Upload
rajesh
View
23
Download
5
Embed Size (px)
DESCRIPTION
company information about my company GMD
Citation preview
GMD CONSULTANTS COMPANY PROFILE
2015
TRAFFIC AND
TRANSPORTATION
ROADS AND
HIGHWAYS
BRIDGES AND
STRUCTURES
2, Park View, Park Avenue, Sector-17, Nerul (E), Navi Mumbai-400706
www.gmdconsultants.in +91-022-27700991, 233
QUALITY ASSURANCE &
QUALITY CONTROL
Company Profile P a g e | 2
GMD Consultants
Highways & Roads
Structures & Bridges
Traffic & Transportation
Quality Assurance &
Control
GMD Consultantsprovidesvalue added solutions for Engineering, Design and Project Management
requirements of infrastructure Industry. Company has its head office in Mumbai and regional office for
northern region at Panchkula, Haryana. The company was established in 2010 as GMD Consultants.
Our main area of expertise includes Traffic & Transportation, Roads, Highways, and Bridges,
Township& Industrial Premises (Infrastructure-Roads, Storm Water Drainage), Detail Engineering,
Pre-Tender Studyand Traffic& Transportation Study of infrastructure projects. Latest state of the art
software for design and modeling provide us cutting edge in terms of accuracy, conformity to
requirement, quality of output and efficiency.
We have successfully completed many Detail Engineering projects including National Highways, State
Highways and other dedicated roads, Pre-Bid assignments for DBFOT projects, Infrastructure Detail
Design for Township, Transportation Planning Assignment and Traffic Impact Studies.
We are empanelled with following government agencies / authorities for providing consultancy
services for infrastructure projects
Ministry of Road Transport & Highways, (MoRT&H)-Category-V
Haryana State Roads & Bridges Development Corporation Ltd (HSRDC)– Category – I
Haryana State Roads & Bridges Development Corporation Ltd (HSRDC)– Category – II
Haryana State Roads & Bridges Development Corporation Ltd – (E-Traffic Census)
Municipal Corporation of Greater Mumbai (MCGM)
City and Industrial Development Corporation of Maharashtra Limited (CIDCO)
Goa Industrial Development Corporation
Mussoorie Dehradun Develoment Authority, Dehradun (MDDA)
WHAT WE DO
Our core area of functionality remains as Design & Project Management for infrastructure projects:
Detail Engineering Design (DPR) of highways, bridges, flyovers and other infrastructure
elements;
Detail Engineering Design of
Infrastructure of Township &
Industrial Premises– Roads,
Storm Water Drainage,
Transportation Planning and
Traffic Studies for Highways,
Townships and Parking;
Pre-Bid services for DFBOT
(NHAI & State Highway
Projects) and other BOT
infrastructure projects like
terminals, logistic parks etc including costing, revenue and financial model;
Project Management Services to Infrastructure Projects;
Traffic & Transportation Studies;
Quality Assurance & /Quality Control (QA / QC)
Traffic Simulation & Modeling(Vehicular & Pedestrian)
Value Engineering
INFRASTRUCTURE DESIGN & PROJECT MANAGEMENT
Company Profile P a g e | 3
GMD Consultants
HOW WE DO
We use latest state of the art technology in terms of
software; best practices and sound engineering to arrive
at optimized design solution. We develop 3-D models for
design evaluations and analysis
GMD is a process based organization which have inbuilt
quality systems for all activities. It has three tier quality
systems with checks and audits at interfaces of
designer, manager and external expert. At GMD we
thrive for value based design solutions.
Designs are checked through 3-D modeling and simulation techniques for visualization and clash
detection. This approach not only enhances optimization and accuracy of design but also helps in
looking at “big picture”.
INFRASTRUCTURE
Technology is our forte. We possess latest software and tool for design and analysis. We are
equipped with Civil Infrastructure Design Suite (Auto
Desk) which includes CIVIL-3D and Infra Modeler.
STAAD Pro and Midas are used for structure designs.
For traffic analysis and simulation we work with VISSIM,
PARAMICS, VISSUM, Auto TRACK.
