Government Of India
Power Sector
Aug-2016
Ministry of Power
Central Electricity Authority
New Delhi
SN Section A - Highlights of Power Sector Page
1 Electricity Generation for Aug 2016 (BU) 1
2 Generating Capacity Addition for Aug 2016 (MW) 2
3 List of Projects Commissioned in Aug 2016 3
4 All India Installed Capacity (MW) Region-wise as on 31082016 3
5 All India Installed Capacity (MW) Sector-wise as on 31082016 4
6 Transmission Lines Added during Aug 2016 (Ckms) 5
7 Transformation Capacity Addition during Aug 2016 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Aug 2016 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Aug 2016 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31082016
13 Average cost of Power amp Average Realisation
14 All India per capita consumption of Electricity (KWh)
15 All India Coal consumption for Power Generation (MT)
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Aug 2016 13
3 Installed Capacity in various Regions including their shares 14-19
1 Programme and Achievements of Transmission Lines in Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
1 Programme and Achievements of Sub-Stations in Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
1 Electricity Generation (MU) Targets and Achievements for 2015-16 22
1 Power Supply Position (Provisional) for Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since 2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA upto Aug 2016
1 Rate of sale of power for the year 2013-2014 33-41
Section H - Rate of sale of power for the year 2013-2014
Executive Summary for the Month of Aug 2016
32
11
20
21
31
Section B - Capacity Addition
Section C - Transmission Lines
Section D - Sub Stations
Section E - Electricity Generation
Section F - Power supply position
Contents
Section G - Growth of Power Sector
SN Contents Page
1 Electricity Generation for Aug 2016 (BU) 1
2 Generating Capacity Addition for Aug 2016 (MW) 2
3 List of Projects Commissioned in Aug 2016 3
4 All India Installed Capacity (MW) Region-wise as on 31082016 3
5 All India Installed Capacity (MW) Sector-wise as on 31082016 4
6 Transmission Lines Added during Aug 2016 (Ckms) 5
7 Transformation Capacity Addition during Aug 2016 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Aug 2016 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Aug 2016 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31082016
13 Average cost of Power amp Average Realisation
14 All India per capita consumption of Electricity (KWh)
15 All India Coal consumption for Power Generation (MT)
Section A - Highlights of Power Sector
11
Achievement
Aug-16
Thermal 72929
Hydro 17737
Nuclear 3515
Bhutan Import 1080
All India 95261 015
Type
Thermal
Hydro
Nuclear
Bhutan Import
All India
1
Electricity Generation During April 2015 to Aug 2015 amp April 2016 to Aug 2016 (BU)
17779
3273
Targets
373096 403856
15873
824
79677
Change
wrt 2015
95120
07060992
101204
Apr 15 - Aug 15 Apr 16 - Aug 16
67659
16269
Change
-243
306 -561
63652
569486441460266
3242
-592
2834
1 Electricity Generation for Aug 2016 (BU)
Aug-16Type
Achievement
Aug-15
17548
73515
95120
95261
95000
95050
95100
95150
95200
95250
95300
BU
Aug 15 Aug 16
460266486441
0000
100000
200000
300000
400000
500000
600000
BU
Apr 15 to Aug 15 Apr 16 to Aug 16
Achievement Targets Achievement
Aug-15
Thermal 871 910 3255 NA
Hydro 0 80 80 NA
Nuclear 0 0 0 NA
All India 871 990 4055 NA
Apr 15 - Aug 15 Apr 16 - Aug 16 Change
Thermal 3921 29485 -25
Hydro 730 185 -75
Nuclear 0 0 NA
All India 4651 31335 -33
2
2 Generating Capacity Addition for Aug 2016 (MW)
Generating Capacity Addition during April 15 to Aug 15 amp April 16 to Aug16 (MW)
Change wrt 2015TypeAug-16
871
4055
0
100
200
300
400
500
600
700
800
900
1000
1 Aug15 Aug 16
4651
31335
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
1Apr 15 to Aug 15 Apr 16 to Aug 16
(i) Thermal
Agartala Gas Based PP St-1 255 MW commissioned on 23082016
(ii) Hydro
(iii) Nuclear
NIL
Nuclear Hydro RES Grand Total
Region Coal Gas Diesel Total
Northern 4586450 555626 000 5142076 162000 1831178 878504 8013758
Western 7275301 1120341 000 8395642 184000 744750 1561300 10885691
Southern 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
Eastern 3062287 10000 000 3072287 000 436912 51939 3561138
North-East 31000 172380 3600 206980 000 124200 26372 357552
Islands 000 000 4005 4005 000 000 1110 5115
ALL INDIA 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Note Captive Genaration is not included in the total 3
Thermal
3 List of Projects Commissioned During Aug 2016
Teesta low dame stage IV U-4 40 MW Commissioned on 11082016
Lower Jurala U-5 40 MW commissioned on 20082016
4 All India Installed Capacity (MW) Region-wise as on 31082016
Nawapara U-1 300 MW commissioned on 14082016
21256890
578000
4296843 4423692
30555425
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 30555425
Sector
Coal Gas Diesel Total
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
All India 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
State 10194593
Private 12729606
Central 7631226
RES
5 All India Installed Capacity (MW) Sector-wise as on 31082016
4
Grand TotalTHERMAL
Nuclear Hydro
State 10194593 33
Private 12729606 42
Central 7631226 25
All India Installed Capacity(MW) as on 31-08-2016 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
9117
0
Apr 15 - Aug 15
1583
4340
3318
9241
4134
0 0
6 Transmission Lines Added during Aug 2016 (Ckms)
2835
1480
3051
669
2455
2148
Transmission Lines Added during Apr 15 to Aug 15 amp Apr 16 to Aug16 (Ckms)
Aug-16
0
Aug-15
0
Apr 16 - Aug 16
0
1190
596
181
1390
0 0
9117
9241
9000
9050
9100
9150
9200
9250
9300
ck
ms
Apr 15 to Aug15 Apr 16 to Aug16
2455
3051
0
500
1000
1500
2000
2500
3000
3500
1
ckm
s
Aug 15 Aug 16
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1760
1500
7 Transformation Capacity Addition During Aug 2016 (MVA)
4760
0
1500
945
1110
0 1500
3940
8540
0
Aug-15 Aug-16
April 15 to Aug 15 April 16 to Aug 16
3555
0
0
0 1500
All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr
16 to Aug 16 (MVA)
27435
0
9000
10835
6100
24480
12000
3555
4760
0500
100015002000250030003500400045005000
MV
A
Transformation Capacity Addition during Aug 2016
Aug 15 Aug16
24480
27435
24000
1
MV
A
Apr 15 to Aug 15 Apr 16 to Aug 16
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16
Northern 32831 31913 31055 31481 -54 -14
Western 27625 27283 27556 27277 -02 00
Southern 24488 26487 23995 26473 -20 -01
Eastern 11187 11230 11132 11221 -05 -01
North Eastern 1297 1461 1221 1421 -59 -28
All India 97428 98374 94959 97873 -25 -05
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16
Northern 54474 50917 50230 48541 -78 -47
Western 42024 40122 41781 39903 -06 -05
Southern 37136 41168 35892 40526 -33 -16
Eastern 17363 18334 17149 18219 -12 -06
North Eastern 2437 2435 2283 2387 -63 -20
All India 149492 151719 146124 148347 -23 -22
7
Region
Power (MW)
8 Power Supply Position (Energy amp Peak) in Aug 2016
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand
Aug 15 0 0 0 0 339 0 0 3943 75
Aug 16 0 0 0 0 359 0 0 924 75
p
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Aug 15 128 31 7 124 0 0 37
Aug 16 21 0 0 13 0 0 2
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Aug 15 0 14 564 151 106 1 0
Aug 16 3 14 76 3 6 3 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
35
9
0 0
92
4
75
0 0 0 0
33
9
0 0
39
43
75
0400800
120016002000240028003200360040004400
Ch
and
iga
rh
De
lhi
Ha
rya
na
HP
Jamp
K
Pun
jab
Ra
jasth
an
UP
Utr
akh
an
d
MW
Northern States (MW)Aug 16 Aug 15
21
0 0
13
0 0 2
128
31
7
124
0 0
37
0
20
40
60
80
100
120
140
Cha
ttis
garh
Gu
jara
t
MP
Mahara
shtr
a
Dam
an amp
Diu
Dad
ar
Na
gar
Haveli G
oa
MW
Western States (MW)Aug 16 Aug 15
3 14 7
6
3 6 3 00 14
564
151
106
1
0
1000
AP
Tele
nga
na
Karn
ata
ka
Kera
la
Tam
il N
ad
u
Pud
uch
err
y
La
ksh
yad
ee
p
MW
Southern States (MW) Aug16 Aug 15
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Aug 15 160 30 25 18 42 0 8
Aug 16 0 100 0 0 19 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Aug 15 1 82 2 0 1 1 1
Aug 16 8 28 0 0 2 1 0
9
0
100
0 0
19
0 8
160
30
25
18
42
0 8
020406080
100120140160180
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Aug 16 Aug15
8
28
0 0 2 1 01
82
2 0 1 1 10
102030405060708090
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pu
ra
MW
North-Eastern States (MW) Aug 16 Aug 15
Sector Aug 15 Aug 16
Central 6925 6620
State 4965 4009
Private 5633 5117
ALL INDIA 5810 5203
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6363
October 6686
November 6034
December 6175
January 6320
February 6495
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Aug 2016
69
25
49
65
56
33
58
10
662
0
400
9
511
7
520
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016
+Aug15 Aug16
62
05
64
16
59
43
58
36
58
10
63
63
66
86
60
34
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumersP Provisional
Total Number of Villages
597464
Pump sets
Energised as on
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
NotIncludin
g Subsidiy
booked
Only
Agriculture
2013-14 400 175
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Provisional
11
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should
be obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the
village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA
is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data
As such each monthly report of Village electrification of CEA is independent of the earlier published
reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31072016
Villiages Electrified (Nos) as on 310816
9810589068
Villages electrified
15 All India Coal consumption for Power Generation (MT)
515
14 All India per capita consumption of Electricity ( KWh)
Realization(paiseunit)
20550647
Pump sets Energised as on 31-08-16
cost of supply (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1266360 1932910 5113550 8312820
Hydro 258402 81700 59500 399602
Nuclear 100000 000 000 100000
Total 1624762 2014610 5173050 8812422
Acievement 6206 12972 11048 9953
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Aug 2016
Achievements upto Aug 2016 during the 12th Plan
723
400
0
108
970
0
53
000
0
831
282
0
39
960
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 8812422 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 255 0 255 255
State 3910 910 0 1820 750 -1070
Pvt 6800 0 300 3650 2173 -1477
Total 134405 910 3255 5470 29485 -25215
Central 490 0 40 0 80 80
State 395 80 40 205 105 -100
Pvt 829 0 0 0 0 0
Total 1714 80 80 205 185 -20
Nuclear Central 1500 0 0 0 0 0
Central 47205 0 655 0 1055 1055
State 4305 990 40 2025 855 -1170
Pvt 7629 0 300 3650 2173 -1477
Total 166545 990 4055 5675 31335 -25415
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Aug 2016
Thermal
2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016
Aug-16 April 16 - Aug 16Schemes Sector
Target
2016-17
91
0
80
0
99
0
32
55
80
0
40
55
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Aug 2016 Target
Achievement
54
70
20
5
0
56
75
29
49
18
5
0
31
34
0
1000
2000
3000
4000
5000
6000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Section A - Highlights of Power Sector Page
1 Electricity Generation for Aug 2016 (BU) 1
2 Generating Capacity Addition for Aug 2016 (MW) 2
3 List of Projects Commissioned in Aug 2016 3
4 All India Installed Capacity (MW) Region-wise as on 31082016 3
5 All India Installed Capacity (MW) Sector-wise as on 31082016 4
6 Transmission Lines Added during Aug 2016 (Ckms) 5
7 Transformation Capacity Addition during Aug 2016 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Aug 2016 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Aug 2016 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31082016
13 Average cost of Power amp Average Realisation
14 All India per capita consumption of Electricity (KWh)
15 All India Coal consumption for Power Generation (MT)
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Aug 2016 13
3 Installed Capacity in various Regions including their shares 14-19
1 Programme and Achievements of Transmission Lines in Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
1 Programme and Achievements of Sub-Stations in Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
1 Electricity Generation (MU) Targets and Achievements for 2015-16 22
1 Power Supply Position (Provisional) for Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since 2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA upto Aug 2016
1 Rate of sale of power for the year 2013-2014 33-41
Section H - Rate of sale of power for the year 2013-2014
Executive Summary for the Month of Aug 2016
32
11
20
21
31
Section B - Capacity Addition
Section C - Transmission Lines
Section D - Sub Stations
Section E - Electricity Generation
Section F - Power supply position
Contents
Section G - Growth of Power Sector
SN Contents Page
1 Electricity Generation for Aug 2016 (BU) 1
2 Generating Capacity Addition for Aug 2016 (MW) 2
3 List of Projects Commissioned in Aug 2016 3
4 All India Installed Capacity (MW) Region-wise as on 31082016 3
5 All India Installed Capacity (MW) Sector-wise as on 31082016 4
6 Transmission Lines Added during Aug 2016 (Ckms) 5
7 Transformation Capacity Addition during Aug 2016 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Aug 2016 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Aug 2016 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31082016
13 Average cost of Power amp Average Realisation
14 All India per capita consumption of Electricity (KWh)
15 All India Coal consumption for Power Generation (MT)
Section A - Highlights of Power Sector
11
Achievement
Aug-16
Thermal 72929
Hydro 17737
Nuclear 3515
Bhutan Import 1080
All India 95261 015
Type
Thermal
Hydro
Nuclear
Bhutan Import
All India
1
Electricity Generation During April 2015 to Aug 2015 amp April 2016 to Aug 2016 (BU)
17779
3273
Targets
373096 403856
15873
824
79677
Change
wrt 2015
95120
07060992
101204
Apr 15 - Aug 15 Apr 16 - Aug 16
67659
16269
Change
-243
306 -561
63652
569486441460266
3242
-592
2834
1 Electricity Generation for Aug 2016 (BU)
Aug-16Type
Achievement
Aug-15
17548
73515
95120
95261
95000
95050
95100
95150
95200
95250
95300
BU
Aug 15 Aug 16
460266486441
0000
100000
200000
300000
400000
500000
600000
BU
Apr 15 to Aug 15 Apr 16 to Aug 16
Achievement Targets Achievement
Aug-15
Thermal 871 910 3255 NA
Hydro 0 80 80 NA
Nuclear 0 0 0 NA
All India 871 990 4055 NA
Apr 15 - Aug 15 Apr 16 - Aug 16 Change
Thermal 3921 29485 -25
Hydro 730 185 -75
Nuclear 0 0 NA
All India 4651 31335 -33
2
2 Generating Capacity Addition for Aug 2016 (MW)
Generating Capacity Addition during April 15 to Aug 15 amp April 16 to Aug16 (MW)
Change wrt 2015TypeAug-16
871
4055
0
100
200
300
400
500
600
700
800
900
1000
1 Aug15 Aug 16
4651
31335
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
1Apr 15 to Aug 15 Apr 16 to Aug 16
(i) Thermal
Agartala Gas Based PP St-1 255 MW commissioned on 23082016
(ii) Hydro
(iii) Nuclear
NIL
Nuclear Hydro RES Grand Total
Region Coal Gas Diesel Total
Northern 4586450 555626 000 5142076 162000 1831178 878504 8013758
Western 7275301 1120341 000 8395642 184000 744750 1561300 10885691
Southern 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
Eastern 3062287 10000 000 3072287 000 436912 51939 3561138
North-East 31000 172380 3600 206980 000 124200 26372 357552
Islands 000 000 4005 4005 000 000 1110 5115
ALL INDIA 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Note Captive Genaration is not included in the total 3
Thermal
3 List of Projects Commissioned During Aug 2016
Teesta low dame stage IV U-4 40 MW Commissioned on 11082016
Lower Jurala U-5 40 MW commissioned on 20082016
4 All India Installed Capacity (MW) Region-wise as on 31082016
Nawapara U-1 300 MW commissioned on 14082016
21256890
578000
4296843 4423692
30555425
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 30555425
Sector
Coal Gas Diesel Total
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
All India 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
State 10194593
Private 12729606
Central 7631226
RES
5 All India Installed Capacity (MW) Sector-wise as on 31082016
4
Grand TotalTHERMAL
Nuclear Hydro
State 10194593 33
Private 12729606 42
Central 7631226 25
All India Installed Capacity(MW) as on 31-08-2016 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
9117
0
Apr 15 - Aug 15
1583
4340
3318
9241
4134
0 0
6 Transmission Lines Added during Aug 2016 (Ckms)
2835
1480
3051
669
2455
2148
Transmission Lines Added during Apr 15 to Aug 15 amp Apr 16 to Aug16 (Ckms)
Aug-16
0
Aug-15
0
Apr 16 - Aug 16
0
1190
596
181
1390
0 0
9117
9241
9000
9050
9100
9150
9200
9250
9300
ck
ms
Apr 15 to Aug15 Apr 16 to Aug16
2455
3051
0
500
1000
1500
2000
2500
3000
3500
1
ckm
s
Aug 15 Aug 16
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1760
1500
7 Transformation Capacity Addition During Aug 2016 (MVA)
4760
0
1500
945
1110
0 1500
3940
8540
0
Aug-15 Aug-16
April 15 to Aug 15 April 16 to Aug 16
3555
0
0
0 1500
All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr
16 to Aug 16 (MVA)
27435
0
9000
10835
6100
24480
12000
3555
4760
0500
100015002000250030003500400045005000
MV
A
Transformation Capacity Addition during Aug 2016
Aug 15 Aug16
24480
27435
24000
1
MV
A
Apr 15 to Aug 15 Apr 16 to Aug 16
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16
Northern 32831 31913 31055 31481 -54 -14
Western 27625 27283 27556 27277 -02 00
Southern 24488 26487 23995 26473 -20 -01
Eastern 11187 11230 11132 11221 -05 -01
North Eastern 1297 1461 1221 1421 -59 -28
All India 97428 98374 94959 97873 -25 -05
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16
Northern 54474 50917 50230 48541 -78 -47
Western 42024 40122 41781 39903 -06 -05
Southern 37136 41168 35892 40526 -33 -16
Eastern 17363 18334 17149 18219 -12 -06
North Eastern 2437 2435 2283 2387 -63 -20
All India 149492 151719 146124 148347 -23 -22
7
Region
Power (MW)
8 Power Supply Position (Energy amp Peak) in Aug 2016
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand
Aug 15 0 0 0 0 339 0 0 3943 75
Aug 16 0 0 0 0 359 0 0 924 75
p
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Aug 15 128 31 7 124 0 0 37
Aug 16 21 0 0 13 0 0 2
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Aug 15 0 14 564 151 106 1 0
Aug 16 3 14 76 3 6 3 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
35
9
0 0
92
4
75
0 0 0 0
33
9
0 0
39
43
75
0400800
120016002000240028003200360040004400
Ch
and
iga
rh
De
lhi
Ha
rya
na
HP
Jamp
K
Pun
jab
Ra
jasth
an
UP
Utr
akh
an
d
MW
Northern States (MW)Aug 16 Aug 15
21
0 0
13
0 0 2
128
31
7
124
0 0
37
0
20
40
60
80
100
120
140
Cha
ttis
garh
Gu
jara
t
MP
Mahara
shtr
a
Dam
an amp
Diu
Dad
ar
Na
gar
Haveli G
oa
MW
Western States (MW)Aug 16 Aug 15
3 14 7
6
3 6 3 00 14
564
151
106
1
0
1000
AP
Tele
nga
na
Karn
ata
ka
Kera
la
Tam
il N
ad
u
Pud
uch
err
y
La
ksh
yad
ee
p
MW
Southern States (MW) Aug16 Aug 15
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Aug 15 160 30 25 18 42 0 8
Aug 16 0 100 0 0 19 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Aug 15 1 82 2 0 1 1 1
Aug 16 8 28 0 0 2 1 0
9
0
100
0 0
19
0 8
160
30
25
18
42
0 8
020406080
100120140160180
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Aug 16 Aug15
8
28
0 0 2 1 01
82
2 0 1 1 10
102030405060708090
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pu
ra
MW
North-Eastern States (MW) Aug 16 Aug 15
