GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 1
GLAST Large Area Telescope: GLAST Large Area Telescope: Face to Face Managers MeetingFace to Face Managers Meeting
LAT Integration & Test LAT Integration & Test April 13, 2005 2:00 PMApril 13, 2005 2:00 PM
Integration and Test Integration and Test 2 towers and next six month2 towers and next six month
Elliott BloomElliott BloomI&T ManagerI&T Manager
Ken FoutsKen FoutsI&T Engineering ManagerI&T Engineering Manager
SLACSLAC
Gamma-ray Large Gamma-ray Large Area Space Area Space TelescopeTelescope
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 2
Last Month's Accomplishments (1 of 4)Last Month's Accomplishments (1 of 4)• Management
– Tracking hardware shortages for LAT integration.• Current shortages are two cables: Thermister cable assembly (LAT-DS-5055), Grid temp sensor cable
assembly (LAT-DS-5073)• IFCT
– Tower A• Validated new trigger test scripts from Trigger group • Receive and validated new CAL & TKR configurations • CPTs, trigger optimization, calibration, data collection, aliveness test completed• Van de Graaff testing completed • Completed Tower-A Single Bay Tests• Installed Tower-A in Grid Bay 0• Tower B• FM105 integrated with TEM/TPS-B• Completed Tower B installation into single bay test stand• Completed Tower-B Single Bay Tests• Installed Tower-B in Grid Bay 4• CAL• Removed and returned three (2) TEM’s and CAL 118 (spare) to NRL.
– MGSE• Completed rework of GPR.• Completed proof test of integration stand, GPR and PAP’s.• GPR fit-up to Grid Complete • Installed Grid into MGSE• Moved stand to B33 and installed in Rm 104.• Complete GPR lift off test to verify ACD clearance.• Completed “L” bracket rework to accommodate ACD with greater clearance.• Second Single Bay Stand Complete
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 3
IFCT (Cont’d)– Mechanical Systems
• Completed S/C Interface check• Completed weight and CG measurement
– Electronics• Tem/TEM PS A,B handover
– Completed safe to mate for ELX prior to hand-off
• Validated EM GASU– Validation in I&T identified errors that were reworked by ELX
requiring return to ELX and retest
• SVAC– Instrument analysis workshop with first flight tower data
completed March 10.– Successful turn around for calibration of single tower data (4
hours).– Offline data processing system under CCB and working.– First evaluation of single tower data complete.
Last Month's Accomplishments (2 of 4)Last Month's Accomplishments (2 of 4)
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 4
• Particle Test– Van de Graaff + BGO Monitor
• LAT-TD-01805-02• VG delivers 17.6 MeV gammas for I&T tests• Single tower testing complete.
– Muon Telescope (Bldg 33)• LAT-TD-04419-02• Working (~1 Hz) for I&T tests (Single Tower Bay + Grid)• Only gives an external trig when muon passes through the
tower• Used to complete single tower and trigger test.
– Muon Telescope (New) (B101 Central Lab)• Working (~.5 Hz) for I&T and test bed tests (Mini Tracker)
– Am241 Source• LAT-TD-04980-02, LAT-PS-06066• Source, procedure, handling equipment complete for single
tower tests• Tests in progress (2-3 hours). ECD 3/31
Last Month's Accomplishments (3 of 4)Last Month's Accomplishments (3 of 4)
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 5
• Online– LATTE 4.8.1 released (need 4.8.2 due to PDU HKP fix)
• V&V’ed• Installed in Bldg 33 flight directories
– CAL V2 scripts assessment• CAL scripts under I&T online CCB control with only bug fixes.
CAL agrees to integrate any script changes via online CCB CM.
– LATTE /eLogbook • Installed in B33 workstations 4/6
– Continued supported of CAL, TKR, INT and test suites.– Supported data taking, trigger and E2E script development.– Problem assessment and fixes a large part of online workload
• NCRs, support for clean room operations, support of subsystems scripts.
