Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

Embed Size (px)

Citation preview

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    1/191

    BSC6900 GSM

    V900R011C00

    Site Maintenance Guide

    Issue 06

    Date 2010-09-15

    HUAWEI TECHNOLOGIES CO., LTD.

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    2/191

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    3/191

    Copyright Huawei Technologies Co., Ltd. 2010. All rights reserved.

    No part of this document may be reproduced or transmitted in any form or by any means without prior written

    consent of Huawei Technologies Co., Ltd.

    Trademarks and Permissions

    and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.

    All other trademarks and trade names mentioned in this document are the property of their respective holders.

    Notice

    The purchased products, services and features are stipulated by the contract made between Huawei and the

    customer. All or part of the products, services and features described in this document may not be within the

    purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,and recommendations in this document are provided "AS IS" without warranties, guarantees or representations

    of any kind, either express or implied.

    The information in this document is subject to change without notice. Every effort has been made in the

    preparation of this document to ensure accuracy of the contents, but all statements, information, and

    recommendations in this document do not constitute the warranty of any kind, express or implied.

    Huawei Technologies Co., Ltd.

    Address: Huawei Industrial Base

    Bantian, Longgang

    Shenzhen 518129

    People's Republic of China

    Website: http://www.huawei.com

    Email: [email protected]

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    i

    http://www.huawei.com/
  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    4/191

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    5/191

    About This Document

    Purpose

    This document describes how to maintain the hardware of the BSC6900 after the BSC6900

    commissioning. The maintenance involves powering on/off the BSC6900 cabinet, replacing

    components, and routine maintenance tasks such as checking LEDs and monitoring the siteenvironment.

    Version

    The following table lists the product version related to the document.

    Product Name Version

    BSC6900 V900R011C00

    Intended Audience

    This document is intended for:

    l Network planning engineers

    l System engineers

    l Field engineers

    Organization

    1 Changes in BSC6900 GSM Site Maintenance Guide

    This chapter describes the changes in the BSC6900 GSM Site Maintenance Guide.

    2 Site Maintenance Preparations

    This chapter describes the preparations for the BSC6900 site maintenance, including the tool

    and spare part preparations.

    3 Routine Hardware Maintenance Items

    BSC6900 GSM

    Site Maintenance Guide About This Document

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    iii

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    6/191

    This chapter describes the routine maintenance of the BSC6900 hardware. Different

    maintenance items require different maintenance methods.

    4 Powering On/Off the BSC6900

    This chapter describes how to power on and power off the BSC6900. The following is described:the distribution of the power switches, powering on the BSC6900 cabinet, powering off the

    BSC6900 cabinet in a normal situation, and powering off the BSC6900 cabinet in case of

    emergencies.

    5 Cleaning the Fan Box

    This chapter describes how to clean a fan box. To ensure stability and reliability of the equipment,

    the maintenance personnel should clean each fan box (including the fan boxes in the service

    subracks and the fan boxes in the independent fan subrack) regularly, preferably once every

    year.

    6 Cleaning and Replacing the Air Filters

    This chapter describes how to clean and replace an air filter. The air filter protects the boards

    and the BSC6900 from dust. If an air filter is damaged, you must replace it with a new one in

    time.

    7 Replacing Boards and Modules

    This chapterdescribes how to replace boards and modules in the BSC6900 cabinet, which

    involves replacing the boards and modules, acknowledging a successful replacement, and

    handling of the faulty boards.

    8 Replacing the Cables

    This chapter describes how to replace the Ethernet cable, E1/T1 cable, optical cable, clock signalcable, cable to the alarm box, and power distribution box monitoring cable. This also describes

    how to check that the cables are successfully replaced and how to handle the faulty cables.

    9 LEDs on the Boards

    This chapter describes the LEDs on the BSC6900 boards.

    10 DIP Switches on Components

    This chapterdescribes the DIP switches on the boards and subracks of the BSC6900.

    11 BSC6900 Site Maintenance Record

    This chapter describes the BSC6900 site maintenance record.

    Conventions

    Symbol Conventions

    The symbols that may be found in this document are defined as follows.

    Symbol Description

    Indicates a hazard with a high level of risk, which if not

    avoided,will result in death or serious injury.

    About This Document

    BSC6900 GSM

    Site Maintenance Guide

    iv Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 06 (2010-09-15)

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    7/191

    Symbol Description

    Indicates a hazard with a medium or low level of risk, which

    if not avoided, could result in minor or moderate injury.

    Indicates a potentially hazardous situation, which if not

    avoided,could result in equipment damage, data loss,

    performance degradation, or unexpected results.

    Indicates a tip that may help you solve a problem or save

    time.

    Provides additional information to emphasize or supplement

    important points of the main text.

    General Conventions

    The general conventions that may be found in this document are defined as follows.

    Convention Description

    Times New Roman Normal paragraphs are in Times New Roman.

    Boldface Names of files, directories, folders, and users are in

    boldface. For example, log in as userroot.

    Italic Book titles are in italics.

    Courier New Examples of information displayed on the screen are in

    Courier New.

    Command Conventions

    The command conventions that may be found in this document are defined as follows.

    Convention Description

    Boldface The keywords of a command line are in boldface.

    Italic Command arguments are in italics.

    [ ] Items (keywords or arguments) in brackets [ ] are optional.

    { x | y | ... } Optional items are grouped in braces and separated by

    vertical bars. One item is selected.

    [ x | y | ... ] Optional items are grouped in brackets and separated by

    vertical bars. One item is selected or no item is selected.

    { x | y | ... }* Optional items are grouped in braces and separated by

    vertical bars. A minimum of one item or a maximum of all

    items can be selected.

    BSC6900 GSM

    Site Maintenance Guide About This Document

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    v

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    8/191

    Convention Description

    [ x | y | ... ]* Optional items are grouped in brackets and separated by

    vertical bars. Several items or no item can be selected.

    GUI Conventions

    The GUI conventions that may be found in this document are defined as follows.

    Convention Description

    Boldface Buttons, menus, parameters, tabs, window, and dialog titles

    are in boldface. For example, clickOK.

    > Multi-level menus are in boldface and separated by the ">"

    signs. For example, choose File > Create > Folder.

    Keyboard Operations

    The keyboard operations that may be found in this document are defined as follows.

    Format Description

    Key Press the key. For example, press Enter and press Tab.

    Key 1+Key 2 Press the keys concurrently. For example, pressing Ctrl+Alt

    +A means the three keys should be pressed concurrently.

    Key 1, Key 2 Press the keys in turn. For example, pressing Alt, A means

    the two keys should be pressed in turn.

    Mouse Operations

    The mouse operations that may be found in this document are defined as follows.

    Action Description

    Click Select and release the primary mouse button without moving

    the pointer.

    Double-click Press the primary mouse button twice continuously and

    quickly without moving the pointer.

    Drag Press and hold the primary mouse button and move the

    pointer to a certain position.