CIVIL LABORATORY
We have established a full-fledged Civil Testing Laboratory which is equipped with all moderns testing
equipment for testing. This in-house capability provides us cutting edges in terms of accuracy and
confidence in test results and also time advantage. We
have In-House capabilities for soil, materials, concrete,
asphalt testing and analysis.
Company Profile P a g e | 4
GMD Consultants
HUMAN RESOURSE
We are close-knit organized team comprising of young, driving, dynamic and talented achievers.
Amongus are highly experienced and skilled professionals in field ofhighways and roadstraffic
structures and transportation, wet infrastructure as Team Leaders. Their experience ranges from 20 to
30+ years. We have a talented and dedicated team of more than 20 Engineers and CAD
professionals to supporting these team leaders.
At a glance profile of Vertical Leaders with GMD is tabled as below:
Sr.
No Name Designation Qualification Field of Experience
Years of
Experience
1 Rajesh Gajjar Managing Director M. Tech
(IITB)
Civil Engineering, Traffic &
Transportation
24
2 Shailendra
Mohan
Director M. Tech
(IIT,BHU)
Civil Engineering, Roads,
Highways Expert
22
3 Vinay Kapur Director & Head-
Regional Office
North
B.E. Civil Engineering,
Infrastructure Construction
and Project Management
38
4 M. N. Sawant Head -Structures B. Tech
(IITB)
Civil Engineering,
Structures (Bridges,
Flyovers, ROBs)
33
These key professionals are ably supported by senior engineers, junior engineers and CAD
professionals.
We constantly upgrade skills and knowledge base of our team by conducting regular training of
software and best practices.
Company Profile P a g e | 5
GMD Consultants
CLIENTS
We have privilege of successfully working with some of the market leaders as our clients. The scope
of work for included Detail Engineering of Highways & Bridges, Detail Design of Infrastructure of
Townships, Pre-Bid Study of NH, SH and other Infrastructure Projects, Traffic & Transportation
Studies and Advisory Consultancy. Our success manifests in form of repeat orders from our clients
and their referrals. Following are some of our major clients.
Company Profile P a g e | 6
GMD Consultants
PROJECTS
We have successfully completed a large number of projects (more than 100) in infra sector pertaining
to Roads, Traffic & Transportation, Bridges and Buildings. List of key projects is given under followed
by salient features of some flagship projects:
A. Traffic & Transportation Projects
Sr. No.
Project Name Client Description Scope Status
1 Traffic
Management
Consultancy for
Lodha Exellencia
Lodha Group Residential Township of
multi-storey apartments
in Mumbai
Traffic Impact Study Completed
2 Parking Study,
Oberoi Oasis,
Mumbai
I Ven realty Ltd Residential Township of
multi-storey apartments
Parking & Traffic
Demand Study
Completed
3 Traffic Planning
Study for ISBT at
Wadala
Pratibha
Industries
Interstate Bus Terminus
for 100 buses with
commercial component
on BOT basis
Traffic Planning Study Completed
4 Traffic study for
Satna-
Chitrakoot SH-
11 for MPRDC
on BOT Basis
Topworth Infra
Pvt Ltd
75 km of state highway Traffic survey, analysis,
growth, forecast &
Revenue modeling,
sensitivity analysis
Completed
5 Traffic study for
Ujjain-Jaora SH-
27 for MPRDC
on BOT Basis
Topworth Infra
Pvt Ltd
95 km of state highway Traffic survey, analysis,
growth, forecast &
Revenue modeling,
sensitivity analysis
Completed
6 Prebid Traffic
Study for
Walahajpet to
Poonamallee on
NH-46 in state
of Tamilnadu
IRB
Infrastructure
Developers LTD
93 km National Highway Traffic survey, analysis,
growth, forecast &
Revenue modeling,
sensitivity analysis
Completed
7 Prebid Traffic
Study for Jaipur
Ring Road
IRB, Jaipur
Development
Authority
60 km of Green field ring
