMER JSM/(IWMP)10/10-11,
BLOCK- JAISALMER
Salient Features of Project
No. of Gram Panchayat Covered Dabla, Pithla,
Keeta, Basanpeer
No. of Revenue Villages Covered 10
Total Project Area 8000
Total Project Cost 1200 Lac
Total Proposed/ Estimated Cost 1263.89
Total Cost Borned by Convergence 63.89
Expected Beneficiaries’s Contribution 54.58
Total Runoff Potential (Cum) 156373
Existing Runoff Storage (Cum) 33280
Proposed Runoff Storage/ Management (Cum) 58026
CHAPTER – I
INTRODUCTION
Location
Jaisalmer (IWMP-10), parewar Project is located in jaisalmer Block, of
Jaisalmer District. The project area lies between the latitudes 26049-26ñ51’ North &
longitudes 70059’-71ñ01’ East. It is at a distance of 20 km from its Block head
quarters and 20 Km from the District head quarters of jaisalmer. There are 10 Numbers. of habitations (Revenue Villages) in the Project area Other details are given below.
General features of watershed
S.
No. Name of Project(as per GOI)
JAISALMER IWMP-13
2010-11
a)
Name of Catchment Dabala, Dhanua,
Akal, Jodha,
Nedia, Basanpeer
South, Pithla,
Satta,Gorera,
Kuldhara
b) Name of watershed area(local
name)
Akal
c) Project Area 9870 ha.
d) Net treatable Area 8000 ha.
e) Cost of Project 1200 lac
f) Cost/hectare 15000
g) Year of Sanction [2010-11]
h) Watershed Code Jaisalmer iwmp-
10[2010-11]
i) No. of Gram Panchayats in
project area
4
j) No. of villages in project area 10
k) Type of Project Desertic
l) Elevation (metres) 190
m) Slope range (%) 0-5%
Macro/micro Name of Gram
Panchayat
Name of Villages
Covered
Cluster Dabala Dabala
Dhanua
Akal
Jodha
Pithla Pithla
Satta
Gorera
Kuldhara
Keeta Nedia
Basanpeer Juni Basanpeer South
The watershed falls in Agro climatic Zone I A, Arid western plain. The soil texture is
Sandy to Sandy Loam. The average rainfall is 207 mm. The temperatures in the area are in
the range between 45º C during summer and 15º C during winter. The major crops in the
area are Bajara, Guar, Moong, Moth, Til etc. Almost 63.78% land is under cultivation 11.20%
land fallow, 13.12% land is wasteland. There is no significant source of irrigation in project
area only a few areas is double cropped due to rain water harvesting (in-situ moisture
conservation) by earthen structures like KHADEEN and the area which is under field/contour
Bunding executed in different programmes implemented under Watershed Development &
Soil Conservation programmes in preceding years.
Out of 6269 Total Households 476 households are BPL (7.59% of Total
households) 64 are landless households (1.02% of Total households) 476 household
are small and marginal farmers (7.59%of Total household). Average land holding in
the area is 12.66 ha. 56.75% area of cultivable land is single cropped and 1.94% is
double cropped. There is no significant source of irrigation in project area only a few
areas is double cropped due to rain water harvesting (in-situ moisture conservation).
The average annual rainfall (10 years) in the area is 207.00 mm. There are no major
streams in the Watershed area. The major festivals in the villages of Project area are
Deepawali, Holi, Akhsay-Tritiya, Rakhsabandhan, Dashehra, Gangour etc. At present
villages of Project area having 6269 population with Communities like Rajput, Devasi,
Rao-Bhat, Meghwal, Bheel, Kumhar, Darji and Brahmin,Muslims etc.
Climatic and Hydrological information
1. Average Annual Rainfall (mm)
S.No. Year Average Annual
Rainfall(mm)
1 2012 231.9
2 2011 295.2
3 2010 361
4 2009 72
5 2008 112
6 2007 142
7 2006 501
8 2005 176
9 2004 42
10 2003 137
2. Average Monthly rainfall (last ten years)
S.No. Month Rainfall(mm)
1 June 31.59
2 July 47.43
3 August 90.13
4 September 24.68
3. Maximum rainfall intensity (mm)
S.No. Duration Rainfall
intensity(mm)
1 15 minute duration 40
2 30 minute duration 58
3 60 minute duration 69
4. Temperature (Degree C)
S.No. Season Max Min
1 Summer Season 49 32
2 Winter Season 26 4
3 Rainy Season 35 24
5. Potential Evaporation Transpiration (PET) (mm/day)
S.No. Season PET
1 Summer 3200
2 Winter 2464
3 Rainy 2784
6. Runoff
1 Peak Rate (cum/hr) 95.25 Cum/per hour
2 Total run off volume of rainy
season (ha.m.) 50.76
3 Time of return of maximum flood 5
years
10
years
In-
Year
4 Periodicity of Drought in village
area
3 7 -
Other Developmental all Schemes in the Project Area
S
.
N
o
Scheme
Name of
the
departme
nt
Key
interventions
under the
Scheme
Targeted
Beneficiar
ies
Provisions
Under
the Scheme
1 MAHANREGA
Rural
Dev. &
Panchayat
i Raj
Departmen
t
Providing
Employment
6269
209.07
2 TFC - 06.13
3 SFC - 04.85
4 BRGF TSC -
07.91
5 SGS IAY -
Details of infrastructure in the project areas
Parameters Status
1 No. of villages connected to the main road by an
all-weather road 10
2 No. of villages provided with electricity 9
3 No. of households without access to drinking water 0
4 No. of educational institutions : P S HS VI
Primary(P)/Secondary(S)/Higher Secondary(HS)/
vocational institution(VI) 9 4 - -
5 No. of villages with access to Primary Health Centre 4
6 No. of villages with access to Veterinary Dispensary -
7 No. of villages with access to Post Office 4
8 No. of villages with access to Banks -
9 No. of villages with access to Markets/ mandis -
10 No. of villages with access to Agro-industries -
Total quantity of surplus milk 460Ltr.
11 No. of milk collection centres U S PA O
(e.g. Union(U)/ Society(S)/ Private agency(PA)/
others (O)) 0 0 0 0
12 No. of villages with access to Anganwadi Centre 6
13 Any other facilities with no. of villages (please
specify)
14 Nearest KVK Jaisalmer
15 Cooperative society 4
16 NGOs 4 0 0 4
17 Credit institutions - - - -
(i) Bank 0 0 0 0
(ii) Cooperative Society 4 0 0 0
18 Agro Service Centre's 0 0 0 0
Institutional Arrangements (SLNA, DWDU, PIA, WDT, WC, Secretary)
DWDU Details
PIA particulars
WDT Particulars:
S.No Particulars Details of DWDU
1 PM ,DWDU Sh. Bhagirath Bishnoi Project
Manager, IWMP, ZP, Jaisalmer
2 Address with contact no.,
website
PM WLDL District Jaisalmer, ZP
Jaisalmer
3 Telephone 02992-250712
4 Fax 02992-250712
5 E-mail [email protected]
S.No Particulars Details of PIA
1 Name of PIA Sh.Jaimal singh indaliya
2 Designation Assist. Engineer
3 Address with contact
no., website
AEN. (IWMP) P.S. Jaisalmer
4 Telephone 02992-2528822
5 E-mail [email protected]
S.
No
Name of WDT
member
M/
F Age Qualification
Experien
ce
in
watershe
d
(Yrs)
Description
of
professiona
l training
Role/
Function
1 Sh.Ramkishor
kalyana M 26 Civil dip. 1 year Yes
2 Sh.Santosh
Sharma M 25 B.sc(AG) 18 mah Yes
Agricaltu
er
3 Sh.Ummed
Singh Charan M 25 12th(Ah) 18 mah Yes
Animail
hasbander
y
4 Smt.sangeeta
vyas f 28 Ma 18 mah Yes Shg
Details of Watershed Committees
S.
No
.
Name of
WCs
Date
of
Gram
Sabh
a
for
WC
Date of
Registra
tion as
a
Society
(dd/mm/y
yyy
Designatio
n Name
M/
F
SC/
ST/OB
C/
Gener
al
Landle
ss/
MF/SF/
BF
Name of
UG/SHG
Education
al
qualifica
tion
1 Dabla
President Duragsingh/Bhawarsingh M Gen MF UG 10th
Secretary Ranidan/Haridan M Gen MF UG 12th
Member’s Siriyo/Goparam F ST SF SHG 5th
Bhanwarsingh/Khetsingh M Gen BF UG 8th
Premkumar/Nakatmal M Gen BF UG 5th
Haridas/poonamchand M OBC MF UG 10th
Cheluram/Rooparam M SC SF UG Litarate
Hamalkhan/Hotkhan M OBC MF UG Litarate
Bhimsingh/Mookansingh M Gen MF UG Litarate
Girdharkumar/Bulidan M Gen MF UG Litarate
Tipu/Revtaram F SC SF SHG Litarate
S.
No.
Name
of WCs
Date
of
Gram
Sabha
for
WC
Date of
Registra
tion as
a Society
(dd/mm/yyyy
Desig
nation Name M/F
SC/
ST/OBC/
General
Landl
ess/
MF/SF/
BF
Name
of
UG/SHG
Edu
cational
Quail
fication
2
Nedia/
Keeta
President Revant singh/Narayan singh M GEN BF UG 12
Secretary Nathu singh/Jabahar singh M GEN BF UG 12
Member Lahari/Shivkaran F SC LL SHG 5
Member Amara Ram/Khushala Ram M SC SF UG 5
Member Jugat singh/Jhabar singh M GEN MF UG 12
Member Dukhe khan/Jbdul khan M OBC SF UG 5
Member Sujan singh/Partap singh M GEN BF UG 8
Member Arjun singh/Ram singh M GEN BF UG 5
Member Narayan singh/Jhabar singh M GEN BF UG 5
Member Mool singh/Durg singh M GEN BF UG 8
Member Jugat singh/Loon singh M GEN BF UG 8
S.
No.
Name
of WCs
Date
of
Gram
Sabha
for WC
Date of
Registra
tion as
a Society
(dd/mm/yyyy
Desig
Nation Name M/F
SC/
ST/OBC/
General
Landl
ess/
MF/SF/
BF
Name
of
UG/SHG
Edu
cational
Quail
fication
3 Basanpeer
South
President Toga Ram/Sona Ram M Sc
Secretary
Member AmaratRam/BhanvarRam M OBC
Member Dheli/Uga Ram F OBC
Member Khiyan/Sukha Ram F OBC
Member Ajij/Sukha Ram M OBC
Member Karam kahn/Santar khana M OBC
Member Nabib khan/Mohak khana M OBC
Member Ummed khan/Meeran khan M OBC
Member Singari /bhanvaru Ram F OBC
S.
No.
Name
of WCs
Date of
Gram
Sabha for
WC
Date of
Registra
tion as
a Society
(dd/mm/yyyy
Desig
nation Name M/F
SC/
ST/OBC/
General
Landl
ess/
MF/SF/
BF
Name
of
UG/SHG
Edu
cational
Quail
fication
4
Pithla
21.01.2013
President Mool singh/Ashu singh M Gen SF UG 8th
Secretary Keshar singh/Nathu singh M Gen MF B.A
Member Parvat singh/Sagat singh M Gen BF UG 8th
Taga ram/Punma ram M ST SF UG 5th
Jujhar singh/Hathi singh M Gen BF UG 8th
Ummed singh/Bhanvar singh M Gen MF UG 10th
Vijay singh/Sujan singh M Gen BF UG 9th
Bulidan singh/Padam singh M Gen MF UG 8th
Ugam kanwar/Ashu singh F Gen SF SHG 5th
Kamudi/Pokara ram F OBC LL SHG 5th
Jograj singh/Bak singh M OBC SF UG 10th
Tanerajsingh/Khetsingh M Gen MF UG 5TH
Bhavanisingh/Deepsingh M Gen MF UG 8th
Oogsingh/Lakhsingh M Gen MF UG 5TH
Hadavantsingh/Parvatsingh M Gen BF UG 8th
Khimsingh/Madhosingh M Gen MF UG 10th
Poonamaram/Rasaram M St MF UG 5th
Anavarkhan/Goramkhan M OBC MF UG 5th
Bulekhan/Ismailkhan M OBC SF UG 8th
Punjaram/Jivnaram M ST MF UG 8th
Hanjikhan/Bhaksekhan M OBC MF UG 10th
Dilavarkhan/Sultankhan M OBC MF UG 8th
Gram Panchayat Wise Details of Various User Groups Constituted for Development of Activities
Gram :- Nedia, Keeta
User Group Agriculture
S.no Name Village
1 Jugat singh/jhabar singh Nedia
2 Nathu singh/jabahar singh Nedia
3 Arjun singh/Ram singh Nedia
4 Narayan singh/jhabar singh Nedia
5 Mool singh/Durg singh Nedia
Gram :- Nedia, Keeta
User Group Non Agriculture
S.no Name Village
1 Lahari/Shivkaran Nedia
2 Amra ram/khushala ram Nedia
3 Dulhe khan/abdul khan Nedia
4 Sujan singh/pratap singh Nedia
5 Jugat singh/lun singh Nedia
Gram : Nedia, Keeta
User Group Drainage Treatment
S.no Name Village
1 Ravant singh/narayan singh Nedia
2 Jugat singh/lun singh Nedia
3 Jugat singh/jhabar singh Nedia
4 Lahari/Shivkaran Nedia
5 Nathu singh/jabahar singh Nedia
Gram :- Basanpeer South
User Group Agriculture
S.no Name Village
1 Toga ram/sona ram Basanpeer South
2 Amrat ram/bhanwaru ram Basanpeer South
3 Ummed khan/miran khan Basanpeer South
4 Naviy khan/maharu khan Basanpeer South
5 Dheli /ugaram Basanpeer South
Gram :- Basanpeer South
User Group Non Agriculture
S.no Name Village
1 Khiyan/suraram Basanpeer South
2 Ajim/ramjan khan Basanpeer South
3 Karim khan/sanjar khan Basanpeer South
4 Singari/bhanwaru ram Basanpeer South
5 Dheli /ugaram Basanpeer South
Gram :- Basanpeer South
User Group Drainage Treatment
S.no Name Village
1 Amrat ram/bhanwaru ram Basanpeer South
2 Ajim/ramjan khan Basanpeer South
3 Naviy khan/maharu khan Basanpeer South
4 Toga ram/sona ram Basanpeer South
5 Singari/bhanwaru ram Basanpeer South
Gram :- Pithla
User Group Agriculture
S.no Name Village
1 Umedsingh/Bhanwarsingh Pithla
2 Jujharsingh/Hanthisingh Pithla
3 Moolsingh/Anshusinhg Satta
4 Vijaysingh/Sujansingh Pithla
5 Bulidansingh/Padamsingh Pithla
Gram :- Pithla
User Group Non Agriculture
S.no Name Village
1 Tanerajsingh/Khetsingh Pithla
2 Jograjsingh/Bhanksingh Pithla
3 Tagaram/Poonamaram Gorera
4 Bhavanisingh/Deepsingh Pithla
5 Poonamaram/Rasaram Gorera
Gram :- Pithla
User Group Drainage Treatment
S.no Name Village
1 Hanjikhan/Bhaksekhan Kuldhara
2 Dilvarkhan/Sultankhan Kuldhara
3 Punjaram/Jivanaram Gorera
4 Kamudi/Pokararam Gorera
5 Ugamkanwar/Anshusingh Satta
Problems and Scope of Improvement in the Project Area
The socio economic conditions of the house holds of the project area reveal
that most of the house holds are engaged in only farming activities which purely
depend on the Monsoonal rainfall. The rainfall in the project area is very less and
very below to the state average, again it occurs only in a limited period and restricted
in a few storms. This further limits the opportunity to cultivate and sow the crops in
time and in diversified manner with variety of crops. The options before the farmers
in rain fed agriculture and given climatic conditions are very limited. The risk
appetite of farmers is very low as probability of good rains and its distribution over a
crop period is not regular as well as the economic conditions of local farmers is also
compromising. The quality of soil in most of the area is poor with a poor organic
matter and low nutritional contents. The top soil faces a lot of risk against water and
wind erosion. The texture of the soil is light by and large in entire area. The rills and
gullies are formed in private and community land at exposed and area those are
devoid of Vegetation. The Monsoonal rainfall when occurs in limited storms with
higher intensities it turns into runoff and most of it go in waste after fulfilling the
retentions of local depressions and some local structures which are constructed by
local community efforts and under different developmental schemes. The area faces
acute water shortage in summers. The quality of ground water is not good and it
cannot be used for agriculture, animal and human use.
The animal husbandry is the part of most of the household’s economy.
Farmers are rearing cattle, goats, seeps, camels etc. but most of these animals are of
local breeds which are less productive and uneconomic as well It imposes increased
biotic pressure on natural resources of project area. The households are having some
surplus milk production but due to poor and unorganised marketing linkages, It does
not fetches rightful value. The other opportunity of allied activities for the support of
livelihood is almost absent. Most of the household are engaged in employment given
under NREGS but it does not suffice to lead a satisfactory life conditions for entire
family for the entire period of a year. In such a forcing situation some people having
skills in different trades prefer to migrate into nearby towns to have better earnings.
The socio economic conditions of the area can be improved through
increased production which can be achieved through expansion in cultivated area
and productivity enhancement 380 ha land is arable wasteland and 1036 ha is fallow
can be brought under cultivation with the interventions of the present project. The
productivity of rain fed agriculture can be improved with interventions of soil and
water conservation activities with improved moisture regime. The crops can be
rescheduled imparting needful trainings to farmers to adopt the proven technologies
and package of practices. The cropping pattern as enormous possibilities to be
improved to attain a fair increment in productivity.
There is no significant source of irrigation in project area, only a few areas are
irrigated and with efforts this can be increased to 5%. The productivity gap of major
crops in the area as compared with District and with areas in the same agro climatic
zones indicate potential to increase the productivity. The demonstration of improved
package of practices, improved varieties, increased irrigation facilities and soil
conservation measures under the project can bridge this gap. Due to small land
holdings in the area focus of the project would be on diversification in agriculture
(horticulture, vegetables, medicinal plants Agro forestry, fodder crops and
diversification in Livelihoods (Agriculture, Animal husbandry, self employment)
18169 MT/year fodder scarcity can be met out through Pasture development and
improving seed varieties, putting more are under fodder cultivation, fodder
treatment and value addition to it, etc.
Improved animal Husbandry practices can increase the productivity of
livestock. The quality of animals can be improved by controlling population of stray
animals adopting castration of male animals those are of local breeds. Breed
improvement can be achieved through artificial inseminations, by distribution of
bulls, rams of improved breed. The scientific methods of milk collection, milk storage,
value addition to its quality and with assured marketing linkages can prove a
promising livelihood support. The females of the area can be organized through self
help groups to promote the habits of saving, thrift and credit. It can be pooled up
through revolving funds. Such organizations to be sensitized on gender issues,
elimination of social evils, education and health etc.
Some innovative concepts like establishment of Grain Bank, Seed Bank,
Fodder Bank, Milk Co operatives, federation of SHG’s may add a surety to self
sustained rural economy. Increased and positive involvement of Panchayati Raj
Institutions, Social Audits, techno- economic monitoring will further ensure expected
outcomes.
CHAPTER – II
Socio economic Features, Problems and Scope
The project comprises of ten villages of four Gram Panchyats. The literacy level is
very low in general again it is very low amongst females. The traditional customs and
followings are persistent yet. The distribution of demography is scattered according to
their land holdings and resides in small habitations/ dhanis. Villages have less connectivity
with the market and other needful amenities. The evil of child marriages, consumption of
liquor, opium poppy and other such narcotic drugs is also observed during the household
survey of the project area. The productivity of the land, animal and household livelihood
activities is very low. To fetch the bread and butter for the family people are forced to
migrate. Most of the migration is of different trade labourers to nearby towns.
The above problems can be minimized by putting the available natural
resources to its optimum capacity without damaging them to irreversible level. The
interventions of IWMP can take care of the lands and whatever moisture is available
can be conserved to enhance the rain fed agriculture productivity. The practice of
animal husbandry can be used as strength of the area with the use of breed
improvement, improvement of animal health, ensuring the quality fodder and feed.
The animal produce, milk may be sold to nearby towns with the improved supply chain
and value addition to the produce on the theme of self help groups or cooperatives.
The institutional arrangements formed and to be formed in the course of time during
project period may improve the governance and the fair distribution of usufructs.
Table 2.1 Population & Household Details:
Total Population
Male Female Total SC ST
3448 2821 6269 1047 531
Household Details
BPL
household
L.