    About This Document

    BSC6900 GSM

    Site Maintenance Guide

    vi Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 06 (2010-09-15)

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    9/191

    Contents

    About This Document...................................................................................................................iii

    1 Changes in BSC6900 GSM Site Maintenance Guide..........................................................1-1

    2 Site Maintenance Preparations................................................................................................2-1

    2.1 Site Maintenance Tool Preparations...............................................................................................................2-2

    2.2 Spare Part Preparations...................................................................................................................................2-2

    3 Routine Hardware Maintenance Items..................................................................................3-1

    3.1 Equipment Room Maintenance Items.............................................................................................................3-2

    3.2 Maintaining the Power Supply and Grounding System..................................................................................3-2

    3.3 Cabinet Maintenance Items.............................................................................................................................3-4

    3.4 Cable Maintenance Items................................................................................................................................3-5

    4 Powering On/Off the BSC6900................................................................................................4-1

    4.1 Distribution of Power Switches on the Common Power Distribution Box.....................................................4-24.2 Distribution of Power Switches on the High-Power PDB..............................................................................4-4

    4.3 Powering On the Cabinet................................................................................................................................4-5

    4.4 Powering Off the Cabinet in a Normal Situation............................................................................................4-8

    4.5 Powering Off the Cabinet in Emergency Cases..............................................................................................4-9

    5 Cleaning the Fan Box.................................................................................................................5-1

    6 Cleaning and Replacing the Air Filters.................................................................................6-1

    6.1 Position of the Air Filters................................................................................................................................6-2

    6.2 Cleaning the Air Filter at the Bottom of the N68E-22 Cabinet......................................................................6-3

    6.3 Cleaning the Air Filter on the Inner Side of the Cabinet Door.......................................................................6-5

    6.4 Replacing the Air Filters.................................................................................................................................6-6

    7 Replacing Boards and Modules...............................................................................................7-1

    7.1 Strategy on Replacing Legacy Components in an Upgrade Scenario.............................................................7-4

    7.2 Procedure for Replacing a Board....................................................................................................................7-4

    7.2.1 Removing a Board..................................................................................................................................7-5

    7.2.2 Inserting a Board....................................................................................................................................7-7

    7.3 Replacing a DPUa/DPUc/DPUd Board..........................................................................................................7-9

    7.4 Replacing an EIUa Board..............................................................................................................................7-11

    7.5 Replacing an FG2a Board.............................................................................................................................7-14

    BSC6900 GSM

    Site Maintenance Guide Contents

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    vii

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    10/191

    7.6 Replacing an FG2c Board.............................................................................................................................7-17

    7.7 Replacing a GCUa Board..............................................................................................................................7-21

    7.8 Replacing a GOUa Board..............................................................................................................................7-23

    7.9 Replacing a GOUc Board..............................................................................................................................7-27

    7.10 Replacing an MDMC Board.......................................................................................................................7-30

    7.11 Replacing an OIUa Board...........................................................................................................................7-32

    7.12 Replacing an OMU Board...........................................................................................................................7-35

    7.12.1 Querying the OMU Information .......................................................................................................7-36

    7.12.2 Backing Up System Files...................................................................................................................7-37

    7.12.3 Replacing OMU Board Hardware......................................................................................................7-38

    7.12.4 Installing the Operating System and Loading the OMU Application................................................7-40

    7.12.5 Verifying Board Replacement ...........................................................................................................7-42

    7.13 Replacing a PAMU Board...........................................................................................................................7-43

    7.14 Replacing a PEUa Board.............................................................................................................................7-467.15 Replacing a POUc Board............................................................................................................................7-49

    7.16 Replacing an SCUa Board...........................................................................................................................7-52

    7.17 Replacing a TNUa Board............................................................................................................................7-55

    7.18 Replacing an XPUa Board..........................................................................................................................7-57

    7.19 Replacing an XPUb Board..........................................................................................................................7-60

    7.20 Replacing a WOPB Board...........................................................................................................................7-63

    7.21 Replacing a Subrack....................................................................................................................................7-65

    7.22 Replacing the Independent Fan Subrack.....................................................................................................7-66

    7.23 Replacing the Power Distribution Box........................................................................................................7-68

    7.24 Replacing the Fan Box................................................................................................................................7-74

    7.25 Replacing the Pluggable Optical Module....................................................................................................7-78

    7.26 Replacing the KVM....................................................................................................................................7-80

    7.27 Replacing the LAN Switch.........................................................................................................................7-82

    7.28 Replacing the GBAM..................................................................................................................................7-83

    8 Replacing the Cables.................................................................................................................8-1

    8.1 Replacing a Power Cable................................................................................................................................8-3

    8.2 Replacing an E1/T1 Cable...............................................................................................................................8-5

    8.3 Replacing an Optical Cable.............................................................................................................................8-7

    8.4 Replacing an Ethernet Cable...........................................................................................................................8-9

    8.5 Replacing a Clock Signal Cable....................................................................................................................8-11

    8.6 Replacing a Y-Shaped Clock Cable..............................................................................................................8-13

    8.7 Replacing an Inter-TNUa Cable....................................................................................................................8-14

    8.8 Replacing an EMU RS485 Communication Cable.......................................................................................8-16

    8.9 Replacing a Signal Cable to the Alarm Box.................................................................................................8-17

    8.10 Replacing the Monitoring Signal Cable for the Power Distribution Box...................................................8-18

    8.11 Replacing the Monitoring Signal Cable for the Independent Fan Subrack.................................................8-20

    9 LEDs on the Boards....................................................................................................................9-1

    9.1 LEDs on the DPUa Board...............................................................................................................................9-3

    Contents

    BSC6900 GSM

    Site Maintenance Guide

    viii Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 06 (2010-09-15)

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    11/191

    9.2 LEDs on the DPUc Board...............................................................................................................................9-3

    9.3 LEDs on the DPUd Board...............................................................................................................................9-4

    9.4 LEDs on the EIUa Board................................................................................................................................ 9-4

    9.5 LEDs on the FG2a Board................................................................................................................................9-5

    9.6 LEDs on the FG2c Board................................................................................................................................9-6

    9.7 LEDs on the GCUa Board...............................................................................................................................9-7

    9.8 LEDs on the GOUa Board.............................................................................................................................. 9-7

    9.9 LEDs on the GOUc Board.............................................................................................................................. 9-8

    9.10 LEDs on the MDMC Board..........................................................................................................................9-9

    9.11 LEDs on the OIUa Board..............................................................................................................................9-9

    9.12 LEDs on the OMUa/OMUb Board.............................................................................................................9-10

    9.13 LEDs on the PAMU Board.........................................................................................................................9-11

    9.14 LEDs on the PEUa Board............................................................................................................................9-11

    9.15 LEDs on the POUc Board...........................................................................................................................9-12

    9.16 LEDs on the SCUa Board...........................................................................................................................9-13

    9.17 LEDs on the TNUa Board...........................................................................................................................9-13

    9.18 LEDs on the XPUa Board...........................................................................................................................9-14

    9.19 LEDs on the XPUb Board...........................................................................................................................9-15

    10 DIP Switches on Components.............................................................................................10-1

    10.1 DIP Switch on the Subrack.........................................................................................................................10-2

    10.2 DIP Switches on the EIUa Board................................................................................................................10-3

    10.3 DIP Switch on the MDMC Board...............................................................................................................10-6

    10.4 DIP Switch on the PAMU Board................................................................................................................10-6

    10.5 DIP Switches on the PEUa Board...............................................................................................................10-7

    10.6 DIP Switch on the PFCU Board................................................................................................................10-10

    10.7 Pins on the PFCB Board............................................................................................................................10-12

    11 BSC6900 Site Maintenance Record.....................................................................................11-1

    BSC6900 GSM

    Site Maintenance Guide Contents

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    ix

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    12/191

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    13/191

    Figures

    Figure 4-1 Mapping between the power switches and the components in the MPR (configured with OMU board)/

    EPR/TCR...............................................................................................................................................................4-2

    Figure 4-2 Mapping between the power switches and the components in the MPR (configured with GBAM)

    ...............................................................................................................................................................................4-3