Sector Aug 15 Aug 16
Central 6925 6620
State 4965 4009
Private 5633 5117
ALL INDIA 5810 5203
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6363
October 6686
November 6034
December 6175
January 6320
February 6495
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Aug 2016
69
25
49
65
56
33
58
10
662
0
400
9
511
7
520
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016
+Aug15 Aug16
62
05
64
16
59
43
58
36
58
10
63
63
66
86
60
34
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumersP Provisional
Total Number of Villages
597464
Pump sets
Energised as on
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
NotIncludin
g Subsidiy
booked
Only
Agriculture
2013-14 400 175
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Provisional
11
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should
be obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the
village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA
is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data
As such each monthly report of Village electrification of CEA is independent of the earlier published
reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31072016
Villiages Electrified (Nos) as on 310816
9810589068
Villages electrified
15 All India Coal consumption for Power Generation (MT)
515
14 All India per capita consumption of Electricity ( KWh)
Realization(paiseunit)
20550647
Pump sets Energised as on 31-08-16
cost of supply (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1266360 1932910 5113550 8312820
Hydro 258402 81700 59500 399602
Nuclear 100000 000 000 100000
Total 1624762 2014610 5173050 8812422
Acievement 6206 12972 11048 9953
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Aug 2016
Achievements upto Aug 2016 during the 12th Plan
723
400
0
108
970
0
53
000
0
831
282
0
39
960
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 8812422 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 255 0 255 255
State 3910 910 0 1820 750 -1070
Pvt 6800 0 300 3650 2173 -1477
Total 134405 910 3255 5470 29485 -25215
Central 490 0 40 0 80 80
State 395 80 40 205 105 -100
Pvt 829 0 0 0 0 0
Total 1714 80 80 205 185 -20
Nuclear Central 1500 0 0 0 0 0
Central 47205 0 655 0 1055 1055
State 4305 990 40 2025 855 -1170
Pvt 7629 0 300 3650 2173 -1477
Total 166545 990 4055 5675 31335 -25415
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Aug 2016
Thermal
2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016
Aug-16 April 16 - Aug 16Schemes Sector
Target
2016-17
91
0
80
0
99
0
32
55
80
0
40
55
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Aug 2016 Target
Achievement
54
70
20
5
0
56
75
29
49
18
5
0
31
34
0
1000
2000
3000
4000
5000
6000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Contents Page
1 Electricity Generation for Aug 2016 (BU) 1
2 Generating Capacity Addition for Aug 2016 (MW) 2
3 List of Projects Commissioned in Aug 2016 3
4 All India Installed Capacity (MW) Region-wise as on 31082016 3
5 All India Installed Capacity (MW) Sector-wise as on 31082016 4
6 Transmission Lines Added during Aug 2016 (Ckms) 5
7 Transformation Capacity Addition during Aug 2016 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Aug 2016 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Aug 2016 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31082016
13 Average cost of Power amp Average Realisation
14 All India per capita consumption of Electricity (KWh)
15 All India Coal consumption for Power Generation (MT)
Section A - Highlights of Power Sector
11
Achievement
Aug-16
Thermal 72929
Hydro 17737
Nuclear 3515
Bhutan Import 1080
All India 95261 015
Type
Thermal
Hydro
Nuclear
Bhutan Import
All India
1
Electricity Generation During April 2015 to Aug 2015 amp April 2016 to Aug 2016 (BU)
17779
3273
Targets
373096 403856
15873
824
79677
Change
wrt 2015
95120
07060992
101204
Apr 15 - Aug 15 Apr 16 - Aug 16
67659
16269
Change
-243
306 -561
63652
569486441460266
3242
-592
2834
1 Electricity Generation for Aug 2016 (BU)
Aug-16Type
Achievement
Aug-15
17548
73515
95120
95261
95000
95050
95100
95150
95200
95250
95300
BU
Aug 15 Aug 16
460266486441
0000
100000
200000
300000
400000
500000
600000
BU
Apr 15 to Aug 15 Apr 16 to Aug 16
Achievement Targets Achievement
Aug-15
Thermal 871 910 3255 NA
Hydro 0 80 80 NA
Nuclear 0 0 0 NA
All India 871 990 4055 NA
Apr 15 - Aug 15 Apr 16 - Aug 16 Change
Thermal 3921 29485 -25
Hydro 730 185 -75
Nuclear 0 0 NA
All India 4651 31335 -33
2
2 Generating Capacity Addition for Aug 2016 (MW)
Generating Capacity Addition during April 15 to Aug 15 amp April 16 to Aug16 (MW)
Change wrt 2015TypeAug-16
871
4055
0
100
200
300
400
500
600
700
800
900
1000
1 Aug15 Aug 16
4651
31335
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
1Apr 15 to Aug 15 Apr 16 to Aug 16
(i) Thermal
Agartala Gas Based PP St-1 255 MW commissioned on 23082016
(ii) Hydro
(iii) Nuclear
NIL
Nuclear Hydro RES Grand Total
Region Coal Gas Diesel Total
Northern 4586450 555626 000 5142076 162000 1831178 878504 8013758
Western 7275301 1120341 000 8395642 184000 744750 1561300 10885691
Southern 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
Eastern 3062287 10000 000 3072287 000 436912 51939 3561138
North-East 31000 172380 3600 206980 000 124200 26372 357552
Islands 000 000 4005 4005 000 000 1110 5115
ALL INDIA 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Note Captive Genaration is not included in the total 3
Thermal
3 List of Projects Commissioned During Aug 2016
Teesta low dame stage IV U-4 40 MW Commissioned on 11082016
Lower Jurala U-5 40 MW commissioned on 20082016
4 All India Installed Capacity (MW) Region-wise as on 31082016
Nawapara U-1 300 MW commissioned on 14082016
21256890
578000
4296843 4423692
30555425
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 30555425
Sector
Coal Gas Diesel Total
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
All India 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
State 10194593
Private 12729606
Central 7631226
RES
5 All India Installed Capacity (MW) Sector-wise as on 31082016
4
Grand TotalTHERMAL
Nuclear Hydro
State 10194593 33
Private 12729606 42
Central 7631226 25
All India Installed Capacity(MW) as on 31-08-2016 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
9117
0
Apr 15 - Aug 15
1583
4340
3318
9241
4134
0 0
6 Transmission Lines Added during Aug 2016 (Ckms)
2835
1480
3051
669
2455
2148
Transmission Lines Added during Apr 15 to Aug 15 amp Apr 16 to Aug16 (Ckms)
Aug-16
0
Aug-15
0
Apr 16 - Aug 16
0
1190
596
181
1390
0 0
9117
9241
9000
9050
9100
9150
9200
9250
9300
ck
ms
Apr 15 to Aug15 Apr 16 to Aug16
2455
3051
0
500
1000
1500
2000
2500
3000
3500
1
ckm
s
Aug 15 Aug 16
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1760
1500
7 Transformation Capacity Addition During Aug 2016 (MVA)
4760
0
1500
945
1110
0 1500
3940
8540
0
Aug-15 Aug-16
April 15 to Aug 15 April 16 to Aug 16
3555
0
0
0 1500
All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr
16 to Aug 16 (MVA)
27435
0
9000
10835
6100
24480
12000
3555
4760
0500
100015002000250030003500400045005000
MV
A
Transformation Capacity Addition during Aug 2016
Aug 15 Aug16
24480
27435
24000
1
MV
A
Apr 15 to Aug 15 Apr 16 to Aug 16
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16
Northern 32831 31913 31055 31481 -54 -14
Western 27625 27283 27556 27277 -02 00
Southern 24488 26487 23995 26473 -20 -01
Eastern 11187 11230 11132 11221 -05 -01
North Eastern 1297 1461 1221 1421 -59 -28
All India 97428 98374 94959 97873 -25 -05
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16
Northern 54474 50917 50230 48541 -78 -47
Western 42024 40122 41781 39903 -06 -05
Southern 37136 41168 35892 40526 -33 -16
Eastern 17363 18334 17149 18219 -12 -06
North Eastern 2437 2435 2283 2387 -63 -20
All India 149492 151719 146124 148347 -23 -22
7
Region
Power (MW)
8 Power Supply Position (Energy amp Peak) in Aug 2016
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand
Aug 15 0 0 0 0 339 0 0 3943 75
Aug 16 0 0 0 0 359 0 0 924 75
p
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Aug 15 128 31 7 124 0 0 37
Aug 16 21 0 0 13 0 0 2
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Aug 15 0 14 564 151 106 1 0
Aug 16 3 14 76 3 6 3 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
35
9
0 0
92
4
75
0 0 0 0
33
9
0 0
39
43
75
0400800
120016002000240028003200360040004400
Ch
and
iga
rh
De
lhi
Ha
rya
na
HP
Jamp
K
Pun
jab
Ra
jasth
an
UP
Utr
akh
an
d
MW
Northern States (MW)Aug 16 Aug 15
21
0 0
13
0 0 2
128
31
7
124
0 0
37
0
20
40
60
80
100
120
140
Cha
ttis
garh
Gu
jara
t
MP
Mahara
shtr
a
Dam
an amp
Diu
Dad
ar
Na
gar
Haveli G
oa
MW
Western States (MW)Aug 16 Aug 15
3 14 7
6
3 6 3 00 14
564
151
106
1
0
1000
AP
Tele
nga
na
Karn
ata
ka
Kera
la
Tam
il N
ad
u
Pud
uch
err
y
La
ksh
yad
ee
p
MW
Southern States (MW) Aug16 Aug 15
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Aug 15 160 30 25 18 42 0 8
Aug 16 0 100 0 0 19 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Aug 15 1 82 2 0 1 1 1
Aug 16 8 28 0 0 2 1 0
9
0
100
0 0
19
0 8
160
30
25
18
42
0 8
020406080
100120140160180
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Aug 16 Aug15
8
28
0 0 2 1 01
82
2 0 1 1 10
102030405060708090
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pu
ra
MW
North-Eastern States (MW) Aug 16 Aug 15
Sector Aug 15 Aug 16
Central 6925 6620
State 4965 4009
Private 5633 5117
ALL INDIA 5810 5203
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6363
October 6686
November 6034
December 6175
January 6320
February 6495
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Aug 2016
69
25
49
65
56
33
58
10
662
0
400
9
511
7
520
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016
+Aug15 Aug16
62
05
64
16
59
43
58
36
58
10
63
63
66
86
60
34
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumersP Provisional
Total Number of Villages
597464
Pump sets
Energised as on
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
NotIncludin
g Subsidiy
booked
Only
Agriculture
2013-14 400 175
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Provisional
11
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should
be obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the
village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA
is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data
As such each monthly report of Village electrification of CEA is independent of the earlier published
reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31072016
Villiages Electrified (Nos) as on 310816
9810589068
Villages electrified
15 All India Coal consumption for Power Generation (MT)
515
14 All India per capita consumption of Electricity ( KWh)
Realization(paiseunit)
20550647
Pump sets Energised as on 31-08-16
cost of supply (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1266360 1932910 5113550 8312820
Hydro 258402 81700 59500 399602
Nuclear 100000 000 000 100000
Total 1624762 2014610 5173050 8812422
Acievement 6206 12972 11048 9953
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Aug 2016
Achievements upto Aug 2016 during the 12th Plan
723
400
0
108
970
0
53
000
0
831
282
0
39
960
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 8812422 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 255 0 255 255
State 3910 910 0 1820 750 -1070
Pvt 6800 0 300 3650 2173 -1477
Total 134405 910 3255 5470 29485 -25215
Central 490 0 40 0 80 80
State 395 80 40 205 105 -100
Pvt 829 0 0 0 0 0
Total 1714 80 80 205 185 -20
Nuclear Central 1500 0 0 0 0 0
Central 47205 0 655 0 1055 1055
State 4305 990 40 2025 855 -1170
Pvt 7629 0 300 3650 2173 -1477
Total 166545 990 4055 5675 31335 -25415
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Aug 2016
Thermal
2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016
Aug-16 April 16 - Aug 16Schemes Sector
Target
2016-17
91
0
80
0
99
0
32
55
80
0
40
55
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Aug 2016 Target
Achievement
54
70
20
5
0
56
75
29
49
18
5
0
31
34
0
1000
2000
3000
4000
5000
6000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Achievement
Aug-16
Thermal 72929
Hydro 17737
Nuclear 3515
Bhutan Import 1080
All India 95261 015
Type
Thermal
Hydro
Nuclear
Bhutan Import
All India
1
Electricity Generation During April 2015 to Aug 2015 amp April 2016 to Aug 2016 (BU)
17779
3273
Targets
373096 403856
15873
824
79677
Change
wrt 2015
95120
07060992
101204
Apr 15 - Aug 15 Apr 16 - Aug 16
67659
16269
Change
-243
306 -561
63652
569486441460266
3242
-592
2834
1 Electricity Generation for Aug 2016 (BU)
Aug-16Type
Achievement
Aug-15
17548
73515
95120
95261
95000
95050
95100
95150
95200
95250
95300
BU
Aug 15 Aug 16
460266486441
0000
100000
200000
300000
400000
500000
600000
BU
Apr 15 to Aug 15 Apr 16 to Aug 16
Achievement Targets Achievement
Aug-15
Thermal 871 910 3255 NA
Hydro 0 80 80 NA
Nuclear 0 0 0 NA
All India 871 990 4055 NA
Apr 15 - Aug 15 Apr 16 - Aug 16 Change
Thermal 3921 29485 -25
Hydro 730 185 -75
Nuclear 0 0 NA
All India 4651 31335 -33
2
2 Generating Capacity Addition for Aug 2016 (MW)
Generating Capacity Addition during April 15 to Aug 15 amp April 16 to Aug16 (MW)
Change wrt 2015TypeAug-16
871
4055
0
100
200
300
400
500
600
700
800
900
1000
1 Aug15 Aug 16
4651
31335
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
1Apr 15 to Aug 15 Apr 16 to Aug 16
(i) Thermal
Agartala Gas Based PP St-1 255 MW commissioned on 23082016
(ii) Hydro
(iii) Nuclear
NIL
Nuclear Hydro RES Grand Total
Region Coal Gas Diesel Total
Northern 4586450 555626 000 5142076 162000 1831178 878504 8013758
Western 7275301 1120341 000 8395642 184000 744750 1561300 10885691
Southern 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
Eastern 3062287 10000 000 3072287 000 436912 51939 3561138
North-East 31000 172380 3600 206980 000 124200 26372 357552
Islands 000 000 4005 4005 000 000 1110 5115
ALL INDIA 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Note Captive Genaration is not included in the total 3
Thermal
3 List of Projects Commissioned During Aug 2016
Teesta low dame stage IV U-4 40 MW Commissioned on 11082016
Lower Jurala U-5 40 MW commissioned on 20082016
4 All India Installed Capacity (MW) Region-wise as on 31082016
Nawapara U-1 300 MW commissioned on 14082016
21256890
578000
4296843 4423692
30555425
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 30555425
Sector
Coal Gas Diesel Total
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
All India 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
State 10194593
Private 12729606
Central 7631226
RES
5 All India Installed Capacity (MW) Sector-wise as on 31082016
4
Grand TotalTHERMAL
Nuclear Hydro
State 10194593 33
Private 12729606 42
Central 7631226 25
All India Installed Capacity(MW) as on 31-08-2016 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
9117
0
Apr 15 - Aug 15
1583
4340
3318
9241
4134
0 0
6 Transmission Lines Added during Aug 2016 (Ckms)
2835
1480
3051
669
2455
2148
Transmission Lines Added during Apr 15 to Aug 15 amp Apr 16 to Aug16 (Ckms)
Aug-16
0
Aug-15
0
Apr 16 - Aug 16
0
1190
596
181
1390
0 0
9117
9241
9000
9050
9100
9150
9200
9250
9300
ck
ms
Apr 15 to Aug15 Apr 16 to Aug16
2455
3051
0
500
1000
1500
2000
2500
3000
3500
1
ckm
s
Aug 15 Aug 16
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1760
1500
7 Transformation Capacity Addition During Aug 2016 (MVA)
4760
0
1500
945
1110
0 1500
3940
8540
0
Aug-15 Aug-16
April 15 to Aug 15 April 16 to Aug 16
3555
0
0
0 1500
All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr
16 to Aug 16 (MVA)
27435
0
9000
10835
6100
24480
12000
3555
4760
0500
100015002000250030003500400045005000
MV
A
Transformation Capacity Addition during Aug 2016
Aug 15 Aug16
24480
27435
24000
1
MV
A
Apr 15 to Aug 15 Apr 16 to Aug 16
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16
Northern 32831 31913 31055 31481 -54 -14
Western 27625 27283 27556 27277 -02 00
Southern 24488 26487 23995 26473 -20 -01
Eastern 11187 11230 11132 11221 -05 -01
North Eastern 1297 1461 1221 1421 -59 -28
All India 97428 98374 94959 97873 -25 -05
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16
Northern 54474 50917 50230 48541 -78 -47
Western 42024 40122 41781 39903 -06 -05
Southern 37136 41168 35892 40526 -33 -16
Eastern 17363 18334 17149 18219 -12 -06
North Eastern 2437 2435 2283 2387 -63 -20
All India 149492 151719 146124 148347 -23 -22
7
Region
Power (MW)
8 Power Supply Position (Energy amp Peak) in Aug 2016
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand
Aug 15 0 0 0 0 339 0 0 3943 75
Aug 16 0 0 0 0 359 0 0 924 75
p
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Aug 15 128 31 7 124 0 0 37
Aug 16 21 0 0 13 0 0 2
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Aug 15 0 14 564 151 106 1 0
Aug 16 3 14 76 3 6 3 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
35
9
0 0
92
4
75
0 0 0 0
33
9
0 0
39
43
75
0400800
120016002000240028003200360040004400
Ch
and
iga
rh
De
lhi
Ha
rya
na
HP
Jamp
K
Pun
jab
Ra
jasth
an
UP
Utr
akh
an
d
MW
Northern States (MW)Aug 16 Aug 15
21
0 0
13
0 0 2
128
31
7
124
0 0
37
0
20
40
60
80
100
120
140
Cha
ttis
garh
Gu
jara
t
MP
Mahara
shtr
a
Dam
an amp
Diu
Dad
ar
Na
gar
Haveli G
oa
MW
Western States (MW)Aug 16 Aug 15
3 14 7
6
3 6 3 00 14
564
151
106
1
0
1000
AP
Tele
nga
na
Karn
ata
ka
Kera
la
Tam
il N
ad
u
Pud
uch
err
y
La
ksh
yad
ee
p
MW
Southern States (MW) Aug16 Aug 15
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Aug 15 160 30 25 18 42 0 8
Aug 16 0 100 0 0 19 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Aug 15 1 82 2 0 1 1 1
Aug 16 8 28 0 0 2 1 0
9
0
100
0 0
19
0 8
160
30
25
18
42
0 8
020406080
100120140160180
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Aug 16 Aug15
8
28
0 0 2 1 01
82
2 0 1 1 10
102030405060708090
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pu
ra
MW
North-Eastern States (MW) Aug 16 Aug 15
Sector Aug 15 Aug 16
Central 6925 6620
State 4965 4009
Private 5633 5117
ALL INDIA 5810 5203
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6363
October 6686
November 6034
December 6175
January 6320
February 6495
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Aug 2016
69
25
49
65
56
33
58
10
662
0
400
9
511
7
520
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016
+Aug15 Aug16
62
05
64
16
59
43
58
36
58
10
63
63
66
86
60
34
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumersP Provisional
Total Number of Villages
597464
Pump sets
Energised as on
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
NotIncludin
g Subsidiy
booked
Only
Agriculture
2013-14 400 175
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Provisional
11
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should
be obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the
village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA
is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data
As such each monthly report of Village electrification of CEA is independent of the earlier published
reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31072016
Villiages Electrified (Nos) as on 310816
9810589068
Villages electrified
15 All India Coal consumption for Power Generation (MT)
515
14 All India per capita consumption of Electricity ( KWh)
Realization(paiseunit)
20550647
Pump sets Energised as on 31-08-16
cost of supply (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1266360 1932910 5113550 8312820
Hydro 258402 81700 59500 399602
