26
42A15SW0065 2 16649 MANN 010 GEOPHYSICAL REPORT FOR FALCONBRIDGE LIMITED ON THE MANN BELT GRID IMAN96-10 MANN TOWNSHIP, PORCUPINE MINING DIVISION NORTHEASTERN ONTARIO R ^^^f-"---^——~ H -W i. ' : if - M!' :.RANCH 2.16 649 .^ Z PREPARED BY: J.C.Grant, GET, FGAC February, 1996

GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

  • Upload
    others

  • View
    20

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

42A15SW0065 2 16649 MANN 010

GEOPHYSICAL REPORTFOR

FALCONBRIDGE LIMITEDON THE

MANN BELT GRID IMAN96-10

MANN TOWNSHIP, PORCUPINE MINING DIVISION NORTHEASTERN ONTARIO

R ^^^f-"---^——~

H -W i. ' : if

- M!' :.RANCH 2.16 649

.^ ZPREPARED BY: J.C.Grant, GET, FGAC

February, 1996

Page 2: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

01OC

TABLE OF CONTENTS

PAGE

INTRODUCTION. . . . .. . . .. . . . . .. . . .. . . . . . . . . . . . . . .. . . l

PROPERTY LOCATION AND ACCESS. . . . . . . . . . . . . . . . . . . . . l

CLAIM GROUP. . . .. .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . ... l

PERSONNEL....... .. .. . . . . . . . . . . .. .. . . . . . . . . . . . . . . . 2

LINECUTTING PROGRAM.............................. 2

GEOPHYSICAL PROGRAM.............................. 2,3

SURVEY RESULTS................................... 3,4

CONCLUSIONS AND RECOMMENDATIONS.. .. .. . . . . . . . . . . . . 4

CERTIFICATE

APPENDICIES: A: BRGM OMNI IV SYSTEM SPECIFICATIONS B: APEX PARAMETRICS, MAXMIN 11 SYSTEM

LIST OF FIGURES: FIGURE l, LOCATION MAPFIGURE 2, PROPERTY LOCATION MAPFIGURE 3, CLAIM MAP

POCKET MAPS: CONTOURED MAGNETIC MAPMAXMIN 444HZ PROFILE MAP MAXMIN 1777HZ PROFILE MAP

Page 3: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

Page l

INTRODUCTION

The services of Exsics Exploration Limited were retained by Falconbridge Limited to complete a line cutting and geophysical program on a group of claims located in Mann Township, Grid |Man96- 10, of the Porcupine Mining Division in Norteastern Ontario. Figure l and 2.

The purpose of this program was to locate and outline airborne targets in an area which was considered favourable for base metal deposition.

The linecutting of the grid began on January 9th, 1996 and was completed on January 20, 1996. The geophysics was started on the 22nd of January and was completed on the 23rd of January, 1996. Due to an error in communications, the grid was reread between February 12th and 14th to complete a detailed magnetic survey only.In all, a total of 11.8 kilometers of grid lines were established on the claim group.

PROPERTY LOCATION AND ACCESS

Grid, Man96-10, is located in the central-north section of Mann Township and generally covers the central portions of Lot 8,7 and 6, Concession IV. Pickerel Lake is situated approximately 700 meters to the west of the grid. The entire grid is located approximately 25 kilometers northwest of the Town of Iroquois Falls. Figure 2.

Access to the grid during the survey period was ideal. Falconbridge Limited has plowed open a drivable road which commences on Highway 11 North at the junction of Concession V and VI. This plowed road runs west along the concession line to an old bridge across the Fredrick House River. A second plowed road was then pushed to the southeast to access the northeast corner of the grid. Travelling time from Timmins to the grid is approximately 1.8 hours.

CLAIM GROUP

The claim numbers which were partially covered by the grid are as follows.

P-1200915 16 units P-1200916 16 units

Refer to figure 3, copied from the MNDM Plan map fG-3537, of Mann Township, scale 1:20,000.

