Upload
others
View
11
Download
0
Embed Size (px)
Citation preview
882
832
818
A
B
C
D
A
B
C
D
654321
654321
ZONE DATEAPPRDESCRIPTION
REVISIONS
DATEDATE
APPROVED
CHECKED
DRAWN
DESIGNER
FM&L APPROVED
SME CHECKED
USER CHECKED
ARCHITECT / ENGINEER
REVSHEETDRAWING NUMBERSCALE
ESH&Q CHECKED
JEFFERSON LAB
Thomas Jefferson National Accelerator Facility
United States Department of Energy Newport News, VA
REV
AS SHOWN
ha-inc.com
p: [804] 285-4171 f: [804] 217-8520
Glen Allen, VA 23060
4880 Sadler Road, Suite 300
PRE FINAL CONCEPTA 4/7/14
B
100'
Scale: 1"=100'-0"50' 0 25' 50' 250'200'
FINAL CONCEPTB 4/15/14
Jefferson Lab
Cooling & Power Upgrade
UIM Computer Center
Conceptual Design
4" PVC
S
S
S
S
SS SS
SS
SS SS
SS
SS
SS
SS
SS
SS SS
S
(90)
EEL
(12)
CENTER
CEBAF
(58)
TEST LAB
(55)
TED
C-102
C-101
C-103RPS
AML
WAG
OVERALL KEY PLAN
(60)
CUP
PAD
CONCRETE
JE
FF
ER
SO
N
AV.
LA
WR
EN
CE
DR.
ONNES DR.
KELVIN DR.
PAULI DR.
RAT
TLEY RD.
HA
DR
ON
DR.
BCS DR.
CORNELL U. RD.
CEBAF BLVD.
IN SAME TRENCH
WITH 10" CHWS/R
AND REPLACED
TO BE REMOVED
6" CHWS/R
EXISTING
CDH
CHWS/R
EXISTING
EXPANSION
BUILDING
CG001
(90A)
HA
DR
ON
DR.
A
B
C
D
A
B
C
D
654321
654321
ZONE DATEAPPRDESCRIPTION
REVISIONS
DATEDATE
APPROVED
CHECKED
DRAWN
DESIGNER
FM&L APPROVED
SME CHECKED
USER CHECKED
ARCHITECT / ENGINEER
REVSHEETDRAWING NUMBERSCALE
ESH&Q CHECKED
JEFFERSON LAB
Thomas Jefferson National Accelerator Facility
United States Department of Energy Newport News, VA
REV
AS SHOWN
Scale: 1"=30'-0"
15' 0 10' 20' 30' 50' 75'
ha-inc.com
p: [804] 285-4171 f: [804] 217-8520
Glen Allen, VA 23060
4880 Sadler Road, Suite 300
PRE FINAL CONCEPTA 4/7/14
B
FINAL CONCEPTB 4/15/14
Jefferson Lab
Cooling & Power Upgrade
UIM Computer Center
Conceptual Design
JE
FF
ER
SO
N
AV.
QUARK PL.
LA
WR
EN
CE
DR.
822868
878
823
877
825
826
827
876
830
885
884
820
819
813
805880
802
883
882
832
818
817
807
814
833
804
835
834
838
836
840
811
844
841
846
845
847
874
875
839
808
812
837
843
842
861
860
859
858
857
870
862
863
869
803
867
866
886
873
872
879
871
KELVIN DR.
RU
TH
ER
FO
RD
RD.
ONNES DR.
CEBAF BLVD.
CEBAF BLVD.
CEBAF BLVD.
BCS DR.
RAT
TLEY RD.
PAULI DR.
STOP
CA
NN
ON
BL
VD.
HOGAN DR.
ONE C
OMP
ASS
WAY
BOHR BLVD. NORTH
BOHR BLVD. SOUTH
BETHE DR.
HOFSTADTER RD.
WETLANDS
FRESHWATER
PF01C
JE
FF
ER
SO
N
AV.
LA
WR
EN
CE
DR.
JE
FF
ER
SO
N
AV.
LA
WR
EN
CE
DR.
JE
FF
ER
SO
N
AV.
HA
DR
ON
DR.
HA
DR
ON
DR.
HA
DR
ON
DR.
CORNELL U. RD.
