20
Geothermal Energy in Nevada: Exploration, Development and Production Rich Perry, Nevada Division of Minerals

Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%

Geothermal Energy in Nevada: Exploration,

Development and Production

Rich Perry, Nevada Division of Minerals

Page 2: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%
Page 3: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%

Uses of Geothermal Energy in Nevada

• Heat and cool buildings

• Industrial drying processes

• Electrical generation

Page 4: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%

EXPLORATION FOR GEOTHERMAL RESOURCES

• Exploration focused initially on areas of known hot springs

• Exploration is now focused on ‘blind’ geothermal systems using geophysical methods

• Intersection of basin and range faults at depth with no surface expression

• Continued focus on range front faults

Page 5: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%
Page 6: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%

Phases of Exploration and Development Drilling

• Initial drilling of temperature gradient holes. Generally 1,000 ft. deep or less

• Drilling of observation wells to deeper depths to test potential reservoir

• Drilling of production wells to test capabilities of the reservoir

• Drilling of injection wells or assigning previously drilled production wells as injection wells

Page 7: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%

Exploration and Production Drilling

Truck Mounted Exploration Rig GeoDrill 1 – Diesel Electric Rig

Page 8: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%

Commercial Uses

OLAM Onion Dehydration Plant , Brady Hot Springs, approximately 250°

Peppermill Casino, Reno Approximately 173°

Page 9: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%

How Geothermal Power is Generated

• Hot water from the Earth is pumped into a heat exchanger where it heats up a refrigerant or Isopentane vaporizing it to gas.

• The pressurized gas then spins a turbine which in turn spins the generator and creates energy.

http://www.tmba.tv/3d-animation/alternative-fuels/

Page 10: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%
Page 11: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%
Page 12: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%

Tungsten Mountain, Churchill County

• Potential future geothermal reservoir which may have 20-30 MW of continuous power generation.

Page 13: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%

Enel Solar/GeothermalStillwater Plant-hybrid facility

Enel Solar Plant

x

240 acres of solar cells26 MW Installed capacity

Page 14: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

0

500

1,000

1,500

2,000

2,500

3,000

3,500

19

85

19

86

19

87

19

88

19

89

19

90

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

Ave

rage

Pri

ce, C

en

ts P

er

KW

H

Tho

usa

nd

s M

WH

YEAR

NEVADA GEOTHERMAL POWER PRODUCTION 1985-2015

Average Price

Production

Page 15: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%
Page 16: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%

From: Lisa Shevenell, Atlas Geosciences, Inc.

Page 17: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%

Nevada Power Grid

Page 18: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%

0

500

1,000

1,500

2,000

2,500

3,000

3,500

0

10

20

30

40

50

60

70

80

90

1001

98

5

19

86

19

87

19

88

19

89

19

90

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

Nu

mb

er

Pe

rmit

s/D

rille

d W

ells

Years

Nevada Production, Injection, and Observation Wells 1985-2015 Permits Issued vs. Wells Drilled

Page 19: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%

FUTURE TRENDS AND OPPORTUNITIES & CHALLENGES

• Co-Located renewable technologies– Solar located at geothermal facilities

• Transmission expansions• Optimizing reservoirs (phased development)• R&D: Frontier Observatory for Research in

Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS)

• Public lands permitting– Sage Grouse impacts – ~60% of NV geothermal wells on private, ~40% on public

lands

Page 20: Geothermal Energy in Nevada: Exploration, Development and ......Geothermal Energy (FORGE), Enhanced Geothermal Systems (EGS) •Public lands permitting –Sage Grouse impacts –~60%