Nuclear 100000 000 000 100000
Total 1624762 2014610 5173050 8812422
Acievement 6206 12972 11048 9953
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Aug 2016
Achievements upto Aug 2016 during the 12th Plan
723
400
0
108
970
0
53
000
0
831
282
0
39
960
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 8812422 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 255 0 255 255
State 3910 910 0 1820 750 -1070
Pvt 6800 0 300 3650 2173 -1477
Total 134405 910 3255 5470 29485 -25215
Central 490 0 40 0 80 80
State 395 80 40 205 105 -100
Pvt 829 0 0 0 0 0
Total 1714 80 80 205 185 -20
Nuclear Central 1500 0 0 0 0 0
Central 47205 0 655 0 1055 1055
State 4305 990 40 2025 855 -1170
Pvt 7629 0 300 3650 2173 -1477
Total 166545 990 4055 5675 31335 -25415
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Aug 2016
Thermal
2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016
Aug-16 April 16 - Aug 16Schemes Sector
Target
2016-17
91
0
80
0
99
0
32
55
80
0
40
55
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Aug 2016 Target
Achievement
54
70
20
5
0
56
75
29
49
18
5
0
31
34
0
1000
2000
3000
4000
5000
6000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Achievement Targets Achievement
Aug-15
Thermal 871 910 3255 NA
Hydro 0 80 80 NA
Nuclear 0 0 0 NA
All India 871 990 4055 NA
Apr 15 - Aug 15 Apr 16 - Aug 16 Change
Thermal 3921 29485 -25
Hydro 730 185 -75
Nuclear 0 0 NA
All India 4651 31335 -33
2
2 Generating Capacity Addition for Aug 2016 (MW)
Generating Capacity Addition during April 15 to Aug 15 amp April 16 to Aug16 (MW)
Change wrt 2015TypeAug-16
871
4055
0
100
200
300
400
500
600
700
800
900
1000
1 Aug15 Aug 16
4651
31335
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
1Apr 15 to Aug 15 Apr 16 to Aug 16
(i) Thermal
Agartala Gas Based PP St-1 255 MW commissioned on 23082016
(ii) Hydro
(iii) Nuclear
NIL
Nuclear Hydro RES Grand Total
Region Coal Gas Diesel Total
Northern 4586450 555626 000 5142076 162000 1831178 878504 8013758
Western 7275301 1120341 000 8395642 184000 744750 1561300 10885691
Southern 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
Eastern 3062287 10000 000 3072287 000 436912 51939 3561138
North-East 31000 172380 3600 206980 000 124200 26372 357552
Islands 000 000 4005 4005 000 000 1110 5115
ALL INDIA 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Note Captive Genaration is not included in the total 3
Thermal
3 List of Projects Commissioned During Aug 2016
Teesta low dame stage IV U-4 40 MW Commissioned on 11082016
Lower Jurala U-5 40 MW commissioned on 20082016
4 All India Installed Capacity (MW) Region-wise as on 31082016
Nawapara U-1 300 MW commissioned on 14082016
21256890
578000
4296843 4423692
30555425
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 30555425
Sector
Coal Gas Diesel Total
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
All India 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
State 10194593
Private 12729606
Central 7631226
RES
5 All India Installed Capacity (MW) Sector-wise as on 31082016
4
Grand TotalTHERMAL
Nuclear Hydro
State 10194593 33
Private 12729606 42
Central 7631226 25
All India Installed Capacity(MW) as on 31-08-2016 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
9117
0
Apr 15 - Aug 15
1583
4340
3318
9241
4134
0 0
6 Transmission Lines Added during Aug 2016 (Ckms)
2835
1480
3051
669
2455
2148
Transmission Lines Added during Apr 15 to Aug 15 amp Apr 16 to Aug16 (Ckms)
Aug-16
0
Aug-15
0
Apr 16 - Aug 16
0
1190
596
181
1390
0 0
9117
9241
9000
9050
9100
9150
9200
9250
9300
ck
ms
Apr 15 to Aug15 Apr 16 to Aug16
2455
3051
0
500
1000
1500
2000
2500
3000
3500
1
ckm
s
Aug 15 Aug 16
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1760
1500
7 Transformation Capacity Addition During Aug 2016 (MVA)
4760
0
1500
945
1110
0 1500
3940
8540
0
Aug-15 Aug-16
April 15 to Aug 15 April 16 to Aug 16
3555
0
0
0 1500
All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr
16 to Aug 16 (MVA)
27435
0
9000
10835
6100
24480
12000
3555
4760
0500
100015002000250030003500400045005000
MV
A
Transformation Capacity Addition during Aug 2016
Aug 15 Aug16
24480
27435
24000
1
MV
A
Apr 15 to Aug 15 Apr 16 to Aug 16
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16
Northern 32831 31913 31055 31481 -54 -14
Western 27625 27283 27556 27277 -02 00
Southern 24488 26487 23995 26473 -20 -01
Eastern 11187 11230 11132 11221 -05 -01
North Eastern 1297 1461 1221 1421 -59 -28
All India 97428 98374 94959 97873 -25 -05
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16
Northern 54474 50917 50230 48541 -78 -47
Western 42024 40122 41781 39903 -06 -05
Southern 37136 41168 35892 40526 -33 -16
Eastern 17363 18334 17149 18219 -12 -06
North Eastern 2437 2435 2283 2387 -63 -20
All India 149492 151719 146124 148347 -23 -22
7
Region
Power (MW)
8 Power Supply Position (Energy amp Peak) in Aug 2016
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand
Aug 15 0 0 0 0 339 0 0 3943 75
Aug 16 0 0 0 0 359 0 0 924 75
p
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Aug 15 128 31 7 124 0 0 37
Aug 16 21 0 0 13 0 0 2
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Aug 15 0 14 564 151 106 1 0
Aug 16 3 14 76 3 6 3 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
35
9
0 0
92
4
75
0 0 0 0
33
9
0 0
39
43
75
0400800
120016002000240028003200360040004400
Ch
and
iga
rh
De
lhi
Ha
rya
na
HP
Jamp
K
Pun
jab
Ra
jasth
an
UP
Utr
akh
an
d
MW
Northern States (MW)Aug 16 Aug 15
21
0 0
13
0 0 2
128
31
7
124
0 0
37
0
20
40
60
80
100
120
140
Cha
ttis
garh
Gu
jara
t
MP
Mahara
shtr
a
Dam
an amp
Diu
Dad
ar
Na
gar
Haveli G
oa
MW
Western States (MW)Aug 16 Aug 15
3 14 7
6
3 6 3 00 14
564
151
106
1
0
1000
AP
Tele
nga
na
Karn
ata
ka
Kera
la
Tam
il N
ad
u
Pud
uch
err
y
La
ksh
yad
ee
p
MW
Southern States (MW) Aug16 Aug 15
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Aug 15 160 30 25 18 42 0 8
Aug 16 0 100 0 0 19 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Aug 15 1 82 2 0 1 1 1
Aug 16 8 28 0 0 2 1 0
9
0
100
0 0
19
0 8
160
30
25
18
42
0 8
020406080
100120140160180
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Aug 16 Aug15
8
28
0 0 2 1 01
82
2 0 1 1 10
102030405060708090
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pu
ra
MW
North-Eastern States (MW) Aug 16 Aug 15
Sector Aug 15 Aug 16
Central 6925 6620
State 4965 4009
Private 5633 5117
ALL INDIA 5810 5203
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6363
October 6686
November 6034
December 6175
January 6320
February 6495
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Aug 2016
69
25
49
65
56
33
58
10
662
0
400
9
511
7
520
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016
+Aug15 Aug16
62
05
64
16
59
43
58
36
58
10
63
63
66
86
60
34
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumersP Provisional
Total Number of Villages
597464
Pump sets
Energised as on
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
NotIncludin
g Subsidiy
booked
Only
Agriculture
2013-14 400 175
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Provisional
11
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should
be obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the
village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA
is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data
As such each monthly report of Village electrification of CEA is independent of the earlier published
reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31072016
Villiages Electrified (Nos) as on 310816
9810589068
Villages electrified
15 All India Coal consumption for Power Generation (MT)
515
14 All India per capita consumption of Electricity ( KWh)
Realization(paiseunit)
20550647
Pump sets Energised as on 31-08-16
cost of supply (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1266360 1932910 5113550 8312820
Hydro 258402 81700 59500 399602
Nuclear 100000 000 000 100000
Total 1624762 2014610 5173050 8812422
Acievement 6206 12972 11048 9953
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Aug 2016
Achievements upto Aug 2016 during the 12th Plan
723
400
0
108
970
0
53
000
0
831
282
0
39
960
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 8812422 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 255 0 255 255
State 3910 910 0 1820 750 -1070
Pvt 6800 0 300 3650 2173 -1477
Total 134405 910 3255 5470 29485 -25215
Central 490 0 40 0 80 80
State 395 80 40 205 105 -100
Pvt 829 0 0 0 0 0
Total 1714 80 80 205 185 -20
Nuclear Central 1500 0 0 0 0 0
Central 47205 0 655 0 1055 1055
State 4305 990 40 2025 855 -1170
Pvt 7629 0 300 3650 2173 -1477
Total 166545 990 4055 5675 31335 -25415
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Aug 2016
Thermal
2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016
Aug-16 April 16 - Aug 16Schemes Sector
Target
2016-17
91
0
80
0
99
0
32
55
80
0
40
55
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Aug 2016 Target
Achievement
54
70
20
5
0
56
75
29
49
18
5
0
31
34
0
1000
2000
3000
4000
5000
6000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
(i) Thermal
Agartala Gas Based PP St-1 255 MW commissioned on 23082016
(ii) Hydro
(iii) Nuclear
NIL
Nuclear Hydro RES Grand Total
Region Coal Gas Diesel Total
Northern 4586450 555626 000 5142076 162000 1831178 878504 8013758
Western 7275301 1120341 000 8395642 184000 744750 1561300 10885691
Southern 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
Eastern 3062287 10000 000 3072287 000 436912 51939 3561138
North-East 31000 172380 3600 206980 000 124200 26372 357552
Islands 000 000 4005 4005 000 000 1110 5115
ALL INDIA 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Note Captive Genaration is not included in the total 3
Thermal
3 List of Projects Commissioned During Aug 2016
Teesta low dame stage IV U-4 40 MW Commissioned on 11082016
Lower Jurala U-5 40 MW commissioned on 20082016
4 All India Installed Capacity (MW) Region-wise as on 31082016
Nawapara U-1 300 MW commissioned on 14082016
21256890
578000
4296843 4423692
30555425
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 30555425
Sector
Coal Gas Diesel Total
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
All India 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
State 10194593
Private 12729606
Central 7631226
RES
5 All India Installed Capacity (MW) Sector-wise as on 31082016
4
Grand TotalTHERMAL
Nuclear Hydro
State 10194593 33
Private 12729606 42
Central 7631226 25
All India Installed Capacity(MW) as on 31-08-2016 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
9117
0
Apr 15 - Aug 15
1583
4340
3318
9241
4134
0 0
6 Transmission Lines Added during Aug 2016 (Ckms)
2835
1480
3051
669
2455
2148
Transmission Lines Added during Apr 15 to Aug 15 amp Apr 16 to Aug16 (Ckms)
Aug-16
0
Aug-15
0
Apr 16 - Aug 16
0
1190
596
181
1390
0 0
9117
9241
9000
9050
9100
9150
9200
9250
9300
ck
ms
Apr 15 to Aug15 Apr 16 to Aug16
2455
3051
0
500
1000
1500
2000
2500
3000
3500
1
ckm
s
Aug 15 Aug 16
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1760
1500
7 Transformation Capacity Addition During Aug 2016 (MVA)
4760
0
1500
945
1110
0 1500
3940
8540
0
Aug-15 Aug-16
April 15 to Aug 15 April 16 to Aug 16
3555
0
0
0 1500
All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr
16 to Aug 16 (MVA)
27435
0
9000
10835
6100
24480
12000
3555
4760
0500
100015002000250030003500400045005000
MV
A
Transformation Capacity Addition during Aug 2016
Aug 15 Aug16
24480
27435
24000
1
MV
A
Apr 15 to Aug 15 Apr 16 to Aug 16
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16
Northern 32831 31913 31055 31481 -54 -14
Western 27625 27283 27556 27277 -02 00
Southern 24488 26487 23995 26473 -20 -01
Eastern 11187 11230 11132 11221 -05 -01
North Eastern 1297 1461 1221 1421 -59 -28
All India 97428 98374 94959 97873 -25 -05
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16
Northern 54474 50917 50230 48541 -78 -47
Western 42024 40122 41781 39903 -06 -05
Southern 37136 41168 35892 40526 -33 -16
Eastern 17363 18334 17149 18219 -12 -06
North Eastern 2437 2435 2283 2387 -63 -20
All India 149492 151719 146124 148347 -23 -22
7
Region
Power (MW)
8 Power Supply Position (Energy amp Peak) in Aug 2016
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand
Aug 15 0 0 0 0 339 0 0 3943 75
Aug 16 0 0 0 0 359 0 0 924 75
p
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Aug 15 128 31 7 124 0 0 37
Aug 16 21 0 0 13 0 0 2
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Aug 15 0 14 564 151 106 1 0
Aug 16 3 14 76 3 6 3 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
35
9
0 0
92
4
75
0 0 0 0
33
9
0 0
39
43
75
0400800
120016002000240028003200360040004400
Ch
and
iga
rh
De
lhi
Ha
rya
na
HP
Jamp
K
Pun
jab
Ra
jasth
an
UP
Utr
akh
an
d
MW
Northern States (MW)Aug 16 Aug 15
21
0 0
13
0 0 2
128
31
7
124
0 0
37
0
20
40
60
80
100
120
140
Cha
ttis
garh
Gu
jara
t
MP
Mahara
shtr
a
Dam
an amp
Diu
Dad
ar
Na
gar
Haveli G
oa
MW
Western States (MW)Aug 16 Aug 15
3 14 7
6
3 6 3 00 14
564
151
106
1
0
1000
AP
Tele
nga
na
Karn
ata
ka
Kera
la
Tam
il N
ad
u
Pud
uch
err
y
La
ksh
yad
ee
p
MW
Southern States (MW) Aug16 Aug 15
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Aug 15 160 30 25 18 42 0 8
Aug 16 0 100 0 0 19 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Aug 15 1 82 2 0 1 1 1
Aug 16 8 28 0 0 2 1 0
9
0
100
0 0
19
0 8
160
30
25
18
42
0 8
020406080
100120140160180
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Aug 16 Aug15
8
28
0 0 2 1 01
82
2 0 1 1 10
102030405060708090
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pu
ra
MW
North-Eastern States (MW) Aug 16 Aug 15
Sector Aug 15 Aug 16
Central 6925 6620
State 4965 4009
Private 5633 5117
ALL INDIA 5810 5203
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6363
October 6686
November 6034
December 6175
January 6320
February 6495
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Aug 2016
69
25
49
65
56
33
58
10
662
0
400
9
511
7
520
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016
+Aug15 Aug16
62
05
64
16
59
43
58
36
58
10
63
63
66
86
60
34
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumersP Provisional
Total Number of Villages
597464
Pump sets
Energised as on
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
NotIncludin
g Subsidiy
booked
Only
Agriculture
2013-14 400 175
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Provisional
11
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should
be obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the
village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA
is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data
As such each monthly report of Village electrification of CEA is independent of the earlier published
reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31072016
Villiages Electrified (Nos) as on 310816
9810589068
Villages electrified
15 All India Coal consumption for Power Generation (MT)
515
14 All India per capita consumption of Electricity ( KWh)
Realization(paiseunit)
20550647
Pump sets Energised as on 31-08-16
cost of supply (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1266360 1932910 5113550 8312820
Hydro 258402 81700 59500 399602
Nuclear 100000 000 000 100000
Total 1624762 2014610 5173050 8812422
Acievement 6206 12972 11048 9953
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Aug 2016
Achievements upto Aug 2016 during the 12th Plan
723
400
0
108
970
0
53
000
0
831
282
0
39
960
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 8812422 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 255 0 255 255
State 3910 910 0 1820 750 -1070
Pvt 6800 0 300 3650 2173 -1477
Total 134405 910 3255 5470 29485 -25215
Central 490 0 40 0 80 80
State 395 80 40 205 105 -100
Pvt 829 0 0 0 0 0
Total 1714 80 80 205 185 -20
Nuclear Central 1500 0 0 0 0 0
Central 47205 0 655 0 1055 1055
State 4305 990 40 2025 855 -1170
Pvt 7629 0 300 3650 2173 -1477
Total 166545 990 4055 5675 31335 -25415
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Aug 2016
Thermal
2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016
Aug-16 April 16 - Aug 16Schemes Sector
Target
2016-17
91
0
80
0
99
0
32
55
80
0
40
55
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Aug 2016 Target
Achievement
54
70
20
5
0
56
75
29
49
18
5
0
31
34
0
1000
2000
3000
4000
5000
6000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Sector
Coal Gas Diesel Total
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
All India 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
State 10194593
Private 12729606
Central 7631226
RES
5 All India Installed Capacity (MW) Sector-wise as on 31082016
4
Grand TotalTHERMAL
Nuclear Hydro
State 10194593 33
Private 12729606 42
Central 7631226 25
All India Installed Capacity(MW) as on 31-08-2016 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
9117
0
Apr 15 - Aug 15
1583
4340
3318
9241
4134
0 0
6 Transmission Lines Added during Aug 2016 (Ckms)
2835
1480
3051
669
2455
2148
Transmission Lines Added during Apr 15 to Aug 15 amp Apr 16 to Aug16 (Ckms)
Aug-16
0
Aug-15
0
Apr 16 - Aug 16
0
1190
596
181
1390
0 0
9117
9241
9000
9050
9100
9150
9200
9250
9300
ck
ms
Apr 15 to Aug15 Apr 16 to Aug16
2455
3051
0
500
1000
1500
2000
2500
3000
3500
1
ckm
s
Aug 15 Aug 16
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1760
1500
7 Transformation Capacity Addition During Aug 2016 (MVA)
4760
0
1500
945
1110
0 1500
3940
8540
0
Aug-15 Aug-16
April 15 to Aug 15 April 16 to Aug 16
3555
0
0
0 1500
All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr
16 to Aug 16 (MVA)
27435
0
9000
10835
6100
24480
12000
3555
4760
0500
100015002000250030003500400045005000
MV
A
Transformation Capacity Addition during Aug 2016
Aug 15 Aug16
24480
27435
24000
1
MV
A
Apr 15 to Aug 15 Apr 16 to Aug 16
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16
Northern 32831 31913 31055 31481 -54 -14
Western 27625 27283 27556 27277 -02 00
Southern 24488 26487 23995 26473 -20 -01
Eastern 11187 11230 11132 11221 -05 -01
North Eastern 1297 1461 1221 1421 -59 -28
All India 97428 98374 94959 97873 -25 -05
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16
Northern 54474 50917 50230 48541 -78 -47
Western 42024 40122 41781 39903 -06 -05
Southern 37136 41168 35892 40526 -33 -16
Eastern 17363 18334 17149 18219 -12 -06
North Eastern 2437 2435 2283 2387 -63 -20
All India 149492 151719 146124 148347 -23 -22
7
Region
Power (MW)
8 Power Supply Position (Energy amp Peak) in Aug 2016
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand
Aug 15 0 0 0 0 339 0 0 3943 75
Aug 16 0 0 0 0 359 0 0 924 75
p
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Aug 15 128 31 7 124 0 0 37
Aug 16 21 0 0 13 0 0 2
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Aug 15 0 14 564 151 106 1 0
Aug 16 3 14 76 3 6 3 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
35
9
0 0
92
4
75
0 0 0 0
33
9
0 0
39
43
75
0400800
120016002000240028003200360040004400
Ch
and
iga
rh
De
lhi
Ha
rya
na
HP
Jamp
K
Pun
jab
Ra
jasth
an
UP
Utr
akh
an
d
MW
Northern States (MW)Aug 16 Aug 15
21
0 0
13
0 0 2
128
31
7
124
0 0
37
0
20
40
60
80
100
120
140
Cha
ttis
garh
Gu
jara
t
MP
Mahara
shtr
a
Dam
an amp
Diu
Dad
ar
Na
gar
Haveli G
oa
MW
Western States (MW)Aug 16 Aug 15
3 14 7
6
3 6 3 00 14
564
151
106
1
0
1000
AP
Tele
nga
na
Karn
ata
ka
Kera
la
Tam
il N
ad
u
Pud
uch
err
y
La
ksh
yad
ee
p
MW
Southern States (MW) Aug16 Aug 15
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Aug 15 160 30 25 18 42 0 8
