Upload
gert-guriev
View
254
Download
10
Tags:
Embed Size (px)
DESCRIPTION
architecture student portfolio
Citation preview
portfoliogert guriev
architectural projects
youth center
2600m2
kalle komissarov emil urbel 2010/11
city hall
33 000m2
andres ojariilmar valdur
markus kaasik 2010/11
3 dl
600m2 martin melioranski
2010/11
narva planning
95 000m2
andres alverindrek rünkla
veljo kaasik 2010/11
private house
200m2
indrek peil, siiri vallner 2010/11
4-6
7-9
10-13
14-17
18-21
scale tutor
year
scale tutor
year
scale tutor
year
scale tutor
year
scale tutor
year
competitions
shopping center competition
40 000m2
3+1 architects
2013 28-30
scale co-
autor year
architectural graphic
-toomas tammis
2009/10
25
scale tutor
year
art work + workshops
drawing workshop
jaan elkenlinda elken
2010/11
car drawings
2011/12
parametrical design ws
raul kalvokirstjan männgio
eve komp, annika aasmamihkel-emil mikk
20011/12
parametrical design ws II
renee puuseppkerstin kivila, riin kersalu
taavi lõoke2012/13
painting workshop
jaan elkenlinda elken
2010/11
tutor
year
year
tutor
co-autor year
tutorco-
autor year
tutor
year
22
26
23
24
27
3
gert guriev 26 / 02 / 1990
[email protected] +372 55 66 24 34
www.gertguriev.com
education
33
VAADE LÄÄNEST
4.MAGAMISTUBA 15,7 m2
9.MAGAMISTUBA + MAG-AMISASE 13,1m2
10.VANNITUBA 5m2
6.VANNITUBA 3,2m2
7.ESIK 11,9m2
1.KUUR 3m2
2.KÖÖK 13,7m2
3.ELUTUBA 37,2m2
5.ESIK+TREPP 13,7m2
8.MAGAMISTUBA + MAG-AMISASE 10,3m2
ESIMENE KORRUS
private house
200m2
indrek peil, siiri vallner 2010/11
scale tutor
year
the heart of the one-storied house is its centrally located livingroom.
the livingroom combines three privatelly located gable-roofed
house parts, where are the bedrooms and the hobbyrooms. the gable-
roofed house parts symbolize the abundance of wooden houses at
the wismari quarter and try to blend into the environment through form and facade materials. the centrally located livingroom is linked to the
terrace and garden.
4
view from west
view from east
view from south
view from north0,00
-0,30
2,70
3,20
7,00
2,90
4,20
7,50
LÕIGE A-A
3.RAAMATUKOGU 13,8m2
1.VEINITUBA 9.2m2
2.TERRASS 65,4 m2
TEINE KORRUS
5
roof deckingbattenlathwaterproof layerplywoodwood rafterheat insulationfeltpilesplywood
527
4540
128
10
2522
195
10
23
300
10 2519
550
20
15
6000
1088
2613
5387
570
1414
5920
942
800
943
800
570
537
5429
845
3222
1400
396
700
461
698
226
1400
360
5479
1160
136114
000
1400
0
20000
846
20000
6708
360
6931 18051333
1814 2407 1668
2268 1970 268170008001183
9069 6931 4000
621
3926
402
733241 700 627
2003 793
700
1 2 3
4
1 2 3 4
AB
C
AB
CD
47
3 5
1
8
9
10
2
6
0,00
-0,30
-0,30
-0,05
-0,25
-0,05
-0,30
VU 2 900X2300
VU 2 900X2300
VU 4 900X2300
A11
A12
A13
A14
A15
A16
A17 A18
A16
SU 2700/2100
SU7700/2100
SU 3700/2100
VU 3900/2300
VU 6700/2300
VU 5700/2300
SU 5700/2100
SU 6700/2100
SU 1700/2100 TR (puust)
16 tõusu210/240
D
terrass
15 tõusu200/210
lakitud laudis (tamm)
piire P2
siinid S1
6
public room
at the start the tube is fi lled with public room, at the end it is totally private room
folding the tube to get connection between start and end
private room is located in external perimeter, public in internal perim-eter
public rooms can open to courtyard one tip of a tube is palced on an-toher to make connetcion between courtyard and outside
logistics scheme
private room
private room
public room
youth center
2600m2
kalle komissaarovemil urbel2010/11
scale tutor year
the youth centre is planned to väike-õismäe, on the bank of a pond that forms with the kindergardens, schools and panel houses a circle-like courtyard. the biggest advantage to the location offer the surrounding nature, facilities and attractions for youth (stadion, ballparks, playgrounds). also the location is child-friendly - no need to cross the roads and the kindergartens and schools are situated close by. the situating of the youth center in the midst of this community carries on the atmosphere and attitude of väike-õismäe to keep within the circle. the biggest downside of the location is diffi cult access to people from further away. the building can be accessed by the walkway surrounding the pond or by taking the right turn from the circle-like courtyard.
