Geographical Information Systems and Utility Modernization Burbank Water and Power October 2013 Acknowledgement: “This material is based upon work supported by the United States Department of Energy under Award Number [DE-OE0000246]” 1

Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

Geographical Information Systems and Utility

Modernization

Burbank Water and Power October 2013

Acknowledgement: “This material is based upon work supported by the United States Department of Energy

under Award Number [DE-OE0000246]”

1

Page 2: Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

Challenges to Traditional Electric Utility Business

• Increased use of Renewables to 33% by 2020; 50% or more later • Rooftop Solar PV impacts

• Overall energy supply

• Electric rate structure and revenues

• Distribution grid reliability, voltage stability, etc.

• Measures to block or stop natural gas fracking • Restricted development of high voltage transmission to renewable resources • Eliminate power plant once-through ocean cooling • Reduce power plant emissions; Green house gas, etc. • New regulations restricting use of coal fuel generation resources • Close nuclear generation resources • Microgrids reduce utility load • Control costs; limit rate increases • Improve reliability and power quality • Provide support for transportation electrification

2

Page 3: Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

Intermittent Wind Production

3

Page 4: Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

Renewable Integration

4

Page 5: Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

Modernization (Smart Grid) Enables Solutions

• GIS based systems • Manage impact of distributed generation/PVs

• Outage Management Systems

• Distribution Mgmt. System for grid optimization and safety

• Partner with Customers • Energy efficiency • Demand response • New rate structures – TOU, Real-time, Fixed service charges

• Advanced Resource portfolio management systems • Transportation Electrification

5

Page 6: Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

BWP Background

ó BWP was created in 1913 ó Burbank home to major entertainment studios: Disney, NBC, Warner Brothers Studio ó 17 Square mile service area ó 52,000 electric customers: 45,000 R; 7,000 C&I ó 26,000 water meters ó 20 electric switching and substations ó 30+ 12 kV feeders ó 80+ 4.16 kV feeders (Multi year conversion program to 12kV) ó Typical peak electric demand: Summer = 280 Mw; Winter = 180 Mw; All time peak = 320 Mw ó Very good reliability: (2012 data) SAIFI = 0.16 outages per customer per year SAIDI = 16 minutes per customer per year

6

Page 7: Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

Utility Modernization Program Objectives

• Modernize our systems - Migrate from analog to digital • Leverage communication and data systems • New tools to support renewables and environmental goals • New Information sharing relationship with Customers • Expand number of customer choices • Improve operational efficiencies, system reliability • Develop benefits for: Customers – Utility – Community

7

Page 8: Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

Utility Modernization Program Overview

Core Systems üCisco powered fiber optic network üTropos City-wide wireless mesh network üTrilliant / General Electric AMI meter system üeMeter Meter Data Management System

Command and Control üSCADA upgrade • Integrated Auto Dispatch System • Distribution Mgmt System (Later)

Improved Business Systems üGeographical Information System data üOutage Management System üEnterprise Service Bus üVirtualized server environment • Customer Info System update/replacement

Distribution/Station Automation üPower Flow Model • Digital Relays / Feeder Auto Reclosers • Station Automation projects • Feeder Automation projects (deferred)

Customer Smart Choice üO Power Energy Usage Reports üCustomer Web Portal • Time of Use Rates • Demand Response / EE Demo Programs • In-Home Display Demo

Demonstration Projects üIce Bear Thermal Energy Storage üElectric Vehicle Chargers • Black Start and Energy Security

Security Suite üPhysical security üCyber security üPolicy, procedures, standards

8

$62 Million – 4 year capital program US DOE Smart Grid Investment Grant - $20 Million

**Underlined indicates GIS related**

Page 9: Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

Utility Modernization Core Systems • Cisco powered fiber optic network – Complete 2009

• Cisco 7609 Core Switches, 10 Gbps backbone

• Garrettcom & Cisco Access Rings to all Electric Stations

• ABB City-wide wireless mesh network – Complete 2011

• Trilliant / General Electric AMI meter system – Complete 2012

• Deployment with in-house staff and temps

• Developed AMI Opt Out policy

• RF radiation, privacy, data security – extensive field testing

• Digital meter w/ no radio - $90 charge + $10/mo.

• eMeter Meter Data Management System – Phase 1&2 Complete 2012

• Integrated to Trilliant Headend, Banner CIS – Complete 2011

• Outage flags integrated to Outage Management System – Complete 2013

9

Page 10: Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

Command and Control and Security Projects

Command and Control • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch System – OATI and Schneider • Data Center upgrades – Backup Ops Center, site improvements • Distribution Management System – ADMS Deferred to 2015

Security Suite • Physical security improvements

• Perimeter fencing, lighting, cameras, access control, audio • Cyber security improvements

• Strategy, firewalls, incident and event manager, device logs, access control, network management system, controlled isolation

• 24/7 Network Operating Center (NOC) w/ security monitoring • Policy, procedures and standards

• Training, compliance with increasing regulations

10

Page 11: Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

Key Control & Information Systems

8

11

Page 12: Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

Integrated Automatic Dispatch System (ADS)

SCADA/PMS (Telvent)

GIS/OMS (Telvent) ADS/AGC

(OATI)

Wholesale & Market

Operations (OATI)

MDMS (eMeter)

CIS

Balancing Authority Trading Partners

Wholesale Markets

Fiber/wireless networks/Internet

Customer Portal

Distributed Generation Energy

Storage Demand

Response

Ice Bear TES units

Building Mgmt

System

12

Page 13: Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

Station and Distribution Automation

• Power Flow Model – SynerGEE model of GIS data; Models 69 KV to Meters • Digital Relays / Feeder Auto Reclosers – SEL 751 for all feeders adding

breaker autoreclosing • Station Automation projects

• Load Tap Changer and Voltage Regulator controls • Relays • Digital Fault Locator data management • Upgraded battery systems

• Feeder Automation projects • Remote line sensing equipment • Automatic switching equipment (later)

13

Page 14: Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

Customer Smart Choice Programs • O Power Energy Usage Reports – All 45,000 residential customers • O Power Customer Web Portal – Displays day after data • Ceiva In-home Frame / Display Demo • Demand Response for top 25 Commercial Customers • Programmable Thermostat Demo with Nest and GWP • Time of Use Rates

• Commercial > 250 KW; and EV Owners • Future roll out of TOU rate plans

14

Page 15: Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

Sample Program Benefits

15

1. Call Center troubleshooting customer problems w/ AMI data

2. 34,107 Remote service connects/disconnects in FY2012/13; Reduced staffing and fleet costs, improved customer service

3. ONE Burbank Program promotes Economic Development while providing $3 M per year in revenues, essentially paying for modernization program.

4. Digital relays improve reliability; Reduced outage durations

5. AMI voltage data used for system planning, optimizing grid operations, resolving voltage problems

6. Water leak detection with AMI data.

Page 16: Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

Lessons Learned ó All assets in GIS early to support multiple applications ó Communications and networks are foundation: Plan to

support wide range of applications/systems: Fiber optics are future proof

ó Virtual Machine Servers and Enterprise Service Bus early to support system deployments

ó Leverage investments for new revenue opportunities: Fiber Optics

ó Plan AMI customer engagement and opt out early ó Provide staff or contract support for integration ó Benefits developed through system integration and

work process re engineering

16

Page 17: Geographical Information Systems and Utility Modernization · • SCADA version upgrade – Schneider OASYS • RTU upgrades – Schneider w/ encryption • Integrated Automatic Dispatch

Thank you. Bruce Hamer Smart Grid Program Manager Burbank Water and Power [email protected]