Aug 16 0 100 0 0 19 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Aug 15 1 82 2 0 1 1 1
Aug 16 8 28 0 0 2 1 0
9
0
100
0 0
19
0 8
160
30
25
18
42
0 8
020406080
100120140160180
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Aug 16 Aug15
8
28
0 0 2 1 01
82
2 0 1 1 10
102030405060708090
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pu
ra
MW
North-Eastern States (MW) Aug 16 Aug 15
Sector Aug 15 Aug 16
Central 6925 6620
State 4965 4009
Private 5633 5117
ALL INDIA 5810 5203
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6363
October 6686
November 6034
December 6175
January 6320
February 6495
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Aug 2016
69
25
49
65
56
33
58
10
662
0
400
9
511
7
520
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016
+Aug15 Aug16
62
05
64
16
59
43
58
36
58
10
63
63
66
86
60
34
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumersP Provisional
Total Number of Villages
597464
Pump sets
Energised as on
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
NotIncludin
g Subsidiy
booked
Only
Agriculture
2013-14 400 175
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Provisional
11
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should
be obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the
village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA
is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data
As such each monthly report of Village electrification of CEA is independent of the earlier published
reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31072016
Villiages Electrified (Nos) as on 310816
9810589068
Villages electrified
15 All India Coal consumption for Power Generation (MT)
515
14 All India per capita consumption of Electricity ( KWh)
Realization(paiseunit)
20550647
Pump sets Energised as on 31-08-16
cost of supply (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1266360 1932910 5113550 8312820
Hydro 258402 81700 59500 399602
Nuclear 100000 000 000 100000
Total 1624762 2014610 5173050 8812422
Acievement 6206 12972 11048 9953
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Aug 2016
Achievements upto Aug 2016 during the 12th Plan
723
400
0
108
970
0
53
000
0
831
282
0
39
960
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 8812422 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 255 0 255 255
State 3910 910 0 1820 750 -1070
Pvt 6800 0 300 3650 2173 -1477
Total 134405 910 3255 5470 29485 -25215
Central 490 0 40 0 80 80
State 395 80 40 205 105 -100
Pvt 829 0 0 0 0 0
Total 1714 80 80 205 185 -20
Nuclear Central 1500 0 0 0 0 0
Central 47205 0 655 0 1055 1055
State 4305 990 40 2025 855 -1170
Pvt 7629 0 300 3650 2173 -1477
Total 166545 990 4055 5675 31335 -25415
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Aug 2016
Thermal
2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016
Aug-16 April 16 - Aug 16Schemes Sector
Target
2016-17
91
0
80
0
99
0
32
55
80
0
40
55
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Aug 2016 Target
Achievement
54
70
20
5
0
56
75
29
49
18
5
0
31
34
0
1000
2000
3000
4000
5000
6000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
9117
0
Apr 15 - Aug 15
1583
4340
3318
9241
4134
0 0
6 Transmission Lines Added during Aug 2016 (Ckms)
2835
1480
3051
669
2455
2148
Transmission Lines Added during Apr 15 to Aug 15 amp Apr 16 to Aug16 (Ckms)
Aug-16
0
Aug-15
0
Apr 16 - Aug 16
0
1190
596
181
1390
0 0
9117
9241
9000
9050
9100
9150
9200
9250
9300
ck
ms
Apr 15 to Aug15 Apr 16 to Aug16
2455
3051
0
500
1000
1500
2000
2500
3000
3500
1
ckm
s
Aug 15 Aug 16
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1760
1500
7 Transformation Capacity Addition During Aug 2016 (MVA)
4760
0
1500
945
1110
0 1500
3940
8540
0
Aug-15 Aug-16
April 15 to Aug 15 April 16 to Aug 16
3555
0
0
0 1500
All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr
16 to Aug 16 (MVA)
27435
0
9000
10835
6100
24480
12000
3555
4760
0500
100015002000250030003500400045005000
MV
A
Transformation Capacity Addition during Aug 2016
Aug 15 Aug16
24480
27435
24000
1
MV
A
Apr 15 to Aug 15 Apr 16 to Aug 16
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16
Northern 32831 31913 31055 31481 -54 -14
Western 27625 27283 27556 27277 -02 00
Southern 24488 26487 23995 26473 -20 -01
Eastern 11187 11230 11132 11221 -05 -01
North Eastern 1297 1461 1221 1421 -59 -28
All India 97428 98374 94959 97873 -25 -05
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16
Northern 54474 50917 50230 48541 -78 -47
Western 42024 40122 41781 39903 -06 -05
Southern 37136 41168 35892 40526 -33 -16
Eastern 17363 18334 17149 18219 -12 -06
North Eastern 2437 2435 2283 2387 -63 -20
All India 149492 151719 146124 148347 -23 -22
7
Region
Power (MW)
8 Power Supply Position (Energy amp Peak) in Aug 2016
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand
Aug 15 0 0 0 0 339 0 0 3943 75
Aug 16 0 0 0 0 359 0 0 924 75
p
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Aug 15 128 31 7 124 0 0 37
Aug 16 21 0 0 13 0 0 2
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Aug 15 0 14 564 151 106 1 0
Aug 16 3 14 76 3 6 3 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
35
9
0 0
92
4
75
0 0 0 0
33
9
0 0
39
43
75
0400800
120016002000240028003200360040004400
Ch
and
iga
rh
De
lhi
Ha
rya
na
HP
Jamp
K
Pun
jab
Ra
jasth
an
UP
Utr
akh
an
d
MW
Northern States (MW)Aug 16 Aug 15
21
0 0
13
0 0 2
128
31
7
124
0 0
37
0
20
40
60
80
100
120
140
Cha
ttis
garh
Gu
jara
t
MP
Mahara
shtr
a
Dam
an amp
Diu
Dad
ar
Na
gar
Haveli G
oa
MW
Western States (MW)Aug 16 Aug 15
3 14 7
6
3 6 3 00 14
564
151
106
1
0
1000
AP
Tele
nga
na
Karn
ata
ka
Kera
la
Tam
il N
ad
u
Pud
uch
err
y
La
ksh
yad
ee
p
MW
Southern States (MW) Aug16 Aug 15
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Aug 15 160 30 25 18 42 0 8
Aug 16 0 100 0 0 19 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Aug 15 1 82 2 0 1 1 1
Aug 16 8 28 0 0 2 1 0
9
0
100
0 0
19
0 8
160
30
25
18
42
0 8
020406080
100120140160180
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Aug 16 Aug15
8
28
0 0 2 1 01
82
2 0 1 1 10
102030405060708090
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pu
ra
MW
North-Eastern States (MW) Aug 16 Aug 15
Sector Aug 15 Aug 16
Central 6925 6620
State 4965 4009
Private 5633 5117
ALL INDIA 5810 5203
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6363
October 6686
November 6034
December 6175
January 6320
February 6495
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Aug 2016
69
25
49
65
56
33
58
10
662
0
400
9
511
7
520
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016
+Aug15 Aug16
62
05
64
16
59
43
58
36
58
10
63
63
66
86
60
34
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumersP Provisional
Total Number of Villages
597464
Pump sets
Energised as on
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
NotIncludin
g Subsidiy
booked
Only
Agriculture
2013-14 400 175
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Provisional
11
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should
be obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the
village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA
is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data
As such each monthly report of Village electrification of CEA is independent of the earlier published
reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31072016
Villiages Electrified (Nos) as on 310816
9810589068
Villages electrified
15 All India Coal consumption for Power Generation (MT)
515
14 All India per capita consumption of Electricity ( KWh)
Realization(paiseunit)
20550647
Pump sets Energised as on 31-08-16
cost of supply (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1266360 1932910 5113550 8312820
Hydro 258402 81700 59500 399602
Nuclear 100000 000 000 100000
Total 1624762 2014610 5173050 8812422
Acievement 6206 12972 11048 9953
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Aug 2016
Achievements upto Aug 2016 during the 12th Plan
723
400
0
108
970
0
53
000
0
831
282
0
39
960
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 8812422 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 255 0 255 255
State 3910 910 0 1820 750 -1070
Pvt 6800 0 300 3650 2173 -1477
Total 134405 910 3255 5470 29485 -25215
Central 490 0 40 0 80 80
State 395 80 40 205 105 -100
Pvt 829 0 0 0 0 0
Total 1714 80 80 205 185 -20
Nuclear Central 1500 0 0 0 0 0
Central 47205 0 655 0 1055 1055
State 4305 990 40 2025 855 -1170
Pvt 7629 0 300 3650 2173 -1477
Total 166545 990 4055 5675 31335 -25415
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Aug 2016
Thermal
2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016
Aug-16 April 16 - Aug 16Schemes Sector
Target
2016-17
91
0
80
0
99
0
32
55
80
0
40
55
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Aug 2016 Target
Achievement
54
70
20
5
0
56
75
29
49
18
5
0
31
34
0
1000
2000
3000
4000
5000
6000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1760
1500
7 Transformation Capacity Addition During Aug 2016 (MVA)
4760
0
1500
945
1110
0 1500
3940
8540
0
Aug-15 Aug-16
April 15 to Aug 15 April 16 to Aug 16
3555
0
0
0 1500
All India Transformation Capacity Addition during Apr 15 to Aug 15 amp Apr
16 to Aug 16 (MVA)
27435
0
9000
10835
6100
24480
12000
3555
4760
0500
100015002000250030003500400045005000
MV
A
Transformation Capacity Addition during Aug 2016
Aug 15 Aug16
24480
27435
24000
1
MV
A
Apr 15 to Aug 15 Apr 16 to Aug 16
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16
Northern 32831 31913 31055 31481 -54 -14
Western 27625 27283 27556 27277 -02 00
Southern 24488 26487 23995 26473 -20 -01
Eastern 11187 11230 11132 11221 -05 -01
North Eastern 1297 1461 1221 1421 -59 -28
All India 97428 98374 94959 97873 -25 -05
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16
Northern 54474 50917 50230 48541 -78 -47
Western 42024 40122 41781 39903 -06 -05
Southern 37136 41168 35892 40526 -33 -16
Eastern 17363 18334 17149 18219 -12 -06
North Eastern 2437 2435 2283 2387 -63 -20
All India 149492 151719 146124 148347 -23 -22
7
Region
Power (MW)
8 Power Supply Position (Energy amp Peak) in Aug 2016
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand
Aug 15 0 0 0 0 339 0 0 3943 75
Aug 16 0 0 0 0 359 0 0 924 75
p
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Aug 15 128 31 7 124 0 0 37
Aug 16 21 0 0 13 0 0 2
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Aug 15 0 14 564 151 106 1 0
Aug 16 3 14 76 3 6 3 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
35
9
0 0
92
4
75
0 0 0 0
33
9
0 0
39
43
75
0400800
120016002000240028003200360040004400
Ch
and
iga
rh
De
lhi
Ha
rya
na
HP
Jamp
K
Pun
jab
Ra
jasth
an
UP
Utr
akh
an
d
MW
Northern States (MW)Aug 16 Aug 15
21
0 0
13
0 0 2
128
31
7
124
0 0
37
0
20
40
60
80
100
120
140
Cha
ttis
garh
Gu
jara
t
MP
Mahara
shtr
a
Dam
an amp
Diu
Dad
ar
Na
gar
Haveli G
oa
MW
Western States (MW)Aug 16 Aug 15
3 14 7
6
3 6 3 00 14
564
151
106
1
0
1000
AP
Tele
nga
na
Karn
ata
ka
Kera
la
Tam
il N
ad
u
Pud
uch
err
y
La
ksh
yad
ee
p
MW
Southern States (MW) Aug16 Aug 15
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Aug 15 160 30 25 18 42 0 8
Aug 16 0 100 0 0 19 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Aug 15 1 82 2 0 1 1 1
Aug 16 8 28 0 0 2 1 0
9
0
100
0 0
19
0 8
160
30
25
18
42
0 8
020406080
100120140160180
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Aug 16 Aug15
8
28
0 0 2 1 01
82
2 0 1 1 10
102030405060708090
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pu
ra
MW
North-Eastern States (MW) Aug 16 Aug 15
Sector Aug 15 Aug 16
Central 6925 6620
State 4965 4009
Private 5633 5117
ALL INDIA 5810 5203
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6363
October 6686
November 6034
December 6175
January 6320
February 6495
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Aug 2016
69
25
49
65
56
33
58
10
662
0
400
9
511
7
520
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016
+Aug15 Aug16
62
05
64
16
59
43
58
36
58
10
63
63
66
86
60
34
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumersP Provisional
Total Number of Villages
597464
Pump sets
Energised as on
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
NotIncludin
g Subsidiy
booked
Only
Agriculture
2013-14 400 175
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Provisional
11
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should
be obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the
village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA
is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data
As such each monthly report of Village electrification of CEA is independent of the earlier published
reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31072016
Villiages Electrified (Nos) as on 310816
9810589068
Villages electrified
15 All India Coal consumption for Power Generation (MT)
515
14 All India per capita consumption of Electricity ( KWh)
Realization(paiseunit)
20550647
Pump sets Energised as on 31-08-16
cost of supply (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1266360 1932910 5113550 8312820
Hydro 258402 81700 59500 399602
Nuclear 100000 000 000 100000
Total 1624762 2014610 5173050 8812422
Acievement 6206 12972 11048 9953
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Aug 2016
Achievements upto Aug 2016 during the 12th Plan
723
400
0
108
970
0
53
000
0
831
282
0
39
960
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 8812422 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 255 0 255 255
State 3910 910 0 1820 750 -1070
Pvt 6800 0 300 3650 2173 -1477
Total 134405 910 3255 5470 29485 -25215
Central 490 0 40 0 80 80
State 395 80 40 205 105 -100
Pvt 829 0 0 0 0 0
Total 1714 80 80 205 185 -20
Nuclear Central 1500 0 0 0 0 0
Central 47205 0 655 0 1055 1055
State 4305 990 40 2025 855 -1170
Pvt 7629 0 300 3650 2173 -1477
Total 166545 990 4055 5675 31335 -25415
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Aug 2016
Thermal
2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016
Aug-16 April 16 - Aug 16Schemes Sector
Target
2016-17
91
0
80
0
99
0
32
55
80
0
40
55
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Aug 2016 Target
Achievement
54
70
20
5
0
56
75
29
49
18
5
0
31
34
0
1000
2000
3000
4000
5000
6000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug 16
Northern 32831 31913 31055 31481 -54 -14
Western 27625 27283 27556 27277 -02 00
Southern 24488 26487 23995 26473 -20 -01
Eastern 11187 11230 11132 11221 -05 -01
North Eastern 1297 1461 1221 1421 -59 -28
All India 97428 98374 94959 97873 -25 -05
Aug 15 Aug 16 Aug 15 Aug 16 Aug15 Aug16
Northern 54474 50917 50230 48541 -78 -47
Western 42024 40122 41781 39903 -06 -05
Southern 37136 41168 35892 40526 -33 -16
Eastern 17363 18334 17149 18219 -12 -06
North Eastern 2437 2435 2283 2387 -63 -20
All India 149492 151719 146124 148347 -23 -22
7
Region
Power (MW)
8 Power Supply Position (Energy amp Peak) in Aug 2016
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand
Aug 15 0 0 0 0 339 0 0 3943 75
Aug 16 0 0 0 0 359 0 0 924 75
p
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Aug 15 128 31 7 124 0 0 37
Aug 16 21 0 0 13 0 0 2
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Aug 15 0 14 564 151 106 1 0
Aug 16 3 14 76 3 6 3 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
35
9
0 0
92
4
75
0 0 0 0
33
9
0 0
39
43
75
0400800
120016002000240028003200360040004400
Ch
and
iga
rh
De
lhi
Ha
rya
na
HP
Jamp
K
Pun
jab
Ra
jasth
an
UP
Utr
akh
an
d
MW
Northern States (MW)Aug 16 Aug 15
21
0 0
13
0 0 2
128
31
7
124
0 0
37
0
20
40
60
80
100
120
140
Cha
ttis
garh
Gu
jara
t
MP
Mahara
shtr
a
Dam
an amp
Diu
Dad
ar
Na
gar
Haveli G
oa
MW
Western States (MW)Aug 16 Aug 15
3 14 7
6
3 6 3 00 14
564
151
106
1
0
1000
AP
Tele
nga
na
Karn
ata
ka
Kera
la
Tam
il N
ad
u
Pud
uch
err
y
La
ksh
yad
ee
p
MW
Southern States (MW) Aug16 Aug 15
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Aug 15 160 30 25 18 42 0 8
Aug 16 0 100 0 0 19 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Aug 15 1 82 2 0 1 1 1
Aug 16 8 28 0 0 2 1 0
9
0
100
0 0
19
0 8
160
30
25
18
42
0 8
020406080
100120140160180
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Aug 16 Aug15
8
28
0 0 2 1 01
82
2 0 1 1 10
102030405060708090
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pu
ra
MW
North-Eastern States (MW) Aug 16 Aug 15
Sector Aug 15 Aug 16
Central 6925 6620
State 4965 4009
Private 5633 5117
ALL INDIA 5810 5203
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6363
October 6686
November 6034
December 6175
January 6320
February 6495
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Aug 2016
69
25
49
65
56
33
58
10
662
0
400
9
511
7
520
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016
+Aug15 Aug16
62
05
64
16
59
43
58
36
58
10
63
63
66
86
60
34
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumersP Provisional
Total Number of Villages
597464
Pump sets
Energised as on
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
NotIncludin
g Subsidiy
booked
Only
Agriculture
2013-14 400 175
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Provisional
11
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should
be obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the
village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA
is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data
As such each monthly report of Village electrification of CEA is independent of the earlier published
reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31072016
Villiages Electrified (Nos) as on 310816
9810589068
Villages electrified
15 All India Coal consumption for Power Generation (MT)
515
14 All India per capita consumption of Electricity ( KWh)
Realization(paiseunit)
20550647
Pump sets Energised as on 31-08-16
cost of supply (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1266360 1932910 5113550 8312820
Hydro 258402 81700 59500 399602
Nuclear 100000 000 000 100000
Total 1624762 2014610 5173050 8812422
Acievement 6206 12972 11048 9953
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Aug 2016
Achievements upto Aug 2016 during the 12th Plan
723
400
0
108
970
0
53
000
0
831
282
0
39
960
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 8812422 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 255 0 255 255
State 3910 910 0 1820 750 -1070
Pvt 6800 0 300 3650 2173 -1477
Total 134405 910 3255 5470 29485 -25215
Central 490 0 40 0 80 80
State 395 80 40 205 105 -100
Pvt 829 0 0 0 0 0
Total 1714 80 80 205 185 -20
Nuclear Central 1500 0 0 0 0 0
Central 47205 0 655 0 1055 1055
State 4305 990 40 2025 855 -1170
Pvt 7629 0 300 3650 2173 -1477
Total 166545 990 4055 5675 31335 -25415
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Aug 2016
Thermal
2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016
Aug-16 April 16 - Aug 16Schemes Sector
Target
2016-17
91
0
80
0
99
0
32
55
80
0
40
55
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Aug 2016 Target
Achievement
54
70
20
5
0
56
75
29
49
18
5
0
31
34
0
1000
2000
3000
4000
5000
6000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP Utrakhand
Aug 15 0 0 0 0 339 0 0 3943 75
Aug 16 0 0 0 0 359 0 0 924 75
p
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Aug 15 128 31 7 124 0 0 37
Aug 16 21 0 0 13 0 0 2
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Aug 15 0 14 564 151 106 1 0
Aug 16 3 14 76 3 6 3 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
35
9
0 0
92
4
75
0 0 0 0
33
9
0 0
39
43
75
0400800
120016002000240028003200360040004400