    Figure 4-3 Distribution of power switches on the power distribution box of the MPR/EPR/TCR..................... 4-4Figure 6-1 Air filters in the single-door N68E-22 cabinet...................................................................................6-2

    Figure 6-2 Air filters in the double-door N68E-22 cabinet..................................................................................6-3

    Figure 6-3 Removing the air filter from the bottom of the cabinet......................................................................6-4

    Figure 6-4 Installing the air filter at the bottom of the cabinet............................................................................ 6-5

    Figure 7-1 Removing a board...............................................................................................................................7-6

    Figure 7-2 Installing a BSC6900 board................................................................................................................7-8

    Figure 7-3 Settings of DIP switch S2 on the MDMC board..............................................................................7-30

    Figure 7-4 Removing an OMU board................................................................................................................7-39

    Figure 7-5 Installing the OMU board.................................................................................................................7-40

    Figure 7-6 Setting of the DIP switch on the PAMU..........................................................................................7-44

    Figure 7-7 Removing the monitoring board panel of the power distribution box..............................................7-44

    Figure 7-8 Removing the PAMU board.............................................................................................................7-45

    Figure 7-9 Replacing a WOPB board.................................................................................................................7-64

    Figure 7-10 Rear panel of the common power distribution box........................................................................7-69

    Figure 7-11 Rear panel of the high-power distribution box...............................................................................7-69

    Figure 7-12 DIP switch on the PFCU................................................................................................................7-74

    Figure 7-13 DIP switch on the PFCU................................................................................................................7-75

    Figure 7-14 Jumper pins on the PFCB...............................................................................................................7-75

    Figure 7-15 Jumper pins on the PFCB...............................................................................................................7-76Figure 7-16 Removing the fan box.....................................................................................................................7-77

    Figure 7-17 Replacing an optical module..........................................................................................................7-79

    Figure 7-18 Distribution of the power switches in the MPR.............................................................................7-81

    Figure 7-19 Front panel of the power distribution box......................................................................................7-85

    Figure 10-1 Cover plate for the DIP switch on the subrack...............................................................................10-2

    Figure 10-2 Layout of the DIP switches on the EIUa board..............................................................................10-4

    Figure 10-3 DIP switch on the MDMC board....................................................................................................10-6

    Figure 10-4 Layout of the DIP switch on the PAMU board..............................................................................10-7

    Figure 10-5 Layout of the DIP switches on the PEUa board.............................................................................10-8

    Figure 10-6 DIP switch on the PFCU board....................................................................................................10-11

    BSC6900 GSM

    Site Maintenance Guide Figures

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    xi

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    14/191

    Figure 10-7 DIP switch on the PFCU board....................................................................................................10-11

    Figure 10-8 Pins on the PFCB board................................................................................................................10-12

    Figure 10-9 Pins on the PFCB board................................................................................................................10-13

    Figures

    BSC6900 GSM

    Site Maintenance Guide

    xii Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 06 (2010-09-15)

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    15/191

    Tables

    Table 2-1 Maintenance items and tools for site maintenance...............................................................................2-2

    Table 2-2 Recommended configuration of the BSC6900 spare parts..................................................................2-3

    Table 3-1 Maintenance items of the equipment room..........................................................................................3-2

    Table 3-2 Maintenance items of the power supply and grounding systems.........................................................3-3

    Table 3-3 BSC6900 cabinet maintenance items...................................................................................................3-4

    Table 3-4 Cable maintenance items......................................................................................................................3-5

    Table 4-1 Mapping between the power switches and the components in the MPR (configured with OMU board)/

    EPR/TCR...............................................................................................................................................................4-2

    Table 4-2 Mapping between the power switches and the components in the MPR (configured with GBAM)

    ...............................................................................................................................................................................4-3

    Table 4-3 Mapping between the power switches and the components in the MPR/EPR/TCR............................4-4

    Table 4-4 Checklist for the power supply to the cabinet components..................................................................4-6

    Table 4-5 Handling power failures in the components in the cabinet..................................................................4-6

    Table 7-1 Strategy on replacing faulty legacy components of the BSC6900.......................................................7-4

    Table 7-2 OMU information table .....................................................................................................................7-36

    Table 7-3 Checklist for the new power distribution box....................................................................................7-71

    Table 7-4 Checklist for the new power distribution box....................................................................................7-73

    Table 7-5 Setting of the DIP switch on the PFCU.............................................................................................7-75

    Table 7-6 Setting of the DIP switch on the PFCU.............................................................................................7-75

    Table 7-7 Setting of the jumper pins on the PFCB.............................................................................................7-76

    Table 7-8 Setting of the jumper pins on the PFCB.............................................................................................7-76

    Table 7-9 Checklist for replacing the fan box....................................................................................................7-77

    Table 7-10 Parameters of optical modules.........................................................................................................7-79

    Table 7-11 Checklist for LAN switch replacement............................................................................................7-83Table 7-12 Checklist for GBAM replacement...................................................................................................7-85

    Table 8-1 Setting switches SW1 to SW6..............................................................................................................8-4

    Table 8-2 Checklist for power cable replacement................................................................................................8-5

    Table 8-3 Checklist for E1/T1 cable replacement................................................................................................8-7

    Table 8-4 Checklist for optical cable replacement...............................................................................................8-9

    Table 8-5 Checklist for Ethernet cable replacement...........................................................................................8-11

    Table 8-6 Checklist for clock signal cable replacement.....................................................................................8-12

    Table 8-7 Checklist for the new Y-shaped clock cable......................................................................................8-14

    Table 8-8 Checklist for inter-TNUa cable replacement.....................................................................................8-15

    Table 8-9 Checklist for monitoring cable replacement......................................................................................8-19

    BSC6900 GSM

    Site Maintenance Guide Tables

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    xiii

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    16/191

    Table 8-10 Checklist for monitoring signal cable replacement..........................................................................8-20

    Table 9-1 LEDs on the DPUa board.....................................................................................................................9-3

    Table 9-2 LEDs on the DPUc board.....................................................................................................................9-3

    Table 9-3 LEDs on the DPUd board....................................................................................................................9-4

    Table 9-4 LEDs on the EIUa board......................................................................................................................9-4

    Table 9-5 LEDs on the FG2a board......................................................................................................................9-5

    Table 9-6 LEDs on the FG2c board......................................................................................................................9-6

    Table 9-7 LEDs on the GCUa board....................................................................................................................9-7

    Table 9-8 LEDs on the GOUa board....................................................................................................................9-7

    Table 9-9 LEDs on the GOUc board....................................................................................................................9-8

    Table 9-10 LEDs on the MDMC board................................................................................................................9-9

    Table 9-11 LEDs on the OIUa board....................................................................................................................9-9

    Table 9-12 LEDs on the OMUa/OMUb board...................................................................................................9-10

    Table 9-13 LEDs on the PAMU board...............................................................................................................9-11

    Table 9-14 LEDs on the PEUa board.................................................................................................................9-11

    Table 9-15 LEDs on the POUc board.................................................................................................................9-12

    Table 9-16 LEDs on the SCUa board.................................................................................................................9-13

    Table 9-17 LEDs on the TNUa board................................................................................................................ 9-14

    Table 9-18 LEDs on the XPUa board.................................................................................................................9-14

    Table 9-19 LEDs on the XPUb board................................................................................................................ 9-15

    Table 10-1 Description about the bits.................................................................................................................10-3

    Table 10-2 Setting of the DIP switch................................................................................................................. 10-3

    Table 10-3 Description of the DIP switches on the EIUa board........................................................................10-4Table 10-4 Description of the different DIP switches........................................................................................10-5

    Table 10-5 DIP switch on the MDMC board.....................................................................................................10-6

    Table 10-6 DIP switch on the PAMU board...................................................................................................... 10-7

    Table 10-7 Description about DIP switches on the PEUa board........................................................................10-9

    Table 10-8 DIP switch on the PFCU board (in a fan box of the service subrack)...........................................10-11

    Table 10-9 DIP switch on the PFCU board (in the independent fan subrack).................................................10-12

    Table 10-10 Pins on the PFCB board (in a fan box of the service subrack)....................................................10-12

    Table 10-11 Pins on the PFCB board (in the independent fan subrack)..........................................................10-13

    Table 11-1 BSC6900 site maintenance record...................................................................................................11-1

    Tables

    BSC6900 GSM

    Site Maintenance Guide

    xiv Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 06 (2010-09-15)

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    17/191

    1Changes in BSC6900 GSM Site MaintenanceGuide

    This chapter describes the changes in the BSC6900 GSM Site Maintenance Guide.

