52
Government of Pakistan Ministry of Information Technology & Telecommunications NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) ***** Government of Pakistan NATIONAL INFORMATION TECHNOLOGY BOARD (NITB) Ministry of Information Technology & Telecommunications REVISED INVITATION FOR BIDS For Supply of IT Hardware and Software For ICT Infrastructure to ensure E-Readiness of Federal Government for Implementation of E-Government Program Tender No. NITB-4(152)/2018-19 February 13, 2020 www.nitb.gov.pk Plot no 24-B, Street No 6, Sector H-9/1, Islamabad Centralized IT Procurement Tender Documents- NITB 1 | Page

Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology & Telecommunications

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

Government of Pakistan

NATIONAL INFORMATION TECHNOLOGY BOARD (NITB)

Ministry of Information Technology & Telecommunications

REVISED INVITATION FOR BIDS

For Supply of IT Hardware and Software

For ICT Infrastructure to ensure E-Readiness of Federal Government for

Implementation of E-Government Program

Tender No. NITB-4(152)/2018-19

February 13, 2020

www.nitb.gov.pk

Plot no 24-B, Street No 6, Sector H-9/1, Islamabad

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 1 | P a g e

Page 2: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................................................................ 4

General Terms & Conditions ................................................................................................................................... 4

1. SCHEDULE OF REQUIREMENTS AND DELIVERY TIMEFRAME ..................................................................... 4

2. ABOUT BIDDERS .......................................................................................................................................... 5

3. Preparation of Bids ..................................................................................................................................... 7

4. Pre-Bid Meeting ........................................................................................... Error! Bookmark not defined.

5. Submission of Bids ...................................................................................................................................... 8

6. Opening, Evaluation and Rejection of Bids ................................................................................................. 8

7. Disqualification and Blacklisting of suppliers and contractors ................................................................... 8

8. Acceptance of Bids and Award of Procurement Contract .......................................................................... 9

9. Warranty & Support ................................................................................................................................... 9

10. Performance Security/Guarantee ......................................................................................................... 10

11. Debarment / blacklisting of firm ........................................................................................................... 10

12. Joint Ventures ....................................................................................................................................... 10

BID FORMS ............................................................................................................................................................ 11

LETTER OF INTENT: BID FORM-01 ..................................................................................................................... 11

DOCUMENTARY EVIDENCE: BID FORM-02 ....................................................................................................... 12

FIRM’S PAST PERFORMANCE: BID FORM-03 .................................................................................................... 13

CONTRACT AWARD LETTER: BID FORM-04 ...................................................................................................... 14

PERFORMANCE GUARANTEE: BID FORM-05 .................................................................................................... 15

BID ANNEXURES .................................................................................................................................................... 16

EVALUATION CRITERIA-I (Bidder’s strength) ANNEXURE-I ........................................................................... 16

Evaluation Criteria-II ......................................................................................................................................... 17

(Products/Services strength) ANNEXURE-I ................................................................................................... 17

LOT/ITEM WISE SPECISIFICATION COMPARION Anexure-II ......................................................................... 29

Anexure-II ......................................................................................................................................................... 29

Format for Financial Bid: Annexure III ......................................................................................................... 30

Format of Financial Bid: Table-7 ................................................................................................................... 30

Mechanism for Grievance Redressal Annex-IV ............................................................................................. 31

Mechanism for debarment/black listing of the firm Annex-V ....................................................................... 32

Mechanism for Arbitration of any dispute Annex-VI ..................................................................................... 33

Specimen of Agreement with successful bidder(s) Annex-VII ..................................................................... 34

Detailed Technical Specification of Equipment/Services: Sample Contract- Table 8.1 ................................ 44

List of Staff Dedicated to the project: Sample Contract- Table 8.2 .............................................................. 45

Deliverables: Sample Contract- Table 8.3 ..................................................................................................... 45

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 2 | P a g e

Page 3: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

Maintenance, Support and Training: Sample Contract- Table 8.4 ............................................................... 46

Sites of Delivery of equipment/services: Sample Contract- Schedule II....................................................... 46

Details of Equipment/Services & Purchase prices: Sample Contract- Schedule III ...................................... 47

LIST OF MINISTRIES/DIVISIONS FOR LAN Annex-VIII ................................................................................. 49

TORs for ESTABLISHMENT OF LAN for bidders Annex-IX ............................................................................. 51

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 3 | P a g e

Page 4: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

EXECUTIVE SUMMARY National IT Board (NITB) is an attached department of Ministry of IT & Telecom and is mandated to undertake and coordinate e-government initiatives at federal ministries/divisions and departments, provide consulting and advisory services in acquiring and implementing IT solutions as well as IT capacity building of staff of these organizations. In order to expedite the implementation of e-Office application suite which is the flagship e-government project of MoITT, Federal Cabinet in its meeting dated 15th November 2018, approved the summary sent by MoITT to conduct a centralized/consolidated procurement to speedily meet the ICT infrastructure shortfall across all Federal Ministries/Divisions.

GENERAL TERMS & CONDITIONS 1. SCHEDULE OF REQUIREMENTS AND DELIVERY TIMEFRAME

1.1 Supply of IT Hardware, Software and Installation of equipment/LAN at Federal Ministries/Divisions/Departments of Government of Pakistan in Islamabad.

1.2 Detailed specifications are attached as Annexure-I. 1.3 NITB may increase or decrease quantities of one or more items.

Schedule of Requirements Table-I

LOT NO.

SCHEDULE OF REQUIREMENTS TIMEFRAME / PERIOD OF

SUPPLY/DELIVERY

Warranty Period Required IT HARDWARE /

SOFTWARE/ SERVICES ITEMS

QUANTITY

Lot #. 1 Desktop (Renowned Brand) PC with LED Display along with MS Windows 10 Pro 64 bit OLP or higher.

2,688 Nos.

As mentioned in Table-2 below

03 years

Lot #. 2 Laptop (Professional/Corporate Series) - Renowned Brand along with licensed MS Windows 10 Pro 64 bit OLP or higher.

401 Nos.

03 years

Lot # 3 Scanners 1,200 Nos. 03 Years

Lot # 4 1KV Smart UPS 2,688 Nos. 03 Years Lot # 5 MS Office Pro Plus 2019 64

bit Sngl GOV OLP or higher.

5,686 Nos. 03 Years

Lot # 6 MS Office Home & Business 2019 or higher

5,686 Nos.

03 Years

Lot # 7 Establishment of LAN in 42+ Ministries/Divisions as per list at Annex-VIII and TORs at Annex-IX

2,838

Network Nodes

As mentioned in Table-2-A below

03 Years

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 4 | P a g e

Page 5: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

Delivery timeframe for Lot #1 to Lot # 6 Table-2 SR. NO. MILESTONE TIME PERIOD PAYMENT

1. Supply and verification as per BoQ on the Client site (as conveyed by the procuring agency)

Six (06) to Eight (08) Weeks from the date of signing of contract / issuance of purchase order.

20% Note-1

2. Installation, configuration and testing of Equipment (Hardware/Software/Other Items)

Four (04) Weeks from the date of supply. Performance Guarantee will have to be provided to cover the warranty as applicable from the date of successful testing and acceptance.

80% On submission of performance Guarantee Note-2

3. End of performance Guarantee

. Release of Performance Guarantee

Note-1: On signed delivery documents from the Client i.e. where delivery is made. Note-2: On successful verification and/or testing report signed by the procuring agency.

Delivery timeframe for Lot #7 Table-2-A

SR. NO. MILESTONE TIME PERIOD PAYMENT

1. Supply of Sample of Active Equipment offered for POC.

One (01) Week from the declaration of preminilary qualified bidders

2. Supply of Passive equipment Two (02) Weeks from the date of signing of contract / issuance of purchase order.

10% (Note-1)

3. Supply of Active equipment Six (06) to Eight (08) Weeks from the date of signing of contract / issuance of purchase order.

20% (Note-2)

4. Installation, configuration and testing of Equipment as per TORs

Eight (08) to Ten (10) Weeks from the date of signing of contract / issuance of purchase order. Performance Guarantee will have to be provided to cover the warranty as applicable from the date of successful testing and acceptance.

70% On submission of performance Guarantee & (Note-3)

5. End of performance Guarantee

- Release of Performance Guarantee

Note-1: On signed delivery documents from the Client i.e. where delivery is made. Note-2: As per Note-1 above. Note-3: On successful verification and/or testing report signed by the procuring agency.

2. ABOUT BIDDERS

2.1. The Bidder must be registered with Sales Tax & Income Tax registered firm and must be on Active Tax Payer List.

2.2. OEM local presence of Sales/Presales/Post Sale, Service Centres and offices for Lot No.1 and 02 only.

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 5 | P a g e

Page 6: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

2.3. The Bidder must establish a Complaint Management System portal to monitor the support

during the warranty period with minimum following reports: a) Warranty Complaints Registered b) Resolved Complaints c) In process Complaints d) Pending Complaints e) Ministry wise Reporting

Minimum following features to be included: a) Complaint Registration b) Escalation Resolution

2.4. The Bidder must be in relevant business /supplies at least for last three (03) years. 2.5. The Bidder Must demonstrate/ undertake at least two (02) supplies of similar equipment in

past 05 years – Work/ Purchase Order along with delivery challans to be attached (details must be provided as per specimen at BID FORM-03)

2.6. The Bidder must provide following details on their letterhead: a) Name of Organization b) Details of offices across Pakistan (Service delivery/support Office). Support Office in

Islamabad/ Rawalpindi is mandatory. c) Location of Head office d) Size of company (number of employees) e) Number of years of being incorporated f) List of certified and dedicated service Engineers/Technicians/Technical Staff.

2.7. The Bidder must have strong references and after sale support mechanism with the offered hardware / software.

2.8. The Bidder to provide information as per templates available at Annexure-I, Annexure-II, and Annexure-III.

2.9. The Bidder shall not propose any item/equipment which is refurbished, used, end of life, expired or near to expire. Proof of import through verified channel is mandatory (where applicable).

2.10. The Bidder shall be responsible for payment of any duties/taxes etc. which are imposed by the Government of Pakistan (GOP). The bid price MUST be inclusive of all taxes. The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments for services rendered by any Bidder who signs a procurement contract with the Government.

2.11. The Bidder must be a certified Tier-I or Higher of principal of respective hardware/software brand(s) for Lot 1 and 2 only.

2.12. Delivery on 42+ different locations in Islamabad (Federal Ministries/Divisions), onsite installation & relevant services to be provided by the vendor/contractor and cost(s), if any, must be included in the bid price.

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 6 | P a g e

Page 7: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

3. PREPARATION OF BIDS

3.1. As per PPRA rules, Single Stage–Two envelope procedure will be used for the said procurement.

3.2. The bids shall be submitted in a sealed package/packages in such a manner that the contents are fully enclosed and cannot be known until duly opened. All the documentary evidences submitted must be mentioned as per specimen given at BID FORM-02.

3.3. Technical Proposal: Envelope for Technical Proposal shall be marked “TECHNICAL PROPOSAL” clearly in bold and legible letters to avoid confusion. It must contain two (02) hard copies (each being physically separated, sealed and labelled as “Technical Proposal”. One marked as original and the other is marked as copy). Each envelope should contain similar supporting documents.