Less
Large
Farmer
Small
Farmer M.
Farmer
Total
Household
SC
household
ST
household
476 64 95 254 222 1111 46 66
Table 2.2 Development indicators
S.
No. Development Indicators State
Project
Area
1 Per capita income (Rs.) 30857 18000
2 Poverty ratio 0.22 00.19
3 Literacy (%) 67 49
4 Sex Ratio 933 837
5 infant mortality rate 6.3% 6.2%
6 maternal mortality ratio 0.38% 0.05%
The table indicates poor socio economic conditions as well as the health conditions.
The total geographical area of the project or cluster selected for the
treatments is 9870 ha. Out of which some area has been treated under different
schemes in preceding years. Some area like Stony wastes, habitations, roads, local
paths, water bodies etc. are not available for treatments as well as some flat lands of
slope 0-1% slope does not require any treatments, hence kept aside from effective
area of the project. The Gram Panchayat wise details are as follows:
Table 2.3(A) Proposed Land Under Treatment
S. No.
Gram Panchayat
Gram Panchayat Wise Details of Area, in ha
Total Geo graphical
Area
Area Already Treated
Area not Available for
Teatment
Area not Requiring Treatment
Net Effective
Area Dabla 4571 709 224 138 3500
Pithla 3533 - 533 - 3000
Keeta 713 - 160 53 500
Basanpeer
juni 1053 - 53 - 1000
Total 9870 709 970 191 8000
Table 2.3(B) Land Use
Land Use Total area in Ha.
Private Panchayat Government Community Total
Agriculture Land 4482 0 1120 0 5602
Temporary fallow 0 0 533 0 533
Permanent fallow 320 0 0 0 320
Cultivated Rain fed 4482 0 1120 0 5602
Cultivated irrigated 192 0 0 0 0
Net Sown Area 4054 0 0 0 4054
Net Area sown more
than once 192
0 0
0
192
Forest Land 0 0 341 0 341
Waste Land 0 0 1659 0 1659
Pastures 0 0 480 0 480
Others 0 0 935 0 935
Total 4802 5068 0 9870
The project area has 1659 ha of cultivable wasteland 533 ha of fallow land
(total 2192 ha) can be brought under cultivation if some irrigation source can be
provided through Construction of WHS like Khadin, Tanka, Farm ponds etc. Through
demonstration of improved & hybrid rain fed varieties of seeds for the crops of
pulses, oil seeds, fodder, cereals etc. Construction of WHS can also increase in area
under Rabi crop in pedakast which is Negligible at present.
1659 ha. (16.80 % of the project area) is under wastelands and can be brought under
vegetative cover, with reasonable effort .Activities like Earthen check dams,
Vegetative filter strip, V-ditches, staggered trenches, WHS (Khadins), Afforestation of
wastelands and Pasture development will be taken up on these lands
Pasture development the land use table shows that there is 480 hectare pasture
land (4.86%) This emphasizes the need for taking up pastureland development works
through sowing of promising species of grasses and forestry plantation. The local
habitat of grass like Dhaman or Sewan which is very hardy and perennial in nature
will be established which will improve the availability of good fodder as well as it will
work as a binding agent for soil particles which in turn reduce the soil erosion.
Table 2.4 .(a) Agriculture and Horticulture Status
and Fuel Availability. Cropping Status
S
.
N
o
.
Seaso
n
Crop
sown
Rainfed Irrigated Total
Variet
y
Area
(ha)
Produc
tion
(Ton)
Productiv
ity
(kg/ha)
Varie
ty
Area
(ha)
Produ
ction
(Ton)
Product
ivity
(kg/ha)
Area
(ha)
Produ
ction
(Ton)
1 Kharif Bajra HHB 67 2432 873 359 0 0 2432 873
Moong K 851 1014 525 518 0 0 1014 525
Gaur
RBC
936 608 344 566 0 608 344
2 Rabi Mustured Bio902 0 0 496 0 100 49.6 496 100 49.60
Zeera 0 0 0 383 0 92 35.23 383 92 35.23
Table 2.4.b Abstract of cropped Area (ha)
The farmers are using indegenious & traditional varieties of Bajra, Guar,
Moong, Month, Til. The varieties for Bajra will be used those are developed by RSSC,
NSC, CAZRI like HSB 67, HSB 75, WCC 75 etc. The Moong of varieties like K 17,
CAZRI-8, Moth of varieties like JADIA, RMO 40, CAZRI etc, Sesame of latest varieties
will be introduced with the advice of WDT, resource persons and Department of
Agriculture. The crop rotation and the cropping pattern will be introduced like inter
cropping, mixed cropping etc. to enhance the out come. The crop rotation for this
area under practice is as follows:
Bajra - Fallow Moong - Tarameera/Mustard Moong - Fallow Fallow - Tarameera/Mustard Til - Fallow Moth - Fallow
The table 2.4.b shows that only 192 ha (1.94%) is double cropped area and
that is also not on assured basis, it is only due to rain harvesting and moisture
conservation practices and some tube wells. Also the crop rotation shows that fallow
lands are there. This indicates that there is scope for change in crop rotation in fields
where there are fallow lands through Soil and Water conservation measures, crop
demonstration and diversification in agriculture.
Soil and Water conservation measures besides putting fallow lands under
cultivation can change the area under single cropping to double as well as multiple
cropping.
Area under Single crop 4054
Area under Double crop 192
Area under Multiple crop 0
Table 2.4.(c) Productivity Gap Analysis
Analysis of the above table indicate that besides national gap there is wide
gap in productivity within state and even within same agro climatic zones.
The reasons for this variation are:
Farmers are using traditional varieties of Bajra, Guar, Moong, Month, Til
whereas the recommended varieties as mentioned above will definitely
improve the productivity.
Lack of Availability of good quality seeds of desired crops and the availability of
variety in adequate quantities and the time for sowing to the farmers.
Availability of water for cultivation (1.94% is irrigated )
The productivity gap and reasons of it indicate potential to increase the
productivity through crop demonstration .Crop demonstrations would be carried out
on improved crops/ varieties, improved agronomic practices. INM, IPM, Mixed
cropping, distribution of fodder seed mini kit. Demonstration of improved methods
and economics of fodder crops cultivation and also distribution it foundation seeds
of Forage Crops for further multiplication, introduction of fodder crops in the existing
crop rotations.
Name of
the crop
Productivity kg/ha
India
Highest
Average in
Rajasthan
Highest
Average of Agro
climatic zone
District Project
Area
Bajra - 339 500 415 359
Moong - 679 7500 625 518
Guar - 476 600 550 566
Moth - - - - 0
Mustard 866 1203 1250 980 496
zeera - - - 400 383
Table 2.5 Existing area under horticulture/ Vegetables
/ Floriculture (ha)
Activity Area Species Varieties Recommended
varieties
Production
(Kg/Ha)
Horticulture --- --- --- --- ---
Vegetables --- --- --- --- ---
Floriculture --- --- --- --- ---
Medicinal
Plants --- --- --- --- ---
Table 2.6 Land holding Pattern in project area
Type of Farmer Total
House holds
Land holding (ha) irrigation source wise
Land holding (ha)Social group wise
Irrigated (source)
Rainfed Total Gen. SC ST OBC BPL
(i) Large farmer 95 0 1680 1680 638 453 168 421 0
(ii) Small farmer 254 0 1961 1961 631 529 196 605 0
(iii) Marginal farmer 222 0 1400 1400 532 378 132 358 0
(iv) Landless person 64 0 0 0 0 0 0 0 0
(V) No. of BPL households
476 0 561 561 213 151 56 141 0
Total 1111 0 5602 5602 2014 1511 552 1525 0
38% land holdings belong to small and marginal farmers who own 3361 ha of
total cultivated area. Horticulture/vegetables could be more Beneficial to Small and
marginal farmers as well as for large farmers with some irrigation facility.
Horticulture/vegetables will be promoted in a part of land with farm pond/Tanka
construction also.
The following activities will be more beneficial for small land holdings and for
diversification of agricultural practices.
Horticulture plantation, Medicinal and Aromatic Crops, floriculture: As discussed
earlier. Horticulture/vegetables could be more economical to Small and marginal
farmers with farm pond/Tanka construction. The project area is planned to put some
area adjacent to the water tanka and RWHS under medicinal crops like
Sonamukhi, Aloevera, Ashwagandha, Asperagus,Gugugals etc.
Agro forestry plantation: To increase the income of farmers and to establish the
shelter belt plantation against wind velocity to protect the lands from erosion due to
high wind velocities.
The limited financial provisions under project restrict to take up these activities. The
convergence with MNREGA or other line Departmental schemes will be sought to
implement it.
Setting of Vermi Compost Units: Keeping in view the side effect of residues of
chemicals and fertilizers on human health, the emphasis would be on cultivation of
organic produce through motivating farmers and providing assistance for production
of organic input, vermi compost, farm yard manure. The SHG would be motivated to
adopt this activity for income generating activity as well as for livelihood support.
Production and Distribution of Quality Seeds: There is need to ensure that good
quality seed is available for cultivators, for which adequate seed production would
be initiated in watershed areas with the assistance of private sector and agriculture
Department with the improved technologies and package of practices. The crop
demonstration of different crops suitable for the area and of promising outputs is
proposed under development plan. The convergence with Agriculture Department
and Horticulture Mission is envisaged.
Sprinklers and Pipelines: For efficient water management practices, emphasis would
be on demonstration of Drip and sprinklers with adequate financial support and
convergence/private partnership.
Establishment of Nurseries: Most of the planting material is procured from other
parts of the District/ State. The procurement of planting material from distant places
causes damage to the planting material and often results in untimely supply. Hence
nursery development activity has been planned in area. The nursery will be raised
through SHG with the support of revolving fund of project as well as groups’s own
resources.
Innovative hi-tech/ Cash Economy Oriented Activities: Innovative hi-tech/ cash
crops/ activities/ projects like mushroom cultivation, medicinal plans etc which are
not in existence at present, can be implemented by individual farmers / private
partnerships as there is enormous scope of mushroom dry or wet in the nearby
tourist oriented hotels/ resorts. The Activity is proposed through SHG with proper
skill development through trainings at specified centres.
Drip irrigation: Drip irrigation will be promoted in all horticulture plantations,
vegetables and in nurseries for rational use of irrigation to achieve higher yields and
quality produce. Earthen pot/ pitcher irrigation will also be practised at water tank
based plantations.
Table 2.7 Livestock Status-animals/milk production/
average yield.
S.
No
.
Descriptio
n of
animals
Populatio
n
in No.
Yield (milk/
mutton/
Wool)
Equ.
cow
units
Dry matter
requiremen
t per year
(7Kg per
animal.)
Total
requireme
nt
in M.T.
1 Cows 6526 6326 16673930
Indigenous - 3.5 ltr. per
day
-
0 16673.930
Hybrid 119 119 30405 304.04
2 Buffaloes 37 6 ltr. per day 37 94535 94.53
3 Goat 23780 1 ltr. per day 11890 30378950 30398.95
4 Sheep 31468 1 to 1½ Kg per
no.
15734
40200370 402001.370
5 Camel 488 - 488 1246840 1246.84
6 Poultry 0 750 grm per
bird
0 0 0
7 Piggery 0 - 0 0 0
Total 47865 - 26917 88625030 450719.66
In spite of the large number of livestock, production is less hence increase in
productivity across all species, is a major challenge. To reduce production of
unproductive cattle and to control the population of cattle, to improve the
productivity by improving the breeds by breeding management following activities
will be taken up
Castration
Artificial insemination
Distribution of superior Breeding bulls for use in Cattle and Buffalo
Breeding & distribution of crossbred rams
Besides breed improvement other animal husbandry practices like better health,
hygiene and feeding practices can increase productivity of livestock. Hence Activities
like Animal health camps, Urea-Molasses treatment demonstration, demonstration
of improved methods of conservation and utilization of Forage crops are proposed.
The Storage of fodder will be managed with the use of compressed fodder bricks
with nutritional value addition.
Table 2.8 Existing area under fodder (ha)
S.
No Item Unit Area/Quantity
1 Existing Cultivable area
under Fodder Ha 3432/24024
2 Production of Green fodder Tonns/year 0
3 Production of Dry fodder Tonns/ Year 4989/34923
4 Area under Pastures Ha 2139/7486.5
5 Production of fodder Tonns/year 4989/34923
6 Existing area under Fuel
wood Ha 341
7 Supplementary feed Kgs/ day 0
8 Silage Pits No 0
9 Availability of fodder Ton 75425
10 Deficiency/excess of fodder Ton 18169
The above table shows there is fodder deficiency (Requirement is 93594. and
availability 75425 Ton.)
To minimize the large and expanding gap between feed and fodder resource
availability and demand there is need for
Increase in area under fodder crops
Increase in productivity of fodder crops
Development of pastures
And reduction in large number of livestock production through replacement by
few but productive animals
Table 2.9 Agriculture implements
Farm Mechanization and Seed Banks: As discussed earlier 34.05% land holdings
belong to small and marginal farmers. The cultivation of 56.75% of total cultivated
area so owning of big farm implements by individual farmers is not economical so
SHG would be promoted to buy farm implements and rent to farmer. The concept of
fodder and Seed bank will be promoted on institutional basis in the project so that
resource poor people could be facilitated and ensured timely and locally available
seed and fodder material as per their need.
Table 2.10 NREGA Status No. of Card Holder,
activities taken so far, employment status.
S.
no. Name of village
Total No
.of job
cards
Employment
Status
Activity taken up
so far
1 Dabla 415 55
Gravel Road,
Tradditational
water bodies,
forest/pasture
enclosures etc.
2 Dhanuva 52 7
3 Akal 112 15
4 Jodha 73 97
5 Pithala 165 22
6 Sata 170 23
7 Gorera 165 23
8 Khldhara 177 24
9 Nedia 0 0
10 Basanpeer south 243 32
S.No Implements Nos.
1 Tractor 62
2 Sprayers-manual/ power 48
3 Cultivators/Harrows 73
4 Seed drill 0
5 Any Other 59
Table 2.11 Migration Details
Name
of
village
No. of
persons
migra
ting
No. of
days per
year of
migration
Major
reason(s)
for
migrating
Distance of
destination
of
migration
from the
village
(km)
Occupation
during
migration
Income
from such
occupation
(Rs.
in lakh)
Dabla 44 180
Employment
& Business 150-2000
Employment
& Business
16.50
Dhanuva 8 180 3.75
Akal 14 180 6.76
Jodha 12 175 3.92
Pithala 24 165 9.00
Sata 16 172 5.38
Gorera 10 170 7.73
Khldhara 8 165 3.75
Nedia 0 0 0
Basanpeer
south
18 65 8.43
The migration can be checked by creation of employment opportunities,
enhancing farm level economy, increased the income of the people engaged in
animal husbandry by dairy, poultry, proper marketing and value addition to the
produce (As discussed earlier) and diversification in livelihoods. Well planned animal
husbandry activities and dairying is envisaged to be taken as main on farm income
generating activity with convergence of other Departmental schemes. A scientific
and hyeigenic proof milk collection unit and milk storage unit (chilling Plant) is
envisaged to be installed on SHG concept. The marketing linkages and MOU with
Governmental as well as non- Government sector dairying units in Jaisalmer will be
ensured with intervention of District administration and allied Departments/ public
sector units.
The existing livelihoods of project Villages are given below
Table 2.12 (a) Major activities (On Farm)
Name of activity No. of
House holds
Average annual income
/per House hold (in lac)
cultivators 571 934 lac
Dairying 222 224 lac
Poultry
Piggery
Landless Agri.
Labourers
64 112 lac
Table 2.12(b) Major activities (Off Farm)
Table 2.12(b)Major activities (Off Farm)
Name of activity
Households/individuals Average annual income from
the
Artisans - -
.
2
-
Carpenter 98 4.25
Blacksmith 9 1.15
Leather Craft - -
Porter 160 1.95
Mason 119 6.40
Others specify (Cycle Repair ,STD,Craft etc)
-
The efforts for increase in income through off farm activities will be made
under livelihood component through assistance to SHG or individuals. Some home
based activities specially for women are being discussed in the meetings of SHG, the
same will be supported through revolving funds and loan from the banks against the
savings/ credits of concerned group
Table 2.13(a) Status of Existing SHG
S.
No
Name of
SHG
Members Activity
involved
Monthly
income
Fund
avai.
Assistance
available
Source of
assistance
Training
receive
1 10 social
activities
like
saving,edu.,
etc.
1,000 - Bank
Loan
Z.P.
Jaisalmer
Yes
The table indicates existences of number of groups in the area also need to be
strengthened through trainings and financial assistance
II. Technical Features
Table 2.14 Ground Water
S.No Source No.
Funct
ional
depth(m)
Dry
Area
irrigat
or
Water
availability(
days)
1 Dug wells - - - - 0
2 Shallow
tube wells - - - - 0
3 Pumping
sets - - - - 0
4 Deep Tube
Wells 31 137 5 - 365 days
Total 31 5
Table 2.15 Availability of drinking water
S.
No
Name of
the
village
Drinking
water
requirem
ent
Ltrs/day
Present
availabi
lity of
drinking
water
Ltrs/day
No. of
drinkin
g water
sources
availab
le
No.
Functio
nal
No.
requir
es
repair
s
No.
defunc
t
1 Dabla 20466 19823.34 4 4 - -
2 Dhanuva 2538 2319.36 2 2 - -
3 Akal 5499 5220.45 3 3 - -
4 Jodha 3591 3221.31 2 2 - -
5 Pithala 5859 2134.99 3 3 - -
6 Sata 5328 5233.54 3 2 - 1
7 Gorera 3465 3273.52 2 2 - -
8 Khldhara 3878 3645.24 3 3 - -
9 Nedia 27 25.37 1 1 - -
10 Basanpeer
south 5778 5596.56 3 3
- -
56429 50493.68
Table 2.16 Water Use efficiency
Name of major
crop
Area (Hectare)
through water
saving
devices(Drip/
Sprinklers)
through
water
conserving
agronomic
practices#
Any other
(pl.
specify)
Total
Bajara 0 2280 --- ---
Guar 0 570 --- ---
Moong 0 950 --- ---
Mustrad 100 0 --- ---
zeera 80 0 --- ---
--- ---
The tables above indicate need for judicious use of available Water.
Encouraging optimum use of water through installation of sprinklers/ drips on every
operational wells and other irrigation source.
Table 2.17 Slope details.
S.No. Slope percentage Area in
hectares
1 0 to 3% 6350
2 3 to 8% 1150
3 8 to 25%
4 > 25%
As most of the area has slope less than 3%, construction of contour bunds can
solve the problem of water erosion in agriculture fields and protect washing of top soil
and manures/fertilisers. The area having less than 2% slope can be improved by
adopting scientific tillage practices, agronomical practices and vegetative barriers.
The arable lands having slope more than 1% to be treated by constructing
earthen bunds, contour/ field bunding fortified with vegetative hedges of perennial
grasses and locally suited agro forestry plants.
Table 2.18 Soil details
S.
No. Major Soil Classes
Area in
hectares
A Soil Depth
1 Sandy Loam 8000
2 Loam
B Soil Depth :
1 0.00 to 7.50 8000
2 7.50 to 45.00
3 > 45.00
C Soil fertility Status
Kg/ha Recomm.
N 50-70 80-90
P 20-30 40-50
K 10-15 20-30
Micronutrients 10-500
ppm 100-500
The analysis of table shows the need to improve and maintain soil fertility. Soil
health card to every farmer every crop season will be provided, which will include the
recommendation for Application of micro nutrient and fertilizers as per the crops those
would be taken on the field.
Table 2.19 Erosion details
Cause Type of erosion
Area
affected
(ha)
Run
off(mm/
year)
Average soil
loss (Tonnes/
ha/ year)
Water erosion
a Sheet 3600
b Rill 1900
c Gully 0
Sub-Total 5500
Wind erosion 2500
Total for project 8000 18 - 20
The need is:
To check land degradation
To reduce excessive biotic pressure by containing the number and controlling
population of livestock
To check cultivation on sloping lands without adequate precautions of soil and water
conservation measures
To discourage cultivation along susceptible nallah beds
To check Faulty agriculture techniques
To check Uncontrolled grazing and developed cattle tracks
To check Deforestation of steep slopes
To check erosive velocity of runoff, store Runoff, to arrest silt carried by runoff and
to recharge ground Water. Structures life Earthen check dams, Earthen embankment
(Nadi) and Khadins would be taken up.