    06 (2010-09-15)

    This is the sixth commercial release.

    Compared with issue 05 (2010-05-31) of V900R011C00, this issue does not include any new

    topic.

    Compared with issue 05 (2010-05-31) of V900R011C00, this issue incorporates the following

    changes:

    Topic Change Description

    7.12 Replacing an OMU Board The procedure for replacing the faulty OMU board is

    modified.

    Compared with issue 05 (2010-05-31) of V900R011C00, this issue does not exclude any topic.

    05 (2010-05-31)

    This is the fifth commercial release.

    Compared with issue 04 (2010-03-25) of V900R011C00, this issue includes the following new

    topics:

    l 7.1 Strategy on Replacing Legacy Components in an Upgrade Scenario

    l 7.10 Replacing an MDMC Board

    l 7.20 Replacing a WOPB Board

    l 7.26 Replacing the KVM

    l 7.27 Replacing the LAN Switch

    l 7.28 Replacing the GBAM

    BSC6900 GSM

    Site Maintenance Guide 1 Changes in BSC6900 GSM Site Maintenance Guide

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    1-1

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    18/191

    Compared with issue 04 (2010-03-25) of V900R011C00, this issue incorporates the following

    changes:

    Topic Change Description

    7.3 Replacing a DPUa/DPUc/DPUd Board

    The procedure for replacing the faulty DPUa board isadded.

    7.23 Replacing the Power

    Distribution Box

    The procedure for replacing the faulty common power

    distribution box is added.

    4.3 Powering On the Cabinet The description about the caution is optimized.

    Compared with issue 04 (2010-03-25) of V900R011C00, this issue does not exclude any topic.

    04 (2010-03-25)

    This is the fourth commercial release.

    Compared with issue 03 (2009-12-05) of V900R011C00, this issue does not include any new

    topic.

    Compared with issue 03 (2009-12-05) of V900R011C00, this issue incorporates the following

    changes:

    Topic Change Description

    10.1 DIP Switch on the Subrack Figure of the setting of the DIP Switch is

    optimized.

    Compared with issue 03 (2009-12-05) of V900R011C00, this issue does not exclude any topic.

    03 (2009-12-05)

    This is the third commercial release.

    Compared with issue 02 (2009-10-30) of V900R011C00, this issue does not include any new

    topic.

    Compared with issue 02 (2009-10-30) of V900R011C00, this issue incorporates the following

    changes:

    Topic Change Description

    7.12 Replacing an OMU Board The procedure for replacing the faulty OMUa

    board is modified.

    Compared with issue 02 (2009-10-30) ofV900R011C00, this issue does not exclude any topic.

    1 Changes in BSC6900 GSM Site Maintenance Guide

    BSC6900 GSM

    Site Maintenance Guide

    1-2 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 06 (2010-09-15)

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    19/191

    02 (2009-10-30)

    This is the second commercial release.

    Compared with issue 01 (2009-07-30) of V900R011C00, this issue includes the following new

    topics:

    l 2.2 Spare Part Preparations

    Compared with issue 01 (2009-07-30) of V900R011C00, this issue incorporates the following

    changes:

    Topic Change Description

    7.12 Replacing an OMU Board The procedure for replacing the faulty OMUa

    board is modified.

    Compared with issue 01 (2009-07-30) of V900R011C00, this issue does not exclude any topic.

    01 (2009-07-30)

    This is the first commercial release.

    BSC6900 GSM

    Site Maintenance Guide 1 Changes in BSC6900 GSM Site Maintenance Guide

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    1-3

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    20/191

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    21/191

    2 Site Maintenance PreparationsAbout This Chapter

    This chapter describes the preparations for the BSC6900 site maintenance, including the tool

    and spare part preparations.

    2.1 Site Maintenance Tool Preparations

    This lists the tools for BSC6900 site maintenance. The tools must be placed in the equipment

    room or nearby places for easy use.

    2.2 Spare Part Preparations

    This section describes the spare parts for the BSC6900 site maintenance. The spare parts must

    be placed in the equipment room or in nearby places for easy use.

    BSC6900 GSM

    Site Maintenance Guide 2 Site Maintenance Preparations

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    2-1

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    22/191

    2.1 Site Maintenance Tool Preparations

    This lists the tools for BSC6900 site maintenance. The tools must be placed in the equipmentroom or nearby places for easy use.

    Table 2-1 lists the maintenance items and tools.

    Table 2-1 Maintenance items and tools for site maintenance

    Item Tools

    Cleaning the fan

    box

    ESD wrist strap, Phillips screwdriver, vacuum cleaner, ESD soft brush,

    and clean cotton cloth

    Cleaning the air

    filters

    ESD wrist strap, Phillips screwdriver, and clean cotton cloth

    Replacing a board ESD wrist strap, Phillips screwdriver, flat-head screwdriver, ESD box

    or bag, clean cotton cloth, and fiber cleaner

    Replacing the fan

    box, power

    distribution box,

    or subrack

    ESD wrist strap, Phillips screwdriver, flat-head screwdriver, ESD box

    or bag, diagonal pliers, dry cotton cloth, and fiber cleaner

    Replacing the

    cables

    ESD wrist strap, Ethernet meter, Ethernet cable pliers, flat-head

    screwdriver, clean cotton cloth, fiber cleaner, ESD gloves, and diagonal

    pliers

    Tools summary for

    the BSC6900 site

    maintenance

    ESD gloves, ESD wrist strap, Phillips screwdriver, flat-head

    screwdriver, ESD box or bag, dustfree cotton cloth, fiber cleaner,

    Ethernet cable tester, Ethernet cable pliers, vacuum cleaner, ESD soft

    brush, and diagonal pliers

    2.2 Spare Part Preparations

    This section describes the spare parts for the BSC6900 site maintenance. The spare parts must

    be placed in the equipment room or in nearby places for easy use.

    Principles for Preparing Spare Parts

    The principles for preparing the BSC6900 spare parts are as follows:

    l When a board that works in independent mode is faulty, the board fault disrupts the services

    carried on the board. Therefore, the priority to prepare a spare board for a board of this type

    is high.

    l When a board that works in resource pool mode is faulty, the board fault does not disrupt

    the services, but only deteriorates the performance of the system in certain aspects.

    Therefore, the priority to prepare a spare board for a board of this type is medium.

    2 Site Maintenance Preparations

    BSC6900 GSM

    Site Maintenance Guide

    2-2 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 06 (2010-09-15)

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    23/191

    l The filler panel is used for cabinet encapsulation and ventilation. It also ensures the

    electromagnetic shielding and neatness of the cabinet. Therefore, the priority to prepare a

    spare filler panel is medium.

    l When a board that works in active/standby mode is faulty, the board fault does not affect

    the services because the system automatically switches over the active and standby boards.Therefore, the priority to prepare a spare board for a board of this type is low.