Ch
and
iga
rh
De
lhi
Ha
rya
na
HP
Jamp
K
Pun
jab
Ra
jasth
an
UP
Utr
akh
an
d
MW
Northern States (MW)Aug 16 Aug 15
21
0 0
13
0 0 2
128
31
7
124
0 0
37
0
20
40
60
80
100
120
140
Cha
ttis
garh
Gu
jara
t
MP
Mahara
shtr
a
Dam
an amp
Diu
Dad
ar
Na
gar
Haveli G
oa
MW
Western States (MW)Aug 16 Aug 15
3 14 7
6
3 6 3 00 14
564
151
106
1
0
1000
AP
Tele
nga
na
Karn
ata
ka
Kera
la
Tam
il N
ad
u
Pud
uch
err
y
La
ksh
yad
ee
p
MW
Southern States (MW) Aug16 Aug 15
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Aug 15 160 30 25 18 42 0 8
Aug 16 0 100 0 0 19 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Aug 15 1 82 2 0 1 1 1
Aug 16 8 28 0 0 2 1 0
9
0
100
0 0
19
0 8
160
30
25
18
42
0 8
020406080
100120140160180
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Aug 16 Aug15
8
28
0 0 2 1 01
82
2 0 1 1 10
102030405060708090
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pu
ra
MW
North-Eastern States (MW) Aug 16 Aug 15
Sector Aug 15 Aug 16
Central 6925 6620
State 4965 4009
Private 5633 5117
ALL INDIA 5810 5203
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6363
October 6686
November 6034
December 6175
January 6320
February 6495
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Aug 2016
69
25
49
65
56
33
58
10
662
0
400
9
511
7
520
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016
+Aug15 Aug16
62
05
64
16
59
43
58
36
58
10
63
63
66
86
60
34
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumersP Provisional
Total Number of Villages
597464
Pump sets
Energised as on
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
NotIncludin
g Subsidiy
booked
Only
Agriculture
2013-14 400 175
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Provisional
11
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should
be obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the
village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA
is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data
As such each monthly report of Village electrification of CEA is independent of the earlier published
reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31072016
Villiages Electrified (Nos) as on 310816
9810589068
Villages electrified
15 All India Coal consumption for Power Generation (MT)
515
14 All India per capita consumption of Electricity ( KWh)
Realization(paiseunit)
20550647
Pump sets Energised as on 31-08-16
cost of supply (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1266360 1932910 5113550 8312820
Hydro 258402 81700 59500 399602
Nuclear 100000 000 000 100000
Total 1624762 2014610 5173050 8812422
Acievement 6206 12972 11048 9953
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Aug 2016
Achievements upto Aug 2016 during the 12th Plan
723
400
0
108
970
0
53
000
0
831
282
0
39
960
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 8812422 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 255 0 255 255
State 3910 910 0 1820 750 -1070
Pvt 6800 0 300 3650 2173 -1477
Total 134405 910 3255 5470 29485 -25215
Central 490 0 40 0 80 80
State 395 80 40 205 105 -100
Pvt 829 0 0 0 0 0
Total 1714 80 80 205 185 -20
Nuclear Central 1500 0 0 0 0 0
Central 47205 0 655 0 1055 1055
State 4305 990 40 2025 855 -1170
Pvt 7629 0 300 3650 2173 -1477
Total 166545 990 4055 5675 31335 -25415
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Aug 2016
Thermal
2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016
Aug-16 April 16 - Aug 16Schemes Sector
Target
2016-17
91
0
80
0
99
0
32
55
80
0
40
55
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Aug 2016 Target
Achievement
54
70
20
5
0
56
75
29
49
18
5
0
31
34
0
1000
2000
3000
4000
5000
6000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Aug 15 160 30 25 18 42 0 8
Aug 16 0 100 0 0 19 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Aug 15 1 82 2 0 1 1 1
Aug 16 8 28 0 0 2 1 0
9
0
100
0 0
19
0 8
160
30
25
18
42
0 8
020406080
100120140160180
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Be
ng
al
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Aug 16 Aug15
8
28
0 0 2 1 01
82
2 0 1 1 10
102030405060708090
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pu
ra
MW
North-Eastern States (MW) Aug 16 Aug 15
Sector Aug 15 Aug 16
Central 6925 6620
State 4965 4009
Private 5633 5117
ALL INDIA 5810 5203
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6363
October 6686
November 6034
December 6175
January 6320
February 6495
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Aug 2016
69
25
49
65
56
33
58
10
662
0
400
9
511
7
520
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016
+Aug15 Aug16
62
05
64
16
59
43
58
36
58
10
63
63
66
86
60
34
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumersP Provisional
Total Number of Villages
597464
Pump sets
Energised as on
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
NotIncludin
g Subsidiy
booked
Only
Agriculture
2013-14 400 175
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Provisional
11
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should
be obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the
village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA
is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data
As such each monthly report of Village electrification of CEA is independent of the earlier published
reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31072016
Villiages Electrified (Nos) as on 310816
9810589068
Villages electrified
15 All India Coal consumption for Power Generation (MT)
515
14 All India per capita consumption of Electricity ( KWh)
Realization(paiseunit)
20550647
Pump sets Energised as on 31-08-16
cost of supply (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1266360 1932910 5113550 8312820
Hydro 258402 81700 59500 399602
Nuclear 100000 000 000 100000
Total 1624762 2014610 5173050 8812422
Acievement 6206 12972 11048 9953
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Aug 2016
Achievements upto Aug 2016 during the 12th Plan
723
400
0
108
970
0
53
000
0
831
282
0
39
960
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 8812422 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 255 0 255 255
State 3910 910 0 1820 750 -1070
Pvt 6800 0 300 3650 2173 -1477
Total 134405 910 3255 5470 29485 -25215
Central 490 0 40 0 80 80
State 395 80 40 205 105 -100
Pvt 829 0 0 0 0 0
Total 1714 80 80 205 185 -20
Nuclear Central 1500 0 0 0 0 0
Central 47205 0 655 0 1055 1055
State 4305 990 40 2025 855 -1170
Pvt 7629 0 300 3650 2173 -1477
Total 166545 990 4055 5675 31335 -25415
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Aug 2016
Thermal
2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016
Aug-16 April 16 - Aug 16Schemes Sector
Target
2016-17
91
0
80
0
99
0
32
55
80
0
40
55
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Aug 2016 Target
Achievement
54
70
20
5
0
56
75
29
49
18
5
0
31
34
0
1000
2000
3000
4000
5000
6000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Sector Aug 15 Aug 16
Central 6925 6620
State 4965 4009
Private 5633 5117
ALL INDIA 5810 5203
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6363
October 6686
November 6034
December 6175
January 6320
February 6495
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Aug 2016
69
25
49
65
56
33
58
10
662
0
400
9
511
7
520
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Aug 2015 and Aug 2016
+Aug15 Aug16
62
05
64
16
59
43
58
36
58
10
63
63
66
86
60
34
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumersP Provisional
Total Number of Villages
597464
Pump sets
Energised as on
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
NotIncludin
g Subsidiy
booked
Only
Agriculture
2013-14 400 175
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Provisional
11
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should
be obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the
village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA
is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data
As such each monthly report of Village electrification of CEA is independent of the earlier published
reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31072016
Villiages Electrified (Nos) as on 310816
9810589068
Villages electrified
15 All India Coal consumption for Power Generation (MT)
515
14 All India per capita consumption of Electricity ( KWh)
Realization(paiseunit)
20550647
Pump sets Energised as on 31-08-16
cost of supply (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1266360 1932910 5113550 8312820
Hydro 258402 81700 59500 399602
Nuclear 100000 000 000 100000
Total 1624762 2014610 5173050 8812422
Acievement 6206 12972 11048 9953
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Aug 2016
Achievements upto Aug 2016 during the 12th Plan
723
400
0
108
970
0
53
000
0
831
282
0
39
960
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 8812422 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 255 0 255 255
State 3910 910 0 1820 750 -1070
Pvt 6800 0 300 3650 2173 -1477
Total 134405 910 3255 5470 29485 -25215
Central 490 0 40 0 80 80
State 395 80 40 205 105 -100
Pvt 829 0 0 0 0 0
Total 1714 80 80 205 185 -20
Nuclear Central 1500 0 0 0 0 0
Central 47205 0 655 0 1055 1055
State 4305 990 40 2025 855 -1170
Pvt 7629 0 300 3650 2173 -1477
Total 166545 990 4055 5675 31335 -25415
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Aug 2016
Thermal
2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016
Aug-16 April 16 - Aug 16Schemes Sector
Target
2016-17
91
0
80
0
99
0
32
55
80
0
40
55
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Aug 2016 Target
Achievement
54
70
20
5
0
56
75
29
49
18
5
0
31
34
0
1000
2000
3000
4000
5000
6000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumersP Provisional
Total Number of Villages
597464
Pump sets
Energised as on
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
NotIncludin
g Subsidiy
booked
Only
Agriculture
2013-14 400 175
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Provisional
11
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should
be obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the
village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA
is provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data
As such each monthly report of Village electrification of CEA is independent of the earlier published
reports
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 31072016
Villiages Electrified (Nos) as on 310816
9810589068
Villages electrified
15 All India Coal consumption for Power Generation (MT)
515
14 All India per capita consumption of Electricity ( KWh)
Realization(paiseunit)
20550647
Pump sets Energised as on 31-08-16
cost of supply (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1266360 1932910 5113550 8312820
Hydro 258402 81700 59500 399602
Nuclear 100000 000 000 100000
Total 1624762 2014610 5173050 8812422
Acievement 6206 12972 11048 9953
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Aug 2016
Achievements upto Aug 2016 during the 12th Plan
723
400
0
108
970
0
53
000
0
831
282
0
39
960
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 8812422 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 255 0 255 255
State 3910 910 0 1820 750 -1070
Pvt 6800 0 300 3650 2173 -1477
Total 134405 910 3255 5470 29485 -25215
Central 490 0 40 0 80 80
State 395 80 40 205 105 -100
Pvt 829 0 0 0 0 0
Total 1714 80 80 205 185 -20
Nuclear Central 1500 0 0 0 0 0
Central 47205 0 655 0 1055 1055
State 4305 990 40 2025 855 -1170
Pvt 7629 0 300 3650 2173 -1477
Total 166545 990 4055 5675 31335 -25415
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Aug 2016
Thermal
2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016
Aug-16 April 16 - Aug 16Schemes Sector
Target
2016-17
91
0
80
0
99
0
32
55
80
0
40
55
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Aug 2016 Target
Achievement
54
70
20
5
0
56
75
29
49
18
5
0
31
34
0
1000
2000
3000
4000
5000
6000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Aug 2016 and April 2016 to Aug 2016 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1266360 1932910 5113550 8312820
Hydro 258402 81700 59500 399602
Nuclear 100000 000 000 100000
Total 1624762 2014610 5173050 8812422
Acievement 6206 12972 11048 9953
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Aug 2016
Achievements upto Aug 2016 during the 12th Plan
723
400
0
108
970
0
53
000
0
831
282
0
39
960
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 8812422 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 255 0 255 255
State 3910 910 0 1820 750 -1070
Pvt 6800 0 300 3650 2173 -1477
Total 134405 910 3255 5470 29485 -25215
Central 490 0 40 0 80 80
State 395 80 40 205 105 -100
Pvt 829 0 0 0 0 0
Total 1714 80 80 205 185 -20
Nuclear Central 1500 0 0 0 0 0
Central 47205 0 655 0 1055 1055
State 4305 990 40 2025 855 -1170
Pvt 7629 0 300 3650 2173 -1477
Total 166545 990 4055 5675 31335 -25415
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Aug 2016
Thermal
2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016
Aug-16 April 16 - Aug 16Schemes Sector
Target
2016-17
91
0
80
0
99
0
32
55
80
0
40
55
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Aug 2016 Target
Achievement
54
70
20
5
0
56
75
29
49
18
5
0
31
34
0
1000
2000
3000
4000
5000
6000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1266360 1932910 5113550 8312820
Hydro 258402 81700 59500 399602
Nuclear 100000 000 000 100000
Total 1624762 2014610 5173050 8812422
Acievement 6206 12972 11048 9953
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Aug 2016
Achievements upto Aug 2016 during the 12th Plan
723
400
0
108
970
0
53
000
0
831
282
0
39
960
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 8812422 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 255 0 255 255
State 3910 910 0 1820 750 -1070
Pvt 6800 0 300 3650 2173 -1477
Total 134405 910 3255 5470 29485 -25215
Central 490 0 40 0 80 80
State 395 80 40 205 105 -100
Pvt 829 0 0 0 0 0
Total 1714 80 80 205 185 -20
Nuclear Central 1500 0 0 0 0 0
Central 47205 0 655 0 1055 1055
State 4305 990 40 2025 855 -1170
Pvt 7629 0 300 3650 2173 -1477
Total 166545 990 4055 5675 31335 -25415
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Aug 2016
Thermal
2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016
Aug-16 April 16 - Aug 16Schemes Sector
Target
2016-17
91
0
80
0
99
0
32
55
80
0
40
55
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Aug 2016 Target
Achievement
54
70
20
5
0
56
75
29
49
18
5
0
31
34
0
1000
2000
3000
4000
5000
6000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 255 0 255 255
State 3910 910 0 1820 750 -1070
Pvt 6800 0 300 3650 2173 -1477
Total 134405 910 3255 5470 29485 -25215
Central 490 0 40 0 80 80
State 395 80 40 205 105 -100
Pvt 829 0 0 0 0 0
Total 1714 80 80 205 185 -20
Nuclear Central 1500 0 0 0 0 0
Central 47205 0 655 0 1055 1055
State 4305 990 40 2025 855 -1170
Pvt 7629 0 300 3650 2173 -1477
Total 166545 990 4055 5675 31335 -25415
13
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Aug 2016
Thermal
2 Capacity Addition Targets Achievements During Aug 2016 amp April 2016 to Aug 2016
Aug-16 April 16 - Aug 16Schemes Sector
Target
2016-17
91
0
80
0
99
0
32
55
80
0
40
55
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Aug 2016 Target
Achievement
54
70
20
5
0
56
75
29
49
18
5
0
31
34
0
1000
2000
3000
4000
5000
6000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Sub Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Sub Total 3062287 10000 000 3072287 000 436912 51939 3561138
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 172380 3600 206980 000 124200 26372 357552
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1110 5115
State 6421050 721070 36393 7178513 000 2819700 196380 10194593
Private 7099238 1035560 55496 8190294 000 312000 4227312 12729606
Central 5139000 749083 000 5888083 578000 1165143 000 7631226
Total 18659288 2505713 91889 21256890 578000 4296843 4423692 30555425
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 30062016 is given below (in MW)
430427 2715140 780534 4423692
1 Installed capacity of Andhra Pradesh has been bifurcated in the ratio of 5389 and 4611 among Telangana and
New Andhra Pradeh respectively Except the installed capacity of Thamminapatnam (300 MW) Simhapuri (450 MW)
and Tanir Bhavi (220 MW) are shown in the state of New Andhra Pradesh
14
4 Unit - 1 of Mangaon CCPP of 388MW has been added to the private sector of Maharashtra
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 31082016)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermalNuclear Hydro
RES
(MNRE)
Northern
Region
Western Region
Southern
Region
Eastern Region
North Eastern
Region
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 30062016
Small
Hydro PowerWind Power
Bio-PowerSolar Power
Total
CapacityBM PowerCogen Waste to Energy
486083 11508
2 Allocation from Agartala CCPP of 135 MW (421+2255) has been revised as per MoP order dated 25022016
3 Unit -1 of NAWAPARA TPP of 300MW has been added in the private sector of Chattisgarh
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 3987 59337
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 3987 804247
State 272000 15000 000 287000 000 88451 5930 381381
Private 216550 000 000 216550 000 000 7489 224039
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 149464 13419 851081
State 000 000 000 000 000 45860 25611 71471
Private 000 000 000 000 000 174800 53790 228590
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 349554 79401 453753
State 000 17500 000 17500 000 123000 10653 151153
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15753 314234
State 263000 15000 000 278000 000 223023 12780 513803
Private 501400 000 000 501400 000 000 72955 574355
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 315188 85735 1293607
State 519000 60380 000 579380 000 98796 2385 680561
Private 319600 000 000 319600 000 000 540135 859735
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 172949 542520 1795344
State 592300 000 000 592300 000 52410 2510 647220
Private 634600 000 000 634600 000 000 101850 736450
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1517895 54997 000 1572892 33572 218475 104360 1929299
State 000 000 000 000 000 125215 6287 131502
Private 9900 22500 000 32400 000 73000 26361 131761
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 29435 000 69385 2228 245139 32648 349400
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 681 681
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 681 12625
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 756755 66156 2770631
Private 1726600 33300 000 1759900 000 247800 812348 2820048
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4586450 555626 000 5142076 162000 1831178 878504 8013758
Uttrakhnad
Chandigarh
Central - Unallocated
Total (Northern
Region)
Rajasthan
Punjab
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Uttar
Pradesh
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
State Ownership
Sector
Modewise breakup
Grand TotalThermal
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
Nuclear
Delhi
Hydro
(Renewable)
RES
(MNRE)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
15
(As on 31082016)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 000 4800
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 005 41245
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 522000 232182 000 754182 000 77200 800 832182