the youth center is like the miniature model of väike-õismäe - a house that lives for its inner community. the build-ing has been built up on a tube that has been turned upside down. private rooms have been directed to the perim-eter of the house, whereas the public parts open up to the courtyard. the pri-vate rooms’ block is of constant width, only the adjacent public rooms change accordingly, thus creating pleasant seat-ing and relaxation areas. in the summer-time, it is possible to expand the areas to the terrace and the inner courtyard.
7
ladu
ladu
peegelsaal
budosaalstuudio
ladu
ladu
TV stuudio
bänd ladubänd
noorteraadio
ladu
section a-a
section b-b
view from east
view from south
view from west
view from north
9
due to its important location, there is an entrance on each side of the
building. the entrance points are clearly marked with different constructions.
the central location has contributed on a larger scale to the connection of the
inner rooms to the outer surroundings. the street in between the two volumes
runs on a parallel with the adjacent service hall.
from the rooftop terrace opens a view to the council hall and on the same
level one can fi nd the restaurant. the entrance to the conference hall
is opened to the ramp located in the front of the house, whereas the
caffeteria has been located under the high-rise building.
the open part of the building has been situated between the construction
lines in a manner, that enables long and trilling views. the solid-structured construction is of a bigger scale near
the entrances and exits. the open spaces are scheduled to be more
complicated and versatile, at the same time the high-rise contrasts with its simplicity and rationality. the high-
rise is situated on a parrallel with the surrounding towers.
city hall
33 000m2
andres ojariilmar valdur
markus kaasik 2010/11
scale tutor
year
10
köök
klassid
kohvik
press
teenindussaal
arhiivi lugemissaal
fuajee
+0.00
ground fl oor
15
restuarant
terrace
a
a
c
c
bb
kitchen
restuarant
press conference
a
a
c
c
bb
conference Room
-
Konstruksioon
fl oorsregular construction changes front of important rooms as halls and rooms which are higher than one fl oor
frist fl oor seccond fl oor
roofs and terrases glass surfaces construction supporting shafts
if you enter to the city hall then you have two choices, you can move on public track (orange) or track for private rooms (blue)
important rooms are situated next to public track.
public part of the house (orange) can be used seperatly from the private one
council hall
a
a
c
c
bb
alkraplennut
parkla
arhiiv
press
alkrap
-2.00
+0.00
+5.50
+10.00
+23.80
+0.00
+4.00
+8.00
+10.00
+16.00
+20.00
+24.00
+28.00
+32.00
+36.00
+40.00
+44.00
+48.00
+52.00
+56.00
+60.00
+64.00
+68.00
+72.00
+76.00
+80.00
+84.00
+88.00
+92.00
+96.00
parkla
arhiiv
press +0.00
+4.00
+8.00
+12.00
+16.00
+20.00
+24.00
+28.00
+32.00
+36.00
+40.00
+44.00
+48.00
+52.00
+56.00
+60.00
+64.00
+68.00
+72.00
+76.00
+80.00
+84.00
+88.00
+92.00
+96.00
-4.00
-7.40
00
00
50
0.00
3.80
third fl oor high-rise fl oors
16
13
3 dl small
600m2 martin melioranski
2010/11
scale tutor
year
ground fl oor seccond fl oorfi rst fl oor third fl oor fourth fl oor
hidden geometrycuboctahedron
8 triangles6 squares12 vertices24 identical sides
15
1
2
3
4
5
cafe/trainstation
youthcenter
stage/viewpoint
black box/class
offi ce
section a-a section b-b
used sides from used sides from cuboctahedroncuboctahedron
folding line which divides folding line which divides polygon into two parts polygon into two parts
two seperate geometry are two seperate geometry are rotated from folding line, so rotated from folding line, so that bottom triangles come that bottom triangles come together.together.