road
Traffic survey, analysis,
growth, forecast &
Revenue modeling,
sensitivity analysis
Completed
Company Profile P a g e | 7
GMD Consultants
8 Pre- Bid Study
of Ahmadabad -
Vadodara (NH-8
& NE-1)
IRB
Infrastructure
Developers LTD
95 km of NH Expressway Traffic survey, analysis,
growth, forecast &
Revenue modeling,
sensitivity analysis
Completed
. IRB won
the project
9 Pre- Bid Study
of Udaipur -
Kishangarh -
Ahmadabad
section of NH-8
IRB
Infrastructure
Developers LTD
300 Km of National
Highway
Traffic survey, analysis,
growth, forecast &
Revenue modeling,
sensitivity analysis
Completed
10 Prebid Traffic
Study for Devas
- Shivpuri -
Gwalior section
of NH-3
IRB
Infrastructure
Developers LTD
Four Laning of 455 km of
national highway in MP
Traffic survey, analysis,
growth, forecast &
Revenue modeling,
sensitivity analysis
Completed
11 Traffic Study for
Palais Royale,
Worli, Mumbai
Shriram Urban
Infrastructure P
Ltd
High rise premium
apartment residential
scheme of 80 storey in
Mumbai
Traffic Planning Study
for Residential Project
On-going
12 Traffic Study for
Golf Estate,
Gurgaon
M3M 75 acre, Residential
Township of multi-storey
apartments in Gurgaon
Traffic Planning Study
for Residential Project
Completed
13 Traffic Study for
Cosmopolitan,
Gurgaon
M3M 11 acre, retail and
commercial complex in
Gurgaon
Traffic Planning Study
for Commercial cum
Retail Project
Completed
14 Traffic Study for
Urbana,
Gurgaon
M3M 12 acre, Retail,
Commercial and Multi-
storey SA apartments in
Gurgaon
Traffic Planning Study
for Commercial cum
Retail cum SA Project
Completed
15 Traffic Study for
Merlin, Gurgaon
M3M 14 acre, Residential
Township of multi-storey
apartments in Gurgaon
Traffic Planning Study
for Residential Project
Completed
16 Traffic Study for
Shopping Mall,
Commercial and
Retail Project,
Gurgaon
Tata Reality and
Infrastructure
14 acre, Mix use project
consisting, residential &
commercial component
in Gurgaon
Traffic Planning Study
for Mixed Use Project
Ongoing
17 Traffic Study for
Multi level car
park at Mumbai
Airport
GVK Multi-level car park of
1200 capacity at Airport
at Mumbai
Traffic Planning Study
for Taxi Staging and
Visitor Car Park Project
Ongoing
Company Profile P a g e | 8
GMD Consultants
18 Traffic Study for
Mumbai Trans
Harbour Link,
Mumbai
SRUIL 22 Km sea link project
having integration of all
links of major
transportation network
Traffic Study and
Feasibility Report
Completed
19 Traffic Study for
Grand Hyatt
Hotel at Noida
Vision Town
Planners and
Developers
7 acre, 5 star Hotel
Complex at NOIDA
Traffic Planning Study
for Hotel, Service
Apartment,
Commercial, Banquet
and Retail Project
Ongoing
20 Prebid Traffic
and toll study
for Dhule to
Amravati
section of NH6
in Maharashtra
IRB
Infrastructure
Developers LTD
480 km of four Laning of
National Highway
Traffic survey, analysis,
growth, forecast &
Revenue modeling,
sensitivity analysis
Completed
21 Traffic Study for
Exhibition
Centre at GIFT,
Ahmedabad
ITME 73 acre of International
Exhibition Centre at GIFT
City Ahmedabad, Gujrat
Traffic Study for 1 lac
sqm International
Exhibition Centre
Facility with all
amenities
Ongoing
22 Prebid Traffic
and toll study
for Eastern
Peripheral
Expressway
(EPE) Delhi
IRB
Infrastructure
Developers LTD
135 km of green field
expressway on eastern
side of Delhi, NHAI
project
Traffic survey, analysis,
growth, forecast &
Revenue modeling,
sensitivity analysis
Completed
23 Parking study at
Matunga
Premises
Birla
Infrastructure
Pvt ltd
Residential Township of
multi-storey apartments
in Mumbai
Traffic Impact Study Completed
24 Traffic study
One M3M,
Gurgaon
M3M 6 acre, Commercial
Complex + Multiplex
Traffic Planning Study On going
25 Mahim Traffic
Study
Sudarshan
Consultant
Residential Township of
multi-storey apartments