3.4. Financial Proposal: Envelope for Financial Proposal shall be marked “FINANCIAL PROPOSAL” clearly in bold and legible letters to avoid confusion. It must contain two (02) hard copies of Financial Proposals sealed and marked separately.

3.5. Soft copies of both Technical and financial proposals must be provided along with bid envelopes in inerasable format i.e. soft copy of technical bid must be placed inside the Envelope containing Technical Bid and soft copy of Financial bid must be placed inside the envelope containing the Financial bid. In case of any difference between hard and soft copy, the hard copy and the original will prevail.

3.6. Bid Bond/Security: A Bid Bond in the shape of a Bank Draft/Pay Order in the name of Deputy Director (Admin), National Information Technology Board, equivalent to 2% of the total cost of the bid must be submitted along with the proposal.

3.7. The Bid Bond to be enclosed in a SEPARATE ENVELOPE, labelled as “BID BOND”, and should be SEALED. It must be ensured by The Bidder that bid bond should not be in the envelope of financial OR technical proposal. In the technical bid, bidder must confirm on company’s letter head that the Bid Bond is being submitted separately as required by NITB.

3.8. The Bidder should duly fill in and submit the Bid Forms (01, 02, 03, 04) 3.9. The Bidder may bid for more than one lots. 3.10. The Bidder shall submit an Affidavit that The Bidder is not blacklisted by any

Government/Semi Government/Autonomous organization at the time of bid. 3.11. The currency in the bids shall only be quoted in Pakistan Rupees (PKR). 3.12. All bids and prices must remain valid till 30th June, 2021 from the closing date of the

submission of tender documents. 3.13. The end user licenses, end user warranties and end user contracting support services will be

in the name of Customer which will be intimated by National Information Technology Board (NITB) in due course, for all the equipment and Software loaded on the equipment delivered during the said procurement.

3.14. The Bidder should clearly indicate the duration of delivery (MUST be within given timeframe i.e. schedule of delivery) of items/equipment/services after the award of procurement contract.

3.15. The bid prepared by The Bidder and all correspondence and documents relating to the bid exchanged by the bidder and NITB shall be written in the ‘English’ language. Any printed literature furnished by the bidder may be written in another language, provided that this literature is accompanied by an English translation, in which case, for purposes of interpretation of the bid, the English translation shall govern.

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 7 | P a g e

Page 8: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

3.16. Bidder is required to stamp every page of the tender document along with signature at the

required pages and submit back along with the bid.

4. SUBMISSION OF BIDS

4.1. Bids shall be delivered by hand or courier in a SEALED CONFIDENTIAL COVER and must reach to Deputy Director (Admin) National Information Technology Board (NITB), Plot no 24-B, Street No 6, Sector H-9/1, Islamabad (Phone: 051-9265054) on or before the last extended date indicated in Tender Notice i.e. 3rd March, 2020 at 11:00am. The bidders must put their signatures along with time and date of submitting the bids before putting the bids in the Bid Box Bid Box whose lock and key will be placed with the CEO NITB.

4.2. Bids received after the time prescribed in tender notice/documents shall not be accepted and be returned unopened. Bids through E-mail / Fax shall not be accepted.

5. OPENING, EVALUATION AND REJECTION OF BIDS

5.1. Technical bids will be opened on the same date at NITB (above mentioned address clause 4.1) at 11:30 AM in front of bidder or their representatives who may choose to be present.

5.2. Details of technical specifications required by NITB are attached at Annexure-II. Initial evaluation/screening will be done as per Annexure-I; whereas, technical evaluation as per Annexure-II. ROs should provide all details in required templates as provided under:

a) Annexure-I for Initial Screening b) Annexure-II for technical evaluation (technical proposal envelope) c) Annexure-III for financial evaluation (financial proposal envelope).

5.3. Date and time for the opening of the Financial Bids, after thorough technical evaluation of the bids, shall be communicated to the technically qualified bidders only, whereas the Financial bids of technically disqualified bidders shall be returned un-opened. In this connection, see PPRA Rule: 36(b).

5.4. The procuring agency shall read aloud the unit price as well as the bid amount and shall record the minutes of the bid opening. All bidders in attendance shall sign an attendance sheet.

5.5. NITB may reject all bids or proposals at any time prior to the acceptance of a bid or proposal. The procuring agency shall upon request communicate to any supplier or contractor who submitted a bid or proposal, the grounds for its rejection of all bids or proposals but is not required to justify those grounds.

5.6. NITB shall incur no liability, solely by virtue of its invoking rule 33 sub-rule (1) towards suppliers or contractors who have submitted bids or proposals.

5.7. In the above case notice of the rejection of all bids or proposals shall be given promptly to all suppliers or contractors that submitted bids or proposals.

6. DISQUALIFICATION AND BLACKLISTING OF SUPPLIERS AND CONTRACTORS

6.1. NITB shall disqualify a supplier or contractor if it finds, at any time, that the information submitted by him concerning his qualification as supplier or contractor was false and materially inaccurate or incomplete.

6.2. Suppliers and contractors who either consistently fail to provide satisfactory performances or are found to be indulging in corrupt or fraudulent practices shall face permanent or temporary bar, from participating in procurement proceedings.

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 8 | P a g e

Page 9: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

7. ACCEPTANCE OF BIDS AND AWARD OF PROCUREMENT CONTRACT

7.1. Acceptance of Bid and award criteria 7.1.1. The bidder after qualifying through the given criteria in Annexure-I and Annexure-II

will be called in for opening of financial proposal/bid. In financial opening the lowest bidder will be selected as per PPRA rules, if not in conflict with any other law, rules, regulations or policy of the Government of Pakistan, shall be awarded the procurement contract, within the original or extended period of bid validity.

7.1.2. Procurement will be done in phases/partially against original quantities mentioned in the RFP till up to 30-june-2021. However, bidders are required to quote for total quantities mentioned in the document. Schedule of deliveries will be shared at the time of signing of contract.

7.2. Notification of Award 7.2.1. Prior to the expiration of the period of bid validity, the Procuring Agency shall notify to

the successful Bidder in writing that the bid has been accepted as per BID FORM-03. 7.2.2. The notification of award shall constitute the formation of the Contract between NITB

and the successful bidder after 15 days of publishing of financial evaluation result. In case of some serious complaint the award may be withheld for not more than 30 days (until the redressal of grievance by Grievance redressal committee (GRC) as per PPRA rule 48 as per mechanism at Annex-IV).

7.2.3. The enforcement of the Contract shall be governed by Rule 44 of the PPRA- 7.3. Signing of Contract

7.3.1. After the notification of award, the Procuring Agency shall send the successful Bidder the Contract Form/Document (if applicable)

7.3.2. The Contract shall become effective upon affixation of signature of the Procuring Agency and the selected Bidder on the Contract document

7.3.3. If the successful Bidder, after completion of all codal formalities shows an inability to sign the Contract then its Bid Security shall stand forfeited and the firm may be blacklisted and de-barred from future participation, whether temporarily or permanently. In such situation the Procuring Agency may award the contract to the next lowest evaluated Bidder or call for new bids.

7.3.4. The Bid bond/security submitted by the successful bidder at the time of submitting its bid shall be returned to the Bidder subject to (a) signing of contract, (b) furnishing of the bank guarantee, (c) delivery of goods.

8. WARRANTY & SUPPORT

8.1. The quoted hardware/software will have relevant local warranty support for a period of no less than Three (03) Years (or unless warranty period defined otherwise as standard market practice) commencing from the date of delivery.

8.2. The bidder will be fully responsible to replace or repair the faulty items during warranty period free of cost without any obligation to NITB and without any delay.

8.3. The bidder will provide details of support available during and after warranty period clearly indicating the offered level of expertise, deliverables and the manner in which these warranty services will be delivered.

8.4. All equipment/items should be supplied through verifiable distribution channels.

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 9 | P a g e

Page 10: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

9. PERFORMANCE SECURITY/GUARANTEE

9.1. The successful Bidder shall be required to deposit in the form of a Bank Guarantee as per specimen given at BID FORM-05, a Performance Bond upon execution of the procurement contract, a sum equivalent to ten percent (10%) of the total procurement Cost of Lot/Lots, on the Form and in the manner prescribed by the Procuring Agency (NITB). This Bank Guarantee shall be issued by a scheduled bank operating in Pakistan and shall be kept valid from the date of issue and should cover the warranty as per period mentioned against each item in Table-I of this document after all contractual obligation have been fulfilled.

9.2. Failure to provide a Performance Guarantee by the successful Bidder is a sufficient ground for annulment of the award and forfeiture of Bid Security. In such event the Procuring Agency may award the contract to the next lowest evaluated bidder or call for new bids.

10. DEBARMENT / BLACKLISTING OF FIRM

10.1. As per clause-19 of the PPRA rules 2004, NITB reserves the right of debarment ‘or’ blacklisting of a firm, association, corporation, joint venture, company, partnership or any other legal entity subject to any of the following acts as per mechanism attached at Annex-V.

11. JOINT VENTURES

Bids submitted by a joint venture of two or more companies or partners as per relevant partnership act shall comply with the following requirements:

a) The Bid, and in case of successful Bid, the Contract form, shall be signed by all so as to be legally binding on all the partners;

b) One of the partners shall be authorized to be in charge; and this authority shall be evidenced by submitting a power of attorney signed by legally authorized signatories of all the partners;

c) The partner in charge shall be authorized to incur liabilities, receive payments and receive instructions for and on behalf of any or all partners of the joint venture;

d) All partners of the joint venture shall be liable jointly and severally for the executing of the Contract in accordance with the Contract terms, and a relevant statement to this effect shall be included in the authorization mentioned under (6.1.2) above as well as in the Bid Forms and the Form of Agreement (in case of a successful Bid); and

e) A copy of the agreement entered into by the joint venture partners shall be submitted with the Bid.

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 10 | P a g e

Page 11: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

BID FORMS

LETTER OF INTENT: BID FORM-01

Bid Ref No.: ___________________ Date: Date of the Opening of Technical Bid Name of the Tender: ____________________ To, DEPUTY DIRECTOR (ADMN) National Information Technology Board (NITB) Plot no 24-B, Street No 6 Sector H-9/1, Islamabad

LETTER OF INTENT Dear Sir, Having examined the tender documents, we offer to supply and deliver the Goods/Services under the above named tender in full conformity with the said bidding documents/rules and at the rates/unit prices described in the price schedule provided in Financial Bid (Annexure-III) or such other sums as may be determined in accordance with the terms &conditions of the said tender. The above amounts are in accordance with the Price Schedules attached herewith and are made part of this bid. We undertake, if our Financial Bid is accepted, to deliver the Goods/Services in accordance with the delivery schedule specified in the Schedule of Requirements. If our Financial Bid is accepted, we undertake to provide a Performance Guarantee in the form, in the amounts, and within the times specified in the tender documents. We agree to abide by this bid, for the Bid Validity Period specified in the tender documents and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period. Until the formal final procurement contract is prepared and executed between us, this bid, together with your written acceptance of the bid and your notification of award of the contract, shall constitute a binding Procurement Contract between us. We understand that you are not bound to accept the lowest or any Financial Bid you may receive. We undertake that, in competing for (and, if the award is made to us, in executing) the above contract, we will strictly observe the laws against fraud and corruption in force in Pakistan. Dated This: _________________________ Signed: _________________________ In the capacity of: _________________________ (title or position) Duly authorized to sign this bid for and on behalf of: (name of Bidder)

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 11 | P a g e

Page 12: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

DOCUMENTARY EVIDENCE: BID FORM-02

Name of the Firm: __________________ Bid Reference No: __________________ Date of opening of Bid: __________________ Documentary evidence for determining eligibility of the bidders & evaluation of bids. Bidders should only initial against those requirements that they are attaching with the form. Bidders are required to mention the exact page number of relevant document placed in the Bid. Bidders are advised to attach all supporting documents with this form in the order of the requirement as mentioned in column-2.

