36
 1 Geotechnical Investigation for the Second Avenue Subway in New York Verya Nasri, PhD, PE Planning and Dev elopment of Underground Space HKIE and HKIP PROJECT PHASING PLAN Phase 2 125 th to 96 th Phase 3 63 rd to Houston Phase 1 96 th to 63 rd Phase 4 Houston to Hanover 

Geotechnical Investigation - Second Avenue Subway in New York -

Embed Size (px)

DESCRIPTION

Geotechnical Investigation

Citation preview

  • 1Geotechnical Investigation for the

    Second Avenue Subway in New York

    Verya Nasri, PhD, PE

    Planning and Development of Underground Space,

    HKIE and HKIP

    PROJECT PHASING PLAN

    Phase 2125th to 96thPhase 3

    63rd to Houston

    Phase 196th to 63rd

    Phase 4

    Houston to Hanover

  • 272nd ST. and 86th ST. STATIONS

    72nd ST. STATION

  • 372nd ST. STATION

    72nd ST. STATION

  • 4PUBLIC CAVERN

    ANCILLARY CAVERN

  • 5FOLIATED METAMORPHIC ROCK

    180 new borings in Phase 1 Area

    Cavern crown centerline borings (rock cover)

    Two inclined borings in cavern at 72nd St

    Historic borings

    Environmental borings

    GEOTECHNICAL BORINGS

  • 6SUBSURFACE TESTING AND

    EXPLORATION PROGRAM

    Orientation and frequency of fracturesShear strength properties of fractures

    Abrasivity of rock

    Faults and shear zones

    Intrusions and alteration

    Rock material properties

    Rock mass properties

    Soil-rock interface profile and condition

    GENERAL TESTS

    Uniaxial Compression

    Point Load Strength

    Deformation Properties

    Brazilian Tensile Strength

    Direct Shear of Joints

    MACHINE TESTS

    Cerchar Abrasivity

    Petrographic Analyses

    Drill Rate Index

    Bit Wear Index

    Cutter Life Index

    LABORATORY TESTING - ROCK

  • 7The quality of the

    rock can change

    in very small

    distances

    VARIABILITY IN ROCK QUALITY

    ATV image

    Core

    CORRELATION OF CORE AND

    ACOUSTIC IMAGE

  • 8GEOLOGIC INTERPRETATION

    Interpreted conjugate faults

    JOINT WAVINESS

    Manhattan Schist

  • 9ROCK WEDGE

    Deep wedge

    stable with irregular joints

    Deep wedge

    can be unstable if friction angle &

    dilatancy is low, occurs with:

    continuous, sheared, planar joints.

    EMPIRICAL DESIGN (Q)

    Span

    Span

    Span

    Crown

    Zone used for determining representative

    Q values, obtained using the weighted

    average of the raw Q values for each core

    run within the zone.

    Rock

    Surface

  • 10

    CONTINUUM ANALYSIS

    2D modeling Hoek-Brown Failure Criterion 50 % Relaxation, Shotcrete Strength Varied With Excavation Sequence

    ROCK MASS PARAMETERS

    Input- Intact Uniaxial Compressive Strength (UCS)- Intact Rock Modulus (Ei)- Disturbance Factor (D)- Geological Strength Index (GSI)- Intact Rock Parameter (mi)

    Output- Hoek-Brown Strength Parameters- Rockmass Deformation Modulus

  • 11

    EXCAVATION SEQUENCE

    CONTINUUM ANALYSIS RESULTS

    No Yielding of Initial Support Small Ground Surface Deformations (5 to 10 mm)

  • 12

    TYPES OF DISCONTINUITIES

    FOLIATION

    SUBVERTICAL STRUCTUREFAULT / SHEAR ZONE

    CONJUGATE JOINTS

    CLUSTER

    CONSTITUTIVE MODELS

    Rock constitutive model: Mohr-Coulomb elastic/plastic failure

    Joint constitutive model: Barton-Bandis joint model

  • 13

    No Axial Failure

    Local Axial Failure

    Bolt Axial Load

    Bolt Axial Load

    BOLT AXIAL LOADS AND FAILURE

    Maximum Settlement3.4 mm

    EXPECTED CASE SETTLEMENT

  • 14

    Maximum Settlement14 mm

    WORST CASE SETTLEMENT

    Expected Case

    Maximum Settlement3.4 mm

    Maximum Settlement14 mm

    Worst Case

    SETTLEMENT AT TOP OF ROCK

  • 15

    TRIDIMENSIONAL CONTINUUM (FLAC3D)

    MODELING

    TRIDIMENSIONAL CONTINUUM (FLAC3D)

    MODELING

  • 16

    TRIDIMENSIONAL CONTINUUM (MIDAS)

    MODELING

    TRIDIMENSIONAL DISCONTINUUM

    (3DEC) MODELING

  • 17

    TRIDIMENSIONAL DISCONTINUUM

    (3DEC) MODELING

    Stress Distribution in Shotcrete Liner

    EXCAVATION SEQUENCE

  • 18

    STATION CAVERN

    Excavation Sequence and Support

    STATION CAVERN

    Excavation Sequence and Support

  • 19

    STATION CAVERN

    Excavation Sequence and Support

    No need for final lining

    Drained, no water pressure (%25 assumed)

    Rock load, capacity of bolts

    Rock-liner interface

    FINAL LINER DESIGN

  • 20

    Design for Environment

    Architecture: 96th St. Entrance 3

  • 21

    Architecture: 86th St. Entrance 2

    Architecture: 72nd St. Entrance 3

  • 22

    Architecture: 86th St. Ancillary 1

    Secant Pile Walls

  • 23

    Secant Pile Walls, Toe Anchors

    Slurry Walls, Permanent Station Walls

  • 24

    Rebar Cage Lift

    100 Right of Way

    41 Travel Way 42 Work Zone

    10 ft

    96th St. Station, Street Cross Section

  • 25

    94th to 95th Streets, Temporary Decking

    Launch Box Excavation

  • 26

    Starter Tunnels

    TBM

  • 27

    TBM Tunnel

    72nd Street Shaft

  • 28

    72nd Street Shaft

    Drill and Blast Design

  • 29

    Overbreak and Profile Control

    Vibration and Damage Control

  • 30

    Vibration Control

    Center Drift of Top Heading

  • 31

    Side Drift of Top Heading

    Penetration

  • 32

    TBM Tunnel Enlargement

    East Side Access Station Caverns in New York

  • 33

    East Side Access Station Caverns in New York

    East Side Access Station Caverns in New York

  • 34

    Updated 0508

    Trans Hudson Express Station Cavern

    Trans Hudson Express Station Cavern

  • 35

    High Speed Train Station in New York (Concept)

    Indianapolis Pump Station Cavern

  • 36

    Designed by Santiago Calatrava

    World Trade Center, New York

    The Future