    Recommended Configuration of Spare Parts

    Table 2-2 describes the recommended configuration of the BSC6900 spare parts.

    Table 2-2 Recommended configuration of the BSC6900 spare parts

    Spare Part Quantity

    Fan box One for each site

    Filler panel Two for each site

    Power distribution

    box

    One for each site

    Board One spare SCUa, DPUc, XPUa/XPUb, GCUa, OMUa/OMUb, and

    TNUa board for each site

    One spare DPUa, DPUd, EIUa, OIUa, POUc, PEUa, FG2a/FG2c, and

    GOUa/GOUc board for each site if these boards are configured

    Optical module One spare optical module for each site if the optical module is configured

    NOTE

    The operator can also apply for a right quantity of spare parts according to the site configuration.

    BSC6900 GSM

    Site Maintenance Guide 2 Site Maintenance Preparations

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    2-3

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    24/191

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    25/191

    3 Routine Hardware Maintenance ItemsAbout This Chapter

    This chapterdescribes the routine maintenance of the BSC6900 hardware. Different

    maintenance items require different maintenance methods.

    3.1 Equipment Room Maintenance Items

    This section describes the maintenance items in the BSC6900 equipment room. The items

    include the ambience alarm, anti-theft device, door and window, temperature, humidity, indoor

    air conditioner, and dustproof condition.

    3.2 Maintaining the Power Supply and Grounding System

    This section describes the maintenance items of the BSC6900 power supply and the grounding

    system. The maintenance items consist of power cables, voltage, PGND cables, components

    inside the cabinet, earth resistance, batteries, and rectifier.

    3.3 Cabinet Maintenance Items

    This section describes the maintenance items of the BSC6900 cabinet. The maintenance items

    consist of fans, air filters, cabinet surface, locks and doors of cabinet, cabinet cleanliness, fan

    box cleanliness, ESD wrist strap, cabinet components, and idle optical ports on boards.

    3.4 Cable Maintenance Items

    This section describes the cable maintenance items. The maintenance items consist of cable

    labels, connectors and sockets, connection of E1/T1 cables, connection of Ethernet cables, and

    connection of optical cables.

    BSC6900 GSM

    Site Maintenance Guide 3 Routine Hardware Maintenance Items

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    3-1

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    26/191

    3.1 Equipment Room Maintenance Items

    This section describes the maintenance items in the BSC6900 equipment room. The items

    include the ambience alarm, anti-theft device, door and window, temperature, humidity, indoor

    air conditioner, and dustproof condition.

    Table 3-1 lists the maintenance items of the equipment room.

    Table 3-1 Maintenance items of the equipment room

    Item Interval Operation Guide ReferenceStandard

    Alarms on

    equipment room

    environment

    Daily Check whether power

    supply alarms, fire

    alarms, or smokealarms are generated.

    No power supply

    alarms, fire alarms, or

    smoke alarms arereported.

    Check anti-theft nets,

    equipment room

    doors, and windows

    Weekly Check whether the

    anti-theft nets, doors,

    and windows are

    intact.

    The anti-theft device,

    door, and window are

    in good condition.

    Check room

    temperature

    Daily Check the

    temperature indicator

    in the equipment

    room.

    The temperature is

    between 15C and 30

    C.

    Check room

    humidity

    Daily Check the humidity

    indicator in the

    equipment room.

    The humidity is

    between 40% and

    65%.

    Check indoor air

    conditioner

    Weekly Check the running

    status of the air

    conditioner.

    The air conditioner

    works properly. The

    temperature set on the

    air conditioner is

    consistent with that

    on the thermometer.

    Check dustproof

    condition

    Weekly Check the equipment

    shell, equipmentinterior, floor, and

    desktop.

    The cabinet surface is

    clean, and the cabinetinterior is dustfree.

    3.2 Maintaining the Power Supply and Grounding System

    This section describes the maintenance items of the BSC6900 power supply and the grounding

    system. The maintenance items consist of power cables, voltage, PGND cables, components

    inside the cabinet, earth resistance, batteries, and rectifier.

    Table 3-2 lists the maintenance items of the power supply and grounding systems.

    3 Routine Hardware Maintenance Items

    BSC6900 GSM

    Site Maintenance Guide

    3-2 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 06 (2010-09-15)

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    27/191

    Table 3-2 Maintenance items of the power supply and grounding systems

    Item Interval Operation Guide Reference Standard

    Power cables Monthly or

    quarterly

    Check all the power cables

    between the power supplysystem and the power

    distribution box of the

    cabinet.

    l The power cables are not

    aged.l The PGND cables are

    securely connected. The

    connection points are not

    corroded.

    Voltage Monthly or

    quarterly

    Measure the voltage of the

    power supply using a

    multimeter.

    The voltage of the power

    supply is within the standard

    voltage range. For details,

    refer to Technical

    Specifications of the Cabinet.

    PGND cables Monthly orquarterly

    Check all the PGNDcables and grounding

    bars.

    lThe PGND cables are notaged.

    l The PGND cables are

    securely connected. The

    connection points are not

    corroded.

    l The grounding bars are

    not corroded. Proper anti-

    corrosion measures are

    taken.

    Components

    inside the

    cabinet

    Monthly or

    quarterly

    Check the connection

    terminals and captive

    screws of all the PGND

    cables.

    l The PGND cables are not

    aged.

    l The PGND cables are

    securely connected. The

    connection points are not

    corroded.

    l The connection terminals

    and captive screws are

    securely and correctly

    connected, and they are

    not corroded.

    Earthresistance

    Monthly orquarterly

    Use an electric earthresistance tester to

    measure the earth

    resistance and keep a

    record.

    The grounding resistance isless than 10 ohms.

    BSC6900 GSM

    Site Maintenance Guide 3 Routine Hardware Maintenance Items

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    3-3

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    28/191

    Item Interval Operation Guide Reference Standard

    Batteries and

    rectifier

    Yearly Check the batteries and

    rectifier of the power

    supply system in each

    equipment room.

    l The batteries are normal.

    There is no battery

    leakage, swelling, or

    corrosion.

    l The capacity of all

    batteries meets the

    standard requirements

    and the batteries are

    correctly connected.

    l The rectifier meets the

    required specifications.

    3.3 Cabinet Maintenance Items

    This section describes the maintenance items of the BSC6900 cabinet. The maintenance items

    consist of fans, air filters, cabinet surface, locks and doors of cabinet, cabinet cleanliness, fan

    box cleanliness, ESD wrist strap, cabinet components, and idle optical ports on boards.

    Table 3-3 lists the maintenance items of the BSC6900 cabinet.

    Table 3-3 BSC6900 cabinet maintenance items

    Item Interval Operation Guide Reference Standard

    FansWeekly or

    monthly

    Check the running state of

    the fans.

    The fan works properly

    without making abnormal

    sounds.

    Air filters QuarterlyCheck the air filters of

    each cabinet.

    The air filters are dust-free

    or damaged. Clean the dirty

    air filter according to 6

    Cleaning and Replacing

    the Air Filters. Replace

    the damaged air filter

    according to 6.4 Replacing

    the Air Filters.

    Cabinet surfaceMonthly or

    quarterly

    Check the cabinet surface

    and the cabinet labels.

    The cabinet surface is

    intact. The labels are

    legible.

    Locks and

    doors

    Monthly or

    quarterly

    Check whether the lock is

    normal and the door can be

    opened and closed easily.