– CCB activity and JIRA maintenance
Last Month's Accomplishments (4 of 4)Last Month's Accomplishments (4 of 4)
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 6
Single Tower I&T SequenceSingle Tower I&T Sequence
Install TKR in single bay
Install CALin met bay
Install TEM/TPSin met bay
Install CAL/TEM/TPSIn single bay
TKR LPT(optional)
CAL CPT
TEM/TPS LPT(optional)
AlivenessTest
TKR CPTCAL CPT
TKR LPT (14/22MHz)CAL LPT (14/22MHz)
Trigger TimingOptimization
DataCollection
Van de Graaff TestAm241 High Rate
Test
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 7
Roadmap to Two Tower TestingRoadmap to Two Tower Testing
Grid mini-IRR
Rework GPR to Grid Brackets
Reinstall Grid in Integration Stand
Run Tower B LPT in Grid
Install Tower B in Grid Bay 4
Grid Survey
Install Tower A in Grid Bay 0
Run EGSE Validation in Grid
Run Tower A LPT in Grid
Install EGSE in Grid
Two Tower Testing(ECD 4/28)
Complete Tower B Single
Bay Tests
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 8
Two Tower Test Plan as of 4/12/05Two Tower Test Plan as of 4/12/05
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 9
I&T MGSE/Grid ActivitiesI&T MGSE/Grid Activities
Weight and CG on Grid GPR return from rework Proof test completion
GPR to Grid fit up Installing GPR and Grid in the Integration Stand
Integration Stand in the cleanroom
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 10
Fit Check for ACD ClearanceFit Check for ACD ClearanceACD in Place
Before GPR Removal
Potential Interference During GPR Removal
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 11
Final Grid weight & CGFinal Grid weight & CG
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 12
TEM/TPS-B + FM105 integrationTEM/TPS-B + FM105 integration
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 13
Two Tower IntegrationTwo Tower Integration
Installation of Tower A in Single bay
Tower A in Grid. Tower B being installed in grid.
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 14
I&T and Tracker Teams - Two Tower Installation I&T and Tracker Teams - Two Tower Installation
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 15
What is SVAC doing in the next 6 MonthsWhat is SVAC doing in the next 6 Months
• Supporting SAS in the – Design, debug, and maintenance of infrastructure for data
analysis
• Performing data analysis on instrument data (will elaborate on this today)– taken during the E2E and SVAC tests
• Coordinating the Collaboration effort through Instrument Analysis Workshops to– Disseminate the knowledge on how the hardware works– Disseminate the knowledge on how the software works– Create a foundation for ISOC to build on
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 16
Excellent Start…Excellent Start…
Calibrated muon peaksIn units of MeV
TKR only triggers
TKR + Muon telescope
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 17
Event Trigger Rate for Tower A 43
.5
43.8
43.5
43.7
43.2
0.5
53.2
47.8
42.9
35.2
5204
.410
85.6
34.7
34.0
33.8 43
.8
31.1
31.1
30.1
6.6
91.3
101.
389
.478
.981
.165
.0 82.9
80.2
38.6 47
.3
43.7
43.7
44.2
28.2 42
.442
.442
.110
4.0
103.
