Getting ready for Advanced Metering Infrastructure

Paper by : Rajesh Nimare

Presented by : Prashant Sharma

Page 2: Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma

AMI by definition

• Infrastructure of metering systems • Automates most of the metering centred

repetitive activities• Collects granular consumption data to deploy

dynamic pricing mechanisms• New payment and customer service options• Control of electrical load control within the home

and or businesses to improve system diversity

Page 3: Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma

Is AMI same As AMR AMR is primarily focused on

the ability to collect data Primary purpose of AMR

systems is customer billing, and reduced costs of meter reading.

AMR systems typically comprise of static meters fitted with communication devices, communication network (media) as well as supporting software to manage the data.

AMI includes not only automated meter reading, but, a system that collects time-differentiated energy usage from advanced meters

The system is capable of providing usage information enables utilities to provide demand response products,

Customers participation. AMI also supports additional

features and functionality related to systems operation and customer service, e.g. outage management, connect/disconnect, customer load management etc.

Page 4: Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma

Business processes

Automatic Meter Reading (AMR)

Advanced Metering Infrastructure (AMI)

Meters · Electronic · Electronic with LAN, HAN, load profile and disconnect.

Data Collection · Monthly · Remote using LAN communication, more frequent

Data recording · Cumulative kWh

· Half hourly so that dynamic prices can be applied.

Business opportunities

· Monthly consumption based billing

· Customer payment option· Pricing options· Utility Operations· Demand response· Emergency response

Key business processes

· Billing· Customer

information system

· Billing· Customer information system· Customer data display· Outage management· Emergency demand response.

Customer’s participation

None In Home Display, cost and environmental consciousness.

Demand response programsAdditional devices None Utility controlled customer load

Smart thermostats / Compressor

Page 5: Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma

Components

• In home Display

• An advanced electricity meter,

• A central back-end software system

• Two way communication system

Page 6: Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma

Stake holder benefit

• Consumers to better manage their electricity use;

• Electricity retailers to make innovative time-of-use price offers to suit consumers’ needs; and

• Electricity distributors to better detect supply faults and respond to them more quickly.

• Industry Benefits:– Carbon Credits– Catering to increasing demand with existing

generation

Page 7: Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma
Page 8: Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma

Technical Architecture / Landscape

Page 9: Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma
Page 10: Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma

SMART meter

• Record electricity consumption by the half hour; • Be remotely read so a meter reader does not have to

visit your home or business; • Provide consumption and price information via an in-

home display• Enable billing queries to be resolved quickly• Allow remote connection of your electricity• Help electricity distributor to detect and locate outages

and restore supply more quickly; and • Monitor the quality of your electricity supply

Page 11: Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma

Programs using AMI

• Demand Response

• Dynamic Pricing

• Critical Peak Pricing

• Real Time Pricing

• Emergency Demand Response

• Economic Demand Response

Page 12: Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma

Planning AMI DeploymentIdentify the current challenges of your business

process.Identify the future challenges that your business, your

customer and the society at large may encounter.Remember, it is not easy to find “problem” or

“inconvenience” or “sluggish system” if these have become a routine. Each business process: meter data collection, revenue collection and customer satisfaction should be challenged with efficient alternatives.

Define your AMI vision statement considering the current and future challenges

Page 13: Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma

Planning AMI deployment

• Start with a pay-back analysis. Telescopically plan your AMI rollout keeping the most rewarding benefits in the first few phases.

• Don’t re-invent the wheel; take suitable help from vendors and consultants as the cost of advice is insignificant in terms of benefits and avoiding rework.