    The locks and the doors of

    the cabinet work properly.

    Cleanness of

    the cabinets

    Monthly or

    quarterly

    Check whether the cabinet

    is clean.

    The cabinet surface is

    clean. The interior of the

    cabinet is dust-free.

    3 Routine Hardware Maintenance Items

    BSC6900 GSM

    Site Maintenance Guide

    3-4 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 06 (2010-09-15)

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    29/191

    Item Interval Operation Guide Reference Standard

    Cleanness of

    the fan boxYearly

    Clean the fan box

    according to 5 Cleaning

    the Fan Box.

    The surface of the fan box

    is clean. The interior of the

    fan box is dust-free.

    Inside of the

    cabinet

    Monthly or

    quarterly

    Check the LEDs of every

    component inside the

    cabinet.

    The LEDs work properly.

    For details on the LEDs,

    refer to the following part:

    Front Panel of the High-

    Power Power Distribution

    Box, Fan Box (Configured

    with the PFCU Board), Fan

    Box (Configured with the

    PFCB Board), 9 LEDs on

    the Boards.

    ESD wrist strap Quarterly

    Measure the grounding

    resistance of the ESD wrist

    strap as follows:

    l Use an ESD wrist strap

    tester to test the ESD

    wrist strap.

    l Use a multimeter.

    l When you use an ESDwrist strap tester, the

    GOOD LED on it is

    ON.

    l When you use a

    multimeter, the

    grounding resistance of

    the ESD wrist strap

    ranges from 0.8

    megohm to 1.2

    megohms.

    Protection of

    the idle optical

    ports on boards

    Monthly or

    quarterly

    Check the dustproof caps

    on the idle optical ports.

    The dustproof caps are on

    the idle optical ports.

    3.4 Cable Maintenance Items

    This section describes the cable maintenance items. The maintenance items consist of cable

    labels, connectors and sockets, connection of E1/T1 cables, connection of Ethernet cables, and

    connection of optical cables.

    Table 3-4 describes the cable maintenance items.

    Table 3-4 Cable maintenance items

    Item Interval Operation Guide Reference Standard

    Check

    connectors and

    sockets

    Monthly or

    quarterly

    Check the insulators of

    the connectors or the

    sockets.

    The insulators of the

    connectors or the sockets

    are clean.

    BSC6900 GSM

    Site Maintenance Guide 3 Routine Hardware Maintenance Items

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    3-5

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    30/191

    Item Interval Operation Guide Reference Standard

    E1/T1 cableconnections

    Yearly Check the connectionsof the E1/T1 cables.

    l The E1/T1 cables are

    properly connected.

    l The E1/T1 cables areintact.

    l The labels on the cables

    are legible.

    Ethernet cable

    connectionsYearly

    Check the connections

    of the Ethernet cables.

    l The Ethernet cables are

    properly connected.

    l The Ethernet cables are

    intact.

    l The labels on the cables

    are legible.

    Optical cable

    connectionsYearly

    Check the connections

    of the optical cables.

    l The optical cables are

    properly connected.

    l The optical cables are

    intact.

    l The labels on the cables

    are legible.

    3 Routine Hardware Maintenance Items

    BSC6900 GSM

    Site Maintenance Guide

    3-6 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 06 (2010-09-15)

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    31/191

    4 Powering On/Off the BSC6900About This Chapter

    This chapter describes how to power on and power off the BSC6900. The following is described:

    the distribution of the power switches, powering on the BSC6900 cabinet, powering off the

    BSC6900 cabinet in a normal situation, and powering off the BSC6900 cabinet in case of

    emergencies.

    4.1 Distribution of Power Switches on the Common Power Distribution Box

    This section describes the mapping between the six routes of power outputs from the power

    distribution box of the BSC6900 cabinet and the components in the BSC6900 cabinet.

    4.2 Distribution of Power Switches on the High-Power PDB

    The power distribution box of the MPR/EPR/TCR provides 20 (10 x 2) routes of power outputs.

    This section describes the mapping between the eight routes of power outputs from the power

    distribution box of the MPR/EPR/TCR and the components in the cabinet.

    4.3 Powering On the Cabinet

    This section describes how to power on the BSC6900 cabinet and how to handle common power

    failures in the components of the cabinet.

    4.4 Powering Off the Cabinet in a Normal Situation

    This section describes how to power off the BSC6900 cabinet in a normal situation. You must

    power off the BSC6900 cabinet before relocating the equipment or before a forecasted territorial

    power blackout. Powering off the BSC6900 cabinet disrupts all the ongoing services. Therefore,power off the BSC6900 cabinet only when required.

    4.5 Powering Off the Cabinet in Emergency Cases

    This section describes how to power off the BSC6900 cabinet in emergency cases. To ensure

    the security of the BSC6900 cabinet, the BSC6900 cabinet must be powered off in emergency

    cases, such as fire, smoke, or water immersion.

    BSC6900 GSM

    Site Maintenance Guide 4 Powering On/Off the BSC6900

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    4-1

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    32/191

    4.1 Distribution of Power Switches on the Common PowerDistribution Box

    This section describes the mapping between the six routes of power outputs from the power

    distribution box of the BSC6900 cabinet and the components in the BSC6900 cabinet.

    Distribution of Power Switches on the Power Distribution Box of the MPR(Configured with OMU Board)/EPR/TCR

    When the MPR is configured with the OMU board, the distribution of power switches on the

    power distribution box of the MPR is the same as the distribution of power switches on the power

    distribution box of the EPR/TCR. Figure 4-1 shows the mapping between the six power switches

    on the power distribution box and the components in the MPR (configured with OMU board)/

    EPR/TCR. Table 4-1 presents the mapping between the six power switches and the componentsin the MPR (configured with OMU board)/EPR/TCR.

    Figure 4-1 Mapping between the power switches and the components in the MPR (configured

    with OMU board)/EPR/TCR

    Table 4-1 Mapping between the power switches and the components in the MPR (configured

    with OMU board)/EPR/TCR

    Component Power Switch on the Power Distribution Box

    Subrack 2 SW1, SW4

    Subrack 1 SW2, SW5

    4 Powering On/Off the BSC6900

    BSC6900 GSM

    Site Maintenance Guide

    4-2 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 06 (2010-09-15)

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    33/191

    Component Power Switch on the Power Distribution Box

    Subrack 0 SW3, SW6

    Distribution of Power Switches on the Power Distribution Box of the MPR(Configured with GBAM)

    Figure 4-2 shows the mapping between the six power switches on the power distribution box

    and the components in the MPR that is configured with GBAM. Table 4-2 presents the mapping

    between the six power switches on the power distribution box and the components in the MPR

    that is configured with GBAM.

    Figure 4-2 Mapping between the power switches and the components in the MPR (configured

    with GBAM)

    Table 4-2 Mapping between the power switches and the components in the MPR (configured

    with GBAM)

    Component Power Switch on the Power Distribution Box

    Subrack 1 SW1, SW4

    Subrack 0 SW2, SW5

    KVM SW3

    LAN switch SW3

    BSC6900 GSM

    Site Maintenance Guide 4 Powering On/Off the BSC6900

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    4-3

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    34/191

    Component Power Switch on the Power Distribution Box

    GBAM SW3, SW6

    4.2 Distribution of Power Switches on the High-Power PDB

    The power distribution box of the MPR/EPR/TCR provides 20 (10 x 2) routes of power outputs.

    This section describes the mapping between the eight routes of power outputs from the power

    distribution box of the MPR/EPR/TCR and the components in the cabinet.