510
2.7
97.8
92.2
0
1
10
100
1000
10000
1350
0089
4
1350
0089
613
5000
898
1350
0090
0
1350
0090
213
5000
904
1350
0090
913
5000
915
1350
0091
813
5000
931
1350
0102
413
5000
990
1350
0092
113
5000
924
1350
0092
6
1350
0090
6
1350
0091
113
5000
912
1350
0091
313
5000
929
1350
0094
513
5000
946
1350
0094
713
5000
949
1350
0096
513
5000
968
1350
0095
113
5000
956
1350
0097
113
5000
975
1350
0093
313
5000
935
1350
0093
613
5000
954
1350
0093
813
5000
939
1350
0094
013
5000
958
1350
0095
913
5000
960
1350
0096
113
5000
962
Run ID
Rat
e (H
z)
Event Trigger RateEvent Trigger Rate
CAL_LO only
Am241
VDG1
kHz
5 kH
z10
kH
z20
kH
z
1 kHz
Ho
rizo
nta
co
smic
sl
4 rangeZero Sup OFF
10 KHz
10 kHz
VDG
Rates agree with expectations
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 18
Number of Error Events for Tower A 8 9
2720
73
8 9 10 100 0
917
8
42
03
751
672
268
1259 24
5321
5314
3516
2818
3056
17 181
136
13
1652
1600
1830
2276
1483
0
1
10
100
1000
10000
1350
0089
4
1350
0089
613
5000
898
1350
0090
0
1350
0090
213
5000
904
1350
0090
913
5000
915
1350
0091
813
5000
931
1350
0102
413
5000
990
1350
0092
113
5000
924
1350
0092
6
1350
0090
6
1350
0091
113
5000
912
1350
0091
313
5000
929
1350
0094
513
5000
946
1350
0094
713
5000
949
1350
0096
513
5000
968
1350
0095
113
5000
956
1350
0097
113
5000
975
1350
0093
313
5000
935
1350
0093
613
5000
954
1350
0093
813
5000
939
1350
0094
013
5000
958
1350
0095
913
5000
960
1350
0096
113
5000
962
Run ID
Nu
mb
er o
f E
rro
r E
ven
ts
Error Events for Tower AError Events for Tower A
Rea
d T
KR
fro
m
on
e si
de
on
ly
So far we found no packet or parity errors.Only FIFO TEM errors were found (OK) VDG VDG
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 19
Lower TKR thresholds : Number of hit planesLower TKR thresholds : Number of hit planes
0.22%< 6 planes
0.07%< 6 planes
Run 135000894, ID 1/1, TKR DAC ~ 30Run 135000894, ID 1/1, TKR DAC ~ 30
Run 135000896, ID 2/3, TKR DAC ~ 22Run 135000896, ID 2/3, TKR DAC ~ 22
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 20
High Rate RunsHigh Rate Runs
Am241 (TKR and CAL are allowed to trigger)
Only the pulse generator Is allowed to trigger (1 kHz)
Run 135001024, ID 4/5Run 135001024, ID 4/5
Run 135000990, ID 4/6Run 135000990, ID 4/6
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 21
GEM Time Interval : High Rate RunsGEM Time Interval : High Rate Runs
Run 135001024, ID 4/5Run 135001024, ID 4/5 Run 135000990, ID 4/6Run 135000990, ID 4/6
Run 135000909, ID 4/1Run 135000909, ID 4/1Run 135000915, ID 4/2Run 135000915, ID 4/2
Am241 @ 5 kHz(TKR and CAL are allowed to trigger)
Only the pulse generator
Is allowed to trigger (1 kHz)
TKR and the pulse generator are allowed to trigger (1 kHz)
TKR, CAL and the pulse generator are allowed to trigger (5 kHz)
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 22
VDG RunsVDG Runs
Tower boundary
Reconstructed XY positions
Fraction of events with 0 hits(red means 0 events)
Very few events make into the thick layers
~ 80% of events have at least one track
Run 135000946, ID 9/1Run 135000946, ID 9/1Trigger rate ~ 100 HzTrigger rate ~ 100 Hz
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 23
Process for Investigating Data Analysis IssuesProcess for Investigating Data Analysis Issues1. An issue is presented in the Friday’s Instrument Analysis meeting 2. SVAC ensures its traceability by documenting it in JIRA 3. SVAC follows up with subsystems/Collaboration to develop a list of potential root
causes:– Insufficient knowledge/documentation of data analysis files
– Could be just a calibration issue or lack of understanding of how data analysis variables are being filled
– Software “Bugs” in three areas– in the data analysis software– in the online/offline software– in the reconstruction software
– Insufficient knowledge/documentation of instrument operational settings– Could be just a feature given the current operational settings
– Insufficient knowledge/documentation of instrument performance– Could be a not well understood/exercised capability of the instrument prior to the
existence of integrated towers– Could be an environmental effect or “noise” external to the LAT, inherent ot the
experimental set-up – Idiosyncrasies of ground cosmic ray spectrum
4. After step 3 is done , we can propose a special test to gather more data (if necessary)5. Finally when we believe an issue points to a flight hardware problem, we
1. Present summaries in IA (Eduardo) or ANA (Steve) meetings, whichever happens first
– Bring it to the attention of all relevant subsystems and recommend strategy to solve the problem
2. Document the issue with System Engineering and I&T for disposition
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 24
Current Issues under investigationCurrent Issues under investigation
• CAL_HI and CAL_LO fired without any crystal hits• CAL_HI trigger fired without high energy deposition • Discrepancy between TKR multiplicities between DATA and MC in
electronics space • There is consistently 10-15% more triggers seen during the 5 and
10kHz runs than expected as measured by the exponential fit to the delta event time register of the GEM.