Page 4: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

HUDSON BAY

\'

PROPERTY LOCATION

EXSKS EXPLORATION LTD.Ml ta W

FALCONBRIDGE LIMITEDMANN BELT PN 8269

TITU: MANN TWPLOCATION . MAP Rg: l

Daft: Feb. 1996 Sola: r-4ZZn*u MNDMDrawn: p. Gauthier Interp: J.C. Grant l Job Mo. E-145

Page 5: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

\ 1^~4i *-~ j'"

?'"4kBRAOBURtf s^rrvi. )L&-Z.-U

7rV\( HACKWtBJJUfflK! OJt~ " ^V^. -————*—————^^i ^^u ' ^m——

^ i. ifi" ; \ . Hi^hM51 .- f r^-^^ sffi5"-^n

EXSKS EXPLORATION LTD.9m MM. KH-1X1M* a

7B-M7-4S1

FALCONBRIDGE LIMITEDN PROPgRTY: MANN BELT PN 8269_____

TITLE: MANN TWP

PROPERTY LOCATION nq. 2Pat t: Feb. 1996 | Scat t: I.6OO.OOO |MNDM Ron^: 22-6Drawn: Intern: J.C. Grant ' Job No. E-'45

Page 6: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

EXSICS EXPLORATION LTD. MLMM-TXI

FALCONBRIDGE LIMITEDMANN BELT PN 8269

MANN TWP MAN96-IO

CLAIM SKETCHScalt: IgO.QOO

Page 7: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

Page 2

PERSONNEL

The field crew directly responsible for the collection of all data were as follows:

Richard Mathieu....... Timmins, OntarioRobin Mathieu......... Timmins, OntarioTodd Mathieu.......... Timmins, Ontario

The geophysical program was completed under the direct supervision of J.C.Grant and all plotting and computer compilation was completed by P. Gauthier of Exsics.

LINECUTTING PROGRAM

The grid consisted of 100 meter line spacing and 25 meter station spacing. The baseline was turned off from the existing baseline of the summer program and was cut at 090 degrees from line 100MW to 1300ME. The stations were chained from BL 0+00 to TL 600MN.

GEOPHYSICAL PROGRAM

This program consisted of a total field magnetic survey done in conjuction with a Horizontal Loop, electromagnetic, HLEM, survey. The magnetic survey was completed on the entire cut grid however the HLEM survey was completed on the cross lines only.

The magnetic survey was completed using the BRGM, OMNI IV system. Specifications for this system can be found as Appendix A of this report. The HLEM survey was completed using the Apex Parameterics, MaxMIn II system. Specifications for this system can be found as Appendix B of this report.

MAGNETIC SURVEY:

The following parameters were kept constant throughout the survey.

Linespacing................... 100 metersStation spacing............... 25 metersReading interval.............. 12.5 metersDiurnal monitior.............. Base station recorderrecord interval............... 30 secondsReference field............... 57960 gammasDatum subtract................ 57500 gammasUnit accuracy................. t/- 0.1 gammaParameters measured........... Earth's total magnetic field

Page 8: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

Page 3

The collected, corrected and levelled data was then plotted directly onto a base map at a scale of 1:5000 and then contoured at 20 gamma intervals where possible. A copy of this base map is included in the back pocket of this report.

HLEM SURVEY:

The following parameters were kept constant throughout the survey.

Linespacing................... 100 metersStation spacing............... 25 metersReading interval.............. 25 metersCoil seperation............... 150 metersTheoretical search depth...... 75-85 metersFrequencies recorded.......... 1777hz, 444hzParameters measured........... inphase and quadrature components of

the secondary field. Unit accuracy................. * /- 0 .5 percent

The collected data was then plotted directly onto a base map at a scale of 1:5000, one base map for each frequency, and then profiled at lcm to +/-20%. An interpretation for each line of the conductor was done as far as depth to source and apparent conductivity in Mhos and was put directly onto the base map. A copy of these base maps are included in the back pocket of this report.

SURVEY RESULTS

The HLEM survey was successful in locating and outlining two parallel conductive horizons on the grid. For interpretation purposes they have been labelled Zones A and B. Each of the zones will be discussed seperately and in detail.

ZONE A:

This zone represents the most predominant and strongest target on the survey grid. It represents a good shallow bedrock conductor ranging in depth from 10 to 20 meters to a depth of 50 to 60 meters as the zone strikes to the east. The conductivity of the zone ranges from 15 to 38 mhos and appears to dip to the south.

The magnetics suggest that the entire zone lies along the north flank of a strong magnetic unit most probably representing the north edge of an ultramafic unit.

Page 9: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

Page 4

The strongest and widest portion of the zone which strikes across lines 3DOME and 400ME correlates with a weak slumping in the magnetic contours. This may represent a concentration of sulphides along the contact between the ultramafics and the mafics.

