Management reserves Dollars included in a cost estimate to allow for future situations that are unpredictable (sometimes called unknown unknowns). Overrun The additional percentage or dollar amount by which actual costs exceed estimates. Parametric modeling A cost-estimating technique that uses project characteristics (parameters) in a mathematical model to estimate project costs. Planned value (PV) The portion of the approved total cost estimate planned to be spent on an activity during a given period; formerly called the budgeted cost of work scheduled (BCWS). Profit margin The ratio between reve

Documentgg

  • Upload
    vikram

  • View
    213

  • Download
    0

Embed Size (px)

DESCRIPTION

he

Citation preview

Management reservesDollars included in a cost estimate to allow for future situations that are unpredictable (sometimes called unknown unknowns).OverrunThe additional percentage or dollar amount by which actual costs exceed estimates.Parametric modelingA cost-estimating technique that uses project characteristics (parameters) in a mathematical model to estimate project costs.Planned value (PV)The portion of the approved total cost estimate planned to be spent on an activity during a given period; formerly called the budgeted cost of work scheduled (BCWS).Profit marginThe ratio between reve