in Mumbai
Traffic Impact Study Completed
26 Pre-bid traffic
study of
Karnataka, Goa
border section
of NH 4A in
state of
IRB
Infrastructure
Developers LTD
70 km of four Laning
NHAI project
Traffic survey, analysis,
growth, forecast &
Revenue modeling,
sensitivity analysis
Completed
Company Profile P a g e | 9
GMD Consultants
Karnataka / Goa
27 Pre-bid traffic
study of
Vijayawada –
Gondugalanu
section of NH-5
in the state of
Andhra Pradesh
IRB
Infrastructure
Developers LTD
104 km of six Laning of
NHAI project
Traffic survey, analysis,
growth, forecast &
Revenue modeling,
sensitivity analysis
Completed
28 Traffic Study
Township
Kharghar, Navi
Mumbai
Adhiraj
developers
50 acre, Residential
Township of multi-storey
apartments in Navi
Mumbai
Traffic Planning Study
and external
circulation design
On going
29 Namaste Traffic
Study, Parel,
Mumbai
Jaguar Buildcon
+ W Hotel
Group
12 acre, 5 Star luxury
Hotel, 363 keys + retail +
commercial Mumbai
Traffic Planning Study
and circulation design
On going
30 Traffic Study
Faridabad
HP Limited 8 acre, mixed use project
in Faridabad
Traffic Impact Study Completed
31 Traffic Study
Bangalore on
Airport Road
Sobha
Developers
30 acre, Commercial and
retail establishment
(Mall, Offices, Multiplex
etc)
Traffic Impact Study
and circulation design
On going
32 Traffic TCS
Indore
TCS / Somaya &
Kalappa
Consultants Pvt
Ltd
100 acre, IT Park (SEZ)
with 15000 employee
capacity at Indore
Traffic Impact Study
and circulation design
On going
33 Diversion Plan
Mumbai Metro-
III
MMRDA /
Shrikhande
Consultants
26 km of metro along
Mumbai Transportation
Network
Traffic diversion plan On going
34 Traffic Study
Rivali Park,
Borivali
CCI Developers 28 acre, Residential
Township of High rise
multi-storey apartments
in Mumbai
Traffic Study of
external & internal
road, Western Express
Highway
On going
35 Traffic Study-
Acme Project -
Andheri
Acme Builders 17 acre, Residential
Township of multi storey
apartments in Andheri,
Traffic Study of
external & internal
road
On going
Company Profile P a g e | 10
GMD Consultants
Mumbai
36 Traffic Study-
Acme Project -
Thane
Acme Builders 27 acre, Residential
Township of multi-storey
apartments in Thane,
Mumbai
Traffic Study of
external & internal
road
On going
37 Traffic Study
imperial Tower
4
S D Corps Premium Residential
High-rise apartments,
Tardeo, Mumbai
Traffic Study of
external & internal
road
On going
38 Traffic Study
World Towers
Lodha Group Residential High Rise
apartments, Mumbai
Traffic Study of
external & internal
road
Completed
39 Traffic Study
Hotel Four
Seasons Phase-II
Magus Estate &
Hotels Limited
High rise premium
apartment expansion of
five star hotel with 800
new rooms at Worli,
Mumbai
Traffic Study of
external & internal
road. Dr. E Moses Road
and Worli Naka,
Mumbai
On going
40 Traffic Study for
The Address,
Ghatkopar
Wadhwa
Residency
Private Limited
Residential High rise
apartments, Ghatkopar,
Mumbai
Traffic Study of
external & internal
roads
On going
41 Traffic Impact
Study Balkum
Thane
Kalpataru /
Enviro Analyst
and Engineers
Ltd
75 acre, Residential
Township of multi-storey
apartments in Thane,
Mumbai
Traffic Study of
external & internal
roads
On going
42 Traffic Impact
Study Panvel
Saket
Developers
7.5 acre, Residential
Township of multi-storey
apartments in Panvel,
Mumbai
Traffic Study of
external & internal
roads
On going
43 Traffic Impact
Study Mulund
Project
Ariisto
Developer
38 acre, Residential
Township of multi-storey
apartments in Mulund,
Mumbai
Traffic Study of
external & internal
roads
On going
44 Traffic Study JJ
Hospital
GES / JJ Hospital
Trust
Expansion of JJ Hospital
with New 800 bed super
specialist Hospital,
Mumbai
Traffic Study of
external & internal
roads
On going
Company Profile P a g e | 11
GMD Consultants