ZONE B:

This zone closely parallels the strike of Zone A. Infact it's closeness to Zone A hampers a better definition of the depth and conductivity of the target. As the zone continues to the east, it strikes further north of Zone A and can be better defined. Interpretation of line 1000ME suggests that the target is situated at a depth to source of 30 meters with good conductivity of 15 mhos. The magnetics suggest that the majority of the zone lies within the mafics however, the eastern extension, especially that portion striking across lines 900ME, 1000ME and 1100ME, appears to correlate to the northern edge of the ultramafic unit covering most of the southern section of the grid. Again there is mild slumping in the magnetic contours, this time to the north of the zone. The dip of the zone is not evident, however, it should be the same as Zone A.

CONCLUSIONS AND RECOMMENDATIONS

The ground program was successful in locating and outlining two good bedrock conductors. Zone A should be tested by drilling as should Zone B. Both of the targets could be tested from the same drill set-up as the zones are close together. Should follow-up surveys be contimplated, then an HLEM survey using a shorter cable length may help in seperating the two zones.

Respectfully submitted

J.C.Grant, GET, FGAC February, 1996.

Page 10: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

CERTIFICATE

I, John C. Grant, hereby certify that:

1) I am a graduate qeophysicist (1975) of the three year program in Geological Technology at Cambrian College of Applied Arts and Technology, Sudbury, Campus. I have worked subsequentely as an Exploration Geophysicist for Teck Exploration Limited (5 years). North Bay office, and as Exploration Manager and Geophysicist for Exsics Exploration Limited from 1980 to present.

2) I am a Member of the Certified Engineering Technologist Association since 1984.

3) I am a member of the Geological Association of Canada.

4) I have been actively engaged in my profession for the lasttwenty (20) years, including all aspects of exploration studies,surveys and interpretations.

5) I have no specific or special interest in the described property. I have been retained as a Consulting Geophysicist by the claim holders.

John Charles Grant, GET, FGA

Page 11: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

APPENDIX A

Page 12: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

Four Magnetometers in OneSelf Correcting for Diurnal variationsReduced instrumentation Requirements250x6 weight Reductionuser Friendly Keypad OperationUniversal Computer interfaceComprehensive Software Packages

Page 13: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

Specificationsdynamic Range 18.000 to 110.000 gammas. Rolhover display featuresuppresses first significant digit upon exceeding 100,000 gammas, 'uning Method ... . ...... Tuning value is calculated accurately utilizing a speciallydeveloped tuning algorithm \u imatic One Tuning .................. ± 15% relative to ambient field strength of last storedvalue )ispiay Resolution.... - - - - - - - 0.1 gammaTpeessingSensitivity .................... ± 0.02gammatz stical Error Resolution 0.01 gammatbaoiute Accuracy ... . . .... ± 1 gamma at 50.000 gammas at 23eC± 2 gamma over total temperature range t dard Memory Capacity1 cal Reid or Gradient 1,200 data blocks or sets of readings lie-line Points 100 data blocks or sets of readings Base Station .......... 5,000 data blocks or sets of readingsMs ay Custom-designed, ruggedized liquid crystal display with anoperating temperature range from -400C to -i- 550C The display contains six numeric digits, decimal point, battery status monitor, signal decay rate and signal amplitude monitor and function descriptors.S a Serial I/O interface 2400 baud, 8 data bits, 2 stop bits, no parity radient Tolerance 6.000 gammas per meter (field proven) est Mode .............. . . . . . A. Diagnostic testing (data and programmable memory)B. Self Test (hardware) er x .... .. Optimized miniature design. Magnetic deanliness isconsistent with the specified absolute accuracy.recent Sensors 0.5 meter sensor separation (standard), normalized togammas/ meter. Optional 1.0 meter sensor separation available. Horizontal sensors optional. 2nsor cable ..... . Remains flexible in temperature range specified, indudesstrain-relief connector /c ig Time (Base Station Mode) Programmable from 5 seconds up to 60 minutes in 1second incrementsDerating Environmental Range -400C to + 550C. D-100% relative humidity; weatherproof 3v r Supply ... .. . Non-magnetic rechargeable sealed lead-add batterycartridge or belt; rechargeable NiCad or Disposable battery cartridge or belt; or 12V DC power source option for base station operation.at ry Cartridge/Belt Life 2,000 to 5.000 readings, for sealed lead add power supply.depending upon ambient temperature and rate of readingseights and Dimensionsin rument Console Only 2.8 kg. 238 x 150 x 250mm N 3d or Alkaline Battery Cartridge 1.2 kg. 235 x 105 x 90mm NiCad or Alkaline Battery Belt 1.2 kg. 540 x 100 x 40mm if 3-Add Battery Cartridge 1.8 kg, 235 x 105 x 90mm U 3-Add Battery Belt 1.8 kg. 540 x 100 x 40mm sensor ....................i.2kg.56mmdiameterx200mm EDAmstrumentsmc.Gradient Sensor