Private 864200 406000 000 1270200 000 000 529272 1799472
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1675062 680609 000 2355671 55932 77200 530072 3018875
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 312007 850907
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 320403 1891716
State 328000 000 000 328000 000 12000 1105 341105
Private 1089800 000 000 1089800 000 000 43863 1133663
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1575254 000 000 1575254 4752 12000 44968 1636974
State 1055000 67200 000 1122200 000 288484 20813 1431497
Private 1179600 56800 000 1236400 000 44700 644639 1925739
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2605826 386393 000 2992219 69014 333184 665452 4059869
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 000 8978
179635 19691 000 199326 22814 000 000 222140
State 2313000 299382 000 2612382 000 548050 31119 3191551
Private 3672500 467600 000 4140100 000 44700 1530181 5714981
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7275301 1120341 000 8395642 184000 744750 1561300 10885691
16
Daman amp Diu
Gujarat
Central - Unallocated
Total (Western
Region)
Madhya
Pradesh
Chhattisgarh
Maharashtra
Dadra amp Nagar
Naveli
Grand TotalThermal RES
(MNRE)Nuclear
Hydro
(Renewable)
Goa
State Ownership
Sector
Modewise breakup
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
(As on 31082016)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 175887 8950 516968
Private 299000 307411 1697 608108 000 000 291171 899279
Central 147330 000 000 147330 12716 000 000 160046
Sub-Total 754921 330951 1697 1087569 12716 175887 300121 1576294
State 480659 000 000 480659 000 217566 000 698225
Private 27000 157089 1983 186072 000 000 89529 275601
Central 172188 000 000 172188 14862 000 000 187050
Sub-Total 679847 157089 1983 838919 14862 217566 89529 1160876
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 10650 216650 000 000 496005 712655
Central 162846 000 000 162846 47586 000 000 210432
Sub-Total 790846 000 23442 814288 47586 359980 511538 1733392
State 000 000 15996 15996 000 188150 13892 218038
Private 000 17400 000 17400 000 000 11655 29055
Central 103869 35958 000 139827 22860 000 000 162687
Sub-Total 103869 53358 15996 173223 22860 188150 25547 409780
State 477000 52408 000 529408 000 218220 12270 759898
Private 295000 50310 41166 386476 000 000 965460 1351936
Central 415510 000 000 415510 98650 000 000 514160
Sub-Total 1187510 102718 41166 1331394 98650 218220 977730 2625994
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
152308 000 000 152308 30048 000 000 182356
State 1688250 79198 28788 1796236 000 1159803 50645 3006684
Private 827000 532210 55496 1414706 000 000 1853823 3268529
Central 1189000 35958 000 1224958 232000 000 000 1456958
Grand Total 3704250 647366 84284 4435900 232000 1159803 1904468 7732171
17
Total (Southern
Region)
NLC
Central - Unallocated
Karnataka
Kerala
Tamil Nadu
Thermal
NuclearHydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
State Ownership
Sector
Modewise breakup
Grand Total
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Andhra Pradesh
Telangana
Puducherry
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
(As on 31082016)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 8852 8852
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 15922 302989
State 119000 000 000 119000 000 13000 405 132405
Private 90000 000 000 90000 000 000 1619 91619
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 240493 000 000 240493 000 20093 2024 262610
State 572000 10000 000 582000 000 97700 9195 688895
Private 178138 000 000 178138 000 000 4432 182570
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 842383 10000 000 852383 000 140830 13627 1006840
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 721066 000 000 721066 000 19326 000 740392
Sub-Total 826066 000 000 826066 000 19326 000 845392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 14525 514525
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 15155 942152
State 000 000 000 000 000 000 5211 5211
Private 000 000 000 000 000 19500 000 19500
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 27027 5211 41448
159707 000 000 159707 000 000 000 159707
State 754000 10000 000 764000 000 316892 22511 1103403
Private 873138 000 000 873138 000 19500 29428 922066
Central 1435149 000 000 1435149 000 100520 000 1535669
Grand Total 3062287 10000 000 3072287 000 436912 51939 3561138
18
Central - Unallocated
Total (Eastern
Region)
Jharkhand
West Bengal
DVC
Odisha
Sikkim
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
RES
(MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Bihar
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
(As on 31082016)
Coal Gas Diesel Total
State 6000 27620 000 33620 000 10000 3001 46621
Private 000 2450 000 2450 000 000 410 2860
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 73630 000 92330 000 42972 3411 138713
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 000 000
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3103 51510
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 500 500
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2101 61054
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 000 000
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 545 20974
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 000 000
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3067 14360
State 000 000 000 000 000 000 3647 3647
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 3657 12177
3750 16136 000 19886 000 12715 000 32601
State 6000 44570 3600 54170 000 38200 25425 117795
Private 000 2450 000 2450 000 000 947 3397
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 172380 3600 206980 000 124200 26372 357552
(As on 31082016)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 510 510
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1035 5040
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 585 585
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1110 5115
19
NuclearHydro
(Renewable)
RES
(MNRE)
Modewise breakup
Andaman amp
Nicobar
lakshadweep
Total (Islands)
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
SectorGrand Total
Thermal
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
RES
(MNRE)
Assam
Mizoram
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Contents Page
1Programme and Achievements of Transmission Lines in Aug 2016 and during April
2016 to Aug 2016
2 List of Transmission Lines CommissionedReady for commissioning during Aug 2016
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2573 0
State Sector 0 0 0 0 0
Total 2597 0 0 2573 0
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 552 0 3123 1391
State Sector 750 416 0 750 0
JVPrivate Sector 1313 0 181 1133 192
Total 5186 968 181 5006 1583
Central Sector 3953 50 744 1980 1681
State Sector 5799 1163 364 2976 1297
JVPrivate Sector 762 0 282 366 1362
Total 10514 1213 1390 5322 4340
Central Sector 78 0 0 0 28
State Sector 5009 548 1480 2010 3290
JVPrivate Sector 0 0 0 0 0
Total 5087 548 1480 2010 3318
Grand Total 23384 2729 3051 14911 9241
Voltage Level
(kV)
Name of the
Transmission LineType
Executing
Agency
Line Length
(CKM)
400 Betul - khandwa (Quad) line DC PGCIL 338
400 Khanwada - Indore line DC PGCIL 344
400 Meja- Allahabad line DC PGCIL 56
400 Sasaram-Allahbad line DC PGCIL 6
PVTSector
765 Mainpuri- Greater Noida SC WUPPTCL 181
400 Cuddalore- Naggapattinam DC IPTCL 95
400 LILO of Moradabad- Muzzafarnagar at Hapur DC WUPPTCL 2
400 Madhugiri- Bidadi DC KTCL 185
400 Lilo of both ckt of MTPS stage III- Arasur (PGCIL)at Karamadai MC TANTRANSCO 124
400 Suryapet- Nandiwanaparthi line DC TSTRANSCO 240
220 Bajakhana- Bagha Purana DC PSTCL 71
220 Boisar II- Borivali MC MSETCL 331
220 Budidampadu- Bhongiri(2nd Ckt) DC TSTRANSCO 14
220 Chatrail- Ramgarh DC RVPNL 90
220 Chittorgarh- Sawa DC RVPNL 53
220 Garividi - Tekkali (2nd Ckt) line DC APTRANSCO 92
220 Hardoi- Shahjahanpur (PG) line DC UPPTCL 60
220 Kasor- herang (DFCC) line DC GETCO 39
220 LILO of 220 kV Jodhpur(220kV GSS)- Pali at 400 KV New DC RVPNL 10
220 LILO of Bhugaon- Pusad at Wardha (PG) DC MSETCL 14
220 LILO of Kanakroli (PG) - Debari at Amberi DC RVPNL 30
220 LILO of Patiala - Mandi Govindgarh at Rajpura DC PSTCL 68
220 LILO of Radhanpur - Mehsana at Sankhari DC GETCO 62
220 LILO of one Ckt of Ganguwal- Gobindgarh -II at Bhari DC PSTCL 6
220 Lower Jurala HEP - Upper Jurla DC TSTRANSCO 21
220 Lucknow PG (400) - Kursi Road DC UPPTCL 30
220 Palwal (Meghpur) - Meerpur DC HVPNL 53
220 Parigi- Kosigi line DC TSTRANSCO 40
220 Roza- Dohna DC UPPTCL 216
220 Visavadar -Timbdi DC GETCO 180
20
CENTRAL Sector
STATE Sector
1 Programme and Achievementsof Transmission Lines in Aug 2016 and during April 2016 to Aug 2016
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Aug16Aug 16
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
2 List of Transmission Line CommissionedReady for commissioning During Aug 2016
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Contents Page
1Programme and Achievements of Sub-Stations in May 2016 and during Apr 2016 to
Aug 2016
2 List of Sub Stations commissionedready for commisssioning during Aug 2016
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 1500 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 1500 1500
Central Sector 10500 3000 0 6000
State Sector 1500 0 0 1500
JVPrivate Sector 2000 0 0 1500
Total 14000 3000 0 9000
Central Sector 9890 0 500 5315
State Sector 13015 1945 1260 3520
JVPrivate Sector 2000 0 0 2000
Total 24905 1945 1760 10835
Central Sector 0 0 0 0
State Sector 4783 360 1500 6100
JVPrivate Sector 0 0 0 0
Total 4783 360 1500 6100
Grand Total 45188 5305 4760 27435
Name of
Sub-StationType
Capacity Added
(MWMVA)
Biswanath Chariyali amp Agra HVDC terminal
(Pole-II)800 1500
400 Somanahalli SS 400200 500
Karamadai SS 400230 945
Kasor(Aug) 40022033 315
Echur (Purisai) (JICA) SS 230110 200
Abohar (Addl) 22066 100
Agthala (Aug) 22066 100
220 Atri (Karadagadia) 2nd ICT 22013233 OPTCL 160
220 Barahua SS 220132 UPPTCL 100
220 Chhatral (Aug) 22066 GETCO 100
220 Kansari (Aug) 22066 GETCO 60
220 Kim (Aug) 22066 GETCO 100
220 Mehsana (Aug) 220132 GETCO 50
220 Mosur SS (4th Addl Auto tr) 220110 TANTRANSCO 100
220 Mota (Aug) 22066 GETCO 110
220 Puri (Samangara) ICT- II 220132 OPTCL 160
220 Rajkot (Nyara)(Aug) 22066 GETCO 60
220 Salejada(Aug) 22066 GETCO 100
21
1500
0
5780
4000
220 kV
(Fig in MVA)
Voltage Level
Sector
Apr 16 - Aug 16
Programme
2000
765 kV
Aug-16
CENTRAL SECTOR
28160
12500
1 Programme amp Achievement of sub- stations in Aug 2016 and during April 2016 to Aug 2016
plusmn 800 kV HVDC
11780
1500
0
2000
0
GETCO
PSTCL
9000
1500
400 kV
800
400
STATE SECTOR
2380
0
2380
Voltage Level
(kV)Executing Agency
PGCIL
2 List of Sub-Stations CommissionedReady for commissioning during Aug 2016
GETCO
400
TANTRANSCO
TANTRANSCO
PGCIL
220
220
230
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2699400 2651870 9824 13750300 14001759 10183
State Sector 31669700 2471200 1881232 7613 12628200 11851009 9385
PvtIPP Sector 33185900 2619200 2590901 9892 13294200 13657912 10274
PvtUTL Sector 1981200 177900 168893 9494 879100 874958 9953
Total 99900000 7967700 7292896 9153 40551800 40385638 9959
Central Sector 5340000 710800 875949 12323 2937300 3320674 11305
State Sector 6719900 830600 677869 8161 2840500 2224873 7833
PvtIPP Sector 1195100 199400 202329 10147 746900 764132 10231
PvtUTL Sector 145000 14000 17600 12571 63000 55496 8809
Total 13400000 1754800 1773747 10108 6587700 6365175 9662
Central Sector 4000000 327300 351454 10738 1671200 1587349 9498
Total 4000000 327300 351454 10738 1671200 1587349 9498
Bhutan Import 500000 70600 108028 15301 236800 306034 12924
Central Sector 42403200 3737500 3879273 10379 18358800 18909782 10300
State Sector 38389600 3301800 2559101 7751 15468700 14075882 9100
Pvt Sector 36507200 3010500 2979723 9898 14983200 15352498 10246
Total 117800000 10120400 9526125 9413 49047500 48644196 9918
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jul-16 Jul-15 Upto July-16 Upto July-15
955429 887151 2967887 2465693
22
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
Aug 16
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Aug 2016 (MU)
Target
(2016-17)
April 16 to Aug 16Sector
405518
65877
16712
490475
403856
63652
15873
486442
0
100000
200000
300000
400000
500000
600000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Contents Page
1 Power Supply Position (Provisional) for Aug 2016 and April 2016 to Aug 2016 23
2 Peak Demand and Peak Met (Provisional) for Aug 2016 and April 2016 to Aug 2016 24
3 Power Supply Position (Revised) for July 2016 25
4 Peak Demand and Peak Met (Revised) for July 2016 26
5 Notified Power cuts Restrictions on Industries during Aug 2016 27
6 Power Supply to Agricultural Sector during Aug 2016 28
Section F - Power supply position
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 172 172 0 00 846 846 0 00
िद ी Delhi 3211 3208 -3 -01 15935 15913 -22 -01
हरयाणा Haryana 5003 5003 0 00 22917 22917 0 00
िहमाचल दश Himachal Pradesh 742 736 -6 -08 3655 3630 -25 -07
ज क(ीर Jammu amp Kashmir 1321 1057 -263 -199 6944 5658 -1286 -185
पजाब Punjab 6269 6269 0 00 26979 26979 0 00
राजथान Rajasthan 4725 4703 -22 -05 27193 27140 -53 -02उरउरउरउर दश Uttar Pradesh 9318 9188 -130 -14 46819 45763 -1056 -23उराखडउराखडउराखडउराखड Uttarakhand 1153 1146 -7 -06 5725 5682 -43 -08उरीउरीउरीउरी Northern Region 31913 31481 -432 -14 157011 154528 -2483 -16छीसगढ़ Chhattisgarh 1952 1947 -5 -03 9996 9948 -48 -05
गजरात Gujarat 7759 7759 0 00 44404 44404 0 00
म- दश Madhya Pradesh 5338 5338 0 00 26105 26104 -1 00
महारा Maharashtra 11113 11113 0 00 58166 58129 -37 -01
दमन और िदउ Daman amp Diu 199 199 0 00 1007 1007 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 510 510 0 00 2549 2549 0 00
गोवा Goa 412 412 0 00 2094 2092 -2 -01
पिमी Western Region 27283 27277 -5 00 144322 144235 -87 -01
आ2 दश Andhra Pradesh 4870 4870 0 00 22237 22202 -35 -02
तलगाना Telangana 4977 4977 0 00 20985 20980 -5 00
कना3टक Karnataka 5352 5339 -13 -02 25992 25751 -241 -09
करल Kerala 1961 1959 -2 -01 10163 10142 -21 -02
तिमल नाड Tamil Nadu 9111 9111 0 00 45600 45592 -8 00
पडचरी Puducherry 217 217 0 00 1124 1123 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 20 20 0 0
दिणी Southern Region 26487 26473 -15 -01 126101 125791 -310 -02
िबहार Bihar 2306 2297 -8 -04 11356 11170 -186 -16
दामोदर घाटी िनगम DVC 1549 1549 0 00 7619 7576 -43 -06
झारख8 Jharkhand 646 646 0 00 3324 3315 -9 -03
ओिडशा Odisha 2306 2306 -1 00 11891 11889 -2 00
पिम बगाल West Bengal 4382 4382 0 00 21771 21701 -70 -03
िसlt=म Sikkim 41 41 0 00 191 191 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 100 75 -25 -250
पव Eastern Region 11230 11221 -9 -01 56153 55843 -310 -06
अgtणाचल दश Arunachal Pradesh 62 61 -1 -22 284 277 -7 -25
असम Assam 971 939 -32 -33 4007 3810 -197 -49
मिणपर Manipur 60 58 -2 -35 294 279 -15 -51
मघालय Meghalaya 138 138 0 00 679 679 0 00
िमज़ोरम Mizoram 41 40 -1 -25 201 196 -5 -25
नागालड Nagaland 69 67 -1 -19 302 295 -7 -23
िAपरा Tripura 121 119 -2 -20 609 595 -14 -23उरउरउरउर-पव North-Eastern Region 1461 1421 -40 -28 6374 6127 -247 -39
सण भारत All India 98374 97873 -502 -05 489961 486524 -3437 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (पवावलोकन) Power Supply Position (Provisional)
अल2016 - अग2016 April2016 to August2016
23
Surplus Deficit (-)
राampState
Surplus Deficit (-)
अग 2016 August2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 281 281 0 00 361 361 0 00
िदी Delhi 5707 5707 0 00 6342 6261 -81 -13
हरयाणा Haryana 8984 8984 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1293 1293 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2367 2008 -359 -152 2478 2102 -376 -152
पजाब Punjab 11228 11228 0 00 11408 11408 0 00
राज$थान Rajasthan 7807 7807 0 00 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 15614 14690 -924 -59 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1963 1888 -75 -38 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 50917 48541 -2376 -47 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3848 3827 -21 -05 3875 3851 -25 -06
गजरात Gujarat 12564 12564 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6759 6759 0 00 8145 8111 -34 -04
महारा) Maharashtra 18657 18644 -13 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 759 759 0 00 781 781 0 00
गोवा Goa 493 491 -2 -03 497 496 -1 -03
पिमी Western Region 40122 39903 -219 -05 45369 44957 -412 -09
आ दश Andhra Pradesh 7963 7960 -3 00 7963 7960 -3 00
तलगाना Telangana 7959 7945 -14 -02 7959 7945 -14 -02
कना0टक Karnataka 9295 9218 -76 -08 9980 9551 -428 -43
करल Kerala 3531 3528 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14164 14158 -6 00 14823 14823 0 00
पडचरी Puducherry 362 359 -3 -09 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 41168 40526 -641 -16 41168 40526 -641 -16
िबहार Bihar 3403 3403 0 00 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2430 2330 -100 -41 2686 2686 0 00
झारख6 Jharkhand 1042 1042 0 00 1498 1498 0 00
ओिडशा Odisha 3919 3919 0 00 4012 4012 0 00
पि8म बगाल West Bengal 8086 8067 -19 -02 8086 8067 -19 -02
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18334 18219 -115 -06 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 148 140 -8 -54 148 140 -8 -54
असम Assam 1661 1633 -28 -17 1661 1633 -28 -17
मिणपर Manipur 145 145 0 00 152 151 -1 -07
मघालय Meghalaya 296 296 0 00 311 311 0 00
िमज़ोरम Mizoram 83 81 -2 -24 88 88 0 00
नागाल=ड Nagaland 117 116 -1 -09 120 119 -1 -08
िgtपरा Tripura 265 265 0 00 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2435 2387 -48 -20 2487 2475 -12 -05
सण भारत All India 151719 148347 -3371 -22 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
24
अिधकतम माग और अिधकतम उपल (पवावलोकन) Peak Demand and Peak Met (Provisional)
आकड़ मगा वाट नट Figures in MW net
अल2016 - अग$2016 April2016 to August2016
Surplus Deficit (-)Surplus Deficit (-)
राStateअग$ 2016 August2016
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
आकड़ िमिलयन यिनट नट Figures in MU net
आवकता उपलता अिधशष कमी (-) आवकता उपलता अिधशष कमी (-)
णाली System Requirement Availability Requirement Availability
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 185 185 0 00 674 674 0 00
िद ी Delhi 3311 3308 -3 -01 12724 12705 -19 -01
हरयाणा Haryana 5303 5303 0 00 17914 17914 0 00
िहमाचल दश Himachal Pradesh 744 738 -7 -09 2913 2894 -19 -07
ज क(ीर Jammu amp Kashmir 1220 1001 -219 -179 5623 4601 -1022 -182
पजाब Punjab 6598 6598 0 00 20710 20710 0 00
राजथान Rajasthan 5284 5276 -8 -01 22468 22437 -31 -01उरउरउरउर दश Uttar Pradesh 9268 9241 -27 -03 37501 36575 -926 -25उराखडउराखडउराखडउराखड Uttarakhand 1149 1138 -11 -09 4572 4536 -36 -08उरीउरीउरीउरी Northern Region 33061 32788 -274 -08 125098 123047 -2051 -16छीसगढ़ Chhattisgarh 1871 1858 -12 -07 8044 8001 -43 -05
गजरात Gujarat 8353 8353 0 00 36645 36645 0 00
म- दश Madhya Pradesh 5196 5196 0 00 20767 20766 -1 00
महारा Maharashtra 10403 10403 0 00 47053 47016 -37 -01
दमन और िदउ Daman amp Diu 203 203 0 00 808 808 0 00
दादर व नगर हवली Dadra amp Nagar Haveli 515 515 0 00 2039 2039 0 00
गोवा Goa 411 411 0 00 1682 1680 -2 -01
पिमी Western Region 26951 26939 -13 00 117039 116958 -81 -01
आ2 दश Andhra Pradesh 4254 4254 0 00 17367 17332 -35 -02
तलगाना Telangana 4051 4051 0 00 16008 16003 -5 00
कना3टक Karnataka 4443 4443 0 00 20640 20412 -228 -11