Table-3

SR. NO. REQUIRED DOCUMENTATION SIGNATURE OF

BIDDER

SUPPORTING DOCUMENT’S

NAME

PAGE NUMBER IN

THE BID 1 NTN Certificate 2 GST Certificate 3 On Active Tax Payers List of FBR 4 Registration/Incorporation/Business Certificate

5 Complete Company profile 6 Operational Office in Islamabad/Rawalpindi 7 Evidence of Firm’s Last three (03) years

Performance (attach POs along with delivery challans)

8 Affidavit: bidder is not blacklisted by any Federal, Provincial Public sector organization

9 The Bidder must be a certified Tier-I or Higher of principal of respective hardware/software brand(s) for Lot 1 and 2 only.

10 All bids and prices must remain valid till 30th June, 2021.

11 Compliance with schedule of requirements 12 Submission of required amount of bid security

with Financial Bid

13 Compliance with Tech Specifications

14 Warranty years & onsite support as per Table-I 15 Technical brochures/data sheets of products

16 Original Bidding documents duly signed/stamped

17 The Bidder has 05-10 local Engineers/qualified staff for the respective products.

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 12 | P a g e

Page 13: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

FIRM’S PAST PERFORMANCE: BID FORM-03

Name of the Firm: __________________ Bid Reference No: __________________ Date of opening of Bid: __________________

Table-4

NAME OF THE CLIENT/INSTITUTION

PURCHASE ORDER NO.

DESCRIPTION OF ORDER

VALUE OF ORDER

DATE OF COMPLETION

WORK COMPLETION CERTIFICATE BY

CLIENT

Note: 1. Bidders may use additional Sheets if required. 2. All certificates are to be attached with this form

Signature: ____________________ Name: ____________________ Designation: _____________________ Official Stamp: _____________________

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 13 | P a g e

Page 14: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

CONTRACT AWARD LETTER: BID FORM-04

Bid Ref No.: _______________ Date: _____________ Name of the Tender: __________________________________ To,

AWARD OF CONTRACT Dear Sir/Madam,

Having examined your technical bid for the above mentioned tender through technical evaluation dated:

_________ and evaluation of financial bid opened on _________, NITB has decided to award the contract to

your company. Draft agreement including all the terms and conditions, in this regard are being shared with

you, you are advised to review it and if agreed, come to NITB for signing of the agreement.

Deputy Director (Admin) ________ 2020

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 14 | P a g e

Page 15: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

PERFORMANCE GUARANTEE: BID FORM-05

To, DEPUTY DIRECTOR (ADMN) National Information Technology Board (NITB) Plot no 24-B, Street No 6 Sector H-9/1, Islamabad Whereas [Name of Supplier] (hereinafter called “the Supplier”) has undertaken, in pursuance of Contract No.[number] dated [date] to supply [description of goods/services] (hereinafter called “the Contract”). And whereas it has been stipulated by you in the said Contract that the Supplier shall furnish you with a Bank Guarantee by a scheduled bank for the sum of 10% of the total Contract amount as a Security for compliance with the Supplier’s performance obligations in accordance with the Contract. And whereas we have agreed to give the Supplier a Guarantee: Therefore, we here by affirm that we are Guarantors and responsible to you, on behalf of the Supplier, up to a total of [Amount of the Guarantee in Words and Figures] and we undertake to pay you, upon your first written demand declaring the Supplier to be in default under the Contract and without cavil or argument, any sum or sums within the limits of [Amount of Guarantee]as aforesaid, without your needing to prove or to show grounds or reasons for your demand or the sum specified therein. This guarantee is valid until the__day of___, 202*. Signature and Seal of the Guarantors/ Bank Address: ______________________ Date: ______________________

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 15 | P a g e

Page 16: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

BID ANNEXURES

EVALUATION CRITERIA-I (BIDDER’S STRENGTH) ANNEXURE-I

Bids evaluation shall be subject to 100% compliance to the following criteria for Vendors qualification:

Evaluation Criteria-I (Bidder’s strength) Table-5.1

SR. NO. GENERAL TERMS AND CONDITIONS COMPLIANCE CLAUSE YES/NO

1 The Bidder must be registered with Sales Tax, Income Tax Departments and must be in possession of a valid NTN certificate. Copies of the certificates must be provided with the bid document and RO must be on the Active Tax Payer List of FBR.

2.1

2 OEM local presence of Sales/Presales/Post Sale, Service Centres and offices for Lot No.1 and 02 only

2.2

3 The Bidder must be in relevant business /supplies at least for last three (03) years.

2.4

4 The Bidder must demonstrate through documentary evidence as per BID FORM 03 that it has successfully delivered at least two (02) POs along with Delivery Challans.

2.5

5 The Bidder must be a certified Tier-I or Higher of principal of respective hardware/software brand(s) for Lot 1 and 2 only.

2.11

6 A Bid Bond in the shape of a Bank Draft/Pay Order in the name of Deputy Director (Admin), National Information Technology Board, equivalent to 2% of the total cost of the bid must be submitted along with the proposal.

3.6

7 The bidder shall submit an Affidavit that The Bidder has never been blacklisted by any Government/Semi Government/Autonomous organization

3.10

8 The Bidder shall have at least 05-10 local engineers/qualified staff for the respective products. List of such staff along with their qualifications, experience summary and contact numbers must be provided.

2.6 (f)

9 The Bidder shall not propose any item/equipment which is refurbished, used, end of life, expired or near to expire. Proof of import through verified channel is mandatory (where applicable).

2.9

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 16 | P a g e

Page 17: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

EVALUATION CRITERIA-II

(PRODUCTS/SERVICES STRENGTH) ANNEXURE-I Table-5.2

Bids evaluation shall be subject to 100% compliance to the following criteria for Vendors qualification:

S#. ITEM/ Parameter SPECIFICATIONS

Bidder-1 Bidder-2…

Complied Non- complied Complied Non-

complied 1 Desktop (Renowned Brand) PC with LED Display

along with MS Windows 10 Pro 64 bit OLP or higher

1.1 Processor Intel core i7 9700 Processor (3.2 GHz or higher). with Intel chipset (Professional/Corporate Series)

1.2 RAM 8GB DDR4

1.3 Storage 1 TB SATA HDD (7200 RPM or higher)

1.4 Graphics Card Intel (integrated/Built-in) 1.5 Mouse/Keyboard U.S Standard USB

Keyboard/Mouse of same brand.

1.6 Chassis Tower 1.7 Licensed software MS Windows 10 Pro 64 bit

OLP or higher

1.8 IO Ports Standard I/O ports including HDMI, or higher. Pakistan Government Logo in BIOS

1.9 Display LED 18” inch or higher 1.10 Hardware

Verification Hardware can be verified from Manufacturer website through service tag number.

1.11 Warranty 03 Years Local Warranty with labor, Parts and Service (on site)

1.12 Equipment demo Quoted model must be given for demo for technical evaluation, if required.

Qualified / Disqualified

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 17 | P a g e

Page 18: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

S#. ITEM/ Parameter SPECIFICATIONS

Bidder-1 Bidder-2….

Complied Non- complied Complied Non-

complied 2 Laptop (Professional/Corporate Series) - Renowned

Brand along with licensed MS Windows 10 Pro 64 bit OLP or higher

2.1

Processor

Intel® Core i7-8565U or above Processor 8th Generation (8MB Cache, 1.8 GHZ or higher

2.2 RAM 8GB DDR4 (8Gx1)

2.3 Hard Drive 480/512GB M.2 Solid State Drive (SSD) or higher

2.4 Display Upto 15" HD (1366x768) Anti-Glare LED

2.5 Camera Integrated HD Webcam

2.6 Connectivity

HDMI, USB 3.1, SD card reader, Headphone/Mic, RJ45 and VGA port/HDMI to VGA converter, Pakistan Government Logo in BIOS

2.7 Wireless 802.11ac Dual Band

2.8 Carrying Case Laptop carrying bag

2.9 Licensed software MS Windows 10 Pro 64 bit OLP or higher.

2.10 Hardware Verification

Hardware can be verified from Manufacturer website through service tag number.

2.11 Warranty

03 Years Local Warranty with labor, Parts and Service (on site).

2.12

Experience

The vendor should have atleast 3years experience with same equipment within local market and having 5-10 local engineers qualified staff

2.13 Equipment demo

Quoted model must be given for demo for technical evaluation, if required.

Qualified / Disqualified

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 18 | P a g e

Page 19: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 19 | P a g e

Page 20: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

S#. ITEM/ Parameter SPECIFICATIONS

Bidder-1 Bidder-2

Complied Non- complied Complied Non-

complied 3 Standard Scanner Renowned Brand 3.1 Type ADF (Straight Path) with

Detachable Flatbed(legal)

3.2 Speed 25-30 ppm/50 ipm with 200 or higher dpi.(color/Black/Gray Scale)

3.3 Paper thickness Support

Minimum 27 g/m and Max 500 g/m

3.4 Daily Volume 2000 to 3000 pages/day. 3.5 Feed Capacity 50-70 sheets (70-90 g/m2) Support

for ID Cards, Business Cards, certificates etc.

3.6 Connectivity USB 2.0 or higher. 3.7 File Formats JPEG, TIFF, PDF (Searchable), BMP,

PNG

3.8 O.S Windows 7, 8, 10, Linux support.

3.9 Warranty and Maintenance

03 Years Local Warranty with labor, Parts and Service (on site)

3.10 Features Crop, Auto Orientation, Border Removal, Punch-hole detection. Scan Both side on the Go (ADF). Send to email/file and advanced text features or higher.

3.11 Equipment demo

Quoted model must be given for demo for technical evaluation, if required.

Qualified / Disqualified

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 20 | P a g e

Page 21: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

S#. ITEM/ Parameter SPECIFICATIONS

Bidder-1 Bidder-2….

Complied Non- complied Complied Non-

complied 4 IKVA Smart UPS Renowned Brand (for

Desktop)

4.1 Power Capacity 1 KVA, 700 Watts

4.2 Topology Line Interactive

4.3 Nominal Input Voltage 230 Volts 4.4 Waveform Sine Wave 4.5 Input frequency Between 50-60 Hz +/-

5 Hz (auto sensing)

4.6 Output Voltage Distortion

0.7 PF (Power Factor)

4.7 Battery Type Maintenance Free sealed Lead-Acid battery 144 watt per hour or higher

4.8 Backup Time PC backup 20-25 minutes or higher

4.9 Recharge Time 03-04 hours

4.10 Input Sockets At least 1 with cord. 4.11 Output Sockets At least 3 sockets

with cords

4.12 Warranty 03 Years Local Warranty with labor, Parts and Service (on site).

4.13

Equipment demo

Quoted model must be given for demo for technical evaluation, if required.

