George Russell IV Stormwater Program Manager
Environmental Complaints and Local Services
Stormwater Permitting
What do we do? Divide tasks between ECLS and WQD
Paperwork! ~2700 facilities All paperwork goes through our group
NOIs and NOTs
Invoicing Annual fees and application fees
Inspections 53 Environmental Specialists throughout the state
21 Field offices
Complaints and NOTs
Permitting Process Enter NOI into database/Invoice
Technical Review
Supervisor Review
Finalization-Issue Permit/Check for past due fees
Inspections/Enforcement/Invoicing
NOT processing
Inspection
Termination
Renewal Same process
We mailed packets to all current permit holders
Submit NOI by January 16, 2018
Best way is through email at
SWP3 required to be submitted for review for
Sites over 40 acres, or
Over 5 acres in the Lake Thunderbird watershed, or
In a sensitive watershed
All fees must be paid before a new permit will be issued
Notice of Intent Different and longer
Where can I find it?
How do I fill it out?
Make sure it is complete and accurate.
http://www.deq.state.ok.us/
Notice of Termination No more Inspection Request forms
The NOT now acts as a IR form
Only 1 NOT form per 90 days per site
2012 General Permit
Permit was terminated at midnight the day it was signed
2017 General Permit
Your permit is not terminated until we send a termination letter
Notice of Termination When we get the NOT
Assign an inspection to the local ES
15 days to complete the inspection
Send pass/fail letter
2 reasons to terminate
Site is stabilized
You are no longer the owner/operator
Notice of Termination Stabilization
Uniform perennial vegetative cover (70%)
No large bare areas (10 square feet)
Pavement, gravel, rip-rap
Coverage
Covered
NotCovered
Notice of Termination No longer in charge of the site
Send in NOT along with NOI of new operator
If you are in a subdivision
For each lot you sell fill out an NCO
Keep with your SWP3 until you are ready to terminate
The new operator must obtain permit coverage
Current Status 1600 Industrial Permits (Renewals due October 3rd)
400 No Exposure
2700 Construction Permits (Renewals due January 16th)
Priority to new permits
Please be patient
Personal Musings Stormwater is important
A Permit is only a piece of paper, you are responsible for what leaves your site
Education is the best BMP
Thank you!
Any Questions?