CHAPTER - III Proposed Development Plan
A) Preparatory phase activities, Capacity Building Trainings and EPA
The IEC activities like Group meetings, door to door campaign, slogans and wall
writings etc. are carried out in all the habitations. A series of meetings were conducted
with GP members, community and discussed about the implementation of IWMP
programme. The PRA exercises also conducted in each and every habitation involving all
the stake holders. User groups are also formed to ensure beneficiaries effective and
active participation since from beginning, planning and in execution so that the can use
them on sustained basis and can maintain even after the completion of project.
Grama Sabhas were conducted for approval of entry point activities, for selecting
the watershed committee and approval of DPR.
S.
No
Name of the Gram
Panchayat
Date on which
Grama Sabha
approved EPA
1 Dabla 09/12/2011
2 Pithala 23/12/2011
3 Keeta 25/12/2011
4 Basanpeer juni 27/12/2011
Details of Entry Point Activities under taken: S. N.
Names of village
Amount earmarked for EPA
Entry Point Activities planned
Estimated cost
Expenditure incurred
Balance
Expected outcome
Actual outcome
1 Dabla 3.00 3.00 3.00 7.25 2.275
Ensured Drinking water
facility and lighting
for community
Ensured Drinking water
facility and lighting
for community
2 Dhanuva 6.00 6.00 6.00
1.45 4.55
3 Akal 6.00 6.00 6.00 1.45 4.55
4 Jodha 6.00 6.00 6.00 1.45 4.55
5 Pithala 6.00 6.00 6.00 1.45 4.55
6 Sata 3.00 3.00 3.00 0.725 2.275
7 Gorera 3.00 3.00 3.00 0.725 2.275
8 Khldhara 6.00 6.00 6.00 1.45 4.55
9 Nedia 3.00 3.00 3.00 0.725 2.275
10 Basanpee
r south
6.00 6.00 6.00 1.45 4.55
The PRA exercise was carried out in all the villages on the dates shown below:
S.
No
Name of the
village/Habitation
Date on which
PRA conducted
1 Dabla 22.11.2011
2 Dhanuva 19.11.2011
3 Akal 29.10.2011
4 Jodha 11.11.2011
5 Pithala 05.11.2011
6 Sata 08.11.2011
7 Gorera 13.11.2011
8 Khldhara 21.11.2011
9 Nedia 23.11.2011
10 Basanpeer south 28.11.2011
Transact walk were carried out involving the community for Social mapping,
Resource mapping. Detailed discussions and deliberations with all the primary
stakeholders were carried out.
Socio-economic survey was carried out for six month period covering all the
households and primary data on demography, Land holdings, Employment status,
Community activities etc. was collected as mentioned in chapter 2.
State Remote Sensing Application centre jodhpur was assigned the work of
preparing various thematic layers using Cartosat-1 and LISS-3 imageries for Creation,
development and management of geo-spatial database depicting present conditions of
land (terrain), water and vegetation with respect to watershed under different
ownerships at village level.
A) Capacity Building
The information and capacity building activities will be taken up as a major and
essential component of this project as per the common guidelines. A provision of 5%
amount of total project cost is proposed for these activities. Different stake holders in
this project implementation will be provided with appropriate trainings to enhance
their skills, knowledge, efficiency etc. Some national and state level organisations have
been identified by the SLNA to impart the trainings to officials of State, District and PIA
level officials and field functuaries. The project and village level stake holders will be
trained at Regional and District level Resourse organizations as approved by the SLNA
as well as by the DWDU/PIA with their available resourses and with help of resourcefull
and eligible voluntary organizations.
The information, education and communication (IEC) activities will also be carried out
as per the direction and content of project to dissiminate the project related
information to fulfil the project obejectives. An amount of Rs. 60.00 is provided for
above I & CB activities.
State Remote Sensing Application Centre (SRSAC) Jodhpur was assigned
the work of preparing various thematic layers using Cartosat-1 and LISS-3 imageries
for Creation, development and management of geo-spatial database depicting
present conditions of land (terrain), water and vegetation with respect to watershed
under different ownerships at village level
Various thematic layers provided by SRSAC:
Delineation of Macro/Micro watershed boundaries.
Digitised Khasara maps of the villages falling in project area.
Network of Drainage lines, existing water bodies, falling in the project area.
Base maps (transport network, village/boundaries, and settlements).
Land Use / Land cover map.
Based on GIS thematic layers, Field visits , PRA and analysis of benchmark data
(as discussed in chapter 2) final Treatment plan on revenue map for implementation has
been framed. Thus each intervention identified has been marked on Geo referenced
Khasra Map with Contours as provided by the SRSAC Jodhpur. ( map enclosed in DPR as
annexure ”A”)
B) Livelihood Action Plan (LAP):
An awareness programme has been undertaken at Gram Sabha for communication &
sensitization of the target beneficiaries. Livelihood Action Plan is a pre requisite for
availing the funds under the livelihood component. LAP has been prepared by the PIA in
consultation with WDT, WC & the members of SHG, SC/ST, women, landless/ assetless
households. Details of funds available & their utilisation is as under :
(i) Total project cost Rs. 1200 Lacs.
(ii) Funds available under livelihood component is 9% of total project cost, Rs. 108.00
Lacs.
(a) Seed money for SHGs as revolving fund, Rs. 64.80 Lacs.
- No. of SHG to be formed 260 Nos.
- No of persons (members) in SHGs 1820 Nos.
(b) Seed money for enterprising individuals, Rs. 10.80 Lacs
- No of persons identified as enterprising individuals 45 Nos.
The identification of enterperising individuals is in process and will be provided
with their intended trade and task’s required trainings and there after will be benefited
with the seed money as well as the admissible assistance/ loan from the project and
provided with credit linkages from banks also.
(c) Funds for Enterprising SHG/Federations of SHG
An amount of Rs. 32.40 lac has been envisaged and devised for enterprising self help
groups and federations of self help groups.
The funding for major livelihood activities will enable the enterprising SHGs/SHG
federation to avail a composite loan for undertaking major livelihood activities or to
upscale activities as recommended by the WC & approved by WCDC in consultation with
line departments.
Details of enterprising SHG/federation would be prepared in coming years after
formation of SHG federation or as the case may be.
C) Production Plan:
An awareness programme has been undertaken at Gram Sabha for communication &
sensitization of the target beneficiaries. Production System & micro enterprises Action
Plan is pre-requisite for availing the funds under the Production System & micro
enterprises component. Production plan has been prepared by the PIA in consultation
with WDT, WC & the members of Users Group. Details of funds available & their
utilisation are as under:
(i) Total project cost Rs. 1200.00 Lacs.
(ii) Funds available under Production System & Micro enterprises component is 10%
of total project cost, Rs.120.00 Lacs.
The appropriate species of horticulture plants those are adaptable in arid climate of
Jaisalmer District like Date palm, Pomegranate, Lesua/ Gunda, Ber etc. will be Provided
to the interested beneficiaries in the coming years who are having some sort of
irrigation facilities or rain water harvesting systems. The water conservation devices
like sprinklers, drip irrigation system, pitcher irrigation etc. will also promoted and
implemented with the convergence of Agriculture/ Horticulture Departments. The
medicinal plants will also be tried to propagate in available conditions with the
technical interventions of project. The promising varieties of different crops will be
provided as crop demonstrations with recommended package of practices to enhance
the agriculture productivities. The vermi-compost units will also be promoted amongst
the interested beneficiaries to ensure its replication at large to provide bio fertilizers.
Individuals beneficiaries are being identified at persent and will also be added in
coming years of project period. The activity wise outlay has been indicated in
development plan.
(iii) Funds for Animal Husbandary activities have been provided Rs 21.70 lacs out of
above total provision of Rs 108.00 lac for production activities.
Awareness Programme
-Slogan Wall Painting,
-Scientific Animal Husbandry Practices; Seminars / Debates / Pamphlet distribution/ Stickers/ Chetana Rally
-Broadcasting / Telecasting Film Show
-Visit- intra/ inter/ out of State/ Abroad
-Fortnightly Meetings with Livestock keeper to discuss and decide all breedable females to be covered.
Creation of Disease Free Zone: Livestock’s health coverage
With the intervention of project it is envisaged to create the project area as a disease free zone with following activities
-Establishment of Pashudhan Seva Kendra (PSK) (Convergence with peer department)
-Deworming to reduce worm load and enhance disease resistance. (Convergence with peer department)
-Distribution of mineral mixture. (Convergence with peer department)
-Free of Cost Vaccination in IWMP area Livestock for H.S., B.Q., F.M.D., PPR, ETV and Sheep Pox.
-Ensure Hygenic measures to check Zonosis. (DAH/ IWMP)
Infertility Management
To ensure Livestock’s Productivity the population of stray animals will be controlled through castration and productivity of animals will be improved with the:
-Expansion of AI Coverage/ reduction in no.of infertile females.
-PCPD+ COMBAT INFERTILITY+ CAMPS INFERTILITY RLDB+ CAMPS INFERTILITY SC COMPONENT
-Breed Improvment: To ensure Livestock’s Productivity enhancement
-A.I. (Convergence with peer department)
-Incentive based Mass Castration at Door Step of Scrub Bulls to Check ND Recycling.
-Registration of bulls (Convergence with peer department)
-Bull / Buck Distribution for NS-.Gir, Murrah And Sirohi /Jamunapari Breed Bulls/ Bucks.
-Financial Incentive to the Inseminator for Calf Borns.
-Convergence with peer Department/DAH/Agriculture/ATMA/ Board/ Trust/ Goseva
-An Assistance to control Malnutrition: Protein Supplementation
-Feed & fodder production enhancement.
ANNUAL ACTION PLAN : PIA will prepare annual action plan in the month of January
indicating outgoing liabilities as well as new projects which they wish to take during next
financial years & will submit to PM(WCDC). These plans will be placed for approval at
P.S. (Standing Committee of Production and Agriculture) & Z.P. (Standing Committee of
Production) level every year. While preparing Annual Action Plan (AAP) if rates of labour
or material in DPR increases or decreases, the changed rates will be applicable for
preparing AAP & the effect of same can be met by converging the remaining works with
other schemes.
Proposed Development Plan
Qty.Total
Cost
Cost
from
Project
Fund
Conver
gence
Fund
Bene
ficiary
Contri
bution
Qty.Total
Cost
Cost
from
Project
Fund
Conver
gence
Fund
Bene
ficiary
Contri
bution
Qty.Total
Cost
Cost
from
Project
Fund
Conver
gence
Fund
Bene
ficiary
Contri
bution
Qty.Total
Cost
Cost
from
Project
Fund
Conver
gence
Fund
Bene
ficiary
Contri
bution
Qty.Total
Cost
Cost
from
Project
Fund
Conver
gence
Fund
Bene
ficiary
Contri
bution
Admn. 10% 52.50 52.50 0.00 0.00 15.00 15.00 0.00 0.00 45.00 45.00 0.00 0.00 7.50 7.50 0.00 0.00 0 120.00 120.00 0.00 0.00
Monitoring 1% 5.25 5.25 0.00 0.00 1.50 1.50 0.00 0.00 4.50 4.50 0.00 0.00 0.75 0.75 0.00 0.00 0 12.00 12.00 0.00 0.00
Evaluation 1% 5.25 5.25 0.00 0.00 1.50 1.50 0.00 0.00 4.50 4.50 0.00 0.00 0.75 0.75 0.00 0.00 0 12.00 12.00 0.00 0.00
EPA 4% 21.00 21.00 0.00 0.00 6.00 6.00 0.00 0.00 18.00 18.00 0.00 0.00 3.00 3.00 0.00 0.00 0 48.00 48.00 0.00 0.00
I&CB 5% 26.25 26.25 0.00 0.00 7.50 7.50 0.00 0.00 22.50 22.50 0.00 0.00 3.75 3.75 0.00 0.00 0 60.00 60.00 0.00 0.00
DPR 1% 5.25 5.25 0.00 0.00 1.50 1.50 0.00 0.00 4.50 4.50 0.00 0.00 0.75 0.75 0.00 0.00 0 12.00 12.00 0.00 0.00
Total (A) 22% 115.50 115.50 0.00 0.00 33.00 33.00 0.00 0.00 99.00 99.00 0.00 0.00 16.50 16.50 0.00 0.00 0.00 264.00 264.00 0.00 0.00
(B) Natural Resource Management (56%) 294.00 84.00 252.0 42.00 672.00Conservation measures for arable land (private land)
Field Bunding ha 0.093 820 76.26 55.68 20.58 4.18 250 23.25 18.84 4.41 1.41 800 74.40 61.55 12.85 4.62 100 9.30 6.90 2.40 0.52 1970 183.21 142.97 40.24 10.72
Earthen Structure 1 No. 1.2 18 21.60 21.60 0.00 1.62 8 9.60 9.60 0.00 0.72 20 24.00 24.00 0.00 1.80 8 9.60 9.60 0.00 0.72 54 64.80 64.80 0.00 4.86
Earthen Structure 2 No. 1.75 15 26.25 26.25 0.00 1.97 4 7.00 7.00 0.00 0.53 12 21.00 21.00 0.00 1.58 2 3.50 3.50 0.00 0.26 33 57.75 57.75 0.00 4.33
Earthen Structure 3 No. 2 7 14.00 14.00 0.00 1.05 2 4.00 4.00 0.00 0.30 9 18.00 18.00 0.00 1.35 0 0.00 0.00 0.00 0.00 18 36.00 36.00 0.00 2.70
Tanka 1 No. 0.64 35 22.40 22.40 0.00 1.68 12 7.68 7.68 0.00 0.58 25 16.00 16.00 0.00 1.20 10 6.40 6.40 0.00 0.48 82 52.48 52.48 0.00 3.94
Tanka 2 No. 0.7 35 24.50 24.50 0.00 1.84 12 8.40 8.40 0.00 0.63 30 21.00 21.00 0.00 1.58 5 3.50 3.50 0.00 0.26 82 57.40 57.40 0.00 4.31
Khadin No. Site wise 7 62.11 62.11 0.00 4.66 1 8.91 8.91 0.00 0.67 2 19.75 19.75 0.00 1.48 1 7.90 7.90 0.00 0.59 11 98.67 98.67 0.00 7.40
Conservation measures for non arable land
Pasture Development ha 0 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
V-ditch ha 0.0192 180 3.46 3.46 0.00 0.00 40 0.77 0.77 0.00 0.00 120 2.30 2.30 0.00 0.00 0 0.00 0.00 0.00 0.00 340 6.53 6.53 0.00 0.00
Water Harvesting Structure No. 3 3 9.00 9.00 0.00 0.00 0 0.00 0.00 0.00 0.00 4 12.00 12.00 0.00 0.00 0 0.00 0.00 0.00 0.00 7 21.00 21.00 0.00 0.00
Afforestation ha 1.6 30 48.00 48.00 0.00 0.00 10 16.00 16.00 0.00 0.00 30 48.00 48.00 0.00 0.00 0 0.00 0.00 0.00 0.00 70 112.00 112.00 0.00 0.00
Tanka 3 ha 1.4 5 7.00 7.00 0.00 0.00 2 2.80 2.80 0.00 0.00 6 8.40 8.40 0.00 0.00 3 4.20 4.20 0.00 0.00 16 22.40 22.40 0.00 0.00
Drainage line treatment
MMS, Gabin No. 0 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
LSCD No. 0 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
WHS No. 0 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
Gully Plugs (ECD) No. 0 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
Ground water structure No. 0 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00
Total (B) 314.58 294.00 20.58 16.99 88.41 84.00 4.41 4.83 264.85 252.00 12.85 13.60 44.40 42.00 2.40 2.84 712.24 672.00 40.24 38.26
Production measures for arable land 52.50 15.00 45.00 7.50 120.00Arid Horticulture ha 1.2 15 18.00 12.00 6.00 1.80 5 6.00 3.00 3.00 0.45 15 18.00 13.50 4.50 2.03 4 4.80 2.65 2.15 0.40 39 46.80 31.15 15.65 4.67
Sprinklers & Drip irrigation ha 0.8 10 8.00 4.00 4.00 0.60 0 0.00 0.00 0.00 0.00 10 8.00 4.00 4.00 0.60 0 0.00 0.00 0.00 0.00 20 16.00 8.00 8.00 1.20
Vegetables No. 0.005 800 4.00 4.00 0.00 0.60 350 1.75 1.75 0.00 0.26 600 3.00 3.00 0.00 0.45 100 0.50 0.50 0.00 0.08 1850 9.25 9.25 0.00 1.39
Medicinal plants No. 0.005 100 0.50 0.50 0.00 0.08 30 0.15 0.15 0.00 0.02 100 0.50 0.50 0.00 0.08 20 0.10 0.10 0.00 0.02 250 1.25 1.25 0.00 0.19
Vermi compost No. 0.1 50 5.00 5.00 0.00 0.75 10 1.00 1.00 0.00 0.15 30 3.00 3.00 0.00 0.45 0 0.00 0.00 0.00 0.00 90 9.00 9.00 0.00 1.35
Crop Demonstration No. 0.015 1000 15.00 15.00 0.00 2.25 300 4.50 4.50 0.00 0.68 800 12.00 12.00 0.00 1.80 150 2.25 2.25 0.00 0.34 2250 33.75 33.75 0.00 5.06
Micro Enterprise
Dairy No. 5.00 5.00 1.60 1.60 0.00 1.60 3.50 3.50 0.00 0.00 0 0.00 0.00 0.00 0.00 0 10.10 10.10 0.00 1.60
Poultry No. 0.60 0.60 0.00 0.00 0.50 0.50 0 0.00 0.00 0.00 0.00 0 1.10 1.10 0.00 0.00
Animal camp/Breed improovement No. 4.00 4.00 2.00 2.00 0.00 0.16 0 3.00 3.00 0.00 0.00 0 1.50 1.50 0.00 0.00 0 10.50 10.50 0.00 0.16
Local Artisans/craft No. 1.20 1.20 0.50 0.50 0.00 0.40 1.00 1.00 0.00 0.10 0 0.50 0.50 0.00 0.00 0 3.20 3.20 0.00 0.50
Food Processing No. 1.20 1.20 0.50 0.50 0.00 0.20 1.00 1.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0 2.70 2.70 0.00 0.20
Total (C) 62.50 52.50 10.00 6.08 18.00 15.00 3.00 3.92 53.50 45.00 8.50 5.50 9.65 7.50 2.15 0.83 143.65 120.00 23.65 16.32
(D) Livelihood Activities (9%) 47.25 47.25 13.50 13.50 0.00 0.00 40.50 40.50 0.00 0.00 0 6.75 6.75 0.00 0.00 0 108.00 108.00 0.00 0.00
Total (D) 47.25 47.25 0.00 0.00 13.50 13.50 0.00 0.00 40.50 40.50 0.00 0.00 6.75 6.75 0.00 0.00 108.00 108.00 0.00 0.00
(E) Consolidation 15.75 15.75 4.50 4.50 13.50 13.50 2.25 2.25 36.00 36.00 0.00 0.00
Total (E) 15.75 15.75 0.00 0.00 0.00 4.50 4.50 0.00 0.00 0.00 13.50 13.50 0.00 0.00 0.00 2.25 2.25 0.00 0.00 0.00 36.00 36.00 0.00 0.00