11 + +
16
vaade a vaade b
initial situationinitial situation preserved old partpreserved old part old preservd tower is joined with new geometry old preservd tower is joined with new geometry though points which where found through though points which where found through hidden geometry. hidden geometry.
construction which hangs construction which hangs new geometry on top of new geometry on top of oldoneoldone
result of joiningresult of joining cutting line from old geometrycutting line from old geometry
22 ==
17
railway & bus station
prospective beachfront building
Peter’s square
city hall square
Narva vocational school
house of culture
Kreenholmi water tower
Kreenholmi factory area
current border crossing
prospective road bridge
the area of this project
Joaoru beach area
border crossing & historical castle
the old town
prospective new border crossing
pederstrian border crossing
Kreenholm used to be the largest textile factory in Europe. It was fi nally closed in
2010 and will be redeveloped as a mixed-use district.
Joaoru has the only public beach of Narva.
A new river promenade and beachfront building
are to be built
The historical old town was razed in the WW
II and has been re-built with soviet panel housing. Recently fi n-ished Narva College building might bring
new importance to the area.
This area is the only one along the river that has been
left without attention
narva planning
95 000m2
taavi lõoketuuliki širokova
andres alverindrek rünkla
veljo kaasik 2010/11
scale co-
authortutor
year
18
212 km
148 km
tallinn418 582
narva65 881
peterburi4 953 200
Geopolitically Narva is located in a very good position. Narva is the 3rd largest city in Estonia and it is closer to St. Petersburg (6th largest city in Europe) than to Tallinn. If the EU - Russian visa regime would loosen, there is a huge possibility for growth.
+Narva - the locationcity rights 1345population 65886
urban area 8,6 km2
density 7661 km-2
nationalities 94% russian 4% estonian
private dwellings742 dwelling unitssmall apartment buildings (<40 units)3208 dwelling unitslarge apartment buildings(>40 units)26380 dwelling units
Since the city was destroyed in the WW II, most of the building pool consists of large panel system buildings that were constructed during the Soviet Union. Hence the living environment tends to be very monotone and unfriendly.
+housing pool
+concepts
farmers market
entertainemnt
complex
officeshotel
spa
kondergarten
vocational
school
sports
center
gardening
store
border
control
The onionskin The perimeter buildings along the western side are extended around the whole area. This allows for freer planning inside the quartier.
riverpromenade The promenade is extended until the Kreenholmi area as a pedestri-an street next to the buildings. The promenade forms different sections along the way.
public functions The plan proposes places for new public buildings and ways to rede-velop buildings that do not have a function today.
height of the buildings The new building will have 1-12 fl oors. At the moment the buildings have 1-8 fl oors.
teeth of the comb The paths towards the river are emphasized. Accordingly, the north-south movement is restricted to lead people to the river promenade.
roads The new road network will direct the citywide traffi c away from the quartier and form two loops that still allow access to the river.
+section
small townhouses
urban villas large apartment block
courtyard apartments
+dwelling typologiesResponding to the monotony of the building pool, the project proposes different building typologies that would diversify the housing market.
size of the planning area 40 hectares
the height of the buildings 1-12 fl oors
old FAR 0,081
new FAR 0,42
new living space 68398 m2
new commercial space 9522 m2
new public space 17012 m2
new apartments 1243
proposed population 3730
+numeric data
19
20
21
9 tubes, Ø 40mm, L=2500mm4500 nuts and 1500 bolts
components 374 pcs10 meter of wire, 4 loops, 4
tensionermaterial cost 97€80 hous of work
parametrical design ws
raul kalvokirstjan männgio
eve komp, annika aasmamihkel-emil mikk
20011/12
the general task of course were to acquire basic knoledge of the
construction of a parametric object in grasshopper and acquire knoledge
of parametric model realization with handy materials and tools.
