LANDF RM – Update on Early Action funded projects to manage local flood risk 17/01/11 1 Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council GIS facilitating the delivery of a Surface Water Management Plan Brian Higgs Corporate GIS Unit Manager & Graham Hodgson Group Engineer – Civil Engineering Structure of Presentation Describe Borough & G.I. infrastructure within Dudley MBC to give context Look at how the project has already exploited the technology Consider how it will influence future direction A business view on the approach, what has been achieved and future direction

GIS facilitating the delivery of a Surface Water ... · GIS facilitating the delivery of a Surface Water Management Plan Brian Higgs Corporate GIS Unit Manager & ... community engagement

Embed Size (px)

Citation preview

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

1Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

GIS facilitating the delivery of aSurface Water Management Plan

Brian HiggsCorporate GIS Unit Manager

&

Graham HodgsonGroup Engineer – Civil Engineering

Structure of Presentation

• Describe Borough & G.I. infrastructure within Dudley MBC to give context

•• Look at how the project has already exploited the technology

• Consider how it will influence future direction

• A business view on the approach, what has been achieved and future direction

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

2Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

ContextDudley Borough covers an area of 98 sq km with a population of 310,000, considered a low risk borough from a flooding perspective. This status does not excuse us from having to have robust and defensible processes in place

The Council’s G.I. Infrastructure:

Creators = 350+ seatsConsumers = over 4,500 staff have used the Intranet GIS Site (GIS-MO)

……… 92% of all PCs on Council’s network have accessed GIS-MO……… Second only to Outlook in magnitude and diversity of user base

Changes business processes, resulting in it being seen as business-critical and as such features in Council’s Business Continuity Plan

400+ data sources including most of the Council’s key business applications are currently accessible through GIS-MO resulting in a holding of over 2 million spatial records

EXPERIAN -MOSAIC UK

M3/Northgate -Environmental

Health

ONS -Index of Multiple

Deprivation / Census Data /

OAC

GIS-MO

GVA -Corporate Asset

Management

iWorld –Housing

Management

NLIS -Land Charges

CONFIRM -Arbor / Grounds

Maintenance

Northgate -Revenues and

Benefits

Business Link Data

MAYRISE -Street Lighting

Symology -Highways

Maintenance

ASPIRE -CRM (Dudley Council Plus)

SIDEM –Parking

Management

CENTRIS -Pupil Records

Northgate -Electoral Register

ELMS2 -Community Equipment

EMS -Early Years

SWIFT -Social Service

Clients

Phone Masts(Mobile Operators Assoc)

Gas & Oil Pipelines

Bus Routes (Centro)

Water Companies (South Staffs / Severn Trent)

British Waterways

Flood Data (EA)

APAS -Planning

Applications back to 1947

Building Reg’s

TPO’s

Enforcements

Planning Policy

ExeGesIS -HBSMR

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

3Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Why consider employing GI handling technologies?

• Explicit recommendation within DEFRA/EA advice and guidance documentation

• More importantly, it’s effective contributory role supporting the following processes can be demonstrated:

• - Asset Data Capture and Maintenance

Critical watercourses identified and captured from OS MasterMapPhase 2 to include other water features held within OS MasterMap:

- 7,837 objects- Data specification yet to be defined

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

4Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Culverts – Also captured to OS MasterMap (where defined) and attributed as ‘Alignment based upon authoritative source’

• Where no OS spatial definition - single straight line between portals to denote existence and attributed as ‘Assumed alignment only – to be confirmed’

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

5Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Storm Water Outfalls…

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

6Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Watercourse Grills…

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

7Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Invasive Species also being captured as a bonus…

Why consider employing GI handling technologies?

• Explicit recommendation within DEFRA/EA advice and guidance documentation

• More importantly, it’s effective contributory role supporting the following processes can be demonstrated:- Asset Data Capture and Maintenance- Evidence areas of “known” flooding

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

8Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Symology Flood Records – Category 1 (Flooding Inside Property - 477 incidents)

Street centric - some difficulty in referencing to property levelMultiple occurrences - filter out multiple reportingFlooding not recognised as explicit service line - business process review required

Symology Flood Records – Category 2 (Flooding Outside Property - 441 incidents)

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

9Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Symology Flood Records – Category 3 (Flooding on Carriageway – 479 incidents)

Other Symology categories mapped -• Flooding of Public Open Space (8 incidents)• Unknown Flooding (223 incidents)

Additional Data - Severn Trent Water Flood Records (Storm / Foul) – 209 incidents

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

10Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Additional Data - DMBC Flood Damage Claims (74 claimants)

2007 DEFRA funded grant (£20,000) in response to flood events

Additional Data - Extents of Actual Flooding (DMBC)

Determined from site visits and information supplied by residents

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

11Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Additional Data - EA Susceptibility to Surface Water Flooding

Additional Data - EA 1 in 200 Year Rainfall

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

12Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

On-Line Survey through Council’s website

Newspaper Archive

Neither source has contributed much to the overall picture

Other indicators of possible flooding

Why consider employing GI handling technologies?