Grand Total 555.58 525.00 30.58 23.07 157.41 150.00 7.41 8.75 471.35 450.00 21.35 19.10 79.55 75.00 4.55 3.66 1263.89 1200.00 63.89 54.58
(A) Preparatory Phase Activities Capacity Building Training & EPA
(C) Production System and Micro Enterprise (10%)
Activity UnitUnit
Cost
GP : Dabla GP : Basanpeer GP : Peethla GP : Keeta Total
Activity Unit Qty.Unit
cost
Total
cost
Cost from
Project
Fund
Conver
gence
Fund
Beneficiary
Contribution
(A) Preparatory phase activities capacity building training & EPAAdmn. 10% 0 0 120.00 120.00 0.00 0.00Monitoring 1% 0 0 12.00 12.00 0.00 0.00Evaluation 1% 0 0 12.00 12.00 0.00 0.00EPA 4% 0 0 48.00 48.00 0.00 0.00I&CB 5% 0 0 60.00 60.00 0.00 0.00DPR 1% 0 0 12.00 12.00 0.00 0.00
Total (A) 264.00 264.00 0.00 0.00
(B) Natural resource management (56%)Conservation measures for arable land (private land)
Field Bunding ha 1970 0.093 183.21 142.97 40.24 10.72
Earthen Structure 1 No. 54 1.2 64.80 64.80 0.00 4.86
Earthen Structure 2 No. 33 1.75 57.75 57.75 0.00 4.33
Earthen Structure 3 No. 18 2 36.00 36.00 0.00 2.70Tanka 1 No. 82 0.64 52.48 52.48 0.00 3.94Tanka 2 No. 82 0.7 57.40 57.40 0.00 4.31Khadin No. 11 Site wise 98.67 98.67 0.00 7.40Conservation measures for non arable land
Pasture Development ha 0 0 0.00 0.00 0.00 0.00V-ditch ha 340 0.0192 6.53 6.53 0.00 0.00
Water Harvesting
StructureNo. 7 3 21.00 21.00 0.00 0.00
Afforestation ha 70 1.6 112.00 112.00 0.00 0.00Tanka 3 ha 16 1.4 22.40 22.40 0.00 0.00Draunage line treatment
MMS, Gaboin No. 0 0 0.00 0.00 0.00 0.00LSCD No. 0 0 0.00 0.00 0.00 0.00WHS No. 0 0 0.00 0.00 0.00 0.00
Gully Plugs (ECD) No. 0 0 0.00 0.00 0.00 0.00
Ground water structure No. 0 0 0.00 0.00 0.00 0.00Total (B) 712.24 672.00 40.24 38.26
(C) Production system and micro enterprise (10%)Production measures for arable land
Arid Horticulture ha 39 1.2 46.80 31.15 15.65 4.67
Sprinklers & Drip irrigation ha 20 0.8 16.00 8.00 8.00 1.20
Vegetables No. 1850 0.005 9.25 9.25 0.00 1.39
Medicinal plants No. 250 0.005 1.25 1.25 0.00 0.19
Vermi compost No. 90 0.1 9.00 9.00 0.00 1.35
Crop Demonstration No. 2250 0.015 33.75 33.75 0.00 5.06Micro Enterprise
Dairy No. 0 0 10.10 10.10 0.00 1.60Poultry No. 0 0 1.10 1.10 0.00 0.00Animal camp/Breed improovementNo. 0 0 10.50 10.50 0.00 0.16Local Artisans/craft No. 0 0 3.20 3.20 0.00 0.50Food Processing No. 0 0 2.70 2.70 0.00 0.20
Total (C) 143.65 120 23.65 16.32
(D) Livelihood Activities (9%) 0 0 108.00 108.00 0.00 0.00
Total (D) 108.00 108.00 0.00 0.00
(E) Consolidation 36.00 36.00 0.00 0.00
Total (E) 0 0 36.00 36.00 0.00 0.00Grand Total 1263.89 1200.00 63.89 54.58
CHAPTER-IV Activity wise Total Abstract of cost
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. 0 0 10% 120.00 36.00 24.00 12.00 12.00 12.00 12.00 12.00 0 120.000
Monitoring 0 0 1% 12.00 0.00 0.00 2.40 2.40 2.40 2.40 2.40 0 12.000
Evaluation 0 0 1% 12.00 0.00 0.00 0.00 2.40 0.00 3.60 6.00 0 12.000
EPA 0 0 4% 48.00 14.40 33.60 0.00 0.00 0.00 0.00 0.00 0 48.000
I & CB 0 0 5% 60.00 12.00 12.00 12.00 6.00 6.00 6.00 6.00 0 60.000
DPR 0 0 1% 12.00 3.60 4.80 0.00 0.00 3.60 0.00 0.00 0 12.000
Total (A) 66.000 74.400 26.400 22.800 24.000 24.000 26.40 0 264.000
Field Bunding ha 1970 0.093 142.97 450 28.59 470 50.04 270 28.59 270 28.59 510 7.15 1970 142.970
Earthen Structure 1 No. 54 1.2 64.80 12 12.96 19 22.68 11 12.96 11 12.96 2 3.24 54 64.800
Earthen Structure 2 No. 33 1.75 57.75 5 11.55 12 20.21 7 11.55 7 11.55 3 2.89 33 57.750
Earthen Structure 3 No. 18 2 36.00 4 7.20 6 12.60 4 7.20 4 7.20 1 1.80 18 36.000
Tanka 1 No. 82 0.64 52.48 15 10.50 29 18.37 16 10.50 16 10.50 5 2.62 82 52.480
Tanka 2 No. 82 0.7 57.40 15 11.48 29 20.09 16 11.48 16 11.48 5 2.87 82 57.400
Khadin No. 11 Site wise 98.67 3 19.73 4 34.53 2 19.73 2 19.73 0 4.93 11 98.670
Conservation measures for non arable land
Pasture Development ha 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000
V-ditch ha 340 0.0192 6.53 80 1.31 119 2.28 68 1.31 68 1.31 5 0.33 340 6.528
Water Harvesting Structure No. 7 3 21.00 1 4.20 2 7.35 1 4.20 1 4.20 0 1.05 7 21.000
Afforestation ha 70 1.6 112.00 15 22.40 25 39.20 14 22.40 14 22.40 3 5.60 70 112.000
Tanka 3 ha 16 1.4 22.40 3 4.48 6 7.84 3 4.48 3 4.48 1 1.12 16 22.400
Drainage line treatment 0 0.000
MMS, Gabin No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000
LSCD No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000
WHS No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000
Gully Plugs (ECD) No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000
Ground water structure No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000
Total (B) 604 134.400 720 235.199 413 134.400 413 134.400 535 33.600 2683 671.998
Arid Horticulture ha 39 1.2 31.15 8 6.23 14 10.90 8 6.23 8 6.23 2 1.56 39 31.150
Sprinklers & Drip irrigation ha 20 0.8 8.00 4 1.60 7 2.80 4 1.60 4 1.60 1 0.40 20 8.000
Vegetables No. 1850 0.005 9.25 370 1.85 648 3.24 370 1.85 370 1.85 93 0.46 1850 9.250
Medicinal plants No. 250 0.005 1.25 50 0.25 88 0.44 50 0.25 50 0.25 13 0.06 250 1.250
Vermi compost No. 90 0.1 9.00 18 1.80 32 3.15 18 1.80 18 1.80 5 0.45 90 9.000
Crop Demonstration No. 2250 0.015 33.75 450 6.75 788 11.81 450 6.75 450 6.75 113 1.69 2250 33.750
Micro Enterprise
Dairy No. 0 0 10.10 0 2.02 0 3.54 0 2.02 0 2.02 0 0.51 0 10.100
Poultry No. 0 0 1.10 0 0.22 0 0.39 0 0.22 0 0.22 0 0.06 0 1.100
Animal camp/Breed improovement No. 0 0 10.50 0 2.10 0 3.68 0 2.10 0 2.10 0 0.53 0 10.500
Local Artisans/craft No. 0 0 3.20 0 0.64 0 1.12 0 0.64 0 0.64 0 0.16 0 3.200
Food Processing No. 0 0 2.70 0 0.54 0 0.95 0 0.54 0 0.54 0 0.14 0 2.700
Total (C) 900 24.000 1575 42.000 900 24.000 900 24.000 225 6.000 4499 120.000
(D) Livelihood Activities (9%) 0 0 108.00 0 21.60 0 37.80 0 21.60 0 21.60 0 5.40 0 108.000
Total (D) 0 21.600 0 37.800 0 21.600 0 21.600 0 5.400 0 108.000
(E) Consolidation 0 0 36.00 0 0.00 0 0.00 0 0.00 0 7.20 0 28.80 0 36.000
Grand Total 66.000 74.400 1503 206.400 2294 337.80 1312 204.00 1312 211.20 760 100.20 7182 1199.998
Yearwise % Targets 5.500 6.200 17.200 28.150 17.000 17.600 8.350 100.000
ANNUAL ACTION PLAN-(THROUGH PROJECT FUND)
(C) Production System and Micro Enterprise(19%)
(A) Preparatory Phase Activities Capacity Building, Trainings & EPA
Production measures for arable land
(B) Natural Resource Management (56%)
Conservation measures for arable land(private land)
5th year 6th year 7th year Total Activity Unit Qty.
Unit
Cost
4th yearTotal
cost
1st year 2nd year 3rd year
1 3 4 5 6S.
No.
Unit of
measurement
Pre-project
Status
Expected Post-
project Status Remarks
1 Meters 137 136.5
2 No. 0 6
3 TDS 2500 2400
4 KLPD 50.493 56.42
5 Ha 192 200
6 Description 0 0
7
Ha 4054 4300
Ha 192 200
Ha 0 0
8 Ha 4054 4300
9
q/ha 3.59 4.25
q/ha 0 0
q/ha 0 10.00
q/ha 4.96 5.00
10
ton 873.08 1138.15
ton 0 0
ton 0 8.0
ton 49.60 50.00
11 Ha 341 411
12 Ha 0 39
13 Ha 341 411
14 Ha 480 590
15 Q 7542500 8500000
16 Litres/day 7100 7800
17 No. 0 130
18 No. 17 45
19 Rs.in lac 0.18 0.3
20 No. 114 70
21 No. 0 16
Yield of Wheat
Yield of Gram
Yield of Mustard
2
Item
Status of water table (Depth to Ground water level)
Ground water structures repaired/ rejuvenated
Quality of drinking water
Availability of drinking water
Production of Bajra
Production of Wheat
Production of Gram
Production of Mustard
Area under vegetation
Change in irrigated Area
Change in cropping/ land use pattern
Area under agricultural crop
Change in cultivated Area
Yield of Bajra
Area under horticulture
Area under fuel
Area under Fodder
Fodder production
Milk production
SHGs Active
production of major crops of area
No. of enterprising individuals
Income
Migration
SHG Federations formed
CHAPTER – VI EXPECTED OUT COMES
Yield of major crops of area
Area under single crop
Area under double crop
Area under multiple crop
No. L B H Qty. Rate Amount
1 Dag belling, 5-10 cm deep LS Mtr 2 100 200 0.40 80.00
2 Jungle clearance, ordinary jungle 82 Sqm 1 100 3.45 345 1.30 448.50
3 Earth work for embankment in dry or
wet in layers of 15 cm, breaking of
clods, picking of grasses, pebbles etc.
& dressing in given profile including
1.5 mtr of lift & 50 mtr of lead, in
hard soil
119(b)
Cum 1 100
(0.45+5.
25)/2 1.2 342 84.00 28728.00
4 Sowing of grass seeds on ridges in 3
layers
114
Mtr 3 100 300 1.00 300.00
5 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)
LS
Kg 3 1 3 80.00 240.00
Sub Total 29796.50
Add: Contingencies @ 3% 893.90
Grand Total 30690
306.904Or Rate per mtr = say 310.00/mtr
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA
Detailed & Abstract of Estimate for Field Bunding
S.
No.Item
Item
Ref.Unit
Details of Measurement
IWMP Estimate 1 1
Length 250 mtr
No. L B H Qty. Rate Amount
1 Dag belling, 5-10 cm deep LS Mtr 2 250 500 0.40 200.00
2 Jungle clearance, ordinary jungle 82 Sqm 1 250 7 1750 1.30 2275.00
3 Earth work for embankment in dry or
wet in layers of 15 cm, breaking of
clods, picking of grasses, pebbles etc.
& dressing in given profile including
1.5 mtr of lift & 50 mtr of lead, in
hard soil
119(b)
Cum 1 250 (1+7)/2 1.5 1500 84.00 126000.00
4 Sowing of grass seeds on ridges in 10
layers
114
Mtr 10 250 2500 1.00 2500.00
5 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)
LS
Kg 10 0.5 5 80.00 400.00
6 Pitiching 15-23 cm size hammer
dressed stones with all lifts and leads
including packing of stones in
required profile
124
Cum 1 20 10 0.2 40 910.00 36400.00
Sub Total 167775.00
Add: Contingencies @ 3% 5033.25
Grand Total 172808
Or say Rs. 175000.00
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA
Detailed & Abstract of Estimate for Earthen Structure
S.
No.Item
Item
Ref.Unit
Details of Measurement
IWMP Estimate 1 2
Length 150 mtr
No. L B H Qty. Rate Amount
1 Dag belling, 5-10 cm deep LS Mtr 2 150 300 0.40 120.00
2 Jungle clearance, ordinary jungle 82 Sqm 1 150 7 1050 1.30 1365.00
3 Earth work for embankment in dry or
wet in layers of 15 cm, breaking of
clods, picking of grasses, pebbles etc.
& dressing in given profile including
1.5 mtr of lift & 50 mtr of lead, in
hard soil
119(b)
Cum 1 150 (1+7)/2 1.5 900 84.00 75600.00
4 Sowing of grass seeds on ridges in 10
layers
114
Mtr 10 150 1500 1.00 1500.00
5 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)
LS
Kg 10 0.5 5 80.00 400.00
6 Pitiching 15-23 cm size hammer
dressed stones with all lifts and leads
including packing of stones in
required profile
124
Cum 1 20 10 0.2 40 910.00 36400.00
Sub Total 115385.00
Add: Contingencies @ 3% 3461.55
Grand Total 118847
Or say Rs. 120000.00
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA
Detailed & Abstract of Estimate for Earthen Structure
S.
No.Item
Item
Ref.Unit
Details of Measurement
IWMP Estimate 1 3
Length 300 mtr
No. L B H Qty. Rate Amount
1 Dag belling, 5-10 cm deep LS Mtr 2 300 600 0.40 240.00
2 Jungle clearance, ordinary jungle 82 Sqm 1 300 7 2100 1.30 2730.00
3 Earth work for embankment in dry or
wet in layers of 15 cm, breaking of
clods, picking of grasses, pebbles etc.
& dressing in given profile including
1.5 mtr of lift & 50 mtr of lead, in
hard soil
119(b)
Cum 1 300 (1+7)/2 1.5 1800 84.00 151200.00
4 Sowing of grass seeds on ridges in 10
layers
114
Mtr 10 300 3000 1.00 3000.00
5 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)
LS
Kg 10 0.5 5 80.00 400.00
6 Pitiching 15-23 cm size hammer
dressed stones with all lifts and leads
including packing of stones in
required profile
124
Cum 1 20 10 0.2 40 910.00 36400.00
Sub Total 193970.00
Add: Contingencies @ 3% 5819.10
Grand Total 199789
Or say Rs. 200000.00
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA
Detailed & Abstract of Estimate for Earthen Structure
S.
No.Item
Item
Ref.Unit
Details of Measurement
IWMP Estimate 1 4
No. L B H Qty. Rate Amount
1 Dag belling, 5-10 cm deep LS Mtr 1 100 100 0.40 40.00
2 Jungle clearance, ordinary jungle 82 Sqm 1 100 3.45 345 1.30 448.50
3 Earth work for excavation in
foundation trenches in dry or moist
soil & back filling of soil in jhiri &
disposal of excavated of soil in
required profile including 1.5 mtr of
lift & 50 mtr of lead, in hard soil
2(b)
Cum ,1/2 100 0.9 0.45 20.25 81.00 1640.25
4 Sowing of grass seeds on ridges in 1
row
114
Mtr 1 100 100 1.00 100.00
5 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)
LS
Kg 1 1 1 80.00 80.00
Sub Total 2308.75
Add: Contingencies @ 3% 69.26
Grand Total 2378
Or per mtr. cost is Rs. 23.78 Say Rs. 24.00/mtr.
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA
Detailed & Abstract of Estimate for V-ditch
S.
No.Item
Item
Ref.Unit
Details of Measurement
IWMP Estimate 1 5
Per ha.
No. L B H Qty. Rate Amount
1 Earth work for excavation in
foundation trenches in dry or moist
soil & back filling of soil in jhiri &
disposal of excavated of soil in
required profile including 1.5 mtr of
lift & 50 mtr of lead, in hard soil
2(b)
V-ditch/Contour Cum 20x1/2 100 0.6 0.3 180 81.00 14580.00
2 Digging of pits for foresty Plants of
the size 45 x 45 x 45 cm in hard soil
112(b)
No. 400 400 7.00 2800.00
3 Plantation of foresty plants in flat
lands
113(b)
No. 400 400 3.00 1200.00
4 Making of balls of grass seeds, FYM,
snad & clay in the ratio of 1:2:2
including beating & screening of
FYM & clay, cleaning of grass seeds
F/3-2
Per 6
Kg 6 60.00 60.00
5 Making of thawala in 50 cm dia in
semi circular pattern, in flat lands
117(b)
No. 400 400 1.70 680.00
6 Sowing of grass seeds on ridges in 1
row
114
Mtr 20 100 2000 1.00 2000.00
7 Watering of plants @ 15 ltr per plant
with available water, 20 watering per
year for 3 years pasture enclosure
3 x 20 x 400
115
No. 24000 24000 2.00 48000.00
8 Supply of potable water for watering
of plants by tractor mounted water
tanker with a lead upto 10 km
LS
Tanker 120 120 500.00 60000.00
9 Hoeing & weeding 15 cm deep & in
45 cm dia in semi circular pattern
twice a year
2 x 3 x 400
116
No. 2400 2400 1.00 2400.00
10 Application of insecticide and
fertilizers to plants excluding cost of
insecticide and fertilizers, twice a year
3 x 2 x 400
F/F-5
No. 2400 2400 0.28 672.00
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA
Detailed & Abstract of Estimate for Silvi-Pasture Model
S.
No.Item
Item
Ref.Unit
Details of Measurement
IWMP Estimate 1 6
No. L B H Qty. Rate Amount
S.
No.Item
Item
Ref.Unit
Details of Measurement
11 Protection of plants from frost/loo
using grass or other localy availble
materials (by making a Jhonpa of 0.6
mtr dia of plant height and covering
the plant by it)
F/G-5
No. 400 400 3.56 1424.00
12 Supply of FYM/fertilizers &
insecticides
LS
No. 2400 2400 10.00 24000.00
13 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)
LS
Kg 6 80.00 480.00
14 Suppy of foresty plant including 20%
gap filling per year & taking into
considration the mortality of plants
during transportation & rehandling &
including of transportation from all
lead & lifts
400 + 80 + 40 + 20 + 50
LS
No. 590 590 10.00 5900.00
15 Provision for watch and ward for 3
years
3 x 12 x 30 man days for 10 ha area
minimum
LS
No. 1080 1080 135.00 14580.00
Sub Total 178776.00
16 Fencing : Provision for barbed wire
fencing with RCC posts as per
enclosed detailed estimate,
considering minimum area of encloser
10 ha. & average length of fencing is
125 mtr./ha.
As per
estimate
Mtr 125 125 1000.00 125000.00
Sub Total 125000.00
Total 303776.00
Add: Contingencies @ 3% 9113.28
Grand Total 312889
Say Rs. 310000.00/ha.
IWMP Estimate 1 7
Per ha.
No. L B H Qty. Rate Amount
1 Surveying of Proposed Area Ha 1 1 182.06 182.06
1 Earth work for excavation in
foundation trenches in dry or moist
soil & back filling of soil in jhiri &
disposal of excavated of soil in
required profile including 1.5 mtr of
lift & 50 mtr of lead, in hard soil
2(b)
V-ditch/Contour furrow at every 25
Mtr interval 4x1/2 100 0.6 0.3 36
Cum 36 81.00 2916.00
2 Digging of pits for foresty Plants of
the size 45 x 45 x 45 cm in hard soil
112(b)
No. 400 400 7.00 2800.00
3 Plantation of foresty plants in flat
lands
113(b)
No. 400 400 3.00 1200.00
4 Making of balls of grass seeds, FYM,
snad & clay in the ratio of 1:2:2
including beating & screening of
FYM & clay, cleaning of grass seeds
F/3-2
Per 6
Kg 6 60.00 60.00
5 Making of thawala in 50 cm dia in
semi circular pattern, in flat lands,
every year upto 3 years
117(b)
No. 1200 1200 1.70 2040.00
6 Sowing of grass seeds on ridges in 1
row
114
Mtr 20 100 2000 1.00 2000.00
7 Watering of plants @ 15 ltr per plant
with available water, 12 watering per
year for 3 years pasture enclosure
3 x 12 x 400
115
No. 14400 14400 2.00 28800.00
8 Supply of potable water for watering
of plants by tractor mounted water
tanker with a lead upto 10 km
LS
Tanker 50 50 500.00 25000.00
9 Hoeing & weeding 15 cm deep & in
45 cm dia in semi circular pattern
twice a year
2 x 3 x 400
116
No. 2400 2400 1.00 2400.00
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA
Detailed & Abstract of Estimate for Silvi-Pasture Model
S.
No.Item
Item
Ref.Unit
Details of Measurement
IWMP Estimate 1 8
No. L B H Qty. Rate Amount
S.