tutor
co-autor year
22
4;5
2;0
0;2
1;4
3;3
3;2
1;0
5;4
2;2
0;1
4;6
5;1
4;2
5;2
5;3
0;0
1;3
2;3
1;5
1;1
4;4
4;1
0;5
3;5
4;0
5;0
0;3
3;1
2;1
4;3
1;2
3;4
0;4
3;0
0;4
3;3
2;3
3;23;1
2;3
4;6
3;0
2;2
5;4
2;2
4;6
5;0
1;0
1;3
5;2
4;1
2;1
4;3 3;4
5;35;4
2;04;1
2;3
3;5
4;1
3;4
2;03;1
5;1
4;6
1;1
0;5
4;0
5;3
3;0 0;0
5;0
1;42;1
0;1
5;3
3;5 0;2
3;33;4
4;3
3;2
4;4
5;0
4;24;0
0;3
4;2
5;2
4;63;03;2
0;3
4;4
0;5
1;3
1;0
5;3 3;0
4;3
5;11;5
1;24;24;3
4;0
5;3
0;2
5;1
3;33;0 1;3 1;0
4;54;2
2;1 1;1
5;04;4
4;0
0;5
1;50;3 0;0
0;20;1
3;5 1;2 3;3
5;1 3;4 2;3 2;20;1
4;4
2;0
3;5
3;5
0;1
5;2
3;4
0;41;3
1;4
3;44;0
4;6
0;41;22;0 3;1 3;3
4;5
1;40;1
5;44;5
5;3
3;3 2;2
3;5
2;2
5;4
4;02;3
0;4
1;2
4;1
0;3
0;0
5;4
5;3
4;53;5
1;3
0;03;5
1;2
1;3
3;2
1;0
5;4
4;5
4;1 3;53;2 1;2
4;2 4;3
0;3
5;4
5;1
4;2
4;43;4
1;5
3;1
1;4
1;3
0;05;1
0;4 0;1
5;4
4;4
4;6
4;1
1;3 1;1 1;01;52;2 2;33;2 3;3 3;44;0 4;14;2
5;05;1
5;4
0;0 0;10;20;30;40;5
1;01;11;21;31;41;5 2;2 2;33;2 3;3 3;4 3;54;0 4;1 4;24;3
5;0
5;1
5;4
0;00;1
0;2
0;30;40;5
1;01;11;21;31;41;5 2;02;13;2 3;3 3;4 3;54;0 4;1 4;2 4;34;4
5;0
5;2
5;4
0;00;10;2
0;3
0;40;5
1;11;21;31;41;5 2;02;13;2 3;3 3;4 3;54;0 4;1 4;2 4;3 4;4
4;5
5;05;2
5;4
0;0
5;0
4;64;54;44;3
5;3
5;4
1;11;21;31;41;55;0
5;25;4
0;0 0;1 0;2 0;31;01;11;2
1;31;41;5
2;02;12;22;3 3;4 3;54;2 4;3 4;44;5
5;05;1
5;25;35;4
0;0 0;1 0;2 0;3 0;41;01;1 1;21;31;41;5
2;02;12;22;3 3;4 3;54;2 4;3 4;4 4;54;6
5;05;1
5;25;35;4
0;0 0;1 0;2 0;3 0;4 0;51;01;11;2 1;31;41;5
2;02;12;22;3 3;03;13;23;34;2 4;3 4;4 4;5 4;6
5;05;1
5;35;4
0;0 0;1 0;2 0;3 0;4 0;51;01;11;21;3
1;4
1;5
2;12;22;3
3;03;13;23;3 4;04;1
5;05;1
5;4
0;0 0;1 0;2 0;3 0;4 0;51;01;11;21;31;4
1;52;22;33;1
3;23;3 4;04;1
5;05;1
5;4
0;2 0;3 0;4 0;51;0 1;1 1;21;32;0
2;12;22;3
3;03;13;23;33;43;54;4 4;5 4;6
5;15;2
5;35;4
0;2 0;3 0;4 0;51;0 1;1 1;2 1;3 1;42;0 2;12;22;3 3;0
3;13;23;33;43;5 4;04;14;24;3
5;15;2
5;4
0;00;11;0 1;1 1;2 1;3 1;4 1;52;02;1
2;22;3
3;23;33;43;5
4;04;14;24;3
5;05;15;25;35;4
2;02;12;25;25;35;4
0;51;3 1;42;02;13;0
3;13;23;33;43;5
4;04;14;24;34;54;6
5;25;3
5;4
0;51;3 1;4 1;52;0 2;13;03;13;2
3;33;43;5
4;04;14;24;34;44;54;6
5;25;3
5;4
0;00;10;20;30;41;3 1;4 1;52;0 2;1 2;23;03;1 3;23;33;43;5
4;04;14;24;34;44;54;6
5;05;25;35;4
0;00;10;20;30;4 1;3 1;4 1;52;0 2;1 2;2 2;33;03;13;2 3;33;43;5
4;14;24;34;44;54;6
5;05;25;35;4
0;00;10;20;30;4 1;01;11;22;0 2;1 2;2 2;33;03;13;23;3
3;4
3;54;2
4;34;44;54;6
5;15;25;35;4
0;10;20;30;4 1;01;11;2 2;0 2;1 2;2 2;33;03;13;23;33;4
3;54;3
4;44;54;6
5;15;25;35;4
0;00;10;20;30;40;51;4 1;52;1 2;23;0 3;13;24;0
4;14;24;34;4
0;5
2;32;20;5 0;4 0;2 0;13;0
0;0
1;0 1;1 1;3 1;4 2;34;15;0
4;42;1
1;00;0
3;0
0;4
3;1
1;23;1 3;3 3;44;14;2 4;44;54;65;35;4
0;31;1
1;22;03;0 3;1 3;3
5;0
4;14;2
4;2
5;2
5;4
0;5 1;3 3;2 3;4
4;1
4;04;14;24;3
4;65;2
5;3