4 Thomciiffe Pane Drive ( S m separation-standard) 2.1 kg. 56n""n diameter x 790mmCi dient Sensor Tetex: 0623222 EDA TOR(1.0m separation -optional) 2.2 kg. 56mm diameter x 1300mmanriard System complement instrument console; sensor; 3-meter cable, aluminumsectional sensor staff, power supply, harness assembly. I",,0;5;* ^nnorafirtnc mam lai E " A instruments inc.operaaons manual. S151 wa,-0 RoaaBase Station Option. ... .. Standard system plus 30 meter cable wneat Rjoge. coioraaoGniiometer Option Standard system plus 0.5 meter sensor 1309422 9112Prmtea in cansaa

Page 14: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

APPENDIX B

Page 15: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

1Y1AXJY1JJ\JM

Five frequencies: 222. O44, 888, T777 and 3555 Hz.

Maximum coupled C horizontal-loop J operation with reference cable.

Minimum coupled operation with reference cable.

Vertical-loop operation without reference cable.Coil separations: 85, 50,100,150,800 and 25Om C with cable ) or 1OO, 800,300,400,600 and BOO ft.Reliable data from depths of up to 18Om C BOO ft J.

Built-in voice communication circuitry with cable.

Tilt meters to control coil orientation.

Page 16: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

. SSB. 1777 and 3555Hz.

MAX: Transmitter col plane and re ceiver coil plane horizontal (Max-coupled; Honzontal-4ocp mode). Used with refer, r"*"**.

MIN: Transmitter coil plane horizon tal and receiver coil plane ver tical (Min-coupted mode). Used with reference cable.

V. L. : Transmitter coil plane verti cal and receiver coil plane hori zontal CVertical-loop mode). Used without reference cable , in parallel lines.

25.5O.1OO.15O.2OOS25Om C MM ID or 1CO. 2OO. 3OO. 4OO.BCO and BOO ft. CMMHF). Coil separations in VL.mode not re stricted to fixed values .

- In-Phase and Quadrature compo nents of the secondary field in MAX and MIN modes.

- Tilt-angle of the total field in VL. mode -

- Automatic, direct readout on 9O mm C3.5") edgewise meters in MAX and MIN modes. No null ing or compensation necessary .

- Tilt angle and null in SOmm edge wise meters in VL.mode .

In-Phase: 2O*. 1OOX by push button switch .

Quadrature: *2O*. 1OOX by push button SNA/itCh .

Tilt: 75Vo slope .NullCVLJ: Sensitivity adjustable

by separation switch.

O.25'5fcto 1 0A normally, depending on conditions, frequencies and coil separation used .

:- 222HZ :22OAtm2 : 2OO Atm3 : 12OAtnn2

- 1777HZ : BOAtm2-3555 Hz: 3OAtma

. SV trans, radio type batteries (4). Life: approx. 35hrs. continuous du ty (alkaline. O.5 Ah), less in cold weather. v

12V G Ah Gel-type rechargeable battery. (Charger supplied).

Light weight 2-conductor teflon cable for minimum friction. Unshield ed. All reference cables optional at extra cost. Please specify.

Built-in intercom system for voice communication between re ceiver and transmitter operators in MAX and MIN modes, via re ference cable .

Built-in signal and reference warn ing lights to indicate erroneous readings .

In-Phase and Quadrature : to Q.5V. ; Tilt: 1V. .

O.25 V.

---r?: -4O*C to+SO'C t-^O-Fto+VJCTF).

i--.—.-. S kg C 13 Ibs.)

--. ~": 13kg 123 Ibs.)

-r..-,-: Typically 6Okg (135lbs.). depend ing on quantities of reference cable and batteries included. Shipped in two field/shipping cases.

Soecif icatioris suDiecc to cnange w ictiouc notification

2OO STEELCASE RD. E.. MARKHAM, QNT. CANADA, L3R 1G2

Phone: ^95-1612 Cables: APEXPARA TORONTO Telex: 06-966773 NORDVIK TOR

Page 17: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

JUL-l6'96(M) 16:13 NO POtCUPME DIV Tft:705 360 2001

'•"l''^, B^k^^llr^^bhdiicted

Mi tomite

P. 010i Mtrw i* *^

Ontario

,, OMHtOb P3E (M, HMphOM (109 tlQ-TlM.

mitructtene: - Pleue type or print and au-Refer lo the MMhg Act ant 'ZAisswooes 216549 MANN Recorder.