करल Kerala 1883 1883 0 00 8202 8183 -19 -02
तिमल नाड Tamil Nadu 9005 9005 0 00 36489 36481 -8 00
पडचरी Puducherry 227 227 0 00 907 906 -1 -01
ल4-ीप Lakshadweep 4 4 0 0 16 16 0 0
दिणी Southern Region 23863 23863 0 00 99614 99318 -296 -03
िबहार Bihar 2199 2165 -33 -15 9050 8873 -177 -20
दामोदर घाटी िनगम DVC 1647 1639 -8 -05 6070 6027 -43 -07
झारख8 Jharkhand 636 636 0 00 2678 2669 -9 -03
ओिडशा Odisha 2366 2366 0 00 9585 9583 -2 00
पिम बगाल West Bengal 4567 4557 -10 -02 17389 17319 -70 -04
िसlt=म Sikkim 34 34 0 00 150 150 0 00
अडमान-िनक ोबार Andaman- Nicobar 20 15 -5 -25 80 60 -20 -250
पव Eastern Region 11449 11398 -51 -04 44923 44622 -301 -07
अgtणाचल दश Arunachal Pradesh 57 56 -1 -20 222 216 -6 -27
असम Assam 815 779 -36 -44 3036 2871 -165 -54
मिणपर Manipur 63 58 -5 -80 234 221 -13 -56
मघालय Meghalaya 149 149 0 00 541 541 0 00
िमज़ोरम Mizoram 41 40 -1 -29 160 156 -4 -25
नागालड Nagaland 65 64 -1 -20 233 228 -5 -21
िAपरा Tripura 116 115 -1 -10 488 476 -12 -25उरउरउरउर-पव North-Eastern Region 1306 1260 -46 -35 4913 4706 -207 -42
सण भारत All India 96631 96248 -383 -04 391587 388651 -2936 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
िवदयत आपित थित (सशोिधत) Power Supply Position (Revised)
अल2016 - जलाई2016 April2016 to July2016
25
Surplus Deficit (-)
राState
Surplus Deficit (-)
जलाई 2016 July2016
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
अिधकतम माग अिधकतम उपल अिधशष कमी (-) अिधकतम माग अिधकतम उपल अिधशष कमी (-)
णाली System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 358 358 0 00 361 361 0 00
िदी Delhi 6342 6261 -81 -13 6342 6261 -81 -13
हरयाणा Haryana 9262 9262 0 00 9262 9262 0 00
िहमाचल दश Himachal Pradesh 1297 1297 0 00 1330 1330 0 00
ज कीर Jammu amp Kashmir 2385 1950 -435 -182 2478 2102 -376 -152
पजाब Punjab 11408 11408 0 00 11408 11408 0 00
राज$थान Rajasthan 9288 9168 -120 -13 9906 9906 0 00उरउरउरउर दश Uttar Pradesh 16123 15154 -969 -60 16123 15501 -622 -39उराखडउराखडउराखडउराखड Uttarakhand 1972 1907 -65 -33 2020 1945 -75 -37उरीउरीउरीउरी Northern Region 52151 51658 -493 -09 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3360 3321 -39 -12 3875 3851 -25 -06
गजरात Gujarat 12692 12692 0 00 14724 14708 -16 -01
म( दश Madhya Pradesh 6671 6660 -12 -02 8145 8111 -34 -04
महारा) Maharashtra 16014 15997 -17 -01 20057 20021 -36 -02
दमन और िदउ Daman amp Diu 327 327 0 00 327 327 0 00
दादर व नगर हवली Dadra amp Nagar
Haveli745 745 0 00 781 781 0 00
गोवा Goa 456 456 0 00 497 496 -1 -03
पिमी Western Region 38999 38709 -290 -07 45369 44957 -412 -09
आ दश Andhra Pradesh 7175 7175 0 00 7576 7361 -215 -28
तलगाना Telangana 6890 6890 0 00 6935 6894 -41 -06
कना0टक Karnataka 8302 8302 0 00 9980 9551 -428 -43
करल Kerala 3372 3369 -3 -01 4132 3996 -135 -33
तिमल नाड Tamil Nadu 14517 14467 -50 -03 14823 14823 0 00
पडचरी Puducherry 358 358 -1 -01 371 368 -3 -07
ल2-ीप Lakshadweep 8 8 0 0 8 8 0 0
दिणी Southern Region 36215 36172 -43 -01 40752 40472 -280 -07
िबहार Bihar 3717 3596 -121 -33 3717 3638 -78 -21
दामोदर घाटी िनगम DVC 2459 2459 0 00 2686 2686 0 00
झारख6 Jharkhand 1134 1134 0 00 1498 1498 0 00
ओिडशा Odisha 3989 3989 0 00 4012 4012 0 00
पि8म बगाल West Bengal 7453 7434 -19 -03 7665 7641 -24 -03
िसम Sikkim 97 97 0 00 112 112 0 00
अडमान-िनक ोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 18211 18075 -135 -07 18642 18596 -46 -02
अणाचल दश Arunachal Pradesh 136 135 -1 -07 141 139 -2 -14
असम Assam 1591 1547 -44 -28 1591 1547 -44 -28
मिणपर Manipur 141 141 0 00 152 151 -1 -07
मघालय Meghalaya 292 292 0 00 311 311 0 00
िमज़ोरम Mizoram 80 79 -1 -13 88 88 0 00
नागाल=ड Nagaland 120 119 -1 -08 120 119 -1 -08
िgtपरा Tripura 259 258 -1 -04 275 273 -2 -06उरउरउरउर-पव North-Eastern Region 2474 2391 -83 -34 2487 2475 -12 -05
सण भारत All India 147453 146289 -1165 -08 152974 149971 -3003 -20
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
Surplus Deficit (-)
अिधकतम माग और अिधकतम उपल (सशोिधत) Peak Demand and Peak Met (Revised)
आकड़ मगा वाट नट Figures in MW net
जलाई 2016 July2016
Surplus Deficit (-)
राampStateअल2016 - जलाई2016 April2016 to July2016
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
रा State Region ऊजा कटौती Energy Cut माग कटौती Demand cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi NIL NIL
हरयाणा Haryana NIL NIL
िहमाचल दश Himachal Pradesh NIL NIL
ज कीर Jammu amp Kashmir
पजाब Punjab NIL NIL
राजथान Rajasthan NIL NILउरउरउरउर दश Uttar Pradesh NIL NILउराखडउराखडउराखडउराखड Uttarakhand 0185 MUday on HTLT industries 140 MW cut on HTLT industries
पिमी Western Regionछीसगढ़ Chhattisgarh NIL NIL
गजरात Gujarat
म दश Madhya Pradesh NIL NIL
महारा$ Maharashtra NIL NIL
गोवा Goa NIL NIL
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
27
अग 2016 म इड ीज पर िवदयत कटौती का िववरण Notified Power CutsRestrictions on Industries during August2016
Nil
Nil
Nil
All industries are allowed to run their units on all days of week and if they want to avail staggered holiday then they
have to be staggered on notified day only and cannot avail as per their choice All industries are required to keep their
recess timings staggered
Nil
Nil
Nil
No Notified Cuts
No Notified Cuts
No Notified Cuts
No Notified Cuts
Data not received
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
रा State Regionउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
िदी Delhi
हरयाणा Haryana
िहमाचल दश Himachal Pradesh
ज कीर Jammu amp Kashmir
पजाब Punjab
राजथान Rajasthanउरउरउरउर दश Uttar Pradeshउराखडउराखडउराखडउराखड Uttarakhand
पिमी Western Regionछीसगढ़ Chhattisgarh
गजरात Gujarat
म दश Madhya Pradesh
महारा$ Maharashtra
गोवा Goa
दिणी Southern Region
आ( दश Andhra Pradesh
तलगाना Telangana
कना)टक Karnataka
करल Kerala
तिमल नाड Tamil Nadu
पडचरी Puducherry No Restrictions
पव Eastern Region
िबहार Bihar
झारख- Jharkhand
ओिडशा Odisha
पिम बगाल West Bengal
28
अगतअगतअगतअगत 2016 2016 2016 2016 किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण किष को िवत आपत का िववरण Power Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during AugustPower Supply to Agricultural Sector during August2016201620162016
Three Phase Supply 9 hrsday (Average) Single phase Supply 18 hrsday (Average)
There is no agricultural load in Delhi
Three Phase Supply 1154 hrsday (Average)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
Three Phase Supply 18 hrsday
Three Phase Supply 645 hrsday (Average) Single phase Supply( FRPNon FRP Feeders) 2400 hrsday (Average)
औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म औसत िवत आपत घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supply
About 18 hrs
About 20 hrs
Three Phase Supply 914 hrsday (Average) Single phase Supply 2400 hrsday (Average)
Three Phase Supply 09 hrsday
Three Phase Supply(Mixed) 2304 hrs day (Average)
Only 8 hours power supply in staggered form in rotation of day and night is given to Agriculture Single Phase supply
during rest of 16 hours Jyotigram Yojana 24 hrs
Data not received
24 hrs
Three Phase Supply 6 hrsday Single Phase Supply 6 - 12 hrsday
Three Phase Supply 1513 hrsday (Average) Single phase Supply 1739 hrsday (Average)
Three Phase Supply 2350 hrsday (Average) Single phase Supply 2350 hrsday (Average)
Three Phase Supply 07 hrsday
No restriction
About 23 hrs
No Restrictions
Three Phase Supply 9 hrsday is ensured (6 hrs during day time and 3 hrs during night time)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 30
2 Growth of Transmission Sector since 6th Plan 31
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Section G - Growth of Power Sector
32
33
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Aug 2016 18659288 2505713 918892 21256890 5780 4296843 4423692 30555425
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-13) = 40 726 MW
Coal Gas Diesel Nuclear Hydro Res Total
18659288 2505713 918892 578000 429684 4423692 22925174
29
All India Generating Installed Capacity ( MW ) (As on 31082016 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 30555425 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
31082016
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 25828 32250
400 ckm 6029 19824 36142 49378 75722 106819 151470 144819
220 ckm 46005 59631 79600 96993 114629 135980 160556 170980
Total ckm 52034 79455 115742 147531 192535 248049 337854 348049
HVDC ckm 0 0 1634 4738 5872 9432 12938 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 350792 364921
765 MVA 0 0 0 0 0 25000 150000 174000
400 MVA 9330 21580 40865 60380 92942 151027 220302 196027
220 MVA 37291 53742 84177 116363 156497 223774 299582 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 669884 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 686384 692301
Inter-regional
transmission
Capacity
MW 14050 27750 59550 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Provisional
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
Source- PFC Reports on the performance of State Power Utilities
31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Provisional
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
957
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
1
32
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
7 Status of Hydro Schemes Cleared by the CEA in Aug 2016
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan
2002-03
13409
2626
4111
Pump Sets Energised Villages Electricfied (Nos)
2001-02
284064
367244
1218
2780
1997-98
1998-99
1999-00
2000-01
297594
010408 to 310309
010409 to 310310
010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
2005-06
2006-07 22594
2003-04
2004-05
651095
2781
3884
15455554
2314176
322968
331020
397343
611750
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
652913
74575 296361511th PlanCumu upto End of 11th Plan
589068 20550647
557439
Nil
Cummulative as on 31082016
8629
3726
46708
18423975
499150
557976
840909
010411 to 310312
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Contents Page
1 Rate of sale of power for the year 2013-2014 33-41
RATE OF SALE OF POWER FOR THE YEAR 2013-2014
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale of Power
as approved by
CERCSERC
(PaiseKwh) iii=( i+ii)
NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 716351 2763
DEHAR H P S Ω BBMB HYDRO-HYDRO 311597 5992
PONG H P S Ω BBMB HYDRO-HYDRO 175078 1797
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 62600 15440
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 234400 20120
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 139200 27400
CHAMERA- IIi HPS NHPC LTD HYDRO-HYDRO 93100 37660
PARBATI - IIi HPS NHPC LTD HYDRO-HYDRO 500 74100
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 27900 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 62560
DULHASTI HPS NHPC LTD HYDRO-HYDRO 212900 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 323800 9580
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 37800 22980
URI HPS NHPC LTD HYDRO-HYDRO 251600 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 40100 33340
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 6900 98520
SEWA - II NHPC LTD HYDRO-HYDRO 49600 43280
ANTA CCPP NTPC LTD THERMAL-GAS 194824 36000
AURAIYA CCPP NTPC LTD THERMAL-GAS 175636 43700
BADARPUR TPS NTPC LTD THERMAL-COAL 380810 46900
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 543508 41200
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 720196 46700
DADRI CCPP NTPC LTD THERMAL-GAS 340586 42100
FARIDABAD CCPP NTPC LTD THERMAL-GAS 169820 35600
RIHAND STPS I NTPC LTD THERMAL-COAL 690904 21500
RIHAND STPS ii NTPC LTD THERMAL-COAL 680289 22400
RIHAND STPS III NTPC LTD THERMAL-COAL 340774 27500
SINGRAULI STPS NTPC LTD THERMAL-COAL 1480981 17100
TANDA TPS NTPC LTD THERMAL-COAL 314024 39400
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 299729 35700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 290114 35800
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 138847 40500
NARORA APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR236268 24856
RAJASTHAN APS 2345 amp6 NPCILNUCLEAR-
NUCLEAR836174 34339
NJHPS SJVNL HYDRO-HYDRO 713153 28740
TEHRI HPP THDC HYDRO-HYDRO 402152 46200
KOTESHWAR HEP THDC HYDRO-HYDRO 150541 36800
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 138041 38331
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 33016 50100
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 41546 37300
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 76970 41400
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 157374 39500
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 157001 39500
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 315789 33800
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 412600 36300WYC HYDEL STATION amp KAKROI HYDEL
PLANT HPGCL HYDRO-HYDRO 20291 11100
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 23066 7200
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7755 10100
GUMMA HPSEB HYDRO-HYDRO 000 27100
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 53417 6600
P-33
RATE OF SALE OF POWER FOR THE YEAR 2013-14
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 7602 12300
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 22785 9700
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 1924 20400
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 4648 29900
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4254 138700
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 830 19500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 1385 27300
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 4545 25500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 59755 39000
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 593 22100
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 478 27400
CHAMBA POWER HOUSE HPSEB HYDRO-HYDRO 149 10800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 665 10500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 100679 39640
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 32300 48830
PPS-I PPCL THERMAL-COAL 235911 31410
PPS-III PPCL THERMAL-GAS 61732 42590
LOWER JHELUM JampKPDD HYDRO-HYDRO 51607 6100
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 9092 6000
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 21421 8300
GANDHARBAL JampKPDD HYDRO-HYDRO 2286 4200
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 276414 30000
KARNAH MPH JampKPDD HYDRO-HYDRO 562 29000
CHENANI I JampKPDD HYDRO-HYDRO 7831 7100
CHENANI II JampKPDD HYDRO-HYDRO 679 9400
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 1750 13700
SEWA-III JampKPDD HYDRO-HYDRO 488 19400
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 419 17700
HUNDER MHP JampKPDD HYDRO-HYDRO 077 25100
SUMOOR JampKPDD HYDRO-HYDRO 008 33200
BAZGO MHP JampKPDD HYDRO-HYDRO 035 31800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 230 45100
PAHALGAM MHP JampKPDD HYDRO-HYDRO 425 52000
MARPACHOO JampKPDD HYDRO-HYDRO 088 46900
HAFTAL JampKPDD HYDRO-HYDRO 129 45400
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 253 14600
STAKNA JampKPDD HYDRO-HYDRO 011 4000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR
LTDTHERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR
LTDTHERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR
LTDTHERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR
KANDI
PUNJAB STATE POWER COR
LTDHYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 852628 34240
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 855632 42125
CHHABRA TPS RRVUNL THERMAL-COAL 258295 36707
RAMGARH GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 48550 46368
DHOLPUR GAS THERMAL POWER STATION RRVUNL THERMAL-GAS 99307 42330
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 22558 9611
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 1020 37800
GIRAL -II RRVUNL THERMAL-COAL 16128 30500
KHARA HEP UPJVNL HYDRO-HYDRO 41588 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 11555 5500
OBRA HEP UPJVNL HYDRO-HYDRO 20292 5300
RIHANDPIPRA HEP UPJVNL HYDRO-HYDRO 50265 5500UGC PS(NIRGAJINI CHITORA SALAWA
BHOLA)UPJVNL HYDRO-HYDRO 1926 21300
P-34
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
ANPARA A TPS UPRVUNL THERMAL-COAL 335192 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 713263 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 7378 44469
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 237568 54697
OBRA A TPS UPRVUNL THERMAL-COAL 48284 28640
OBRA B TPS UPRVUNL THERMAL-COAL 306577 23911
PANKI TPS UPRVUNL THERMAL-COAL 62700 43434
PARICHHA TPS UPRVUNL THERMAL-COAL 41241 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 226278 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 111717 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 93760 5842
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 48603 6625
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 5717 6837
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 12365 8429
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 9329 6290
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 21207 7568
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 6724 6393
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 43661 10305
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 114267 14144
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 17733 7652
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 492362 50932MAHATMA GANDHI THERMAL POWER
PLANT JHAJJAR POWER LTD THERMAL-COAL 581305 39180
BASPA-II HEP J P POWER VENTURES HYDRO-HYDRO 134532 23200
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 178673 20300
KARCHAM WANGTOO HEP J P POWER VENTURES HYDRO-HYDRO 490638 31500
MALANA HPS MALANA PCL HYDRO-HYDRO 23861 27992
MALANA - II HPS EVEREST PPL HYDRO-HYDRO 27762 41940
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57350 53107
RENUSAGAR DIVISION HINDALCO IND LTD THERMAL-COAL 613385 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 369734 37540
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030 000
ROJA THERMAL POWER PLANT PH-I ROJA POWER SCL THERMAL-COAL 741400 52300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46521 22400
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 46902 22300
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 48375 22300
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50228 23200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 46464 22400
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 404891 17981
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 161995 30306
GANDHAR CCPP NTPC LTD THERMAL-GAS 124377 32100
KAWAS CCPP NTPC LTD THERMAL-GAS 131439 29300
KORBA I amp II NTPC LTD THERMAL-COAL 1579249 15200
KORBA III NTPC LTD THERMAL-COAL 361664 25800
SIPAT STPS I NTPC LTD THERMAL-COAL 1184432 29400
SIPAT STPS II NTPC LTD THERMAL-COAL 631123 28400
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 854994 22100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 732972 21200
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 752721 26000
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 350633 30500
MOUDA i NTPC LTD THERMAL-COAL 71866 46000
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-
NUCLEAR337293 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-
NUCLEAR196830 9679
TARAPUR 3 amp 4 NPCIL NUCLEAR-
NUCLEAR699895 28511
RGPPL ANJANVEL NTPC+GAIL) RATNAGIRI GPPL THERMAL-GAS 146474 43008
STATE SECTOR
KORBA TPS EAST CSPGCL THERMAL-COAL 189873 22496
P-35
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