0;1
4;44;3
0;5
3;0
1;5
0;2
4;3
5;45;3
5;4
4;40;4
1;1 2;12;3
4;03;1
1;04;5
0;2
5;1
5;2
4;0
2;12;0
3;02;12;0
0;0
3;3 3;2
1;5
1;5
1;4
2;13;1
1;1
0;4
4;5
0;2
1;41;30;5
4;4
0;40;30;20;10;0
5;4
5;25;0
4;64;54;44;34;24;0 3;53;43;33;2 2;1 2;01;5
0;5
1;4 1;31;2
0;5
0;4
0;30;20;1
3;2 2;01;10;3
5;3
4;6
4;34;23;43;1 1;10;5 0;4 0;2 0;1
4;6
4;34;14;0 3;33;2 2;2 1;2 1;00;5 0;3 0;2
5;34;54;34;2
0;31;2
4;5
parametrical design ws II
renee puuseppkerstin kivila, riin kersalu taavi lõoke2012/13
the aim of this one week workshop was to give an introduction to paramet-ric design and digital moddeling in parrallel with physical proto-typing. the task was to design a pavilion-like structure. working with grasshopper in rhinocer-os 5 we had to arrive at a fabricated paperboard model at the end of the workshop
tutorco-autor year
mapping straight lines to double-curved surface is diffi cult because the lines unroll to a curve. to be able to construct a model, geodetic lines, that take the curvature of the surface into account and unroll into a straight lines, had to be calculated
staright lines projected onto surface staright lines projected onto surface
geodetic lines from all the support
concept
grid formula
control the structure
geodetic lines from all the support
line transformed into geodesic lines line transformed into geodesic lines
usually gridshells are made with orthogonal lattice. as a consequence it only allows for structures with 4 cornes. we envisioned a grid that would make for a 5 corner structure and decided to try the version with ribs radiating from the supports.
23
painting workshop
jaan elkenlinda elken
2010/11
tutor
year
24
architectural graphic
-toomas tammis 2009/10
scale tutoryear
25
car drawings
photoshop CS5wacom tablet
2011/12
with
year
26
drawing workshop
jaan elkenlinda elken 2010/11
tutor
year
27
view from soola street m 1:800 view from aleksander `s street m 1:800
vertical and horisontal section
seccond stage volumes
seccond stage volumes
local infl uences
dynamic internal space
facade grid
different scales
shopping center competition
40 000m2
3+1 architects
2013
scale co-autor
year
S
SSSSSSSS
S
SS
S
S
Kitse kohvik
XL
laadimisala
kaubaladu
hotellisissepäässupermarket
büroo/korterisissepääs
28
fi rst fl oor m 1:800 seccond fl or : 1:800
büroo/korter
büroo/korter
büroo/korter
büroo/korter
büroo/korter
büroo/korter
büroo/korter
büroo/korter
büroo/korter
büroo/korter
büroo/korter
büroo/korter
büroo/korter
WC
S L XL
XL
XL
XL
L
L
LS
L
S
S
S
S
S
S
SS
L
büroo/korterisissepääs
büroo/korterisissepääs
SS
S
S
S
S
S
S
S
S
L
L
L
XL
XL
XL
L
L
L
L L
L
+/- 0.0
5.5
9.5
15.5
18.5
22.0
32.0
12.5
- 3.0
- 6.0
section 1 m 1:800 section 2 m 1:800
29
VAADE TURU TÄNAVALT VM 1:400
30