Ut-lu *.*

HH900

.1571 Honda Axe.. R

PercuOint

13067*?

2 S.Work I*8rlorm8d (Ctiack Ono WoifcOnny Only)

l Sumy

•ICiUdblQ DiflmQ

VIM

/Mgnmemftoffl

TVP*HLEK.q^7 Wrvs

Total Ai rt Work CWriMd on ttw Attached ftatoflMrt of Cotte tNot* Tha HflnMar may rafaol for i

holder cannot vwtfy expend! l In tfwt el or pert of *M l M! It MM aa nn M!ailM m um IVCORMO

of coils wMMn 80 ctays of a flBQUM far varfficiBrvi.PerMM Md Stifvoy Oonp.v.y Ww *ii^^

NenwEniks E^ptoraAion (.Ad-

———————————————— AddM' ——

V^Vbox i860 Svik \1 Holll'n4U &-UU. rim\rrNi(\\ , Oft^-

1

{mtMM B •cnvduto D ntovMMVn

8e*No(8llo. loareverael amiy tM M BM *M ON vorfi BM pwfgiMd, tt* npon w* NeMMki**cunrtbal*ykMM •rta by di* tun* iwarM baUir.

Ccfttflcdion of Wofk iwpdrt

Hid WMMd npflft V etUkX

iMMi Moneb A-t. BO. Bwif IffO T^nr\m'm5 OrtV- 7H1W-

For Office Ut* Onfy

II COPoncuniic u:? JH3 avi

Page 18: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

j*-t?

H O O

(T

Jr

•oh* Osd*

*

j,Zfa S 3 x-

|ff?

fi

f!

CO c

*ir*Total Value

OJJsil 0

O**-0xj 0

N

^

-F0*

-F1/3

"*J

S

K) 10-*J

enK) K)

I-

!-

tt

Credits you are claiming in this report may be cut back. In order to minimize the adverse effects of such deletions, please indicate from which claims you wish to priorize the deletion of credits. Please mark (^) one of the following:1. D Credits are to be cut back starting with the daim listed last, working backwards.2. D Credits are to be cut back equally over all claims contained in this report of work.3. H Credits are to be cut back as priorized on the attached appendix, p 1200^ | SIn the event that you have not specified your choice of priority, option one will be implemented.

Note 1: Examples of benefldal Interest are unrecorded transfers, option agreements, memorandum of agreements, etc., with respect to the mining claims.

Note 2: If work has been performed on patented or leased land, please complete the following:l certify that the recorded holder had a beneficial Interest In the patented or toesed land at the time the work was performed.

Signature Date

Page 19: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

Ontario

Ministry olNonharn Oavaiopmanland Mln*s

Ministers du Oeveioppemeni du Nord at das mlnas

Statement of Costs for Assessment Credit(hat des coOts aux fins du credit devaluationMining Act/Lot sur les mines

Transaction NoJN* da transaction

9660 (JO

C, P,Personal Information collected on this form Is obtained under the authority ol the Mining Act. This Inlormaiton will be used lo maintain a record and ongoing status of the mining clalm(s). Questions about this collection should be directed lo ihe Provincial Manager. Minings Lands. Ministry of Northern Development and Mines. 4ih Floor, 159 Cedar Street. Sudbury. Ontario P3E 6A5. telephone (70S) 670-7264.

Las renselgnemenis parsonnals conianus dans Is present* formula soni racueiins an vartu da la Lot aur las mlnas al sarvlroni a lanlr s Jour un regisire das concessions mlnleres. Adrassar tout* quaslton sur la collaca da cas ransalgnamants au chef provincial das terrains minlars. minister* du Dtveloppemenl du Nord at das Mlnas. ISO. rue Cedar. 4* elage. Sudbury (Ontario) P3E 6A5. telephone (705) 670-7264.

1. Direct Costs/CoOts directs

Type

WagaaSatalrea

iontractor'a and Consultant's FeesDrolls de ('entrepreneur et d* ('expert- consell

Supplies Used Fournltures utlllsees

Equipment Rental Location da materiel

Description

Labour Malrvd'oeuvreField Supervision Supervision sur la terrain

Type UtAt-CAjiWiri^

HLEMKac^

Type Floc^c^ifNCV

\l \J *

r^tkc.^ -\0^

Typ*

Truttc

5r\ooo rv\obt Ifi-

Amount Montani

SOO

3oo

SSHS

Vaeoi

10

62

IOO

5o

Total Direct Coata Total dea coOta -directs

Totals Total global

*00*

l(M**ii(,44

38*, 3*1

fclt8

7*

I5d6970

2. Indirect Costs/CoOts Indlrects* * Note: When claiming RahabHlatlon work Indirect costs ara not allowable as assessment work.