45 Traffic Study of
Ariisto Harmony
Project at
Kandivali
Ariisto
Developer
42 floors - High rise
Multi- Storey apartments
at Kandivali, Mumbai
Traffic Study of
external & internal
roads
Completed
46 Traffic Study SA
and Residential
at NOIDA,
BOP / Design
Plus Architects
4.7 Acre mixed use,
Retail + multi storey
residential project with
1030 apartments at
NOIDA
Traffic Study of
external & internal
roads
On going
47 Traffic Study
Raheja
Reflection
Raheja
Universal
9 acre residential
township with more
than 900 apartments at
Kandivali, Mumbai
Traffic Study of
external & internal
roads
Completed
48 Traffic Study
Samara Nagar
Shapoorji
Pallonji
53 acre residential
township at Samtanagar,
Kandivali, Mumbai
Traffic Study of
external & internal
roads
On going
49 Traffic Study for
Kanakia Levels,
Malad
Kanakia Group 1100 apartments 33
storey High Rise
residential project at
Malad, Mumbai
Traffic Study of
external & internal
roads
On going
50 Traffic Study for
Hotel Trident at
Ghansoli, Navi
Mumbai
Reliance /
Trident Group
165 keys 5 star hotel
with banquet hall (1500
pax)
Traffic Study of
external & internal
roads
Completed
51 Traffic study
Aman Shanti
Project at
Goregaon
Indu
Constructions
14 acre, 52 floors High
Rise apartments
Traffic Study of
external & internal
roads
completed
52 Traffic study
Mangal Bhuvan
Project at Parel
Apex
Constructions
12 acre, 61 floors High
Rise apartments
Traffic Study of
external & internal
roads
completed
53 Traffic study
Raheja Mix
Development
Complex, Navi
Mumbai RICC I
Raheja
Universal
68 acre, 8 High Rise
apartments, 8 IT
Commercial towers,
12000 parking spaces
Traffic Study of
external & internal
roads
On going
54 Traffic study
Raheja
commercial
Development
Raheja
Universal
38 acre, Commercial
spaces, 1000 parking
spaces
Traffic Study of
external & internal
roads
On going
Company Profile P a g e | 12
GMD Consultants
Complex, Navi
Mumbai RICC II
55 Traffic study
Northern
Heights, Dahisar
NRose
Constructions
22 acre, 32 floors 4
towers High Rise
apartments
Traffic Study of
external & internal
roads
On going
56 Traffic study
High Rise
Residential at
Borivali
Mighty Group 9 acre, 24 floors 2
towers High Rise
apartments
Traffic Study of
external & internal
roads
On going
57 Traffic study
Mixed use
development at
Andheri
L & T Realty 13.5 acre, 32 floors 6
towers High Rise
apartments +
Commercial + Retail
Traffic Study of
external & internal
roads
On going
58 5 Star + 3 Star
hotel project
Kamala Group Star hotel + retail +
commercial at Lower
Parel
Traffic Impact Study On going
59 Premium High
Rise Residential
Project – Sumer
concorde
Sumer Group Premium Apartments
tower at Prabhadevi
Traffic Impact Study Completed
60 5 Star Hotel Vishwagreen
Group
250 keys Star Hotel at
Nerul, MIDC
Traffic Impact Study On going
61 Traffic Study for
Four Laning of
Panchkula –
Yamunanagar
section of NH-
73
National
Highways
Authority of
India (NHAI)-PIU
Chandigarh
104 km of national
highway
Traffic survey, Analysis
and forecast
Completed
62 Traffic Study for
Six Laning of
Chandigarh-
Ludhiana
section of NH-
21 and NH-95
National
Highways
Authority of
India (NHAI)-PIU
Chandigarh
87 km of national
highway
Traffic survey, Analysis
and forecast
Completed
63 Traffic Study for
Four Laning of
Ambala- Kaithal
section of NH-
NH-65
National
Highways
Authority of
India (NHAI)-PIU
Ambala
Traffic Study of 70 km of
national highway
Traffic survey, Analysis
and forecast
On going
Company Profile P a g e | 13
GMD Consultants
B. Infrastructure Design Project
Sr. No. Project Name Client Project
Specification
Service Scope Remarks
1 DPR for Satna-
Chitrakoot SH-11
for MPRDC on BOT
Basis
Topworth Infra
Limited, MPRDC
Four / Two
Laning of 75 km
of State
Highway on
DBOT
Detail design, plan-
profile pavement,