Qualified / Disqualified

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 21 | P a g e

Page 22: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

S#. ITEM/ Parameter SPECIFICATIONS

Bidder-1 Bidder-2….

Complied Non- complied Complied Non-

complied 5 MS Office Pro Plus 2019 64 bit Sngl GOV OLP or

higher.

S#. ITEM/ Parameter SPECIFICATIONS

Bidder-1 Bidder-2….

Complied Non- complied Complied Non-

complied 6 MS Office Home & Business 2019 or higher

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 22 | P a g e

Page 23: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

S#. 07 ITEM DESCRIPTION/ SPECIFICATIONS

Bidder-1 Bidder-2….

Complied Non-complied Complied Non-

complied

Supply, installation, configuration and successful testing and acceptance of Active and Passive components of networking equipment for Local Area Network at 42 Ministries/ Divisions

1 Active Equipment : Layer 2 Switches Manageable

(Renowned Brand): Hardware Specifications : -

2 48 / 24 RJ-45 autosensing 10/100/1000 ports (IEEE 802.3 Type 10BASE-T, IEEE 802.3u Type 100BASE-TX, IEEE 802.3ab Type 1000BASE-T)

3 04 Combo Gigabit Ports with 2 x GBIC. Single Mode 1310nm should be included with each switch. (Original same as manufacturer)

4 One fixed power-supply 5 80G, with stacking port trunking Units Per Physical Stack

6 1.0GHz, 1GB MB flash, 1GB DRAM or higher, Packet Buffer Size 1.5MB,Jumbo frame 9216 Byte or higher

7 Forwarding : 90 Mbps or equal or higher 8 Forwarding Bandwidth: 128 GB or equal or higher 9 Switching capacity: 128 Gbps or higher

10 MAC Address 16K or equal or higher 11 Management features: fully command-line interface/GUI

12

L2 switching : * supports IEEE 802.1Q (4,094 VLAN IDs) and 256 VLANs simultaneously or higher * Support voice and data VLAN Simultaneously * Link aggregation * BPDU tunneling * IEEE 802.1w Rapid Convergence Spanning Tree Protocol * IEEE 802.1D Spanning Tree Protocol (STP) and RSTP * IEEE 802.1s Multiple Spanning Tree * Port mirroring * SNMPv1, v2c, and v3

13 ACLPort base ACL, Interface ACL, VLAN ACL 14 Network Management Interface 10/100 Mbps Ethernet 15 The switch must be equipped with SFP ports, not less than 4

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 23 | P a g e

Page 24: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

and 2x SFP+ ports

16 The switch should work using a modular operating system with the ability to restart an individual process without a full reset switch

17 The failure of any switch in the stack should not cause stack outage more than 50ms.

18 Accessories :Power Cables, Rack mounting accessories and CDs

19

Including Manufacturer Support Service for 03 years. (A detailed Warranty Plan will be submitted by the Vendors along with technical Bid) Equipment Should not be EOS/EOL for next 5 Year from Date of PO.

S#. ITEM DESCRIPTION/ SPECIFICATIONS Bidder-1 Bidder-2….

Complied Non-

Complied Non-

complied Complied

Active Equipment : Layer 3 Switch (Renowned Brand): Hardware Specification:-

1 Layer-3 switch with updated/latest operating systems and must be minimum AES 128/256 for encryption and SHA-256 for authentication is required and level 2 plus (FIPS 140-2) or EAL-4 Plus certified.

2 20 / 10 port 1 Gigabit Ethernet SFP-based model

3 4 / 2 Combo 10/100/1000BASE-T/SFP ports 4 / 2 10GbE SFP+ ports- 02 SFP / RJ45 module Single Mode 1310nm should be included with each switch

4 Switching capacity 100Gbps or equal or higher 5 DRAM 1GB or equal or higher 6 CPU Speed 1Ghz or equal or higher 7 Flash 1GB Ram or equal or higher 8 Physical stack of up to 8 units or equal or higher 9 Supports long-distance stacking over fiber

10 80 Gbps per device physical stacking bandwidth or equal or higher

11 IP Interface 12 Supports 256 interfaces or equal or higher 13 Jumbo Frame: 9216 Bytes or higher 14 Forwarding Rate : 68.4 Mbps or equal or higher 15 Redundant Power Supply 16 Management features command-line interface

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 24 | P a g e

Page 25: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

17

L3 routing * RIP * Includes RIPv1 and RIPv2 routing * Static IP routing / OSPF * Provides OSPFv2 for IPv4 routing and OSPFv3 for IPv6

18

Routing * Policy-based routing * IPv4 border gateway routing protocol BGPv4/v4+ super VLAN * load balancing and failover support (VRRP v3)

19

L2 switching Features: * Support voice and data VLAN Simultaneously * GARP VLAN registration protocol * Port Mirroring * IEEE 802.1ad Q-in-Q * VLAN support and tagging * Supports the IEEE 802.1Q standard and 2,048 VLANs

20

Simultaneously * MAC-based VLAN * ERPS (Ethernet Ring Protection Switching) ver 2 * spanning tree protocol (STP) and RSTP * 802.1s MSTP

21

Security * Port Security * Supports up to 12K MAC addresses per port/VLAN/system * Broadcast/Multicast/Unicast Storm Control * Safeguard Engine the uplink ports * Source-port filtering * Secure shell (SSH) * Secure Sockets Layer (SSL) * 802.1x * Port security * IP source guard * Secure FTP * STP root guard * Cable Diagnostics * 802.3ah Ethernet Link OAM * Unidirectional Link Detection * Dying gap

22 The switch should work using a modular operating system with the ability to restart an individual process without a full reset switch.

23 The switch must support the IEEE family protocols: 802.3: 802.3, 802.3ae, 802.3ab, 802.3z.

24 The switch should support intrusion detection mechanism, prevent the spread of worms and viruses, suppression of attacks such as DoS.

25 Accessories: Power Cables, Console Cable, Rack mounting accessories and CDs

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 25 | P a g e

Page 26: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

26

Including Manufacturer Support Service for 03 years. (A detailed Warranty Plan will be submitted by the Vendors along with technical Bid) Equipment Should not be EOS/EOL for next 5 Year from Date of PO.

S#. ITEM DESCRIPTION/ SPECIFICATIONS Bidder-1 Bidder-2….

Complied Non-

Complied Non-

complied complied

Next Generation Firewall Device (Renowned Brand):

1 NGN firewalls must be minimum level

2 plus (FIPS 140-2) or EAL-4 Plus certified. Firewall must be AES-128/256 recommended for encryption and SHA-256 for authentication with latest operating systems

2 Type: Application Layer Firewall

3 Firewall Application Layer Throughput: 1,000 Mbps or higher

4 Threat Prevention Throughput: 700 to 1,000 Mbps or higher

5 IPSec VPN Throughput: 400 Mbps or higher

6 I/O interfaces: 4 x 10/100/1000, 8 x Gigabit SFP

7 Storage capacity: 240GB SSD or higher

8 IPSec VPN tunnels/ interfaces: 1,000 minimum

9 SSL VPN concurrent users: 1,000 minimum

10 New Sessions Per Second: 8,000 or higher

11 Max Sessions: 120,000 or higher

12 SSL Decryption, SSH Decryption, SSL Decryption Port mirroring

13

Subscriptions (8x5 Bundle) * Antivirus * IPS/IDS * URL Filtering * All other subscriptions as optional

14 Hardware Support: 3 Years with warranty and subscriptions

15 Services: Installation & configuration

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 26 | P a g e

Page 27: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

16

Rack mount kit: Yes • Proposed solution must Supports 200+ users and 50 Mbps internet bandwidth with 4 monitoring ports at least • Proposed solution should be available as dedicated custom built hardware appliance * Platform should be optimized for layer 7 application level content processing • Solution must be able to fail open in case of a hardware malfunction when deployed inline • Platform should capture and store packet captures of traffic relevant to the analysis of detected threats include HTTP, FTP, IRC, TCP • Solution should have its logs archived locally, and should be downloadable via the GUI • Solution should support both online and offline update of global malware intelligence via the GUI • The solution should support reporting in HTML/Graphical/CVS/PDF Formats or more, Built-in Reporting for Applications, User activities, and Threats (IPS, AV, AntiSpyware) (no external reporting solution) • Ability to fully forensically analyze identified malware and provide the following information to enterprise staff: • Comprehensive Host Modification Report • Copy of malware binary(s) • PCAP of all Malware Communications to Malware Command & Control servers • Full URL trails identifying all of the locations to which the malware attempts to communicate. • Summary reports of enterprise malware events breaking down malware by type, host, and activity. • Immediate analysis as to whether the malware maps to a previously KNOWN or UNKNOWN threat *5 minutes Automatic Signature generation after malware analysis and Custom application signatures * Ability to create custom user-defined signatures * Data filtering: Custom Data Patterns • Severity information, illustrating how effective, other defenses would have worked against this threat. • The analysis must be performed runtime in order to detect all the malware actions, even the ones that fail in the virtual environment but might be successful on a client workstation. Before and after differential Comparison. • The solution must be able to detect and report malware downloaded by users, or downloaded in the context of a web exploit by using multiple client operating systems with multiple service pack levels. • Solution should perform dynamic real-time analysis of advanced malware on the appliance itself to confirm true zero-day and targeted attacks. No information should be send to third party systems or cloud infrastructure system for analysis and detection of Malware • Solution should have the ability to stop data exfiltration from existing malware infected systems. • Solution should support Local Virtual Machine • Solution should detect potential malicious network traffic,

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 27 | P a g e

Page 28: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

• Solution should identify the potentially compromised system • Solution should perform Dynamic Analysis on the System • Solution should provide an ability to locate the infected Malware sample • Solution should perform Static Analysis *Solution should be port agnostic for web attacks *Generate Anti-Malware signatures *Generate DNS (malware domain) signatures *Built-in Firewall Portal for user authentication and identification * Must have separate management (control) plane and data plane to avoid any disruption to traffic processing while managing the box or generating logs &reports *Equipment Should not be EOS/EOL for next 5 Year from Date of PO.

S#. ITEM DESCRIPTION/ SPECIFICATIONS Bidder-1 Bidder-2….

Complied Non-

Complied Non-

complied complied 1 Renowned/Recognized brands:-

2 CAT-VI 23/24 AWG Gigabit fluke tested original copper cable. Cable should support 10G speed upto 40 meter

3 Non Shuttered Pre loaded CAT6 Patch Panels for switch/data cabinets with Rear Cable Manager.

4 Shuttered Faceplate single & double I/O and Mount Box

5 Patch Cord: CAT-VI Gigabit Machine punched branded cable from faceplate to PC in every room and all Network nodes

6 Switch Cabinets with PDU for Patch Panels and Active Equipment etc to be installed where needed.

7 20 years performance warranty from Manufacturer with Presence and Office Registered in Pakistan.

