Upload
dwight-owen-barker
View
215
Download
0
Tags:
Embed Size (px)
Citation preview
Goals/Objectives Safe
Portable Affordable Easy to use Reliable Score
Safe *** 1 1 1 1 4
Portable 0 *** 1 0 0 1
Affordable 0 0 *** 0 0 0
Easy to use 0 1 1 *** 1 3
Reliable 0 1 1 0 *** 2
Back
Back
SEEKSolutions with Electrical Engineering Knowledge
Team Members:-Kamal Al Khuffash 920012902Abdullah Al Qaydi 920011367Syed Ghufran Hashmi 920013717
Project Management for “Toys for Special Needs Children” project
Outline:-• Introduction:– Project overview
• Purpose• Stakeholders
– Clarifications of client needs• Original Client statement• Objectives and constraints• Revised Client statement
• Project Management– Approach– Work breakdown schedule– Obstacles
• Conclusion and request to proceed
Project Overview
The team intends to build an educational toy for special needs children to develop their learning skills.
Our client is the “Special Care Center” in Abu Dhabi, and will be used by the children in the center.
Client Statement
“The Special Care Center is seeking proposals from experienced engineering companies for the design of an educational toy for use in our classrooms. The toy should be suitable for children with varying disabilities and should be appropriate for use in a class room environment. The toy must be safe, affordable and reliable.”
Objectives
• Safe• Portable• Affordable• Easy to use• Reliable
Pair wise comparison chartObjectives tree
Revised Client statement
• “The team should build an educational toy to support the learning experience of the special needs children in the Special Care Center. As the client has stated the toy will be used by children with various disabilities in a classroom environment, therefore it is important that the toy has to be portable. The client also required the toy should be easy to use by the teachers and the children themselves with a minimum purchase cost. The most important factors that the toy’s safety and reliability should be guaranteed.”
Project Management
• Reasons.• Tools Used– GANTT Chart– Percentage Completion Matrix “PCM”– Linear Responsibility Chart “LRC”
• Progress
The Team Approach
Problem Definition
Conceptual design
Detailed Design
Building the prototype
Testing the prototype
Objectives Functions Means EvaluationMatrix
* Circuit * Materials
* Dimensions* Codes
Work Breakdown Schedule
Obstacles
• Time Management• Looking for alternatives• Early deadline
Summery
• Objectives– Safe– Portable– Affordable– Easy to use– Reliable
• Revised Client statement– “The team should build a safe, portable, affordable, easy to use and reliable
educational toy to support the learning experience of the special needs children in the Special Care Center.”
• Project Management– GANTT Chart– LRC– PCM
Any Questions??
SEEKSolutions with Electrical Engineering Knowledge