No.Item
Item
Ref.Unit
Details of Measurement
10 Application of insecticide and
fertilizers to plants excluding cost of
insecticide and fertilizers, twice a year
3 x 2 x 400
F/F-5
No. 2400 2400 0.36 864.00
11 Protection of plants from frost/loo
using grass or other localy availble
materials (by making a Jhonpa of 0.6
mtr dia of plant height and covering
the plant by it)
F/G-5
No. 400 400 3.56 1424.00
12 Supply of FYM/fertilizers &
insecticides
LS
No. 2400 2400 10.00 24000.00
13 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)
LS
Kg 6 80.00 480.00
14 Suppy of foresty plant including 20%
gap filling per year & taking into
considration the mortality of plants
during transportation & rehandling &
including of transportation from all
lead & lifts
400 + 80 + 40 + 20 + 50
LS
No. 590 590 10.00 5900.00
15 Provision for watch and ward for 3
years
3 x 12 x 30 man days for 10 ha area
minimum
LS
No. 1080 1080 135.00 14580.00
Sub Total 114464.00
16 Fencing : Provision for barbed wire
fencing with RCC posts as per
enclosed detailed estimate,
considering minimum area of encloser
10 ha. & average length of fencing is
125 mtr./ha.
As per
estimate
Mtr 125 125 320.00 40000.00
Sub Total 40000.00
Total 154464.00
Add: Contingencies @ 3% 4633.92
Grand Total 159098
Say Rs. 160000.00/ha.
IWMP Estimate 1 9
Per 100 mtr
No. L B H Qty. Rate Amount
1 Earth work for excavation in
foundation trenches in dry or moist
soil & back filling of soil in jhiri &
disposal of excavated of soil in
required profile including 1.5 mtr of
lift & 50 mtr of lead, in hard soil. (Pits
for fixing Stone Patti posts, 5 mtr
interval))
2(b)
Cum 20 0.6 0.45 0.6 3.24 81.00 262.44
2 Supply of Stone Patties, 7' long Sqm 20 2.15 0.3 12.9 465.00 5998.50
20 7 1 0.25 35
Cum 0.991 204.00 202.15
4 P& F of Goat proof jali LS Mtr 1 100 100 100.00 10000.00
LS 5 100 500
Kg 82 90.00 7380.00
6 P& F of MS gate as per instruction of
Engineer incharge
LS
Kg 100 100 70.00 7000.00
Sub Total 30843.09
Add: Contingencies @ 3% 925.29
Grand Total 31768
Estimated cost is Rs. 320/mtr
Or say Rs. 32000.00
Carriage of stone patties, Avg. 40 Km
lead. (7'X1'X0.25')
Supply, Drawing & fixing of barbed
wire strands with binding wires and
clips, Barbed wire for fencing
including transportation, 5 Strands
3
5
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA
Detailed & Abstract of Estimate for Barbed Wire Fencing with Stone Patti Posts
S.
No.Item
Item
Ref.Unit
Details of Measurement
IWMP Estimate 1 10
Per 100 mtr
No. L B H Qty. Rate Amount
1 Earth work for excavation in
foundation trenches in dry or moist
soil & back filling of soil in jhiri &
disposal of excavated of soil in
required profile including 1.5 mtr of
lift & 50 mtr of lead, in hard soil
2(b)
Cum 53 0.45 0.45 0.6 6.44 81.00 521.60
2 PCC in 1:3:6 (1Cement :3 Course
Sand :6 Graded stone aggregate 20
mm nominal size for fixing of posts
102(b)
Cum 53 0.45 0.45 0.6 6.44 2229.00 14353.65
3 RCC in 1:2:4 for pre-casting of RCC
posts with curing etc.
37(a)
Cum 53 2.1 0.1 0.1 1.113 2960.00 3294.48
4 P&F centering & shuttering 45(a) Sqm 53 2.1 0.4 44.52 100.00 4452.00
5 P & F mild steel bars for
reinforcement, 01.5% of RCC
46
Kg 131.1 59.00 7732.29
6 Transporation of pre-casted RCC
posts
LS
No. 53 53 30.00 1590.00
7 Providing & drawing the barbed wire
through hooks provided in posts and
tightening the same and fixing with
the binding wire in 6 strands with
diagonally double bracing, each 10th
post & corner post to be reinforced
with slanted supports both way
LS
Mtr 100 100 650.00 65000.00
Sub Total 96944.01
Add: Contingencies @ 3% 2908.32
Grand Total 99852
Estimated cost is Rs. 1000/mtr
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA
Or say Rs. 100000.00
Detailed & Abstract of Estimate for Barbed Wire Fencing with Precasted RCC Posts
S.
No.Item
Item
Ref.Unit
Details of Measurement
IWMP Estimate 1 11
Village: …………………………………….
Khasra No.: …………………………………. 20000 Ltr Capacity (Circular)
No. L B H Qty. Rate Amount
Earth work in excavation and disposal
of earth in given profile including 1.5
mtr of lift & 50 mtr of lead, in hard soil
119(b)
Water Tank 16.83
Inlets 2 1 1 1 2.00
18.83 81.00 1525.10
2 in disintegrated rocks and one aditional
lift
119©
Cum 16.83 139.00 2339.15
PCC in Foundation Providing and
laying cement concrete incduding
curring compection etc.complete in
specified grade excluding the cost of
centering and shuttering - All work up
to plinth level. 1:4:8 (1cement : 4
coarse sand : 8 graded stone aggregate
40 mm nominal size).
11(c)a
Water Tank 2.88
Inlets 2 1 1 0.3 0.60
Cum 3.48 1723.00 5996.04
Cement Concrete flooring in 1:2:4
using crusher broken aggregate of 12
mm size , 50 mm thick, in Bottom of
Tank
58(a)
5.93
at top of the Tanka 9.63
Inlets 2 1 1 2.00
Sqm 17.56 224.00 3933.44
Stone Masonry For Foundation
Random Rubble stone masonry for
foundation and plinth in cement sand
mortar above 30cm thick wall in:
cement mortar 1:6 (1cement : 6sand)
24(a)a
Water Tank 13.05
Inlets 2 2.4 0.3 3.25 4.68
Cum 17.73 1625.00 28811.25
3
4
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA
Detailed & Abstract of Estimate for Water Tank
S.
No.Item
Item
Ref.Unit
Details of Measurement
5
1x∏x3.125x0.38x3.5
0.5x(∏/4x3.5x3.5x3.5)
1x(∏/4x2.75x2.75)
1x(∏/4x3.5x3.5)
0.5x(∏/4x3.5x3.5x3.5)
1
1x(∏/4x3.5x3.5x0.30)
IWMP Estimate 1 12
No. L B H Qty. Rate Amount
S.
No.Item
Item
Ref.Unit
Details of Measurement
6 P/L stone slab roofing in good quality
slabs including filling of joints in CM
1:4 complete
36
Sqm 9.61 933.00 8966.13
Plaster in CM (1:4 ), 25 mm thick 67(a)
Inner Wall of Water tank 30.22
Outer walls of water Tank 6.59
Inlets 2 3 0.6 3.60
Sqm 40.41 163.00 6586.83
8 P/F Lid over Opening, Mesh in inlets,
Display boards etc.
LSNo. 1 1.00 2000.00 2000.00
Total 60157.95
Add: Contingencies @ 3% 1804.74
Grand Total 61963
7
Say Rs. 0.62 lac
1x∏x2.75x3.5
1x∏x3.5x0.60
∏/4x3.5x3.5
JEn
IWMP …….
AEn
& PIA IWMP ……….
IWMP Estimate 1 13
Village: …………………………………….
Khasra No.: …………………………………. 22000 Ltr Capacity (Rect+Semi Circular)
No. L B H Qty. Rate Amount
Earth work in excavation and disposal
of earth in given profile including 1.5
mtr of lift & 50 mtr of lead, in hard soil
119(b)
Water Tank (Semi circular part) 10.05
Water Tank (Rectangular part) 8.00
Inlets 2 1 1 1 2.00
Cum 20.05 81.00 1623.89
in disintegrated rocks and one aditional
lift
119©
Water Tank (Semi circular part) 10.05
Water Tank (Rectangular part) 8.00
Cum 18.05 139.00 2508.67
PCC in Foundation Providing and
laying cement concrete incduding
curring compection etc.complete in
specified grade excluding the cost of
centering and shuttering - All work up
to plinth level. 1:4:8 (1cement : 4
coarse sand : 8 graded stone aggregate
40 mm nominal size).
11(c)a
Water Tank (Semi circular part) 2.41
Water Tank (Rectangular part) 1.92
Inlets 2 1 1 0.3 0.60
Cum 4.93 1723.00 8497.01
Cement Concrete flooring in 1:2:4
using crusher broken aggregate of 12
mm size , 50 mm thick, in Bottom of
58(a)
At bottom or floor
Water Tank (Semi circular part) 4.71
Water Tank (Rectangular part) 4.90
Inlets 2 1 1 0.3 0.60
at top of the Tanka
Water Tank (Semi circular part) 8.04
Water Tank (Rectangular part) 6.40
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA
Detailed & Abstract of Estimate for Water Tank
S.
No.Item
Item
Ref.
3
Details of Measurement
1x(∏/4x3.2x3.2x0.30)
0.5x(2.0x3.2x2.5)
0.5x(∏/4x3.2x3.2x2.5)
0.5x(2.0x3.2x2.5)
Unit
1
0.5x(∏/4x3.2x3.2x2.5)
4
1x(2.00x3.2)
2
1x(2.0x3.2x0.30)
1x(∏/4x2.45x2.45)
1x(2.0x2.45)
1x(∏/4x3.2x3.2)
IWMP Estimate 1 14
No. L B H Qty. Rate Amount
S.
No.Item
Item
Ref.
Details of MeasurementUnit
Sqm 24.65 224.00 5521.68
Stone Masonry For Foundation
Random Rubble stone masonry for
foundation and plinth in cement sand
mortar above 30cm thick wall in:
cement mortar 1:6 (1cement : 6sand)
24(a)a
Water Tank (Semi circular part) 8.07
Water Tank (Rectangular part) 3.64
Inlets 2 2.4 0.3 3.25 4.68
Cum 16.39 1625.00 26637.25
6 P/L stone slab roofing in good quality
slabs including filling of joints in CM
1:4 complete
36
Water Tank (Semi circular part) 8.04
Water Tank (Rectangular part) 6.40
Patti as lintel 1.92
Sqm 16.36 933.00 15262.39
Plaster in CM (1:4 ), 25 mm thick 67(a)
Inner Wall, semi circular 20.00
Inner Wall, Rectangular 10.40
Outer walls, semi circular 6.03
Outer walls, Rectangular 2.40
Inlets 2 3 0.6 3.60
Sqm 42.43 163.00 6916.19
8 P/F Lid over Opening, Mesh in inlets,
Display boards etc.
LSNo. 1 1.00 1000.00 1000.00
Total 67967.08
Add: Contingencies @ 3% 2039.01
Grand Total 70006
Say Rs. 0.70 lac
5
1x∏x2.825x0.35x2.60
2x2.0x0.35x2.60
AEn
& PIA IWMP ……….
4
1x(∏/4x3.2x3.2)
1x(2.0x3.2)
2x3.2x0.30
1x∏x3.2x0.60
2x2.0x0.60
JEn
IWMP …….
7
1x∏x2.45x2.60
2x2.0x2.60
IWMP Estimate 1 15
Village: …………………………………….
Khasra No.: …………………………………. 30000 Ltr Capacity (Circular)
No. L B H Qty. Rate Amount
Earth work in excavation and disposal
of earth in given profile including 1.5
mtr of lift & 50 mtr of lead, in hard soil
119(b)
Water Tank 23.75
Inlets 2 1 1 1 2.00
Peripheri wall 3.23
Cum 28.98 81.00 2347.56
2 in disintegrated rocks and one aditional
lift, Water Tank
119© Cum 23.75 139.00 3301.24
PCC in Foundation Providing and
laying cement concrete incduding
curring compection etc.complete in
specified grade excluding the cost of
centering and shuttering - All work up
to plinth level. 1:4:8 (1cement : 4
coarse sand : 8 graded stone aggregate
40 mm nominal size).
11(c)a
Water Tank 2.13
Inlets 2 1 1 0.3 0.60
Peripheri wall 4.31
Cum 7.04 1723.00 12123.91
Cement Concrete flooring in 1:2:4
using crusher broken aggregate of 12
mm size , 50 mm thick, in Bottom of
Tank
58(a) 9.62
at top of the Tanka 14.18
Inlets 2 1 1 2.00
Copping over periphery wall 14.37
Sqm 40.16 224.00 8996.02
Stone Masonry For Foundation
Random Rubble stone masonry for
foundation and plinth in cement sand
mortar above 30cm thick wall in:
cement mortar 1:6 (1cement : 6sand)
24(a)a
Water Tank 16.18
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA
Detailed & Abstract of Estimate for Water Tank
S.
No.Item
Item
Ref.Unit
Details of Measurement
1
0.5x(∏/4x4.25x4.25x3.35)
0.5x(∏/4x4.25x4.25x3.35)
3
1x(∏/4x15.25x0.6x0.45)
0.5x(∏/4x4.25x4.25x0.30)
1x(∏x15.25x0.6x0.15)
4 1x(∏/4x3.5x3.5)
1x(∏/4x4.25x4.25)
5
1x∏x3.875x0.38x3.5
1x(∏x15.25x0.30)
IWMP Estimate 1 16
No. L B H Qty. Rate Amount
S.
No.Item
Item
Ref.Unit
Details of Measurement
Inlets 2 2.4 0.3 3.25 4.68
Peripheri wall, first footing 6.46
Peripheri wall, second footing 14.37
Cum 41.69 1625.00 67750.72
6 P&F Stone lintels in mortar of
masonary, 15 cm thick.
Sqm 1 3 0.3 0.90 679.00 611.10
7 P/L stone slab roofing in good quality
slabs including filling of joints in CM
1:4 complete
36 Sqm 14.18 933.00 13229.07
Plaster in CM (1:4 ), 25 mm thick 67(a)
Inner Wall of Water tank 38.47
Outer walls of water Tank 8.01
Inlets 2 3 0.6 3.60
Sqm 50.07 163.00 8161.74
9 Flush or ruled pointing in CM(1:3) over
stone masonary
70 (a) Sqm 95.77 61.00 5841.97
10 Laying, watering and ramming of
available (excavated) quary rubbish/
murrum for preparation of catchment
85- 97
(d)
Cum 49.44 239.00 11816.79
11 P/F Lid over Opening, Mesh in inlets,
Display boards etc.
LS No. 1 1.00 2000.00 2000.00
Total 136180.10
Add: Contingencies @ 3% 4085.40
Grand Total 140266
5
∏/4x4.25x4.25
1x(∏x15.25x0.45x0.30)
1x(∏x15.25x0.30x1.00)
8
1x∏x3.5x3.5
1x∏x4.25x0.60
Say Rs. 1.40 lac
JEn
IWMP …….
AEn
& PIA IWMP ……….
2x(∏x15.25x1.00)
1x(∏x9.675x10.85x0.15)
IWMP Estimate 1 17
Village: …………………………………….
Khasra No.: …………………………………. 40000 Ltr Capacity (Rect+Semi Circular)
No. L B H Qty. Rate Amount
Earth work in excavation and disposal
of earth in given profile including 1.5
mtr of lift & 50 mtr of lead, in hard soil
119(b)
Water Tank (Semi circular part) 15.39
Water Tank (Rectangular part) 15.40
Inlets 2 1 1 1 2.00
Cum 32.79 81.00 2655.67
in disintegrated rocks and one aditional
lift
119©
Water Tank (Semi circular part) 15.39
Water Tank (Rectangular part) 15.40
Cum 30.79 139.00 4279.25
PCC in Foundation Providing and
laying cement concrete incduding
curring compection etc.complete in
specified grade excluding the cost of
centering and shuttering - All work up
to plinth level. 1:4:8 (1cement : 4
coarse sand : 8 graded stone aggregate
40 mm nominal size).
11(c)a
Water Tank (Semi circular part) 2.88
Water Tank (Rectangular part) 2.89
Inlets 2 1 1 0.3 0.60
Cum 6.37 1723.00 10979.60
Cement Concrete flooring in 1:2:4
using crusher broken aggregate of 12
mm size , 50 mm thick, in Bottom of
58(a)
At bottom or floor
Water Tank (Semi circular part) 4.71
Water Tank (Rectangular part) 7.56
Inlets 2 1 1 0.3 0.60
at top of the Tanka
Water Tank (Semi circular part) 9.62
Water Tank (Rectangular part) 9.63
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI SANKRA
Detailed & Abstract of Estimate for Water Tank
S.
No.Item
Item
Ref.Unit
Details of Measurement
1
0.5x(∏/4x3.5x3.5x3.2)
0.5x(2.75x3.5x3.2)
2
0.5x(∏/4x3.5x3.5x3.2)
0.5x(2.75x3.5x3.2)
3
1x(∏/4x3.5x3.5x0.30)
1x(2.75x3.5x0.30)
4
1x(∏/4x2.75x2.75)
1x(2.75x2.75)
1x(∏/4x3.5x3.5)
1x(2.75x3.5)
IWMP Estimate 1 18
No. L B H Qty. Rate Amount
S.
No.Item
Item
Ref.Unit
Details of Measurement
Sqm 32.12 224.00 7193.92
Stone Masonry For Foundation
Random Rubble stone masonry for
foundation and plinth in cement sand
mortar above 30cm thick wall in:
cement mortar 1:6 (1cement : 6sand)
24(a)a
Water Tank (Semi circular part) 11.93
Water Tank (Rectangular part) 6.69
Inlets 2 2.4 0.3 3.25 4.68
Cum 23.30 1625.00 37862.50
6 P&F Stone lintels in mortar of
masonary, 15 cm thick.Sqm 2 3 0.3 1.80 679.00 1222.20
7 P/L stone slab roofing in good quality
slabs including filling of joints in CM
1:4 complete
36
Water Tank (Semi circular part) 8.04
Water Tank (Rectangular part) 8.80
Sqm 16.84 933.00 15710.23
Plaster in CM (1:4 ), 25 mm thick 67(a)
Inner Wall, semi circular 27.63
Inner Wall, Rectangular 17.60
Outer walls, semi circular 6.59
Outer walls, Rectangular 3.30
Inlets 2 3 0.6 3.60
Sqm 58.73 163.00 9572.34
8 P/F Lid over Opening, Mesh in inlets,
Display boards etc.
LSNo. 1 1.00 2000.00 2000.00
Total 91475.71
Add: Contingencies @ 3% 2744.27
Grand Total 94220
4
5
1x∏x3.125x0.38x3.20
2x2.75x0.38x3.20
1x(∏/4x3.2x3.2)
Say Rs. 0.94 lac
JEn
IWMP …….
AEn
& PIA IWMP ……….
1x(2.75x3.2)
7
1x∏x2.75x3.20
2x2.75x3.20
1x∏x3.50x0.60
2x2.75x0.60
IWMP Estimate 1 19
Hydro Geological Data
1. Area of Catchment, A 485.00 ha
2. Total Length of Run 1850.00 mtr
3. Total Fall/Relief of the Catchment 12.00 mtr
4. 1 Hr. Rainfall for 25 years Frequency 70.00 mm
5. Contour interval of Submergence area in m 0.30 mtr
6. Area of first contour in ha 0.50 ha
second Contour 0.80 ha
third contour 2.75 ha
fourth contour 4.25 ha
fifth contour 6.80 ha
sixth contour 0.00 ha
seventh contour 0.00 ha
7. Height at FTL 1.2 mtr
8. Yield of the Catchment, by Strange's Table
Factor Area Factor Area Factor Area
170 103.57 242.5 77.675 145.5 52.685 97 41527.88
Total expected Yield of Catchment = 4.15
9. Storage Capacity of the Khadin at FTL, by Symphson's formula
V= h/3 [(A1+An)+4(A2+A4+…+An-1)+2(A3+A5+….+An-2)]
V= Storage Volume of Khadin in ha-m
A= Area of the contours, ha
n= Total no. of contours
Village: ……………………
Khasra No.: ……………….