8 Installation should be done by Manufacturer Trained installers as per ANSI/BICSI standards.

9 Satisfactory report should be given by the manufacturer after inspection of installed passive network.

10 Fluke Test Reports with Minimum DTX-1800 should also be submitted.

11 Hands On Training of relevant Ministry/Division IT Resources regarding Structured Cabling practices

12 Connectivity between switches with Fiber Optic Cable (same brand as copper )

13 Cat-VI (Cat-6) cable routed with adamjee ducting and flexible PVC pipe, fiber termination unit/ODF (same brand as fiber) where needed

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 28 | P a g e

Page 29: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

LOT/ITEM WISE SPECISIFICATION COMPARISON ANEXURE-II

Quantities, Required Technical Specification by NITB and Comparative Statement of Technical Specification of the Quoted Items

Evaluation & Award Committee will verify the compliance with specifications mentioned below: Table-6

Lot No.

Items

Quantity Item Description & Required Specifications by NITB

Specification of the

Quoted Items by the

Vendor 1 Desktop PC Renowned

Brand PC with LED Display.

2,688 Nos.

Specifications as per Annexure-I (Quoted model must be given for demo for technical evaluation, if required.)

2 Laptop (Professional/Corporate Series) - Renowned Brand

401 Nos.

Specifications as per Annexure-I (Quoted model must be given for demo for technical evaluation, if required.)

3 Standard Scanner Renowned Brand

1,200 Nos. Specifications as per Annexure-I (Quoted model must be given for demo for technical evaluation, if required.)

4 1KV Smart UPS 2,688 Nos. Specifications as per Annexure-I (Quoted model must be given for demo for technical evaluation, if required.)

5 MS Office Pro Plus 2019 64 bit Sngl GOV OLP or higher.

5,686 Nos.

Specifications as per Annexure-I (Quoted model must be given for demo for technical evaluation, if required.)

6. MS Office Home & Business 2019 or higher

5,686 Nos.

Specifications as per Annexure-I (Quoted model must be given for demo for technical evaluation, if required.)

7. Establishment of LAN in 42+ Ministries/Divisions as per list at Annex-VIII and TORs at Annex-IX

2,838

Network Nodes

Specifications as per Annexure-I (Quoted model must be given for demo for technical evaluation, if required.)

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 29 | P a g e

Page 30: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

FORMAT FOR FINANCIAL BID: ANNEXURE III

Format of Financial Bid: Table-7

Lot # Items Quantity

Specification of the Quoted Items

(To be filled by bidder)

Inclusive of all applicable taxes

Unit Price (PKR) Total Price (PKR)

Same as per Annexure-I

Note:

(i) NITB may increase or decrease the number of ITEMS at any time, furthermore ROs must bid in unit for (Lot No. 01 to 06).

(ii) Bidder/ROs will submit price per Network Node for passive equipment ONLY and bidder may quote active equipment prices on following format (For Lot No.07):

Items (As per Specs mentioned at Annex-I of Lot #6)

Unit Price with Tax Rs.

Layer-2 switch (24 port) Layer-2 switch (48 port) Layer-3 switch (12 port) Layer-3 switch (24 port) Layer-3 switch (48 port) Firewall for 250 users Firewall for 500 users

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 30 | P a g e

Page 31: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

MECHANISM FOR GRIEVANCE REDRESSAL ANNEX-IV

a) Grievance redressal committee A grievance redressal committee will be notified as under to redress any such application received from the bidders within the 03 days of announcement of Financial evaluation by the procurement Committee:-

CEO NITB Chairman Director General Admin NITB Member Joint Secretary (Admin), MoIT (or his rep) Member

b) Receipt of grievance application An application from any of bidder will be accepted who had submitted his bid before the closing of the bids receiving time. Application other than the bidders will not be entertained.

c) Addressing the grievance A meeting will be notified to study the application and the applicant may also be asked to attend the meeting and he/she will be interviewed by the committee. By the permission of the chair the proceeding can also be recorded. Committee minutes will be recorded and if deemed necessary the decision will also be submitted to procurement committee. The decisions will be conveyed to the aggrieved party within 03 days of the meeting and same decisions will also be published on NITB website. If a matter require so the committee may decide to further probe into the matter and in this case the matter may not be prolonged to maximum to 10 days.

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 31 | P a g e

Page 32: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

MECHANISM FOR DEBARMENT/BLACK LISTING OF THE FIRM ANNEX-V

a) Debarment committee

A committee will be notified as under to assess the conditions reported by the Administration Wing and decide any such debarment/blacklisting of the firm as under:-

CEO NITB Chairman Director General Admin, NITB Member Joint Secretary (Admin), MoIT (or his rep) Member

b) Conditions for debarment I. Consistent failure to provide satisfactory performance after been serving 02 notices on

the given address in the tender document and/or in the final agreement as the case may be.

II. Contractor becomes insolvent. III. Existence of judicial decision against a contractor in respect of a corrupt or collusive

practice. IV. Submission of false and spurious documents, making false statements and allegations to

gain undue advantage. V. Commission of fraud.

VI. Contractor abandons the contract. VII. Contractor without reasonable excuse fails to commence the work ‘or’ suspends the

progress of work for 14 days. VIII. Contractor is not executing the work in accordance with the contract or is persistently or

flagrantly neglecting to carry out his obligations under the contract. IX. Commission of embezzlement, criminal breach of trust, theft, cheating, forgery, bribery,

falsification or destruction of records, receiving stolen property, false use of trademark, securing fraudulent registration with sales tax authorities, Pakistan Engineering council etc., giving false evidence, furnishing of false information of serious nature.

c) Meeting for debarment

On reporting of such conditions by Admin Wing, NITB to the notified committee, the Chairman of Committee shall call a meeting within one week of any such notice. The bidder may also be called for presenting his views on the matter to the committee and with the permission of the chair the proceeding can be recorded also. Minutes of the meeting shall be recorded and decisions will be communicated to bidder and the relevant authorities within 05 days of the meeting. If any debarment is decided it will be for a specified period or indefinite period and for NITB, MoIT or for whole Federal Government level. Forums to cancel this debarment will also be clearly written in the minutes of the meeting.

d) Duration of debarment

The debarment shall be for a reasonable specified period of time, commensurate with the seriousness of the cause. However, the debarment period shall not exceed from three years. Moreover, NITB also reserves the right of permanent blacklisting of a contractor subject to severity of the corrupt or fraudulent practices.

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 32 | P a g e

Page 33: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

MECHANISM FOR ARBITRATION OF ANY DISPUTE ANNEX-VI

a) Discussion Period: If any dispute of any kind whatsoever shall arise between the NITB and the successful Bidder in connection with any opinion or specification of the provided items or services out of this Agreement, including without prejudice to the generality of the foregoing, any question regarding its existence, validity or termination, or the completion of the agreement (whether during or after the engagement and whether before or after the termination, abandonment or breach of the Agreement) the Parties shall seek to resolve any such dispute or difference -through mutual consultation.

b) Referral to Dispute Resolution Committee

In case the Parties fail to reach agreement within fourteen (14) Days of the date upon which a Party serves notice upon the other with regard to the existence of a dispute, the dispute shall then be referred to the Dispute Resolution Committee. CEO, NITB will constitute the committee comprising of two (02) members from NITB, one (01) from Ministry of IT, and a member from the successful bidder. DRC shall finally resolve the dispute (with representation of NITB, MolTT, and the Successful bidder) within fourteen (14) Days of such dispute having been referred to it after giving each Party reasonable opportunity of presenting its respective point of view. The decision of which shall be final and binding and shall be enforceable in any court of competent jurisdiction, and the Parties hereby waive any objection to or claims of immunity in respect of such enforcement.

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 33 | P a g e

Page 34: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

SPECIMEN OF AGREEMENT WITH SUCCESSFUL BIDDER(S) ANNEX-VII

Agreement for the procurement of Hardware/Services for the “Centralized IT Procurement” Index to Clauses

1) Definitions 2) Sale of Equipment 3) Purchase Price 4) Delivery 5) Installation and Acceptance 6) Title to and Risk in the Equipment 7) Warranty 8) Patent and Copyright Indemnity 9) Access to Sites 10) Termination 11) Confidentiality 12) Force Majeure 13) Penalty Clause 14) Integrity Pact 15) Training 16) Miscellaneous

Schedules SCHEDULE-I Schedule of Requirements, Detailed Technical Specifications of

Hardware, List of Contractor’s Staff Dedicated to the Project, Maintenance, Support and Training, Deliverables.

SCHEDULE-II Sites. SCHEDULE-III Equipment & Purchase Price, Project Time Table, Contract Price.

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 34 | P a g e

Page 35: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology & Telecommunications

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

HARDWARE/SERVICES SALE AGREEMENT

This Hardware/Services Sale Agreement No.____________Islamabad on this____________ day of ________,___________.

BY AND BETWEEN President of Islamic Republic of Pakistan, through National Information Technology Board, with its office at Plot No.24-B, St No.6, Sector H-9/1, Islamabad, (hereinafter referred to as the “Purchaser”, which expression shall include its successors-in-interest and assigns) OF THE ONE PART;

AND ___________________________[Selected Bidder]., a company incorporated under the Companies Ordinance, 1984, with its registered office at ___________________________________________________________________[Address], acting through its authorized representative, ___________________________[representative], duly authorized and appointed to execute, deliver and perform this Agreement pursuant to its constitutive documents (hereinafter referred to as the “Seller”, which expression shall include its successors-in-interest and assigns) OF THE OTHER PART.

WHEREAS (A) The Purchaser is desirous of acquiring and commissioning the Equipment (hereinafter referred to as

Schedule II) at the Site. (B) The Purchaser issued a Invitation for Bids (IFB) inviting quotations for the delivery, installation,

commissioning, maintenance of the Equipment/services and, from amongst the quotations received in response, selected and approved the Proposal (hereinafter referred to as Proposal); and.

(C) The Seller has represented and confirmed to the Purchaser that the Seller is the authorized distributor/ reseller of the overseas manufacturer of the Equipment/services and is fully empowered and authorized in its own right, and not merely as an agent of the manufacturer, to import, deliver, sell, install, commission and maintain the Equipment.

NOW, THEREFORE, the parties hereto agree as follows: 1. DEFINITIONS

In this Purchase Order unless the context otherwise requires: (a) ‘ACCEPTANCE CERTIFICATE’ means the certificate to be issued by the Purchaser in accordance with the

provisions of article 5 signifying acceptance by the Purchaser of the Equipment and Documentation; (b) 'ACCEPTANCE DATE’ means the date on which the Acceptance Certificate is issued; (c) ‘PURCHASE ORDER’ (PO) means this Purchase Order and includes the Appendix and recitals hereto, as may be

amended from time to time; (d) 'DELIVERY DATE’ means the date falling six to eight (6-8) weeks after the date of this Purchase Order; (e) 'DOCUMENTATION’ means the manuals and other documentation prepared by the manufacturer and

customarily provided with the Equipment describing technical and functional specifications, operating procedures, maintenance details, any voluntary/ complimentary literature/ information/ software from OEM and the like information in relation to the Equipment;

(f) 'EQUIPMENT’ means the items of hardware and other Hardware with accessories and additional features, including the related software for operation of each of the foregoing and back-ups thereof, identified by type, serial number, price and technical and functional specifications as set out in Appendix I & Appendix III;

(g) ‘PROPOSAL’ means the quotation dated 29th January 2020 submitted by the Seller in response to the RFQ. (h) 'PURCHASE PRICE’ means the aggregate price of the Equipment (including the Documentation) & Services

set out in Appendix I; and (I) “RFQ” means the Request For Quotation issued by the purchaser; and (J) “SITES” means the location’s in the Ministries/ Divisions Islamabad where the Project will be

implemented;

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 35 | P a g e

Page 36: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

2. SALE OF EQUIPMENT/SERVICES 2.1 The Seller agrees to:

(i) Sell the Equipment/services; and (ii) Deliver, install, and commission the equipment, upon the terms and conditions of this Purchase Order and in consideration of the payment of the Purchase Price by the Purchaser.