bridges, culverts,
junctions, toll plaza,
bus bays, truck lay
byes, drainage etc
Completed
2 Pre-bid study for
Kolhapur - Sangli
M.S.H.3, Govt of
Maharashtra
Pratibha
Industries Limited
2/4 Lane MDR Engineering design
and estimation of 51
km of 2-laning Major
Roads in
Maharashtra,
Revenue, Financial
Modeling
Completed
3 Detail design of
structures
including major
bridges and
flyovers of Panvel -
Indapur NH-17
Supreme/ CES Major Structure-
Kharpada Bridge
(813 m),
Vadkhal Flyover
(1092m)
Detail Design of
foundation,
substructure and
superstructure
Completed
4 DPR for Ujjain-
Jaora SH-27 for
MPRDC on BOT
Basis
Topworth Infra
Limited, MPRDC
Four / Two
Laning of 95 km
of State
Highway on
DBOT
Detail design, plan-
profile pavement,
bridges, culverts,
junctions, toll plaza,
bus bays, truck lay
byes, drainage etc
Completed
5 Detail Design
Pavement- BMC
Road
MCGM, Mumbai City roads of
Mumbai
Detail pavement
design of more than
15 lakh SQM of of
BMC roads
On going
6 Detailed Design
Project
Management of
Roads and Traffic
Study
Kyan Resorts 2 km of arterial
road for hilly
township along
with retaining
structures
Kyan Resort
township – 22 acres
at Karjat
Completed
7 Detail Design of
Culverts for Jammu
- Udhampur
Project
AFCONS, Mumbai 4 Laning of
Jammu-
Udhampur NH
23 No’s culvert (Box,
Slab)
Completed
Company Profile P a g e | 14
GMD Consultants
8 Detail Design of
Road from SH-10
to Vedanta
Aluminum Plant,
Jharsuguda, Orissa
AFCONS, Mumbai Green field four
/ two lane road
with elevated
portion of 2 km
viaduct and
truck terminal
About 5 km of four
lane & two lane road
for industrial traffic
Completed
9 Detail Design of 6
Km long elevated
viaduct and
stations for Delhi
MRTS
AFCONS, Mumbai 6 km of metro
rail viaduct and
three stations
6 km elevated
corridor
Completed
10 Infrastructure
design of 150 acre
"Empyrean"
Residential
Township, Nagpur
Fire Arcor,
Nagpur
Four lane and
two lane roads
with footpath,
cycle track and
other facilities
Over 7 km of arterial,
sub arterial and
collector roads,
Parking
Completed
11 Infrastructure
design of 200 acre
"Empyrean"
Residential
Township,
Bangalore
Fire Luxur,
Bangalore
Four lane and
two lane roads
with footpath,
cycle track and
other facilities
Over 25 km of
arterial, sub arterial
and collector roads,
Lake front
development,
Parking
Completed
12 Infrastructure
design of 23 acre
"Grande 101" G
Corps Borivali,
Mumbai
CCI, Mumbai Internal roads of
township
Over 5 km of arterial,
sub arterial and
collector roads,
Pedestrian High
Streets
Completed
13 Al Khor Bypass
(Qatar)
Urban planning
and Development
Authority, Qatar
6/8 lane rural
expressway
Concept design of 16
Km Rural Expressway
Completed
14 Mkeines-UMM Bab
Link Road UPDA
(Qatar)
Urban planning
and Development
Authority, Qatar
6/8 lane rural
expressway
Concept design of38
Km Rural Expressway
Completed
15 Due Diligence &
Technical Audit of
Bangalore to
Mulbagal NH-4
TRIL Roads &
AIIDPL
80 km of 4-
laning of NHAI
Road
Technical audit,
design review of
geometric, pavement
quality assessment,
estimate,
maintenance
Completed
Company Profile P a g e | 15
GMD Consultants
16 Due Diligence &
Technical Audit of
Nelmangala to
Devihalli NH-48
TRIL Roads &
AIIDPL
80 km of 4-
laning of NHAI
Road
Technical audit,
design review of
geometric, pavement
quality assessment,
estimate,
maintenance
Completed
17 Pre-bid study of
Hyderabad Metro
AFCONS, Mumbai Metro rail
viaduct design
and estimation
7.75 km of elevated
corridor for
Hyderabad Metro
including station
viaduct
Completed
18 Prebid study for
Ropar to Doraha
road on DBFOT
Topworth, PIDB 2 Lane state
highway along
bank of Canal
Engineering design
and estimation of 53
km of 2-laning State
Highway in Punjab
Completed
19 Pre-bid for two
Laning of NH-66
from Tindivanam
to Krishnagiri.