    The power distribution box of the MPR/EPR/TCR provides eight routes of power outputs in two

    groups (group A and group B), which are controlled by switches A7 to A10 and B7 to B10

    respectively. Figure 4-3 shows the mapping between the power switches on the power

    distribution box and the components in the MPR/EPR/TCR. Table 4-3 lists the mapping between

    the power switches and the components.

    Figure 4-3 Distribution of power switches on the power distribution box of the MPR/EPR/TCR

    Table 4-3 Mapping between the power switches and the components in the MPR/EPR/TCR

    Component Power Switch on the Power Distribution Box

    Subrack 2 A8, B8

    Subrack 1 A9, B9

    Subrack 0 A10, B10

    4 Powering On/Off the BSC6900

    BSC6900 GSM

    Site Maintenance Guide

    4-4 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 06 (2010-09-15)

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    35/191

    Component Power Switch on the Power Distribution Box

    Independent fan subrack A7, B7

    4.3 Powering On the Cabinet

    This section describes how to power on the BSC6900 cabinet and how to handle common power

    failures in the components of the cabinet.

    Prerequisite

    l The surface of the input power cables is not damaged. The input power cables are correctly

    and securely connected.

    l The green and yellow PGND cable for the cabinet is properly connected.

    l The power switches SW1 to SW6 (or A1 to A10 and B1 to B10) on the power distribution

    box are set to OFF.

    CAUTION

    Ensure that the Checking and Setting the DIP Switch of the Subrack operation is performed

    before the cabinet is powered on. After the cabinet is powered on, any modification to the setting

    of a DIP switch on a subrack does not take effect.

    Procedure

    Step 1 Set the power switches that control the BSC power supply on the power distribution frame (PDF)to ON.

    Step 2 Set the power switches on the power distribution box to ON after the RUN LED on the frontpanel of the power distribution box blinks every alternate 0.25s.

    If the cabinet is... Then...

    MPR, Set the corresponding power switches on the power distribution

    box to ON. Then, go to Step 3.

    EPR/TCR, Set the power switches that correspond to the subracksconfigured in the same cabinet to ON. Then, go to Step 4.

    Step 3 Set the power switch on the front panel of the GBAM and the power switch on the rear panel ofthe KVM to ON if the GBAM is configured.

    Step 4 Check the power supply to the cabinet components, as listed in Table 4-4.

    BSC6900 GSM

    Site Maintenance Guide 4 Powering On/Off the BSC6900

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    4-5

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    36/191

    Table 4-4 Checklist for the power supply to the cabinet components

    Component Normal LED Status

    Board The green RUN LED on the board panel blinks every

    alternate second.

    Fan box The green LED on the panel of the fan box blinks every

    alternate second after the subrack/independent fan

    subrack is powered on.

    Power distribution monitor board The green RUN LED on the board panel blinks every

    alternate second.

    GBAM The main power LED on the front panel is on.

    LAN switch The POWER LED on the front panel is on.

    KVM The POWER LED on the keyboard is on.

    Step 5 Power on the cabinet and then check the power supply to the components in the cabinet. Clearthe power failures, if any, according to Table 4-5.

    Table 4-5 Handling power failures in the components in the cabinet

    Failure Type Handling Measures

    Power failure in all the internal

    parts of the cabinet

    Check whether the -48 V power cables and the RTN power

    cables are properly connected.

    l If the cable connection is wrong, set all the powerswitches on the power distribution box to OFF, and then

    reconnect the power cables.

    CAUTIONSet the power switches that control the BSC power supply on

    the PDF to OFF before reconnecting the power cables.

    l If the cable connection is correct, replace the

    Overvoltage Protection Board (WOPB). If the failure

    persists, replace the power distribution box.

    Power failure in all the boards

    in a subrack

    Use a multimeter to measure the input voltage of the subrack

    l If the input voltage is between -40 V and -57 V, replace

    the subrack.

    l If the input voltage is not between -40 V and -57 V, check

    the connections of the power cables. If the connections

    of the power cables are loose, set the power switch on

    the power distribution box corresponding to the subrack

    to OFF and then reconnect the power cables. Otherwise,

    replace the power distribution box because the power

    switch on it may be faulty.

    4 Powering On/Off the BSC6900

    BSC6900 GSM

    Site Maintenance Guide

    4-6 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 06 (2010-09-15)

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    37/191

    Failure Type Handling Measures

    Power failure in a certain board

    in a subrack

    Perform the following operations:

    1. Check whether the board is securely connected. If the

    board is not securely connected, reinstall the board.Observe the LEDs on the board panel. For details about

    the states of the LEDs on the board panel, see 9 LEDs

    on the Boards.

    2. Remove the board, and check whether there is any

    distorted pin, broken pin, or or if any pin is missing on

    the board socket. Replace the subrack if there is a

    distorted pin, broken pin, or if a pin is missing.

    3. Reinstall the board, and observe the LEDs on the board

    panel. For details about the states of the LEDs on the

    board panel, see 9 LEDs on the Boards.

    4. If the LEDs indicate that the board does not worknormally, remove the board and install it into an idle slot

    that is for a board of the same type. Then, observe the

    LEDs on the board panel.

    l If the board works normally, it indicates that the slot

    is faulty. In this case, replace the subrack.

    l If the board does not work normally, it indicates that

    the board is faulty. In this case, replace the board.

    Power failure in the GBAM Use a multimeter to measure the input voltage of the GBAM.

    l If the input voltage is between -40 V and -57 V, replace

    the power modules of the GBAM.l If the input voltage is not between -40 V and -57 V, check

    the connections of the power cables. If the connections

    of the power cables are loose, set the power switch on

    the power distribution box corresponding to the GBAM

    to OFF and then reconnect the power cables. Otherwise,

    replace the power distribution box because the power

    switch on it may be faulty.

    Power failure in any other part

    in the cabinet

    Use a multimeter to measure the input voltage of the faulty

    component.

    l If the input voltage is between -40 V and -57 V, replace

    the component.

    l If the input voltage is not between -40 V and -57 V, check

    the connections of the power cables. If the connections

    of the power cables are loose, set the power switch on

    the power distribution box corresponding to the

    component to OFF and then reconnect the power cables.

    Otherwise, replace the power distribution box because

    the power switch on it may be faulty.

    ----End

    BSC6900 GSM

    Site Maintenance Guide 4 Powering On/Off the BSC6900

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    4-7

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    38/191

    4.4 Powering Off the Cabinet in a Normal Situation

    This section describes how to power off the BSC6900 cabinet in a normal situation. You must

    power off the BSC6900 cabinet before relocating the equipment or before a forecasted territorial

    power blackout. Powering off the BSC6900 cabinet disrupts all the ongoing services. Therefore,

    power off the BSC6900 cabinet only when required.

    Prerequisite

    l The green and yellow PGND cable for the cabinet is properly connected.

    l The data on the BSC6900 is backed up.

    Context

    To minimize the adverse impact on the BSC6900, power off the EPR/TCR before you poweroff the MPR.

    Procedure

    l In the case that the external GBAM is configured

    1. Run the Telnet client, such as PuTTY, on the LMT PC. Enter the IP address of the

    external GBAM and then log in to the GBAM as user root.

    2. Run the poweroffcommand to shut down the external GBAM.

    3. Set the power switch on the front panel of the external GBAM to OFF.

    4. Set power switches SW1 to SW6 on the power distribution box of the EPR/TCR to

    OFF.

    5. If multiple EPR/TCRs are configured, repeat Step 4 to power off all the EPRs/TCRs.

    CAUTION

    If only a few EPRs/TCRs are powered off, data inconsistency may occur.