3. PURCHASE PRICE 3.1 The Purchase Price shall include:

(i) The cost of delivery of the Equipment/Services and Documentation to the Site; (ii) The installation, and commissioning of the equipment/Services at the site; and (iii) all duties, levies, taxes and charges including customs duties, income taxes, sales

taxes, import fees, handling, shipping and clearance charges payable in respect of the import, clearance and transportation of the Equipment/services, including duties taxes and charges as may become payable after the date of this Purchase Order.

3.2 The Purchase Price is payable in Pakistan Rupees without reference to any rate of exchange or

currency of any other country. 3.3 The Purchase Price shall be paid by the Purchaser to the Seller in the following manner.

(i) Twenty percent (20%) of the Purchase Price shall be paid after supply of equipment/services;

(ii) Eighty percent (80%) of the Purchase Price shall be paid after installation, configuration of

hardware, software; and after successful testing and acceptance. The Seller shall furnish to the Purchaser a bank guarantee in form and substance and by a bank acceptable to the Purchaser in the sum of ten percent (10%) of the Contract Price (the “Performance Guarantee”). The Performance Guarantee shall remain valid until three (03) years for all Lots for remaining Lots after the Acceptance Date. The Performance Guarantee shall be forfeited by the Government if the responding organization breaches any of its obligations under the contract, including slippages in the committed Appendixs.

4. DELIVERY 4.1 The Seller shall deliver the Equipment/Services and Documentation to the Site on or before the

Delivery Date. Subject to clause 5.3, delivery shall be complete and of all items of Equipment/Services and Documentation. Partial deliveries shall not constitute delivery for the purposes of this Purchase Order. Time shall be of essence in relation to the Delivery Date. Late delivery charges at 0.05% per day with the maximum of 20 days will be deducted by NITB.

4.2 The Seller shall deliver the requisite items of Equipment/Services and Documentation directly at

the specified 10 locations at different Ministries/Divisions/departments as conveyed by NITB against a delivery note duly signed by an authorized representative (whose name will be communicated in writing by the undersigned), and counter-signed by a representative each of the Seller and the Purchaser.

5. INSTALLATION AND ACCEPTANCE 5.1 The Seller shall complete the Installation of the Equipment/Services at the Sites no later than four

weeks of the Delivery Date. The time for installation shall be of essence.

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 36 | P a g e

Page 37: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

5.2 Upon completion of installation and configuration of the Equipment/Services at the Sites, the

Seller shall notify the Purchaser in writing that the Equipment/Services is ready for testing for acceptance. The Seller shall no later that three (3) days after the notification afore-said conduct test-runs on the Equipment/Services in the presence of the Purchaser’s representative and the Purchaser shall, subject to there being (a) Full compliance with the technical and functional specifications set out in Appendix I, and (b) No breach of the warranties, would be allowed to all items of procurement.

5.3 The Seller shall remove any defects and have the Equipment/Services ready for further testing if

the Equipment/Services does not pass the acceptance tests. In the event the Equipment/Services fails to pass the acceptance tests after the third trial, the Purchaser shall be entitled to terminate the Purchase Order whereupon all sums received by the Seller towards the Purchase Price shall be refunded forthwith.

5.4 Notwithstanding the possession or retention of the Equipment/Services by the Purchaser at the

respective individual location(s) comprised in the Sites, or installation of Equipment/Services at the Site by the Seller, the Purchaser shall not be deemed to have accepted the Equipment/Services until it has passed the acceptance tests.

5.5 Upon acceptance as afore-said, the Purchaser shall issue the Acceptance Certificate.

6. TITLE TO AND RISK IN THE EQUIPMENT 6.1 The property in the Equipment/Services shall pass to the Purchaser on payment of the Purchase

Price in full to the Seller. 6.2 The Seller shall ensure that there is no restriction on transfer of the bill of lading or other

document of title to the Equipment/Services by endorsement in favor of and delivery to the Purchaser or its nominee. The Seller shall endorse the document of title to the Purchaser or its nominee.

6.3 Risk in the Equipment/Services shall pass to the Purchaser on the date of actual and full delivery

of the Equipment/Services at the Site. For the avoidance of doubt, delivery to a carrier shall not constitute delivery.

7. WARRANTY 7.1 The Seller warrants to the Purchaser that:

(a) Three (03) years for all Lots, have comprehensive warranty, including parts and labor. (b) The title to the Equipment/Services shall be free and encumbered and that the Seller shall, at

the time of delivery, have the full right / power and authority to transfer the title to the Equipment/Services in favor of the Purchaser free from any encumbrance, third Party claim or right or a negative covenant.

7.2 The Purchaser shall give notice to the Seller as soon as it becomes aware of a breach of warranty. 7.3 The Seller shall as soon as it is reasonably able, but in any event not later than four(4) days of the

date of notice under clause 7.2, investigate any breach of warranty and:

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 37 | P a g e

Page 38: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

(i) In the case of a breach of warranty falling within clause 7.1(a) above, shall remedy the

same, free of charge, by:

(a) carrying out such repairs modifications or alterations to the Equipment/Services; and/or

(b) replacing the Equipment/Services or such component parts (including

software), as shall in the circumstances be necessary to remedy the breach of warranty; and

(ii) in the case of a breach of warranty falling within clause 7.1(b) above, shall remedy the

same, free of charge, by obtaining such releases, discharges, assignments, transfers or conveyances as shall in the circumstances be necessary to remedy the breach of warranty.

7.4 Any Equipment/Services or component parts of the Equipment/Services replaced by the Seller

pursuant to clause 7.3(i) above ('Replaced Equipment/Services') shall upon replacement become the property of the Purchaser and the Seller warrants that its title to such Replaced Equipment/Services shall be free and unencumbered and that it shall have all necessary consents and authorities to part with possession of the Replaced Equipment/Services.

7.5 In the event the Seller is unable to remedy a breach of warranty on the expiry of thirty (30) days

after the notification under clause 7.2 then, notwithstanding acceptance of the Equipment/Services by the Purchaser, the Seller shall be obliged to refund the Purchase Price (or a proportionate part in case of breach of Warranty in respect of less than the full number of units comprised in the Equipment/Services) and remove at its cost the Equipment/Services from the Sites.

7.6 The Seller shall accept liability to the Purchaser in respect of damage to the tangible property of

the Purchaser resulting from the negligence of the Seller or its employees agents and sub-contractors.

8. PATENT AND COPYRIGHT INDEMNITY The Seller will indemnify and hold harmless the Purchaser against any damages (including costs)

that may be awarded or agreed to be paid to any third Party in respect of any claim or action that the normal operation possession or use of the Equipment/Services and/or the Documentation by the Purchaser infringes the patent copyright registered design or trade mark rights of the said third Party.

9. ACCESS TO SITES The Purchaser shall allow the Seller including its employees agents and sub-contractors such

reasonable access to the Sites as it shall from time to time require to perform its obligations under this Purchase Order.

10. TERMINATION 10.1 Without prejudice to the rights to terminate provided elsewhere in this Purchase Order, this

Purchase Order may be terminated: (i) forthwith by the Seller if the Purchaser fails to pay any sum due hereunder within

forty-five (45) days of the due date therefore;

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 38 | P a g e

Page 39: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

(ii) forthwith by either party if the other commits any material breach of any term of this

Purchase Order (other than one falling within sub-paragraph (i) above) and which (in the case of a breach capable of being remedied) shall not have been remedied within fourteen (14) days of a written request to remedy the same; and

(iii) forthwith by the Purchaser if the Seller shall convene a meeting of its creditors or if a

proposal shall be made for a voluntary arrangement or a proposal for any other composition scheme or arrangement with (or assignment for the benefit of) its creditors or if the Seller shall be unable to pay its debts or if a trustee, receiver, administrative receiver or similar officer is appointed in respect of all or any part of the business or assets of the Seller or if a petition is presented or a meeting is convened for the purpose of considering a resolution or other steps are taken for the winding-up of the Seller or for the making of an administration order (otherwise than for the purpose of an amalgamation or reconstruction).

10.2 Any termination of this Purchase Order shall be without prejudice to any other rights or remedies

a Party may be entitled to hereunder or at law and shall not affect any accrued rights or liabilities of either Party nor the coming into or continuance in force of any provision hereof which is expressly or by implication intended to come into or continue in force on or after such termina-tion.

11. CONFIDENTIALITY Each of the Parties hereto undertakes to the other to keep confidential all information (written or

oral) concerning the business and affairs of the other that it shall have obtained or received as a result of the discussions leading up to or the entering into of this Purchase Order.

12. FORCE MAJEURE 12.1 Neither Party hereto shall be liable for any breach of its obligations hereunder resulting from

causes beyond its reasonable control including but not limited to fires strikes (of its own or other employees) insurrection or riots embargoes inability to obtain supplies or regulations of any civil or military authority (an "Event of Force Majeure”), provided such an event could not have been prevented or overcome with reasonable foresight and the exercise of due diligence or adoption of preventive or curative measures (including by way of incurring additional expense), provided further that, under no circumstances shall an increase in the cost of performance by a Party of its obligations hereunder constitute an Event of Force Majeure.

12.2 Each of the parties hereto agrees to give notice forthwith to the other upon becoming aware of an

Event of Force Majeure such notice to contain details of the circumstances giving rise to the Event of Force Majeure. A Party shall resume performance immediately upon cessation of the Event of Force Majeure.

12.3 If a default due to an Event of Force Majeure shall continue for more than three (3) weeks then

the Party not in default shall be entitled to terminate this Purchase Order. Neither Party shall have any liability to the other in respect of the termination of this Purchase Order as a result of an Event of Force Majeure, provided that, a Party which has received any benefit hereunder resulting in a reciprocal executory obligation shall remain obliged to restitute such benefit to the other Party.

13. PENALTY CLAUSE

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 39 | P a g e

Page 40: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

Without prejudice to the right of the Customer to terminate this Purchase Order for delay in completion of the Project beyond the Completion Date, the Contractor shall be liable to pay liquidated damages at the rate of one-tenth of one percent (0.05%) of the Contract Price for each day of delay beyond the Completion Date until completion of the Project, provided that, payment of liquidated damages shall not relieve the Contractor of its obligation to achieve completion of the Project.