KEY MAPNOT TO SCALE
MATCH LINE SHEET C-102
LEGEND
RPS
WAG
NOTES
PVC
CHWS/R
UTILITY SITE PLAN
SUPPLY/RETURN
CHILLED WATER
EXISTING BELOW GROUND
POLYVINYL CHLORIDE
CHILLED WATER SUPPLY/RETURN
CDH
AML
BENDS, TEES AND LONGITUDINAL JOINTS
PROVIDE CONCRETE THRUST BLOCKS AT ALL
PIPING SYSTEM
CHWS PIPE SHALL BE A PRE-INSULATED
CHWS/R PIPES SHALL BE PVC
CONTINUATION INTO CEBAF CENTER
REFER TO MECHANICAL PLANS FOR
4.
3.
2.
1.
C-101
C-101
C-102
C-103
(12)
CENTER
CEBAF
(90)
EEL
FROM EX 6" CHWS/R
REUSE PENETRATIONS
NEW 10" CHWS/R WILL
TRENCH
WITH 10" CHWS/R IN SAME
BE REMOVED AND REPLACE
EXISTING 6" CHWS/R WILL
BCS DR.
(90B)
DEWER
PAD
HA
DR
ON
DR.
A
B
C
D
A
B
C
D
654321
654321
ZONE DATEAPPRDESCRIPTION
REVISIONS
DATEDATE
APPROVED
CHECKED
DRAWN
DESIGNER
FM&L APPROVED
SME CHECKED
USER CHECKED
ARCHITECT / ENGINEER
REVSHEETDRAWING NUMBERSCALE
ESH&Q CHECKED
JEFFERSON LAB
Thomas Jefferson National Accelerator Facility
United States Department of Energy Newport News, VA
REV
AS SHOWN
Scale: 1"=30'-0"
15' 0 10' 20' 30' 50' 75'
ha-inc.com
p: [804] 285-4171 f: [804] 217-8520
Glen Allen, VA 23060
4880 Sadler Road, Suite 300
PRE FINAL CONCEPTA 4/7/14
B
FINAL CONCEPTB 4/15/14
Jefferson Lab
Cooling & Power Upgrade
UIM Computer Center
Conceptual Design
JE
FF
ER
SO
N
AV.
QUARK PL.
LA
WR
EN
CE
DR.
822868
878
823
877
825
826
827
876
830
885
884
820
819
813
805880
802
883
882
832
818
817
807
814
833
804
835
834
838
836
840
811
844
841
846
845
847
874
875
839
808
812
837
843
842
861
860
859
858
857
870
862
863
869
803
867
866
886
873
872
879
871
KELVIN DR.
RU
TH
ER
FO
RD
RD.
ONNES DR.
CEBAF BLVD.
CEBAF BLVD.
CEBAF BLVD.
BCS DR.
RAT
TLEY RD.
PAULI DR.
STOP
CA
NN
ON
BL
VD.
HOGAN DR.
ONE C
OMP
ASS
WAY
BOHR BLVD. NORTH
BOHR BLVD. SOUTH
BETHE DR.
HOFSTADTER RD.
WETLANDS
FRESHWATER
PF01C
JE
FF
ER
SO
N
AV.
LA
WR
EN
CE
DR.
JE
FF
ER
SO
N
AV.
LA
WR
EN
CE
DR.
JE
FF
ER
SO
N
AV.
HA
DR
ON
DR.
HA
DR
ON
DR.
HA
DR
ON
DR.
CORNELL U. RD.
KEY MAPNOT TO SCALE
MATCH LINE C-101
LEGEND
UTILITY SITE PLAN
RPS
AML
WAG
MATCH LINE C-103
PVC
CHWS/R
NOTES
SUPPLY/RETURN
CHILLED WATER
EXISTING BELOW GROUND
POLYVINYL CHLORIDE
CHILLED WATER SUPPLY/RETURN
CDH
BENDS AND TEES AND LONGITUDINAL JOINTS
PROVIDE CONCRETE THRUST BLOCKS AT ALL
PIPING SYSTEM
CHWS PIPE SHALL BE A PRE-INSULATED
CHWS/R PIPES SHALL BE PVC
3.
2.
1.
C-101
C-102
C-103
C-102
CHWS/R
EXISTING 10"
CONNECT TO
(90)
EEL
(58)
TEST LAB
(55)
TED
TO BE REMOVED
EXISTING 10"X6" REDUCER
EXISTING 10" CHWS/R
TRENCH
10" CHWS/R IN SAME
AND REPLACE WITH
WILL BE REMOVED
EXISTING 6" CHWS/R
882
818
(45)CEBAF BLVD.