DSPM TPS KORBA EAST CSPGCL THERMAL-COAL 243116 23640
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 158509 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 548553 16850
GANGREL HEP CSPGCL HYDRO-HYDRO 4285 37650
BANGO HEP CSPGCL HYDRO-HYDRO 23609 8880
MINI HYDEL (SHP KW) CSPGCL HYDRO-HYDRO 825 42010
SIKASAR HEP CSPGCL HYDRO-HYDRO 991 27120
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3821 162285
DHUVARAN CCPP-2 GSECL THERMAL-GAS 14826 82554
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 61350 82249
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 109652 38625
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125156 31275
KUTCH LIG TPS 4 GSECL THERMAL-LIG 30140 44736
SIKKA TPS GSECL THERMAL-COAL 52514 64562
UKAI 1-5 GSECL THERMAL-COAL 324942 34959
UKAI TPS 6 GSECL THERMAL-COAL 124316 37645
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 358832 42987
WANAKBORI TPS 7 GSECL THERMAL-COAL 94977 38361
KADANA HPS GSECL HYDRO-HYDRO 40661 14139
UKAI HPS GSECL HYDRO-HYDRO 83428 2860
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 165454 11600
BANSAGAR-II MPPGCL HYDRO-HYDRO 14126 10100
BANSAGAR- III MPPGCL HYDRO-HYDRO 12960 11700
JHINNA HPS MPPGCL HYDRO-HYDRO 12473 15100
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 53743 3600
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 40469 4100
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 4756 14800
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 13566 30900
PENCH HPS MPPGCL HYDRO-HYDRO 42631 8000
RAJGHAT HPS MPPGCL HYDRO-HYDRO 6053 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 114098 23500
AMARKANTAK PH III MPPGCL THERMAL-COAL 150134 33000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 206390 38700
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 178326 38700
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 346052 38400
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 166734 28100
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 43551 39700
BHUSAWAL TPS MSPGCL THERMAL-COAL 263700 36100
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1274100 22700
KHAPERKHEDA MSPGCL THERMAL-COAL 680700 32900
KORADI TPS MSPGCL THERMAL-COAL 215200 40300
NASIK TPS MSPGCL THERMAL-COAL 377700 42400
PARLI TPS MSPGCL THERMAL-COAL 369100 35600
PARAS MSPGCL THERMAL-COAL 266700 33200
URAN CCPP MSPGCL THERMAL-GAS 365700 27000
KOYANAPOPHALI MSPGCL HYDRO-HYDRO 341000 2600
VAITARANA MSPGCL HYDRO-HYDRO 26000 7900
YELDARI MSPGCL HYDRO-HYDRO 2400 27000
BHATGHAR MSPGCL HYDRO-HYDRO 12200 16500
PANSHET MSPGCL HYDRO-HYDRO 9300 15900
BHIRA MSPGCL HYDRO-HYDRO 9600 5800
TILLARI MSPGCL HYDRO-HYDRO 14400 5800
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 521600 20500
SARDAR SAROVAR PROJECT SSNNL HYDRO-HYDRO 66016 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 2712500 28355
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 959300 33816
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 343000 33764
P-36
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
WPCL-WARORA SAI WARDHA POWER LTD THERMAL-COAL 258607 49500SABARMATI THERMAL POWER STAN
SABARMATITORRENT POWER LTD THERMAL-COAL 246553 32700
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 503200 27190
GOA ENERGY PRIVATE LTD GOA ENERGY THERMAL-GAS 14054 24000
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6562900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 15659 88192
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 85876 54789SURAT LIG POWER PLANT (SLPL
STATION -I)GUJARAT INDUSTRIES PCL THERMAL-LIG 129284 24692
SURAT LIG POWER PPANT (SSPP
STATION -II)GUJARAT INDUSTRIES PCL THERMAL-LIG 133626 32342
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 98539 21000
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GAS 24682 286100
MUNDRA UMPPCOASTAL GUJARAT POWER
LTD THERMAL-COAL 2197200 24094
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2197200 24100
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 206700 30700
BHILAI EXPANSION POWER PLANT NTPC-SAIL POWER COMPRIV
LTD THERMAL-COAL 331861 39772
4X250 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 743600 32800
4X600 MW O P JINDAL STPS JINDAL POWER LTD TAMNAR THERMAL-COAL 5000 20500
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 24143 133800
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 373881 34600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 353500 42000
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 45400 190600
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 124200 37300
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-COAL 140900 46700
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIRA TATA POWER COM LTD HYDRO-HYDRO 48450 14300
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 30500 26400
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 32300 33500
SBU 3 JSW(JINDAL) ENERGY LTD JSW ENERGY LTD THERMAL-COAL 677000 36900
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 359455 33743
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 301359 31429
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1010437 26383
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 94715 129800
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1488082 27100
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 385728 36500
SIMHADRI I NTPC LTD THERMAL-COAL 717656 34100
SIMHADRI II NTPC LTD THERMAL-COAL 682910 40800
KAIGA 123 amp 4 NPCILNUCLEAR-
NUCLEAR593317 30196
MADRAS APS 1 amp 2 NPCILNUCLEAR-
NUCLEAR189800 20539
STATE SECTOR
APGAS POWER CORPORN
LTD(VIJJESWARAM - I)
ANDHRA PRADESH GPCL THERMAL-GAS 3833 30260
APGAS POWER CORPORN
LTD(VIJJESWARAM -II)
ANDHRA PRADESH GPCL THERMAL-GAS 6337 32830
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814206 35600
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 359941 35600
RAYALASEEMA THERMAL POWER
PROJECT-I
APGENCO THERMAL-COAL 230795 35600
RAYALASEEMA THERMAL POWER
PROJECT-II
APGENCO THERMAL-COAL 275620 35600
RAYALASEEMA THERMAL POWER
PROJECT-III
APGENCO THERMAL-COAL 128300 35600
KOTHAGUDEM THERMAL POWER
STATION (OampM)
APGENCO THERMAL-COAL 380420 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-V)
APGENCO THERMAL-COAL 323854 35600
KOTHAGUDEM THERMAL POWER
STATION (KTPS-VI)
APGENCO THERMAL-COAL 324071 35600
RAMAGUNDEM THERMAL POWER
STATION
APGENCO THERMAL-COAL 40072 35600
KAKATHIYA TPP (KTPP) APGENCO THERMAL-COAL 293827 35600
SRISAILAM (OampM0 APGENCO HYDRO-HYDRO 147191 35600
SRISAILAM LEBT BANK HES(SLBHES) APGENCO HYDRO-HYDRO 132521 35600
NAGARJUNASAGAR APGENCO HYDRO-HYDRO 164042 35600
UPPER SILERU APGENCO HYDRO-HYDRO 45142 35600
LOWER SILERU APGENCO HYDRO-HYDRO 124763 35600
DONKARAYI APGENCO HYDRO-HYDRO 11533 35600
P-37
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 478 35600
POCHAMPAD APGENCO HYDRO-HYDRO 8342 35600
SINGUR APGENCO HYDRO-HYDRO 429 35600
NIZAMSAGAR APGENCO HYDRO-HYDRO 1256 35600
PEDDAPALLI MINI HYDELS APGENCO HYDRO-HYDRO 459 35600
CHETTIPETA APGENCO HYDRO-HYDRO 265 35600
MUCHKUND APGENCO HYDRO-HYDRO 31072 35600
TUNGABHADRA HES amp HAMPI PH (AP
Share)
APGENCO HYDRO-HYDRO 15306 35600
PRIYADARSHINI JURALA APGENCO HYDRO-HYDRO 26645 35600
BELLARY TPS KPCL THERMAL-COAL 564935 40103
RAICHUR TPS KPCL THERMAL-COAL 880141 39881
YELHANKA (DG) KPCL THERMAL-DIESEL 1958 216206
ALMATTI DPH HPS KPCL HYDRO-HYDRO 49362 13569
BHADRA HPS KPCL HYDRO-HYDRO 6154 25111
GERUSUPPA HPS KPCL HYDRO-HYDRO 60128 10645
GHAT PRABHA HPS KPCL HYDRO-HYDRO 8034 12967
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 25660 8392
KADRA HPS KPCL HYDRO-HYDRO 35179 14451
KALINADI HPSNAGJHARI KPCL HYDRO-HYDRO 258317 4940
SUPA HPS KPCL HYDRO-HYDRO 46303 4940
KODASALLI HPS KPCL HYDRO-HYDRO 31594 11133
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 26209 2436
MUNIRABAD HPS KPCL HYDRO-HYDRO 9984 6494
SHARAVATHY HPS KPCL HYDRO-HYDRO 547332 2436
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21371 11053
VARAHI (UG) HPS KPCL HYDRO-HYDRO 128272 9093
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 3240 9093
SHIMSHAPURA KPCL HYDRO-HYDRO 6665 11053
IDAMALAYAR HPS KSEB HYDRO-HYDRO 38576 46800
IDUKKI HPS KSEB HYDRO-HYDRO 272776 46800
KAKKAD HPS KSEB HYDRO-HYDRO 24661 46800
KALLADA HPS KSEB HYDRO-HYDRO 6734 46800
KUTTIYADI amp KTR KSEB HYDRO-HYDRO 84004 46800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 59923 46800
MALANKARA HPS KSEB HYDRO-HYDRO 3009 46800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 36505 46800
PALLIVASAL HPS KSEB HYDRO-HYDRO 20676 46800
PANNIAR HPS KSEB HYDRO-HYDRO 16956 46800
PORINGALKUTHU+PLBE KSEB HYDRO-HYDRO 23624 46800
SABARIGIRI HPS KSEB HYDRO-HYDRO 163120 46800
SENGULAM HPS KSEB HYDRO-HYDRO 14172 46800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23232 46800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-LSHS 2729 46800
KOZHIKODE DG (KDPP) KSEB THERMAL-LSHS 18677 46800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 725 286900
KAVARATTI Ω
LAKSHADEEP THERMAL-DIESEL 983 286900
AMINI Ω
LAKSHADEEP THERMAL-DIESEL 464 286900
ANDROTT Ω
LAKSHADEEP THERMAL-DIESEL 628 286900
KALPENI Ω
LAKSHADEEP THERMAL-DIESEL 316 286900
AGATTI Ω
LAKSHADEEP THERMAL-DIESEL 491 286900
KADMAT Ω
LAKSHADEEP THERMAL-DIESEL 376 286900
KILTAN Ω
LAKSHADEEP THERMAL-DIESEL 250 286900
CHETLET Ω
LAKSHADEEP THERMAL-DIESEL 153 286900
BITRA Ω
LAKSHADEEP THERMAL-DIESEL 022 286900
BANGARAM Ω
LAKSHADEEP THERMAL-DIESEL 005 286900
KARAIKAL CCGPP PUDDUCHERRY THERMAL-GAS 24122 38120
ENNORE TN GEN amp DIS CORP LTD THERMAL-COAL 101089 49852
METTUR TN GEN amp DIS CORP LTD THERMAL-COAL 790640 49852
NORTH CHENNAI TN GEN amp DIS CORP LTD THERMAL-COAL 584618 49852
TUTICORIN TN GEN amp DIS CORP LTD THERMAL-COAL 725262 49852
P-38
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 45662 49852
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 117871 49852
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 59415 49852
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 6211 49852
PYKARA MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 918 49852
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14790 49852
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 084 49852
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 26931 49852
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65985 49852
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 37961 49852
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 14234 49852
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 7337 49852
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 4251 49852
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10441 49852
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 35606 49852
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 7321 49852
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6584 49852
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6401 49852
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5214 49852
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 2482 49852
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 496 49852
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 184 49852
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 191 49852
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 051 49852
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 45258 49852
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 2712 49852
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10010 49852
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 13685 49852
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 5004 49852
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13787 49852
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14371 49852
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 50120 49852
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19483 49852
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 7159 49852
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 11231 49852
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 4596 49852
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 489 49852
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 39648 49852
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 462 49852
PERUNCHANI TN GEN amp DIS CORP LTD HYDRO-HYDRO 097 49852
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1370 49852
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 13190 49852
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 73263 000
BSES KERALA POWER LTD BSES KERALA THERMAL-N 33668 129500GMR BARGE MOUNTED CCP PLANT GMR
ENERGYGMR BMCC POWER PLANT THERMAL-GAS 040 44900
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 95856 36200
JEGURUPADU CCPP PH-II GVK INDUSTRIS LIMITED THERMAL-GAS 54224 45600
GVK GAUTAMI POWER LIMITED GVK GAUTAMI THERMAL-GAS 000 000SBU 1 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 202900 52700
SBU 2 JSW(JINDAL) ENERGY LTD
VIJAYANAGARJSW ENERGY LTD THERMAL-COAL 456400 52500
LANCO KONDAPALLI POWER LTD PH-ILANCO KONDAPALLI POWER
LTDTHERMAL-GAS 139963 000
LANCO KONDAPALLI POWER LTD PH-IILANCO KONDAPALLI POWER
LTD THERMAL-GAS 000 000
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 220400 55400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 35450 139700
PPN POWER PPN POWER POWER THERMAL-GAS 145600 000
RINFRA-SPS RELIANCE INFRAS LTD THERMAL-GAS 46630 53600
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 30623 130367
KONASEEMA GAS POWER LTD KONASEEMA GAS THERMAL-GAS 000 31400
UDUPI POWER CORPORATION LTD LANCO UDUPI POWER THERMAL-COAL 637182 44724
P-39
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GAS 106543 36426
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 353531 44213GMR VEMAGIRI POWER GENERATION
LTD GMR VEMAGIRI PGL THERMAL-GAS 17197 118200
EASTERN REGION
CENTRAL SECTOR
BOKARO `B` TPS DVC THERMAL-COAL 152029 41900
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 434806 41900
DURGAPUR TPS DVC THERMAL-COAL 167885 43278
DURGAPUR STEEL TPS DVC THERMAL-COAL 415723 43278
MEJIA TPS DVC THERMAL-COAL 1195338 43278
KODERMA TPS DVC THERMAL-COAL 139150 41900
MAITHON HPS DVC HYDRO-HYDRO 9757 43278
PANCHET HPS DVC HYDRO-HYDRO 12650 41900
TILLAYA HPS DVC HYDRO-HYDRO 456 41900
RANGIT HPS NHPC LTD HYDRO-HYDRO 34700 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 227300 23380
TLDP - III NHPC LTD HYDRO-HYDRO 18900 000
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 970344 39600
FARAKKA STPS III NTPC LTD THERMAL-COAL 297195 47800
KAHALGAON TPS I NTPC LTD THERMAL-COAL 544944 37600
KAHALGAON TPS II NTPC LTD THERMAL-COAL 846271 38500
TALCHER TPS NTPC LTD THERMAL-COAL 340799 17900
TALCHER KANIHA I NTPC LTD THERMAL-COAL 676567 23500
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1373163 22800
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 28198 51140
STATE SECTOR
ANDMAN amp NIC ISLAND ED(53 Stns) ANDMAN amp NIC ISLAND TH-
DIESEL+H+SOLAR27499 185900
Barauni T P S BIHAR STATE POWER GENCO THERMAL-COAL 000 000
EG CANAL HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 2276 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 564 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 82800 24900
PATRATU TPS Ω JHARKHAND BVNL THERMAL-COAL 73113 76332
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 10951 19869
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 163196 7112
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 68601 9253
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 30617 5219
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 88547 7846
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 244511 8052
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 85231 3535
MACHHKUND HEP ODISHA HPCL HYDRO-HYDRO 23512 3080
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 254712 20940
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 200143 30764
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 169575 44091
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 559229 30349
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 628193 32069
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 118825 33822
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 246733 35822
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 295427 32115
P-40
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 15900 65900
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 26600 65900
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 9900 65900
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 78500 65900
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2500 65900
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 817500 61100
DISHERGARH POWER STATION INDIA POWER THERMAL-COAL 1411 42400
RAJRAPPA EASTERN (I) POWERTECH THERMAL-WR 2118 000
GIDI EASTERN (I) POWERTECH THERMAL-WR 2191 000
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 38500 49100
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 74800 39100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 66900 38400
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 74200 39900
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 275900 37600
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 32600 27700
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 31900 27700
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22500 27700
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 62300 27840
AGARTALA GT NEEPCO THERMAL-GAS 64165 37138
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 172642 34221
DOYANG HPS NEEPCO HYDRO-HYDRO 24574 41546
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 97317 9505
RANGANADI HPS NEEPCO HYDRO-HYDRO 98091 24376
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 42040 14250
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 81747 36477
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 49498 37967
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
LANG MHP GOVT OF NAGALAND HYDRO-HYDRO 061 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 6854 9700
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4123 13780
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 13320 13500
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 17451 9100
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 2091 9000
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 539 11400
LESHKA MEGHALAYA ENE COR LTD HYDRO-HYDRO 41228 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 057 35900
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 156 35900
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 064 35900
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 206 35900
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 120 35900
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 671 35900
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 4149 35900
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 35900
BARAMURA GT TRIPURA SECL THERMAL-GAS 27224 51494
ROKHIA GT TRIPURA SECL THERMAL-GAS 44967 51494
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3428 51494
Note
P-41
LIG Lignite MMH Mini Micro Hydel N Naptha 000 Not given WHR Waste Heat Recovery amp WR Washery Rejects
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2012-13 data
Ω COD = ROSP(Concerned Utilities not given ROSOP)