14. INTEGRITY PACT The Seller hereby declares its intention not to obtain or induce the procurement of any contract, right, interest, privilege or other obligation or benefit from Government of Pakistan (GOP) or any administrative subdivision or agency thereof or any other entity owned or controlled by it (GoP) through any corrupt business practices.

14.1 Without limiting the generality of the foregoing, the Seller represents and warrants that it has

fully declared the brokerage, commission, fees etc. paid or payable to anyone and not given or agreed to give and shall not give or agree to give to anyone within or outside Pakistan either directly or indirectly through any natural or juridical person, including its affiliate, agent, associate, broker, consultant, director, promoter, shareholder, sponsor or subsidiary, any commission, gratification, bribe, finder’s fee or kickback, whether described as consultation fee or otherwise, with the object of obtaining or inducing the procurement of a contract, right, interest, privilege or other obligation or benefit in whatsoever form from GoP, except that which has been expressly declared pursuant hereto.

14.2 The Seller certifies that it has made and will make full disclosure of all POs and arrangements

with all persons in respect of or related to the transaction with GoP and has not taken any action or will not take any action to circumvent the above declaration, representation or warranty.

14.3 The Seller accepts full responsibility and strict liability for making any false declaration not

making full disclosure, misrepresenting facts or taking any action likely to defeat the purpose of this declaration, representation and warranty. It agrees that any contract, right, interest, privilege or other obligation or benefit obtained or procured as aforesaid shall, without prejudice to any other rights and remedies available to GoP under any law, contract or other instrument, be void able at the option of GoP.

14.4 Notwithstanding any rights and remedies exercised by GoP in this regard, the Seller agrees to

indemnify GoP for any loss or damage incurred by it on account of its corrupt business practices and further pay compensation to GoP in an amount equivalent to ten times the sum of any commission, gratification, bribe, finder’s fee or kickback given by the Seller as aforesaid for the purpose of obtaining or inducing the procurement of any contract, interest, privilege or other obligation or benefit in whatsoever form from GoP.

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 40 | P a g e

Page 41: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

15. MISCELLANEOUS 15.1 WAIVER: The waiver by either Party of a breach or default of any of the provisions of this

Purchase Order by the other Party shall not be construed as a waiver of any succeeding breach of the same or other provisions nor shall any delay or omission on the part of either Party to exercise or avail itself of any right power or privilege that it has or may have hereunder operate as a waiver of any breach or default by the other Party.

15.2 NOTICES: Any notice, request, instruction or other document required to be given hereunder

by any Party hereto shall be sent to the following addresses by facsimile, prepaid recorded delivery or registered post and shall be deemed effective if sent by post at the expiration of seventy-two (72) hours after the same was posted whether or not received and if sent by facsimile twenty-four (24) hours after the facsimile transmission. The Parties hereto shall notify the others of any change of address within forty-eight (48) hours of such change.

Notices to the Seller:

Mailing Address

[Selected Bidder] [Address including Phone numbers and official email etc]

Notices to the Purchaser:

Mailing Address: National Information Technology Board 24-B, Street no 6, Sector H-9/1, Islamabad.

Phone Number: 051-9265054 15.3 INVALIDITY AND SEVERABILITY: If any provision of this Purchase Order shall be found by any

court or administrative body of competent jurisdiction to be invalid or unenforceable, the invalidity or unenforceability of such provision shall not affect the other provisions of this Purchase Order.

15.4 SELLER TO BE PERSONALLY RESPONSIBLE: Notwithstanding the Seller being a licensed agent and

authorized distributor of the overseas manufacturer of the Equipment/Services, and without prejudice to any rights of the Purchaser against the overseas manufacturer of the Equipment/Services, the Seller confirms, agrees and undertakes to the Purchaser that: (i) it shall at all times be personally and solely responsible to perform and discharge its

obligations to the Purchaser under this Purchase Order; (ii) the Purchaser shall not be required to implead the manufacturer in any proceedings

arising out of or in connection with this Purchase Order; (iii) the Seller shall not set up in defence or in diminution of its liability any arrangement,

Purchase Order or understanding express or implied between the Seller and its principal; and

(iv) any limitations, restrictions or exclusions of liability provided in the Documentation or terms of

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 41 | P a g e

Page 42: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

sale or agency between the Seller and its principal shall not apply to the transactions contemplated under this Purchase Order, all of which are expressly excluded, and, further, that the Seller shall at all times provide and endorse to the Purchaser all assurances, warranties and support undertakings as are provided by its principal to its customers in the normal course.

15.5 ASSIGNMENT AND SUB-CONTRACTING: The Seller shall not be entitled to assign or sub-

contract the whole or part of this Purchase Order nor all or any of its rights and obligations hereunder without the prior written consent of the Purchaser. The Seller hereby agrees that the Purchaser may assign/ novate this Purchase Order in respect of all or any of its rights and obligations hereunder to any other Party.

15.6 DISPUTE RESOLUTION: All disputes or differences which shall at any time hereafter arise

between the Seller and the Purchaser in respect of the construction or effect of this Purchase Order or any matter or event connected with or arising out of this Purchase Order (a "Relevant Event") shall in the first instance be settled through mediation between the Parties. If they fail to resolve either of the Party may refer the matter in dispute, with in 14 days of the decision of the Dispute resolution committee as per Annex-VI of the IFB, either to resolve the same by Arbitration, as laid down in Arbitration act of 1940 or submit to the jurisdiction of Pakistan. If the Parties agree for the Arbitration then Arbitration committee shall be constituted comprising of three (3) members, each of whom shall be of eminent repute with experience in the information technology sector of not less than ten (10) years, With one (1) member appointed by each Party. Third member shall be Principal Secretary Law, Justice and Human Rights Division, or his nominee. Each Party shall be responsible for the remuneration and cost in relation to the member of the Arbitration committee. The Decision / Award passed by the Arbitration Committee shall be final and binding on the Parties.

15.7 TAX: All payments made pursuant to this Purchase Order shall be subject to such withholding or

deduction on account of applicable duties, levies or taxes as may be provided under the applicable law of Pakistan.

15.8 ENTIRE Purchase Order: This Purchase Order constitutes the entire Purchase Order between

the Parties hereto and supersedes all prior documentation, correspondence and Purchase Orders in relation to the subject-matter of this Purchase Order.

15.9 HEADINGS: Headings to clauses in this Purchase Order are for the purpose of information and

identification only and shall not be construed as forming part of this Purchase Order. 15.10 GOVERNING LAW: This Purchase Order shall be governed by and construed in accordance with

the laws of Pakistan. 15.11 DUE AUTHORIZATION: Each party represents warrants and confirms to the other that:

(i) it is duly authorized under the applicable law of Pakistan and its constitutive

documents (if any) to execute, deliver and perform this Purchase Order; (ii) the person signing on its behalf is duly authorized to sign and deliver this Purchase

Order; and (iii) This Purchase Order constitutes its valid, binding and enforceable obligations in terms

hereof.

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 42 | P a g e

Page 43: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

IN WITNESS WHEREOF, THE PARTIES HAVE EXECUTED THIS AGREEMENT IN THE PRESENCE OF WITNESSES ON THE DATE AND YEAR FIRST ABOVE WRITTEN. ________________________________ ________________________________ FOR AND ON BEHALF OF THE PURCHASER Full Name : ______________________ CEO, NITB Address: Plot No.24-B, Street No. 6, Sector H-9/1, Islamabad

FOR AND ON BEHALF OF THE SELLER Full Name : _________ _________________ Address: _______________________________ ________________________________________

WITNESSES: 1. ________________________________ 2. __________________________________

Full Name: Full Name:

NIC No: NIC No:

Address: Plot No.24-B, Street No. 6, Sector H-9/1, Islamabad Address:

Schedule I

Statement of Requirements 1. The Project consists of provision, installation, configuration & necessary training on Hardware and its accessories at

each Ministries/Divisions, Islamabad. 2. The Hardware will comply with the functional and technical specifications set out in Schedule I. 3. The Installation and configuration manuals shall be prepared with sufficient level of detail for future reference. All

manuals (including documentation) related to Equipment/Services will be delivered to and shall be the property of the customer.

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 43 | P a g e

Page 44: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology & Telecommunications

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

Detailed Technical Specification of Equipment/Services: Sample Contract- Table 8.1

Lot No.

Items

Quantity Item Description & Required Specifications by NITB

Specification of the

Quoted Items by the

Vendor 1 Desktop PC Renowned

Brand PC with LED Display.

2,688 Nos.

Specifications as per Annexure-I

2 Laptop (Professional/Corporate Series) - Renowned Brand

401 Nos.

Specifications as per Annexure-I

3 Standard Scanner Renowned Brand

1,200 Nos. Specifications as per Annexure-I

4 1KV Smart UPS 2,688 Nos. Specifications as per Annexure-I

5 MS Office Pro Plus 2019 64 bit Sngl GOV OLP or higher.

5,686 Nos.

Specifications as per Annexure-I

6. MS Office Home & Business 2019 or higher

5,686 Nos. Specifications as per Annexure-I

7. Establishment of LAN in 42+ Ministries/Divisions as per list at Annex-VIII and TORs at Annex-IX

2,838

Network Nodes

Specifications as per Annexure-I

C e n t r a l i z e d I T P r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 44 | P a g e

Page 45: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

List of Staff Dedicated to the project: Sample Contract- Table 8.2

Sr.# Name Designation Phone No. E-mail

1

2

3

4

5

6

7

8

9

10

Deliverables: Sample Contract- Table 8.3 Sr # Items

1 Product Documentation/Manuals & Hardware installation guides (Hard & Soft Copy)

2 Items mentioned in Schedule I

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 45 | P a g e

Page 46: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

Maintenance, Support and Training: Sample Contract- Table 8.4

The seller will provide maintenance and support during the warranty period of hardware, on the terms & conditions described below:

Hardware

Sr.# Action Item Response time Contact person name, email & Mobile No.

1 Replacement (Backup) 24 Hours

2 Repair 2 Weeks

3 Reconfiguration 1 Day

4 Replacement (Original) 4 Weeks

The seller shall remain committed to and shall if so requested by the purchaser provide such maintenance services as shall be necessary or required by the purchaser for a term of three (03) years after the expiry of the respective warranty periods for the Equipment/Services stipulated in clause 7.1 The charges for the required Maintenance Services shall be negotiated and agreed between the parties.

Sites of Delivery of equipment/services: Sample Contract- Schedule II

All Equipment/Services will be supplied and installed at different Ministries/Divisions/Departments as per list

to be provided with actual agreement.

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 46 | P a g e

Page 47: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

Details of Equipment/Services & Purchase prices: Sample Contract- Schedule III

Sr. # Description Qty Unit Cost (Rs.) Total Price including all Taxes (Rs.)

1. Desktop PC Renowned Brand PC with LED Display.

2,688 Nos.

2. Laptop (Professional/Corporate Series) - Renowned Brand

401 Nos.

3. Standard Scanner Renowned Brand 1,200 Nos.

4. 1KV Smart UPS 2,688 Nos.

5. MS Office Pro Plus 2019 64 bit Sngl GOV OLP or higher.

5,686 Nos.

6. MS Office Home & Business 2019 or higher

5,686 Nos.

7.