Pour le ramboursemenl des travaux de rehabilitation, las coOts Indlrects ne sont pas admtsslbles en tanl que travaux d'evaJuaUon.

Type

Transportation Transport

Food and Lodging Nourrllur* *t hibtrgementMobilization and Demobilization Mobilisation el dimoblllwllon

DescriptionType

RECEIV' JUL 5 19

MINING LANDS B

Amount Montani

EDJ6 —— -

lANCH

Sub Total of Indirect Costa Total partial dea coOta Indlrecta

Amount Allowable (not greater than 20H of Direct Costs) Montani admissible (n'excfdsnt pss 20 H des coOts direct*Total Value of Aasassmant Credit Val*ur total* du credit (Toul of Olr*et *nd Allowable devaluation Indirect eoilit rTaltl dii cadti dtoeti

Totals Total global

6970•l Mtodi (dolMWtf

Not*: Tha recorded holder win be required lo verify expenditures claimed In this statement of costs within 90 days of a request for verification. II verification Is not made, (he Minister may reject lor assessment work ad or part of the assessment work submitted.

Note : Le Utuialra enregislre sera tenu de verifier les depenses damandaas dans la present etat das coOls dans las 30 Jours sutvant una demand* a cal elfal. SI la verification n'est pas effecluee. le mlnlstre peut rejeier loul ou une partla das travaux devaluation presentes.

Filing Discounts

1. Work Hied within two years of completion Is claimed at the above Total Value of Assessment Credit.

of

Remises pour depot

1. Les travaux deposes dans les deux ans sulvant leur achievement sonl rembourses a 100 H de la vateur totate susmentionnee du crMH o"evaIuaUon.2. Work filed three, four or five years after completion Is claimed at 504fe of (he above Total Value of Assessment Credit. See calculations below:Total Value ol Assessment Credit Tola! Assessment Claimed

x 0.50 -

2. Les travaux deposes trots, quatre ou cinq ans apres leur achievement aonl rembourses a 50 H de la valeur totale du credit devaluation ausmenilonne. Volr lea calculs d-dessous.V*l*ur total* du eredH d'*vaJueUonEvaluation total* demand**

x 0,50 -

Certification Verifying Statement of Costs

l hereby certify:(hat the amounts shown are as accurate as possible and these costs were Incurred while conducting assessment work on the lands shown on ihe accompanying Report of Work form.

that as(Recorded Holder. Ajoni. Posiiion In Company)

i to make (his certification

Attestation de l'6tat dea coOts

J'atteste par la presente :que les montanls Indlques sont le plus exact possible et que ces depenses ont Ale engagers pour effectuer les travaux devaluation sur les terrains Indlques dans la formule de rapport de travail cl-|oint.

l am authorized El qu'a litre de je suls autorlsdpitulilr* anrtgislr*. r*pr4s*nitni. potla occup* dans K compagnle)

a faire cette attestation.

or Nsia : Dans cede formula, lorsqu'll design* des personnes, le masculln esl miMs* au **ns nautr*.

Page 20: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

19'V6 Ifc:55 iXilCS txn. 82

EXSICS EXPLORATION LIMITEDCONTRACTING ft CONSULTING GCOPHrSKS

Tol. (705) 267-4161 Fax (70S) 264-5790

P.O. Box 1880timmins. Ontario P4N7X1

RECEIVED

JUL 5 1996

LANDS BRANCHINVOICE f:369 PROJECT |:E-144

ON ACCOUNT WITH: falconbridge Limited P.O. BOX 1140 Timmlna, Ontario

Attention: Christine Fetch

0.8.T. REQIflTRATIOH t 113433791

2. 16 649

Linecutting of grids Mann, 96-12 and 95-10

TOTAL OF THIS INVOICE:

DATE: January 19,1996

SIGNED:

$8,560.19

S 'U

y

AT A RATE OF: 96-124-io

3

... 18.0 km ft S265.00Xkm. ..

. .. 11.8 km 6 *265.00Xkm...Sub-total.......

1* 08T.total

boxes of tags. ^32.00Xbox. PST.OST. . . . . . . .

64,770.00 63.127.00S? , 8 97. 00S 552.79(8,449.796 96.00 5*1 tittS 6.72

4- !YK,i *-

vx/ MV' ^

PAYMENT DOE UPON RECEIPT OF INVOICE.TERMS: HET 30, 2% INTEREST PfcR MOUTH OH OVERDUE ACCOOKTS.