Design Khadin
Yield of the Catchment per hectare Area in Cum
Good Catchment Avg. Catchment Bad Catchment
Total
Monsoonal
Rainfall in
mm
Toatal
Yield
Cum
Khadin 1 1
h= Contour interval, m
Volume V= 3.98 ha-m
By readjusting the height of Crest/ FTL to have app. Capacity, FTL= 1.2 Mtr
10. Top width of the bund= H/5+1.50
.= 1.74
or say 2.00 Mtr
11. Total Length of Bund corresponding to above height 1170.00 Mtr
12. Time of Concentration 45.62 minute
13. Intensity of Rainfall Corresponding to Time of Concentration 90.00 mm/hour
14. Average Runoff Coefficent 0.25
15. Peak Rate of Runoff 30.31 m3/sec.
Hydraulic Design
1. Available Crest Length 40.00 mtr
2. Available impounding depth 1.20 mtr
3. Heigth above Crest to accommodate peak discharge 0.58 mtr
Structural Design
A. Fetch Length according to impounding at HFL 220.00 mtr
B. Free Board provided 0.31
C. Gross heigth of Structure 1.39 Say 2
1. Length of Headwall 40.00
2. Top width of Headwall 0.60
3. Bottom width of Headwall 1.00 Say 1
4. Height of Headwall 0.50
5. Length of Headwall Extention 2.39 Say 2.5
6. Top width of Headwall Extention 0.45
7. Bottom width of Headwall Extention 0.45
8. Height of Headwall Extention 1.39 Say 1.5
9. Length of Sidewall 3.22 Say 3.3
10. Top width of Sidewall 0.60
11. Bottom width of Sidewall 0.60
12. Height of Sidewall at head wall Ext. junction 1.39 Say 1.5
13. Length of Sidewall Extention 1.31 Say 1.5
14. Top width of Sidewall Extention 0.60
Khadin 1 2
15. Bottom width of Sidewall Extention 0.60
16. Height of Sidewall Extention 0.87 Say 0.9
17. Length of Toewall 40.00
18. Width of Toewall 0.45
19. Hieght of Toewall 0.30
20. Width of Apron 3.22 Say 3.3
JEn
IWMP ………
AEn
& PIA IWMP ……….
Khadin 1 3
1.5
2
Chainage
No.
Chain
LengthNSL TBL Height
Bottom
Width
Top
Width
Cross
Section
Avg. Cross
SectionQty.
1 30 227.80 227.90 0.10 2.35 2.00 0.22
2 30 227.50 227.90 0.40 3.40 2.00 1.08 0.65 19.46
3 30 227.40 227.90 0.50 3.75 2.00 1.44 1.26 37.76
4 30 227.30 227.90 0.60 4.10 2.00 1.83 1.63 49.01
5 30 227.30 227.90 0.60 4.10 2.00 1.83 1.83 54.90
6 30 227.20 227.90 0.70 4.45 2.00 2.26 2.04 61.31
7 30 226.80 227.90 1.10 5.85 2.00 4.32 3.29 98.63
8 30 227.00 227.90 0.90 5.15 2.00 3.22 3.77 113.03
9 30 227.00 227.90 0.90 5.15 2.00 3.22 3.22 96.53
10 30 226.90 227.90 1.00 5.50 2.00 3.75 3.48 104.51
11 30 226.70 227.90 1.20 6.20 2.00 4.92 4.34 130.05
12 30 226.70 227.90 1.20 6.20 2.00 4.92 4.92 147.60
13 30 226.80 227.90 1.10 5.85 2.00 4.32 4.62 138.56
14 30 226.75 227.90 1.15 6.03 2.00 4.61 4.47 133.98
15 30 226.85 227.90 1.05 5.68 2.00 4.03 4.32 129.66
16 30 226.80 227.90 1.10 5.85 2.00 4.32 4.17 125.20
17 30 227.05 227.90 0.85 4.97 2.00 2.96 3.64 109.23
18 30 226.00 227.90 1.90 8.65 2.00 10.12 6.54 196.23
19 30 226.30 227.90 1.60 7.60 2.00 7.68 8.90 266.96
20 30 226.30 227.90 1.60 7.60 2.00 7.68 7.68 230.40
21 30 226.40 227.90 1.50 7.25 2.00 6.94 7.31 219.26
22 30 226.40 227.90 1.50 7.25 2.00 6.94 6.94 208.13
23 30 226.50 227.90 1.40 6.90 2.00 6.23 6.58 197.51
Earth work calculation for Earthen Bund of Khadin
Side slope, downstream side =
Side slope, upstream side =
Village: …………………
Khadin 1 4
Chainage
No.
Chain
LengthNSL TBL Height
Bottom
Width
Top
Width
Cross
Section
Avg. Cross
SectionQty.
24 30 226.40 227.90 1.50 7.25 2.00 6.94 6.58 197.51
25 30 226.80 227.90 1.10 5.85 2.00 4.32 5.63 168.83
26 30 226.80 227.90 1.10 5.85 2.00 4.32 4.32 129.52
27 30 226.90 227.90 1.00 5.50 2.00 3.75 4.03 121.01
28 30 226.90 227.90 1.00 5.50 2.00 3.75 3.75 112.50
29 30 227.00 227.90 0.90 5.15 2.00 3.22 3.48 104.51
30 30 227.10 227.90 0.80 4.80 2.00 2.72 2.97 89.06
31 30 227.10 227.90 0.80 4.80 2.00 2.72 2.72 81.60
32 30 227.20 227.90 0.70 4.45 2.00 2.26 2.49 74.66
33 30 227.25 227.90 0.65 4.28 2.00 2.04 2.15 64.45
34 30 227.30 227.90 0.60 4.10 2.00 1.83 1.93 58.04
35 30 227.35 227.90 0.55 3.93 2.00 1.63 1.73 51.89
36 30 227.30 227.90 0.60 4.10 2.00 1.83 1.73 51.89
37 30 227.30 227.90 0.60 4.10 2.00 1.83 1.83 54.90
38 30 227.40 227.90 0.50 3.75 2.00 1.44 1.63 49.01
39 30 227.50 227.90 0.40 3.40 2.00 1.08 1.26 37.76
40 0 0.00 0.00 2.00 2.00 0.00 0.54 0.00
Total 1170 27.55 208.625 4315.07
JEn
IWMP ……..
AEn
& PIA IWMP …………..
Khadin 1 5
No. L B H Qty. Rate Amount
1 Dag belling, 5-10 cm deep LS Mtr 2 1170 2340.00 0.40 936.00
2 Jungle clearance, ordinary jungle 82 Sqm 1 1170 5.35 6258.75 1.30 8136.38
3 Earth work for embankment in dry or
wet in layers of 15 cm, breaking of
clods, picking of grasses, pebbles etc.
& dressing in given profile including
1.5 mtr of lift & 50 mtr of lead, in
hard soil
119(b)
Cum 4315.07 84.00 362465.78
4 Sowing of grass seeds on ridges in 5
lines
114
Mtr 5 1130 5650.00 1.00 5650.00
5 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)
LS
Kg 10 1 10.00 80.00 800.00
6 Spreading of quarry rubbish which
have 40% of stone spals or kankar or
Murrum on bund surface including
supply, watering & ramming etc.
complete
85
Sqm 1 1170 1.27 0.1 149.00 279.00 41570.83
7 Dry stone pitching with 15-23 cm
long hammer dressed singel stone
including supply & all lead & lift, on
upstream side of bund
124
Cum 0.75 585 1.58 0.2 138.61 910.00 126133.52
Sub Total A 545692.50
Earth work for excavation in
foundation trenches in dry or moist
soil & back filling of soil in jhiri &
disposal of excavated of soil in
required profile including 1.5 mtr of
lift & 50 mtr of lead, in hard soil
2(b)
Head Wall 1 40 1.3 1 52.00Head Wall Extention 1 2.5 0.75 1 1.88
Side Wall 2 3.3 0.9 1 5.94Side wall extention/ Wing walls 2 1.5 0.9 1 2.70
Apron 1 40 3.3 0.45 59.40Toe wall/ Cut off wall 1 40 0.75 1 30.00
Cum 151.92 81.00 12305.12PCC in Foundation Providing and
laying cement concrete incduding
curring compection etc.complete in
specified grade excluding the cost of
centering and shuttering - All work up
to plinth level. 1:4:8 (1cement : 4
coarse sand : 8 graded stone aggregate
40 mm nominal size).
Less : Deduct for hand broken
aggregates used in place of crusher
broken
11(c)a
Head Wall 1 40 1.3 0.3 15.60Head Wall Extention 1 2.5 0.75 0.3 0.56
Side Wall 2 3.3 0.9 0.3 1.78Side wall extention/ Wing walls 2 1.5 0.9 0.3 0.81
Apron 1 40 3.3 0.3 39.60Toe wall/ Cut off wall 1 40 0.75 0.3 9.00
Cum 67.35 1723.00 116051.80
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Detailed & Abstract of Estimate for Khadin
S.
No.Item
Item
Ref.
Waste Weir
Village: ……………………Khasra No.: ……………….
UnitDetails of Measurement
1
2
Earthen Bund
As per Earth
work Calculation chart
Khadin 1 6
No. L B H Qty. Rate Amount
S.
No.Item
Item
Ref.Unit
Details of Measurement
Stone Kharanja in CM (1:8) in soling
stones upto plinth including filling of
jhiri, curing etc
24(b)
Apron 1 40 3.3 0.15 19.80
Cum 19.80 1301.00 25759.80
Stone Masonry For Foundation
Random Rubble stone masonry for
foundation and plinth in cement sand
mortar above 30cm thick wall in:
cement mortar 1:6 (1cement : 6sand)
24(a)a
Head Wall 1 40 1 0.7 28.00
Head Wall Extention 1 2.5 0.45 0.7 0.79
Side Wall 2 3.3 0.9 0.7 4.16
Side wall extention/ Wing walls 2 1.5 0.9 0.7 1.89
Toe wall/ Cut off wall 1 40 0.75 0.7 21.00
Cum 55.84 1625.00 90732.69
Stone Masonry For Super structure in
Random Rubble stone masonry for
foundation and plinth in cement sand
mortar above 30cm thick wall in:
cement mortar 1:6 (1cement : 6sand)
24(a)a
+ 25
Head Wall 1 40 0.8 0.5 16.00
Head Wall Extention 1 2.5 0.45 1.50 1.69
Side Wall 2 3.3 0.6 1.2 4.75
Side wall extention/ Wing walls 2 1.5 0.6 0.9 1.62
Toe wall/ Cut off wall 1 40 0.45 0.3 5.40
Cum 29.46 1759.00 51819.26
Plaster in CM (1:4 ), 25 mm thick 67(a)
Head Wall 1 40 0.5 20.00
Head Wall Extention 2 2.5 1.50 7.50
Side Wall 4 3.3 1.2 15.84
Side wall extention/ Wing walls 4 1.5 0.9 5.40
Toe wall/ Cut off wall 2 40 0.3 24.00
1 40 0.45 18.00
Sqm 90.74 163.00 14790.62
Pointing in CM (1:3) flush or ruled 70(a)
Head Wall 1 40 0.64 25.61
Sqm 25.61 61.00 1562.36
Copping in CM (1:2:4) 50 mm thick 58(a)
Head Wall 1 40 0.6 24.00
Head Wall Extention 1 2.5 0.45 1.13
Side Wall 2 3.3 0.6 3.96
Side wall extention/ Wing walls 2 1.5 0.6 1.80
Sqm 30.89 224.00 6918.24
Sub Total B 319939.89
Total 865632.39
Add: Contingencies @ 3% 25968.97
Grand Total 891601
Say Rs. 8.91 lac
JEn
IWMP ………
AEn
& PIA IWMP ………
8
5
6
7
4
3
Khadin 1 7
Village: …………………………………..
Hydro Geological Data
1. Area of Catchment, A 480.00 ha
2. Total Length of Run 3600.00 mtr
3. Total Fall/Relief of the Catchment 45.00 mtr
4. 1 Hr. Rainfall for 25 years Frequency 70.00 mm
5. Contour interval of Submergence area in m 0.40 mtr
6. Area of first contour in ha 0.70 ha
second Contour 1.25 ha
third contour 2.00 ha
fourth contour 2.90 ha
fifth contour 3.85 ha
sixth contour 0.00 ha
seventh contour 0.00 ha
7. Height at FTL 2 mtr
8. Yield of the Catchment, by Strange's Table
Factor Area Factor Area Factor Area
170 103.57 240 77.675 144 52.685 96 41099.76
Total expected Yield of Catchment = 4.11
9. Storage Capacity of the Khadin at FTL, by Symphson's formula
V= h/3 [(A1+An)+4(A2+A4+…+An-1)+2(A3+A5+….+An-2)]
V= Storage Volume of Khadin in ha-m
A= Area of the contours, ha
n= Total no. of contours
h= Contour interval, m
Volume V= 3.87 ha-m
By readjusting the height of Crest/ FTL to have app. Capacity, FTL= 2 Mtr
10. Top width of the bund= H/5+1.50
.= 1.90
or say 2.00 Mtr
11. Total Length of Bund corresponding to above height 930.00 Mtr
Design Khadin
Yield of the Catchment per hectare Area in Cum
Good Catchment Avg. Catchment Bad Catchment
Total
Monsoonal
Rainfall in
mm
Toatal
Yield
Cum
Khasra No.: ……………………………..
Khadin 2 1
12. Time of Concentration 59.17 minute
13. Intensity of Rainfall Corresponding to Time of Concentration 95.00 mm/hour
14. Average Runoff Coefficent 0.25
15. Peak Rate of Runoff 31.67 m3/sec.
Hydraulic Design
1. Available Crest Length 40.00 mtr
2. Available impounding depth 2.00 mtr
3. Heigth of flood above Crest to accommodate peak discharge 0.60 mtr
Structural Design
A. Fetch Length according to impounding at HFL 300.00 mtr
B. Free Board provided 0.36
C. Gross heigth of Structure at waste weir 1.46 Say 1.5
1. Length of Headwall 40.00
2. Top width of Headwall 0.60
3. Bottom width of Headwall 1.00 Say 1
4. Height of Headwall 0.50
5. Length of Headwall Extention 2.46 Say 2.5
6. Top width of Headwall Extention 0.45
7. Bottom width of Headwall Extention 0.45
8. Height of Headwall Extention 1.46 Say 1.5
9. Length of Sidewall 2.05 Say 2.1
10. Top width of Sidewall 0.60
11. Bottom width of Sidewall 0.60
12. Height of Sidewall at head wall Ext. junction 1.46 Say 1.5
13. Length of Sidewall Extention 1.35 Say 1.5
14. Top width of Sidewall Extention 0.60
15. Bottom width of Sidewall Extention 0.60
16. Height of Sidewall Extention 0.90 Say 1
17. Length of Toewall 40.00
18. Width of Toewall 0.45
19. Hieght of Toewall 0.30
20. Width of Apron 2.05 Say 2.1
JEn
IWMP ……..
AEn
& PIA IWMP ……….
Khadin 2 2
Village: …………………………………
1.5
2
Chainage
No.
Chain
LengthNSL TBL Height
Bottom
Width
Top
Width
Cross
Section
Avg.
Cross
Section
Qty.
1 30 224.20 224.50 0.30 3.05 2.00 0.76
2 30 224.10 224.50 0.40 3.40 2.00 1.08 0.92 27.56
3 30 224.10 224.50 0.40 3.40 2.00 1.08 1.08 32.40
4 30 224.00 224.50 0.50 3.75 2.00 1.44 1.26 37.76
5 30 223.80 224.50 0.70 4.45 2.00 2.26 1.85 55.42
6 30 223.70 224.50 0.80 4.80 2.00 2.72 2.49 74.66
7 30 223.50 224.50 1.00 5.50 2.00 3.75 3.24 97.05
8 30 223.30 224.50 1.20 6.20 2.00 4.92 4.33 130.05
9 30 223.30 224.50 1.20 6.20 2.00 4.92 4.92 147.60
10 30 223.20 224.50 1.30 6.55 2.00 5.56 5.24 157.16
11 30 223.10 224.50 1.40 6.90 2.00 6.23 5.89 176.81
12 30 223.10 224.50 1.40 6.90 2.00 6.23 6.23 186.90
13 30 222.80 224.50 1.70 7.95 2.00 8.46 7.34 220.31
14 30 222.40 224.50 2.10 9.35 2.00 11.92 10.19 305.62
15 30 222.50 224.50 2.00 9.00 2.00 11.00 11.46 343.76
16 30 222.50 224.50 2.00 9.00 2.00 11.00 11.00 330.00
17 30 222.70 224.50 1.80 8.30 2.00 9.27 10.14 304.05
18 30 222.90 224.50 1.60 7.60 2.00 7.68 8.48 254.25
19 30 223.00 224.50 1.50 7.25 2.00 6.94 7.31 219.26
20 30 223.15 224.50 1.35 6.72 2.00 5.89 6.41 192.40
21 30 223.35 224.50 1.15 6.03 2.00 4.61 5.25 157.56
22 30 223.40 224.50 1.10 5.85 2.00 4.32 4.47 133.98
23 30 223.00 224.50 1.50 7.25 2.00 6.94 5.63 168.83
24 30 223.10 224.50 1.40 6.90 2.00 6.23 6.58 197.51
25 30 223.10 224.50 1.40 6.90 2.00 6.23 6.23 186.90
26 30 223.15 224.50 1.35 6.72 2.00 5.89 6.06 181.79
Earth work calculation for Earthen Bund of Khadin
Side slope, downstream side =
Side slope, upstream side =
Khasra No.: ……………………………
Khadin 2 3
Chainage
No.
Chain
LengthNSL TBL Height
Bottom
Width
Top
Width
Cross
Section
Avg.
Cross
Section
Qty.
27 30 223.40 224.50 1.10 5.85 2.00 4.32 5.10 153.10
28 30 223.50 224.50 1.00 5.50 2.00 3.75 4.03 121.01
29 30 223.70 224.50 0.80 4.80 2.00 2.72 3.24 97.05
30 30 223.95 224.50 0.55 3.93 2.00 1.63 2.17 65.24
31 30 224.10 224.50 0.40 3.40 2.00 1.08 1.35 40.64
Total 930 25.80 189.4 4796.66
JEn
IWMP ……..
AEn
& PIA IWMP …….
Khadin 2 4
Village: ………………………………..
No. L B H Qty. Rate Amount
1 Dag belling, 5-10 cm deep LS Mtr 2 930 1860.00 0.40 744.00
2 Jungle clearance, ordinary jungle 82 Sqm 1 930 6 5580.00 1.30 7254.00
3 Earth work for embankment in dry or
wet in layers of 15 cm, breaking of
clods, picking of grasses, pebbles etc.
& dressing in given profile including
1.5 mtr of lift & 50 mtr of lead, in
hard soil
119(b)
Cum 4796.66 84.00 402919.65
4 Sowing of grass seeds on ridges in 5
lines
114
Mtr 5 890 4450.00 1.00 4450.00
5 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)
LS
Kg 10 1 10.00 80.00 800.00
6 Spreading of quarry rubbish which
have 40% of stone spals or kankar or
Murrum on bund surface including
supply, watering & ramming etc.
complete
85
Sqm 1 930 3.50 0.08 260.40 279.00 72651.60
7 Dry stone pitching with 15-23 cm
long hammer dressed singel stone
including supply & all lead & lift, on
upstream side of bund
124
Cum 0.75 232.5 1 0.2 34.88 910.00 31736.25
Sub Total A 520555.50
Earth work for excavation in
foundation trenches in dry or moist
soil & back filling of soil in jhiri &
disposal of excavated of soil in
required profile including 1.5 mtr of
lift & 50 mtr of lead, in hard soil
2(b)
Head Wall 1 40 1.3 1 52.00Head Wall Extention 1 2.5 0.75 1 1.88
Side Wall 2 2.1 0.9 1 3.78Side wall extention/ Wing walls 2 1.5 0.9 0.5 1.35
Apron 1 40 2.1 0.45 37.80Toe wall/ Cut off wall 1 40 0.75 0.5 15.00
Cum 111.81 81.00 9056.21
PCC in Foundation Providing and
laying cement concrete incduding
curring compection etc.complete in
specified grade excluding the cost of
centering and shuttering - All work up
to plinth level. 1:4:8 (1cement : 4
coarse sand : 8 graded stone aggregate
40 mm nominal size).
Less : Deduct for hand broken
aggregates used in place of crusher
broken
11(c)a
Head Wall 1 40 1.3 0.3 15.60Head Wall Extention 1 2.5 0.75 0.3 0.56
Side Wall 2 2.1 0.9 0.3 1.13Side wall extention/ Wing walls 2 1.5 0.9 0.3 0.81
Apron 1 40 2.1 0.3 25.20Toe wall/ Cut off wall 1 40 0.75 0.3 9.00
Cum 52.31 1723.00 90124.10
As per Earth work
Calculation chart
Waste Weir
Khasra No.: …………………………..
1
2
Earthen Bund
UnitDetails of Measurement
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Detailed & Abstract of Estimate for Khadin
S.
No.Item
Item
Ref.
Khadin 2 5
No. L B H Qty. Rate AmountUnit
Details of MeasurementS.
No.Item
Item
Ref.