Gammon India
ltd, NHAI
182 km of 2
Lane NHAI road
project
Engineering design
and estimation of
182 km of 2-laning
with paved shoulder
of NH in Tamilnadu
Completed
20 Prebid for Bhopal
By-pass for MPRDC
under BOT Basis
Topworth Infra
Limited
52 km of four
lane green field
project of NHAI
Engineering design
and estimation of 52
km of 4 lane
greenfield Bhopal
bypass by MPRDC
Completed
21 Pre bid for 4 -
Laning of Panvel -
Indapur section of
NH-17 from KM 0.0
to 84.0 KM on
DBFOT Basis
TRIL Roads P Ltd
(Tata)
84 km of four
Laning project,
NHAI
Engineering design
and estimation of 84
km of 4 lane
greenfield Bhopal
bypass by MPRDC
Completed
22 Detail Design of
Delhi Gate Flyover
at Surat
Surat
Municipality /
CES
1020 m flyover
with varying
span (42 m Max)
GAD, Detail Design,
BOQ, Construction
drawings
On going
23 Detail Design of
Moorva Creek
Bridge
Pentacle 35 m RCC
integral bridge
on MMRDA
Road
GAD, Detail Design,
BOQ, Construction
drawings
On going
24 Omalur –
Namakkal Due
diligence
TRIL Roads P Ltd
(Tata)
68 Km of NHAI
four lane road
Technical audit,
design review of
geometric, pavement
quality assessment,
Completed
Company Profile P a g e | 16
GMD Consultants
estimate,
maintenance
25 CIDCO Shed design CIDCO 70000 SQFT of
steel frame shed
at Navi Mumbai
Detail design, BOQ &
Estimates,
construction
drawings
Completed
26 Detailed design of
Pen ROB at NH-17
near Mumbai
CES 135m long ROB
on NH-17 at Pen
(Raigarh)
GAD, Detail Design,
BOQ, Construction
drawings
On going
27 MTHL Project Sriram Urban 22 km sea link
connecting
Sewri to Nava
Sheva in
Mumbai
Pre-bid advisory
Services
Completed
28 Pre-bid study for
Nashik - Sinnar
section of NH-50 in
Maharashtra
Pratibha
Industries Limited
4 Laning of NHAI Engineering design
and estimation of 25
km of 4-laning NH
road in Maharashtra,
Revenue, Financial
Modeling
Completed
29 Pre-Bid For Metro
Depot
Supreme
Infrastructures
Metro depot for
Navi Mumbai
Metro Rail
Tender designs, BOQ
and estimates
Completed
30 Road Design Kochi
Township
Kochi Info Park
Limited /
Shrikhande
Consultants
5 Km of internal
road of SEZ- info
park at Kochi
Roads design
including pavement,
geometrics, signage,
tender documents
etc
On going
31 Detail Design of
external and
internal road-
Chembur Project
Wadhwa Group
Developers
4 Km of external
road on tunnel
and internal
roads of 40 acre
township in
Mumbai
Traffic study, detail
design of geometrics,
pavement,
estimates, tender
documents etc
On going
32 Pre- Concept
Design Logistic
Road Bangalore
Agri Gold Projects
Ltd
Concept design
of 210 km of 6/8
lane road for
logistic corridor
at Bangalore
Concept design,
estimates, typical
sections, walk thru
Completed
Company Profile P a g e | 17
GMD Consultants
33 Concept Design of
Improvement of
Shivaji Chowk
Junction at
Panjarpole,
Chembur, Mumbai
Mumbai
Metropolitan
Region
Development
Authority
Improvement of
6 legged
complicated
high traffic
junction at
Chembur,
Mumbai
Traffic Survey, Topo
survey, Concept
design of various
options and 3 D
Modeling
Completed
34 Concept Design of
Approach Road
Panvel Project
Wadhwa Group 1500 Acre
redevelopment
township
Concept Design of
access road including
railway crossing /
ROB / RUP
On going
35 Design of city
Roads
Municipal
Corporation of
Greater Mumbai
(MCGM)
Area of South
Mumbai – 9
wards (A to G).