    6. Turn off the power switch on the rear panel of the KVM.

    7. Set power switches SW1 to SW6 on the power distribution box of the MPR to OFF.

    8. Set the power switches that control the BSC6900 power supply on the PDF to OFF.

    l In the case that the OMU board is configured

    1. Set the power switches corresponding to the subracks configured in the EPR. That is,

    set the power switches A7 to A10 and B7 to B10 on the power distribution box to

    OFF in sequence.

    2. Flip open the ejector levers of the OMU board, as shown in part A ofRemoving the

    OMUa board.

    NOTE

    Repeat this step if two OMU boards are configured. After you flip open the upper and lower

    ejector levers, the OMU board automatically shuts down the operating system and hard disks.The OFFLINE LED on the board is on, which indicates that the board is powered off.

    4 Powering On/Off the BSC6900

    BSC6900 GSM

    Site Maintenance Guide

    4-8 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 06 (2010-09-15)

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    39/191

    3. After the OFFLINE LED on the OMU board is ON, set the power switches A7 to

    A10 and B7 to B10 on the power distribution box to OFF in sequence.

    4. Flip the ejector levers of the OMU board inwards until they are in position, as shown

    in part B ofInstalling the OMUa board.

    5. Set the power switches that control the BSC power supply on the PDF to OFF.

    ----End

    4.5 Powering Off the Cabinet in Emergency Cases

    This section describes how to power off the BSC6900 cabinet in emergency cases. To ensure

    the security of the BSC6900 cabinet, the BSC6900 cabinet must be powered off in emergency

    cases, such as fire, smoke, or water immersion.

    Procedure

    Step 1 Set all the switches on the power distribution box of the BSC6900 cabinet to OFF.

    Step 2 If time permits, set the switches that control the power supply to the BSC6900 on the PDF toOFF.

    ----End

    BSC6900 GSM

    Site Maintenance Guide 4 Powering On/Off the BSC6900

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    4-9

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    40/191

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    41/191

    5 Cleaning the Fan BoxThis chapter describes how to clean a fan box. To ensure stability and reliability of the equipment,

    the maintenance personnel should clean each fan box (including the fan boxes in the service

    subracks and the fan boxes in the independent fan subrack) regularly, preferably once every

    year.

    Prerequisite

    l The tools are ready. They are the ESD wrist strap, clean cotton cloth, ESD soft brush,

    vacuum cleaner, and Phillips screwdriver.

    l A clean backup fan box is ready for use.

    Context

    CAUTION

    l To protect the components from electrostatic discharge, wear an ESD wrist strap properly.

    Ensure that the ESD wrist strap is properly connected to the ESD connector on the cabinet.

    If no ESD wrist strap or no proper grounding point is available, wear ESD gloves.

    l Cleaning the fan box severely affects heat dissipation; therefore, you should replace the fan

    box in less than one minute. Otherwise, the boards may be damaged due to high temperature.

    Procedure

    Step 1 Clean the backup fan box by using a clean cotton cloth, an ESD soft brush, and a vacuum cleaner.

    Step 2 Use a Phillips screwdriver to open the front door of the cabinet and loosen the two captive screwson the fan box.

    Step 3 Remove the fan box from the cabinet.

    BSC6900 GSM

    Site Maintenance Guide 5 Cleaning the Fan Box

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    5-1

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    42/191

    DANGER

    When replacing the fan box, do not put your hand inside the fan box. Otherwise, the revolving

    fan blade may injure your fingers.

    Step 4 Install the backup fan box into the cabinet and then fasten the captive screws to secure the fanbox.

    Step 5 Clean the removed fan box with a clean cotton cloth, an ESD soft brush, and a vacuum cleaner.After being cleaned, the fan box is reserved as a backup for future use.

    Step 6 Repeat Step 2 through Step 5 to replace other fan boxes.

    ----End

    5 Cleaning the Fan Box

    BSC6900 GSM

    Site Maintenance Guide

    5-2 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 06 (2010-09-15)

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    43/191

    6 Cleaning and Replacing the Air FiltersAbout This Chapter

    This chapter describes how to clean and replace an air filter. The air filter protects the boards

    and the BSC6900 from dust. If an air filter is damaged, you must replace it with a new one in

    time.

    6.1 Position of the Air Filters

    This section describes the position of the air filters in the BSC6900 cabinet. The air filters are

    installed on the inner side of the front and back doors and at the bottom of the cabinet.

    6.2 Cleaning the Air Filter at the Bottom of the N68E-22 Cabinet

    This section describes how to clean the air filter at the bottom of the N68E-22 cabinet. The

    maintenancepersonnel should clean the air filter at the bottom of each cabinet regularly,

    preferably once every quarter.

    6.3 Cleaning the Air Filter on the Inner Side of the Cabinet Door

    This section describes how to clean the air filter on the inner side of the cabinet door. The

    maintenancepersonnel should clean the air filters regularly, preferably once every quarter.

    6.4 Replacing the Air Filters

    This section describes how to replace a worn-out BSC6900 air filter. It takes about five minutes

    to replace an air filter.

    BSC6900 GSM

    Site Maintenance Guide 6 Cleaning and Replacing the Air Filters

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    6-1

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    44/191

    6.1 Position of the Air Filters

    This section describes the position of the air filters in the BSC6900 cabinet. The air filters are

    installed on the inner side of the front and back doors and at the bottom of the cabinet.

    Figure 6-1 shows the position of the air filters in the single-door N68E-22 cabinet. Figure

    6-2 shows the position of the air filters in the double-door N68E-22 cabinet.

    Figure 6-1 Air filters in the single-door N68E-22 cabinet

    6 Cleaning and Replacing the Air Filters

    BSC6900 GSM

    Site Maintenance Guide

    6-2 Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    Issue 06 (2010-09-15)

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    45/191

    Figure 6-2 Air filters in the double-door N68E-22 cabinet

    NOTE

    The air filter at the bottom of the cabinet is white, and fixed on the rack with screws. The other filters are

    black, and fixed on the cabinet with binding strips.

    6.2 Cleaning the Air Filter at the Bottom of the N68E-22Cabinet

    This section describes how to clean the air filter at the bottom of the N68E-22 cabinet. The

    maintenance personnel should clean the air filter at the bottom of each cabinet regularly,

    preferably once every quarter.

    BSC6900 GSM

    Site Maintenance Guide 6 Cleaning and Replacing the Air Filters

    Issue 06 (2010-09-15) Huawei Proprietary and Confidential

    Copyright Huawei Technologies Co., Ltd.

    6-3

  • 7/28/2019 Good Document_Replace Board BSC_BSC6900 GSM Site Maintenance Guide(V900R011C00_06)

    46/191

    Prerequisite

    The tools are ready. They are the ESD wrist strap, Phillips screwdriver, and dry cleaning cloth.

    Context

    CAUTION

    To protect the components from electrostatic discharge, wear an ESD wrist strap properly.

    Ensure that the ESD wrist strap is properly connected to the ESD connector on the cabinet. If

    no ESD wrist strap or no proper grounding point is available, wear ESD gloves.

    Procedure

    Step 1 Open the front door of the cabinet and then remove the two screws from the air filter with aPhillips screwdriver, as shown in Figure 6-3.

    Figure 6-3 Removing the air filter from the bottom of the cabinet

    Step 2 Hold the panel of the air filter frame with both hands and lift the frame slightly to raise the panelhigher than the screws fixing the grounding cables at the bottom of the cabinet. Then, pu