• TKR only triggers are around 85% (TBR) of the time when the muon telescope triggers
• Discrepancy between Data and MC for TKR dead channel list • Discrepancy calculated and measured event size• There seems to be a high incidence of reasonable looking events with
both CAL low and CAL high without a TKR trigger. These events generally had plenty of hits in the tracker
• Discrepancy between GEM and TriggerAlg for trigger types• Discrepancy in trigger rates for 1,5,10 and 20 KHz runs,
underestimated for low rates and overestimated for high rates at a few % level
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 25
I&T NCRs by Month Open/Closed StatusI&T NCRs by Month Open/Closed Status
Month NCR Opened
Current Status
0
2
4
6
8
10
12
14
16
18
Sep-04 Nov-04 Dec-04 Jan-05 Feb-05 Mar-05 Apr-05
Open
Closed
Count of Detailed Status
Open/Closed Status
As of April 12th
0
2
4
6
8
10
12
14
16
18
Sep-04 Nov-04 Dec-04 Jan-05 Feb-05 Mar-05
Count of Open/Closed Status
Last Month
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 26
Two Tower Test PreparationTwo Tower Test Preparation
• Open EGSE Item Status – PDU GASU support in the grid.
• Complete– Cable terminations at grid interface to EGSE
• MGSE complete.– EGSE locations (Test Crate and power supply).
• Location identified on Integration Stand• Complete and installed
– PDU Operational Constraints without SIU.• Complete
– Harness routings and tie downs.• Concept for routing and tie downs discussed.• Routings to be finalized on Grid.
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 27
EGSE Configuration for Two TowerEGSE Configuration for Two Tower
PDU
GASU
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 28
EGSE Configuration for Two Tower TestEGSE Configuration for Two Tower Test
EGSE Support Shelf added in two locations
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 29
Upcoming I&T EventsUpcoming I&T Events
– Accept Grid from Mechanical Systems (Complete)– Acceptance test EM PDU (ECD 4/13)– Install Tower B in Grid (Complete)– Build 2 tower test cables (Complete)– Receiving Tracker Tower 2 (Complete)– Complete 2 tower test procedure (Complete)– Two tower test power supply ready (Complete)– Installation of all two tower EGSE in room 104 (ECD 4/15)– Integration of Tower A and B into Grid & functional test
(ECD 4/13)– Two tower test (ECD 4/28)
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 30
I&T Detail Schedule (1 of 4)I&T Detail Schedule (1 of 4)ID Task Name Start % Compl ete Finish
