14
German Space Agency Report: DLR Manfred Zink, DLR Albrecht von Bargen, DLR Space Administration

German Space Agency Report: DLRceos.org/document_management/Working_Groups/WGCV/Meetings...Sept –Dec 2015 Large bistatic ~ 3.6 km cross track at the equator Close bistatic Small

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: German Space Agency Report: DLRceos.org/document_management/Working_Groups/WGCV/Meetings...Sept –Dec 2015 Large bistatic ~ 3.6 km cross track at the equator Close bistatic Small

German Space Agency Report: DLR Manfred Zink, DLR Albrecht von Bargen, DLR Space Administration

Page 2: German Space Agency Report: DLRceos.org/document_management/Working_Groups/WGCV/Meetings...Sept –Dec 2015 Large bistatic ~ 3.6 km cross track at the equator Close bistatic Small

The German Earth Observation Programme

Missions • TerraSAR-X, TanDEM-X, RapidEye, EnMAP, METimage, MERLIN, GRACE FO Scientific and technical Mission Preparation • HRWS, Lidar, IR Detectors, TerraSAR-X HD, Tandem-L Mission Support & Development of Applications • TerraSAR-X, TanDEM-X and EnMAP algorithms, • Synergy between national missions + Sentinels, new Applications for national

missions Market Development and Copernicus • Sentinel services, Copernicus Pilot programme, Copernicus

Activities in the national Earth Observation Programme

1. Germany largest participant in European EO Programmes ESA EO Envelope Programme, Copernicus and EUMETSAT Programmes

2. Complementary German national EO Programme Missions, Technology, Data Exploitation

> ESA bilateral > G. Roßner • German EO data utilisation programme > 3rd July 2014 www.DLR.de • Chart 2

Page 3: German Space Agency Report: DLRceos.org/document_management/Working_Groups/WGCV/Meetings...Sept –Dec 2015 Large bistatic ~ 3.6 km cross track at the equator Close bistatic Small

National Missions

12 13 14 15 16 17 18 19 20 21 22 23 24

Atmosphere, Meteorology, Climate

Land, Hazards

Geophysics

SCIAMACHY

EnMAP EnMAP-2

12 13 14 15 16 17 18 19 20 21 22 23 24

TanDEM-X TerraSAR-X &

TS-X HD HRWS

RapidEye RapidEye nG

GRACE GRACE FO

MERLIN MERLIN nG

METimage on MetOp SG

> ESA bilateral > G. Roßner • German EO data utilisation programme > 3rd July 2014 www.DLR.de • Chart 3

Page 4: German Space Agency Report: DLRceos.org/document_management/Working_Groups/WGCV/Meetings...Sept –Dec 2015 Large bistatic ~ 3.6 km cross track at the equator Close bistatic Small

TerraSar-X and TanDEM-X Status

Manfred Zink, DLR-HR

www.DLR.de • Chart 4 > Lecture > Author • Document > Date

Page 5: German Space Agency Report: DLRceos.org/document_management/Working_Groups/WGCV/Meetings...Sept –Dec 2015 Large bistatic ~ 3.6 km cross track at the equator Close bistatic Small

Final DEM Tiles – 90% Absolute Difference to ICESat

Analysis Statistics 22.04.2015 Number of Available DEM Tiles 9,691 Accumulated Number of Validation Points 8,741,165 Mean Height Deviation of Validation Points 0.15 m Linear Error for Absolute Height Accuracy of 10 m 99.77% Accumulated Absolute Height Accuracy with 90% LE 1.07 m

Count = 12 Count = 25 Count = 166 Count = 1519 Count = 7771

Page 6: German Space Agency Report: DLRceos.org/document_management/Working_Groups/WGCV/Meetings...Sept –Dec 2015 Large bistatic ~ 3.6 km cross track at the equator Close bistatic Small

Final DEM Tiles – Relative Height Error

Actual status of final DEM: 98.4% of all data achieve relative height error specification (2m/4m)

Page 7: German Space Agency Report: DLRceos.org/document_management/Working_Groups/WGCV/Meetings...Sept –Dec 2015 Large bistatic ~ 3.6 km cross track at the equator Close bistatic Small

Voids/Invalid Data in SRTM Poor performance in desert regions Rough/Poor/inexact water mask Edge of landmass cover

Approx. 20% of SRTM tiles have > 1% Void Density

Shadow/Layover Effects

Page 8: German Space Agency Report: DLRceos.org/document_management/Working_Groups/WGCV/Meetings...Sept –Dec 2015 Large bistatic ~ 3.6 km cross track at the equator Close bistatic Small

Voids/Invalid Data TanDEM-X

Less than 2% of TanDEM-X tiles have > 1% Void Density

Page 9: German Space Agency Report: DLRceos.org/document_management/Working_Groups/WGCV/Meetings...Sept –Dec 2015 Large bistatic ~ 3.6 km cross track at the equator Close bistatic Small

TanDEM-X DEM Status

Stable operations in close formation since Oct-2010 Outstanding calibration of the interferometric system

Data acquisition for global DEM completed

60% of the final TanDEM-X DEMs processed

Available data well within specifications

Global TanDEM-X DEM to be completed in Q3-2016

Page 10: German Space Agency Report: DLRceos.org/document_management/Working_Groups/WGCV/Meetings...Sept –Dec 2015 Large bistatic ~ 3.6 km cross track at the equator Close bistatic Small

Aug-Sept 14

Close bistatic

Small along-track Northern Hemisphere

Oct 2014 –Feb 2015

Pursuit Monostatic 76 km along-track

Helix drift in 104 days

Mar – Aug 2015 Sept –Dec 2015

Large bistatic

~ 3.6 km cross-track at the equator

Close bistatic

Small along-track Southern Hemisphere

from Dec. 2014: Dual Receive Antenna Mode

TanDEM-X Science Phase https://tandemx-science.dlr.de/

Page 11: German Space Agency Report: DLRceos.org/document_management/Working_Groups/WGCV/Meetings...Sept –Dec 2015 Large bistatic ~ 3.6 km cross track at the equator Close bistatic Small
Page 12: German Space Agency Report: DLRceos.org/document_management/Working_Groups/WGCV/Meetings...Sept –Dec 2015 Large bistatic ~ 3.6 km cross track at the equator Close bistatic Small

TerraSAR-X/TanDEM-X Mission beyond 2015

• Based on available onboard resources operation up to 2020 predicted for both satellites

• Unique feature of close formation flight and bistatic operation to be continued

• TanDEM-X Interferometer can do more: local high resolution DEMs (HDEMs) 6m posting, 0.8m (goal) rel. height error

• Agreement between DLR & AIRBUS for mission continuation in preparation

Page 13: German Space Agency Report: DLRceos.org/document_management/Working_Groups/WGCV/Meetings...Sept –Dec 2015 Large bistatic ~ 3.6 km cross track at the equator Close bistatic Small

SRTM, 2000 30/90m

TanDEM, 2012 12m

TanDEM “experimental” 6m

Page 14: German Space Agency Report: DLRceos.org/document_management/Working_Groups/WGCV/Meetings...Sept –Dec 2015 Large bistatic ~ 3.6 km cross track at the equator Close bistatic Small

> Standard presentation > April 2014 DLR.de • Chart 14

Northern Sibiria