^ :l '' lf

Page 21: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

EXSICS EXPLORATION LIMITEDCONTRACTING 8. CONSULTING GEOPHYSICS

Tel (705)267-4151 Fax (705) 264-5790

P.O. Box 1880Timmins. Ontario P4N7X1

INVOICE f:391 PROJECT f:E-144

ON ACCOUNT WITH: Falconbridge LimitedP.O. Box 1140 Timmins, Ontario P4N 7H9

ATTENTION; Paul Naqerl

G.S.T. REGISTRATION t 113433791

. R f f-

RE: Magnetic and Max Min Surveys Mann Township 95-10. 96-12

AT A RATE OF:96-12Magnetic Survey 18 Km @ SlOO.OO/KmHLEM Survey 13.8 Km Q SieO.OO/Kml day l man to spot start of 96-12, 95-10(DCC27/95)

7% GST

95-10Magnetic Survey 11.8 Km @ SlOO.OO/KmHLEM Survey 9 .0Km Q SieO.OO/Km

7% GST

TOTAL OF THIS INVOICE:

SI,800.00 S2,208.00

S 200.00 S4,208.00 S 2 94.56 S4.502.56

Si,180.00 SI.440.00 S2,620.00 S 183.40 S2.803.40

S7.305.96

DATE: January 26, 1996

SIGNEDc^^--

II\ ' fJJ^-.JI (

Page 22: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

OntarioMinistry of Ministere duNorthern Development Developpement du Nordand Mines et des Mines

July 19, 1996

Geoscience Assessment Office 933 Ramsey Lake Road 6th Floor Sudbury, Ontario P3E 6B5

Telephone: (705) 670-5853 Fax: (705) 670-5863

Our File: 2.16649 Transaction f : W9660.00306

Mining RecorderMinistry of Northern Development l Mines60 Wilson Ave.1st FloorTimmins, OntarioP4N 2S7

Dear Mr. White:

SUBJECT: APPROVAL OF ASSESSMENT WORK CREDIT ON MINING LAND, CLAIM(S) 1200915 (ET AL.) IN MANN TOWNSHIP(AREA)

Assessment work credit has been approved as outlined on the Declaration of Assessment Work Form accompanying this submission. The credit has been approved under Section 14, Geophysics(MAG,EM) of the Assessment Work Regulation.

The approval date is July 16, 1996. Please indicate this approval on the claim record.

If you have any questions regarding this correspondence, please contact Bruce Gates at (705) 670-5856.

Yours sincerely, ORIGINAL SIGNED BY:

Ron C. GashinskiSenior Manager, Mining Lands SectionMines and Minerals Division

BIG/cc

cc: Resident Geologist Timmins, Ontario

Assessment Files Library Sudbury, Ontario

Page 23: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

- 9!:i

' li

i

S!

!

. -

. j-.

|^- -*-*~ ^

*. .

--, -

--- li

-i. r"#*'-^"^

t', *

. .-

f"'-

•'i:*

cc a35-2T

C

r-

Z f

* iw r!^, < u-J

c? O

O I

5u;

W *

Z

UV

5 o oX

H

-J

cc

uj CD

U

- ^

O

- tr 5

TILITV LINES

~3

2UJ

ItON PfcRcNuiAl

Z

toHly•r•jy^CLOOulNG C'H 1-u.

*,a.uU•^a:o

o•^

UBOIVISION Olto

FSERVATIONS

or

UJZ

-iUJ

VICINAL SHORO

aUJ

Vi

2cr OIGC5i

h-Zl1D

IINES

RAVERSE WON

KCJu.

OZOKDISPQSI1

lo

e:K—O

<

NE

WM

AR

KE

TO

V^N

SH

IP

;. CM

lJllt

a. 3:z"-•S*

i 1201945

1 (2 UNITS)

Q.

X

CO

ri* CD CDci

H

H

CVJ

l^

-'

UJ .P

-J Z

^

Qz

o .-"C

e?2 S

o c?

3'

r1

3

ut z

zc

S tt

z l

JE, * 5 S

J

u)3

sor trUJoUJq

is:-J

10

o. o-

feiCO O

.

: O (fl t

UJ z z

C l

.ujo

jOco

gg

z

-igZ

oS

gg.

n ?

. T

. . ^

* : lo

loziy

WD-3

WK

UJQ

2C

UJO

1U"C

i^SsJiiMiis!o!5

zQ

O

"Joe

SZSZ

~J5^iUJ

.W'

!l!