336 Tower A Mon 11/22/04 100% Thu 4/7/05337 Readiness for I&T CAL CPT Mon 11/22/04 100% Fri 1/7/05356 FM101 Post ship test and receiving test Mon 12/6/04 100% Fri 1/14/05365 FM101 Post Test CAL Actions Thu 1/13/05 100% Fri 1/14/05368 Readiness for CAL Integration Mon 12/13/04 100% Tue 12/14/04372 Tracker A post ship test & receiving test Mon 1/3/05 100% Sat 2/5/05413 Readiness for I&T Tracker CPT Fri 12/10/04 100% Wed 2/2/05422 I&T TKR-A Receiving Test (LAT-PS-3290) Fri 2/4/05 100% Mon 2/7/05423 Readiness for Tracker Integration Wed 12/1/04 100% Thu 2/10/05434 Readiness TEM/TPS A Integration Wed 12/15/04 100% Fri 3/11/05455 Tower-A Test Bay I&T Thu 2/10/05 100% Thu 4/7/05521 Tower B Mon 1/10/05 77% Thu 4/28/05522 TEM/TPS-B Safe-to-Mate Tue 3/8/05 100% Tue 3/8/05523 FM102 Post ship test and receiving test Mon 1/10/05 100% Thu 1/13/05530 Tracker B post ship test & receiving test (AIDS 751) Mon 2/14/05 100% Mon 2/28/05540 TEM/TPS-B Handover Review Fri 3/11/05 100% Fri 3/11/05541 Receive 1st EM Gasu Thu 3/10/05 100% Mon 3/21/05542 Safe-to-mate 1st EM Gasu Mon 3/21/05 100% Tue 3/22/05543 redline procedures Mon 3/21/05 100% Mon 3/21/05544 receive FM105 config file from NRL Tue 3/22/05 100% Wed 3/23/05545 Validate 1st EM Gasu Wed 3/23/05 100% Fri 3/25/05546 NCR 373 disposition work Thu 3/24/05 100% Fri 3/25/05547 TEM/TPS B Flight Readiness Tue 3/8/05 100% Tue 3/8/05 3/8
2/27 3/20 4/10 5/1 5/22 6/12Feb '05 Mar '05 Apr '05 May '05 Jun '05
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 31
I&T Detail Schedule (2 of 4)I&T Detail Schedule (2 of 4)ID Task Name Start % Complete Finish
548 TEM/TPS-B I&T Mon 3/7/05 100% Mon 3/28/05554 Tower-B Test Bay I&T Tue 2/22/05 100% Fri 4/8/05582 Tower-B Grid Bay I&T Fri 4/8/05 95% Wed 4/13/05583 TKR-B installation into grid bay Fri 4/8/05 100% Mon 4/11/05584 NCR 420 demate FMA flex cables facing bay 4 Fri 4/8/05 100% Fri 4/8/05585 FM105 crane operation into single bay Fri 4/8/05 100% Fri 4/8/05586 TKR-B Crane Operation into grid bay 4 Fri 4/8/05 100% Fri 4/8/05587 TKR-B Flexure Fastening Fri 4/8/05 100% Mon 4/11/05588 TKR-B Flex Cable Bending/Bonding Mon 4/11/05 100% Mon 4/11/05589 FM105 installation into grid bay Fri 4/8/05 100% Mon 4/11/05590 FM105 crane operation into grid bay 4 Fri 4/8/05 100% Fri 4/8/05591 TKR-B Flex Cable Flight Mate to TEM/TPS-B Mon 4/11/05 100% Mon 4/11/05592 Tower-B Grid Bay Test Mon 4/11/05 83% Wed 4/13/05593 Re-mate TKR FMA flex cables Mon 4/11/05 100% Mon 4/11/05594 Tower A aliveness test & TKR LPT Wed 4/13/05 0% Wed 4/13/05595 Bays 0,4 optical survey Mon 4/11/05 100% Tue 4/12/05596 Tower-B post-integration Aliveness Test Wed 4/13/05 0% Wed 4/13/05597 Tower-B post-integration Single Bay CPT Wed 4/13/05 0% Wed 4/13/05598 Two Tower Test Tue 3/22/05 39% Thu 4/28/05599 Acceptance test EM PDU Wed 4/6/05 100% Wed 4/6/05600 Build 2 Tower Test Cables Wed 4/6/05 100% Thu 4/7/05601 Two Tower Test Power Supply Ready Wed 4/6/05 50% Tue 4/12/05602 16 port GASU with updated firmware ready Mon 4/4/05 100% Mon 4/4/05603 Validate Two Tower Test Procedure Mon 4/11/05 0% Thu 4/14/05