Stone Kharanja in CM (1:8) in soling
stones upto plinth including filling of
jhiri, curing etc
24(b)
Apron 1 40 2.1 0.15 12.60Cum 12.60 1301.00 16392.60
Stone Masonry For Foundation
Random Rubble stone masonry for
foundation and plinth in cement sand
mortar above 30cm thick wall in:
cement mortar 1:6 (1cement : 6sand)
24(a)a
Head Wall 1 40 1 0.7 28.00Head Wall Extention 1 2.5 0.45 0.7 0.79
Side Wall 2 2.1 0.9 0.7 2.65Side wall extention/ Wing walls 2 1.5 0.9 0.2 0.54
Toe wall/ Cut off wall 1 40 0.75 0.2 6.00Cum 37.97 1625.00 61706.94
Stone Masonry For Super structure in
Random Rubble stone masonry for
foundation and plinth in cement sand
mortar above 30cm thick wall in:
cement mortar 1:6 (1cement : 6sand)
24(a)a
+ 25
Head Wall 1 40 0.8 0.5 16.00
Head Wall Extention 1 2.5 0.45 1.50 1.69
Side Wall 2 2.1 0.6 1.25 3.15
Side wall extention/ Wing walls 2 1.5 0.6 1 1.80
Toe wall/ Cut off wall 1 40 0.45 0.3 5.40
Cum 28.04 1759.00 49317.96
Plaster in CM (1:4 ), 25 mm thick 67(a)
Head Wall 1 40 0.5 20.00
Head Wall Extention 2 2.5 1.50 7.50
Side Wall 4 2.1 1.25 10.50
Side wall extention/ Wing walls 4 1.5 1 6.00
Toe wall/ Cut off wall 2 40 0.3 24.00
1 40 0.45 18.00
Sqm 86.00 163.00 14018.00
Pointing in CM (1:3) flush or ruled 70(a)
Head Wall 1 40 0.64 25.61
Sqm 25.61 61.00 1562.36
Copping in CM (1:2:4) 50 mm thick 58(a)
Head Wall 1 40 0.6 24.00
Head Wall Extention 1 2.5 0.45 1.13
Side Wall 2 2.1 0.6 2.52
Side wall extention/ Wing walls 2 1.5 0.6 1.80
Sqm 29.45 224.00 6595.68
Sub Total B 248773.85
Total 769329.35
Add: Contingencies @ 3% 23079.88
Grand Total 792409
7
3
JEn
IWMP ………
AEn
& PIA IWMP ………..
8
5
6
4
Say Rs. 7.90 lac
Khadin 2 6
Village: ……………………………………..
Hydro Geological Data
1. Area of Catchment, A 670.00 ha
2. Total Length of Run 2150.00 mtr
3. Total Fall/Relief of the Catchment 6.50 mtr
4. 1 Hr. Rainfall for 25 years Frequency 70.00 mm
5. Contour interval of Submergence area in m 0.30 mtr
6. Area of first contour in ha 0.80 ha
second Contour 2.55 ha
third contour 3.80 ha
fourth contour 4.85 ha
fifth contour 6.75 ha
sixth contour 0.00 ha
seventh contour 0.00 ha
7. Height at FTL 2 mtr
8. Yield of the Catchment, by Strange's Table
Factor Area Factor Area Factor Area
170 103.57 335 77.675 201 52.685 134 57368.42
Total expected Yield of Catchment = 5.74
9. Storage Capacity of the Khadin at FTL, by Symphson's formula
V= h/3 [(A1+An)+4(A2+A4+…+An-1)+2(A3+A5+….+An-2)]
V= Storage Volume of Khadin in ha-m
A= Area of the contours, ha
n= Total no. of contours
Khasra No.: ………………………………..
Design Khadin
Yield of the Catchment per hectare Area in Cum
Good Catchment Avg. Catchment Bad Catchment
Total
Monsoonal
Rainfall in
mm
Toatal
Yield
Cum
Khadin 3 1
h= Contour interval, m
Volume V= 5.15 ha-m
By readjusting the height of Crest/ FTL to have app. Capacity, FTL= 2 Mtr
10. Top width of the bund= H/5+1.50
.= 1.90
or say 2.00 Mtr
11. Total Length of Bund corresponding to above height 1260.00 Mtr
12. Time of Concentration 68.71 minute
13. Intensity of Rainfall Corresponding to Time of Concentration 85.00 mm/hour
14. Average Runoff Coefficent 0.25
15. Peak Rate of Runoff 39.55 m3/sec.
Hydraulic Design
1. Available Crest Length 50.00 mtr
2. Available impounding depth 2.00 mtr
3. Heigth of flood above Crest to accommodate peak discharge 0.60 mtr
Structural Design
A. Fetch Length according to impounding at HFL 280.00 mtr
B. Free Board provided 0.35
C. Gross heigth of Structure at waste weir 1.25 Say 1.6
1. Length of Headwall 50.00
2. Top width of Headwall 0.60
3. Bottom width of Headwall 0.84 Say 1
4. Height of Headwall 0.30
5. Length of Headwall Extention 2.25 Say 2.3
6. Top width of Headwall Extention 0.45
7. Bottom width of Headwall Extention 0.45
8. Height of Headwall Extention 1.25 Say 1.3
9. Length of Sidewall 1.69 Say 2
10. Top width of Sidewall 0.60
11. Bottom width of Sidewall 0.60
12. Height of Sidewall at head wall Ext. junction 1.25 Say 1.3
13. Length of Sidewall Extention 1.35 Say 1.5
14. Top width of Sidewall Extention 0.60
Khadin 3 2
15. Bottom width of Sidewall Extention 0.60
16. Height of Sidewall Extention 0.90 Say 1.3
17. Length of Toewall 50.00
18. Width of Toewall 0.45
19. Hieght of Toewall 0.30
20. Width of Apron 1.69 Say 1.7
JEn
IWMP ……..
AEn
& PIA IWMP ……..
Khadin 3 3
Village: …………………………………….
1.5
2
Chainage
No.
Chain
LengthNSL TBL Height
Bottom
Width
Top
Width
Cross
Section
Avg. Cross
SectionQty.
1 30 204.00 204.00 0.00 2.00 2.00 0.00
2 30 203.50 204.00 0.50 3.75 2.00 1.44 0.72 21.56
3 30 203.25 204.00 0.75 4.63 2.00 2.48 1.96 58.83
4 30 203.10 204.00 0.90 5.15 2.00 3.22 2.85 85.53
5 30 203.00 204.00 1.00 5.50 2.00 3.75 3.48 104.51
6 30 202.80 204.00 1.20 6.20 2.00 4.92 4.33 130.05
7 30 202.70 204.00 1.30 6.55 2.00 5.56 5.24 157.16
8 30 202.90 204.00 1.10 5.85 2.00 4.32 4.94 148.13
9 30 203.00 204.00 1.00 5.50 2.00 3.75 4.03 121.01
10 30 203.50 204.00 0.50 3.75 2.00 1.44 2.59 77.81
11 30 203.10 204.00 0.90 5.15 2.00 3.22 2.33 69.83
12 30 203.20 204.00 0.80 4.80 2.00 2.72 2.97 89.06
13 30 203.20 204.00 0.80 4.80 2.00 2.72 2.72 81.60
14 30 203.00 204.00 1.00 5.50 2.00 3.75 3.24 97.05
15 30 202.80 204.00 1.20 6.20 2.00 4.92 4.33 130.05
16 30 202.70 204.00 1.30 6.55 2.00 5.56 5.24 157.16
17 30 203.00 204.00 1.00 5.50 2.00 3.75 4.65 139.61
18 30 203.30 204.00 0.70 4.45 2.00 2.26 3.00 90.11
19 30 203.40 204.00 0.60 4.10 2.00 1.83 2.04 61.31
20 30 202.90 204.00 1.10 5.85 2.00 4.32 3.07 92.21
21 30 202.80 204.00 1.20 6.20 2.00 4.92 4.62 138.56
Earth work calculation for Earthen Bund of Khadin
Side slope, downstream side =
Side slope, upstream side =
Khasra No.: …………………………………
Khadin 3 4
Chainage
No.
Chain
LengthNSL TBL Height
Bottom
Width
Top
Width
Cross
Section
Avg. Cross
SectionQty.
22 30 202.50 204.00 1.50 7.25 2.00 6.94 5.93 177.86
23 30 202.60 204.00 1.40 6.90 2.00 6.23 6.58 197.51
24 30 202.40 204.00 1.60 7.60 2.00 7.68 6.96 208.65
25 30 202.30 204.00 1.70 7.95 2.00 8.46 8.07 242.06
26 30 202.00 204.00 2.00 9.00 2.00 11.00 9.73 291.86
27 30 202.90 204.00 1.10 5.85 2.00 4.32 7.66 229.76
28 30 202.70 204.00 1.30 6.55 2.00 5.56 4.94 148.13
29 30 202.60 204.00 1.40 6.90 2.00 6.23 5.89 176.81
30 30 203.00 204.00 1.00 5.50 2.00 3.75 4.99 149.70
31 30 202.90 204.00 1.10 5.85 2.00 4.32 4.03 121.01
32 30 203.10 204.00 0.90 5.15 2.00 3.22 3.77 113.03
33 30 203.05 204.00 0.95 5.32 2.00 3.48 3.35 100.45
34 30 203.00 204.00 1.00 5.50 2.00 3.75 3.61 108.44
35 30 203.10 204.00 0.90 5.15 2.00 3.22 3.48 104.51
36 30 203.20 204.00 0.80 4.80 2.00 2.72 2.97 89.06
37 30 203.35 204.00 0.65 4.28 2.00 2.04 2.38 71.39
38 30 203.20 204.00 0.80 4.80 2.00 2.72 2.38 71.39
39 30 203.10 204.00 0.90 5.15 2.00 3.22 2.97 89.06
40 30 203.50 204.00 0.50 3.75 2.00 1.44 2.33 69.83
41 30 203.40 204.00 0.60 4.10 2.00 1.83 1.63 49.01
42 30 204.00 204.00 0.00 2.00 2.00 0.00 0.91 27.45
Total 1260 31.00 227.325 4888.14
JEn
IWMP ………..
AEn
& PIA IWMP ………….
Khadin 3 5
Village: …………………………….
No. L B H Qty. Rate Amount
1 Dag belling, 5-10 cm deep LS Mtr 2 1260 2520.00 0.40 1008.00
2 Jungle clearance, ordinary jungle 82 Sqm 1 1260 8.41944 10608.50 1.30 13791.05
3 Earth work for embankment in dry or
wet in layers of 15 cm, breaking of
clods, picking of grasses, pebbles etc.
& dressing in given profile including
1.5 mtr of lift & 50 mtr of lead, in
hard soil
119(b)
Cum 4888.14 84.00 410604.08
4 Sowing of grass seeds on ridges in 5
lines
114
Mtr 5 1210 6050.00 1.00 6050.00
5 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)
LS
Kg 10 1 10.00 80.00 800.00
6 Spreading of quarry rubbish which
have 40% of stone spals or kankar or
Murrum on bund surface including
supply, watering & ramming etc.
complete
85
Sqm 1 1260 2.07 0.08 208.64 279.00 58210.90
7 Dry stone pitching with 15-23 cm
long hammer dressed singel stone
including supply & all lead & lift, on
upstream side of bund
124
Cum 0.75 315 2.56734 0.2 121.31 910.00 110389.09
Sub Total A 600853.12
Earth work for excavation in
foundation trenches in dry or moist
soil & back filling of soil in jhiri &
disposal of excavated of soil in
required profile including 1.5 mtr of
lift & 50 mtr of lead, in hard soil
2(b)
Head Wall 1 50 1.14 0.75 42.75Head Wall Extention 1 2.25 0.75 0.75 1.27
Side Wall 2 2 0.9 0.75 2.70Side wall extention/ Wing walls 2 1.5 0.9 0.5 1.35
Apron 1 50 2 0.45 45.00Toe wall/ Cut off wall 1 50 0.75 0.5 18.75
Cum 111.82 81.00 9057.07
1
As per Earth work Calculation
chart
Waste Weir
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Detailed & Abstract of Estimate for Khadin
S.
No.Item
Khasra No.: ……………………….
Details of Measurement
Earthen Bund
Item
Ref.Unit
Khadin 3 6
No. L B H Qty. Rate Amount
S.
No.Item
Details of MeasurementItem
Ref.Unit
PCC in Foundation Providing and
laying cement concrete incduding
curring compection etc.complete in
specified grade excluding the cost of
centering and shuttering - All work up
to plinth level. 1:4:8 (1cement : 4
coarse sand : 8 graded stone aggregate
40 mm nominal size).
Less : Deduct for hand broken
aggregates used in place of crusher
broken
11(c)a
Head Wall 1 50 1.14 0.3 17.10Head Wall Extention 1 2.25 0.75 0.3 0.51
Side Wall 2 2 0.9 0.3 1.08Side wall extention/ Wing walls 2 1.5 0.9 0.3 0.81
Apron 1 50 2 0.3 30.00Toe wall/ Cut off wall 1 50 0.75 0.3 11.25
Cum 60.75 1723.00 104665.79
Stone Kharanja in CM (1:8) in soling
stones upto plinth including filling of
jhiri, curing etc
24(b)
Apron 1 50 2 0.15 15.00
Cum 15.00 1301.00 19515.00
Stone Masonry For Foundation
Random Rubble stone masonry for
foundation and plinth in cement sand
mortar above 30cm thick wall in:
cement mortar 1:6 (1cement : 6sand)
24(a)a
Head Wall 1 50 0.84 0.45 18.90
Head Wall Extention 1 2.25 0.45 0.45 0.46
Side Wall 2 2 0.9 0.45 1.62
Side wall extention/ Wing walls 2 1.5 0.9 0.2 0.54
Toe wall/ Cut off wall 1 50 0.75 0.2 7.50
Cum 29.02 1625.00 47150.39
Stone Masonry For Super structure in
Random Rubble stone masonry for
foundation and plinth in cement sand
mortar above 30cm thick wall in:
cement mortar 1:6 (1cement : 6sand)
24(a)a
+ 25
Head Wall 1 50 0.72 0.3 10.80
Head Wall Extention 1 2.25 0.45 1.30 1.32
Side Wall 2 2 0.6 1.3 3.12
Side wall extention/ Wing walls 2 1.5 0.6 1.3 2.34
Toe wall/ Cut off wall 1 50 0.45 0.3 6.75
Cum 24.33 1759.00 42789.87
Plaster in CM (1:4 ), 25 mm thick 67(a)
5
2
4
3
6
Khadin 3 7
No. L B H Qty. Rate Amount
S.
No.Item
Details of MeasurementItem
Ref.Unit
Head Wall 1 50 0.3 15.00
Head Wall Extention 2 2.25 1.30 5.85
Side Wall 4 2 1.3 10.40
Side wall extention/ Wing walls 4 1.5 1.3 7.80
Toe wall/ Cut off wall 2 50 0.3 30.00
1 50 0.45 22.50
Sqm 91.55 163.00 14922.65
Pointing in CM (1:3) flush or ruled 70(a)
Head Wall 1 50 0.384 19.21
Sqm 19.21 61.00 1171.77
Copping in CM (1:2:4) 50 mm thick 58(a)
Head Wall 1 50 0.6 30.00
Head Wall Extention 1 2.25 0.45 1.01
Side Wall 2 2 0.6 2.40
Side wall extention/ Wing walls 2 1.5 0.6 1.80
Sqm 35.21 224.00 7887.60
Sub Total B 247160.14
Total 848013.26
Add: Contingencies @ 3% 25440.40
Grand Total 873454
8
AEn
& PIA IWMP ………….
Say Rs. 8.75 lac
JEn
IWMP ……….
6
7
Khadin 3 8
Village: …………………………….
Hydro Geological Data
1. Area of Catchment, A 460.00 ha
2. Total Length of Run 2450.00 mtr
3. Total Fall/Relief of the Catchment 8.00 mtr
4. 1 Hr. Rainfall for 25 years Frequency 70.00 mm
5. Contour interval of Submergence area in m 0.30 mtr
6. Area of first contour in ha 0.74 ha
second Contour 1.85 ha
third contour 2.70 ha
fourth contour 3.80 ha
fifth contour 5.20 ha
sixth contour 0.00 ha
seventh contour 0.00 ha
7. Height at FTL 2 mtr
8. Yield of the Catchment, by Strange's Table
Factor Area Factor Area Factor Area
170 103.57 230 77.675 138 52.685 92 39387.27
Total expected Yield of Catchment = 3.94
9. Storage Capacity of the Khadin at FTL, by Symphson's formula
V= h/3 [(A1+An)+4(A2+A4+…+An-1)+2(A3+A5+….+An-2)]
V= Storage Volume of Khadin in ha-m
A= Area of the contours, ha
n= Total no. of contours
h= Contour interval, m
Volume V= 3.91 ha-m
By readjusting the height of Crest/ FTL to have app. Capacity, FTL= 2 Mtr
10. Top width of the bund= H/5+1.50
.= 1.90
or say 2.00 Mtr
11. Total Length of Bund corresponding to above height 1230.00 Mtr
12. Time of Concentration 73.76 minute
13. Intensity of Rainfall Corresponding to Time of Concentration 85.00 mm/hour
14. Average Runoff Coefficent 0.25
Khasra No.: …………………………
Design Khadin
Yield of the Catchment per hectare Area in Cum
Good Catchment Avg. Catchment Bad Catchment
Total
Monsoonal
Rainfall in
mm
Toatal
Yield
Cum
Khadin 4 1
15. Peak Rate of Runoff 27.15 m3/sec.
Hydraulic Design
1. Available Crest Length 40.00 mtr
2. Available impounding depth 2.00 mtr
3. Heigth of flood above Crest to accommodate peak discharge 0.54 mtr
Structural Design
A. Fetch Length according to impounding at HFL 280.00 mtr
B. Free Board provided 0.35
C. Gross heigth of Structure at waste weir 1.19 Say 1.2
1. Length of Headwall 40.00
2. Top width of Headwall 0.60
3. Bottom width of Headwall 0.84 Say 1
4. Height of Headwall 0.30
5. Length of Headwall Extention 2.19 Say 2.2
6. Top width of Headwall Extention 0.45
7. Bottom width of Headwall Extention 0.45
8. Height of Headwall Extention 1.19 Say 1.2
9. Length of Sidewall 1.64 Say 1.7
10. Top width of Sidewall 0.60
11. Bottom width of Sidewall 0.60
12. Height of Sidewall at head wall Ext. junction 1.19 Say 1.2
13. Length of Sidewall Extention 1.22 Say 1.5
14. Top width of Sidewall Extention 0.60
15. Bottom width of Sidewall Extention 0.60
16. Height of Sidewall Extention 0.81 Say 1
17. Length of Toewall 40.00
18. Width of Toewall 0.45
19. Hieght of Toewall 0.30
20. Width of Apron 1.64 Say 2.2
JEn
IWMP …….
AEn
& PIA IWMP ………
Khadin 4 2
Village: …………………………………..
1.5
2
Chainage
No.
Chain
LengthNSL TBL Height
Bottom
Width
Top
Width
Cross
Section
Avg.
Cross
Section
Qty.
1 30 212.00 212.00 0.00 2.00 2.00 0.00
2 30 211.50 212.00 0.50 3.75 2.00 1.44 0.72 21.56
3 30 211.35 212.00 0.65 4.28 2.00 2.04 1.74 52.15
4 30 211.30 212.00 0.70 4.45 2.00 2.26 2.15 64.45
5 30 211.25 212.00 0.75 4.63 2.00 2.48 2.37 71.13
6 30 211.20 212.00 0.80 4.80 2.00 2.72 2.60 78.07
7 30 211.30 212.00 0.70 4.45 2.00 2.26 2.49 74.66
8 30 211.30 212.00 0.70 4.45 2.00 2.26 2.26 67.72
9 30 211.30 212.00 0.70 4.45 2.00 2.26 2.26 67.72
10 30 211.20 212.00 0.80 4.80 2.00 2.72 2.49 74.66
11 30 211.20 212.00 0.80 4.80 2.00 2.72 2.72 81.60
12 30 211.15 212.00 0.85 4.97 2.00 2.96 2.84 85.27
13 30 211.15 212.00 0.85 4.97 2.00 2.96 2.96 88.93
14 30 211.10 212.00 0.90 5.15 2.00 3.22 3.09 92.73
15 30 210.90 212.00 1.10 5.85 2.00 4.32 3.77 113.03
16 30 210.80 212.00 1.20 6.20 2.00 4.92 4.62 138.56
17 30 210.75 212.00 1.25 6.38 2.00 5.23 5.08 152.32
18 30 210.70 212.00 1.30 6.55 2.00 5.56 5.40 161.88
19 30 210.70 212.00 1.30 6.55 2.00 5.56 5.56 166.73
20 30 210.70 212.00 1.30 6.55 2.00 5.56 5.56 166.73
21 30 210.50 212.00 1.50 7.25 2.00 6.94 6.25 187.43
22 30 210.20 212.00 1.80 8.30 2.00 9.27 8.10 243.11
23 30 210.10 212.00 1.90 8.65 2.00 10.12 9.69 290.81
24 30 210.00 212.00 2.00 9.00 2.00 11.00 10.56 316.76
25 30 210.00 212.00 2.00 9.00 2.00 11.00 11.00 330.00
26 30 210.20 212.00 1.80 8.30 2.00 9.27 10.14 304.05
27 30 210.30 212.00 1.70 7.95 2.00 8.46 8.86 265.91
Earth work calculation for Earthen Bund of Khadin
Side slope, downstream side =
Side slope, upstream side =
Khasra No.: ……………………………….