MOC

O

ac J

0

CAK

r

g5

- iKii 1 S

iS uj

i 2

i u.

UJ ,. i

;? I W

. l

SW

QQ

^w

ubi

Q.<

o:Z

^ = S

^l

<Iu

.<c^5

= w

l

o

oCM

fi W :

V\ M A M

Page 24: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

600 NORTH

400 NORTH

200 NORTH

O o cvi

2651 2675 2734 2821 292! 3033 312! 3211 3261 3331 3421 351! 358! 3671 3765 3861 39W 4101 4221 4331 443! 4531 464! 471i 4911

600 NORTH

400 NORTH

i 12009165361 5557 5741 5810 6011 6260 6454 6641 6729 6711 BBIt 6660 •MS 883! 6602 6519 64!2 63!4 62)0 6112 5990 584!

16 RTH l

o 2.16649

\o o

CO

a cm IDCO

\ ro o o

X CO

COo orn xCO

CD ornX CO

en o ornX CO

en o ornX CO

o orn3D CO

oo o ornXi CO

CD o o

xCO

o oorn xCO

CDoPI xCO

K)o o

xCO

COo o

xCO

LDT 8LEGEND

Instrument! BRGM DMNI-1VParameters Measured' Earth's total magnetic Field Accuracy" +/- 0 .1 nano-teslas Dlurnalsi Corrected by base station recorder Contour Interval! 0,20,40,60,80,....,., Reference Fleldi 57,960 gammas Datum Subtracted" 57,500 gammas

'P E C E i -- t D;

LDT 7 LDT 6 EXSICS EXPLORATION LTD.P.O. Box I860, P4N-7X1Suite 13, Hollinger Bldg. Timmins Ont.Telephone: 705-267-4151^___________

CLIENT: FALCONBRIDGE LIMITEDPROPERTY: MANN BELT PN 8269TITLE: MANN TWP MAN96-10

MAGNETOMETER SURVEYLDate:Feb. 1996Drawn: P. Gauthier

Scale: 1:5000Inter p: J. C. Gr ant

NTS:Job No.:E-145

Page 25: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

600 NORTH 600 NORTH

400 NORTH 400 NORTH

1200916

-37 -57

•v -37 -52 \i-40 -48

200 NORTH

C NI

2. 16 6 49

LDT 8

LEGENDInstrument! Apex Paranetrlcs Max-Mln 11 Modei Maxlnun Coupled, Horizontal Loop Survey Parameters Measured" Inphase (X)

Out of phase C/.) Frequencyi 444 Hz Coll Seperatloni 150n Dperaton R. 8, R. Mathieu Profile Scalei lc^+X-20'/.

Conductor Axis

LDT 7 LDT 6

In-phase

Dut-of-phase

EXSICS EXPLORATION LTD,P.O. Box 1880, P4N-7X1Suite 13, Hollinger Bldg, Timmins Ont.Telephone: 705-267-4151______________

CLIENT: FALCONBRIDGE LIMITEDPROPERTY: MANN BELT PN 8269TITLE: MANN TWP MAN96-10

MAX-MIN II 444 HzDate:Feb. 1996Drawn-.P. Gauthier

Scale: 1:5000Inter p: J. C. Gr ant

NTS:Job No.:E-145

Page 26: GEOPHYS RPT ON MANN BELT GRID MAN96-10 MANN TP

600 NORTH

400 NORTH

O

200 NORTH

LOT 8

LEGENDInstrument Apex Paranetrlcs Max-Mln 11 Modei Maximum Coupled, Horlzon-tal Loop Survey Parameters Measured" Inphase (X)

Dut of phase (X) Frequencyi 1777 Hz Coll Seperatlom 150n Dperatori R. 8. R, Mathieu Profile Scalei

MAX-MIN 11

Ccnducior

LDT 7 LDT

In-phase

Dut-of-phase

- +10

600 NORTH

400 NORTH

1200916C

I

o f

EXSICS EXPLORATION LTD.P.O. Box 1880, P4N-7X1Suite 13, Hollinger Bldg, Timmins Ont.Telephone: 705-267-4151^^^^^^^^^^

CLIENT: FALCONBRIDGE LIMITEDPROPERTY: MANN BELT PN 8269TITLE: MANN TWP MAN96-10

MAX-MIN II 1777 HzDate:Feb. 1996Drawn:?.Gauthier

Scale: 1:5000Interp: J. C. Gr ant

NTS:Job No.:E-145