4/6
4/4
2/27 3/20 4/10 5/1 5/22 6/12Feb '05 Mar '05 Apr '05 May '05 Jun '05
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 32
I&T Detail Schedule (3 of 4)I&T Detail Schedule (3 of 4)ID Task Name Start % Compl ete Finish
604 Receive EGSE bracket prints Tue 3/22/05 100% Wed 3/23/05605 Build EGSE Brackets & shelves Thu 3/24/05 100% Tue 4/12/05606 Install eLog Tue 4/5/05 100% Tue 4/5/05607 EGSE test/training in DAQ lab Fri 4/8/05 50% Tue 4/12/05608 Update Muon telescope procedure Tue 4/12/05 0% Tue 4/12/05609 Receive muon telelscope parts Tue 4/12/05 0% Wed 4/13/05610 validate muon telelscope in grid Wed 4/13/05 0% Thu 4/14/05611 install EGSE into Grid Tue 4/12/05 0% Tue 4/12/05612 Install Latte 4.8 Fri 4/8/05 70% Tue 4/12/05613 Install facility grounding bars Fri 4/8/05 50% Tue 4/12/05614 Test EGSE in Grid Thu 4/14/05 0% Fri 4/15/05615 Two Tower Test Pre-test review Tue 4/12/05 0% Tue 4/12/05616 Two Tower Test EGSE Ready Fri 4/15/05 0% Fri 4/15/05617 Two Tower CPT Mon 4/18/05 0% Wed 4/20/05618 userAppBrowser released properly by ELX Mon 4/18/05 0% Mon 4/18/05619 userAppBrowser in INT Tag Mon 4/18/05 0% Mon 4/18/05620 userApp execution Mon 4/18/05 0% Mon 4/18/05621 Aliveness Mon 4/18/05 0% Mon 4/18/05622 FMA CPT Mon 4/18/05 0% Mon 4/18/05623 FMB CPT Mon 4/18/05 0% Mon 4/18/05624 TE702, TE703, TE704 for A and B Mon 4/18/05 0% Wed 4/20/05625 FM104 CPT Wed 4/20/05 0% Wed 4/20/05626 FM105 CPT Wed 4/20/05 0% Wed 4/20/05
4/15
4/18
2/27 3/20 4/10 5/1 5/22 6/12Feb '05 Mar '05 Apr '05 May '05 Jun '05
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 33
ID Task Name Start % Compl ete Finish
627 Two Tower Trigger tests Wed 4/20/05 0% Thu 4/21/05628 TREQ alignment STR Wed 4/20/05 0% Wed 4/20/05629 TACK optimization STR Wed 4/20/05 0% Wed 4/20/05630 trigger eff Wed 4/20/05 0% Thu 4/21/05631 trigger eff for wide angle Thu 4/21/05 0% Thu 4/21/05632 Two Tower Calibration Thu 4/21/05 0% Fri 4/22/05633 FM104 calibDAC, MuTrig, calibGen Thu 4/21/05 0% Thu 4/21/05634 FM105 calibDAC, MuTrig, calibGen Thu 4/21/05 0% Fri 4/22/05635 TE601/602/604 for FMA Fri 4/22/05 0% Fri 4/22/05636 TE601/602/604 for FMb Fri 4/22/05 0% Fri 4/22/05637 CSPT (STR) Fri 4/22/05 0% Fri 4/22/05638 E2E Data Collection Fri 4/22/05 0% Thu 4/28/05639 E2E basic cosmics Fri 4/22/05 0% Mon 4/25/05640 E2E S/C Power Margin Mon 4/25/05 0% Mon 4/25/05641 E2E External pulser Mon 4/25/05 0% Tue 4/26/05642 SVAC data collection Tue 4/26/05 0% Wed 4/27/05643 Two Tower Post Test Review Thu 4/28/05 0% Thu 4/28/05644 Tower 1 Mon 12/6/04 24% Tue 5/10/05645 FM101 Post ship test and receiving test Mon 12/6/04 100% Fri 1/14/05653 Tracker 2 post ship test & receiving test Mon 4/4/05 25% Fri 4/29/05654 TKR-2 Post-Ship Test Mon 4/4/05 25% Fri 4/29/05666 TEM/TPS 1 Flight Readiness w/rework Fri 4/22/05 0% Fri 4/22/05 4/22
