Upload
gusty
View
69
Download
0
Embed Size (px)
DESCRIPTION
Get a Grip. Engineering a low-budget prosthetic arm Cary Busby Episcopal School of Knoxville. 8 th Grade Engineering Curriculum. Engineering Methods vs. Scientific Methods Importance of Iterations (a.k.a. Failures) Importance of Communication skills. www.sciencebuddies.com. - PowerPoint PPT Presentation
Citation preview
Get a GripEngineering a low-budget prosthetic arm
Cary BusbyEpiscopal School of Knoxville
8th Grade Engineering CurriculumEngineering
Methods vs. Scientific Methods
Importance of Iterations (a.k.a. Failures)
Importance of Communication skills
www.sciencebuddies.com
Two engineering projectsLow-Tech: the
Prosthetic ArmHigh-Tech: the
Lego Robots
Get a GripDeveloped at Northwestern
Universityhttp://www.ideanet.org/get-a-grip
/Start-up cost: about $20 per
groupMaintenance cost: less than $5
per groupTime: 5-7 class periodsGroups of 3 students, with similar
abilities within the group.
The ScenarioAfghani girl lost her hand to a
land mine.Compare culture in Afghanistan
to culture in the United States.Examine state-of-the art
prosthetic devices.Design a prosthetic hand for her:
◦Must be able to carry a bucket of water.
◦Must be able to eat dinner by herself.
More SpecificationsIndependence – put on alone.Flexibility – either or both hands
lost.Comfort – so she can play with
her friends.Cost – Use materials that would
be available in a small village.Client has no hand or wrist
motion, but is able-bodied otherwise.
Materials
ToolboxRechargeable drill and bitsHacksawAwlPliersNeedle-nose PliersGood scissorsClampsWire cutters
Grading the projectEngineering Work:
◦ Listening & working together (20 points)◦ Staying on task (20 points)◦ Good use of materials (20 points)◦ Documentation/Reflection (20 points)
Accomplishing the Tasks:◦ Carrying water (5 points)◦ Eating olives (5 points)
Innovations:◦ Creative design◦ Moving parts◦ (10 points possible)