(52C)
INJECTOR (53)
DEWER
HA
DR
ON
DR.
CORNELL U. RD.
A
B
C
D
A
B
C
D
654321
654321
ZONE DATEAPPRDESCRIPTION
REVISIONS
DATEDATE
APPROVED
CHECKED
DRAWN
DESIGNER
FM&L APPROVED
SME CHECKED
USER CHECKED
ARCHITECT / ENGINEER
REVSHEETDRAWING NUMBERSCALE
ESH&Q CHECKED
JEFFERSON LAB
Thomas Jefferson National Accelerator Facility
United States Department of Energy Newport News, VA
REV
AS SHOWN
Scale: 1"=30'-0"
15' 0 10' 20' 30' 50' 75'
ha-inc.com
p: [804] 285-4171 f: [804] 217-8520
Glen Allen, VA 23060
4880 Sadler Road, Suite 300
PRE FINAL CONCEPTA 4/7/14
B
FINAL CONCEPTB 4/15/14
Jefferson Lab
Cooling & Power Upgrade
UIM Computer Center
Conceptual Design
JE
FF
ER
SO
N
AV.
QUARK PL.
LA
WR
EN
CE
DR.
822868
878
823
877
825
826
827
876
830
885
884
820
819
813
805880
802
883
882
832
818
817
807
814
833
804
835
834
838
836
840
811
844
841
846
845
847
874
875
839
808
812
837
843
842
861
860
859
858
857
870
862
863
869
803
867
866
886
873
872
879
871
KELVIN DR.
RU
TH
ER
FO
RD
RD.
ONNES DR.
CEBAF BLVD.
CEBAF BLVD.
CEBAF BLVD.
BCS DR.
RAT
TLEY RD.
PAULI DR.
STOP
CA
NN
ON
BL
VD.
HOGAN DR.
ONE C
OMP
ASS
WAY
BOHR BLVD. NORTH
BOHR BLVD. SOUTH
BETHE DR.
HOFSTADTER RD.
WETLANDS
FRESHWATER
PF01C
JE
FF
ER
SO
N
AV.
LA
WR
EN
CE
DR.
JE
FF
ER
SO
N
AV.
LA
WR
EN
CE
DR.
JE
FF
ER
SO
N
AV.
HA
DR
ON
DR.
HA
DR
ON
DR.
HA
DR
ON
DR.
CORNELL U. RD.
KEY MAPNOT TO SCALE
C-101
C-102
UTILITY SITE PLAN
RPS
AML
WAG
MATCH LINE C-102
EQUIPMENT AND PIPING INFORMATION
REFER TO MECHANICAL PLANS FOR
NOTE
C-103
SS
W
CDH
LEGEND
SD
CHWS/R
EXISTING WATER
EXISTING SANITARY SEWER
STORM PIPE
STORM INLET
SUPPLY/RETURN
CHILLED WATER
EXISTING BELOW GROUND
REINFORCED CONCRETE PAD
STORM DRAIN
CHILLED WATER SUPPLY/RETURN
C-103
(55)
TED
(58)
TEST LAB
(60)
CUPCONCRETE PAD
REINFORCED
(57)
(51)
EXISTING CHWS/R
CHWS/R
EXISTING
CHWS/R
EXISTING
SS 6"PVC
MH6
SS
6"A
BS
SS 8"A
BS
MH5
SS 4"
MH7
SS 8"
SS 8"
4" PVC
S
S
S
S
SS SS
SS
SS SS
SS
SS
SS
SS
SS
SS
SS
SS SS
SS
SS
S
W
12"
PIV #7
FDC
W 8" W
8"
4" DIP
W
W
W W
W
W
WW
#11-A
HYD
STOP VLVS
3/4" CORP
8"X6"F
HT
6"V
AL
VE
FH
#12-A
HYD
W8"
#12
HY
D
WW
W
W
W
WW
CAPPEDW
W
ADDITION
BUILDING
SD
SD
SD
EXISTING DRAINAGE DITCH
PIPE (TYPICAL)
EXISTING STORM
DITCH
DRAINAGE
EXISTING
TOWER
COOLING
BUILDING EXPANSION
AND DIVERT WATER AROUND
STORM PIPES TO COLLECT