Establishment of LAN in 42+ Ministries/Divisions as per list at Annex-VIII and TORs at Annex-IX

2,838

Network Nodes

Grand Total Rs.

Project Time Table Delivery timeframe for Lot # 1 to Lot # 6 Table-2

SR. NO. MILESTONE TIME PERIOD PAYMENT

1. Supply and verification as per BoQ on the Client site (as conveyed by the procuring agency)

Six (06) to Eight (08) Weeks from the date of signing of contract / issuance of purchase order.

20%

2. Installation, configuration and testing of Equipment (Hardware/Software/Other Items)

Four (04) Weeks from the date of supply. Performance Guarantee will have to be provided to cover the warranty as applicable from the date of successful testing and acceptance.

80% On submission of performance Guarantee

3. End of performance Guarantee

. Release of Performance Guarantee

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 47 | P a g e

Page 48: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

Delivery timeframe for Lot # 7 Table-2-A SR. NO. MILESTONE TIME PERIOD PAYMENT

1. Supply of Sample of Active Equipment offered for POC.

One (01) Week from the declaration of preminilary qualified bidders

2. Supply of Passive equipment Two (02) Weeks from the date of signing of contract / issuance of purchase order.

10% (Note-1)

3. Supply of Active equipment Six (06) to Eight (08) Weeks from the date of signing of contract / issuance of purchase order.

20% (Note-2)

4. Installation, configuration and testing of Equipment as per TORs

Eight (08) to Ten (10) Weeks from the date of signing of contract / issuance of purchase order. Performance Guarantee will have to be provided to cover the warranty as applicable from the date of successful testing and acceptance.

70% On submission of performance Guarantee & (Note-3)

5. End of performance Guarantee

- Release of Performance Guarantee

Note-1: On signed delivery documents from the Client i.e. where delivery is made. Note-2: As per Note-1 above. Note-3: On successful verification and/or testing report signed by the procuring agency.

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 48 | P a g e

Page 49: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

LIST OF MINISTRIES/DIVISIONS FOR LAN ANNEX-VIII

S.No. Name of Division Location Address

1 Law & Justice Division S block, Pak Secretariat, Ibd. "S" Block, Pak Secretariat, Islamabad

2 Science & Technology Division S&T Building S&T Building, Constitution Avenue, Islamabad.

3 Water Resources Division 6th Ataturk Avenue, Opposite NEPRA, G-5/1, Islamabad.

4 Defence Division PAK Secretariat-II Pak Secretariat-II, Rawalpindi

5 Inter-Provincinal Coordinator Division Cabinet Block, Cabinet Block, 3rd Floor, Pak Secretariat,

Islamabad 6 Cabinet Division Cabinet Block Cabinet Block, Pak Secretariat, Islamabad 7 Foreign Affairs Division Constitution Avenue G-5, Constitution Avenue, Islamabad.

8 National History & Literary Heritage Division Evacuee Trust Complex 3rd Floor, Evacuee Trust Complex F-5/1,

Islamabad

9 Federal Education and Professional Training Division

"C" Block "C" Block, 1st Floor. Pak Secretariat, Islamabad.

10 Industries and Production Division

"A" Block "A" Block, 1st Floor, Pak Secretariat, Islamabad "D" Block "D" Block, Pak Secretariat, Islamabad

11 Textile Industry Division Evacuee Trust Complex Evacuee Trust Complex ,1st Floor, F-5, Islamabad

12 States & Frontier Regions Division "S" Block "S" Block, Pak Secretariat, Islamabad

13 Defense Production Division PAK Secretariat-II PAK Secretariat-II, Adam Jee Road, Rawalpindi

14 Religious Affairs Division Melody Civic Centre 20-CIVIC CENTRE, G-6 MARKAZ, ISLAMABAD

15 Information & Broadcasting Division Cabinet Block, 4 th Floor Cabinet Block, 4 th Floor, Pak Secretariat,

Islamabad 16 Privatization Division STI Building STI Building, 3rd Floor, F-5, Islamabad

17 Finance Division "Q" Block, , "Q" Block, Pak Secretariat, Islamabad "S" Block "S" Block, Pak Secretariat, Islamabad FBC Building G-5, Islamabad.

18 Parliamentary Affairs Division "R" Block "R"Block, 3rd Floor, Pak Secretariat, Islamabad

19 Human Rights Division Shaheed-e-Millat Secretariat Shaheed-e-Millat Secretariat, Blue Area, Islamabad

20 Planning Division

"P" Block "P" Block, Pak Secretariat, Islamabad

PPMI Building PPMI Building, H-8, Near Shifa International Hospital, Islamabad.

S&T Building S&T Building, Constitution Avenue, Islamabad. Shalimar Plaza Shalimar Plaza, Blue Area, Islamabad.

21 Revenue Division FBR House FBR House, 6th Floor, Constitution Avenue, Islamabad

22 Kashmir Affairs & Gilgit Baltistan "R" Block "R" Block, Pak Secretariat, Islamabad.

23 Economic Affairs Division "C" Block "C" Block, 3rd Floor, Pak Secretariat,

Islamabad "B" Block "B" Block, Pak Secretariat, Islamabad

24 Establishment Division Cabinet Block Cabinet Block, Pak Secretariat, Islamabad

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 49 | P a g e

Page 50: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

MIS Wing Shaheed-e-Millat Secretariat, Blue Area, Islamabad

25 Postal Services Division G-8, Director General Pakistan Post Office, G-8/4 Islamabad.

26 Statistics Division G-9 Muave Area, G-9, Islamabad 27 Aviation Division PIA Building PIA Building, Blue Area Islamabad.

28 Interior Division

"R" Block "R" Block, Pak Secretariat, Islamabad "S" Block "S" Block, Pak Secretariat, Islamabad

Shaheed-e-Millat Secretariat Shaheed-e-Millat Secretariat, Blue Area, Islamabad

29 Maritime Affairs Division "D" Block "D" Block, Pak Secretariat, Islamabad 30 Communication Division "C" Block "C" Block, Pak Secretariat, Islamabad

31 Commerce Division "A" Block "A" Block, 4-6th Floor, Pak Secretariat,

Islamabad WTO Wing STI Building, F-5, Ground Floor, Islamabad. TDC Wing Statelife Building, Blue Area, Islamabad.

32 Power Division "A" Block "A" Block, Pak Secretariat, Islamabad 33 Housing & Works Division "B" Block "B" Block, Pak Secretariat, Islamabad 34 Climate Change Division LG&RD Complex LG & RD Complex, G-5/2, Islamabad.

35 Information Technology Division Evacuee Trust Complex Evacuee Trust Complex, 4th Floor, F-5,

Islamabad

36 Narcotics Control Division Immigration Tower

Ministry of Narcotics Control, 1st Floor, Emigration Tower,10th Mauve Area,G-8/1,Islamabad +92-51-9261647

37 National Food Security & Research Division

"B" Block "B" Block, Pak Secretariat, Islamabad

38 National Health Services, Regulation & Coordination Division

LG&RD Complex LG & RD Complex, G-5/2, Islamabad.

39 Overseas Pakistanis & HRD "B" Block "B" Block, Pak Secretariat, Islamabad

Benevolent Fund Building Benevolent Fund Building, Zeropoint, Islamabad

40 Petroleum & Natural Resources Division

"A" Block "A" Block, 3rd Floor, Pak Secretariat, Islamabad

41 Railways Division "D" Block "D" Block, Pak Secretariat, Islamabad 42 National Security Division Prime Minister Secretariat Prime Minister Secretariat, Islamabad.

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 50 | P a g e

Page 51: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

TORS FOR ESTABLISHMENT OF LAN FOR BIDDERS ANNEX-IX

TORs for LAN (Active and Passive equipment) to be installed in Error! Reference source not found. Ministries\Divisions

1. Proof of Concept (POC): All bidders are required to provide the POC Hardware Devices (Firewall

and Layer-3 Switches) of the quoted brand and model with all the required valid licenses for at

least 45 days to NITB for technical evaluation along with technical proposals. The bidder must

extend all possible technical support for the said hardware.

2. After Security Strength evaluation of quoted brand\models of Firewall and Layer-3 Switch will be

inducted/installed in any Ministry/Division.

3. Provision of LAN drawings & estimated BoQ covering the locations proposed for each and every node and the equipment proposed to laid down/placed.

4. Provision of written commitment that the work awarded will be completed within a period given in the purchase order on all the sites awarded failing which a penalty of 0.05% per day will be levelled by the procuring agency.

5. Delivering of Items as per BoQ to the Client Stores.

6. Safety and non-disturbance of existing LAN working where no replacement is to be done.

7. Bidder/ROs will submit price per Network Node for passive equipment ONLY and bidder may

quote active equipment prices on following format:.

Items (As per Specs mentioned at Annex-I of Lot #6)

Unit Price with Tax Rs.

Layer-2 switch (24 port) Layer-2 switch (48 port) Layer-3 switch (12 port) Layer-3 switch (24 port) Layer-3 switch (48 port) Firewall for 250 users Firewall for 500 users

8. Renowned brand of Active & Passive equipment will be entertained.

9. Low Level Design (LLD) have to be provided by vendor.

10. Vender will setup MRTG of all Network Equipment.

11. Identification and Implementation of current Network Flows.

12. All active equipment should be of same manufacturer. cross platform solution except Firewall will

not be entertained.

13. Support services also include Fiber connectivity between switches.

14. Professional hands on Training for 04 Persons will also be required on each location/site.

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 51 | P a g e

Page 52: Government of Pakistan · 2020-02-14 · The Bidder is hereby informed that the Government shall deduct tax at the rate prescribed under the tax laws of Pakistan, from all payments

Government of Pakistan Ministry of Information Technology

NATIONAL INFORMATION TCHNOLOGY BOARD (NITB) *****

15. Hardware replacement and installation of all or any parts of the equipment, which become

defective or malfunctioned, on exchange bases as Free of Cost (FOC). Hardware

capacity/specification of the replaced part/device must be equal or higher than the

defective/malfunctioned part/device.

16. Technical Support: resolution of issues related to hardware, software and service impact issues

which are unable to resolve locally.

17. Recommendations related to Network design and optimization may be provided by the vendor.

18. Vendor has to make sure that this hardware support for active equipment includes availability of

all possible patches, hardware firmware upgrade and OS upgrades on installed OS.

19. All major/ minor patches, hardware firmware upgrades and OS upgrade would be informed to

NITB and activities to install them will be carried out by vendor.

20. Hardware devices having end of life must be communicated to NITB, moreover nearly end of life

hardware devices will not be acceptable.

21. Hardware replacement activities and relative spares maintenance will also be carried out by

vendor.

22. End-to-end Proper tagging and labelling of all Network Nodes/ Points in all aspects as per

international standards and documented for Active and Passive Work on each location/site.

23. Physical verification of end-to-end works completed along with reps of NITB and the Client.

24. Signing of Joint verification report 25. 24 x 7 availability of hotline (for ticketing logging of complaints etc)

Note: if any hardware has end of service life during the support tenure NITB would not be responsible; vendor must be able to support the hardware till end of warranty period/contract.

*********

C e n t r a l i z e d I T p r o c u r e m e n t T e n d e r D o c u m e n t s - N I T B 52 | P a g e