2/27 3/20 4/10 5/1 5/22 6/12Feb '05 Mar '05 Apr '05 May '05 Jun '05
I&T Detail Schedule (4 of 4)I&T Detail Schedule (4 of 4)
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 34
I&T 9 Month Look Ahead (1 of 3)I&T 9 Month Look Ahead (1 of 3)
ID Task Name Duration Start Finish
1 LAT Integration Plan 429.31 days 3/19/04 1/11/06
2 Grid RFI 0 days 10/22/04 10/22/04
3 X-LAT Thermal Plate RFI 0 days 6/1/05 6/1/05
4 Radiators RFI 0 days 5/31/05 5/31/05
5 Tracker Receiving 147.81 days 2/4/05 9/16/05
86 Calorimeter Receiving 133.31 days 12/8/04 6/29/05
177 Electronics Receiving 349.81 days 3/19/04 9/2/05
178 Cables 81.63 days 2/10/05 6/14/05
197 TEM Assemblies 107.38 days 2/18/05 8/1/05
216 TEM PS Assemblies 107.38 days 2/18/05 8/1/05
235 Electronic Boxes 349.81 days 3/19/04 9/2/05
243 ACD Receiving 0 days 6/9/05 6/9/05
245 Grid Assemby in I&T 76.19 days 11/1/04 2/25/05
246 Grid Assembly 55.19 days 11/1/04 1/25/05
266 Grid Box Base Assy Inspection and Fitcheck 21 days 1/25/05 2/25/05
276 TEM to Calorimeter 116.88 days 2/7/05 8/2/05
277 Calorimeter A 9 days 2/7/05 2/21/05
280 Calorimeter B 6.63 days 2/25/05 3/8/05
283 Calorimeter 1 16.44 days 3/30/05 4/22/05
286 Calorimeter 2 1.44 days 4/28/05 4/29/05
289 Calorimeter 3 4.69 days 4/29/05 5/6/05
292 Calorimeter 4 4.69 days 5/6/05 5/13/05
295 Calorimeter 5 4.69 days 5/13/05 5/20/05
298 Calorimeter 6 4.69 days 5/20/05 5/27/05
301 Calorimeter 7 5.19 days 5/27/05 6/6/05
304 Calorimeter 8 4.69 days 6/6/05 6/13/05
307 Calorimeter 9 4.69 days 6/13/05 6/20/05
310 Calorimeter 10 4.69 days 6/20/05 6/27/05
313 Calorimeter 11 4.69 days 6/27/05 7/5/05
316 Calorimeter 12 4.69 days 7/5/05 7/12/05
319 Calorimeter 13 4.69 days 7/12/05 7/19/05
322 Calorimeter 14 4.69 days 7/19/05 7/26/05
325 Calorimeter 15 3.75 days 7/26/05 8/1/05
328 Calorimeter 16 1 day 8/1/05 8/2/05
10/22
6/1
5/31
6/9
30 6 13 20 27 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25 2Jan '05 Feb '05 Mar '05 Apr '05 May '05 Jun '05 Jul '05 Aug '05 Sep '05 Oct '05
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 35
I&T 9 Month Look Ahead (2 of 3)I&T 9 Month Look Ahead (2 of 3)
ID Task Name Duration Start Finish
331 Calorimeter/Tracker/TEM/TEM-PS Test 132.88 days 2/21/05 9/9/05
332 Tower A 26 days 2/21/05 3/30/05
335 Tower B 2 days 3/30/05 4/1/05
338 Tower 1 1 day 4/22/05 4/25/05
341 Tower 2 1 day 4/29/05 5/2/05
344 Tower 3 1 day 5/6/05 5/9/05