Total Km 120 km
approx
Design of flexible and
rigid (CC) roads
including traffic
study, geometry, soil
investigations and
topo survey
On going
36 Third Party Quality
Audit of Rural
Roads in Haryana
about 400 km
State Agriculture
Marketing Board
(HSAMB)
Rural roads of
six districts
approximately
1000 roads
Third party quality
inspection
On going
C. Integrated Township Projects
Sr. No.
Project Name Client Scope Remarks
1 UPDA Qatar Road Packages – Drainage
UPDA, Qatar Design of Roads including Junctions, Flyovers, Interchanges and Drainage 300 acres
Completed
2 Detail design of roads, drainage and protection works of Kyan Club & Resorts, Karjat
Srinathji Construction
Detail Design of road network, junctions, street furniture, utility corridor, drainage and protection works and conducting traffic study for township – 21 acres
In- Progress
3 Detail design of roads, drainage and protection works of IgatPuri Township
Vaibhav Reality Detail Design of road network, junctions, street furniture, utility corridor, drainage and protection works and conducting traffic study for township – 25 acres
In- Progress
4 Detail Infrastructure Design of Empyrean - Phase II, Bangalore.
Fire Luxur Developers Ltd
200 acre township. Detail Design of road network, junctions, street furniture, utility corridor, water supply, drainage, sewerage network and plants, solid waste management, electrical systems for township
Completed
Company Profile P a g e | 18
GMD Consultants
5 The Empyrean Vista, Nagpur.
Fire Arcor 150 acre township. Detail Design of road network, junctions, street furniture, utility corridor, water supply, drainage, sewerage network and plants, solid waste management, electrical systems for township.
Completed
6 "Grande 101” Township, Mumbai
G Corp Properties
23 acre high rise township. Design of road network, circulation, parking, water supply, drainage, sewerage network and plants, solid waste management, electrical systems and other related infrastructure works for 23 acre plus township at Mumbai, India
Completed
7 Raipur - Water Supply and Sewerage system Design
Naya Raipur Development Authority / Buildcraft
Detail Design of 1600 acres city level Water & Sewerage Infrastructure including Pumping main from WTP to Reservoirs, water distribution network, reservoirs, water pumping stations, sewerage collection network, sewage pumping stations, Sewage Treatment Plants, Treated Sewage Effluent Network etc
Completed
8 Infrastructure Design - Township at Khopoli
Neel Siddhi Developers
Detail Design of road network, junctions, street furniture, utility corridor, and conducting traffic study for township – 30 acres
On-going
9 Traffic and Road design for Bharatiya City, Bangalore
Bharatiya City Developers
126 acre township with mixed use development incl 5 star hotel, retail, convention centre, school, hospital and residential units. Scope includes traffic study and road design – geometry, specs, BoQ and estimate
On going
10 Road Design and Realignment Study
Department of Transport – Abu Dhabi
Realignment of Corniche road (5km) to enhance urban public realm, parking spaces and social facilities, utility diversion, roads, urban planning
On going
DIRECTORS Rajesh Gajjar
(+91 9920519933)
Shailendra Mohan
(+91 9967014586)
CONTACT
Head Office:
2, Park View Society,
Sector-17, Nerul (East),
Navi Mumbai - 400706.
Phones - +91 22 27700991/233
Email: [email protected]
Web: www.gmdconsultants.in
CONTACT
Regional Office (North): Vinay Kapur (Head & Director) House N0. 1041, Sector-11,
Panchkula -134109 (Haryana)
Phones - +91 172 4010255
Mobile - +91 7837257246
Email: [email protected]
Web: www.gmdconsultants.in