• Explicit recommendation within DEFRA/EA advice and guidance documentation

• More importantly, it’s effective contributory role supporting the following processes can be demonstrated:- Asset Data Capture and Maintenance- Evidence areas of “known” flooding - Determine “Hot Spots” and associated geographies

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

13Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Establishment of Hot Spots

Reviewed all areas of “known” flooding

Considered potential impact on the following:• People• Property (internal)• Highway• Sensitive land use

Required at least two events

Other professional judgements

• Once established need to define associated “Consideration Zone”

Flood Consideration Zones

The primary requirement is to be able to identify through the Development Control process any development or land use change which may have a negative impact on the hot spot area

Other service areas such as Emergency Planning will have access to the geography

Currently considering business rules for how to define these areas, needs to be robust as almost certainly will be challenged by developers

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

14Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Why consider employing GI handling technologies?

Explicit recommendation within DEFRA/EA advice and guidance documentation

More importantly, it’s effective contributory role in supporting the following processes can be demonstrated:- Asset Data Capture and Maintenance- Evidence areas of “known” flooding - Determine “Hot Spots” and associated geographies- Information informed Risk Assessment

Flood RiskNeed to consider adverse consequences for:

- Human Health including Social Deprivation and Vulnerability- Economic Activity- Heritage- The Environment

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

15Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Recorded flood extents mapped (DMBC records)

Index of Multiple Deprivation (Lower Layer Super Output Areas)

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

16Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

• MOSAIC data – Customer insight, necessary for effective community engagement

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

17Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Land Use to NLUD ClassificationHelps identify economic activity

LLPG - Business Premise Register

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

18Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Historic Buildings Sites & Monuments Record (HBSMR)

Nature Conservation Enhancement ZonesAlternative views need to co-reside

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

19Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Building Class (indicates age of structure, possibility of cellars, etc)

Key infrastructure at risk (from LLPG)

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

20Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Bus stops and routes

GIS-MO for Emergency & Contingency Planning

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

21Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Need to consider “marooned” properties as part of the risk assessment and evacuation planning

Potentially inundated properties

Potentially marooned properties

Why consider employing GI handling technologies?

Explicit recommendation within DEFRA/EA advice and guidance documentation

More importantly, it’s effective contributory role in supporting the following processes can be demonstrated:- Asset Data Capture and Maintenance- Evidence areas of “known” flooding - Determine “Hot Spots” and associated geographies- Information informed Risk Assessment- Underpins open and transparent dissemination of resulting data

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

22Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Publishing data throughG.I. Infrastructure

Single view of data ensuring appropriate level of currency and integrity

Embed within processes such as Planning Application Consultation

Geometries can be transparent – change the question

Raise awareness of topic – possible extended user community

GIS facilitating the delivery of aSurface Water Management Plan

A Business Perspective

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

23Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

GIS facilitating the delivery of aSurface Water Management Plan

• Confidently Identify and Understand where SW Flooding will occur• Identify the Probability & Consequences of SW Flooding

- (Human Health: Economic Activity: Cultural Heritage & the Environment)• Support the Principles of PPS25 • Identify Opportunities where SuDS can play a more significant role

in mitigating Flood Risk• Interactively Inform Spatial Planning, Development & Emergency

Planning• Help Target Public Engagement to raise Flood Awareness• Allow 3rd Party Access • Asset Register

GIS facilitating the delivery of aSurface Water Management Plan

Final Thought• 6 Months Since Early Action Bid Funding

Without the Expertise, Good Corporate Partnering & the Power of GIS

“How would we deliver the requirements of the Floods & Water Management Act and its

Associated Regulations as Efficiently and Effectively ?”

LANDF RM – Update on Early Action funded projects to manage local flood risk

17/01/11

24Brian Higgs and Graham Hodgson – Dudley Metropolitan Borough Council

Thank you for your attention