347 Tower 4 1 day 5/19/05 5/20/05
350 Tower 5 1 day 6/8/05 6/9/05
353 Tower 6 1 day 6/21/05 6/22/05
356 Tower 7 1 day 7/1/05 7/5/05
359 Tower 8 1 day 7/12/05 7/13/05
362 Tower 9 1 day 7/21/05 7/22/05
365 Tower 10 1 day 8/1/05 8/2/05
368 Tower 11 1 day 8/10/05 8/11/05
371 Tower 12 1 day 8/19/05 8/22/05
374 Tower 13 1 day 8/30/05 8/31/05
377 Tower 14 1 day 9/8/05 9/9/05
380 Tower Installation 108.88 days 4/1/05 9/15/05
381 Install Tower A 3 days 4/5/05 4/8/05
385 Install Tower B 3 days 4/1/05 4/6/05
389 2 Tow er CPT 10 days 4/8/05 4/25/05
390 Install Tower 1 2.5 days 4/25/05 4/28/05
397 Install Tower 2 2.5 days 5/2/05 5/5/05
404 4 Tow er CPT 4 days 5/5/05 5/11/05
405 Install Tower 3 2.5 days 5/11/05 5/16/05
412 Install Tower 4 2.5 days 5/20/05 5/24/05
419 Install Tower 5 2.5 days 6/9/05 6/13/05
426 Install Tower 6 2.5 days 6/22/05 6/24/05
433 8 Tow er CPT 5 days 6/27/05 7/5/05
434 Install Tower 7 2.5 days 7/5/05 7/7/05
441 Install Tower 8 2.5 days 7/13/05 7/15/05
448 Install Tower 9 2.5 days 7/22/05 7/26/05
455 Install Tower 10 3 days 8/2/05 8/5/05
462 Install Tower 11 3 days 8/11/05 8/16/05
469 Install Tower 12 2.5 days 8/22/05 8/24/05
476 Install Tower 13 2.5 days 8/31/05 9/2/05
483 Install Tower 14 3.5 days 9/9/05 9/15/05
0%
0%
0%
30 6 13 20 27 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25 2Jan '05 Feb '05 Mar '05 Apr '05 May '05 Jun '05 Jul '05 Aug '05 Sep '05 Oct '05
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 36
I&T 9 Month Look Ahead (3 of 3)I&T 9 Month Look Ahead (3 of 3)
ID Task Name Duration Start Finish
491 Install Electronics and Cables 6 days 9/15/05 9/23/05
496 16 Tow er CPT 5 days 9/23/05 9/30/05
497 ACD 8 days 9/30/05 10/13/05
501 LAT Level System Test 45 days 10/13/05 12/22/05
507 Pack & Ship 3 days 12/22/05 1/4/06
508 Deliver to NRL 5 days 1/4/06 1/11/06
0%
0%
0%
1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1May '05 Jun '05 Jul '05 Aug '05 Sep '05 Oct '05 Nov '05 Dec '05 Jan '06
GLAST LAT Project Managers F2F 041305
4.1.9 - Integration and Test 37
Issues & ConcernsIssues & Concerns
ISSUES• Availability of flight assembly hardware.
– Shortages identified by I&T and being worked with Subsystems.
• Flight CablesCONCERNS• I&T Procedure Development
– Two tower test procedure (4/15/05 Need date)• Continued support from subsystems for NCR closure.• Hardware delivery planning for Tracker
– New supplier for flex cables is able to increase production how does it impact Tracker delivery
• TPS rework and replacement, availability for future tower installations.
• Need firm delivery dates for ELX boxes • LATTE 5.0 ready Oct. 1 for use in LAT Functional testing due to
start 10/14. E2E tests start 11/1.