Khadin 4 3
Chainage
No.
Chain
LengthNSL TBL Height
Bottom
Width
Top
Width
Cross
Section
Avg.
Cross
Section
Qty.
28 30 210.25 212.00 1.75 8.13 2.00 8.86 8.66 259.75
29 30 210.30 212.00 1.70 7.95 2.00 8.46 8.66 259.75
30 30 210.40 212.00 1.60 7.60 2.00 7.68 8.07 242.06
31 30 210.10 212.00 1.90 8.65 2.00 10.12 8.90 266.96
32 30 210.40 212.00 1.60 7.60 2.00 7.68 8.90 266.96
33 30 210.35 212.00 1.65 7.78 2.00 8.06 7.87 236.17
34 30 210.30 212.00 1.70 7.95 2.00 8.46 8.26 247.83
35 30 210.20 212.00 1.80 8.30 2.00 9.27 8.86 265.91
36 30 210.50 212.00 1.50 7.25 2.00 6.94 8.10 243.11
37 30 210.80 212.00 1.20 6.20 2.00 4.92 5.93 177.86
38 30 211.10 212.00 0.90 5.15 2.00 3.22 4.07 122.06
39 30 211.30 212.00 0.70 4.45 2.00 2.26 2.74 82.12
40 30 211.50 212.00 0.50 3.75 2.00 1.44 1.85 55.42
41 30 212.00 212.00 0.00 2.00 2.00 0.00 0.72 21.56
Total 1230 40.40 251.225 6505.52
JEn
IWMP ………
AEn
& PIA IWMP ………..
Khadin 4 4
Village: …………………………………….
No. L B H Qty. Rate Amount
1 Dag belling, 5-10 cm deep LS Mtr 2 1230 2460.00 0.40 984.00
2 Jungle clearance, ordinary jungle 82 Sqm 1 1230 9.30 11444.69 1.30 14878.10
3 Earth work for embankment in dry or
wet in layers of 15 cm, breaking of
clods, picking of grasses, pebbles etc.
& dressing in given profile including
1.5 mtr of lift & 50 mtr of lead, in hard
soil
119(b)
Cum 6505.52 84.00 546463.58
4 Sowing of grass seeds on ridges in 5 114 Mtr 5 1190 5950.00 1.00 5950.00
5 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)
LS
Kg 10 1 10.00 80.00 800.00
6 Spreading of quarry rubbish which
have 40% of stone spals or kankar or
Murrum on bund surface including
supply, watering & ramming etc.
complete
85
Sqm 1 1230 2.70 0.08 265.43 279.00 74055.72
7 Dry stone pitching with 15-23 cm long
hammer dressed singel stone including
supply & all lead & lift, on upstream
side of bund
124
Cum 1 307.5 3.35 0.2 205.77 910.00 187248.83
Sub Total A 830380.22
Earth work for excavation in foundation
trenches in dry or moist soil & back
filling of soil in jhiri & disposal of
excavated of soil in required profile
including 1.5 mtr of lift & 50 mtr of
lead, in hard soil
2(b)
Head Wall 1 40 1.14 0.75 34.20Head Wall Extention 1 2.2 0.75 0.75 1.24
Side Wall 2 1.7 0.9 0.75 2.30Side wall extention/ Wing walls 2 1.5 0.9 0.5 1.35
Apron 1 40 1.7 0.45 30.60Toe wall/ Cut off wall 1 40 0.75 0.5 15.00
Cum 84.68 81.00 6859.28
Earthen Bund
Khasra No.: ………………………………….
As per Earth work
Calculation chart
Waste Weir
UnitDetails of Measurement
1
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Detailed & Abstract of Estimate for Khadin
S.
No.Item
Item
Ref.
Khadin 4 5
No. L B H Qty. Rate AmountUnit
Details of MeasurementS.
No.Item
Item
Ref.
PCC in Foundation Providing and
laying cement concrete incduding
curring compection etc.complete in
specified grade excluding the cost of
centering and shuttering - All work up
to plinth level. 1:4:8 (1cement : 4
coarse sand : 8 graded stone aggregate
40 mm nominal size).
Less : Deduct for hand broken
11(c)a
Head Wall 1 40 1.14 0.3 13.68Head Wall Extention 1 2.2 0.75 0.3 0.50
Side Wall 2 1.7 0.9 0.3 0.92Side wall extention/ Wing walls 2 1.5 0.9 0.3 0.81
Apron 1 40 1.7 0.3 20.40Toe wall/ Cut off wall 1 40 0.75 0.3 9.00
Cum 45.30 1723.00 78057.07Stone Kharanja in CM (1:8) in soling
stones upto plinth including filling of
jhiri, curing etc
24(b)
Apron 1 40 1.7 0.15 10.20Cum 10.20 1301.00 13270.20
Stone Masonry For Foundation
Random Rubble stone masonry for
foundation and plinth in cement sand
mortar above 30cm thick wall in:
cement mortar 1:6 (1cement : 6sand)
24(a)a
Head Wall 1 40 0.84 0.45 15.12Head Wall Extention 1 2.2 0.45 0.45 0.45
Side Wall 2 1.7 0.9 0.45 1.38Side wall extention/ Wing walls 2 1.5 0.9 0.2 0.54
Toe wall/ Cut off wall 1 40 0.75 0.2 6.00Cum 23.48 1625.00 38159.06
Stone Masonry For Super structure in
Random Rubble stone masonry for
foundation and plinth in cement sand
mortar above 30cm thick wall in:
cement mortar 1:6 (1cement : 6sand)
24(a)a
+ 25
Head Wall 1 40 0.72 0.3 8.64
Head Wall Extention 1 2.2 0.45 1.20 1.19
Side Wall 2 1.7 0.6 1.1 2.24
Side wall extention/ Wing walls 2 1.5 0.6 1 1.80
Toe wall/ Cut off wall 1 40 0.45 0.3 5.40
Cum 19.27 1759.00 33899.45
3
4
5
2
Khadin 4 6
No. L B H Qty. Rate AmountUnit
Details of MeasurementS.
No.Item
Item
Ref.
Plaster in CM (1:4 ), 25 mm thick 67(a)
Head Wall 1 40 0.3 12.00
Head Wall Extention 2 2.2 1.20 5.28
Side Wall 4 1.7 1.1 7.48
Side wall extention/ Wing walls 4 1.5 1 6.00
Toe wall/ Cut off wall 2 40 0.3 24.00
1 40 0.45 18.00
Sqm 72.76 163.00 11859.88
Pointing in CM (1:3) flush or ruled 70(a)
Head Wall 1 40 0.384 15.37
Sqm 15.37 61.00 937.42
Copping in CM (1:2:4) 50 mm thick 58(a)
Head Wall 1 40 0.6 24.00
Head Wall Extention 1 2.2 0.45 0.99
Side Wall 2 1.7 0.6 2.04
Side wall extention/ Wing walls 2 1.5 0.6 1.80
Sqm 28.83 224.00 6457.92
Sub Total B 189500.28
Total 1019880.50
Add: Contingencies @ 3% 30596.42
Grand Total 1050477
JEn
IWMP …….
AEn
& PIA IWMP ……….
7
8
6
Say Rs. 10.50 lac
Khadin 4 7
Village: ………………………………
Hydro Geological Data
1. Area of Catchment, A 530.00 ha
2. Total Length of Run 1750.00 mtr
3. Total Fall/Relief of the Catchment 8.00 mtr
4. 1 Hr. Rainfall for 25 years Frequency 70.00 mm
5. Contour interval of Submergence area in m 0.30 mtr
6. Area of first contour in ha 0.70 ha
second Contour 1.90 ha
third contour 2.85 ha
fourth contour 4.80 ha
fifth contour 5.90 ha
sixth contour 0.00 ha
seventh contour 0.00 ha
7. Height at FTL 2 mtr
8. Yield of the Catchment, by Strange's Table
Factor Area Factor Area Factor Area
170 103.57 265 77.675 159 52.685 106 45380.99
Total expected Yield of Catchment = 4.54
9. Storage Capacity of the Khadin at FTL, by Symphson's formula
V= h/3 [(A1+An)+4(A2+A4+…+An-1)+2(A3+A5+….+An-2)]
V= Storage Volume of Khadin in ha-m
A= Area of the contours, ha
n= Total no. of contours
h= Contour interval, m
Volume V= 4.50 ha-m
By readjusting the height of Crest/ FTL to have app. Capacity, FTL= 2 Mtr
10. Top width of the bund= H/5+1.50
.= 1.90
or say 2.00 Mtr
11. Total Length of Bund corresponding to above height 1080.00 Mtr
12. Time of Concentration 50.01 minute
Design Khadin
Yield of the Catchment per hectare Area in Cum
Good Catchment Avg. Catchment Bad Catchment
Total
Monsoonal
Rainfall in
mm
Toatal
Yield
Cum
Khasra No.: …………………………
Khadin 5 1
13. Intensity of Rainfall Corresponding to Time of Concentration 85.00 mm/hour
14. Average Runoff Coefficent 0.25
15. Peak Rate of Runoff 31.28 m3/sec.
Hydraulic Design
1. Available Crest Length 40.00 mtr
2. Available impounding depth 2.00 mtr
3. Heigth of flood above Crest to accommodate peak discharge 0.59 mtr
Structural Design
A. Fetch Length according to impounding at HFL 280.00 mtr
B. Free Board provided 0.35
C. Gross heigth of Structure at waste weir 1.25 Say 1.5
1. Length of Headwall 40.00
2. Top width of Headwall 0.60
3. Bottom width of Headwall 0.84 Say 1
4. Height of Headwall 0.30
5. Length of Headwall Extention 2.25 Say 2.3
6. Top width of Headwall Extention 0.45
7. Bottom width of Headwall Extention 0.45
8. Height of Headwall Extention 1.25 Say 1.5
9. Length of Sidewall 1.68 Say 1.7
10. Top width of Sidewall 0.60
11. Bottom width of Sidewall 0.60
12. Height of Sidewall at head wall Ext. junction 1.25 Say 1.5
13. Length of Sidewall Extention 1.34 Say 1.5
14. Top width of Sidewall Extention 0.60
15. Bottom width of Sidewall Extention 0.60
16. Height of Sidewall Extention 0.89 Say 1
17. Length of Toewall 40.00
18. Width of Toewall 0.45
19. Hieght of Toewall 0.30
20. Width of Apron 1.68 Say 1.7
JEn
IWMP ………
AEn
& PIA IWMP ……..
Khadin 5 2
Village: …………………………….
1.5
2
Chainage
No.
Chain
LengthNSL TBL Height
Bottom
Width
Top
Width
Cross
Section
Avg.
Cross
Section
Qty.
1 30 210.50 210.50 0.00 2.00 2.00 0.00 0.00 0.00
2 30 209.90 210.50 0.60 4.10 2.00 1.83 0.91 27.45
3 30 209.80 210.50 0.70 4.45 2.00 2.26 2.04 61.31
4 30 209.80 210.50 0.70 4.45 2.00 2.26 2.26 67.72
5 30 209.70 210.50 0.80 4.80 2.00 2.72 2.49 74.66
6 30 209.60 210.50 0.90 5.15 2.00 3.22 2.97 89.06
7 30 209.50 210.50 1.00 5.50 2.00 3.75 3.48 104.51
8 30 209.90 210.50 0.60 4.10 2.00 1.83 2.79 83.70
9 30 209.80 210.50 0.70 4.45 2.00 2.26 2.04 61.31
10 30 209.75 210.50 0.75 4.63 2.00 2.48 2.37 71.13
11 30 209.50 210.50 1.00 5.50 2.00 3.75 3.12 93.52
12 30 209.50 210.50 1.00 5.50 2.00 3.75 3.75 112.50
13 30 209.20 210.50 1.30 6.55 2.00 5.56 4.65 139.61
14 30 209.10 210.50 1.40 6.90 2.00 6.23 5.89 176.81
15 30 209.00 210.50 1.50 7.25 2.00 6.94 6.58 197.51
16 30 208.90 210.50 1.60 7.60 2.00 7.68 7.31 219.26
17 30 208.80 210.50 1.70 7.95 2.00 8.46 8.07 242.06
18 30 208.70 210.50 1.80 8.30 2.00 9.27 8.86 265.91
19 30 208.50 210.50 2.00 9.00 2.00 11.00 10.14 304.05
20 30 208.60 210.50 1.90 8.65 2.00 10.12 10.56 316.76
21 30 208.50 210.50 2.00 9.00 2.00 11.00 10.56 316.76
22 30 208.80 210.50 1.70 7.95 2.00 8.46 9.73 291.86
23 30 208.75 210.50 1.75 8.13 2.00 8.86 8.66 259.75
24 30 208.80 210.50 1.70 7.95 2.00 8.46 8.66 259.75
25 30 209.00 210.50 1.50 7.25 2.00 6.94 7.70 230.92
26 30 209.20 210.50 1.30 6.55 2.00 5.56 6.25 187.43
27 30 209.25 210.50 1.25 6.38 2.00 5.23 5.40 161.88
28 30 209.30 210.50 1.20 6.20 2.00 4.92 5.08 152.32
Earth work calculation for Earthen Bund of Khadin
Side slope, downstream side =
Side slope, upstream side =
Khasra No.: ………………………..
Khadin 5 3
Chainage
No.
Chain
LengthNSL TBL Height
Bottom
Width
Top
Width
Cross
Section
Avg.
Cross
Section
Qty.
29 30 209.40 210.50 1.10 5.85 2.00 4.32 4.62 138.56
30 30 209.50 210.50 1.00 5.50 2.00 3.75 4.03 121.01
31 30 209.60 210.50 0.90 5.15 2.00 3.22 3.48 104.51
32 30 209.65 210.50 0.85 4.97 2.00 2.96 3.09 92.73
33 30 209.90 210.50 0.60 4.10 2.00 1.83 2.40 71.92
34 30 209.90 210.50 0.60 4.10 2.00 1.83 1.83 54.90
35 30 209.90 210.50 0.60 4.10 2.00 1.83 1.83 54.90
36 30 209.90 210.50 0.60 4.10 2.00 1.83 1.83 54.90
Total 1080 35.90 214.1 5262.97
JEn
IWMP
…………….
AEn
& PIA IWMP …………….
Khadin 5 4
Village: …………………………………………
No. L B H Qty. Rate Amount
1 Dag belling, 5-10 cm deep LS Mtr 2 1080 2160.00 0.40 864.00
2 Jungle clearance, ordinary jungle 82 Sqm 1 1080 9.73 10510.36 1.30 13663.47
3 Earth work for embankment in dry or wet
in layers of 15 cm, breaking of clods,
picking of grasses, pebbles etc. & dressing
in given profile including 1.5 mtr of lift &
50 mtr of lead, in hard soil
119(b)
Cum 5262.97 84.00 442089.90
4 Sowing of grass seeds on ridges in 5 lines 114 Mtr 5 1040 5200.00 1.00 5200.00
5 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)
LS
Kg 10 1 10.00 80.00 800.00
6 Spreading of quarry rubbish which have
40% of stone spals or kankar or Murrum
on bund surface including supply,
watering & ramming etc. complete
85
Sqm 1 1080 2.94 0.08 254.17 279.00 70913.90
7 Dry stone pitching with 15-23 cm long
hammer dressed singel stone including
supply & all lead & lift, on upstream side
of bund
124
Cum 1 270 3.65 0.2 197.04 910.00 179304.80
Sub Total A 712836.08
Earth work for excavation in foundation
trenches in dry or moist soil & back filling
of soil in jhiri & disposal of excavated of
soil in required profile including 1.5 mtr
of lift & 50 mtr of lead, in hard soil
2(b)
Head Wall 1 40 1.14 0.75 34.20Head Wall Extention 1 2.3 0.75 0.75 1.29
Side Wall 2 1.7 0.9 0.75 2.30Side wall extention/ Wing walls 2 1.5 0.9 0.5 1.35
Apron 1 40 1.7 0.45 30.60Toe wall/ Cut off wall 1 40 0.75 0.5 15.00
Cum 84.74 81.00 6863.84PCC in Foundation Providing and laying
cement concrete incduding curring
compection etc.complete in specified
grade excluding the cost of centering and
shuttering - All work up to plinth level.
1:4:8 (1cement : 4 coarse sand : 8 graded
stone aggregate 40 mm nominal size).
Less : Deduct for hand broken aggregates
used in place of crusher broken
11(c)a
Head Wall 1 40 1.14 0.3 13.68Head Wall Extention 1 2.3 0.75 0.3 0.52
Side Wall 2 1.7 0.9 0.3 0.92Side wall extention/ Wing walls 2 1.5 0.9 0.3 0.81
Apron 1 40 1.7 0.3 20.40Toe wall/ Cut off wall 1 40 0.75 0.3 9.00
Cum 45.33 1723.00 78095.84
Details of Measurement
Earthen Bund
Item
Ref.Unit
1
2
As per Earth work
Calculation chart
Waste Weir
Khasra No.: ………………………………….
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Detailed & Abstract of Estimate for Khadin
S.
No.Item
Khadin 5 5
No. L B H Qty. Rate Amount
Details of MeasurementItem
Ref.Unit
S.
No.Item
Stone Kharanja in CM (1:8) in soling
stones upto plinth including filling of jhiri,
curing etc
24(b)
Apron 1 40 1.7 0.15 10.20
Cum 10.20 1301.00 13270.20
Stone Masonry For Foundation Random
Rubble stone masonry for foundation and
plinth in cement sand mortar above 30cm
thick wall in: cement mortar 1:6 (1cement
: 6sand)
24(a)a
Head Wall 1 40 0.84 0.45 15.12
Head Wall Extention 1 2.3 0.45 0.45 0.47
Side Wall 2 1.7 0.9 0.45 1.38
Side wall extention/ Wing walls 2 1.5 0.9 0.2 0.54
Toe wall/ Cut off wall 1 40 0.75 0.2 6.00
Cum 23.50 1625.00 38191.97
Stone Masonry For Super structure in
Random Rubble stone masonry for
foundation and plinth in cement sand
mortar above 30cm thick wall in: cement
mortar 1:6 (1cement : 6sand)
24(a)a
+ 25
Head Wall 1 40 0.72 0.3 8.64
Head Wall Extention 1 2.3 0.45 1.50 1.55
Side Wall 2 1.7 0.6 1.25 2.55
Side wall extention/ Wing walls 2 1.5 0.6 1 1.80
Toe wall/ Cut off wall 1 40 0.45 0.3 5.40
Cum 19.94 1759.00 35078.86
Plaster in CM (1:4 ), 25 mm thick 67(a)
Head Wall 1 40 0.3 12.00
Head Wall Extention 2 2.3 1.50 6.90
Side Wall 4 1.7 1.25 8.50
Side wall extention/ Wing walls 4 1.5 1 6.00
Toe wall/ Cut off wall 2 40 0.3 24.00
1 40 0.45 18.00
Sqm 75.40 163.00 12290.20
Pointing in CM (1:3) flush or ruled 70(a)
Head Wall 1 40 0.38 15.37
Sqm 15.37 61.00 937.42
Copping in CM (1:2:4) 50 mm thick 58(a)
Head Wall 1 40 0.6 24.00
Head Wall Extention 1 2.3 0.45 1.04
Side Wall 2 1.7 0.6 2.04
Side wall extention/ Wing walls 2 1.5 0.6 1.80
Sqm 28.88 224.00 6468.00
Sub Total B 191196.32
Total 904032.40
Add: Contingencies @ 3% 27120.97
Grand Total 931153
JEn
IWMP…………..
AEn
& PIA IWMP …………….
4
3
6
7
Say Rs. 9.40 lac
8
5
Khadin 5 6